A multi-agent task allocation and path planning method in industrial environments

By combining the Hungarian algorithm and the rolling field of view window with the MLA* algorithm, multi-agent task allocation and path planning are optimized, and agent resources and conflict factors are taken into consideration to solve the problems of high cost and poor scalability caused by a single factor in the existing algorithm, and achieve More efficient task allocation and path planning.

CN118625817BActive Publication Date: 2024-10-18CHENGDU UNIV OF INFORMATION TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411110249.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-10-18
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

Existing multi-agent task allocation and path planning algorithms mainly consider distance factors and ignore the resource constraints and conflict factors of agents, resulting in unreasonable task allocation, high cost and poor scalability, especially when there are a large number of agents and tasks. .

Method used

The Hungarian algorithm is used in combination with the rolling window of view and the MLA* algorithm. Through the task redistribution strategy and the cycle detection task optimization allocation strategy, the task allocation plan is optimized by considering distance, resource constraints and conflict factors, and the agent volume factor is considered in the path planning. Improve search speed and scalability.

Benefits of technology

It effectively reduces path costs, improves task completion efficiency and algorithm scalability, and can handle a large number of agents and tasks, ensuring the work efficiency of agents and avoiding energy exhaustion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118625817B_ABST
    Figure CN118625817B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of intelligent agent technology, and specifically discloses a multi-agent task allocation and path planning method in an industrial environment, comprising the following steps: initializing the time step, based on TAPF The problem and the Hungarian algorithm are used to obtain the initial task allocation plan; the Hungarian algorithm is optimized according to the task reallocation strategy and the periodic detection task optimization allocation strategy to obtain a new task allocation plan; according to the new task allocation plan, the task target point is obtained and combined with the field of view rolling window and MLA * The present invention solves the problems of the existing algorithm for task allocation, such as single consideration of factors and unreasonable task allocation leading to high cost, and the problem of poor algorithm scalability due to excessive search overhead for path planning, and reduces the path cost, which can cope with the situation of a large number of intelligent agents and tasks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of intelligent agent technology, and specifically relates to the design of a multi-agent task allocation and path planning method in an industrial environment. Background Art

[0002] Existing multi-agent task allocation and path planning usually only consider the distance factor and do not consider the impact of conflict factors by default, but do not fully consider the agent's own resource limitations, which leads to unreasonable task allocation; the agent is regarded as a particle and its size is ignored. In complex and narrow scenes, the size of the agent may directly affect the work efficiency; it is only suitable for situations where the number of agents and tasks is small.

[0003] Existing CBS-TA Algorithms, in path planning algorithms CBS Based on the task allocation algorithm, the task allocation scheme is updated through the root node of the binary tree. However, the algorithm sacrifices its scalability to ensure the quality of the solution. It is only suitable for use in smaller cases, and task allocation is based only on the single factor of distance cost. CBS-TA The basis of ITA-CBS The algorithm is mainly used to solve the problem of a large number of repeated conflicts caused by task allocation. CBS-TA The multiple search trees generated during task allocation are changed to only one search tree, which increases the search speed. However, this paper still only considers the distance factor as the task allocation criterion and does not consider the impact of conflict factors by default. MS * algorithm, which transforms the task allocation problem into a multi-traveling salesman problem and uses a heuristic strategy to obtain the task sequence. M* The improved algorithm is used for path search and is called the optimal algorithm. MS * The algorithm's task allocation only considers distance as a factor, and the algorithm's scalability is too poor. When the number of agents exceeds 10, the success rate will drop significantly. To solve this problem, a CBSS Algorithm. MS *algorithm, CBSS The success rate of the algorithm has been significantly improved, however, the scalability of the algorithm is still limited and it still relies only on the single factor of distance for task allocation. Summary of the invention

[0004] The purpose of this invention is to solve the problems of existing algorithms for task allocation due to single consideration factors and unreasonable task allocation resulting in excessively high costs, and for path planning search overhead resulting in poor algorithm scalability. A multi-agent task allocation and path planning method in an industrial environment is proposed.

[0005] The technical solution of the present invention is: a multi-agent task allocation and path planning method in an industrial environment, comprising the following steps:

[0006] S1. Initialize the time step and obtain the initial task allocation scheme based on the multi-agent task allocation and path planning problem and the Hungarian algorithm;

[0007] S2. Optimize the Hungarian algorithm according to the task reallocation strategy and the cycle detection task optimization allocation strategy to obtain a new task allocation scheme;

[0008] S3. According to the new task allocation plan, the task target point is obtained and combined with the field of view rolling window and MLA * Algorithm for path planning.

[0009] The beneficial effects of the present invention are:

[0010] In view of the special industrial environment, the present invention considers the distance factor, the self-resource limitation (maximum number of executed tasks, maximum driving distance) and the conflict factor in task allocation, and proposes a task redistribution strategy and a periodic detection task optimization allocation strategy to reduce the path cost. In path planning, the volume factor of the intelligent agent is considered, and the path search speed is improved, so that it can cope with the situation of a large number of intelligent agents and tasks, and improves the scalability of the algorithm.

[0011] Preferably, the step S2 specifically comprises the following steps:

[0012] S21. Select an agent that satisfies the constraints;

[0013] S22. Detect whether there is an agent that has reached the task target point. If there is an agent that has reached the task target point, trigger the task reallocation strategy to reallocate tasks and execute step S23. If there is no agent, execute step S23.

[0014] S23. Calculate the distance cost value from the agent to each task point ;

[0015] S24. Every cycle time , triggering the periodic detection task optimization allocation strategy to perform task optimization allocation and execute step S25;

[0016] S25. Based on distance cost value Constructing the cost matrix ;

[0017] S26. Calculate the current cost matrix The corresponding total cost value, for the cost matrix Perform matrix transformation to obtain the cost matrix with the minimum total cost value;

[0018] S27. Obtain a new task allocation plan based on the cost matrix with the minimum total cost value to achieve task allocation.

[0019] The beneficial effects of the above preferred solution are:

[0020] A task reallocation optimization strategy and a periodic detection task optimization allocation strategy were designed to optimize the allocation plan, reduce the path cost, and improve the task completion efficiency.

[0021] Preferably, the constraint condition in step S21 is expressed as follows:

[0022]

[0023] in, Represents a single agent The complete path collection of ; Representing a collection The cardinality of Indicates the maximum driving distance of the agent; Represents the number of all agents; Representing an Agent Whether to execute the task ; Indicates an agent; Indicates the Task; Indicates the number of all tasks that need to be executed; Indicates the maximum number of tasks that the agent can execute.

[0024] The beneficial effects of the above preferred solution are:

[0025] Through the constraints of maximum driving distance and maximum number of executed tasks, the action range of the agent is limited, which avoids the exhaustion of energy of the agent. At the same time, the work efficiency of each agent is ensured to prevent the agent from being overloaded.

[0026] As a preferred embodiment, the task reallocation strategy in step S22 is as follows: the task completed by the current agent is removed from the total task set. , clear all tasks currently executed by the agent, and use the position of the agent at the current time step as the new starting point.

[0027] The beneficial effects of the above preferred solution are:

[0028] The task reallocation strategy can cope with real industrial scenarios, effectively reduce the path cost of intelligent delivery, make each delivery the best choice at the moment, and improve work efficiency.

[0029] As a preference, the distance cost value from the agent to each task point in step S23 is The calculation formula is:

[0030]

[0031] in, express A * algorithm; is a vertex set The vertices in represent the locations where the agents exist; Represents a set of vertices The number of vertices in .

[0032] As a preferred embodiment, the periodic detection task optimization allocation strategy in step S24 is specifically as follows: according to the path of the agent in the future, the distance cost of executing the current task is obtained; the distance cost of executing the current task is compared with the distance cost value Compare them. If they are the same, it means there is no conflicting agent, and execute step S25; if they are not the same, it means there is a conflicting agent, and add the conflicting agent to the agent set. , and change the distance cost value , clear the agent set The task currently being performed by the agent in the program and execute step S25.

[0033] The beneficial effects of the above preferred solution are:

[0034] Through the periodic detection task optimization allocation strategy, the problem of increased path cost caused by ignoring conflict factors in task allocation is solved, which can effectively reduce the task allocation cost.

[0035] Preferably, the calculation formula of the cost matrix with the minimum total cost value in step S26 is:

[0036]

[0037] in, , represents a set of vertices, represents a vertex in a vertex set, represents a discrete time step, In discrete time steps Time Agent location, Represents a single agent The full path of Representing a collection The cardinality of Indicates an agent; Represents the number of all agents.

[0038] As a preference, the field of view scrolling window in step S3 is specifically: presetting the conflict detection window and re-planning window ,Require ; Each time a path is searched, only the conflict detection window is resolved Conflicts within a time step; every replanning window time, i.e., each time the agent plans to move only The path of the time step.

[0039] The beneficial effects of the above preferred solution are:

[0040] By introducing the field of view scrolling window, the number of conflicts resolved in each path search is greatly reduced, which reduces the overall time cost of path search.

[0041] Preferably, the step S3 specifically comprises the following steps:

[0042] S31. Obtain the initial position and task target position of each agent;

[0043] S32. Initialize the root node of the binary tree, using MLA * The algorithm generates an initial path for each agent;

[0044] S33. Use the matrix representation method to perform conflict detection on the generated path, record the conflicts generated, calculate the current total path cost, and add the root node to OPEN gather;

[0045] S34. Judgment OPEN Is the set empty? If not, select the node with the smallest total path cost. , and execute step S35, if yes, it means the search fails and the process ends;

[0046] S35. Judgment Node The path collection in the conflict detection window Is there a conflict within the time step? If so, set the node is the parent node, and step S36 is executed. If there is no conflict, it means that the path planning is successful, and node is the target node, and the target node is obtained The path collection in, the process ends;

[0047] S36. According to the parent node Generate child nodes and child nodes , for child nodes and child nodes Add conflict constraints and use MLA * The algorithm regenerates the path and uses the matrix representation method to detect conflicts on the newly generated path, record the conflicts generated, calculate the current total path cost, and and child nodes join in OPEN Collect and return to step S34.

[0048] The beneficial effects of the above preferred solution are:

[0049] In order to address the problems of poor algorithm scalability due to excessive path planning search overhead and ignoring the size of the agent itself, the impact of the agent's volume factor is specially considered in the entire path planning process. A field of view scrolling window is introduced to improve the path search efficiency, enabling it to handle a large number of agents and tasks, and expanding the scope of application of the algorithm.

[0050] Preferably, the matrix representation method in step S33 is specifically as follows: each intelligent agent is represented by a circumscribed circle to obtain the spatial area occupied by each intelligent agent; a two-dimensional matrix is ​​used to represent the spatial area occupied by each intelligent agent, the square value occupied by the intelligent agent is 1, and the unoccupied square value is 0; it is determined whether there are identical vertices in the area represented by the two-dimensional matrix. If there are no identical vertices, it indicates that there is no conflict between the intelligent agents. If there are identical vertices, it indicates that there is a conflict between the intelligent agents. The positions in the two-dimensional matrix corresponding to the vertices are added, and the obtained value indicates the number of intelligent agents that have conflicted at that position.

[0051] The beneficial effects of the above preferred solution are:

[0052] Through the matrix representation method, the actual volume of the agent is taken into account, thus effectively solving the conflict detection problem with volumetric agents. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 Shown is a flow chart of a multi-agent task allocation and path planning method in an industrial environment. DETAILED DESCRIPTION

[0054] Now, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the embodiments shown and described in the accompanying drawings are only exemplary and are intended to explain the principles and spirit of the present invention, rather than to limit the scope of the present invention.

[0055] like Figure 1 As shown, a multi-agent task allocation and path planning method in an industrial environment includes the following steps:

[0056] S1. Initialize the time step, based on multi-agent task allocation and path planning ( TAPF ) problem and Hungarian algorithm to obtain the initial task allocation plan;

[0057] S2. Optimize the Hungarian algorithm according to the task reallocation strategy and the cycle detection task optimization allocation strategy to obtain a new task allocation scheme;

[0058] S3. According to the new task allocation plan, the task target point is obtained and combined with the field of view rolling window and MLA * Algorithm for path planning.

[0059] In this embodiment, step S2 specifically includes the following steps:

[0060] S21. Select an agent that satisfies the constraints;

[0061] S22. Detect whether there is an agent that has reached the task target point. If there is an agent that has reached the task target point, trigger the task reallocation strategy to reallocate tasks and execute step S23. If there is no agent, execute step S23.

[0062] S23. Calculate the distance cost value from the agent to each task point ;

[0063] S24. Every cycle time , triggering the periodic detection task optimization allocation strategy to perform task optimization allocation and execute step S25;

[0064] S25. Based on distance cost value Constructing the cost matrix ;

[0065] S26. Calculate the current cost matrix The corresponding total cost value, for the cost matrix Perform matrix transformation to obtain the cost matrix with the minimum total cost value;

[0066] S27. Obtain a new task allocation plan based on the cost matrix with the minimum total cost value to achieve task allocation.

[0067] In this embodiment, the formula of the constraint condition in step S21 is:

[0068]

[0069] in, Represents a single agent The complete path collection of ; Representing a collection The cardinality of represents the maximum driving distance of the agent; Represents the number of all agents; Representing an Agent Whether to execute the task ; Indicates an agent; Indicates the Task; Indicates the number of all tasks that need to be executed; Indicates the maximum number of tasks that the agent can execute.

[0070] In this embodiment, the task reallocation strategy in step S22 is specifically: the task completed by the current agent is removed from the total task set. , clear all tasks currently executed by the agent, and use the position of the agent at the current time step as the new starting point.

[0071] In this embodiment, the distance cost value from the agent to each task point in step S23 is The calculation formula is:

[0072]

[0073] in, express A * algorithm; is a vertex set The vertices in represent the locations where the agents exist; Represents a set of vertices The number of vertices in .

[0074] In this embodiment, the periodic detection task optimization allocation strategy described in step S24 is specifically as follows: according to the path of the agent in the future, the distance cost of executing the current task is obtained; the distance cost of executing the current task is compared with the distance cost value. Compare them. If they are the same, it means there is no conflicting agent, and execute step S25; if they are not the same, it means there is a conflicting agent, and add the conflicting agent to the agent set. , and change the distance cost value , clear the agent set The task currently being performed by the agent in the program and execute step S25.

[0075] In this embodiment, the calculation formula of the cost matrix with the minimum total cost value described in step S26 is:

[0076]

[0077] in, , represents a set of vertices, represents a vertex in the vertex set, represents a discrete time step, In discrete time steps Time Agent location, Represents a single agent The full path of Representing a collection The cardinality of Indicates an agent; Represents the number of all agents.

[0078] In this embodiment, the field of view scrolling window in step S3 is specifically: a conflict detection window is pre-set and re-planning window ,Require ; Each time the path is searched, only the fixed window length is solved Conflict within, window Conflicts other than these are not resolved; every window length time to re-plan the path, that is, each time the agent only moves The path of the time step.

[0079] In this embodiment, step S3 specifically includes the following steps:

[0080] S31. Obtain the initial position and task target position of each agent;

[0081] S32. Initialize the root node of the binary tree, using MLA * The algorithm generates an initial path for each agent;

[0082] S33. Use the matrix representation method to perform conflict detection on the generated path, record the conflicts generated, calculate the current total path cost, and add the root node to OPEN gather;

[0083] S34. Judgment OPEN Is the set empty? If not, select the node with the smallest total path cost. , and execute step S35, if yes, it means the search fails and the process ends;

[0084] S35. Judgment Node The path collection in the conflict detection window Is there a conflict within the time step? If so, set the node is the parent node, and step S36 is executed. If there is no conflict, it means that the path planning is successful, and node is the target node, and the target node is obtained The path collection in, the process ends;

[0085] S36. According to the parent node Generate child nodes and child nodes , for child nodes and child nodes Add conflict constraints and use MLA * The algorithm regenerates the path and uses the matrix representation method to detect conflicts on the newly generated path, record the conflicts generated, calculate the current total path cost, and and child nodes join in OPEN Collect and return to step S34.

[0086] In this embodiment, the matrix representation method described in step S33 is specifically as follows: each intelligent agent is represented by a circumscribed circle to obtain the spatial area occupied by each intelligent agent; a two-dimensional matrix is ​​used to represent the spatial area occupied by each intelligent agent, and the value of the square occupied by the intelligent agent is 1, and the value of the unoccupied square is 0; it is determined whether there are identical vertices in the area represented by the two-dimensional matrix. If there are no identical vertices, it indicates that there is no conflict between the intelligent agents. If there are identical vertices, it indicates that there is a conflict between the intelligent agents. The positions corresponding to the vertices in the two-dimensional matrix are added, and the obtained value indicates the number of intelligent agents that have conflicted at that position.

[0087] TAPF The problem is a collection of agents With an undirected graph Composition, vertex set Represents the possible locations of the agent, a set of vertices The element positions in are all vectors, and the edge sets Represents a path that the agent can walk, where any edge All of them are composed of vertex sets The line connecting the two vertices in . Representation and Agents For example, with In discrete time steps Time Agent The position of each agent There is an initial position At each time step In the intelligent You can choose to Waiting in place or moving along the edge to an adjacent location, but whether waiting or moving, it will cost a time step. In addition, there is a task set , each agent Can be assigned to perform any task , and the agent There can be multiple tasks to be executed.

[0088] The path generated by path planning is a series of positions associated with time. Represents a single agent The full path of ,gather Each element in is represented by the time step And the corresponding position constitute, The size of increases with the growth of , and the path set of all agents called TAPF The set of path solutions to the problem. TAPF The goal is to find a set of conflict-free solutions , and minimize the path set cost.

[0089] The path planning in this embodiment is ECBS Algorithm-based, ECBS The algorithm is a hierarchical two-layer algorithm, divided into a high-level and a low-level. The role of the high-level is to search for conflicts between paths, resolve conflicts and add constraints. The role of the low-level is to re-plan the path according to the constraints generated by the high-level, and finally find a conflict-free path. The entire path search process is implemented through a binary tree with constraints. Each node in the tree contains information such as the current path solution set, the constraint set, and the total path cost value. Each constraint in the constraint set belongs to an agent. The root node constraint of the binary tree is empty. When generating a new child node, each node will inherit the constraint set of the parent node and add new constraints for the relevant agent. The low-level will re-plan the path according to the constraint set related to the current agent. The constraints will be met when planning the path, and the influence of other agents will be ignored during the path search process. Finally, a node without conflict is found in the binary tree. The path in this node is the final result. This node is called the target node.

[0090] In this embodiment, a rolling window of vision is used. The agent may reach the task target point within a certain time window. In order to ensure that the agent has enough tasks to execute within the time window, it may be necessary to plan multiple tasks for the agent at one time. ECBS The algorithm can only handle the limitation of a single starting point and a single target point. MLA* algorithm as its low-level algorithm. MLA * The algorithm achieves continuous access to multiple task target points by adding a label to each task target. MLA * When the algorithm performs path search, it mainly selects path nodes based on the cost value of the search node. MLA * The search node in the algorithm is the structure used to search for a single agent path. The search node contains the position corresponding to the current search node. , the actual cost from the starting point to the current node , the estimated cost from the current node to the target node , the comprehensive cost value of the current node ( ), as well as the parent node of the current search node, which is used to trace back the path to obtain complete path information. Due to the addition of multiple targets, the total cost value corresponding to the search node needs to be changed to a certain extent, mainly changing .exist MLA * In the algorithm, It should contain the cost values ​​of all currently unfinished tasks. Assume that the search node Meso-agent The actual location is , which still exists Task sequence to be completed , now search for node The corresponding estimated cost It is expressed as follows:

[0091]

[0092] in Representing an Agent From Location To the first mission objective The estimated cost of Representing an Agent The estimated cost between reaching the target point of the subsequent task.

[0093] Those skilled in the art will appreciate that the embodiments described herein are intended to help readers understand the principles of the present invention, and should be understood that the protection scope of the present invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific variations and combinations that do not deviate from the essence of the present invention based on the technical revelations disclosed by the present invention, and these variations and combinations are still within the protection scope of the present invention.

Claims

1. A multi-agent task allocation and path planning method in an industrial environment, characterized in that: It is characterized by comprising the following steps: S1. Initialize the time step and obtain the initial task allocation scheme based on the multi-agent task allocation and path planning problem and the Hungarian algorithm; S2. The Hungarian algorithm is optimized according to the task reallocation strategy and the period detection task optimization allocation strategy to obtain a new task allocation scheme, which specifically includes the following steps: S21. Select an agent that satisfies the constraints; S22. Detect whether there is an agent that has reached the task target point. If there is an agent that has reached the task target point, trigger the task reallocation strategy to reallocate tasks and execute step S23. If there is no agent, execute step S23. S23. Calculate the distance cost value from the agent to each task point ; S24. Every cycle time , triggering the periodic detection task optimization allocation strategy to perform task optimization allocation and execute step S25; S25. Based on distance cost value Constructing the cost matrix ; S26. Calculate the current cost matrix The corresponding total cost value, for the cost matrix Perform matrix transformation to obtain the cost matrix with the minimum total cost value; S27. Obtain a new task allocation scheme based on the cost matrix with the minimum total cost value to achieve task allocation; S3. According to the new task allocation plan, the task target point is obtained and combined with the field of view rolling window and MLA * Algorithms for path planning; The visual field scrolling window is specifically: a pre-set conflict detection window and re-planning window ,Require ; Each time a path is searched, only the conflict detection window is resolved Conflicts within a time step; every replanning window time, i.e., each time the agent plans to move only The path of the time step; The step S3 specifically includes the following sub-steps: S31. Obtain the initial position and task target position of each agent; S32. Initialize the root node of the binary tree, using MLA * The algorithm generates an initial path for each agent; S33. Use the matrix representation method to perform conflict detection on the generated path, record the conflicts generated, calculate the current total path cost, and add the root node to OPEN gather; S34. Judgment OPEN Is the set empty? If not, select the node with the smallest total path cost. , and execute step S35, if yes, it means the search fails and the process ends; S35. Judgment Node The path collection in the conflict detection window Is there a conflict within the time step? If so, set the node is the parent node, and step S36 is executed. If there is no conflict, it means that the path planning is successful, and node is the target node, and the target node is obtained The path collection in, the process ends; S36. According to the parent node Generate child nodes and child nodes , for child nodes and child nodes Add conflict constraints and use MLA * The algorithm regenerates the path and uses the matrix representation method to detect conflicts on the newly generated path, record the conflicts generated, calculate the current total path cost, and and child nodes join in OPEN Collect and return to step S34.

2. The multi-agent task allocation and path planning method in an industrial environment according to claim 1 is characterized in that: The formula of the constraint condition in step S21 is: in, Represents a single agent The complete path collection of ; Representing a collection The cardinality of represents the maximum driving distance of the agent; Represents the number of all agents; Representing an Agent Whether to execute the task ; Indicates an agent; Indicates the Task; Indicates the number of all tasks that need to be executed; Indicates the maximum number of tasks that the agent can execute.

3. The multi-agent task allocation and path planning method in an industrial environment according to claim 1 is characterized in that: The task redistribution strategy in step S22 is specifically: the task completed by the current agent is removed from the total task set , clear all tasks currently executed by the agent, and use the position of the agent at the current time step as the new starting point.

4. The multi-agent task allocation and path planning method in an industrial environment according to claim 1, characterized in that: The distance cost value from the agent to each task point in step S23 The calculation formula is: in, express A * algorithm; is a vertex set The vertices in represent the locations where the agents exist; Represents a set of vertices The number of vertices in .

5. The multi-agent task allocation and path planning method in an industrial environment according to claim 1, characterized in that: The optimization allocation strategy of the periodic detection task in step S24 is specifically as follows: according to the path of the agent in the future, the distance cost of executing the current task is obtained; the distance cost of executing the current task is compared with the distance cost value Compare them. If they are the same, it means there is no conflicting agent, and execute step S25; if they are not the same, it means there is a conflicting agent, and add the conflicting agent to the agent set. , and change the distance cost value , clear the agent set The task currently being performed by the agent in the program and execute step S25.

6. The multi-agent task allocation and path planning method in an industrial environment according to claim 1, characterized in that: The calculation formula of the cost matrix with the minimum total cost value described in step S26 is: in, , represents a set of vertices, represents a vertex in the vertex set, represents a discrete time step, In discrete time steps Time Agent location, Represents a single agent The full path of Representing a collection The cardinality of Indicates an agent; Represents the number of all agents.

7. The multi-agent task allocation and path planning method in an industrial environment according to claim 1, characterized in that: The matrix representation method described in step S33 is specifically as follows: each intelligent agent is represented by a circumscribed circle to obtain the spatial area occupied by each intelligent agent; a two-dimensional matrix is ​​used to represent the spatial area occupied by each intelligent agent, the square value occupied by the intelligent agent is 1, and the unoccupied square value is 0; it is determined whether there are identical vertices in the area represented by the two-dimensional matrix. If there are no identical vertices, it indicates that there is no conflict between the intelligent agents. If there are identical vertices, it indicates that there is a conflict between the intelligent agents. The positions corresponding to the vertices in the two-dimensional matrix are added, and the obtained value indicates the number of intelligent agents that have conflicted at that position.

Citation Information

Patent Citations

  • Multi-unmanned plane formation flight path planning method based on hungarian algorithm

    CN108733074A

  • The invention discloses a mMulti-robot task allocation method combining pre-allocation with a Hungarian algorithm

    CN109615188A