Methods, devices, computer equipment, readable storage media, and program products for assessing the maturity of digital twin models for substation engineering.

By detecting the standardization, connectivity and intuitiveness of the digital twin model of substation engineering, combined with quantitative and qualitative detection, the problem of inaccurate maturity detection in the existing technology is solved, and multi-dimensional accurate maturity evaluation is achieved, which improves the fortune. Dimensional efficiency and decision quality.

CN118627756BActive Publication Date: 2024-12-06南方电网能源发展研究院有限责任公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411081739.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-12-06
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

It is difficult for the prior art to accurately detect the maturity of the digital twin model of substation engineering, which affects its usage effect and operation and maintenance efficiency.

Method used

By obtaining the standardization degree, connectivity degree and intuitive information of the digital twin model of the substation engineering, combining multi-dimensional quantitative and qualitative detection, the quantitative detection results of its maturity are determined, and accurate maturity detection is finally achieved.

Benefits of technology

It improves the accuracy and reliability of the maturity detection of the digital twin model of substation engineering, quantifies the performance of the model in multiple dimensions, and improves the operation and maintenance efficiency and decision-making quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118627756B_ABST
    Figure CN118627756B_ABST
Patent Text Reader

Abstract

The present application relates to a method, device, computer equipment, computer-readable storage medium and computer program product for detecting the maturity of a digital twin model of a substation project, and relates to the field of digital twin technology, which can improve the accuracy of maturity detection. The method includes: obtaining a digital twin model of a substation project whose maturity is to be detected; obtaining the degree of standardization of the data processing process of the digital twin model of the substation project, and determining the universal information of the digital twin model of the substation project according to the degree of standardization; determining the degree of connectivity between the digital twin model of the substation project and the data providing object, and determining the connectivity information of the digital twin model of the substation project according to the degree of connectivity; obtaining the intuitive information of the digital twin model of the substation project, and determining the quantitative maturity detection result corresponding to the digital twin model of the substation project according to the intuitive information, universal information and connectivity information; and determining the final maturity detection result of the digital twin model of the substation project according to the quantitative maturity detection result.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of digital twin technology, and in particular to a method, device, computer equipment, computer-readable storage medium and computer program product for detecting the maturity of a digital twin model of a substation project. Background Art

[0002] As a way to achieve information-physical integration, digital twins are an effective means to promote digital transformation and intelligent improvement, and have received widespread attention. By building a corresponding digital twin model for substation projects, the operation and maintenance efficiency of substation projects and the quality of related decisions can be significantly improved.

[0003] In related technologies, a digital twin model corresponding to the substation equipment can be constructed, and then the staff can conduct a maturity test on the digital twin model to determine the application scenarios of the digital twin model of the substation equipment in daily work based on the maturity test.

[0004] However, the above method mainly relies on staff to determine the evaluation results based on the use effect of the digital twin model of the substation project. It is difficult to accurately detect the maturity of the digital twin model of the substation project, which affects the detection accuracy and limits the use of the digital twin model of the substation equipment. Summary of the invention

[0005] Based on this, it is necessary to provide a maturity detection method, device, computer equipment, computer-readable storage medium and computer program product for a digital twin model of a substation project, which can improve the accuracy of maturity detection results, in response to the above technical problems.

[0006] In a first aspect, the present application provides a method for detecting the maturity of a digital twin model of a substation project, comprising:

[0007] Obtain the digital twin model of the substation project to be tested for maturity;

[0008] Obtaining a degree of standardization corresponding to a data processing process of the digital twin model of the power substation engineering, and determining universal information of the digital twin model of the power substation engineering according to the degree of standardization;

[0009] Determine the degree of connectivity between the digital twin model of the substation engineering project and the data providing object, and determine connectivity information of the digital twin model of the substation engineering project according to the degree of connectivity;

[0010] Obtaining intuitive information of the digital twin model of the substation engineering project, and determining a quantitative maturity detection result corresponding to the digital twin model of the substation engineering project according to the intuitive information, the universal information and the connectivity information;

[0011] According to the quantitative maturity test result, the final maturity test result corresponding to the digital twin model of the substation project is determined.

[0012] In a second aspect, the present application also provides a maturity detection device for a digital twin model of a substation engineering, comprising:

[0013] Model acquisition module, used to obtain the digital twin model of the substation project whose maturity is to be tested;

[0014] A universality quantification module is used to obtain the degree of standardization corresponding to the data processing process of the digital twin model of the substation engineering, and determine the universality information of the digital twin model of the substation engineering according to the degree of standardization;

[0015] A connectivity quantification module is used to determine the degree of connectivity between the digital twin model of the substation engineering and the data providing object, and determine the connectivity information of the digital twin model of the substation engineering according to the degree of connectivity;

[0016] A quantitative detection result acquisition module, used to obtain intuitive information of the digital twin model of the substation engineering, and determine the maturity quantitative detection result corresponding to the digital twin model of the substation engineering according to the intuitive information, the universal information and the connectivity information;

[0017] The maturity determination module is used to determine the final maturity detection result corresponding to the digital twin model of the substation project according to the quantitative maturity detection result.

[0018] In a third aspect, the present application also provides a computer device including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of the maturity detection method of the digital twin model of a substation project described in any one of the above items are implemented.

[0019] In a fourth aspect, the present application also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the maturity detection method of the digital twin model of a substation project described in any one of the above items are implemented.

[0020] In a fifth aspect, the present application also provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the maturity detection method of the digital twin model of a substation project as described in any of the above items.

[0021] The above-mentioned method, device, computer equipment, computer-readable storage medium and computer program product for detecting the maturity of the digital twin model of the substation project can obtain the digital twin model of the substation project whose maturity is to be detected, obtain the degree of standardization corresponding to the data processing process of the digital twin model of the substation project, determine the universality information of the digital twin model of the substation project according to the degree of standardization, determine the degree of connectivity between the digital twin model of the substation project and the data providing object, determine the connectivity information of the digital twin model of the substation project according to the degree of connectivity, obtain the intuitiveness information of the digital twin model of the substation project, determine the quantitative detection result of the maturity corresponding to the digital twin model of the substation project according to the intuitiveness information, universality information and connectivity information, and determine the final detection result of the maturity corresponding to the digital twin model of the substation project according to the quantitative detection result of the maturity. In this embodiment, by according to the degree of standardization corresponding to the data processing process of the digital twin model of the substation project, the degree of connectivity with the data provider and the intuitive information of the digital twin model of the substation project, it is possible to accurately quantify the maturity of the digital twin model of the substation project in multiple dimensions based on the performance of multiple links of the digital twin model of the substation project, thereby effectively improving the maturity detection accuracy of the digital twin model of the substation project. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 The present invention is a flowchart of a maturity detection method of a digital twin model of a substation project in an embodiment;

[0024] Figure 2 A schematic flow chart of a step of obtaining a final maturity test result in one embodiment;

[0025] Figure 3 A schematic diagram of a detection element framework for a maturity qualitative analysis in an embodiment;

[0026] Figure 4 A schematic diagram of a detection element framework for maturity quantitative analysis in one embodiment;

[0027] Figure 5 It is a structural block diagram of a maturity detection device for a digital twin model of a substation project in an embodiment;

[0028] Figure 6 The figure is a diagram of the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0030] In one embodiment, Figure 1 As shown, a method for detecting the maturity of a digital twin model of a substation engineering is provided. This embodiment uses the method applied to a terminal as an example. It can be understood that the method can also be applied to a server, and can also be applied to a system including a terminal and a server, and is implemented through the interaction between the terminal and the server. In this embodiment, the method includes the following steps:

[0031] S101, obtaining a digital twin model of a substation project whose maturity is to be tested.

[0032] The digital twin model of the substation engineering project can be evaluated by the maturity of the model. At different maturity levels, the digital twin model of the substation engineering project can achieve different functions. For example, when the maturity of the digital twin model is at the lowest level, the digital twin model of the substation engineering project is mainly used to describe and characterize the physical entity. The digital twin model of the substation engineering project and the physical entity cannot achieve real-time interaction through direct data exchange, and mainly rely on human intervention to achieve indirect virtual-real interaction; when the maturity of the digital twin model of the substation engineering project is at the highest level, the physical entity and its digital copy in the digital twin model of the substation engineering project can achieve seamless synchronization and adaptive update throughout the life cycle. At this stage, the digital twin model and the physical entity can not only achieve long-term synchronous operation, but also achieve true autonomous twins through dynamic self-update and reconstruction throughout the life cycle.

[0033] S102, obtaining the degree of standardization corresponding to the data processing process of the digital twin model of the substation project, and determining the universal information of the digital twin model of the substation project according to the degree of standardization.

[0034] Among them, the data processing process of the digital twin model of the substation project can include the processing of any one or more links from data input to data output.

[0035] In practical applications, the degree of standardization corresponding to the data processing process of the digital twin model of the substation project can be determined. The higher the degree of standardization, the lower the difficulty of docking the digital twin model of the substation project with other information. Based on this, after obtaining the degree of standardization corresponding to the data processing process of the digital twin model of the substation project, the universality information of the digital twin model of the substation project can be determined according to the degree of standardization. Among them, the universality information can characterize the universality of the digital twin model of the substation project, and the universality information can be a qualitative result.

[0036] S103, determining the degree of connectivity between the digital twin model of the substation project and the data providing object, and determining the connectivity information of the digital twin model of the substation project according to the degree of connectivity.

[0037] Among them, the data providing object may be one or more objects that can provide input data to the digital twin model of the substation project. In some examples, the data providing object may include at least one of the following: a physical entity, other digital twin models, and actual electrical equipment in a real substation project.

[0038] It can be understood that the higher the degree of connectivity between the digital twin model of the substation engineering and the data provider, the easier it is for the digital twin model of the substation engineering to obtain data input, and the higher the degree of connectivity with the outside world. In this regard, in this step, the degree of connectivity between the digital twin model of the substation engineering and the data provider can be determined, and the connectivity information of the digital twin model of the substation engineering can be determined according to the degree of connectivity, wherein the connectivity information can be a qualitative result, and the connectivity information can reflect the degree of connectivity between the digital twin model of the substation engineering and various external information.

[0039] S104, obtaining intuitive information of the digital twin model of the substation project, and determining the quantitative maturity detection result corresponding to the digital twin model of the substation project based on the intuitive information, universal information and connectivity information.

[0040] Among them, intuitive information can be information that reflects the degree of visualization or intuitiveness of the content of the digital twin model of the substation project. The intuitiveness of the digital twin model of the substation project is a key factor in quantitative evaluation. A digital twin model of the substation project with good intuitiveness can make it easier for users to understand and analyze the physical entity or system represented by the digital twin model of the substation project, thereby improving decision-making efficiency and accuracy. With the continuous improvement of the maturity of the digital twin model of the substation project, its intuitiveness will gradually increase. At a lower maturity level, the digital twin model of the substation project may only provide basic simulation and analysis functions, and its intuitiveness is relatively weak. At a higher maturity level, the digital twin model of the substation project can not only reflect the operating status and change process of the physical entity in real time, but also provide a more intuitive and vivid display effect through technical means such as three-dimensional visualization. This improvement in intuitiveness not only improves the user experience, but also enables the model to better serve the actual production and decision-making process.

[0041] After obtaining the intuitive information of the digital twin model of the substation project, the quantitative maturity detection results corresponding to the digital twin model of the substation project can be determined based on the intuitive information, universal information and connectivity information.

[0042] S105: Determine the final maturity test result corresponding to the digital twin model of the substation project based on the quantitative maturity test result.

[0043] After obtaining the quantitative maturity test results, the quantitative maturity test results can be used as the final maturity test results corresponding to the digital twin model of the substation project; alternatively, the digital twin model of the substation project can be tested through other maturity test strategies, and the final maturity test results corresponding to the digital twin model of the substation project can be determined based on the obtained test results and the quantitative maturity test results.

[0044] In the above-mentioned maturity detection method of the digital twin model of the substation engineering, the digital twin model of the substation engineering whose maturity is to be detected can be obtained, the standardization degree corresponding to the data processing process of the digital twin model of the substation engineering can be obtained, the universality information of the digital twin model of the substation engineering can be determined according to the standardization degree, the degree of connectivity between the digital twin model of the substation engineering and the data providing object can be determined, the connectivity information of the digital twin model of the substation engineering can be determined according to the connectivity degree, the intuitiveness information of the digital twin model of the substation engineering can be obtained, the quantitative maturity detection result corresponding to the digital twin model of the substation engineering can be determined according to the intuitiveness information, the universality information and the connectivity information, and the final maturity detection result corresponding to the digital twin model of the substation engineering can be determined according to the quantitative maturity detection result. In this embodiment, by determining the standardization degree corresponding to the data processing process of the digital twin model of the substation engineering, the degree of connectivity with the data providing object and the intuitiveness information of the digital twin model of the substation engineering, the maturity of the digital twin model of the substation engineering can be accurately quantified in multiple dimensions based on the performance of multiple links of the digital twin model of the substation engineering, and the maturity detection accuracy of the digital twin model of the substation engineering can be effectively improved.

[0045] In one embodiment, Figure 2 As shown in step S105, according to the quantitative maturity test result, determining the final maturity test result corresponding to the digital twin model of the substation project may include the following steps:

[0046] S201, obtaining qualitative maturity test results corresponding to the digital twin model of the substation project.

[0047] S202: Perform weighted processing on the qualitative maturity test result and the quantitative maturity test result according to their respective weights to obtain a final maturity test result corresponding to the digital twin model of the substation engineering project.

[0048] In the specific implementation, the maturity of the digital twin model of the substation engineering can be qualitatively tested to obtain the qualitative test results of maturity. Then, the weights corresponding to the qualitative test results of maturity and the quantitative test results of maturity can be determined, and then the qualitative test results of maturity and the quantitative test results of maturity can be weighted according to the weights corresponding to the qualitative test results of maturity and the quantitative test results of maturity to obtain the final test results of maturity corresponding to the digital twin model of the substation engineering.

[0049] In this embodiment, the digital twin model of the substation project can be subjected to qualitative and quantitative maturity tests respectively. On the one hand, qualitative maturity test does not require strict quantitative equations. For states or phenomena in the digital twin model of the substation project that are difficult to describe with precise numerical values, the qualitative maturity test results can flexibly describe the maturity of the digital twin model of the substation project under different characteristics. On the other hand, the quantitative maturity test results can accurately detect slight changes in the digital twin model of the substation project in specific dimensions. In this embodiment, by combining the results of qualitative maturity test and quantitative maturity test, a more comprehensive evaluation of the digital twin model of the substation project can be performed. Qualitative maturity test provides preliminary judgment and intuitive understanding, while quantitative maturity test provides precise data support. The two complement each other and jointly improve the accuracy and reliability of the final maturity test results.

[0050] In this application, on the one hand, at the qualitative detection level, the model focuses on evaluating the development stage of each dimension of the digital twin system, and by defining maturity levels and corresponding scoring criteria, the accuracy of the model at the geometric, physical, behavioral and rule levels and the quality of interaction between the model and the entity are ensured. Each evaluation factor is given a matching weight according to their influence on the substation project, reflecting their importance in practical applications. On the other hand, in the process of obtaining quantitative maturity detection, a variety of quantitative calculation formulas can be used, which not only consider the model file format, data dimensions and units, and the degree of standardization of the data interface, but also evaluate the standardization level of the model description. These calculation formulas can convert subjective judgments into objective values, and the total maturity score is calculated by accumulating the degree of standardization of the sub-model or parameter multiplied by the corresponding weight factor. In addition, the model also focuses on the intuitiveness and connectivity of the digital twin model, which are the key to understanding the model structure, operation process and its interaction with physical entities and other digital twin models.

[0051] In one embodiment, in step S201, obtaining the qualitative maturity test result corresponding to the digital twin model of the substation engineering may include the following steps:

[0052] Determine multiple maturity qualitative detection elements corresponding to the digital twin model of the substation project, and obtain the reference feature information corresponding to each qualitative detection result of each maturity qualitative detection element; for each maturity qualitative detection element, extract the model feature information associated with the maturity qualitative detection element, match the extracted model feature information with the reference feature information corresponding to each qualitative detection result of the maturity qualitative detection element, and determine the element qualitative detection result corresponding to the maturity qualitative detection element according to the matching result; determine the maturity qualitative detection result according to the qualitative detection results of each element.

[0053] In practical applications, reference feature information corresponding to each qualitative detection result can be pre-set. The reference feature information can be understood as the feature information possessed by the digital twin model of the substation project when it corresponds to a qualitative detection result.

[0054] For the digital twin model of the substation project, multiple maturity qualitative detection elements can be set. In some embodiments, Figure 3 As shown in the figure, the digital twin consists of five dimensions: physical entity, twin model, twin data, connection interaction, and functional service. When conducting qualitative testing on the digital twin model of the substation project, qualitative analysis and evaluation can be carried out from the three dimensions of twin model, twin data, and connection interaction. Figure 3 This is a qualitative analysis structure diagram of maturity assessment. For the three dimensions, this embodiment proposes different key evaluation factors (i.e., qualitative maturity detection elements), such as completeness, standardization, data interface, integrity, flexibility, richness, document compatibility, accessibility, quality, method, latency, object and scope, and connection quality. Through clear standards, qualitative analysis is carried out, and then a complete substation digital twin maturity assessment model is constructed in combination with the subsequent quantitative assessment model.

[0055] Then, the reference feature information corresponding to each qualitative detection result of each maturity qualitative detection element can be obtained. For each maturity qualitative detection element, the model feature information associated with the maturity qualitative detection element is extracted, that is, the relevant model feature information used to determine the detection result corresponding to the maturity qualitative detection element is extracted from the digital twin model of the substation engineering. Then, the extracted model feature information is matched with the reference feature information corresponding to each qualitative detection result of the maturity qualitative detection element, and the element qualitative detection result corresponding to the maturity qualitative detection element is determined according to the matching result, and then the maturity qualitative detection result can be determined according to the qualitative detection results of each element.

[0056] For example, for the digital twin model dimension, the various maturity qualitative detection elements and the reference feature information corresponding to each qualitative detection result can be shown in Table 1 below:

[0057] Table 1

[0058]

[0059] For the twin data dimension, the various maturity qualitative detection elements and the reference feature information corresponding to each qualitative detection result can be shown in Table 2 below:

[0060] Table 2

[0061]

[0062] For the connection interaction dimension, the various maturity qualitative detection elements and the reference feature information corresponding to each qualitative detection result can be shown in the following Table 3:

[0063] Table 3

[0064]

[0065] In this embodiment, by matching the extracted model feature information with the reference feature information corresponding to each qualitative detection result of the maturity qualitative detection element, and determining the element qualitative detection result corresponding to the maturity qualitative detection element according to the matching result, the qualitative detection results of each element can be obtained based on the same detection strategy. While quickly acquiring the maturity qualitative detection results, it helps to improve the accuracy and repeatability of the maturity qualitative detection results and reduce the deviation caused by different detection logic.

[0066] In one embodiment, in step S102, obtaining the standardization degree corresponding to the data processing process of the digital twin model of the substation engineering, and determining the universality information of the digital twin model of the substation engineering according to the standardization degree may include the following steps:

[0067] S1021, determining the degree of standardization of the model file format of the digital twin model of the substation engineering project according to the degree of standardization of the three-dimensional design model file format of each sub-model in the digital twin model of the substation engineering project.

[0068] In some optional embodiments, reference may be made to Figure 4 One or more elements in the maturity quantitative calculation structure diagram shown determine the maturity quantitative test results.

[0069] In a specific implementation, the digital twin model of a substation project can be composed of multiple sub-models. For example, each electrical device in a real substation project can have a corresponding sub-model. Each sub-model can have a corresponding three-dimensional design model file. In this embodiment, the degree of standardization of the three-dimensional design model file format can be determined, and the degree of standardization of the model file format of the digital twin model of the substation project can be determined based on the degree of standardization of each three-dimensional design model file format. In some embodiments, the degree of standardization of the model file format can be determined according to the following formula :

[0070]

[0071] in, is the total number of multi-dimensional sub-models included in the digital twin model of the substation project; For the The standardization degree of the 3D design model file format of each sub-model is scored by the difficulty of users understanding and using the sub-model of the substation engineering digital twin multi-dimensional sub-model. The easier it is, the higher the score. The value range is [0,1]. For digital twin multi-dimensional models that are completely incomprehensible or difficult to accept during use, .

[0072] S1022, determining the degree of standardization of the model data dimension of the digital twin model of the substation engineering project according to the degree of standardization corresponding to the units of each parameter in the digital twin model of the substation engineering project.

[0073] The digital twin model of the substation project involves multiple parameters, each of which can have a corresponding unit (or dimension). The degree of standardization of the data dimension and unit of the digital twin model of the substation project refers to the consistency and standardization level followed by various parameters and units in the process of building and maintaining the digital twin model of the substation project, including standardization of data format, measurement unit, parameter naming convention, measurement unit, and interface and communication protocol standardization. A high degree of standardization is the key to achieving effective data exchange and integration between different systems, equipment, and software.

[0074] In this step, the degree of standardization corresponding to the units of each parameter in the digital twin model of the substation engineering can be determined, and then the degree of standardization of the model data dimensions of the digital twin model of the substation engineering can be determined according to the degree of standardization corresponding to the units of each parameter. In some embodiments, the degree of standardization of the model data dimensions can be determined according to the following formula: :

[0075]

[0076] in, is the total number of parameters of the digital twin model; For the The degree of standardization of parameters and units. For parameters that conform to the International System of Units, ; For parameters that do not conform to the International System of Units, but can be used by users to convert, analyze and use them, The score is given based on the principle that the easier it is to use, the higher the score, and the value range is [0,1]. For parameters that do not conform to the International System of Units and are not conducive to user use, .

[0077] S1023, determining the degree of standardization of the model data interface of the digital twin model of the substation project according to the degree of standardization of the external data interaction interface of the digital twin model of the substation project.

[0078] The degree of standardization of the data interface of the digital twin model of the substation project refers to the consistency and standardization of the general standards and protocols followed by the data interface when building and maintaining the digital twin model. This concept emphasizes the unification and compatibility of data exchange formats, communication protocols, interface designs, and data security standards to ensure that different systems, devices, and applications can exchange data efficiently, accurately, and securely. Data interface standardization plays a vital role in the establishment and operation of digital twin models because it directly affects the integration, scalability, and maintainability of the model.

[0079] In this step, the degree of standardization of the external data interaction interface of the digital twin model of the substation engineering project can be determined, wherein the external data interaction interface is the interface for the digital twin model of the substation engineering project to interact with the outside world. Then, the degree of standardization of the model data interface of the digital twin model of the substation engineering project can be determined. In some embodiments, the degree of standardization of the model data interface can be determined according to the following formula: :

[0080]

[0081] in, The total number of parameters that the digital twin model needs to interact with the outside world for data; It is The standardization degree of the data interface corresponding to each parameter is scored according to the difficulty of users to parse and use the interface. The easier it is, the higher the branch. The value range is [0,1]. For data interfaces that cannot be parsed at all or are difficult to accept during use, .

[0082] S1024, determining the degree of standardization of the model description text of the digital twin model of the substation engineering project according to the degree of standardization corresponding to the text content of the model description text of the digital twin model of the substation engineering project.

[0083] The degree of standardization of the description of the digital twin model of the substation project refers to the extent to which unified and standardized standards or protocols are used in the description of the structure, attributes, behavior and interaction of the model when building the digital twin model. This standardization covers all components of the model, ensuring that the model can be understood, used and interacted with in a consistent manner by different systems, platforms and tools, making it easier for users to understand and use it.

[0084] In this step, the standardization degree of the text content of the model description text of the substation engineering digital twin model can be determined, and then the standardization degree of the model description text of the substation engineering digital twin model can be determined according to the standardization degree of the text content. In some embodiments, the standardization degree of the model description text can be determined according to the following formula: :

[0085]

[0086] in, Refers to the total number of annotation texts and memo materials required to properly describe and explain the content, functions, usage methods, etc. of the digital twin model; For the The degree of standardization of a model description is determined by the degree of satisfaction with the user's normative requirements for the model description. The higher the score is, the value range is [0,1]. The normative requirements for model descriptions usually include annotation format, document format, abbreviation definition, purpose description, usage description, principle description, and precautions. In particular, for the case of missing descriptions, ; For the The clarity factor of the model description.

[0087] S1025, determine the universal information of the digital twin model of the substation project according to the standardization degree of the model file format, the standardization degree of the model data dimension, the standardization degree of the model data interface and the standardization degree of the model description text.

[0088] In some embodiments, the weights corresponding to the degree of standardization of the model file format, the degree of standardization of the model data dimensions, the degree of standardization of the model data interface, and the degree of standardization of the model description text can be obtained, and the degree of standardization of the model file format, the degree of standardization of the model data dimensions, the degree of standardization of the model data interface, and the degree of standardization of the model description text are weighted and summed according to the weights to obtain the universal information of the digital twin model of the substation project.

[0089] In this embodiment, the versatility of the digital twin model of the substation engineering project can be accurately quantified in multiple dimensions based on the degree of standardization of the model file format, the degree of standardization of the model data dimension, the degree of standardization of the model data interface, and the degree of standardization of the model description text.

[0090] In one embodiment, in step S103, determining the degree of connectivity between the digital twin model of the substation engineering and the data providing object, and determining the connectivity information of the digital twin model of the substation engineering according to the degree of connectivity may include the following steps:

[0091] S1031, obtaining a first degree of interaction between the digital twin model of the substation project and multiple physical entities, and determining a first degree of connectivity of the digital twin model of the substation project according to each first degree of interaction.

[0092] The degree of connectivity between the digital twin model and the physical entity in the substation project is very critical, which determines whether the digital model can accurately reflect the state of the physical entity and respond to physical changes in real time.

[0093] In this step, the first interaction degree between the digital twin model of the substation engineering and multiple physical entities can be obtained, and the first connectivity degree of the digital twin model of the substation engineering can be determined according to each first interaction degree. In one embodiment, the first connectivity degree can be determined by the following formula: :

[0094]

[0095] in, The total number of parameters contained in the digital twin model of the substation project that need to interact with the physical entity in real time; Indicates Whether the parameter can interact with the physical entity, the value is 1 or 0; For the The real-time factor of the interaction between the parameters and the physical entity is manually scored according to the principle that the higher the real-time interaction, the higher the score, and the value range is [0,1].

[0096] S1032, obtaining a second degree of interaction between interaction parameters of the substation engineering digital twin model and other digital twin models, and determining a second degree of connectivity between the substation engineering digital twin model and other digital twin models according to each second degree of interaction.

[0097] In substation projects, the degree of connectivity between digital twin models refers to the closeness of information and data exchange between the two models, which usually involves data consistency, real-time and accuracy between models, ensuring that updates to one model can be reflected in another model.

[0098] In this step, the second degree of interaction between the interaction parameters of the substation engineering digital twin model and other digital twin models can be obtained, and the second degree of connectivity between the substation engineering digital twin model and other digital twin models can be determined according to each second degree of interaction. In one embodiment, the second degree of connectivity can be determined by the following formula: :

[0099]

[0100] in, The total number of parameters that the digital twin model needs to interact with other digital twin models; Indicates Whether the parameter can effectively interact with other digital twin models, the value is 1 or 0; For the The real-time factor of the interaction of the parameters is manually scored according to the principle that the higher the real-time interaction, the higher the score, and the value range is [0,1].

[0101] S1033, obtaining a third degree of interaction between the digital twin model of the substation project and the twin data provided by multiple actual electrical equipment, and determining a third degree of connectivity between the digital twin model of the substation project and the twin data according to the third degree of interaction.

[0102] The degree of connectivity between the digital twin model of the substation project and the twin data refers to the closeness of data exchange and synchronization between the virtual model (digital twin model) and the actual physical equipment (twin data) in the substation digital twin system.

[0103] In this step, the third degree of interaction between the digital twin model of the substation engineering and the twin data provided by multiple actual electrical devices can be obtained, and the third degree of connectivity between the digital twin model of the substation engineering and the twin data can be determined according to the third degree of interaction. In one embodiment, the second degree of connectivity can be determined by the following formula: :

[0104]

[0105]

[0106] Where: , , , Respectively indicate whether the digital twin model can access historical data, operation data, service data, and information system data, with values ​​of 1 or 0; , , , They are , , , The weight is determined according to business needs and the value range is [0,1].

[0107] S1034: Determine connectivity information of the digital twin model of the substation project according to the first connectivity level, the second connectivity level, and the third connectivity level.

[0108] In some optional embodiments, the first degree of connectivity, the second degree of connectivity, and the third degree of connectivity may be weightedly summed, and connectivity information of the digital twin model of the substation engineering may be determined based on the weighted summation result.

[0109] In this embodiment, by determining the degree of connectivity between the digital twin model of the substation project and the physical entity, the degree of connectivity with the digital twin model, and the degree of connectivity with the twin data, the connectivity of the digital twin model of the substation project with the outside world during the entire data processing process can be accurately quantified, effectively improving the accuracy of the connectivity information of the digital twin model of the substation project.

[0110] In one embodiment, in step S104, obtaining intuitive information of the digital twin model of the substation engineering may include the following steps:

[0111] Determine a first number of visualized parameters in the digital twin model of the substation project, and determine the degree of intuitiveness of the model parameters of the digital twin model of the substation project based on the first number; determine the coupling relationship between multiple sub-models and the parameter relationship between multiple parameters in the digital twin model of the substation project, and determine the degree of intuitiveness of the model structure based on a second number corresponding to the visualized coupling relationships in the multiple coupling relationships and a third number corresponding to the visualized parameter relationships in the multiple parameter relationships; determine the intuitiveness information of the digital twin model of the substation project based on the degree of intuitiveness of the model parameters and the degree of intuitiveness of the model structure.

[0112] Among them, the visualization parameters are the parameters of the digital twin model of the substation project that can be presented intuitively; the visualization coupling relationship is the coupling relationship between the multi-dimensional sub-models of the digital twin of the substation project that can be presented intuitively; the visualization parameter relationship is the correlation relationship between the parameters of the digital twin model of the substation project that can be presented intuitively.

[0113] In some optional embodiments, the intuitiveness of the model parameters can be determined according to the following formula: :

[0114]

[0115] in, is the number of parameters of the digital twin model of the substation project that can be presented intuitively (i.e., the first quantity); is the total number of parameters of the digital twin model of the substation project.

[0116] In some optional embodiments, the intuitiveness of the model structure can be determined according to the following formula: :

[0117]

[0118] in, and They are respectively the number of coupling relationships between multi-dimensional sub-models of digital twins that can be presented intuitively (i.e., the second quantity) and the number of correlation relationships between parameters of the digital twin model of the substation project (i.e., the third quantity); and They are the total number of coupling relationships between multi-dimensional sub-models of digital twins and the total number of association relationships between parameters of digital twin models, respectively.

[0119] In some optional embodiments, the intuitiveness of the model operation process may also be determined according to the following formula:

[0120]

[0121] in, Indicates whether the digital twin model can intuitively reflect the operation process of the physical entity. It is manually scored according to the principle that the higher the intuitiveness, the higher the score. The value range is .

[0122] In this embodiment, by determining the intuitiveness of the parameters of the digital twin model of the substation project and the intuitiveness of the model structure, the intuitiveness of the digital twin model of the substation project itself can be accurately quantified, thereby improving the accuracy of the intuitive information.

[0123] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0124] Based on the same inventive concept, the embodiment of the present application also provides a device for detecting the maturity of a digital twin model of a substation engineering project for realizing the above-mentioned method for detecting the maturity of a digital twin model of a substation engineering project. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above-mentioned method, so the specific limitations in one or more embodiments of the device for detecting the maturity of a digital twin model of a substation engineering project provided below can refer to the limitations of the method for detecting the maturity of a digital twin model of a substation engineering project in the above text, and will not be repeated here.

[0125] In an exemplary embodiment, Figure 5 As shown, a maturity detection device for a digital twin model of a substation engineering is provided, comprising:

[0126] The model acquisition module 501 is used to acquire the digital twin model of the substation engineering to be tested for maturity;

[0127] The universality quantification module 502 is used to obtain the standardization degree corresponding to the data processing process of the substation engineering digital twin model, and determine the universality information of the substation engineering digital twin model according to the standardization degree;

[0128] A connectivity quantification module 503 is used to determine the degree of connectivity between the digital twin model of the substation engineering and the data providing object, and determine the connectivity information of the digital twin model of the substation engineering according to the degree of connectivity;

[0129] A quantitative detection result acquisition module 504 is used to obtain intuitive information of the digital twin model of the substation engineering, and determine the maturity quantitative detection result corresponding to the digital twin model of the substation engineering according to the intuitive information, the universal information and the connectivity information;

[0130] The maturity determination module 505 is used to determine the final maturity detection result corresponding to the digital twin model of the substation project according to the quantitative maturity detection result.

[0131] In one embodiment, the maturity determination module 505 is used to:

[0132] Obtain a qualitative maturity test result corresponding to the digital twin model of the substation project; perform weighted processing on the qualitative maturity test result and the quantitative maturity test result according to their respective corresponding weights, and obtain a final maturity test result corresponding to the digital twin model of the substation project.

[0133] In one embodiment, the maturity determination module 505 is used to:

[0134] Determine multiple maturity qualitative detection elements corresponding to the digital twin model of the substation project, and obtain reference feature information corresponding to each qualitative detection result of each maturity qualitative detection element; for each maturity qualitative detection element, extract model feature information associated with the maturity qualitative detection element, match the extracted model feature information with the reference feature information corresponding to each qualitative detection result of the maturity qualitative detection element, and determine the element qualitative detection result corresponding to the maturity qualitative detection element according to the matching result; determine the maturity qualitative detection result according to each element qualitative detection result.

[0135] In one embodiment, the universality quantification module 502 is used to:

[0136] According to the standardization degree of the three-dimensional design model file format of each sub-model in the digital twin model of the substation engineering, the standardization degree of the model file format of the digital twin model of the substation engineering is determined; according to the standardization degree corresponding to the unit of each parameter in the digital twin model of the substation engineering, the standardization degree of the model data dimension of the digital twin model of the substation engineering is determined; according to the standardization degree of the external data interaction interface of the digital twin model of the substation engineering, the standardization degree of the model data interface of the digital twin model of the substation engineering is determined; according to the standardization degree corresponding to the text content of the model description text of the digital twin model of the substation engineering, the standardization degree of the model description text of the digital twin model of the substation engineering is determined; according to the standardization degree of the model file format, the model data dimension, the model data interface and the model description text, the universal information of the digital twin model of the substation engineering is determined.

[0137] In one embodiment, the connectivity quantification module 503 is used to:

[0138] Obtain a first degree of interaction between the digital twin model of the substation project and multiple physical entities, and determine a first degree of connectivity of the digital twin model of the substation project according to each of the first degrees of interaction; obtain a second degree of interaction between the digital twin model of the substation project and other digital twin models, and determine a second degree of connectivity between the digital twin model of the substation project and the other digital twin models according to each of the second degrees of interaction; obtain a third degree of interaction between the digital twin model of the substation project and twin data provided by multiple actual electrical equipment, and determine a third degree of connectivity between the digital twin model of the substation project and the twin data according to the third degree of interaction; determine the connectivity information of the digital twin model of the substation project according to the first degree of connectivity, the second degree of connectivity and the third degree of connectivity.

[0139] In one embodiment, the quantitative detection result acquisition module 504 is used to:

[0140] Determine a first number of visualized parameters in the digital twin model of the substation project, and determine the degree of intuitiveness of the model parameters of the digital twin model of the substation project based on the first number; determine the coupling relationship between multiple sub-models and the parameter relationship between multiple parameters in the digital twin model of the substation project, and determine the degree of intuitiveness of the model structure based on a second number corresponding to the visualized coupling relationships in the multiple coupling relationships and a third number corresponding to the visualized parameter relationships in the multiple parameter relationships; determine the intuitiveness information of the digital twin model of the substation project based on the degree of intuitiveness of the model parameters and the degree of intuitiveness of the model structure.

[0141] Each module in the above-mentioned maturity detection device for the digital twin model of the substation engineering can be implemented in whole or in part by software, hardware, or a combination thereof. Each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.

[0142] In an exemplary embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as shown in FIG. Figure 6 As shown. The computer device includes a processor, a memory, an input / output interface, a communication interface, a display unit and an input device. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface, the display unit and the input device are connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and the external device. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be realized through WIFI, a mobile cellular network, near field communication (NFC) or other technologies. When the computer program is executed by the processor, a maturity detection method for a digital twin model of a substation engineering is realized. The display unit of the computer device is used to form a visually visible picture, which can be a display screen, a projection device or a virtual reality imaging device. The display screen can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covering the display screen, or a button, trackball or touchpad set on the computer device shell, or an external keyboard, touchpad or mouse.

[0143] Those skilled in the art will understand that Figure 6 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0144] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.

[0145] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0146] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0147] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0148] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.

[0149] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0150] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A maturity detection method for digital twin models of substation projects. It is characterized in that The method comprises: Obtaining a digital twin model of a substation engineering project whose maturity is to be tested; the digital twin model of the substation engineering project is composed of multiple sub-models; Determine the standardization degree of the model file format of the digital twin model of the substation engineering project according to the standardization degree of the three-dimensional design model file format of each of the multiple sub-models in the digital twin model of the substation engineering project; the standardization degree of the three-dimensional design model file format is determined according to the difficulty of the user to understand and use the sub-model; Determining the degree of standardization of the model data dimension of the digital twin model of the substation engineering project according to the degree of standardization corresponding to the unit of each parameter in the digital twin model of the substation engineering project; According to the standardization degree of the external data interaction interface of the digital twin model of the substation engineering, the standardization degree of the model data interface of the digital twin model of the substation engineering is determined; the external data interaction interface is an interface for the digital twin model of the substation engineering to interact with the outside world for data; Determining the standardization degree of the model description text of the digital twin model of the substation engineering project according to the standardization degree corresponding to the text content of the model description text of the digital twin model of the substation engineering project; Determine the universality information of the digital twin model of the substation engineering according to the standardization degree of the model file format, the standardization degree of the model data dimension, the standardization degree of the model data interface and the standardization degree of the model description text; Acquire a first degree of interaction between the digital twin model of the power transformation project and a plurality of physical entities, and determine a first degree of connectivity of the digital twin model of the power transformation project according to each of the first degrees of interaction; Obtain a second degree of interaction between the interaction parameters of the substation engineering digital twin model and other digital twin models, and determine a second degree of connectivity between the substation engineering digital twin model and the other digital twin models according to each of the second degrees of interaction; Obtaining a third degree of interaction between the digital twin model of the power transformation project and the twin data provided by a plurality of actual electrical devices, and determining a third degree of connectivity between the digital twin model of the power transformation project and the twin data according to the third degree of interaction; Determining connectivity information of the digital twin model of the substation engineering according to the first connectivity degree, the second connectivity degree, and the third connectivity degree; Determine a first number of visualization parameters in the digital twin model of the power transformation project, and determine the intuitiveness of model parameters of the digital twin model of the power transformation project according to the first number; Determine the coupling relationship between multiple sub-models and the parameter relationship between multiple parameters in the digital twin model of the substation engineering, and determine the intuitiveness of the model structure according to the second quantity corresponding to the visualized coupling relationship in the multiple coupling relationships and the third quantity corresponding to the visualized parameter relationship in the multiple parameter relationships; Determine the intuitiveness information of the digital twin model of the substation engineering project according to the intuitiveness of the model parameters and the intuitiveness of the model structure, and determine the maturity quantitative detection result corresponding to the digital twin model of the substation engineering project according to the intuitiveness information, the universality information and the connectivity information; Obtaining a qualitative maturity test result corresponding to the digital twin model of the substation engineering; According to the weights corresponding to the qualitative detection result of maturity and the quantitative detection result of maturity, weighted processing is performed on the qualitative detection result of maturity and the quantitative detection result of maturity to obtain the final maturity detection result corresponding to the digital twin model of the substation project.

2. The method according to claim 1, It is characterized in that The obtaining of the qualitative maturity test result corresponding to the digital twin model of the substation engineering includes: Determine a plurality of maturity qualitative detection elements corresponding to the digital twin model of the substation engineering, and obtain reference feature information corresponding to each qualitative detection result of each maturity qualitative detection element; For each of the maturity qualitative detection elements, extract model feature information associated with the maturity qualitative detection element, match the extracted model feature information with reference feature information corresponding to each qualitative detection result of the maturity qualitative detection element, and determine the element qualitative detection result corresponding to the maturity qualitative detection element according to the matching result; The qualitative test result of maturity is determined based on the qualitative test results of each of the elements.

3. A maturity detection device for digital twin model of substation engineering, It is characterized in that The device comprises: A model acquisition module is used to acquire a digital twin model of a substation engineering project whose maturity is to be tested; the digital twin model of the substation engineering project is composed of multiple sub-models; A universality quantification module, for determining the degree of standardization of the model file format of the digital twin model of the substation engineering project according to the degree of standardization of the three-dimensional design model file formats of the multiple sub-models in the digital twin model of the substation engineering project; determining the degree of standardization of the model data dimension of the digital twin model of the substation engineering project according to the degree of standardization corresponding to the units of each parameter in the digital twin model of the substation engineering project; determining the degree of standardization of the model data interface of the digital twin model of the substation engineering project according to the degree of standardization of the external data interaction interface of the digital twin model of the substation engineering project; determining the degree of standardization of the model description text of the digital twin model of the substation engineering project according to the degree of standardization corresponding to the text content of the model description text of the digital twin model of the substation engineering project; determining the universality information of the digital twin model of the substation engineering project according to the degree of standardization of the model file format, the degree of standardization of the model data dimension, the degree of standardization of the model data interface and the degree of standardization of the model description text; the degree of standardization of the three-dimensional design model file format is determined according to the difficulty of the user to understand and use the sub-model; the external data interaction interface is the interface for the digital twin model of the substation engineering project to interact with the outside world for data; A connectivity quantification module is used to obtain a first degree of interaction between the digital twin model of the substation project and multiple physical entities, and determine the first degree of connectivity of the digital twin model of the substation project according to each of the first degrees of interaction; obtain a second degree of interaction between the digital twin model of the substation project and other digital twin models, and determine the second degree of connectivity between the digital twin model of the substation project and the other digital twin models according to each of the second degrees of interaction; obtain a third degree of interaction between the digital twin model of the substation project and twin data provided by multiple actual electrical equipment, and determine the third degree of connectivity between the digital twin model of the substation project and the twin data according to the third degree of interaction; determine the connectivity information of the digital twin model of the substation project according to the first degree of connectivity, the second degree of connectivity and the third degree of connectivity; A quantitative detection result acquisition module is used to determine a first number of visualization parameters in the digital twin model of the substation project, and determine the intuitiveness of the model parameters of the digital twin model of the substation project based on the first number; determine the coupling relationship between multiple sub-models and the parameter relationship between multiple parameters in the digital twin model of the substation project, and determine the intuitiveness of the model structure based on a second number corresponding to the visualized coupling relationships in the multiple coupling relationships and a third number corresponding to the visualized parameter relationships in the multiple parameter relationships; determine the intuitiveness information of the digital twin model of the substation project based on the intuitiveness of the model parameters and the intuitiveness of the model structure, and determine the quantitative maturity detection result corresponding to the digital twin model of the substation project based on the intuitiveness information, the universality information and the connectivity information; The maturity determination module is used to obtain the qualitative detection result of maturity corresponding to the digital twin model of the substation project; according to the weights corresponding to the qualitative detection result of maturity and the quantitative detection result of maturity, the qualitative detection result of maturity and the quantitative detection result of maturity are weighted to obtain the final detection result of maturity corresponding to the digital twin model of the substation project.

4. A computer device comprising a memory and a processor, wherein the memory stores a computer program, It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 2 are implemented.

5. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 2 are implemented.

6. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 2 are implemented.