A precast primary and secondary beam steel tongue and groove connection node

By using a combination of positioning clamps, bearing steel plates, and support rods in the tongue-and-groove connection nodes of precast primary and secondary beams, precise adjustment and fixation of the precast secondary beams were achieved, solving the problem of low installation accuracy and improving the load-bearing capacity and stability of the structure.

CN118639749BActive Publication Date: 2026-11-17CHONGQING UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410910520.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2026-11-17
Estimated Expiration
2044-07-09

AI Technical Summary

Technical Problem

The installation accuracy of existing precast primary and secondary beam steel tongue-and-groove connection nodes is not high, which affects the structural bearing capacity.

Method used

The system employs a combination structure of positioning clamps, pressure-bearing steel plates, support rods, and connecting rods. The height and verticality of the precast secondary beams are adjusted by moving the pressure-bearing steel plates and connecting rods. The positioning clamps and tongue-and-groove plates are used for clamping and fixing to ensure connection accuracy. At the same time, the connection of the reinforcing bars and sleeves improves the stability of the nodes.

Benefits of technology

This improved the installation accuracy and structural bearing capacity of the precast primary and secondary beam connection nodes, enhanced the stability and shear resistance of the connections, and ensured the safety of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118639749B_ABST
    Figure CN118639749B_ABST
Patent Text Reader

Abstract

This invention discloses a precast steel tongue-and-groove connection node for primary and secondary beams, belonging to the field of construction technology. It includes a precast primary beam and a precast secondary beam. The precast primary beam has an installation groove on its side wall, with several U-shaped connection holes pre-embedded at the bottom of the groove. Positioning clamps, with their ends extending into the groove, are installed within the connection holes, and the diameter of the positioning clamps is smaller than the diameter of the connection holes. A pressure-bearing steel plate connected to the positioning clamps is installed within the installation groove. A positioning clamp is installed on the pressure-bearing steel plate, and several support rods are hinged to the bottom of the pressure-bearing steel plate. Each support rod has a connecting rod sliding coaxially at its bottom. The ends of the connecting rods are hinged to the bottom of the installation groove, and an elastic buffer is provided between the connecting rods and the support rods. A steel tongue-and-groove is pre-embedded at the connection end of the precast secondary beam. The purpose is to solve the problem of low installation accuracy in existing precast steel tongue-and-groove connection nodes for primary and secondary beams, which affects the structural bearing capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of construction technology, specifically relating to a precast steel tongue-and-groove connection node for primary and secondary beams. Background Technology

[0002] Precast beam construction is a crucial step in the prefabricated building construction process. It involves prefabricating main beams, secondary beams, and steel joints in a factory, then hoisting and connecting the precast secondary beams to the precast main beams using steel joints, and finally sealing the connections between the precast main beams, secondary beams, and steel joints with concrete. However, the connections between the precast main beams, secondary beams, and steel joints are where the building experiences the greatest torque. Therefore, to ensure the structure's load-bearing capacity meets the requirements, precise installation is essential to avoid errors that could affect the structural bearing capacity. Summary of the Invention

[0003] In view of this, the present invention discloses a precast primary and secondary beam steel tongue and groove connection node, the purpose of which is to solve the problem that the installation accuracy of the existing precast primary and secondary beam steel tongue and groove connection nodes is not high, which affects the structural bearing capacity.

[0004] To achieve the above objectives, the present invention provides the following technical solution: A precast primary and secondary beam steel tongue-and-groove connection node includes a precast primary beam and a precast secondary beam. The precast primary beam has an installation groove on its side wall. Several U-shaped connection holes are pre-embedded in the bottom of the installation groove. Positioning clamps, with their ends extending into the installation groove, are installed in the connection holes, and the diameter of the positioning clamps is smaller than the diameter of the connection holes. A pressure-bearing steel plate connected to all the positioning clamps is installed in the installation groove. A positioning clamp is installed on the pressure-bearing steel plate. Several inclined support rods are hinged to the bottom of the pressure-bearing steel plate. A connecting rod slides coaxially at the bottom of each support rod. The end of each connecting rod is hinged to the bottom of the installation groove. An elastic buffer is provided between the connecting rod and the support rod, and a limiting pin is provided on the connecting rod to restrict the sliding of the support rod relative to it. A steel tongue-and-groove joint that mates with the positioning clamp is pre-embedded at the connection end of the precast secondary beam.

[0005] In this scheme, after the precast main beam is installed, the precast secondary beam is hoisted so that the steel tongue and groove of the precast secondary beam extends into the installation groove and contacts the bearing steel plate. Then, the steel tongue and groove are connected to the positioning clamp. If there is an error at the connection, the limiting pin on the support rod is removed so that the connecting rod can slide relative to the support plate. At this time, by moving the bearing steel plate, the height, verticality and other factors of the end of the precast secondary beam can be adjusted until the error at the connection is eliminated. Then, the limiting pin is reset to restrict the sliding of the connecting rod, which restricts the movement of the bearing steel plate. If the accuracy of the connection between the precast secondary beam and the precast main beam meets the design requirements, subsequent pouring is carried out. After the concrete enters the connection hole, the positioning clamp is poured together with the connection hole to further improve the stability of the bearing steel plate.

[0006] Furthermore, the steel tongue and groove joint includes several evenly distributed tongue and groove plates; the positioning clamp includes several bases that are horizontally and detachably slidably connected to the pressure plate in the horizontal direction, and the bases are provided with positioning pins to restrict their sliding. Each base has two plates vertically arranged, and a horizontally arranged adjusting rod is rotatably connected to the base. The two ends of the adjusting rod are respectively threaded to the bottom of the corresponding plate, and the threads at the two ends of the adjusting rod are in opposite directions; two mutually hinged support plates are arranged between adjacent bases, and the ends of the support plates are hinged to the ends of the adjacent support plates. Several cylinders are arranged between adjacent support plates, and the two ends of the cylinders are coaxially and slidably connected with reinforcing ribs. The reinforcing ribs are hinged to the adjacent plates, and the sleeves are provided with locking pins to restrict the sliding of the reinforcing ribs. The same elastic buffer is provided between adjacent reinforcing ribs.

[0007] The steel tongue and groove joint consists of several tongue and groove plates. During the installation of precast secondary beams, the base is slid according to the distribution of the tongue and groove plates, aligning the base directly with the tongue and groove plates before hoisting the precast secondary beams. After the precast secondary beams are hoisted, the ends of the tongue and groove plates are placed on the base and positioned between the corresponding two plates. At this point, the locking pin is removed, and the adjusting rod is rotated. The adjusting rod moves the plates on both sides of the tongue and groove plate toward the tongue and groove plate until the plates clamp and fix the tongue and groove plate. Then, the locking pin is reset. In this scheme, using the plates to clamp and fix the tongue and groove plates not only accommodates tongue and groove plates of different specifications but also facilitates the installation and positioning of the tongue and groove plates, thus making the hoisting of precast secondary beams more convenient. At the same time, the cylinder and reinforcing ribs between adjacent plates provide stable support between the plates, i.e., provide stable support between the tongue and groove plates, thereby improving the shear resistance of the connection joint and achieving the purpose of improving the structural bearing capacity.

[0008] Furthermore, the precast main beam has pre-embedded connecting steel bars extending out of the precast main beam, the connecting section of the precast secondary beam has a cast-in-place zone, the end of the precast secondary beam has pre-embedded fixing steel bars extending into the cast-in-place zone, and the connecting steel bars and the fixing steel bars are connected by sleeves.

[0009] Furthermore, a main beam connecting clamp is provided at the top of the precast main beam, and longitudinal reinforcing bars of the main beam are fixedly connected to the main beam connecting clamp on the precast main beam; a secondary beam connecting clamp is provided on the precast secondary beam, and longitudinal reinforcing bars of the secondary beam are fixedly connected to the secondary beam connecting clamp on the precast secondary beam, with the ends of the longitudinal reinforcing bars of the secondary beam extending into the space between adjacent main beam connecting clamps.

[0010] Furthermore, both ends of the pressure-bearing steel plate are provided with upwardly bent reinforcing bars, and the two side walls of the mounting groove are provided with receiving grooves to accommodate the bent reinforcing bars, and the diameter of the receiving grooves is larger than the diameter of the bent reinforcing bars.

[0011] Furthermore, the curved steel bar is provided with several pull-out protrusions at an angle around its periphery, and adjacent pull-out protrusions are inclined in opposite directions.

[0012] Furthermore, several keyways are provided on both the connecting hole and the side wall of the receiving groove.

[0013] Other advantages, objectives, and features of the invention will be set forth in the following description and will be apparent to those skilled in the art in some respects, or may be learned by practice of the invention. The objectives and other advantages of the invention can be realized and obtained through the following description. Attached Figure Description

[0014] To make the objectives, technical solutions, and beneficial effects of this invention clearer, the following figures are provided for illustration: Figure 1 This is a schematic diagram of the structure of an embodiment of the present invention; Figure 2 for Figure 1 Enlarged view of point A in the middle; Figure 3 This is a longitudinal sectional view of the mounting groove in an embodiment of the present invention; Figure 4 for Figure 3 Enlarged view of point B in the middle; Figure 5 This is a schematic diagram of the prefabricated secondary beam in an embodiment of the present invention.

[0015] The following are the markings in the attached diagram: 1. Precast main beam; 2. Precast secondary beam; 3. Connecting hole; 4. Positioning clamp; 5. Bearing steel plate; 6. Support rod; 7. Connecting rod; 8. Tongue and groove plate; 9. Base; 10. Plate; 11. Adjusting rod; 12. Support plate; 13. Support plate; 14. Cylinder; 15. Reinforcing rib; 16. Elastic buffer; 17. Fixed reinforcing bar; 18. Connecting reinforcing bar; 19. Sleeve; 20. Main beam connecting clamp; 21. Main beam longitudinal reinforcing bar; 22. Secondary beam connecting clamp; 23. Secondary beam longitudinal reinforcing bar; 24. Bending reinforcing bar; 25. Receiving groove; 26. Pull-out protrusion; 27. Keyway. Detailed Implementation

[0016] like Figures 1-5 As shown: A precast main beam and secondary beam steel tongue-and-groove connection node includes a precast main beam 1 and a precast secondary beam 2. The precast main beam 1 has an installation groove on its side wall. Several U-shaped connection holes 3 are pre-embedded in the bottom of the installation groove. Positioning clamps 4, with their ends extending into the installation groove, are installed in the connection holes 3, and the diameter of the positioning clamps 4 is smaller than the diameter of the connection holes 3. A pressure-bearing steel plate 5, connected to all the positioning clamps 4, is installed in the installation groove. A positioning clamp is installed on the pressure-bearing steel plate 5. Several inclined support rods 6 are hinged to the bottom of the pressure-bearing steel plate 5. A connecting rod 7 is coaxially slidably attached to the bottom of each support rod 6. The end of the connecting rod 7 is hinged to the bottom of the installation groove. An elastic buffer 16 is provided between the connecting rod 7 and the support rod 6, and a limiting pin is provided on the connecting rod 7 to restrict the sliding of the support rod 6 relative to it. A steel tongue-and-groove joint that cooperates with the positioning clamp is pre-embedded at the connection end of the precast secondary beam 2.

[0017] In this scheme, after the precast main beam 1 is installed, the precast secondary beam 2 is hoisted so that the steel tongue and groove of the precast secondary beam 2 extends into the installation groove and contacts the bearing steel plate 5. Then, the steel tongue and groove are connected to the positioning clamp. If there is an error at the connection, the limiting pin on the support rod 6 is removed so that the connecting rod 7 can slide relative to the support plate 12. At this time, by moving the bearing steel plate 5, the height, verticality and other factors of the end of the precast secondary beam 2 can be adjusted until the error at the connection is eliminated. Then, the limiting pin is reset to restrict the sliding of the connecting rod 7, which can restrict the movement of the bearing steel plate 5. If the accuracy of the connection between the precast secondary beam 2 and the precast main beam 1 meets the design requirements, subsequent pouring is carried out. After the concrete enters the connection hole 3, the positioning clamp 4 is poured together with the connection hole 3 to further improve the stability of the bearing steel plate 5.

[0018] Furthermore, the steel tongue and groove joint includes several evenly distributed tongue and groove plates 8; the positioning clamp includes several bases 9 that are horizontally and detachably slidably connected to the pressure-bearing steel plate 5 in the horizontal direction, and the bases 9 are provided with positioning pins to restrict their sliding. Each base 9 has two plates 10 vertically arranged on it, and a horizontally arranged adjusting rod 11 is rotatably connected to the base 9. The two ends of the adjusting rod 11 are respectively threaded to the bottom of the corresponding plate 10, and the threads at the two ends of the adjusting rod 11 are opposite in direction; two mutually hinged support plates 12 are arranged between adjacent bases 9, and the ends of the support plates 12 are hinged to the ends of the adjacent plates 10. Several cylinders 14 are arranged between adjacent support plates 12, and the two ends of the cylinders 14 are coaxially slidably connected with reinforcing ribs 15. The reinforcing ribs 15 are hinged to the adjacent support plates 12, and the sleeves 19 are provided with locking pins to restrict the sliding of the reinforcing ribs 15. The same elastic buffer 16 is provided between adjacent reinforcing ribs 15.

[0019] The steel tongue and groove joint includes several tongue and groove plates 8. During the installation of the precast secondary beam 2, the base 9 is slid according to the distribution position of the tongue and groove plates 8 so that the base 9 is directly opposite the tongue and groove plates 8, and then the precast secondary beam 2 is hoisted. After the precast secondary beam 2 is hoisted, the end of the tongue and groove plate 8 is placed on the base 9 and located between the corresponding two plates 10. At this time, the locking pin is removed, and by rotating the adjusting rod 11, the adjusting rod 11 drives the plates 10 on both sides of the tongue and groove plate 8 to move toward the tongue and groove plate 8 until the plates 10 clamp and fix the tongue and groove plate 8. Then the locking pin is reset. In this scheme, the tongue and groove plate 8 is clamped and fixed by the plate 10. On the one hand, it can meet the requirements of tongue and groove plates 8 of different specifications. On the other hand, it can facilitate the installation and positioning of the tongue and groove plate 8, thereby making the hoisting of the precast secondary beam 2 more convenient. At the same time, the cylinder 14 and the reinforcing rib 15 between adjacent plates 10 provide stable support between the plates 10, that is, provide stable support between the tongue and groove plates 8, thereby improving the shear resistance of the connection node and achieving the purpose of improving the structural bearing capacity.

[0020] Furthermore, the precast main beam 1 is pre-embedded with connecting steel bars 18 extending out of the precast main beam 1, the connecting section of the precast secondary beam 2 is provided with a cast-in-place zone, the end of the precast secondary beam 2 is pre-embedded with fixing steel bars 17 extending into the cast-in-place zone, and the connecting steel bars 18 and the fixing steel bars 17 are connected by sleeves 19.

[0021] After the precast secondary beam 2 is hoisted into place, the connecting steel bar 18 is connected and fixed to the corresponding fixed steel bar 17 through the sleeve 19. Then, the casting area is poured to cast the connecting steel bar 18, the embedded steel bar and the connecting sleeve 19 together, which further improves the stability of the connection node.

[0022] Furthermore, the precast main beam 1 is provided with a main beam connecting clamp 20 at its top end, and the precast main beam 1 is provided with a main beam longitudinal reinforcing bar 21 fixedly connected to the main beam connecting clamp 20; the precast secondary beam 2 is provided with a secondary beam connecting clamp 22, and the precast secondary beam 2 is provided with a secondary beam longitudinal reinforcing bar 23 fixedly connected to the secondary beam connecting clamp 22, with the end of the secondary beam longitudinal reinforcing bar 23 extending into the space between adjacent main beam connecting clamps 20.

[0023] After the precast secondary beam 2 is hoisted and adjusted into place, the upper surface of the precast main beam 1, as well as the main beam connecting clamp 20, the longitudinal reinforcing bars 21 of the main beam, and the ends of the longitudinal reinforcing bars 23 of the secondary beam are poured with overlapping layers; and the upper surface of the precast secondary beam 2, as well as the secondary beam connecting clamp 22 and the longitudinal reinforcing bars 23 of the secondary beam are poured with corresponding overlapping layers. This not only improves the connection stability of the precast main beam 1 and the precast secondary beam 2, but also improves the longitudinal bearing capacity of the precast main beam 1 and the precast secondary beam 2.

[0024] Furthermore, both ends of the pressure-bearing steel plate 5 are integrally formed with upwardly bent reinforcing bars 24, and the two side walls of the mounting groove are provided with receiving grooves 25 to accommodate the bent reinforcing bars 24, and the diameter of the receiving grooves 25 is larger than the diameter of the bent reinforcing bars 24.

[0025] After the precast secondary beam 2 is hoisted into place, the receiving groove 25 and the bent steel bar 24 are poured together. The bent steel bar 24 is used to provide the bearing capacity of the pressure plate 5 to the steel tongue and groove.

[0026] Furthermore, the curved steel bar 24 is integrally formed with a plurality of pull-out protrusions 26 on its periphery. The pull-out protrusions 26 are inclined and adjacent pull-out protrusions 26 are inclined in opposite directions. By setting the pull-out protrusions 26, the curved steel bar 24 is prevented from falling out of the receiving groove 25.

[0027] Furthermore, several keyways 27 are integrally formed on the side walls of the connecting hole 3 and the receiving groove 25 to improve the connection strength between the poured concrete and the connecting hole 3 and the receiving groove 25, and to prevent the bent reinforcing bar 24 and the positioning clamp 4 from loosening, which would cause the pressure plate 5 to loosen and affect the connection stability of the precast secondary beam 2.

[0028] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made to it in form and detail without departing from the scope defined by the claims of the present invention.

Claims

1. A prefabricated main and secondary girder steel joint connection node, comprising a prefabricated main girder and a prefabricated secondary girder, characterized in that: The precast main beam has an installation groove on its side wall. Several U-shaped connecting holes are pre-embedded in the bottom of the installation groove. Positioning clamps, with their ends extending into the installation groove, are installed in the connecting holes, and the diameter of the positioning clamps is smaller than the diameter of the connecting holes. A pressure-bearing steel plate, connected to all the positioning clamps, is installed in the installation groove. A positioning clamp is installed on the pressure-bearing steel plate. Several inclined support rods are hinged to the bottom of the pressure-bearing steel plate. A connecting rod slides coaxially at the bottom of each support rod. The end of each connecting rod is hinged to the bottom of the installation groove. An elastic buffer is installed between the connecting rod and the support rod, and a limiting pin is installed on the connecting rod to restrict the sliding of the support rod relative to it. A steel tongue-and-groove joint, cooperating with the positioning clamp, is pre-embedded at the connecting end of the precast secondary beam. The steel tongue-and-groove joint includes several evenly distributed... Tongue and groove plate; the positioning clamp includes several bases that are horizontally and detachably slidably connected to the pressure plate in the horizontal direction. The bases are provided with positioning pins to restrict their sliding. Each base has two plates vertically arranged. A horizontally arranged adjusting rod is rotatably connected to the base. The two ends of the adjusting rod are respectively threaded to the bottom of the corresponding plate, and the threads at the two ends of the adjusting rod are opposite in direction. Two mutually hinged support plates are arranged between adjacent bases. The ends of the support plates are hinged to the ends of the adjacent plates. Several cylinders are arranged between adjacent support plates. The two ends of each cylinder are coaxially and slidably connected with reinforcing ribs. The reinforcing ribs are hinged to the adjacent support plates, and the sleeves are provided with locking pins to restrict the sliding of the reinforcing ribs. The same elastic buffer is provided between adjacent reinforcing ribs.

2. The precast primary and secondary beam steel tongue-and-groove connection node according to claim 1, characterized in that: The precast main beam has pre-embedded connecting steel bars extending out of it. The connecting section of the precast secondary beam has a cast-in-place zone. The end of the precast secondary beam has pre-embedded fixing steel bars extending into the cast-in-place zone. The connecting steel bars and the fixing steel bars are connected by sleeves.

3. The precast primary and secondary beam steel tongue-and-groove connection node according to claim 2, characterized in that: The precast main beam is provided with a main beam connecting clamp at its top, and the precast main beam is provided with longitudinal reinforcing bars that are fixedly connected to the main beam connecting clamp; the precast secondary beam is provided with a secondary beam connecting clamp, and the precast secondary beam is provided with longitudinal reinforcing bars that are fixedly connected to the secondary beam connecting clamp, with the ends of the longitudinal reinforcing bars of the secondary beam extending into the space between adjacent main beam connecting clamps.

4. The precast primary and secondary beam steel tongue-and-groove connection node according to claim 3, characterized in that: Both ends of the pressure-bearing steel plate are provided with upwardly bent reinforcing bars, and the two side walls of the mounting groove are provided with receiving grooves to accommodate the bent reinforcing bars, and the diameter of the receiving grooves is larger than the diameter of the bent reinforcing bars.

5. A precast primary and secondary beam steel tongue-and-groove connection node according to claim 4, characterized in that: The curved steel bar is provided with several pull-out protrusions at an angle around its perimeter, and adjacent pull-out protrusions are inclined in opposite directions.

6. The precast primary and secondary beam steel tongue-and-groove connection node according to claim 5, characterized in that: Both the connecting hole and the side wall of the receiving groove are provided with several keyways.

Citation Information

Patent Citations

  • Rigid combination connection node and method for prefabricated main and secondary beam steel rabbets

    CN114016604A

  • Earthquake -resistant structure of reinforced concrete beam column

    CN208604758U