A real-time order processing method for supply chain platform

By calculating the fluctuation degree and predicted value of inventory balance, we determine the necessity of order delivery and prioritize key orders, which solves the problem of reduced efficiency of the supply chain under abnormal circumstances and achieves refinement of inventory management and improvement of supply chain efficiency. promote.

CN118644185BActive Publication Date: 2024-10-18INSPUR SMART SUPPLY CHAIN TECH (SHANDONG) CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411118231.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-18
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

The existing supply chain management system is difficult to handle in a timely manner when faced with abnormal situations such as supply interruptions or demand surges, resulting in stagnant production and reduced overall supply chain efficiency.

Method used

By obtaining the unprocessed orders and inventory balance forecast values ​​of the current cycle, calculate the fluctuation degree and minimum forecast value of the inventory balance, determine the necessity of order shipment, and prioritize orders according to importance to ensure that key orders are processed in a timely manner. Thereby improving the efficiency of the supply chain.

Benefits of technology

By accurately calculating the forecast value of inventory balance and its degree of fluctuation, we can effectively manage inventory, optimize the allocation of transportation and warehousing resources, avoid risks caused by abnormal situations, and improve the overall efficiency of the supply chain.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118644185B_ABST
    Figure CN118644185B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of electronic digital data processing, and the present invention relates to a real-time order processing method for a supply chain platform, the method comprising: obtaining the goods demand of all unprocessed orders in the current cycle and the inventory balance forecast value of the current cycle; calculating the fluctuation degree of the inventory balance forecast value of the current cycle, and taking the product of the fluctuation degree and the inventory balance forecast value and the minimum value of the inventory balance forecast value as the minimum forecast value; calculating the necessity of shipment of the unprocessed orders according to the minimum forecast value; setting a threshold, screening orders whose shipment necessity is greater than the threshold, and sorting them in order from large to small according to the shipment necessity, and shipping them in order. The present invention ensures that order demand can be met even in abnormal situations, and flexibly adjusts the priority of order processing according to the shipment necessity of the order, thereby improving the efficiency of the supply chain.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electronic digital data processing. The present invention relates to a real-time order processing method for a supply chain platform. Background Art

[0002] Supply chain refers to the network structure formed by upstream and downstream enterprises involved in the production and circulation process, which involves providing products or services to end users, that is, the entire chain from merchants to consumers. In the current development of logistics companies, transportation efficiency is an important indicator for measuring logistics companies. From the perspective of the current development of logistics companies, after applying supply chain management theory, logistics companies have significantly improved their overall work efficiency.

[0003] At present, the patent application document with the publication number CN114581012A discloses a method and system for inventory adjustment based on supply chain management, which includes: collecting the first inventory information of the first enterprise in the first supply chain, as well as the logistics supply information and product demand information of the first enterprise in the first supply chain over a period of time, adjusting the logistics supply information and product demand information based on the historical logistics supply information and the historical product demand information, obtaining the first logistics supply information and the first product demand information, and using the NSGA-II genetic algorithm to perform multi-objective optimization on the inventory based on the first inventory information, the first logistics supply information and the first product demand information, and obtaining multiple optimization results. This solves the problem that the efficiency and accuracy of the enterprises in the supply chain when controlling and adjusting the inventory are low, resulting in a decrease in the overall benefits of the enterprises, as proposed in the patent application document.

[0004] However, when faced with abnormal situations such as supply disruptions or surges in demand, the above method may not be able to handle these abnormal situations in a timely manner, resulting in production stagnation and reducing the efficiency of the overall supply chain. Summary of the invention

[0005] In order to solve the above-mentioned technical problem of reduced efficiency of the supply chain when facing abnormal situations, the present invention provides the following technical solution.

[0006] A real-time order processing method for a supply chain platform, comprising:

[0007] Obtain the goods demand of all unprocessed orders in the current cycle and the inventory balance forecast value of the current cycle;

[0008] Calculate the fluctuation degree of the inventory balance forecast value of the current period, and take the minimum value between the product of the fluctuation degree and the inventory balance forecast value and the inventory balance forecast value as the minimum forecast value;

[0009] The shipment necessity of the unprocessed orders is calculated based on the lowest forecast value, and the shipment necessity is: ; For the The necessity of shipping unprocessed orders, is the lowest predicted value, For the The quantity of goods required for unprocessed orders, For the Number of days unprocessed orders have been on hold. The average number of days that all unprocessed orders are kept on hold;

[0010] Set a threshold, filter out orders whose delivery necessity is greater than the threshold, sort them in descending order of delivery necessity, and prioritize delivery in that order.

[0011] By predicting the inventory balance of the current cycle and taking into account the volatility of the inventory balance, the minimum range of the inventory balance in the current cycle is determined to ensure that order demand can be met even in abnormal situations. The necessity of shipping each unprocessed order is calculated, and important orders are screened out and sorted according to the necessity of shipping important orders. The priority of order processing can be flexibly adjusted to ensure that key orders are processed in a timely manner, thereby improving the efficiency of the supply chain.

[0012] Preferably, obtaining the inventory balance forecast value of the current cycle includes:

[0013] Obtain the inventory balance of the historical period and construct the first inventory balance sequence in chronological order;

[0014] The first inventory balance sequence is used to train the ARIMA model to obtain a trained ARIMA model, and the trained ARIMA model is used to predict the inventory balance of the current period to generate a predicted inventory balance value of the current period.

[0015] Preferably, the fluctuation degree of the inventory balance forecast value satisfies the relationship:

[0016] ; In the formula, is the volatility of the inventory balance forecast value, is the overall forecast difference degree of the first inventory balance series, is the degree of local forecast difference of the first inventory balance series.

[0017] By using the ratio of the maximum and minimum values, we can adapt to differences of different sizes and ensure that the degree of fluctuation can reflect the actual fluctuation situation without being affected by the absolute numerical size.

[0018] Preferably, the process of obtaining the overall prediction difference degree includes:

[0019] When the ARIMA model is trained using the first inventory balance sequence, the forecast values ​​of all inventory balances in the first inventory balance sequence are calculated;

[0020] The sum of the differences between all inventory balances in the first inventory balance sequence and the corresponding predicted values ​​is calculated, and the average value of the sum of the differences in the first inventory balance sequence is used as the overall prediction difference degree.

[0021] Preferably, the process of obtaining the local prediction difference degree includes:

[0022] In the first inventory balance sequence, a second inventory balance sequence is constructed, where the second inventory balance sequence starts from the current time point and traces back to the defined local prediction range to obtain all inventory balances and corresponding prediction values ​​within the local prediction range;

[0023] An average value of the sum of differences between all inventory balances in the second inventory balance sequence and the corresponding predicted values ​​is calculated, and the average value is used as the local prediction difference degree.

[0024] By analyzing the overall and local forecast differences, the performance of the forecasting model can be more accurately evaluated, thereby improving the accuracy of inventory forecasting.

[0025] Preferably, the sum of the differences in the first inventory balance sequence satisfies the following relationship:

[0026] ; In the formula, is the sum of the differences in the first inventory balance sequence, The first inventory balance sequence Days of inventory balance, The first inventory balance sequence The forecast value of inventory balance for the day, is the total number of days included in the first inventory balance sequence, is the logarithmic function with base 2.

[0027] Logarithmic transformation helps to standardize the data, especially when the data range is large, making it fairer to compare forecast errors over different time periods.

[0028] Preferably, the sum of the differences between all inventory balances in the second inventory balance sequence and the corresponding predicted values ​​satisfies the following relationship:

[0029] ; In the formula, is the sum of the differences between all inventory balances in the second inventory balance sequence and the corresponding forecast values, The second inventory balance sequence Days of inventory balance, The second inventory balance sequence The forecast value of inventory balance for the day, is the total number of days included in the second inventory balance sequence, is the logarithmic function with base 2.

[0030] By analyzing the forecast results in different time periods, the impact of forecast errors is emphasized, which enables a more comprehensive understanding of the accuracy of inventory forecasts.

[0031] Preferably, the sum of the differences in the first inventory balance sequence satisfies the following relationship:

[0032] ; In the formula, is the sum of the differences in the first inventory balance sequence, The first inventory balance sequence Days of inventory balance, The first inventory balance sequence The forecast value of inventory balance for the day, The total number of days included in the first inventory balance sequence.

[0033] The present invention has the following beneficial effects:

[0034] The present invention accurately calculates the predicted value of inventory balance and its fluctuation degree, so that the staff can manage the inventory more carefully and avoid the risks caused by abnormal inventory conditions. By giving priority to orders with high necessity of shipment, the transportation, warehousing and human resources can be allocated more effectively, thereby improving the efficiency of the supply chain. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] By reading the following detailed description with reference to the accompanying drawings, the above and other objects, features and advantages of the exemplary embodiments of the present invention will become readily understood. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:

[0036] Figure 1 It is a method flow chart of steps S1 to S4 in a real-time order processing method for a supply chain platform in an embodiment of the present invention. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0038] The application scenario of the present invention is to analyze a single cargo so as to reasonably allocate storage and logistics resources.

[0039] The specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0040] Reference Figure 1 A real-time order processing method for a supply chain platform includes steps S1 to S4, which are as follows:

[0041] S1: Obtain the goods demand for all unprocessed orders in the current cycle and the inventory balance forecast value of the current cycle.

[0042] In an embodiment of the present invention, the inventory balance of the historical period is extracted from the warehouse inventory management system. For example, the period is set to one day or one week, and the inventory balance at the end of each day in the past year or half a year is extracted from the warehouse inventory management system (in the embodiment of the present invention, the data of each day in half a year is selected to be extracted), and the extracted historical inventory balance is arranged in chronological order to form a first inventory balance sequence. In addition, the first inventory balance sequence can be cleaned to remove abnormal values ​​or fill missing values. And the goods demand for all unprocessed orders in the current period is obtained.

[0043] In order to unify the measurement standards, the demand for unprocessed orders and all inventory balances in the first inventory balance sequence are converted into percentages relative to the total inventory.

[0044] It should be noted that the change of warehouse inventory balance is not stable, but has a certain trend. This means that the inventory level is not constant, but increases or decreases over time. Therefore, in the management of the supply chain, it is crucial to be able to accurately predict the change of inventory.

[0045] Specifically, in an embodiment of the present invention, an ARIMA (autoregressive integrated moving average) model is selected for training, the first inventory balance sequence is used to train the ARIMA model, and then a trained ARIMA model is obtained, and the trained ARIMA model is predicted using the inventory balance of the current period to generate an inventory balance prediction value of the current period.

[0046] In other embodiments, methods such as exponential smoothing, seasonal autoregressive integrated moving average model (SARIMA) and the like may also be used.

[0047] It should be noted that the ARIMA model is used to predict future values ​​based on past data. It combines the autoregression (AR), difference (I) and moving average (MA) models to predict time series data.

[0048] S2: Calculate the fluctuation degree of the inventory balance forecast value of the current period, and take the minimum value of the product of the fluctuation degree and the inventory balance forecast value and the inventory balance forecast value as the minimum forecast value.

[0049] During the ARIMA model training process in the above step S1, the prediction values ​​corresponding to all inventory balances in the first inventory balance sequence are also calculated, and then the overall prediction difference degree of the first inventory balance sequence can be obtained by analyzing the differences between all inventory balances in the first inventory balance sequence and the corresponding prediction values.

[0050] Then the overall prediction difference mentioned above satisfies the following relationship:

[0051]

[0052]

[0053] In the formula, is the overall forecast difference degree of the first inventory balance series, is the sum of the differences in the first inventory balance sequence, The first inventory balance sequence Days of inventory balance, The first inventory balance sequence The forecast value of inventory balance for the day, is the total number of days included in the first inventory balance sequence, is the logarithmic function with base 2.

[0054] In another embodiment, the sum of the differences in the first inventory balance sequence is It also satisfies the following relationship:

[0055]

[0056] In the formula, is the sum of the differences in the first inventory balance sequence, The first inventory balance sequence Days of inventory balance, The first inventory balance sequence The forecast value of inventory balance for the day, The total number of days included in the first inventory balance sequence.

[0057] The overall forecast difference of the first inventory balance sequence reflects the overall predictability of the inventory balance. The greater the overall forecast difference, the more unpredictable the emergence of unprocessed orders in the current cycle. Similarly, since the changes in inventory balance are not stable, it is also necessary to analyze short-term data.

[0058] Specifically, in the first inventory balance sequence, a local prediction range is defined (in the embodiment of the present invention, the local prediction range is selected as the past 14 days, and in other embodiments, 30 days or a quarter can be selected), the current cycle is determined as the starting point of the backtracking, and from the current cycle, the inventory balance data at the end of each day and the corresponding prediction value are collected to construct the second inventory balance sequence. The local prediction difference degree of the first inventory balance sequence can be obtained by analyzing the difference between all inventory balances in the second inventory balance sequence and the corresponding prediction value.

[0059] Then the local prediction difference mentioned above satisfies the following relationship:

[0060]

[0061]

[0062] In the formula, is the local forecast difference degree of the first inventory balance series, is the sum of the differences between all inventory balances in the second inventory balance sequence and the corresponding forecast values, The second inventory balance sequence Days of inventory balance, The second inventory balance sequence The forecast value of inventory balance for the day, is the total number of days included in the second inventory balance sequence, is the logarithmic function with base 2.

[0063] In another embodiment, the sum of the differences in the second inventory balance sequence It also satisfies the following relationship:

[0064]

[0065] In the formula, is the sum of the differences between all inventory balances in the second inventory balance sequence and the corresponding forecast values, The second inventory balance sequence Days of inventory balance, The second inventory balance sequence The forecast value of inventory balance for the day, is the total number of days included in the second inventory balance sequence, is the logarithmic function with base 2.

[0066] The overall forecast difference degree indicates the forecast accuracy of inventory balance at all times, while the local forecast difference degree indicates the forecast accuracy of inventory in recent time. The greater the difference between the overall forecast difference degree and the local forecast difference degree, the greater the change pattern of inventory balance in recent period compared with the past. Based on this, the fluctuation degree of inventory balance forecast value in the current cycle can be inferred.

[0067] Specifically, the fluctuation degree of the inventory balance forecast value of the current cycle is obtained according to the overall forecast difference degree and the local forecast difference degree. The fluctuation degree satisfies the following relationship:

[0068]

[0069] In the formula, is the volatility of the inventory balance forecast value, is the overall forecast difference degree of the first inventory balance series, is the local forecast difference degree of the first inventory balance series, and Represents minimum and maximum functions.

[0070] in, The smaller it is, the greater the difference between the local forecast difference and the overall forecast difference, which means that the change in inventory balance in the recent period is different from the change in inventory balance in the long term. Therefore, more consideration should be given to the change in inventory balance in the long term to ensure that the forecast of inventory balance will not be overly distorted.

[0071] Furthermore, in order to ensure that unprocessed orders in the current cycle can be delivered in a timely manner, the minimum range within which the inventory balance in the current cycle can vary is determined. This range is the lower limit of the inventory level to ensure that order demand can be met even when the forecast is inaccurate.

[0072] Specifically, the minimum value between the product of the fluctuation degree and the inventory balance forecast value and the inventory balance forecast value is taken as the minimum forecast value. The minimum forecast value satisfies the following expression:

[0073]

[0074] In the formula, is the lowest predicted value, is the fluctuation degree of the inventory balance forecast value of the current cycle, is the forecast value of inventory balance in the current period, is the minimum function.

[0075] S3: Calculate the shipment necessity of currently unprocessed orders based on the lowest forecast value.

[0076] In step S2, a minimum forecast value of the inventory balance in the current cycle is obtained, and the shipment necessity is calculated based on the minimum forecast value and the demand for goods of unprocessed orders.

[0077] For example, get Number of days unprocessed orders have been on hold , the average number of days that all unprocessed orders are held in the current cycle , No. The quantity of goods required for unprocessed orders , and then calculate the The necessity of shipping unprocessed orders. The shipment necessity of unprocessed orders satisfies the following relationship:

[0078]

[0079] In the formula, For the The necessity of shipping unprocessed orders, is the lowest predicted value, For the The quantity of goods required for unprocessed orders, For the Number of days unprocessed orders have been on hold. The average number of days that all unprocessed orders are held.

[0080] Similarly, the necessity of shipping all unprocessed orders can be calculated.

[0081] S4: Set a threshold, filter out orders whose delivery necessity is greater than the threshold, sort them in descending order of delivery necessity, and prioritize delivery in order.

[0082] After calculating the necessity of shipping of all unprocessed orders in the above step S3, a threshold is set. In the embodiment of the present invention, it is set to 0.5 based on experience. All unprocessed orders are screened to screen out orders whose necessity of shipping is greater than the threshold. After screening, they are sorted again in order of the necessity of shipping from large to small to determine the final order of order shipment, and the orders are shipped according to the final order.

[0083] The present invention predicts the inventory balance of the current cycle and takes into account the fluctuation degree of the inventory balance, and then determines the minimum range of the inventory balance that can vary in the current cycle, so as to ensure that order demand can be met even in abnormal situations, and calculates the necessity of shipping each unprocessed order, screens out important orders, and sorts them according to the necessity of shipping important orders. The priority of order processing can be flexibly adjusted to ensure that key orders are processed in a timely manner, thereby improving the efficiency of the supply chain.

[0084] In the description of this specification, "plurality" or "several" means at least two, such as two, three or more, etc., unless otherwise clearly and specifically defined.

[0085] Although this specification has shown and described a number of embodiments of the present invention, it will be apparent to those skilled in the art that such embodiments are provided by way of example only. Those skilled in the art will conceive of many modifications, changes and alternatives without departing from the ideas and spirit of the present invention. It should be understood that in the practice of the present invention, various alternatives to the embodiments of the present invention described herein may be employed.

Claims

1. A real-time order processing method for a supply chain platform, characterized in that: include: Obtain the goods demand of all unprocessed orders in the current cycle and the inventory balance forecast value of the current cycle; Calculate the fluctuation degree of the inventory balance forecast value of the current period, and take the minimum value between the product of the fluctuation degree and the inventory balance forecast value and the inventory balance forecast value as the minimum forecast value; The shipment necessity of the unprocessed orders is calculated based on the lowest forecast value, and the shipment necessity is: ; For the The necessity of shipping unprocessed orders, is the lowest predicted value, For the The quantity of goods required for unprocessed orders, For the Number of days unprocessed orders have been on hold. The average number of days that all unprocessed orders are kept on hold; Set a threshold, filter out orders whose delivery necessity is greater than the threshold, sort them in descending order of delivery necessity, and prioritize delivery in that order.

2. A real-time order processing method for a supply chain platform according to claim 1, characterized in that: Obtaining the inventory balance forecast value for the current period includes: Obtain the inventory balance of the historical period and construct the first inventory balance sequence in chronological order; The first inventory balance sequence is used to train the ARIMA model to obtain a trained ARIMA model, and the trained ARIMA model is used to predict the inventory balance of the current period to generate a predicted inventory balance value of the current period.

3. A real-time order processing method for a supply chain platform according to claim 2, characterized in that: The fluctuation degree of the inventory balance forecast value satisfies the relationship: ; In the formula, is the volatility of the inventory balance forecast value, is the overall forecast difference degree of the first inventory balance series, is the degree of local forecast difference of the first inventory balance series.

4. A real-time order processing method for a supply chain platform according to claim 3, characterized in that: The process of obtaining the overall prediction difference degree includes: When the ARIMA model is trained using the first inventory balance sequence, the forecast values ​​of all inventory balances in the first inventory balance sequence are calculated; The sum of the differences between all inventory balances in the first inventory balance sequence and the corresponding predicted values ​​is calculated, and the average value of the sum of the differences in the first inventory balance sequence is used as the overall prediction difference degree.

5. A real-time order processing method for a supply chain platform according to claim 4, characterized in that: The process of obtaining the local prediction difference degree includes: In the first inventory balance sequence, a second inventory balance sequence is constructed, where the second inventory balance sequence starts from the current time point and traces back to the defined local prediction range to obtain all inventory balances and corresponding prediction values ​​within the local prediction range; An average value of the sum of differences between all inventory balances in the second inventory balance sequence and the corresponding predicted values ​​is calculated, and the average value is used as the local prediction difference degree.

6. A real-time order processing method for a supply chain platform according to claim 5, characterized in that: The sum of the differences in the first inventory balance sequence satisfies the following relationship: ; In the formula, is the sum of the differences in the first inventory balance sequence, The first inventory balance sequence Days of inventory balance, The first inventory balance sequence The forecast value of inventory balance for the day, is the total number of days included in the first inventory balance sequence, is the logarithmic function with base 2.

7. A real-time order processing method for a supply chain platform according to claim 6, characterized in that: The sum of the differences between all inventory balances in the second inventory balance sequence and the corresponding forecast values ​​satisfies the following relationship: ; In the formula, is the sum of the differences between all inventory balances in the second inventory balance sequence and the corresponding forecast values, The second inventory balance sequence Days of inventory balance, The second inventory balance sequence The forecast value of inventory balance for the day, is the total number of days included in the second inventory balance sequence, is the logarithmic function with base 2.

8. A real-time order processing method for a supply chain platform according to claim 5, characterized in that: The sum of the differences in the first inventory balance sequence satisfies the following relationship: ; In the formula, is the sum of the differences in the first inventory balance sequence, The first inventory balance sequence Days of inventory balance, The first inventory balance sequence The forecast value of inventory balance for the day, The total number of days included in the first inventory balance sequence.

Citation Information

Patent Citations

  • Inventory adjustment method and system based on supply chain management

    CN114581012A

  • Apparatus and method for order quantity recommendation

    KR1020240040969A

  • Systems and methods for supply chain management

    US20230351322A1