A load emergency control method based on dynamic event triggering mechanism

Through the dynamic event triggering mechanism and the adaptive load shedding strategy guided by real-time electricity prices, the problems of distribution network operation risks and communication pressure in traditional methods are solved, precise load shedding and user compensation are achieved, and operating costs and communication burdens are reduced.

CN118646016BActive Publication Date: 2024-10-25NANJING UNIV OF POSTS & TELECOMM

Patent Information

Application Number
CN202411117937.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-25
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

The traditional low-frequency load shedding control method increases operational risks in the distribution network, and fails to fully utilize the flexible resources and responsiveness of the user side. There are difficulties in how to accurately and quickly shed loads in low-accident level scenarios, especially in dynamic situations. In terms of the application of the event triggering mechanism, how to reduce the communication pressure between the main station and substations of the distribution network remains to be studied.

Method used

Through the load emergency control method based on the dynamic event triggering mechanism, areas are divided according to the system's safe operation indicators, and an adaptive load shedding adjustment range guided by real-time electricity prices is established. The alternating multiplier method is used to calculate the load shedding optimization strategy, and is implemented in conjunction with the dynamic event triggering mechanism. Interaction and execution of load control strategies to reduce communication pressure.

Benefits of technology

It achieves precise shedding of grid load, improves grid stability and user compensation, reduces distribution network master station operating costs, improves information transmission efficiency, and reduces communication burden.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118646016B_ABST
    Figure CN118646016B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of smart grid and power system automation control, and discloses a load emergency control method based on a dynamic event trigger mechanism, which divides the distribution network into regions according to the system safety operation index; proposes an adaptive load level division method based on user response willingness, and establishes a distribution network precise load control model with the goal of minimizing the distribution network system operation cost; adopts a dynamic event trigger mechanism to reduce the communication between the distribution network substation and the main station, and realizes the effective interaction and precise execution of load control strategy information. The method described in the present invention can accurately realize the precise control of the load, and effectively alleviate the communication transmission pressure of the distribution network, ensuring the stability of the power grid and the continuous supply of key loads.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of smart grid and power system automation control, and in particular relates to a load emergency control method based on a dynamic event triggering mechanism. Background Art

[0002] The rapid growth of electricity demand has put forward severe requirements on electricity supply. When there is a power shortage in the distribution network line, the dispatching master station needs to quickly make a decision to remove part of the load to smooth the steady-state power shortage of the power grid and improve the safety resilience and regulation flexibility of the power grid. The traditional low-frequency load reduction control method achieves a balance between power supply and demand by cutting off the entire transmission line in the distribution network area, which will increase the operating risk of the distribution network and have an adverse impact on the normal economic development of the society and the living standards of users. Therefore, it is very necessary to study the load shedding under low accident level scenarios. How to tap the potential of load shedding on the distribution network side and implement load shedding operations accurately and quickly is a problem that needs to be solved urgently.

[0003] When the current distribution network performs precise load shedding, it does not fully utilize the user-side flexibility resources and user response level under the guidance of time-of-use electricity prices; in addition, although the static event trigger mechanism can alleviate the communication pressure of the distribution network to a certain extent, the dynamic trigger mechanism has been proven to be able to achieve information transmission based on less data sampling or data transmission in complex transmission systems, thereby reducing communication pressure; however, for the load shedding operation of the distribution network, how to set up a suitable dynamic event trigger mechanism to reduce the communication pressure between the distribution network master station and the substation remains to be studied. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a load emergency control method based on a dynamic event trigger mechanism. In an emergency, the demand side, especially the willingness of people's livelihood loads and effective communication conditions are fully considered. Through grid risk assessment and load priority division, the grid safety and stability control system realizes accurate grid load shedding according to the issued load shedding strategy to ensure the stability of the grid and the supply of critical loads.

[0005] The present invention provides a load emergency control method based on a dynamic event triggering mechanism, comprising the following steps:

[0006] Step 1: Divide the distribution network into regions according to the system safety operation indicators to ensure the conditions for safe operation of the system;

[0007] Step 2: Based on the partitioned areas, an adaptive load shedding adjustment range method based on real-time electricity prices is proposed, and a user participation load shedding response coefficient based on real-time electricity prices is established;

[0008] Step 3: With the goal of minimizing the operating cost of distribution network substations, establish a precise load control model for distribution networks in each region;

[0009] Step 4: Use a dynamic event trigger mechanism to achieve effective interaction and precise execution of load shedding information in this area and the load control strategy information in its adjacent areas;

[0010] Step 5: Based on the electricity price signal, the willingness of users in the region to participate in load shedding is fully considered. Based on the distribution network precise load control model, the target is to minimize the distribution network operation cost, and the system safety operation is the constraint condition. The alternating multiplier method is used to calculate the load shedding optimization strategy for each region.

[0011] Step 6: Based on the shelvable load optimization strategy obtained in step 5, when a power shortage occurs in the distribution network, the interruptible loads participating in the load shedding operation in the area are used to adjust the safe and stable operation of the system.

[0012] Furthermore, in step 1, the distribution network is divided into regions based on the consideration of the stability characteristics of the power grid, that is, the voltage regulation capability is fully considered based on the consideration of the modularity index to achieve the optimal partitioning of the distribution network;

[0013] The modularity index of the distribution network is used to measure the degree of association between two nodes in the distribution network area, as follows:

[0014] (1),

[0015] In the formula, Indicates the degree of association between nodes. represents the electrical distance between node i and node j, i and j are nodes in the distribution network, k i represents the node degree of node i, is the sum of the weights of all edges connected to node i; k j represents the node degree of node j; m is the sum of the weights of all edges in the partitioned region, that is, ;δ(i,j) is a binary variable, , it means nodes i and j are in the same area, otherwise ;

[0016] The correlation index between two nodes in the distribution network is as follows:

[0017] (2),

[0018] (3),

[0019] In the formula, the value range of i and j is from 1 to w, i≠j; S VP,jj represents the voltage sensitivity of load node j to active source j, SVQ,jj represents the voltage sensitivity of load node j to reactive power source j, S VP,ij represents the voltage sensitivity of load node i to active power source j, S VQ,ij represents the voltage sensitivity of load node i to reactive power source j; D iw It is used to measure the influence of node w on node i, D jw It is used to measure the influence of node w on node j, D ij Characterizes the comprehensive impact of the power change of node j on node i, D ij The smaller it is, the greater the impact of the power change of node j on node i, and the smaller the distance between the two nodes; The larger the value, the better the structure of the distribution network division;

[0020] Considering the voltage regulation capability, voltage regulation indicators are introduced to divide the regions, as follows:

[0021] (4),

[0022] In the formula, It represents the average value of voltage deviation in each area; It represents the voltage measurement index of each node i in region n at time t; when the maximum voltage deviation in the region Less than the maximum allowable deviation of the area hour, , otherwise the value is , N represents the number of divided areas.

[0023] Furthermore, in step 2, it is assumed that the user’s expected value of electricity price at time t is p ex,t , when the actual electricity price is higher than the user's expectation, the user participation will be high, and the amount of load that can be adjusted will increase; conversely, the user's willingness will decrease, and the corresponding load that can be cut will decrease. Therefore, the user response coefficient is established:

[0024] (5),

[0025] In the formula, ρ i,t represents the response coefficient of the user at node i participating in the distribution network at time t, p t represents the actual electricity price at time t, p max Indicates the maximum value of electricity price, is the participation willingness of the user at node i, ;

[0026] when , the user at node i actively participates at time t, the upward adjustment margin of the load that can be cut at the node increases, and the corresponding interruptible power adjustment range will increase accordingly; conversely, the downward adjustment margin of the load that can be cut will decrease, and the interruptible load adjustment range will decrease accordingly; therefore, the definition reflects the change value of the load that can be cut for:

[0027] (6),

[0028] when When users actively participate, When the electricity price is lower than the user's expectation, the user's participation decreases accordingly; therefore, the upper and lower limits of the load that can be cut are adaptively adjusted based on the original electricity price signal, that is:

[0029] when hour:

[0030] (7),

[0031] when hour:

[0032] (8),

[0033] The adjusted upper limit of the load that can be cut does not exceed the total load value of the current user;

[0034] In the formula, , Indicates the initial upper and lower limits of the load power that can be cut. , Indicates the upper and lower limits of the load that users can cut under the guidance of electricity prices.

[0035] Furthermore, the cost paid by the distribution network to users is modeled as follows:

[0036] (9),

[0037] In the formula, is the cost of compensation from the distribution network to the user at time t, M is the number of interruptible load levels, λ m is the compensation price corresponding to the mth level of interruptible load; the higher the load level, the greater the compensation the user can get, that is, the compensation price corresponding to the high load level is λ m The larger the value; is the total amount of interruptible load of level m at time t;

[0038] The load shedding safety range constraint of interruptible load is:

[0039] (10),

[0040] In the formula is the total amount of all interruption loads at node i at time t;

[0041] (11),

[0042] In the formula is the mth level interruptible load at node i at time t;

[0043] The maximum number of resections is constrained as:

[0044] (12),

[0045] In the formula Indicates the maximum number of interruptions of the interruptible load;

[0046] The minimum and maximum duration constraints of the removable load are:

[0047] (13),

[0048] Where b i,t represents the state of the interruptible load at time t, b i,t-1 Indicates the state of interruptible load at time t-1; When , it means that the load can be interrupted to participate in the load shedding operation, otherwise it will not participate; Indicates the maximum number of interruptions of the interruptible load; , Indicates the maximum and minimum interruption duration of the interruptible load.

[0049] Furthermore, step 3 is specifically as follows:

[0050] Step 3-1: Establish the objective function for load shedding control of the distribution network:

[0051] (14),

[0052] In the formula, It represents the power value traded between node i and the main grid in period t. The value is positive when purchasing electricity from the main grid, otherwise it is negative; is the cost coefficient of node i’s transaction with the main network in period t;

[0053] In order to ensure the safe operation of the system, it is necessary to establish safe operation constraints, among which the line flow constraints are:

[0054] (15),

[0055] In the formula , They represent the renewable energy output and energy storage charging and discharging active power at node i at time t, , Indicates the corresponding reactive power;

[0056] The phase angle of branch power flow is relaxed in equation (15), and the linear power flow constraint obtained after relaxation is as follows:

[0057] (16),

[0058] The power expression after relaxation at the head end of the branch line is as follows:

[0059] (17),

[0060] Formula (17) can be further rewritten into the form of rotated second-order cone programming as follows:

[0061] (18),

[0062] In order to ensure that the active power of the controllable units in the distribution network operates within its allowed safety range, the upper and lower limits of its operation are constrained as shown in formula (19):

[0063] (19),

[0064] Similarly, in order to ensure that the reactive power of the controllable units in the distribution network operates within its allowed safety range, the upper and lower limits of its operation are constrained as shown in formula (20):

[0065] (20),

[0066] During the operation of the distribution network, the voltage of each node must operate within its safety range, so the constraint condition of each node is formula (21):

[0067] (twenty one).

[0068] Furthermore, step 4 is specifically as follows:

[0069] Assume that the distribution network operation status value measured by the i-th measuring device at the k-th sampling time is , then the event generation function is expressed as:

[0070] (twenty two),

[0071] In the formula, x i,τ Represents the system operation state vector transmitted to the distribution network master station at the most recent moment; σ i represents the trigger threshold of the i-th measuring device;

[0072] Based on formula (22), the generation function based on the dynamic trigger event mechanism is constructed as:

[0073] (twenty three),

[0074] In the formula, δ i,k It is a dynamic variable set in the dynamic event trigger mechanism, and the minimum sampling interval under the dynamic event trigger mechanism is not less than the minimum sampling interval under the static event trigger mechanism; , λ is a scalar between (0, 1), ;

[0075] Based on formula (23), the interval between any two triggering times [t i,k , t i,k+1 ), define the logic trigger variable γ according to the calculated value of the event generation function i,k , the specific expression is:

[0076] (twenty four),

[0077] From formula (24), we can see that when γ i,k When it is 1, the substation updates its own controller, and the master station transmits the status data of the substation to the adjacent distribution substation. will be set to 0, triggering the function , then the logical variable γ i,k It is set to 0 until the next time the trigger function is satisfied and it will be executed again. When power shortage occurs and other substations need to coordinate load shedding to ensure stable operation of the system, a dynamic event trigger mechanism is implemented.

[0078] The beneficial effects of the present invention are as follows: the method of the present invention guides users to actively participate in the load shedding operation of the distribution network by establishing a response coefficient under the current dynamic electricity price mechanism. This mechanism not only helps to generate an adaptive load shedding strategy, but also allows users to obtain more compensation and reduce the operating cost of the distribution network master station. The present invention also improves the information transmission efficiency between the distribution network master station and the substation by introducing a dynamic event trigger mechanism, effectively reducing the communication burden in the process of power information transmission. BRIEF DESCRIPTION OF THE DRAWINGS

[0079] Figure 1 It is a flow chart of the dynamic event triggering mechanism;

[0080] Figure 2 It is the framework diagram of the load shedding control strategy;

[0081] Figure 3 It is a schematic diagram of the improved 33-node distribution network system;

[0082] Figure 4 It is the output power load demand and electricity price curve of photovoltaic and wind turbines;

[0083] Figure 5 is a schematic diagram of typical node voltage levels;

[0084] Figure 6 is the graph of voltage levels at all nodes;

[0085] Figure 7 This is a schematic diagram of the traditional proportional load shedding scheduling results;

[0086] Figure 8 is a schematic diagram of adaptive load shedding scheduling results;

[0087] Fig. 9 It is a schematic diagram of the time triggering moment of each sub-area;

[0088] Fig.10 is a flow chart of the method of the present invention. DETAILED DESCRIPTION

[0089] In order to make the contents of the present invention more clearly understood, the present invention is further described in detail below based on specific embodiments in conjunction with the accompanying drawings.

[0090] like Fig.10 As shown, a load emergency control method based on a dynamic event triggering mechanism described in the present invention comprises the following steps:

[0091] Step 1: Divide the distribution network into regions according to the system safety operation indicators to ensure the conditions for safe operation of the system;

[0092] Step 2: Based on the partitioned areas, an adaptive load shedding adjustment range method based on real-time electricity prices is proposed, and a user participation load shedding response coefficient based on real-time electricity prices is established;

[0093] Step 3: With the goal of minimizing the operating cost of distribution network substations, establish a precise load control model for distribution networks in each region;

[0094] Step 4: Use a dynamic event trigger mechanism to achieve effective interaction and precise execution of load shedding information in this area and the load control strategy information in its adjacent areas;

[0095] Step 5: Based on the electricity price signal, the willingness of users in the region to participate in load shedding is fully considered. Based on the distribution network precise load control model, the target is to minimize the distribution network operation cost, and the system safety operation is the constraint condition. The alternating multiplier method is used to calculate the load shedding optimization strategy for each region.

[0096] Step 6: Based on the shelvable load optimization strategy obtained in step 5, when a power shortage occurs in the distribution network, the interruptible loads participating in the load shedding operation in the area are used to adjust the safe and stable operation of the system.

[0097] When a distribution network fails or the power shortage is in the early stage, there will be problems such as frequency drop, current limit overrun, and overuse of tie line power. The distribution network master station control system must be able to achieve fast, accurate and load operation. The typical load shedding control system consists of the distribution network center master station, distribution network substation and electrical equipment control terminal, such as Figure 2 As shown. The main station of the distribution network decision-making layer is mainly responsible for receiving information uploaded by the control center station, performing optimization decision calculations to distribute load shedding, coordinating data interaction between the modules of each distribution network substation, and issuing control operation instructions. The distribution network substation of the coordination layer mainly collects information on the amount of load that can be cut in the region, exchanges data with the distribution network master station and the equipment layer, and executes the load shedding control instructions issued by the master station; the terminal equipment layer is equipped with a control terminal to collect the amount of load that can be cut at the user end, upload it to the distribution network substation, and receive instructions from the distribution network substation to achieve rapid load shedding operations.

[0098] When a power shortage occurs in the power grid, the distribution network is partitioned under a low accident level to solve problems such as some voltage and frequency exceeding the limit and section power exceeding the stability limit. Compared with the overall load shedding measures, this method has the advantage of low control cost. Therefore, the present invention first divides the distribution network into regions when a power shortage occurs on the basis of considering the stability characteristics of the power grid, that is, fully considers the voltage regulation capability on the basis of considering the modularity index, and realizes the optimized partitioning of the distribution network.

[0099] The modularity index of the distribution network is used to measure the degree of association between two nodes in the distribution network area, as follows:

[0100] (1),

[0101] In the formula represents the electrical distance between node i and node j, i and j are nodes in the distribution network, k i represents the node degree of node i, k i =∑ i l ij is the sum of the weights of all edges connected to node i, and m is the sum of the weights of all edges in the region, that is, ; δ(i,j) is a binary variable, , it means that nodes i and j are located in the same area, otherwise .

[0102] The correlation index between two nodes in the distribution network is as follows:

[0103] (2),

[0104] (3),

[0105] Where S VP and SVQ Denote active and reactive voltage sensitivity matrices respectively, D ij Characterizes the comprehensive impact of the power change of node j on node i, D ij The smaller it is, the greater the impact of the power change of node j on node i, and the smaller the distance between the two nodes; The larger the value, the better the structure of the distribution network division.

[0106] In addition to considering the physical significance of the structure, the regional division of the distribution network should also focus on the stable operation of the system. Therefore, the present invention introduces the voltage regulation index as an important consideration for regional division. The introduction of this index can effectively adjust the voltage limit problem when the power is insufficient and reduce the power loss between different regions:

[0107] (4),

[0108] This indicator is expressed by the average value of the voltage deviation in each area, where represents the voltage measurement index of each node i in region n, where the maximum voltage deviation in the region Less than the maximum allowable deviation of the area hour, , otherwise the value is , N represents the number of divided areas.

[0109] Based on the time-of-use electricity price, users are guided to participate in load shedding operations, and an adaptive load shedding strategy based on the user response coefficient is established. The user response coefficient reflects the degree of user participation, and the user benefit reflects the compensation of load shedding to the user.

[0110] Assume that the user's expected value of electricity price at time t is p ex,t , when the actual electricity price is higher than the user's expectation, the user participation will be high, and the amount of load that can be adjusted will increase; conversely, the user's willingness will decrease, and the corresponding load that can be cut will decrease. Therefore, the user response coefficient is established:

[0111] (5),

[0112] Where ρ i,t represents the response coefficient of the user at node i participating in the distribution network at time t, p t represents the actual electricity price at time t, p max Indicates the maximum value of electricity price, is the participation willingness of the user at node i, ;when When the user at node i actively participates at time t, the upward adjustment margin of the cuttable load at the node increases, and the corresponding interruptible power adjustment range will increase accordingly; conversely, the downward adjustment margin of the cuttable load will decrease, and the interruptible load adjustment range will decrease accordingly. Therefore, the change value of the cuttable load is defined as:

[0113] (6),

[0114] From the previous analysis, we can see that When users actively participate, When the electricity price is lower than the user's expectation, the user's participation will decrease accordingly. Therefore, the upper and lower limits of the load that can be cut can be adaptively adjusted based on the original electricity price signal. hour,

[0115] (7),

[0116] when hour:

[0117] (8);

[0118] However, the modified upper limit of the load that can be cut should not exceed the total load value of the current user; , Indicates the initial upper and lower limits of the load power that can be cut. , It indicates the upper and lower limits of the load that users can cut under the guidance of electricity prices. The load that can be cut is adaptively adjusted as the electricity price changes, which increases the flexibility of load cutting.

[0119] The present invention implements the load shedding function by operating the interruptible load. The benefits obtained by users participating in the load shedding are related to the interruptible load amount and the load level. The higher the level of the interruptible load, the higher the price the distribution network compensates the user. From the perspective of the distribution network cost, the smaller the cost corresponding to the compensation, the better. The cost modeling of the distribution network paying to the user is as follows:

[0120] (9),

[0121] Where M is the interruptible load level number, λ m is the compensation price corresponding to the mth level of interruptible load; in this method model, the higher the load level, the greater the compensation the user can get, that is, the compensation price corresponding to the high load level is λ m The larger the value; is the total amount of interruptible load of level m at time t.

[0122] In addition, the interruptible load should also meet the constraints of the cut-off load safety range, cut-off times, cut-off duration, etc.:

[0123] (10),

[0124] (11),

[0125] The maximum number of resections is constrained as:

[0126] (12),

[0127] The minimum and maximum duration constraints of the removable load are:

[0128] (13),

[0129] Where b i,t Indicates the state of interruptible load. When , it means that the load can be interrupted to participate in the load shedding operation, otherwise it will not participate; Indicates the maximum number of interruptions of the interruptible load; , Indicates the maximum and minimum interruption duration of the interruptible load.

[0130] The objective function is established for load shedding control of the distribution network. In addition to paying compensation for user load shedding, the distribution network master station also needs to consider the transaction cost with the main network:

[0131] (14),

[0132] In the formula, It represents the power value traded between node i and the main grid in period t. The value is positive when purchasing electricity from the main grid, otherwise it is negative; is the cost coefficient of node i’s transaction with the main network in period t.

[0133] In order to ensure the safe and stable operation of the distribution network, the present invention adopts Distflow optimal power flow to model the constraints, and adopts the second-order cone programming method to relax the quadratic nonlinear shape conditions in the Distflow model, and transforms the original problem into a mixed integer second-order cone programming problem.

[0134] The line power flow constraint is:

[0135] (15),

[0136] In the formula , They represent the renewable energy output and energy storage charging and discharging active power at node i at time t, , Indicates the corresponding reactive power;

[0137] The phase angle of branch power flow is relaxed in equation (15), and the linear power flow constraint obtained after relaxation is as follows:

[0138] (16),

[0139] The power expression after relaxation at the head end of the branch line is as follows:

[0140] (17),

[0141] Formula (17) can be further rewritten into the form of rotated second-order cone programming as follows:

[0142] (18),

[0143] In order to ensure that the active power of the controllable units in the distribution network operates within its allowed safety range, the upper and lower limits of its operation are constrained as shown in formula (19):

[0144] (19),

[0145] Similarly, in order to ensure that the reactive power of the controllable units in the distribution network operates within its allowed safety range, the upper and lower limits of its operation are constrained as shown in formula (20):

[0146] (20),

[0147] During the operation of the distribution network, the voltage of each node must operate within its safety range, so the constraint condition of each node is formula (21):

[0148] (twenty one).

[0149] The objective function and constraint conditions of the power grid load shedding model established in the present invention satisfy the form of a second-order cone programming problem. The decision variables are the states of the load switches in the substation, and can be effectively solved using commercial solvers such as CLPEX.

[0150] When a power shortage occurs in the distribution network and load shedding is performed, the system operation data collected by the measuring device needs to be transmitted to the distribution network substation through the communication network and the exact load shedding amount needs to be quickly calculated. According to the user's willingness to participate in load shedding, the interruptible load participating in the load shedding operation in the area is used to adjust the safe and stable operation of the system.

[0151] When the area has not yet recovered to the safe operation range of the system, the substation needs to send demand information to the distribution network master station. The distribution network master station selects adjacent areas that meet the conditions according to the load margin to perform cross-regional load shedding. In order to implement the load shedding operation, frequent transmission of information between the master station and the substation is required. The traditional mechanism usually adopts fixed-cycle sampling. With the widespread application of smart meters, the amount of measured data transmitted by the network is increasing. When transmitting under communication conditions with limited bandwidth, it will increase the pressure on the communication channel, resulting in the occurrence of network induction. In order to rationally utilize limited communication resources and alleviate network communication pressure, the present invention adopts a dynamic event triggering mechanism, such as Figure 1 As shown in the figure, the event is defined as whether the adjacent sub-area participates in the load shedding operation. The event trigger detector of the distribution network substation will only act when it receives a trigger signal that meets the conditions, and then the event trigger controller will pass the data information to the adjacent substation. By setting a reasonable trigger function to reflect the state of the event being triggered, the amount of data transmitted by the distribution master station in the load shedding operation is reduced, and the communication pressure between the distribution network master station and the substation is relieved.

[0152] Assume that the distribution network operation status value measured by the i-th measuring device at the k-th sampling time is , then the event generation function can be expressed as:

[0153] (twenty two),

[0154] Where x i,τ Indicates the system operation state vector transmitted to the distribution network master station at the most recent moment. Since the dynamic trigger event adds internal dynamic variables on the basis of the static trigger event, the communication frequency between the system master station and the substation can be reduced. Based on this, the generation function based on the dynamic trigger event mechanism is:

[0155] (twenty three),

[0156] In the formula, δ i,k It is a dynamic variable set in the dynamic trigger event mechanism, and it is proved from mathematical theory that the minimum sampling interval under the dynamic event trigger mechanism is not less than the minimum sampling interval under the static event trigger mechanism, so that unnecessary transmission can be further reduced during the information interaction process. , λ is a scalar between (0, 1), .

[0157] The interval between any two triggering times [t i,k , t i,k+1 ), define the logic trigger variable γ according to the calculated value of the event generation function i,k , while γ i,kThe value of determines whether the substation status information is transmitted to the adjacent distribution substation through the communication network. The specific expression of the measured event trigger logic variable is:

[0158] (twenty four).

[0159] It can be seen that when γ i,k When it is 1, the substation updates its own controller, and the master station transmits the status data of the substation to the adjacent distribution substation. will be set to 0, triggering the function , then the logical variable γ i,k It is set to 0 until the next time the trigger function is satisfied and it will be executed again. When power shortage occurs and other substations need to coordinate load shedding to ensure stable operation of the system, a dynamic event trigger mechanism is implemented.

[0160] In order to verify the effectiveness of the load shedding method proposed in this invention, it is verified in the improved IEEE33-node distribution network model. Figure 3 As shown in the figure, the node numbers are 1-33, the areas are divided into ①②③, the base capacity of the distribution network system is 10MVA, the base voltage is 12.66kV, and the per-unit voltage value of each node is allowed to be 0.95-1.05 (pu). Figure 4 shown.

[0161] In the simulation verification of the present invention, it is assumed that a power shortage of 11MW is generated at node 12 when the system is running. According to the partitioning method proposed by the present invention, the improved 33-node distribution network is divided into three areas: Figure 3 Shown in different colors.

[0162] In this system, nodes 6, 14, and 24 are connected to the first-level cuttable load, nodes 20, 23, and 25-28 are connected to the second-level interruptible load, and nodes 8-10 are the third-level interruptible load. If the load is cut off only according to its importance, it is obvious that the loads at nodes 6, 14, and 24 will be cut off first, which will cause the voltage of the nodes to exceed the limit in some periods of time, such as Figure 5 The voltage change curve at node 6 is shown. Since there is photovoltaic access at node 6, the voltage exceeds the upper limit at 11:00-13:00 and 15:00, which will cause some distributed power sources to trip and disconnect from the grid. Since the method proposed in the present invention fully considers the voltage index of the region and compensates for different types of removable loads according to the importance of the load, the load is dispersedly removed when a power shortage occurs. Although some secondary and tertiary loads are removed in this process, it can ensure that the voltage at the node where the distributed power source is located does not exceed the limit, which can effectively avoid the hidden danger of large-scale power outages.

[0163] The voltage level of 33 nodes under the partition load shedding scheme proposed by the present invention is as follows: Figure 6 As shown, all node voltages are within the safety range of 0.95-1.05 (pu), satisfying the voltage operation constraints of the distribution network after load shedding. Compared with the traditional scheme of load importance, the partitioned load shedding proposed in the present invention can ensure the power supply reliability of users during the distribution network load shedding operation.

[0164] In order to verify the correctness and effectiveness of the method proposed in the present invention, the method proposed in the present invention is compared with the traditional method in proportion to perform load shedding operation under the same test environment and parameter settings. The results are as follows: Figure 7 , Figure 8 At the same time, the shearable loads described in the present invention are divided into three levels, and the higher the level, the greater the importance of the load. Figure 7 , Figure 8 It can be seen that when the system has a power shortage and the user needs to cut the load, the method adopted by the present invention significantly reduces the number of load shedding times. At the same time, the method adopted by the present invention significantly reduces the number of times the important load is cut off than the traditional method.

[0165] In the simulation verification, the present invention sets the user's expected electricity price to be 467 yuan / MWh, which is between the maximum and minimum values ​​of the grid electricity price and is reasonably set. Figure 8 It can be seen that when the actual electricity price is higher than the user's psychological price period is (8:00-23:00), the time when users actually participate in load shedding operations is mainly concentrated in (10:00-11:00, 14:00-18:00). Figure 8 It can be seen that the electricity price in these periods is much higher than the psychological expectations of users, so the enthusiasm of users to participate in load shedding is significantly higher than that in other periods. This also shows that under the current time-of-use electricity price, the method proposed in the present invention can better guide users to actively participate in the distribution network load shedding operation. The range of interruptible load changes can be adjusted autonomously according to different electricity prices, realizing the adaptive removal amount of interruptible load.

[0166] Since users actively participate in load shedding during the peak period of electricity prices, and the higher the load level, the greater the compensation users can receive, compared with traditional methods, the method proposed in this invention can allow users to obtain more compensation. The compensation amounts corresponding to primary load, secondary load, and tertiary load are 350, 500, and 1000 (unit: yuan / MW) respectively. Figure 8It can be seen that at 11:00, 15:00, and 16:00 when the electricity price is at its peak, the three-level load released by users is 0.544MWh, 0.595MWh, and 0.612MWh, which is much larger than the important load released by the traditional method in these three periods. The three-level load removed by the traditional method at the peak of the electricity price is 0.16MWh, 0.175MWh, and 0.18MWh, respectively. Therefore, the compensation obtained by users removing the load by the traditional method is relatively small. At the same time, based on the adaptive mechanism proposed by the present invention that can dynamically change the load according to the change of electricity price, the operating cost of the distribution network can be reduced, because the cost of compensating users during the peak of electricity price is less than the cost of purchasing electricity from the power grid, which is equivalent to the distribution network master station only needing to pay less to purchase the electricity released by the user. Therefore, facing the same environment, the method proposed by the present invention is better.

[0167] When the power shortage of the distribution network occurs and the load is cut, since the load cut amount in the area where the node 12 is located cannot meet the demand, it is necessary to send a signal to the distribution network substations in the two adjacent areas, and finally the distribution network master station coordinates and realizes it. The measuring device in the area where the node 12 is located takes the current system operation status information (load that can be cut, branch power, node voltage value, etc.) as a trigger event, and when transmitting information to the distribution network substation and the adjacent substation, since the present invention adopts a dynamic trigger event mechanism to realize information transmission between adjacent areas, the data transmission rate can be significantly improved. Here, the method proposed in the present invention is compared with the static event trigger mechanism in the load shedding process. Under the same test environment and parameter settings, the simulation time of the two trigger mechanisms (dynamic event triggering and static event triggering) is 10s, the parameters λ are set to 0.6, α is set to 1.5, and the trigger threshold σ is set to 0.01. The number of triggers under the two mechanisms is shown in Table 1. It can be seen that the number of event triggers using the method proposed in the present invention is significantly reduced. Compared with the static trigger event, the number of triggers in the present invention is reduced by about 25% at the minimum, and the maximum number of triggers can be reduced by about 46%.

[0168] Table 1 Comparison of the number of times of different triggering methods in each area

[0169]

[0170] Fig. 9 The triggering time of the measuring devices in the three areas under the dynamic triggering event triggering mechanism is shown. In the given simulation time, due to the introduction of the dynamic disturbance δ, the interval between the two triggering times becomes larger, the maximum communication time intervals of adjacent sub-areas are 1.3s, 1.09s, and 1.1s, and the minimum communication time interval of each sub-area is greater than 0.05s. Fig. 9 It can be seen that when power shortage occurs in area ②, the coordinated load shedding of the substations in the other two areas is required to achieve system stability. The number of triggers in area ② is obviously more than the number of triggers in the other two areas. Figure 8 It can be seen that the dynamic event trigger mechanism adopted by the present invention has a longer average communication time interval, which will occupy less communication resources to a certain extent. It can be seen that the dynamic event trigger mechanism adopted by the present invention can greatly reduce the number of communications for load shedding information interaction between each distribution sub-area, which is beneficial to reduce the data transmission pressure of the communication network to a certain extent, thereby improving the efficiency of the load shedding process.

[0171] In view of the shortcomings of traditional load shedding schemes, the present invention proposes a load emergency control strategy based on a dynamic event trigger mechanism. Under the current dynamic electricity price mechanism, by establishing a response coefficient to guide users to actively participate in the load shedding operation of the distribution network, this mechanism not only helps to generate adaptive load shedding strategies, but also allows users to obtain more compensation and reduce the operating costs of the distribution network master station. The present invention also improves the information transmission efficiency between the distribution network master station and the substation by introducing a dynamic event trigger mechanism, effectively reducing the communication burden in the process of power information transmission.

[0172] The above description is only a preferred embodiment of the present invention and is not intended to be a further limitation of the present invention. All equivalent changes made using the contents of the present specification and drawings are within the protection scope of the present invention.

Claims

1. A load emergency control method based on a dynamic event trigger mechanism, characterized in that: The following steps are involved: Step 1: Divide the distribution network into regions according to the system safety operation indicators; Step 2: Based on the partitioned areas, an adaptive load shedding adjustment range method based on real-time electricity prices is proposed, and a user participation load shedding response coefficient based on real-time electricity prices is established; specifically: Assume that the user's expected value of electricity price at time t is p ex,t , when the actual electricity price is higher than the user's expectation, the user participation will be high, and the amount of load that can be adjusted will increase; conversely, the user's willingness will decrease, and the corresponding load that can be cut will decrease. Therefore, the user response coefficient is established: (5), In the formula, ρ i,t represents the response coefficient of the user at node i participating in the distribution network at time t, p t represents the actual electricity price at time t, p max Indicates the maximum value of electricity price, is the participation willingness of the user at node i, ; when , the user at node i actively participates at time t, the upward adjustment margin of the load that can be cut at the node increases, and the corresponding interruptible power adjustment range will increase accordingly; conversely, the downward adjustment margin of the load that can be cut will decrease, and the interruptible load adjustment range will decrease accordingly; therefore, the definition reflects the change value of the load that can be cut for: (6), when When users actively participate, When the electricity price is lower than the user's expectation, the user's participation decreases accordingly; therefore, the upper and lower limits of the load that can be cut are adaptively adjusted based on the original electricity price signal, that is: when hour: (7), when hour: (8), The adjusted upper limit of the load that can be cut does not exceed the total load value of the current user; In the formula, , Indicates the initial upper and lower limits of the load power that can be cut. , Indicates the upper and lower limits of the load that users can cut under the guidance of electricity prices; Step 3: With the goal of minimizing the operating cost of distribution network substations, establish a precise load control model for distribution networks in each region; specifically: The objective function for load shedding control of the distribution network is established: (14), In the formula, It represents the power value traded between node i and the main grid in period t. The value is positive when purchasing electricity from the main grid, otherwise it is negative; is the cost coefficient of node i’s transaction with the main network in period t; is the cost of compensation from the distribution network to users at time t, In order to ensure the safe operation of the system, it is necessary to establish safe operation constraints, among which the line flow constraints are: (15), In the formula , They represent the renewable energy output and energy storage charging and discharging active power at node i at time t, , Indicates the corresponding reactive power; is the total amount of all interruptible loads at node i at time t; The phase angle of branch power flow is relaxed in equation (15), and the linear power flow constraint obtained after relaxation is as follows: (16), The power expression after relaxation at the head end of the branch line is as follows: (17), Formula (17) can be further rewritten into the form of rotated second-order cone programming as follows: (18), In order to ensure that the active power of the controllable units in the distribution network operates within its allowed safety range, the upper and lower limits of its operation are constrained as shown in formula (19): (19), Similarly, in order to ensure that the reactive power of the controllable units in the distribution network operates within its allowed safety range, the upper and lower limits of its operation are constrained as shown in formula (20): (20), During the operation of the distribution network, the voltage of each node must operate within its safety range, so the constraint condition of each node is formula (21): (21); Step 4: Based on the dynamic event trigger mechanism, the load shedding in this area and the load control strategy information of its adjacent areas are effectively interacted and accurately executed; Step 5: Based on the electricity price signal, the willingness of users in the region to participate in load shedding is fully considered. Based on the distribution network precise load control model, the target is to minimize the distribution network operation cost, and the system safety operation is the constraint condition. The alternating multiplier method is used to calculate the load shedding optimization strategy for each region. Step 6: Based on the shelvable load optimization strategy obtained in step 5, when a power shortage occurs in the distribution network, the interruptible loads participating in the load shedding operation in the area are used to adjust the safe and stable operation of the system.

2. A load emergency control method based on a dynamic event trigger mechanism according to claim 1, characterized in that: In step 1, the distribution network is divided into regions based on the consideration of the stability characteristics of the power grid, that is, the voltage regulation capability is fully considered based on the modularity index to achieve the optimal partitioning of the distribution network; The modularity index of the distribution network is used to measure the degree of association between two nodes in the distribution network area, as follows: (1), In the formula, Indicates the degree of association between nodes. represents the electrical distance between node i and node j, i and j are nodes in the distribution network, k i represents the node degree of node i, is the sum of the weights of all edges connected to node i; k j represents the node degree of node j; m is the sum of the weights of all edges in the partitioned region, that is, ; δ(i,j) is a binary variable, , it means nodes i and j are in the same area, otherwise ; The correlation index between two nodes in the distribution network is as follows: (2), (3), In the formula, the value range of i and j is from 1 to w, i≠j; S VP,jj represents the voltage sensitivity of load node j to active source j, S VQ,jj represents the voltage sensitivity of load node j to reactive power source j, S VP,ij represents the voltage sensitivity of load node i to active power source j, S VQ,ij represents the voltage sensitivity of load node i to reactive power source j; D iw It is used to measure the influence of node w on node i, D jw It is used to measure the influence of node w on node j, D ij Characterizes the comprehensive impact of the power change of node j on node i, D ij The smaller it is, the greater the impact of node j’s power change on node i, and the smaller the distance between the two nodes; ρ l The larger the value, the better the structure of the distribution network division; Considering the voltage regulation capability, voltage regulation indicators are introduced to divide the regions, as follows: (4), In the formula, It represents the average value of voltage deviation in each area; It represents the voltage measurement index of each node i in region n at time t; when the maximum voltage deviation in the region Less than the maximum allowable deviation of the area hour, , otherwise the value is , N represents the number of divided areas.

3. A load emergency control method based on a dynamic event trigger mechanism according to claim 1, characterized in that: The cost paid by the distribution network to users is modeled as follows: (9), In the formula, is the cost of compensation from the distribution network to the user at time t, M is the number of interruptible load levels, λ m is the compensation price corresponding to the mth level of interruptible load; the higher the load level, the greater the compensation the user can get, that is, the compensation price corresponding to the high load level is λ m The larger the value; is the total amount of interruptible load of level m at time t; The load shedding safety range constraint of interruptible load is: (10), In the formula is the total amount of all interruptible loads at node i at time t; (11), In the formula is the mth level interruptible load at node i at time t; The maximum number of resections is constrained as: (12), In the formula Indicates the maximum number of interruptions of the interruptible load; The minimum and maximum duration constraints of the removable load are: (13), Where b i,t represents the state of the interruptible load at time t, b i,t-1 Indicates the state of interruptible load at time t-1; When , it means that the load can be interrupted to participate in the load shedding operation, otherwise it will not participate; Indicates the maximum number of interruptions of the interruptible load; , Indicates the maximum and minimum interruption duration of the interruptible load.

4. A load emergency control method based on a dynamic event trigger mechanism according to claim 1, characterized in that: Step 4 is as follows: Assume that the distribution network operation status value measured by the i-th measuring device at the k-th sampling time is , then the event generation function is expressed as: (22), In the formula, x i,τ Represents the system operation state vector transmitted to the distribution network master station at the most recent moment; σ i represents the trigger threshold of the i-th measuring device; Based on formula (22), the generation function based on the dynamic trigger event mechanism is constructed as: (23), In the formula, δ i,k It is a dynamic variable set in the dynamic event trigger mechanism, and the minimum sampling interval under the dynamic event trigger mechanism is not less than the minimum sampling interval under the static event trigger mechanism; , λ is a scalar between (0, 1), ; Based on formula (23), the interval between any two triggering times (t i,k , t i,k+1 ), define the logic trigger variable γ according to the calculated value of the event generation function i,k , the specific expression is: (24), From formula (24), we can see that when γ i,k When it is 1, the substation updates its own controller, and the master station transmits the status data of the substation to the adjacent distribution substation. will be set to 0, triggering the function , then the logical variable γ i,k It is set to 0 until the next time the trigger function is satisfied and it will be executed again. When power shortage occurs and other substations need to coordinate load shedding to ensure stable operation of the system, a dynamic event trigger mechanism is implemented.

Citation Information

Patent Citations

  • Elastic load frequency control method for multi-region power system under denial of service attack

    CN113972671A

  • Power distribution network layered and partitioned load shedding coordination control method based on event trigger mechanism

    CN114844050A

  • Source network load storage cooperative stability control algorithm based on equivalent model

    CN116632933A

  • Load shedding optimization control method and system for power distribution network, and computer equipment

    CN117439095A

  • Complex power distribution network optimization method considering trigger function

    CN117913827A

Cited By

  • Method for selecting loads to be subjected to power curtailment and control system of a power grid implementing such method

    WO2026110099A1