Day-ahead decision method, device, storage medium and electronic device for multi-energy complementary system
By obtaining and optimizing the forecast value and initial conditions of the water and wind-sun complementary system, calculating the water output, the end water level and power abandonment of the reservoir, drawing a curve to determine the target water and electricity output value, solving the problem of unbalanced benefits and risks of the water and wind-sun complementary system. The best decision-making and stability of the system are achieved.
Patent Information
- Application Number
- CN202411153311.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-08-21
AI Technical Summary
There is an imbalance between benefits and risks in water, wind and light complementary systems. The existing technology focuses mostly on the evaluation of single quantitative indicators or analysis from complementary scheduling results, making it difficult to achieve the best decision of the system.
By obtaining the forecast values of available water, wind power generation and photovoltaic power generation of the water and wind power complementary system, setting initial conditions and the water and wind power output value recently, conducting water and wind power complementary dispatch, and calculating the hydropower generation and reservoirs associated with each water and power output value recently, each water and wind power output value recently, The end water level and power waste, dynamically optimize and determine the hydropower generation and power waste in the future stage, draw the hydropower benefit curve and power waste risk curve, and find the target hydropower output value to achieve the best balance.
Taking into account a variety of factors, the imbalance between benefits and risks of water and scenery complementary systems has been solved, and scientific decision-making support is provided for water and scenery complementary scheduling recently, improving the stability and economics of the system.
Smart Images

Figure CN118674236B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of water-wind-solar complementarity, and specifically relates to a day-ahead decision-making method, device, storage medium and electronic equipment for a multi-energy complementary system. Background Art
[0002] Developing renewable energy is the most effective means to achieve the dual carbon goals of "carbon peak and carbon neutrality". The regulation capacity of hydropower and the complementarity between energy sources are the key to building a multi-energy complementary system. However, with the continuous access to wind and solar energy, the regulation of the water-wind-solar complementary system is insufficient, and the operating risks are increasing. Problems such as power abandonment, water abandonment, hydropower efficiency reduction, and hydropower unit losses are also becoming increasingly prominent. Therefore, it is particularly important to rationally use the regulation capacity of hydropower to balance the benefits and risks of the water-wind-solar system.
[0003] The decision on the day-ahead hydropower output affects the hydropower benefits and complementary system benefits of the entire dispatching process. How to make decisions on hydropower to achieve the optimization of benefits and risks of the hydro-wind-solar complementary system has become an important scientific issue. At present, most of the research on the benefit-risk assessment of the hydro-wind-solar complementary system focuses on the evaluation of a single quantitative indicator or the analysis of complementary dispatching results.
[0004] Therefore, there is an imbalance between benefits and risks in the day-ahead decision-making of the hydro-wind-solar complementary system. Summary of the invention
[0005] The purpose of the embodiments of the present application is to provide a method, device, storage medium and electronic device for day-ahead decision-making of a multi-energy complementary system, which can solve the problem of imbalance between benefits and risks in day-ahead decision-making of a water-wind-solar complementary system.
[0006] In a first aspect, an embodiment of the present application provides a day-ahead decision method for a multi-energy complementary system, the method comprising:
[0007] Obtain the forecast value of available water volume, wind power generation, photovoltaic power generation and initial conditions of the water-wind-solar complementary system during the scheduling period;
[0008] The initial conditions and the day-ahead hydropower output values are set for the water-wind-solar complementary system. Through the day-ahead complementary dispatch of water-wind-solar, the day-ahead hydropower generation, the day-ahead reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value are calculated.
[0009] According to the reservoir final water level in the day-ahead stage, the forecast value of available water volume in the future stage, the forecast value of wind power generation and the forecast value of photovoltaic power generation respectively associated with each hydropower output value the day before, through the optimized complementary scheduling of water, wind and photovoltaic, the future stage hydropower generation and future stage abandoned power associated with each hydropower output value the day before are determined; according to the forecast value of available water volume in the scheduling period, the day-ahead stage hydropower generation associated with each hydropower output value the day before, and the future stage hydropower generation associated with each hydropower output value the day before, multiple groups of associated day-ahead hydropower output values and water consumption rates are determined to obtain a hydropower benefit curve; the hydropower benefit curve is used to describe the relationship between the day-ahead hydropower output value and the water consumption rate;
[0010] According to the forecast values of wind power generation and photovoltaic power generation in the dispatching period, the day-ahead stage abandonment associated with each day-ahead hydropower output value, and the future stage abandonment associated with each day-ahead hydropower output value, multiple groups of associated day-ahead hydropower output values and abandonment rates are determined to obtain an abandonment risk curve, which is used to describe the relationship between the day-ahead hydropower output value and the abandonment rate;
[0011] According to the hydropower benefit curve and the power abandonment risk curve, the target hydropower output value in the day-ahead stage is determined.
[0012] In a second aspect, an embodiment of the present application provides a day-ahead decision-making device for a multi-energy complementary system, the device comprising:
[0013] An acquisition module is used to obtain the forecast value of available water volume, the forecast value of wind power generation, the forecast value of photovoltaic power generation and initial conditions of the water-wind-solar complementary system during the scheduling period;
[0014] The calculation module is used to set the initial conditions and the day-ahead hydropower output values for the water-wind-solar complementary system, and calculate the day-ahead hydropower generation, the reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value through the day-ahead complementary dispatch of water, wind and solar.
[0015] The first determination module is used to determine the future stage hydropower generation and future stage abandoned power generation associated with each day-ahead hydropower output value through water-wind-solar optimization and complementary scheduling, based on the day-ahead reservoir final water level, the future stage available water forecast value, the future stage wind power forecast value and the future stage photovoltaic power forecast value associated with each day-ahead hydropower output value, respectively.
[0016] The second determination module is used to determine multiple groups of associated day-ahead hydropower output values and water consumption rates according to the forecast value of available water in the scheduling period, the day-ahead stage hydropower generation associated with each day-ahead hydropower output value, and the future stage hydropower generation associated with each day-ahead hydropower output value, so as to obtain a hydropower benefit curve; the hydropower benefit curve is used to describe the relationship between the day-ahead hydropower output value and the water consumption rate;
[0017] The third determination module is used to determine multiple groups of associated day-ahead hydropower output values and power abandonment rates according to the forecast value of wind power generation in the scheduling period, the forecast value of photovoltaic power generation, the day-ahead stage abandonment amount associated with each day-ahead hydropower output value, and the future stage abandonment amount associated with each day-ahead hydropower output value, so as to obtain an abandonment risk curve, and the abandonment risk curve is used to describe the relationship between the day-ahead hydropower output value and the abandonment rate;
[0018] The fourth determination module is used to determine the target hydropower output value in the day-ahead stage according to the hydropower benefit curve and the power abandonment risk curve.
[0019] In a third aspect, an embodiment of the present application provides an electronic device, which includes a processor and a memory, wherein the memory stores programs or instructions that can be run on the processor, and when the program or instructions are executed by the processor, the steps of the method described in the first aspect are implemented.
[0020] In a fourth aspect, an embodiment of the present application provides a readable storage medium, on which a program or instruction is stored, and when the program or instruction is executed by a processor, the steps of the method described in the first aspect are implemented.
[0021] In a fifth aspect, an embodiment of the present application provides a chip, comprising a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run a program or instruction to implement the method described in the first aspect.
[0022] In a sixth aspect, an embodiment of the present application provides a computer program product, which is stored in a storage medium and is executed by at least one processor to implement the method described in the first aspect.
[0023] In an embodiment of the present application, the forecast value of the available water volume, the forecast value of the wind power generation, the forecast value of the photovoltaic power generation and the initial conditions of the water-wind-solar complementary system during the scheduling period are obtained; the initial conditions and the hydropower output values of each day-ahead are set for the water-wind-solar complementary system, and through the water-wind-solar complementary scheduling, the hydropower generation in the day-ahead stage, the final water level of the reservoir in the day-ahead stage and the power abandonment in the day-ahead stage associated with each hydropower output value in the day-ahead are calculated to reflect the influence of different hydropower output values on the current power generation and reservoir water storage. Since the current scheduling decision will affect the hydropower output in the future period, according to the calculated final water level of the reservoir in the day-ahead stage, the available water in the future stage and the predicted wind and solar output in the future stage, through the optimized complementary scheduling of water, wind and solar, the hydropower generation and power abandonment in the future stage corresponding to each hydropower output value in the day-ahead can be dynamically calculated.
[0024] Taking into account the total water consumption during the scheduling period, the day-ahead hydropower generation and the future stage hydropower generation corresponding to each day-ahead hydropower output value, the water consumption rate corresponding to different hydropower output values is calculated, and multiple groups of related day-ahead hydropower output values and water consumption rate data are obtained to obtain a hydropower benefit curve used to characterize the relationship between hydropower output and system benefit. According to the forecast values of wind power generation and photovoltaic power generation in the scheduling period, the day-ahead curtailment amount associated with each day-ahead hydropower output value, and the future stage curtailment amount associated with each day-ahead hydropower output value, multiple groups of related day-ahead hydropower output values and curtailment rates are determined to obtain a curtailment risk curve used to describe the relationship between the day-ahead hydropower output value and the curtailment rate.
[0025] By comprehensively considering the hydropower benefit curve and the power abandonment risk curve, the optimal balance point of hydropower output, system benefit and power abandonment risk under given constraints is found, that is, the target hydropower output value in the day-ahead stage. Thus, the optimal scheduling plan is obtained by comprehensively considering multiple factors, which solves the problem of imbalance between benefits and risks in the hydro-wind-solar complementary system. At the same time, it provides effective decision-making support for the day-ahead scheduling of hydro-wind-solar complementary scheduling, and is more suitable for the scheduling project of hydro-wind-solar multi-energy complementary system. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a flow chart of a day-ahead decision-making method for a multi-energy complementary system provided in an embodiment of the present application;
[0027] Figure 2 It is a schematic diagram of a hydropower benefit curve and a power abandonment risk curve provided in an embodiment of the present application;
[0028] Figure 3 It is a structural diagram of a day-ahead decision-making device for a multi-energy complementary system provided in an embodiment of the present application;
[0029] Figure 4 It is a schematic diagram of the hardware structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings of the embodiments of the present application to clearly describe the technical solutions of the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present application belong to the scope of protection of this application.
[0031] The terms "first", "second", etc. in the specification and claims of this application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.
[0032] The day-ahead decision-making method for a multi-energy complementary system provided in the embodiment of the present application can be applied to at least the following application scenarios, which are described below.
[0033] At present, hydropower, wind power and photovoltaic power, as representatives of renewable energy, have significant differences in their output characteristics. In grid dispatching and power system operation, it is necessary to comprehensively consider the output characteristics of the three, and build a water-wind-solar integrated dispatching system combining the hydropower regulation capacity and the complementary characteristics of energy sources to improve the stability and economy of the power system. For example: using the flexible regulation capacity of hydropower can effectively smooth out the volatility and intermittency of wind power and photovoltaic power. At night and on cloudy days, when the photovoltaic output is low, the power demand can be met by increasing the hydropower output or dispatching the energy storage system to release electricity.
[0034] In response to the problems arising from related technologies, the embodiments of the present application provide a method, device, storage medium and electronic device for day-ahead decision-making of a multi-energy complementary system, which can solve the problem of imbalance between benefits and risks in day-ahead decision-making of a water-wind-solar complementary system.
[0035] The day-ahead decision-making method for a multi-energy complementary system provided in the embodiment of the present application is described in detail below through specific embodiments and application scenarios in conjunction with the accompanying drawings.
[0036] Figure 1 A flowchart of a day-ahead decision-making method for a multi-energy complementary system provided in an embodiment of the present application.
[0037] like Figure 1 As shown, the multi-energy complementary system day-ahead decision method may include steps 110 to 160. The method is applied to a multi-energy complementary system day-ahead decision device, as shown below:
[0038] Step 110, obtaining a forecast value of available water volume, a forecast value of wind power generation, a forecast value of photovoltaic power generation, and initial conditions of the water-wind-solar complementary system during the scheduling period;
[0039] The forecast value of available water during the entire scheduling period depends on the forecast inflow and initial and final water level information. Wind power generation can be calculated based on the forecast wind speed, and photovoltaic power generation can be calculated based on the forecast radiation intensity, temperature, wind speed and other information.
[0040] The hydropower-wind-solar complementary system is an energy system formed by the regulating capacity of hydropower and the complementary relationship between hydropower, wind power and photovoltaic power. This system uses the complementary characteristics of more sunlight and less wind during the day and strong wind and no sunlight at night, as well as the regulating capacity of hydropower to smooth out the fluctuations in wind and solar power output, thereby improving energy utilization efficiency and supply stability.
[0041] Step 120, setting initial conditions and each day-ahead hydropower output value for the water-wind-solar complementary system, and calculating the day-ahead hydropower generation, the day-ahead reservoir final water level, and the day-ahead power abandonment associated with each day-ahead hydropower output value through the day-ahead complementary scheduling of the water-wind-solar system;
[0042] Step 130, according to the last water level of the reservoir in the day-ahead stage, the forecast value of the available water volume in the future stage, the forecast value of the wind power generation and the forecast value of the photovoltaic power generation respectively associated with each hydropower output value a day ago, through the water-wind-solar optimized complementary scheduling, determine the future stage hydropower generation and future stage abandoned power respectively associated with each hydropower output value a day ago;
[0043] Using the reservoir water level at the end of the day as the initial condition and combining it with the future water inflow forecast, the available water volume in the future corresponding to each day-ahead hydropower output value is calculated. These data are also the key inputs for the subsequent steps.
[0044] Step 140, according to the forecast value of available water in the scheduling period, the hydropower generation in the day-ahead phase respectively associated with each hydropower output value a day-ahead, and the hydropower generation in the future phase respectively associated with each hydropower output value a day-ahead, determine a plurality of groups of associated hydropower output values a day-ahead and water consumption rates to obtain a hydropower benefit curve; the hydropower benefit curve is used to describe the relationship between the hydropower output value a day-ahead and the water consumption rate;
[0045] The hydropower generation of the day-ahead and future periods is added together to obtain the total power generation of the entire scheduling period. Then, the corresponding average water consumption rate is calculated based on the total water consumption of the scheduling period. By trying different day-ahead hydropower output values and repeating the above process, multiple sets of feasible day-ahead output plans and their corresponding water consumption rates are obtained.
[0046] The scheduling period refers to a complete scheduling cycle. During this cycle, various factors need to be considered comprehensively to determine the optimal scheduling plan.
[0047] The future hydropower generation refers to the hydropower generation obtained through the optimized complementary scheduling of water, wind and solar power in certain time periods in the future, based on the available water volume calculated based on the reservoir water level and water inflow forecast, and the wind and solar power output predicted in the future. This data is very critical for evaluating the hydropower output during the entire scheduling period.
[0048] Water consumption rate refers to the amount of water consumed per unit of hydroelectric power generation within a certain period of time. The water consumption rate reflects the efficiency of water resource utilization.
[0049] The hydropower benefit curve is a curve used to describe the relationship between hydropower output and hydropower generation efficiency. Through this curve, the optimal decision point between hydropower output and hydropower benefit can be found under given constraints.
[0050] Step 150, according to the forecast value of wind power generation in the scheduling period, the forecast value of photovoltaic power generation, the amount of abandoned power in the day-ahead phase associated with each hydropower output value a day-ahead, and the amount of abandoned power in the future phase associated with each hydropower output value a day-ahead, determine multiple groups of associated hydropower output values a day-ahead and abandonment rates to obtain an abandonment risk curve, where the abandonment risk curve is used to describe the relationship between the hydropower output value a day-ahead and the abandonment rate;
[0051] The power abandonment rate refers to the proportion of wind and solar power generation that has to be abandoned due to oversupply of electricity in a certain period of time.
[0052] The power abandonment risk curve is a curve used to describe the relationship between hydropower output and power abandonment risk. Through this curve, the optimal balance point between hydropower output and power abandonment risk under given constraints can be found.
[0053] Abandoned electricity refers to the electricity that is abandoned when the power generation from hydropower, wind power and solar power exceeds the load demand.
[0054] Step 160, determining the target hydropower output value in the day-ahead phase according to the hydropower benefit curve and the power abandonment risk curve.
[0055] Taking into account the hydropower benefit curve and the power abandonment risk curve, the optimal day-ahead hydropower output target value is selected as the final day-ahead decision-making plan. By modeling and analyzing different hydropower output plans, the optimal balance point between hydropower output and system benefits and power abandonment risk is found, thereby determining the optimal day-ahead hydro-wind-solar complementary scheduling plan.
[0056] In an embodiment of the present application, the forecast value of the available water volume, the forecast value of the wind power generation, the forecast value of the photovoltaic power generation and the initial conditions of the water-wind-solar complementary system during the scheduling period are obtained; the initial conditions and the hydropower output values of each day-ahead are set for the water-wind-solar complementary system; through the water-wind-solar complementary scheduling, the hydropower generation in the day-ahead stage, the final water level of the reservoir in the day-ahead stage and the power abandonment in the day-ahead stage associated with each hydropower output value in the day-ahead stage are calculated to reflect the influence of different hydropower output values on the day-ahead power generation and reservoir water storage; because the current scheduling decision will affect the hydropower regulation capacity in the future period, according to the calculated final water level of the reservoir in the day-ahead stage, the available water volume in the future stage and the predicted wind-solar output in the future stage, through the optimized complementary scheduling of water-wind-solar, the hydropower generation and power abandonment in the future stage corresponding to each hydropower output value in the day-ahead stage can be dynamically calculated.
[0057] Taking into account the total water consumption during the scheduling period, the day-ahead hydropower generation and the future stage hydropower generation corresponding to each day-ahead hydropower output value, the water consumption rate corresponding to different hydropower output values is calculated, and multiple groups of related day-ahead hydropower output values and water consumption rate data are obtained to obtain a hydropower benefit curve used to characterize the relationship between the day-ahead decision output and the system benefit. According to the forecast values of wind power generation and photovoltaic power generation in the scheduling period, the day-ahead curtailment amount associated with each day-ahead hydropower output value, and the future stage curtailment amount associated with each day-ahead hydropower output value, multiple groups of related day-ahead hydropower output values and curtailment rates are determined to obtain a curtailment risk curve used to describe the relationship between the day-ahead hydropower output value and the curtailment rate.
[0058] By comprehensively considering the hydropower benefit curve and the power abandonment risk curve, the optimal balance point of hydropower output, system benefit and power abandonment risk under given constraints is found, that is, the target hydropower output value in the day-ahead stage. Thus, the optimal scheduling plan is obtained by comprehensively considering multiple factors, which solves the problem of imbalance between the benefits and risks of the hydro-wind-solar complementary system, and at the same time provides effective decision-making support for the day-ahead scheduling of hydro-wind-solar complementarity.
[0059] Steps 110 to 160 are described below respectively:
[0060] Step 110, obtaining a forecast value of available water volume, a forecast value of wind power generation, a forecast value of photovoltaic power generation, and initial conditions of the water-wind-solar complementary system during the scheduling period;
[0061] The initial conditions include: initial reservoir water level, reservoir water level at the end of the dispatch period and the status of the hydropower units.
[0062] Step 120, setting initial conditions and each day-ahead hydropower output value for the water-wind-solar complementary system, and calculating the day-ahead hydropower generation, the day-ahead reservoir final water level, and the day-ahead power abandonment associated with each day-ahead hydropower output value through the day-ahead complementary scheduling of the water-wind-solar system;
[0063] In a possible embodiment, step 120 includes:
[0064] Construct the first relationship between the hydropower station's power generation coefficient, average water head, power generation flow and the day-ahead hydropower output value;
[0065] Constructing a second relationship between the final reservoir water level in the day-ahead phase, the initial reservoir water level in the day-ahead phase, the average downstream water level and the average head loss;
[0066] Construct the third relationship between the initial storage capacity, inflow flow, outflow flow, day-ahead dispatching duration and the final storage capacity of the day-ahead operation;
[0067] Establishing a fourth relationship between power generation flow, abandoned water flow and outflow flow;
[0068] Establish a fifth relationship between the average downstream water level and outflow;
[0069] Establishing the sixth relationship between the initial water level of the reservoir in the day-ahead phase and the initial storage capacity in the day-ahead phase;
[0070] Set the hydropower output value of each day before, solve the first relational expression, the second relational expression, the third relational expression, the fourth relational expression, the fifth relational expression and the sixth relational expression, and obtain the final water level of the reservoir in the day before stage;
[0071] According to each day-ahead hydropower output value and the day-ahead dispatching duration, the day-ahead hydropower generation, the day-ahead reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value are calculated.
[0072] Set each day-ahead hydropower output value, substitute it into the above 6 relational expressions to solve, and get the reservoir final water level in the day-ahead stage. For each set day-ahead hydropower output value, substitute the first to sixth relational expressions to solve the corresponding day-ahead reservoir final water level. According to each day-ahead hydropower output value and day-ahead dispatching duration, calculate the day-ahead hydropower generation associated with each day-ahead hydropower output value.
[0073] Hydropower generation = P * day-ahead dispatch duration;
[0074] The day-ahead hydropower generation under different hydropower output targets can be obtained.
[0075] According to the load demand, hydropower output, wind power output and photovoltaic output, the day-ahead power abandonment amount associated with each day-ahead hydropower output value is calculated.
[0076] Abandoned power output value = hydropower output + wind power output + photovoltaic output - load;
[0077] When the output of hydropower, wind and solar power is greater than the load demand, power abandonment occurs. On the contrary, when the output of hydropower, wind and solar power is less than or equal to the load demand, power abandonment does not occur and the amount of power abandonment is 0.
[0078] Abandoned power amount = abandoned power output value * previous dispatching time.
[0079] The following will be explained in combination with formula (1) and formula (10), where formula (1) to formula (6) correspond to the first to sixth relationship above respectively:
[0080]
[0081] It should be noted that, for the day-ahead stage, t=1; i represents the hourly segment within the day, i=1, 2, ..., 24.
[0082] Formula (1): k is the power generation coefficient of the hydropower station, H (t) is the average water head, q pg (t) is the power generation flow, j is the hydropower output value on the previous day;
[0083] Formula (2): H(t) is the average water head, Z(t+1) is the final water level of the reservoir in the previous period, Z(t) is the initial water level of the reservoir in the previous period, and Z down (t) is the average downstream water level, h loss is the average head loss.
[0084] Formula (3): V(t+1) is the final storage capacity of the day-ahead stage, V(t) is the initial storage capacity of the day-ahead stage; Q(t) and q(t) are the inflow and outflow flows, respectively, and △t is the day-ahead scheduling duration;
[0085] Formula (4): q pg (t) is the power generation flow, q spill (t) is the abandoned water flow, and q(t) is the outflow flow.
[0086] Formula (5): Z down (t) is the average downstream water level, Fqz is the relationship curve between outflow and downstream water level, and q(t) is the outflow;
[0087] Formula (6): Fzv is the water level and storage capacity curve, Z(t) is the initial water level of the reservoir in the day-ahead stage, and V(t) is the initial storage capacity in the day-ahead stage;
[0088] Formula (7): N PC (i) is the curtailed power output in the day-ahead phase; N HP (i) is the hydropower output in the day-ahead phase, N wp (i) is the wind power output in the day-ahead phase, N pv (i) is the photovoltaic output at day t, N L (i) is the load curve of the day-ahead phase
[0089] Formula (8): E PC (t) is the amount of power abandoned in the day-ahead phase, △t' is the scheduling duration within the day;
[0090] Formula (9): N HP (t) is the hydropower output in the day-ahead phase;
[0091] Formula (10): E HP (t) is the hydroelectric power generation in the day-ahead period.
[0092] Therefore, a water-wind-solar complementary scheduling model was constructed, including the relationship between multiple key factors such as power generation power, head, downstream flow, reservoir water balance, and power balance. The water-wind-solar complementary scheduling model can provide support for setting different day-ahead hydropower output targets, comprehensively considering many physical factors and constraints, so as to accurately calculate the corresponding reservoir operating final water level and the day-ahead hydropower generation.
[0093] Step 130, according to the last reservoir water level in the day-ahead phase, the available water volume in the future phase, and the wind and solar output respectively associated with each day-ahead hydropower output value, through water-wind-solar optimization and complementary scheduling, determine the future phase hydropower generation and future phase abandoned power respectively associated with each day-ahead hydropower output value;
[0094] Meteorological forecast data can be used, combined with the actual power generation characteristics of wind farms and photovoltaic power stations, to predict wind power output and photovoltaic output in the future (such as the day before or the day after). It is necessary to establish a corresponding prediction model and make predictions based on factors such as weather forecasts and power generation equipment parameters.
[0095] For each set day-ahead hydropower output value, the predicted future inflow, wind power output and photovoltaic output, combined with information such as the initial and final water levels of the reservoir, can be used to calculate the corresponding future hydropower generation and abandoned power through optimized complementary scheduling of water, wind and photovoltaic power.
[0096] Therefore, the overall power generation of hydropower, wind power and photovoltaic power generation in the future stage is comprehensively considered to provide a basis for the optimal dispatch of hydropower. This method needs to combine hydrological and meteorological forecast data, and use a combination of physical models and statistical prediction models to predict the forecast information in the future stage as accurately as possible. By comparing the benefits and risks of the future stage under different day-ahead hydropower output targets, it is easy to find the optimal complementary dispatching plan, and fully consider the characteristics and complementarity of different types of power sources to obtain a more economical and efficient dispatching result.
[0097] In a possible embodiment, step 130 includes:
[0098] Determine the available water volume in the future stage according to the reservoir final water level and the predicted inflow flow in the previous stage associated with each hydropower output value the previous day;
[0099] The first objective function is established with the goal of maximizing the power generation of the water-wind-solar complementary system; the power generation of the water-wind-solar complementary system is the sum of the hydropower generation, wind power generation and photovoltaic power generation within the scheduling time of the future period;
[0100] The second objective function is established with the goal of minimizing the power abandonment rate of the water-wind-solar hybrid system; the power abandonment rate of the water-wind-solar hybrid system is the ratio of the power abandonment in the future period to the wind-solar power generation; the wind-solar power generation is the sum of wind power generation and photovoltaic power generation;
[0101] Establish multiple constraints of the first objective function and the second objective function, and the multiple constraints are used to constrain the decision-making and scheduling of the water-wind-solar complementary system in terms of reservoir water level, downstream flow, hydropower output and water head;
[0102] Based on the first objective function, the second objective function and the constraints, the forecast values of available water volume and wind and solar power generation in the future stage are input into the water-wind-solar multi-energy complementary optimization scheduling model. Through the water-wind-solar multi-energy complementary optimization scheduling model, the future stage hydropower generation and future stage abandoned power associated with each day-ahead hydropower output value are determined.
[0103] Using the previously established hydropower station operation model, the corresponding hydropower station operating end water level can be inferred based on the previous hydropower output value. Combined with the hydropower station's head, power generation efficiency and other parameters, the hydropower output in the future period can be calculated.
[0104] The power generation of the water-wind-solar complementary system = (hydropower output in the future period + wind power output + photovoltaic output - abandoned power output) × scheduling duration. The first objective function is established, with the maximum power generation of the water-wind-solar complementary system as the goal. The first objective function indicates that the total power generation of hydropower, wind power and photovoltaic power output is maximized in the future period.
[0105] The power abandonment rate of the water-wind-solar complementary system = the amount of abandoned power in the future period / (the amount of wind power generation in the future period + the amount of photovoltaic power generation). The second objective function is established with the goal of minimizing the power abandonment rate of the water-wind-solar complementary system. The second objective function indicates that it is hoped to reduce the amount of abandoned power of wind power and photovoltaic power generation as much as possible while meeting the load demand.
[0106] Reservoir water level constraints: The final water level of the reservoir needs to meet upper and lower limit constraints;
[0107] The upper limit of reservoir water level may include: daily fluctuation of reservoir water level, controlled water level of dispatching regulations and the maximum water level allowed for reservoir operation.
[0108] The lower limit of reservoir water level may include: daily fluctuation of reservoir water level, control water level of dispatching regulations, and reservoir dead water level or minimum operating water level.
[0109] Downstream flow constraints: The downstream flow must meet upper and lower limit constraints;
[0110] The lower limit of downstream flow includes: ecological flow constraints, downstream water supply and demand constraints, etc.
[0111] The upper limit of the downstream flow rate includes: the maximum flow rate of the unit, the maximum downstream flow rate under head constraints, and the flood control safety discharge capacity, etc.
[0112] Hydropower output constraints: Hydropower output needs to meet upper and lower limit constraints;
[0113] Upper limit of hydropower output: including: the maximum output value of the number of online units under the current water head.
[0114] The lower limit of hydropower output includes: the minimum output value of the start-up units considering the vibration zone, the output value corresponding to the ecological flow, etc.
[0115] Head constraint: The head needs to meet the actual operating conditions. The reservoir operating head should not be lower than the minimum head value and should not exceed the maximum head value.
[0116] The first objective function, the second objective function and the constraint conditions mentioned above are explained below in combination with formula (11) and formula (15):
[0117]
[0118] Formula (11): F1 is the first objective function, T is the scheduling duration of the future stage, N HP (t) is the hydropower output in the future stage t, N wp (t) is the wind power output at future stage t, N pv (t) is the photovoltaic output at the future stage t, N pc (t) is the curtailed power output in the future stage t; △t is the dispatching duration in the future stage;
[0119] F2 is the first objective function, E PC (t) is the amount of power abandoned, E W (t) is wind power generation, E PV (t) is the photovoltaic power generation
[0120] Formula (12): Z(t), q(t), N(t), and h(t) are the reservoir water level, discharge flow, hydropower output, and hydraulic head at time period t, respectively;
[0121] Z min (t)、Z max (t) are the lower and upper limits of the reservoir water level, respectively;
[0122] q min (t), q max (t) are the lower and upper limits of the reservoir discharge flow, respectively;
[0123] N min (t), N max (t) are the lower and upper limits of hydropower output respectively;
[0124] h min 、h max are the minimum head and maximum head respectively.
[0125] Formula (13): It is used to express the water balance relationship in the future stage; V(t+1) is the final storage capacity in the future stage, V(t) is the initial storage capacity in the future stage; Q(t) and q(t) are the inflow and outflow respectively, and △t is the scheduling duration in the future stage;
[0126] Formula (14): used to express the power balance relationship in the future stage; N L (t) load curve of period t in the future stage; N HP (t) is the hydropower output in the future stage t, N wp (t) is the wind power output at the future stage t, N pv (t) is the photovoltaic output at the future stage t, N pc (t) is the curtailed power output at future stage t;
[0127] Formula (15): E PC (t) Amount of power abandoned in the future, N PC (t) The abandoned power output in the future stage; △t is the dispatching time in the future stage.
[0128] Based on the above two objective functions and constraints, the forecast values of available water volume and wind and solar power generation in the future stage are input into the hydro-wind-solar multi-energy complementary optimization scheduling model to optimize the future stage hydropower generation associated with each day-ahead hydropower output value. Through the multi-objective optimization algorithm, the total power generation of the hydro-wind-solar complementary system is maximized and the power abandonment rate is minimized while satisfying various constraints.
[0129] Therefore, the overall performance of hydropower, wind power and photovoltaic power generation in the future period is comprehensively considered and converted into two objective functions. At the same time, multiple constraints are set to ensure that the optimization results meet the actual operation requirements of the power system. The final result is the hydropower generation and abandoned power in the future stage corresponding to the hydropower output value on the previous day, which provides a scientific basis for the optimized complementary scheduling of hydropower, wind power and photovoltaic power.
[0130] Step 140, according to the forecast value of available water in the scheduling period, the hydropower generation in the day-ahead phase respectively associated with each hydropower output value a day-ahead, and the hydropower generation in the future phase respectively associated with each hydropower output value a day-ahead, determine a plurality of groups of associated hydropower output values a day-ahead and water consumption rates to obtain a hydropower benefit curve; the hydropower benefit curve is used to describe the relationship between the hydropower output value a day-ahead and the water consumption rate;
[0131] In a possible embodiment, step 140 includes:
[0132] For any day-ahead hydropower output value, the sum of the day-ahead hydropower generation associated with the day-ahead hydropower output value and the future hydropower generation is determined as the hydropower generation in the dispatching period;
[0133] The ratio of the forecast value of available water during the scheduling period to the hydropower generation during the scheduling period is determined as the water consumption rate.
[0134]
[0135] Formula (16): λ(j) is the hydropower output value on each day before. j The associated water consumption rate; V T It is the forecast value of available water during the scheduling period.
[0136] For a certain hydropower output value a day ago, its hydropower generation in the day-ago period and the future period has been determined. The sum of the hydropower generation in these two periods is the hydropower generation in the scheduling period corresponding to the hydropower output value a day ago. The forecast value of the available water in the scheduling period can be calculated by the forecast inflow flow in the scheduling period and the initial and final water levels in the scheduling period. The forecast value of the available water in the scheduling period is divided by the hydropower generation in the scheduling period to obtain the water consumption rate in the scheduling period corresponding to the hydropower output value a day ago. The hydropower generation and water consumption rate in the scheduling period can be calculated based on any hydropower output value a day ago.
[0137] Therefore, the power generation characteristics of hydropower in the previous day and future periods can be comprehensively considered to give full play to the utilization efficiency of water resources.
[0138] Step 150, according to the forecast value of wind power generation in the scheduling period, the forecast value of photovoltaic power generation, the amount of abandoned power in the day-ahead phase associated with each hydropower output value a day-ahead, and the amount of abandoned power in the future phase associated with each hydropower output value a day-ahead, determine multiple groups of associated hydropower output values a day-ahead and abandonment rates to obtain an abandonment risk curve, where the abandonment risk curve is used to describe the relationship between the hydropower output value a day-ahead and the abandonment rate;
[0139] In a possible embodiment, step 150 includes:
[0140] For any day-ahead hydropower output value, the sum of wind power generation and photovoltaic power generation during the dispatch period is determined as the wind and photovoltaic power generation during the dispatch period;
[0141] The sum of the abandoned power in the day-ahead phase and the abandoned power in the future phase is determined as the abandoned power in the dispatch period;
[0142] The ratio of the amount of abandoned electricity during the scheduling period to the amount of wind and solar power generation during the scheduling period is determined as the abandonment rate.
[0143]
[0144] Formula (17): γ(j) is the hydropower output value on each day before. j The associated amount of abandoned electricity; E PC (j) is the amount of abandoned electricity associated with each day-ahead hydropower output value j; E W is the wind power generation, E PV The photovoltaic power generation.
[0145] For any day-ahead hydropower output value, the wind power generation and photovoltaic power generation in the dispatching period are added together to obtain the total wind and solar power generation. The power abandonment rate in the dispatching period associated with the day-ahead hydropower output value is divided by the wind and solar power generation in the dispatching period. Each day-ahead hydropower output value can be associated with its corresponding dispatching period abandonment rate. This can obtain multiple sets of data points of day-ahead hydropower output values and abandonment rates. These data can be used for subsequent multi-objective optimization analysis.
[0146] Step 160, determining the target hydropower output value in the day-ahead phase according to the hydropower benefit curve and the power abandonment risk curve.
[0147] In a possible embodiment, step 160 includes:
[0148] According to the power abandonment risk curve, determine the hydropower output range corresponding to the preset power abandonment rate;
[0149] According to the hydropower benefit curve, determine the water consumption rate range corresponding to the hydropower output range;
[0150] The hydropower output value corresponding to the minimum water consumption rate in the water consumption rate range is determined as the target hydropower output value.
[0151] Exemplarily, the preset power abandonment rate may be 0, 1%, 2%, 3%, 4%, or 5%.
[0152]
[0153] Formula (18): F is the optimal solution objective function, γ 0 is the preset power abandonment rate, that is, the acceptable power abandonment rate M is the value of the hydropower output.
[0154] like Figure 2 As shown in the figure, the optimal solution can be found through the day-ahead decision diagram, which includes the power abandonment risk curve and the power abandonment risk curve. The horizontal axis is used to indicate the hydropower output value of each day-ahead; the vertical axis is used to indicate the power abandonment rate and the water consumption rate; the solid line is used to indicate the power abandonment risk curve; and the dotted line is used to indicate the hydropower benefit curve.
[0155] For example, when the power abandonment rate is controlled at 0%, the hydropower output range corresponding to the preset power abandonment rate is determined, that is, a range on the horizontal axis. According to the hydropower benefit curve, the water consumption rate range corresponding to the hydropower output range is determined, that is, a range on the vertical axis.
[0156] The hydropower output value corresponding to the minimum water consumption rate in the water consumption rate range is determined as the target hydropower output value, that is, under this hydropower output, the hydropower benefit and the risk of the water-wind-solar complementary system reach the optimal solution. Therefore, the optimal hydropower output can be determined by the day-ahead decision diagram of the water-wind-solar complementary system, which can provide effective decision support for the day-ahead complementary scheduling of water-wind-solar.
[0157] Therefore, by formulating the hydropower benefit curve and the power abandonment risk curve respectively associated with the hydropower output on the day before, a decision is made on the hydropower output on the day before, and the benefits and risks of the water-wind-solar complementary system under different hydropower output conditions are analyzed, solving the problem of imbalance between the benefits and risks of the water-wind-solar complementary system, and providing effective decision support for the water-wind-solar complementary scheduling on the day before. Therefore, through the embodiments of the present application, the decision diagram obtained is more effective and more suitable for the actual water-wind-solar multi-energy complementary scheduling project.
[0158] In an embodiment of the present application, the forecast value of the available water volume, the forecast value of the wind power generation, the forecast value of the photovoltaic power generation and the initial conditions of the water-wind-solar complementary system during the scheduling period are obtained; the initial conditions and the hydropower output values of each day-ahead are set for the water-wind-solar complementary system, and through the water-wind-solar complementary scheduling, the hydropower generation in the day-ahead stage, the final water level of the reservoir in the day-ahead stage and the amount of power abandoned in the day-ahead stage associated with each hydropower output value in the day-ahead are calculated to reflect the impact of different hydropower output values on the day-ahead power generation and reservoir water storage. Since the current scheduling decision will affect the hydropower output in the future period, according to the calculated final water level of the reservoir in the day-ahead stage, the available water volume in the future stage and the predicted wind-solar output in the future stage, through the optimized complementary scheduling of water, wind and solar, the hydropower generation and amount of power abandoned in the future stage corresponding to each hydropower output value in the day-ahead can be dynamically calculated.
[0159] Taking into account the total water consumption during the scheduling period, the day-ahead hydropower generation and the future stage hydropower generation corresponding to each day-ahead hydropower output value, the water consumption rate corresponding to different hydropower output values is calculated, and multiple groups of related day-ahead hydropower output values and water consumption rate data are obtained to obtain a hydropower benefit curve used to characterize the relationship between hydropower output and system benefit. According to the forecast values of wind power generation and photovoltaic power generation in the scheduling period, the day-ahead curtailment amount associated with each day-ahead hydropower output value, and the future stage curtailment amount associated with each day-ahead hydropower output value, multiple groups of related day-ahead hydropower output values and curtailment rates are determined to obtain a curtailment risk curve used to describe the relationship between the day-ahead hydropower output value and the curtailment rate.
[0160] By comprehensively considering the hydropower benefit curve and the power abandonment risk curve, the optimal balance point of hydropower output, system benefit and power abandonment risk under given constraints is found, that is, the target hydropower output value in the day-ahead stage. Thus, the optimal scheduling plan is obtained by comprehensively considering multiple factors, which solves the problem of imbalance between benefits and risks in the hydro-wind-solar complementary system. At the same time, it provides effective decision-making support for the day-ahead scheduling of hydro-wind-solar complementary scheduling, and is more suitable for the scheduling project of hydro-wind-solar multi-energy complementary system.
[0161] The multi-energy complementary system day-ahead decision method provided in the embodiment of the present application can be executed by a multi-energy complementary system day-ahead decision device. In the embodiment of the present application, the multi-energy complementary system day-ahead decision method is executed by a multi-energy complementary system day-ahead decision device as an example to illustrate the multi-energy complementary system day-ahead decision device provided in the embodiment of the present application.
[0162] Figure 3 300 is a block diagram of a day-ahead decision-making device for a multi-energy complementary system provided in an embodiment of the present application. The device 300 includes:
[0163] An acquisition module 310 is used to obtain a forecast value of available water, a forecast value of wind power generation, a forecast value of photovoltaic power generation, and initial conditions of the water-wind-solar complementary system during the scheduling period;
[0164] The calculation module 320 is used to set initial conditions and each day-ahead hydropower output value for the water-wind-solar complementary system, and calculate the day-ahead hydropower generation, the day-ahead reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value through the day-ahead complementary scheduling of the water-wind-solar system;
[0165] The first determination module 330 is used to determine the future stage hydropower generation and future stage abandoned power generation associated with each day-ahead hydropower output value through water-wind-solar optimization and complementary scheduling, based on the day-ahead reservoir final water level, the future stage available water forecast value, the future stage wind power generation forecast value and the future stage available water forecast value associated with each day-ahead hydropower output value, respectively.
[0166] The second determination module 340 is used to determine a plurality of groups of associated day-ahead hydropower output values and water consumption rates according to the forecast value of available water in the scheduling period, the day-ahead hydropower generation associated with each day-ahead hydropower output value, and the future stage hydropower generation associated with each day-ahead hydropower output value, so as to obtain a hydropower benefit curve; the hydropower benefit curve is used to describe the relationship between the day-ahead hydropower output value and the water consumption rate;
[0167] The third determination module 350 is used to determine multiple groups of associated day-ahead hydropower output values and power abandonment rates according to the forecast value of wind power generation in the scheduling period, the forecast value of photovoltaic power generation, the day-ahead stage abandonment amount associated with each day-ahead hydropower output value, and the future stage abandonment amount associated with each day-ahead hydropower output value, so as to obtain an abandonment risk curve, where the abandonment risk curve is used to describe the relationship between the day-ahead hydropower output value and the abandonment rate;
[0168] The fourth determination module 360 is used to determine the target hydropower output value in the day-ahead phase according to the hydropower benefit curve and the power abandonment risk curve.
[0169] In a possible embodiment, the fourth determining module 360 is specifically configured to:
[0170] According to the power abandonment risk curve, determine the hydropower output range corresponding to the preset power abandonment rate;
[0171] According to the hydropower benefit curve, determine the water consumption rate range corresponding to the hydropower output range;
[0172] The hydropower output value corresponding to the minimum water consumption rate in the water consumption rate range is determined as the target hydropower output value.
[0173] In a possible embodiment, the calculation module 320 is specifically configured to:
[0174] Construct the first relationship between the hydropower station's power generation coefficient, average water head, power generation flow and the day-ahead hydropower output value;
[0175] Constructing a second relationship between the final reservoir water level in the day-ahead phase, the initial reservoir water level in the day-ahead phase, the average downstream water level and the average head loss;
[0176] Construct the third relationship between the initial storage capacity, inflow flow, outflow flow, day-ahead dispatching duration and the final storage capacity of the day-ahead operation;
[0177] Establishing a fourth relationship between power generation flow, abandoned water flow and outflow flow;
[0178] Establish a fifth relationship between the average downstream water level and outflow;
[0179] Establishing the sixth relationship between the initial water level of the reservoir in the day-ahead phase and the initial storage capacity in the day-ahead phase;
[0180] Set the hydropower output value of each day before, solve the first relationship, the second relationship, the third relationship, the fourth relationship, the fifth relationship and the sixth relationship, and obtain the final water level of the reservoir in the day before stage;
[0181] According to each day-ahead hydropower output value and the day-ahead dispatching duration, the day-ahead hydropower generation, the day-ahead reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value are calculated.
[0182] In a possible embodiment, the first determining module 330 is specifically configured to:
[0183] Determine the available water volume in the future stage according to the reservoir final water level in the previous stage and the predicted inflow in the future stage respectively associated with each hydropower output value in the previous stage;
[0184] The first objective function is established with the goal of maximizing the power generation of the water-wind-solar complementary system; the power generation of the water-wind-solar complementary system is the sum of the hydropower generation, wind power generation and photovoltaic power generation within the scheduling time of the future period;
[0185] The second objective function is established with the goal of minimizing the power abandonment rate of the water-wind-solar hybrid system; the power abandonment rate of the water-wind-solar hybrid system is the ratio of the power abandonment in the future period to the wind-solar power generation; the wind-solar power generation is the sum of wind power generation and photovoltaic power generation;
[0186] Establish multiple constraints of the first objective function and the second objective function, and the multiple constraints are used to constrain the decision-making and scheduling of the water-wind-solar complementary system in terms of reservoir water level, downstream flow, hydropower output and water head;
[0187] Based on the first objective function, the second objective function and the constraints, the forecast values of available water volume and wind and solar power generation in the future stage are input into the water-wind-solar multi-energy complementary optimization scheduling model. Through the water-wind-solar multi-energy complementary optimization scheduling model, the future stage hydropower generation and future stage abandoned power associated with each day-ahead hydropower output value are determined.
[0188] In a possible embodiment, the second determining module 340 is specifically configured to:
[0189] For any day-ahead hydropower output value, the sum of the day-ahead hydropower generation associated with the day-ahead hydropower output value and the future hydropower generation is determined as the hydropower generation in the dispatching period;
[0190] The ratio of the forecast value of available water during the scheduling period to the hydropower generation during the scheduling period is determined as the water consumption rate.
[0191] In a possible embodiment, the third determining module 350 is specifically configured to:
[0192] For any day-ahead hydropower output value, the sum of wind power generation and photovoltaic power generation during the dispatch period is determined as the wind and photovoltaic power generation during the dispatch period;
[0193] The sum of the abandoned power in the day-ahead phase and the abandoned power in the future phase is determined as the abandoned power in the dispatch period;
[0194] The ratio of the amount of abandoned electricity during the scheduling period to the amount of wind and solar power generation during the scheduling period is determined as the abandonment rate.
[0195] In an embodiment of the present application, the forecast value of the available water volume, the forecast value of the wind power generation, the forecast value of the photovoltaic power generation and the initial conditions of the water-wind-solar complementary system during the scheduling period are obtained; the initial conditions and the hydropower output values of each day-ahead are set for the water-wind-solar complementary system, and through the water-wind-solar complementary scheduling, the hydropower generation in the day-ahead stage, the final water level of the reservoir in the day-ahead stage and the power abandonment in the day-ahead stage associated with each hydropower output value in the day-ahead are calculated to reflect the influence of different hydropower output values on the current power generation and reservoir water storage. Since the current scheduling decision will affect the hydropower output in the future period, according to the calculated final water level of the reservoir in the day-ahead stage, the available water in the future stage and the predicted wind and solar output in the future stage, through the optimized complementary scheduling of water, wind and solar, the hydropower generation and power abandonment in the future stage corresponding to each hydropower output value in the day-ahead can be dynamically calculated.
[0196] Taking into account the total water consumption during the scheduling period, the day-ahead hydropower generation and the future stage hydropower generation corresponding to each day-ahead hydropower output value, the water consumption rate corresponding to different hydropower output values is calculated, and multiple groups of related day-ahead hydropower output values and water consumption rate data are obtained to obtain a hydropower benefit curve used to characterize the relationship between hydropower output and system benefit. According to the forecast values of wind power generation and photovoltaic power generation in the scheduling period, the day-ahead curtailment amount associated with each day-ahead hydropower output value, and the future stage curtailment amount associated with each day-ahead hydropower output value, multiple groups of related day-ahead hydropower output values and curtailment rates are determined to obtain a curtailment risk curve used to describe the relationship between the day-ahead hydropower output value and the curtailment rate.
[0197] By comprehensively considering the hydropower benefit curve and the power abandonment risk curve, the optimal balance point of hydropower output, system benefit and power abandonment risk under given constraints is found, that is, the target hydropower output value in the day-ahead stage. Thus, the optimal scheduling plan is obtained by comprehensively considering multiple factors, which solves the problem of imbalance between benefits and risks in the hydro-wind-solar complementary system. At the same time, it provides effective decision-making support for the day-ahead scheduling of hydro-wind-solar complementary scheduling, and is more suitable for the scheduling project of hydro-wind-solar multi-energy complementary system.
[0198] The device provided in the embodiment of the present application can implement each process implemented in the above method embodiment. To avoid repetition, it will not be described again here.
[0199] Optionally, Figure 4 A schematic diagram of the hardware structure of an electronic device provided in an embodiment of the present application is shown.
[0200] The electronic device may include a processor 401 and a memory 402 storing computer program instructions.
[0201] Specifically, the processor 401 may include a central processing unit (CPU), or an application specific integrated circuit (ASIC), or may be configured to implement one or more integrated circuits of the embodiments of the present application.
[0202] The memory 402 may include a large capacity memory for data or instructions. By way of example and not limitation, the memory 402 may include a hard disk drive (HDD), a floppy disk drive, a flash memory, an optical disk, a magneto-optical disk, a tape, or a universal serial bus (USB) drive or a combination of two or more of these. Where appropriate, the memory 402 may include a removable or non-removable (or fixed) medium. Where appropriate, the memory 402 may be inside or outside the integrated gateway disaster recovery device. In a specific embodiment, the memory 402 is a non-volatile solid-state memory. In a specific embodiment, the memory 402 includes a read-only memory (ROM). Where appropriate, the ROM may be a mask-programmed ROM, a programmable ROM (PROM), an erasable PROM (EPROM), an electrically erasable PROM (EEPROM), an electrically rewritable ROM (EAROM) or a flash memory or a combination of two or more of these.
[0203] The processor 401 implements any one of the methods in the embodiments shown in the figure by reading and executing the computer program instructions stored in the memory 402.
[0204] In one example, the electronic device may further include a communication interface 404 and a bus 410. Figure 4 As shown, the processor 401, the memory 402, and the communication interface 404 are connected via a bus 410 and communicate with each other.
[0205] The communication interface 404 is mainly used to implement communication between various modules, devices, units and / or equipment in the embodiments of the present application.
[0206] Bus 410 includes hardware, software or both, and couples the components of the electronic device to each other. For example, but not limitation, the bus may include an accelerated graphics port (AGP) or other graphics bus, an enhanced industrial standard architecture (EISA) bus, a front-side bus (FSB), a hypertransport (HT) interconnect, an industrial standard architecture (ISA) bus, an infinite bandwidth interconnect, a low pin count (LPC) bus, a memory bus, a microchannel architecture (MCA) bus, a peripheral component interconnect (PCI) bus, a PCI-Express (PCI-X) bus, a serial advanced technology attachment (SATA) bus, a video electronics standard association local (VLB) bus or other suitable bus or a combination of two or more of these. Where appropriate, bus 410 may include one or more buses. Although the present application embodiment describes and shows a specific bus, the present application considers any suitable bus or interconnect.
[0207] The electronic device can execute the method in the embodiment of the present application, thereby realizing the combination Figure 1 Describe the method.
[0208] In addition, in combination with the method in the above embodiment, the embodiment of the present application can provide a computer-readable storage medium to implement. The computer-readable storage medium stores computer program instructions; when the computer program instructions are executed by the processor, the Figure 1 method.
[0209] It should be clear that the present application is not limited to the specific configuration and processing described above and shown in the figures. For the sake of simplicity, a detailed description of the known method is omitted here. In the above embodiments, several specific steps are described and shown as examples. However, the method process of the present application is not limited to the specific steps described and shown, and those skilled in the art can make various changes, modifications and additions, or change the order between the steps after understanding the spirit of the present application.
[0210] The functional blocks shown in the structural block diagram described above can be implemented as hardware, software, firmware or a combination thereof. When implemented in hardware, it can be, for example, an electronic circuit, an application-specific integrated circuit (ASIC), appropriate firmware, a plug-in, a function card, etc. When implemented in software, the elements of the present application are programs or code segments used to perform the required tasks. The program or code segment can be stored in a machine-readable medium, or transmitted on a transmission medium or a communication link by a data signal carried in a carrier. "Machine-readable medium" may include any medium capable of storing or transmitting information. Examples of machine-readable media include electronic circuits, semiconductor memory devices, ROMs, flash memories, erasable ROMs (EROMs), floppy disks, CD-ROMs, optical disks, hard disks, optical fiber media, radio frequency (RF) links, etc. The code segment can be downloaded via a computer network such as the Internet, an intranet, etc.
[0211] It should also be noted that the exemplary embodiments mentioned in this application describe some methods or systems based on a series of steps or devices. However, this application is not limited to the order of the above steps, that is, the steps can be performed in the order mentioned in the embodiment, or in a different order from the embodiment, or several steps can be performed simultaneously.
[0212] The above is only a specific implementation of the present application. Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working processes of the systems, modules and units described above can refer to the corresponding processes in the aforementioned method embodiments, and will not be repeated here. It should be understood that the protection scope of the present application is not limited to this. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in this application, and these modifications or replacements should be included in the protection scope of this application.
Claims
1. A day-ahead decision-making method for a multi-energy complementary system, characterized in that: The method comprises: Obtain the forecast value of available water volume, wind power generation, photovoltaic power generation and initial conditions of the water-wind-solar complementary system during the scheduling period; The initial conditions and the day-ahead hydropower output values are set for the water-wind-solar complementary system. Through the day-ahead complementary dispatch of water-wind-solar, the day-ahead hydropower generation, the day-ahead reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value are calculated. The initial conditions and the day-ahead hydropower output values are set for the water-wind-solar complementary system, and the day-ahead hydropower output values are calculated through the day-ahead complementary scheduling, and the day-ahead hydropower generation, the day-ahead reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value are calculated, including: Construct the first relationship between the hydropower station's power generation coefficient, average water head, power generation flow and the day-ahead hydropower output value; Constructing a second relationship between the final reservoir water level in the day-ahead phase, the initial reservoir water level in the day-ahead phase, the average downstream water level and the average head loss; Construct the third relationship between the initial storage capacity, inflow flow, outflow flow, day-ahead dispatching duration and the final storage capacity of the day-ahead operation; Establishing a fourth relationship between power generation flow, abandoned water flow and outflow flow; Establish a fifth relationship between the average downstream water level and outflow; Establishing the sixth relationship between the initial water level of the reservoir in the day-ahead phase and the initial storage capacity in the day-ahead phase; Set the hydropower output value of each day before, solve the first relational expression, the second relational expression, the third relational expression, the fourth relational expression, the fifth relational expression and the sixth relational expression, and obtain the final water level of the reservoir in the day before stage; According to each day-ahead hydropower output value and day-ahead dispatch duration, calculate the day-ahead hydropower generation, the day-ahead reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value; Among them, formula (1) to formula (6) correspond to the first to sixth relationship above respectively: For the day-ahead phase, t=1; i represents the hourly period within the day, i=1, 2, ..., 24; Formula (1): k is the power generation coefficient of the hydropower station, H (t) is the average water head, q pg (t) is the power generation flow, j is the hydropower output value on the previous day; Formula (2): H(t) is the average water head, Z(t+1) is the final water level of the reservoir in the previous period, Z(t) is the initial water level of the reservoir in the previous period, and Z down (t) is the average downstream water level, h loss is the average head loss; Formula (3): V(t+1) is the final storage capacity of the day-ahead stage, V(t) is the initial storage capacity of the day-ahead stage; Q(t) and q(t) are the inflow and outflow flows, respectively, and △t is the day-ahead scheduling duration; Formula (4): q pg (t) is the power generation flow, q spill (t) is the abandoned water flow, q(t) is the outflow flow; Formula (5): Z down (t) is the average downstream water level, Fqz is the relationship curve between outflow and downstream water level, and q(t) is the outflow; Formula (6): Fzv is the water level and storage capacity curve, Z(t) is the initial water level of the reservoir in the day-ahead stage, and V(t) is the initial storage capacity in the day-ahead stage; Formula (7): N PC (i) is the curtailed power output in the day-ahead phase; N HP (i) is the hydropower output in the day-ahead phase, N wp (i) is the wind power output in the day-ahead phase, N pv (i) is the photovoltaic output at day t, N L (i) is the load curve in the day-ahead phase; Formula (8): E PC (t) is the amount of power abandoned in the day-ahead phase, △t' is the scheduling duration within the day; Formula (9): N HP (t) is the hydropower output in the day-ahead phase; Formula (10): E HP (t) is the hydroelectric power generation in the day-ahead period; According to the predicted values of the reservoir final water level in the previous stage, the available water volume in the future stage, the predicted values of wind power generation and the predicted values of photovoltaic power generation, which are respectively associated with each hydropower output value a day ago, the hydropower generation and the future stage abandoned power associated with each hydropower output value a day ago are determined through the optimized complementary scheduling of water, wind and photovoltaic power; Among them, according to the last water level of the reservoir in the day-ahead stage, the forecast value of the available water volume in the future stage, the forecast value of the wind power generation and the forecast value of the photovoltaic power generation respectively associated with each hydropower output value a day ago, through the water-wind-solar optimization complementary scheduling, the future stage hydropower generation and future stage abandoned power generation respectively associated with each hydropower output value a day ago are determined, including: Determine the available water volume in the future stage according to the reservoir final water level in the previous stage and the predicted inflow in the future stage respectively associated with each hydropower output value in the previous stage; The first objective function is established with the goal of maximizing the power generation of the water-wind-solar complementary system; the power generation of the water-wind-solar complementary system is the sum of the hydropower generation, wind power generation and photovoltaic power generation within the scheduling time of the future period; The second objective function is established with the goal of minimizing the power abandonment rate of the water-wind-solar hybrid system; the power abandonment rate of the water-wind-solar hybrid system is the ratio of the power abandonment in the future period to the wind-solar power generation; the wind-solar power generation is the sum of wind power generation and photovoltaic power generation; Establish multiple constraints of the first objective function and the second objective function, and the multiple constraints are used to constrain the decision-making and scheduling of the water-wind-solar complementary system in terms of reservoir water level, downstream flow, hydropower output and water head; Based on the first objective function, the second objective function and the constraints, the forecast value of the available water volume and the forecast value of the wind and solar power generation in the future stage are input into the water-wind-solar multi-energy complementary optimization scheduling model, and the future stage hydropower generation and future stage abandoned power generation associated with each day-ahead hydropower output value are determined through the water-wind-solar multi-energy complementary optimization scheduling model; Combining formula (11) and formula (15), the first objective function, the second objective function and the constraint conditions are explained respectively: Formula (11): F1 is the first objective function, T is the scheduling duration of the future stage, N HP (t) is the hydropower output in the future stage t, N wp (t) is the wind power output at the future stage t, N pv (t) is the photovoltaic output at the future stage t, N pc (t) is the curtailed power output in the future stage t; △t is the dispatching duration in the future stage t; F2 is the first objective function, E PC (t) is the amount of power abandoned, E W (t) is wind power generation, E PV (t) is the photovoltaic power generation; Formula (12): Z(t), q(t), N(t), and h(t) are the reservoir water level, discharge flow, hydropower output, and hydraulic head at time period t, respectively; Z min (t)、Z max (t) are the lower and upper limits of the reservoir water level, respectively; q min (t), q max (t) are the lower and upper limits of the reservoir discharge flow, respectively; N min (t), N max (t) are the lower and upper limits of hydropower output respectively; h min 、h max are the minimum head and maximum head respectively; Formula (13): It is used to express the water balance relationship in the future stage; V(t+1) is the final storage capacity in the future stage, V(t) is the initial storage capacity in the future stage; Q(t) and q(t) are the inflow and outflow respectively, and △t is the scheduling duration in the future stage; Formula (14): used to express the power balance relationship in the future stage; N L (t) load curve of period t in the future stage; N HP (t) is the hydropower output in the future stage t, N wp (t) is the wind power output at the future stage t, N pv (t) is the photovoltaic output at the future stage t, N pc (t) is the curtailed power output at future stage t; Formula (15): E PC (t) Amount of power abandoned in the future, N PC (t) The abandoned power output in the future stage; △t is the dispatching time in the future stage; Based on the above two objective functions and constraints, the forecast values of available water volume and wind-solar power generation in the future stage are input into the hydro-wind-solar multi-energy complementary optimization scheduling model to optimize the future stage hydropower generation associated with each day-ahead hydropower output value. Through the multi-objective optimization algorithm, the total power generation of the hydro-wind-solar complementary system is maximized and the power abandonment rate is minimized under the premise of meeting various constraints. According to the forecast value of available water in the dispatching period, the day-ahead hydropower generation associated with each day-ahead hydropower output value, and the future-stage hydropower generation associated with each day-ahead hydropower output value, multiple groups of associated day-ahead hydropower output values and water consumption rates are determined to obtain a hydropower benefit curve, which is used to describe the relationship between the day-ahead hydropower output value and the water consumption rate; According to the forecast values of wind power generation and photovoltaic power generation in the dispatching period, the day-ahead stage abandonment associated with each day-ahead hydropower output value, and the future stage abandonment associated with each day-ahead hydropower output value, multiple groups of associated day-ahead hydropower output values and abandonment rates are determined to obtain an abandonment risk curve, which is used to describe the relationship between the day-ahead hydropower output value and the abandonment rate; According to the hydropower benefit curve and the power abandonment risk curve, the target hydropower output value in the day-ahead stage is determined.
2. The method according to claim 1, characterized in that Determining the target hydropower output value in the day-ahead stage according to the hydropower benefit curve and the power abandonment risk curve includes: According to the power abandonment risk curve, determine the hydropower output range corresponding to the preset power abandonment rate; Determine the water consumption rate range corresponding to the hydropower output range according to the hydropower benefit curve; The hydropower output value corresponding to the minimum water consumption rate in the water consumption rate range is determined as the target hydropower output value.
3. The method according to claim 1, characterized in that The method of determining a plurality of groups of associated day-ahead hydropower output values and water consumption rates according to the forecast value of available water in the scheduling period, the day-ahead hydropower generation associated with each day-ahead hydropower output value, and the future stage hydropower generation associated with each day-ahead hydropower output value comprises: For any day-ahead hydropower output value, the sum of the day-ahead hydropower generation associated with the day-ahead hydropower output value and the future hydropower generation is determined as the hydropower generation in the dispatching period; The ratio of the forecast value of available water during the scheduling period to the hydropower generation during the scheduling period is determined as the water consumption rate.
4. The method according to claim 1, characterized in that: The method of determining a plurality of groups of associated day-ahead hydropower output values and power abandonment rates according to the forecast value of wind power generation in the scheduling period, the forecast value of photovoltaic power generation, the day-ahead stage abandoned power associated with each day-ahead hydropower output value, and the future stage abandoned power associated with each day-ahead hydropower output value comprises: For any day-ahead hydropower output value, the sum of wind power generation and photovoltaic power generation during the dispatch period is determined as the wind and photovoltaic power generation during the dispatch period; The sum of the abandoned power in the day-ahead phase and the abandoned power in the future phase is determined as the abandoned power in the dispatch period; The ratio of the amount of abandoned electricity during the scheduling period to the amount of wind and solar power generation during the scheduling period is determined as the abandonment rate.
5. A day-ahead decision-making device for a multi-energy complementary system, characterized in that: The device comprises: An acquisition module is used to obtain the forecast value of available water volume, the forecast value of wind power generation, the forecast value of photovoltaic power generation and initial conditions of the water-wind-solar complementary system during the scheduling period; The calculation module is used to set the initial conditions and the day-ahead hydropower output values for the water-wind-solar complementary system, and calculate the day-ahead hydropower generation, the reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value through the day-ahead complementary dispatch of water, wind and solar. The computing module is specifically used for: Construct the first relationship between the hydropower station's power generation coefficient, average water head, power generation flow and the day-ahead hydropower output value; Constructing a second relationship between the final reservoir water level in the day-ahead phase, the initial reservoir water level in the day-ahead phase, the average downstream water level and the average head loss; Construct the third relationship between the initial storage capacity, inflow flow, outflow flow, day-ahead dispatching duration and the final storage capacity of the day-ahead operation; Establishing a fourth relationship between power generation flow, abandoned water flow and outflow flow; Establish a fifth relationship between the average downstream water level and outflow; Establishing the sixth relationship between the initial water level of the reservoir in the day-ahead phase and the initial storage capacity in the day-ahead phase; Set the hydropower output value of each day before, solve the first relational expression, the second relational expression, the third relational expression, the fourth relational expression, the fifth relational expression and the sixth relational expression, and obtain the final water level of the reservoir in the day before stage; According to each day-ahead hydropower output value and day-ahead dispatch duration, calculate the day-ahead hydropower generation, the day-ahead reservoir final water level and the day-ahead power abandonment associated with each day-ahead hydropower output value; Among them, formula (1) to formula (6) correspond to the first to sixth relationship above respectively: For the day-ahead phase, t=1; i represents the hourly period within the day, i=1, 2, ..., 24; Formula (1): k is the power generation coefficient of the hydropower station, H (t) is the average water head, q pg (t) is the power generation flow, j is the hydropower output value on the previous day; Formula (2): H(t) is the average water head, Z(t+1) is the final water level of the reservoir in the previous period, Z(t) is the initial water level of the reservoir in the previous period, and Z down (t) is the average downstream water level, h loss is the average head loss; Formula (3): V(t+1) is the final storage capacity of the day-ahead stage, V(t) is the initial storage capacity of the day-ahead stage; Q(t) and q(t) are the inflow and outflow flows, respectively, and △t is the day-ahead scheduling duration; Formula (4): q pg (t) is the power generation flow, q spill (t) is the abandoned water flow, q(t) is the outflow flow; Formula (5): Z down (t) is the average downstream water level, Fqz is the relationship curve between outflow and downstream water level, and q(t) is the outflow; Formula (6): Fzv is the water level and storage capacity curve, Z(t) is the initial water level of the reservoir in the day-ahead stage, and V(t) is the initial storage capacity in the day-ahead stage; Formula (7): N PC (i) is the curtailed power output in the day-ahead phase; N HP (i) is the hydropower output in the day-ahead phase, N wp (i) is the wind power output in the day-ahead phase, N pv (i) is the photovoltaic output at day t, N L (i) is the load curve in the day-ahead phase; Formula (8): E PC (t) is the amount of power abandoned in the day-ahead phase, △t' is the scheduling duration within the day; Formula (9): N HP (t) is the hydropower output in the day-ahead phase; Formula (10): E HP (t) is the hydropower generation in the day-ahead stage; the first determination module is used to determine the future stage hydropower generation and future stage abandoned power generation associated with each day-ahead hydropower output value through water-wind-solar optimization and complementary scheduling according to the reservoir final water level in the day-ahead stage, the forecast value of available water in the future stage, the forecast value of wind power generation and the forecast value of photovoltaic power generation associated with each day-ahead hydropower output value, respectively; Wherein, the first determination module is specifically used for: Determine the available water volume in the future stage according to the reservoir final water level in the previous stage and the predicted inflow in the future stage respectively associated with each hydropower output value in the previous stage; The first objective function is established with the goal of maximizing the power generation of the water-wind-solar complementary system; the power generation of the water-wind-solar complementary system is the sum of the hydropower generation, wind power generation and photovoltaic power generation within the scheduling time of the future period; The second objective function is established with the goal of minimizing the power abandonment rate of the water-wind-solar hybrid system; the power abandonment rate of the water-wind-solar hybrid system is the ratio of the power abandonment in the future period to the wind-solar power generation; the wind-solar power generation is the sum of wind power generation and photovoltaic power generation; Establish multiple constraints of the first objective function and the second objective function, and the multiple constraints are used to constrain the decision-making and scheduling of the water-wind-solar complementary system in terms of reservoir water level, downstream flow, hydropower output and water head; Based on the first objective function, the second objective function and the constraints, the forecast value of the available water volume and the forecast value of the wind and solar power generation in the future stage are input into the water-wind-solar multi-energy complementary optimization scheduling model, and the future stage hydropower generation and future stage abandoned power generation associated with each day-ahead hydropower output value are determined through the water-wind-solar multi-energy complementary optimization scheduling model; Combining formula (11) and formula (15), the first objective function, the second objective function and the constraint conditions are explained respectively: Formula (11): F1 is the first objective function, T is the scheduling duration of the future stage, N HP (t) is the hydropower output in the future stage t, N wp (t) is the wind power output at the future stage t, N pv (t) is the photovoltaic output at the future stage t, N pc (t) is the curtailed power output in the future stage t; △t is the dispatching duration in the future stage t; F2 is the first objective function, E PC (t) is the amount of power abandoned, E W (t) is wind power generation, E PV (t) is the photovoltaic power generation; Formula (12): Z(t), q(t), N(t), and h(t) are the reservoir water level, discharge flow, hydropower output, and hydraulic head at time period t, respectively; Z min (t)、Z max (t) are the lower and upper limits of the reservoir water level, respectively; q min (t), q max (t) are the lower and upper limits of the reservoir discharge flow, respectively; N min (t), N max (t) are the lower and upper limits of hydropower output respectively; h min 、h max are the minimum head and maximum head respectively; Formula (13): It is used to express the water balance relationship in the future stage; V(t+1) is the final storage capacity in the future stage, V(t) is the initial storage capacity in the future stage; Q(t) and q(t) are the inflow and outflow respectively, and △t is the scheduling duration in the future stage; Formula (14): used to express the power balance relationship in the future stage; N L (t) load curve of period t in the future stage; N HP (t) is the hydropower output in the future stage t, N wp (t) is the wind power output at the future stage t, N pv (t) is the photovoltaic output at the future stage t, N pc (t) is the curtailed power output at future stage t; Formula (15): E PC (t) Amount of power abandoned in the future, N PC (t) The abandoned power output in the future stage; △t is the dispatching time in the future stage; Based on the above two objective functions and constraints, the forecast value of available water volume in the future stage and the forecast value of wind and solar power generation are input into the water-wind-solar multi-energy complementary optimization scheduling model to optimize and solve the future stage hydropower generation associated with each day-ahead hydropower output value. Through the multi-objective optimization algorithm, the total power generation of the water-wind-solar complementary system is maximized and the power abandonment rate is minimized under the premise of meeting various constraints. The second determination module is used to determine multiple groups of associated day-ahead hydropower output values and water consumption rates according to the forecast value of available water volume in the scheduling period, the day-ahead hydropower generation associated with each day-ahead hydropower output value, and the future stage hydropower generation associated with each day-ahead hydropower output value, so as to obtain the hydropower benefit curve. The hydropower benefit curve is used to describe the relationship between the day-ahead hydropower output value and the water consumption rate. The third determination module is used to determine multiple groups of associated day-ahead hydropower output values and power abandonment rates according to the forecast value of wind power generation in the scheduling period, the forecast value of photovoltaic power generation, the day-ahead stage abandonment amount associated with each day-ahead hydropower output value, and the future stage abandonment amount associated with each day-ahead hydropower output value, so as to obtain an abandonment risk curve, and the abandonment risk curve is used to describe the relationship between the day-ahead hydropower output value and the abandonment rate; The fourth determination module is used to determine the target hydropower output value in the day-ahead stage according to the hydropower benefit curve and the power abandonment risk curve.
6. The device according to claim 5, characterized in that The fourth determining module is specifically used for: According to the power abandonment risk curve, determine the hydropower output range corresponding to the preset power abandonment rate; Determine the water consumption rate range corresponding to the hydropower output range according to the hydropower benefit curve; The hydropower output value corresponding to the minimum water consumption rate in the water consumption rate range is determined as the target hydropower output value.
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer program instructions, and when the computer program instructions are executed by the processor, the day-ahead decision-making method for a multi-energy complementary system as claimed in any one of claims 1 to 4 is implemented.
8. An electronic device, characterized in that: The electronic device comprises: a processor and a memory storing computer program instructions; when the processor executes the computer program instructions, the day-ahead decision-making method for a multi-energy complementary system as claimed in any one of claims 1 to 4 is implemented.