Dynamic modeling method and system for regional water resources allocation and scheduling system

By dynamically screening water supply and demand objects and constructing complex network models, combined with multi-agent theory and evaluation methods, the problems of response to changes and difficulty in collaboration in traditional water resources dispatch methods are solved, and efficient and precise water resources management and dispatch are achieved.

CN118691060BActive Publication Date: 2024-10-25HOHAI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411196931.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-10-25
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

Traditional water resources allocation and scheduling methods lack dynamic modeling technology and cannot respond to changes in water supply and demand in real time. It is difficult to achieve variable structure simulation and multi-object joint collaboration of regional water resources systems, resulting in low water resource allocation accuracy and low management effects.

Method used

The coupling degree-Spearman correlation coefficient method is used to screen water supply and demand objects, the CN-Agent model is constructed based on complex network theory, and the regional water resources allocation and dispatching system is dynamically constructed by combining MAS theory and dual-echelon logic theory, and is constructed using the FCM-PCA-VIKOR method. Multi-dimensional evaluation index set and select the optimal solution.

Benefits of technology

It achieves rapid generation and refined management of water resources allocation and dispatch, improves dispatch efficiency, provides effective decision support, and promotes the sustainable development of regional water resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118691060B_ABST
    Figure CN118691060B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for dynamic modeling of a regional water resources allocation and scheduling system. The method determines the water resources management control section by collecting regional data, and uses the coupling degree-Spearman correlation coefficient method and the barrier degree model-QAP method to screen out the water resources supply and demand objects related to the control section, as well as the key factors related to the supply and demand objects. Based on complex network theory, a single water resources supply and demand model CN-Agent is constructed, and its behavior selection is optimized by the ML-SSGN algorithm. Using MAS theory and ACL communication language, a water resources allocation and scheduling system and a collaboration mechanism of multiple CN-Agents are dynamically constructed to generate multiple scheduling schemes. Finally, the FCM-PCA-VIKOR method is used to sort the schemes and select the best implementation plan. The system can provide a scientific implementation plan for regional water resources scheduling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a dynamic modeling method for regional water resources configuration and dispatching system. Background Art

[0002] Regional water resource allocation and dispatch is a necessary means to implement refined management and deployment of regional water resources. It aims to achieve artificial deployment of water resources in space and time through scientific modeling and simulation technology to improve the comprehensive utilization efficiency of water resources. Traditional water resource allocation and dispatch often lack dynamic modeling technology, which cannot respond to changes in water resource supply and demand in real time. It is also difficult to implement variable structure simulation and multi-object joint collaboration for regional water resource systems, resulting in low water resource allocation accuracy and water resource management level. Summary of the invention

[0003] Purpose of the invention: To provide a method for dynamic modeling of regional water resources allocation and scheduling system to solve the above problems existing in the prior art.

[0004] Technical solution: A dynamic modeling method for regional water resources allocation and scheduling system, including the following steps:

[0005] Step S1, collect data on the study area, determine the regional control section according to water resource allocation and scheduling needs, and use the coupling degree-Spearman correlation coefficient method to dynamically screen out water resource supply and demand objects with strong correlation with the control indicators of the control section; use the obstacle degree model-QAP method to respectively select the influencing factors with strong correlation with the water demand of users in each sub-unit and the influencing factors with strong correlation with the water supply of each water source as sensitive factors;

[0006] Step S2: Based on complex network theory, a single CN-Agent model of water resources supply and demand objects is constructed that conforms to the topological structure of water resources scheduling engineering and effectively expresses the correlation between water resources scheduling variables, and the behavior selection of a single agent is completed based on complex network theory and ML-SSGN learning algorithm;

[0007] Step S3: dynamically construct a regional water resources allocation and scheduling system based on MAS theory, and establish the communication mode between CN-Agents based on ACL communication language; adopt a method combining double-echelon logic theory and evolutionary game theory to construct a dynamic collaboration and organization mechanism of multiple CN-Agents, and generate a set of regional water resources allocation and scheduling solutions;

[0008] Step S4: construct an evaluation index set based on the FCM-PCA-VIKOR fusion method and sort the evaluation results of all schemes, and select the best scheme from the scheme set based on the sorting results as the final implementation plan for regional water resources allocation and scheduling.

[0009] In another embodiment of the present application, step S4 is to construct a multi-dimensional evaluation index set, use FCM clustering and PCA methods to form a comprehensive index evaluation matrix; use the Delphi method and decision laboratory method to determine the index weights; apply the VIKOR method to calculate the compromise feasible solution of each plan; according to the ranking of the compromise feasible solutions, select the optimal plan as the final implementation plan for regional water resources allocation and scheduling.

[0010] According to one aspect of the present application, step S1 further comprises:

[0011] Step S11: Collect multi-dimensional data of the study area, including natural geography, hydrology, engineering and socio-economic data; obtain control indicator data of important control sections; analyze user needs, determine the scheduling period, time scale and system operation parameters, and provide basic data support for regional water resources allocation and scheduling system modeling;

[0012] Step S12, obtaining water resources supply and demand object indicator data, using vulture search-projection pursuit method and DEMATEL-CRITIC method for data processing and weight calculation; applying coupling degree-Spearman correlation coefficient method, calculating the correlation between the control index of the control section and each water resources supply and demand object, and screening out objects with strong correlation;

[0013] Step S13, collect data on factors affecting user water demand and water source water supply, standardize the data and calculate the barrier degree through the vulture search-projection pursuit method and the barrier degree model; use the QAP method and entropy weight method to analyze the correlation of the influencing factors and determine the final sensitive factor.

[0014] According to one aspect of the present application, step S1 further comprises:

[0015] Step S11, collect data of the study area, including: natural geographical information, administrative division data, engineering characteristics data, historical runoff data, water demand data, water allocation constraints, groundwater exploitation constraints data, as well as water level-area curves, water level-reservoir capacity curves, discharge capacity curves, characteristic water levels, locations, effective reservoir capacity, control areas, water supply objects, water supply scope, water supply capacity, scheduling and operation rules of each water conservancy project, social and economic information, real-time water conditions, rainfall conditions, construction conditions, water use and water quality monitoring data, and important control sections in the study area, collect control indicator data of important control sections, including discharge flow, discharge volume, and water quality; analyze the water resources scheduling and allocation requirements proposed by users, determine the scheduling period, time scale, initial state of the system operation period, and control requirements at the end of the operation period of water resources allocation and scheduling, all of which are set as operating parameters of the regional water resources allocation and scheduling system;

[0016] Step S12: Dynamic screening is performed using the coupling degree-Spearman correlation coefficient method, by analyzing and calculating the correlation between water resource supply and demand objects and control indicators of the control section, and selecting water resource supply and demand objects with a strong correlation with the control indicators of the control section;

[0017] Step S13, using the obstacle model-QAP method, respectively calculate the correlation between the water demand of each partition unit user, the water supply of each water source and its influencing factors, and respectively select the influencing factors with a strong correlation with the water demand of each partition unit user and the influencing factors with a strong correlation with the water supply of each water source as sensitive factors.

[0018] According to one aspect of the present application, step S12 further comprises:

[0019] Step S12a, using the vulture search-projection pursuit method to standardize and normalize the index data range of the water resources supply and demand object, construct and optimize the projection index function, use the vulture search algorithm to solve the projection index function, calculate the best projection direction and the projection value of each index, and eliminate the dimensionality influence between different indicators;

[0020] Step S12b, using the DEMATEL method, constructing the influence matrix of water resources supply and demand object indicators through expert scoring, and performing normalization processing to obtain the standard influence matrix, calculating the standard influence matrix to obtain the comprehensive influence matrix of water resources supply and demand object indicators and the weight of each indicator, and using the CRITIC method to calculate the coefficient of variation and correlation coefficient, deriving the comprehensive index and the weight of each indicator, and obtaining the comprehensive weight based on the combination of subjective and objective weights;

[0021] Step S12c, using the coupling degree-Spearman correlation coefficient method, assigning comprehensive weights to the indicators of each water resource supply and demand object, using the coupling degree model and the Spearman correlation coefficient method to solve the correlation between the control indicators of the management section and each water resource supply and demand object, and screening the water resource supply and demand objects with an absolute value of correlation greater than a threshold as the water resource supply and demand objects with a strong correlation with the control indicators of the management section.

[0022] According to one aspect of the present application, step S13 is further:

[0023] Step S13a, using the vulture search-projection pursuit method, standardizing the range of the index data of the influencing factors of the water demand of each partition unit user and the index data of the influencing factors of the water supply from each water source, constructing and optimizing the projection index function, solving it using the vulture search algorithm, obtaining the best projection direction and the projection value of each index, and eliminating the dimensionality influence between different indicators;

[0024] Step S13b, using the barrier model, respectively calculating the exponential barrier of the sensitive factors related to the water demand of each sub-unit user and the exponential barrier of the sensitive factors related to the water supply of each water source, that is, the exponential barrier of the water demand of each sub-unit user and the total population at the end of the year, urbanization rate, rainfall, gross industrial production value, crop planting area, effective irrigation area, gross industrial production value, water consumption per 10,000 yuan of industrial added value, green coverage area, and annual average temperature factors, and the exponential barrier of the water supply of each water source and runoff, precipitation, average air pressure, average temperature, and average relative humidity factors;

[0025] Step S13c, using the matrix of water demand and water inflow as the explained variable and the matrix of influencing factors as the explanatory variable, constructing a relational data measurement model, using the QAP method to compare the corresponding values ​​between the matrices to obtain the correlation coefficient, using the QAP method to perform analysis, comparing the corresponding values ​​between the matrices to obtain the correlation coefficient, and performing a non-parametric test on the coefficient, using the entropy weight method to objectively weight the index barrier degree and correlation coefficient of the influencing factor, and sorting and comparing the data to obtain the sensitive factor.

[0026] According to one aspect of the present application, step S2 is:

[0027] Step S21, determine the CN-Agent nodes based on the supply and demand objects in the water resources system, including the scheduling variables of the water source and the user agent; calculate the attribute index of the complex network, and use the Z-score-EWM method to obtain the correlation coefficient between nodes; draw the edges according to the node correlation, use time series analysis to determine the edge direction, and construct a complex network structure diagram;

[0028] Step S22, obtain sensitive factor data and real-time water and rainfall information, predict the water inflow and water demand of CN-Agent, and update its knowledge base; perform belief reasoning and learning based on complex network structure and ML-SSGN algorithm, update the behavior state of CN-Agent; select the optimal behavior using the maximum expected utility criterion; complete the autonomous behavior response of CN-Agent through an iterative process.

[0029] According to another aspect of the present application, step S2 is further:

[0030] Step S21, determine the extractable nodes of a single agent, construct an internal complex network, and use representative indicators of the complex network to quantitatively express the correlation between water resource scheduling variables; construct edges based on the correlation between nodes, obtain the topological relationship of the water resource scheduling project, and draw a complex network structure diagram based on the topological relationship of the water resource scheduling project;

[0031] Step S22: Based on the maximum expected utility criterion, the ML-SSGN learning algorithm is used to complete the behavior selection of a single agent.

[0032] According to one aspect of the present application, step S21 is further:

[0033] Step S21a, determining nodes based on the Agent corresponding to each supply and demand object in the water resource system, including: for the water source CN-Agent, the scheduling variables include the amount of water entering the reservoir, the amount of water stored at the end of the period, the amount of water discharged, and the amount of water supplied in a certain period, and the above variables are discretely decomposed to obtain finite nodes; for the user CN-Agent, the scheduling variable is the amount of water supplied to the user in a certain period, and the discrete finite nodes are obtained according to the change in the amount of water demanded by the user from different water sources during the process of balancing the supply and demand of water resources;

[0034] Step S21b, respectively calculate the degree distribution, shortest path length and clustering coefficient of the complex network, use the Z-score-EWM comprehensive method to eliminate the influence of the dimension, calculate the comprehensive reflection coefficient of the correlation between the nodes, and use this coefficient to characterize the correlation between the nodes; based on the node correlation, draw edges for the associated nodes with related relationships, use the dynamic observation method of time series analysis to determine the direction of the edges, and draw a complex network structure diagram.

[0035] According to one aspect of the present application, step S22 is further:

[0036] Step S22a: Based on the sensitive factors, the water supply and demand of a single water resource supply and demand object CN-Agent is predicted, and the water supply and demand information during the scheduling period is obtained and used as the information input of the CN-Agent; the real-time water and rainfall information and user information are extracted and input into the CN-Agent, and the knowledge base of the CN-Agent is updated;

[0037] Step S22b: perform belief reasoning based on the complex network structure, call the ML-SSGN learning algorithm for learning, and update the behavior state of the CN-Agent; use the updated CN-Agent to calculate the model attribute indicators and perform correlation reasoning; calculate the utility function corresponding to each possible value of the node in the CN-Agent model based on the maximum expected utility criterion, and select the behavior with the largest utility value from the action set as the behavior choice for the next state of the single CN-Agent;

[0038] Step S22c: repeat steps S22a to S22b to complete the autonomous behavior response process of a single CN-Agent.

[0039] According to one aspect of the present application, step S3 further comprises:

[0040] Step S31: construct a water resources allocation and scheduling system based on MAS theory, assign a unique identifier and communication address to each CN-Agent; set the message primitive and parameter declaration method of the ACL communication language, and define the message transmission type; establish the information interaction content of each CN-Agent, including Agent attributes and communication data, to form a complete regional water resources allocation and scheduling system communication framework;

[0041] Step S32, construct a collaborative channel for direct communication between multiple CN-Agents; based on the double-echelon logic framework and evolutionary game theory, establish a supply and demand group game system, formulate collaborative strategies for CN-Agents and calculate the profit matrix; within the set scheduling period, seek equilibrium solutions through dynamic adjustments and strategy updates; and finally generate a feasible set of regional water resources allocation and scheduling solutions.

[0042] According to one aspect of the present application, step S31 is further:

[0043] Step S31a, based on the MAS theory, the water resources supply and demand object CN-Agent is organized into a regional water resources allocation and scheduling system, and an intelligent decomposition MAS model is constructed;

[0044] Step S31b: set a unique identity for each CN-Agent in turn, determine the communication address of each Agent based on the syntax of the ACL communication language, and open a message request port to other Agents;

[0045] Step S31c, setting the message primitive of the ACL communication language, using parameter declaration method to indicate the type of message transmission in each communication, the type includes: information sender identification and address, information receiver identification and address, sender's behavior status, sender's intention, information content, information interaction status and language name;

[0046] Step S31d: Set the message content that can be transmitted by various CN-Agents during information interaction, including: the communication address, type, capability, status, environment, request and response information of the sender Agent.

[0047] According to one aspect of the present application, step S32 is further:

[0048] Step S32a: Based on the communication mode among multiple agents, direct communication is used to build a multi-agent collaboration channel and cooperation mechanism;

[0049] Step S32b, based on the double-echelon logic framework, a double-echelon game system for supply and demand objects is constructed, with the water source CN-Agent as the supplier and the user CN-Agent as the demander, forming a many-to-many supply and demand group game space; based on the evolutionary game theory, collaborative strategies are formulated for various CN-Agents, including cooperation strategies and betrayal strategies, and the benefits of the two parties in the game when adopting different strategies are calculated based on the double-echelon logic theory, and the benefit matrix in each game is constructed, and a dynamic replication equation is established based on the Fermi rule;

[0050] Step S32c, setting the scheduling period of regional water resources allocation and scheduling as the game cycle, based on the game cycle, the CN-Agent that receives the collaboration request will continuously repeat the above dynamic adjustment and strategy update process until an equilibrium solution is found, and serve as the actual response made by the CN-Agent in the collaboration; through the collaborative operation of each CN-Agent in the system, a series of regional water resources allocation and scheduling schemes that are feasible under the existing supply and demand conditions are finally generated.

[0051] According to one aspect of the present application, step S4 is further:

[0052] Step S41, construct a multi-dimensional evaluation index set, including water shortage, water use guarantee rate and water resource utilization cost; establish absolute and relative index matrices, set threshold parameters and normalize them; use the FCM clustering method of the whale optimization algorithm to classify the indicators, combine the PCA method to extract the principal components, and form a comprehensive index evaluation matrix;

[0053] Specifically, step S41 is: based on the regional water resources allocation and scheduling plan set, construct an evaluation index set, the evaluation index set includes: the total water shortage and total water shortage rate of the region, the water shortage and water shortage rate of each sub-district, the external water transfer volume, the water transfer cost, the unconventional water utilization, the unconventional water utilization cost, the domestic water guarantee rate, the industrial water guarantee rate, the agricultural water guarantee rate, the ecological water guarantee rate, the groundwater exploitation rate, the discharge flow and water level of the important control section; based on the characteristics of the indicators, respectively construct an absolute indicator matrix and a relative indicator matrix, and set a threshold parameter for each relative indicator, and use the absolute value of the difference between the relative indicator and the parameter as the value of the relative indicator, thereby constructing an initial evaluation matrix; normalizing the initial evaluation matrix to obtain a standard evaluation matrix; using the FCM clustering method based on the whale optimization algorithm to classify various indicators, and using the PCA method to find the principal components with a cumulative variance contribution rate of more than 85% in various indicators, thereby forming a comprehensive indicator evaluation matrix;

[0054] Step S42: Use the Delphi method to score the importance of each indicator, and repeat the consultation and reaffirmation process until the expert opinion concentration reaches 5.0 points or more, and then end the consultation; use the decision laboratory method to calculate the comprehensive weight of each evaluation indicator in turn to obtain the final weight matrix;

[0055] Step S43, using the VIKOR method to calculate the index weighted matrix, and calculate the maximum group benefit and the minimum individual loss, and use the weighted Z-score method to calculate the compromise coefficient of each plan, and finally calculate the compromise feasible solution of each plan;

[0056] Step S44: sort the compromise feasible solutions corresponding to the various schemes from largest to smallest, wherein the scheme with the smallest compromise feasible solution is the optimal scheme for regional water resources allocation and scheduling, and is used as the final implementation plan.

[0057] According to another aspect of the present application, a regional water resources allocation and scheduling system dynamic modeling system is provided, comprising:

[0058] at least one processor;

[0059] and a memory communicatively coupled to at least one of the processors;

[0060] Among them, the memory stores instructions that can be executed by the processor, and the instructions are used to be executed by the processor to implement the dynamic modeling method of the regional water resources allocation and scheduling system described in any of the above technical solutions.

[0061] Beneficial effects: The dynamic modeling method of regional water resources allocation and scheduling system proposed in the present invention can flexibly and efficiently establish simulation models for various water resources research areas, and provide an autonomous parallel computing mechanism to ensure the rapid generation of water resources allocation and scheduling optimization plans; at the same time, it can access real-time monitoring data, combined with meteorological, hydrological and other multi-dimensional information, to achieve refined and intelligent management of water resources, optimize water resources allocation plans, improve scheduling efficiency, provide effective decision-making support for water resources management, and promote the sustainable development of regional water resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] Figure 1 It is a flow chart of the present invention.

[0063] Figure 2 It is a simplified schematic diagram of the internal complex network structure of a single CN-Agent of the present invention. DETAILED DESCRIPTION

[0064] like Figure 1 According to one aspect of the present application, a method for dynamic modeling of a regional water resources allocation and scheduling system is provided, characterized in that it includes the following steps:

[0065] Step S1, collect data on the study area, determine the regional control section according to water resource allocation and scheduling needs, and use the coupling degree-Spearman correlation coefficient method to dynamically screen out water resource supply and demand objects with strong correlation with the control indicators of the control section; use the obstacle degree model-QAP method to respectively select the influencing factors with strong correlation with the water demand of users in each sub-unit and the influencing factors with strong correlation with the water supply of each water source as sensitive factors;

[0066] Step S2: Based on complex network theory, a single CN-Agent model of water resources supply and demand objects is constructed that conforms to the topological structure of water resources scheduling engineering and effectively expresses the correlation between water resources scheduling variables, and the behavior selection of a single agent is completed based on complex network theory and ML-SSGN learning algorithm;

[0067] Step S3: dynamically construct a regional water resources allocation and scheduling system based on MAS theory, and establish the communication mode between CN-Agents based on ACL communication language; adopt a method combining double-echelon logic theory and evolutionary game theory to construct a dynamic collaboration and organization mechanism of multiple CN-Agents, and generate a set of regional water resources allocation and scheduling solutions;

[0068] Step S4: construct an evaluation index set based on the FCM-PCA-VIKOR fusion method and sort the evaluation results of all schemes, and select the best scheme from the scheme set based on the sorting results as the final implementation plan for regional water resources allocation and scheduling.

[0069] This embodiment achieves comprehensive, accurate and dynamic modeling of complex water resource systems, providing a support tool for water resource management decision-making. From data collection, model construction to program evaluation, a complete technical chain is formed.

[0070] In the data collection and analysis stage, the coupling degree-Spearman correlation coefficient method and the barrier degree model-QAP method were combined to achieve accurate screening of key water resource supply and demand objects and their key influencing factors. Not only the linear and nonlinear relationships between variables were considered, but also two-way screening from both supply and demand was performed at the same time, which improved the pertinence and effectiveness of the model, improved the form of fixed simulation and scheduling of all objects in the region, and improved the adaptability and flexibility of the model.

[0071] In the model building stage, the complex network theory and ML-SSGN learning algorithm are innovatively combined to abstract the water resource system into a complex network and introduce an intelligent learning mechanism. It can not only accurately express the topological structure of the water resource scheduling project, but also capture the complex correlation between the variables in the system, laying the foundation for subsequent intelligent decision-making.

[0072] In the stage of system integration and collaboration mechanism construction, the dynamic construction and intelligent collaboration of multi-CN-Agent system are realized by combining MAS theory, ACL communication language, double echelon logic theory and evolutionary game theory. The water resources system is regarded as a complex adaptive system composed of multiple intelligent agents, and the overall joint optimization of the system is achieved through efficient communication mechanism and dynamic game strategy.

[0073] In the scheme evaluation and decision-making stage, the FCM-PCA-VIKOR fusion method was used to construct a multi-dimensional and multi-level evaluation system and decision-making mechanism. It can comprehensively consider indicators of water balance, economic benefits, ecological environment, social equity and other aspects, and find the best balance between conflicting goals. In the scenario of regional water resources allocation and scheduling, it solves the problem that traditional models are difficult to deal with system complexity, dynamics and multi-objectives at the same time. It can effectively respond to complex situations such as water shortage, diversified water demand, climate change, etc., and provide more accurate, flexible and reliable decision-making support for water resources management departments.

[0074] Especially in the face of emergencies (such as droughts and floods) and long-term changes (such as economic restructuring), the dynamic and adaptive nature of this method enables it to quickly adjust strategies and ensure the rational allocation of water resources. In short, it has significant advantages in improving the accuracy, fairness, efficiency and sustainability of water resource allocation and scheduling. It can not only improve the efficiency of water resource utilization and reduce waste, but also balance the needs of different stakeholders and promote the scientific management and sustainable use of water resources. In addition, this method provides a systematic, intelligent and dynamic modeling tool for solving regional water resource problems.

[0075] In another embodiment of the present application,

[0076] Step S2 is: Step S21, determine the CN-Agent node based on the supply and demand objects in the water resources system, including the scheduling variables of the water source and the user agent; calculate the attribute index of the complex network, and use the Z-score-EWM method to obtain the correlation coefficient between the nodes; draw the edge according to the node correlation, use time series analysis to determine the edge direction, and construct a complex network structure diagram;

[0077] Step S22, obtain sensitive factor data and real-time water and rainfall information, predict the water inflow and water demand of CN-Agent, and update its knowledge base; perform belief reasoning and learning based on complex network structure and ML-SSGN algorithm, update the behavior state of CN-Agent; select the optimal behavior using the maximum expected utility criterion; complete the autonomous behavior response of CN-Agent through an iterative process.

[0078] Step S3 is specifically as follows:

[0079] Step S31: construct a water resources allocation and scheduling system based on MAS theory, assign a unique identifier and communication address to each CN-Agent; set the message primitive and parameter declaration method of the ACL communication language, and define the message transmission type; establish the information interaction content of each CN-Agent, including Agent attributes and communication data, to form a complete regional water resources allocation and scheduling system communication framework;

[0080] Step S32, construct a collaborative channel for direct communication between multiple CN-Agents; based on the double-echelon logic framework and evolutionary game theory, establish a supply and demand group game system, formulate collaborative strategies for CN-Agents and calculate the profit matrix; within the set scheduling period, seek equilibrium solutions through dynamic adjustments and strategy updates; and finally generate a feasible set of regional water resources allocation and scheduling solutions.

[0081] Step S4 is: construct a multi-dimensional evaluation index set, use FCM clustering and PCA methods to form a comprehensive index evaluation matrix; use the Delphi method and decision laboratory method to determine the index weights; apply the VIKOR method to calculate the compromise feasible solution of each scheme; according to the ranking of the compromise feasible solutions, select the optimal scheme as the final implementation plan for regional water resources allocation and scheduling.

[0082] According to one aspect of the present application, step S1 further comprises:

[0083] Step S11, collect data of the study area, including: natural geographical information, administrative division data, engineering characteristics data, historical runoff data, water demand data, water allocation constraints, groundwater exploitation constraints data, as well as water level-area curves, water level-reservoir capacity curves, discharge capacity curves, characteristic water levels, locations, effective reservoir capacity, control areas, water supply objects, water supply scope, water supply capacity, scheduling and operation rules of each water conservancy project, social and economic information, real-time water conditions, rainfall conditions, construction conditions, water use and water quality monitoring data, and important control sections in the study area, collect control indicator data of important control sections, including discharge flow, discharge volume, and water quality; analyze the water resources scheduling and allocation requirements proposed by users, determine the scheduling period, time scale, initial state of the system operation period, and control requirements at the end of the operation period of water resources allocation and scheduling, all of which are set as operating parameters of the regional water resources allocation and scheduling system;

[0084] Step S12: Dynamic screening is performed using the coupling degree-Spearman correlation coefficient method, by analyzing and calculating the correlation between water resource supply and demand objects and control indicators of the control section, and selecting water resource supply and demand objects with a strong correlation with the control indicators of the control section;

[0085] Step S13, using the obstacle model-QAP method, respectively calculate the correlation between the water demand of each partition unit user, the water supply of each water source and its influencing factors, and respectively select the influencing factors with a strong correlation with the water demand of each partition unit user and the influencing factors with a strong correlation with the water supply of each water source as sensitive factors.

[0086] In this embodiment, a rich and comprehensive data foundation is established by comprehensively collecting various data such as the natural geography, administrative divisions, engineering characteristics, historical runoff, and water demand of the study area. The coupling degree-Spearman correlation coefficient method is used for dynamic screening, which not only considers the linear relationship between variables, but also captures nonlinear correlations, so as to more accurately identify water supply and demand objects with strong correlations with the control indicators of the control section. The advantage is that it can quickly locate key influencing factors in complex water resource systems, which improves the pertinence and effectiveness of the model. Through the obstacle degree model-QAP method, the influencing factors with strong correlations with the user water demand of each partition unit and the water supply of each water source are screened respectively. The two-way screening mechanism can consider the key factors of both supply and demand at the same time, so as to more comprehensively reflect the dynamic characteristics of the water resource system. Especially when dealing with large-scale, multi-variable water resource systems, it can effectively reduce the complexity of the system and improve the interpretability and practicality of the model. In the scenario of dynamic modeling of regional water resource allocation and scheduling system, the problem that traditional modeling methods are difficult to take into account both system complexity and model accuracy is solved. By accurately screening key influencing factors, this method significantly reduces the complexity of the model while ensuring that the model accurately describes the actual water resource system. This balance is crucial for formulating effective water resource allocation strategies, especially in the face of uncertainties such as climate change and population growth, and can provide more flexible and adaptable decision support. In addition, the dynamic characteristics of this method enable the model to respond promptly to changes in the water resource system, such as sudden droughts and changes in water quality, thereby supporting more timely and accurate scheduling decisions.

[0087] According to one aspect of the present application, step S12 further comprises:

[0088] Step S12a, using the vulture search-projection pursuit method to standardize and normalize the index data range of the water resources supply and demand object, construct and optimize the projection index function, use the vulture search algorithm to solve the projection index function, calculate the best projection direction and the projection value of each index, and eliminate the dimensionality influence between different indicators;

[0089] Step S12b, using the DEMATEL method, constructing the influence matrix of water resources supply and demand object indicators through expert scoring, and performing normalization processing to obtain the standard influence matrix, calculating the standard influence matrix to obtain the comprehensive influence matrix of water resources supply and demand object indicators and the weight of each indicator, and using the CRITIC method to calculate the coefficient of variation and correlation coefficient, deriving the comprehensive index and the weight of each indicator, and obtaining the comprehensive weight based on the combination of subjective and objective weights;

[0090] Step S12c, using the coupling degree-Spearman correlation coefficient method, assigning comprehensive weights to the indicators of each water resource supply and demand object, using the coupling degree model and the Spearman correlation coefficient method to solve the correlation between the control indicators of the management section and each water resource supply and demand object, and screening the water resource supply and demand objects with an absolute value of correlation greater than a threshold as the water resource supply and demand objects with a strong correlation with the control indicators of the management section.

[0091] In this embodiment, the process of step S12a may be specifically as follows: collecting the index data of the water resource supply and demand objects, and organizing them into a matrix form X = (xij)m×n, where m is the number of samples and n is the number of indicators.

[0092] Range standardization: For each indicator j, calculate its maximum value max(xj) and minimum value min(xj). Standardize each data point xij: zij = (xij - min(xj)) / (max(xj) - min(xj))

[0093] Normalization: Calculate the mean μj and standard deviation σj of each indicator. Normalize the standardized data: yij = (zij - μj) / σj

[0094] Construct the projection index function: define the projection index function Q(a) = Sz × Dz; where Sz is the standard deviation of the projection value and Dz is the local density of the projection value; initialize the vulture search algorithm parameters: set the population size N, the maximum number of iterations T, and other control parameters. Execute the vulture search algorithm:

[0095] a. Randomly initialize N projection directions a; b. Calculate the fitness value Q(a) of each direction; c. Update the optimal solution a*; d. For each vulture individual, update its position: calculate the exploration coefficient E = 2(1 - t / T), generate random numbers r1, r2, r3; if |E| ≥ 1, perform the exploration phase update; if |E| < 1, perform the development phase update.

[0096] e. Repeat steps bd until the maximum number of iterations is reached;

[0097] Calculate the optimal projection direction and projection value: use the optimal solution a* to calculate the projection value of each sample: zi = Xi× a*; eliminate the influence of dimensions between indicators: standardize the projection value zi to obtain the final projection result.

[0098] In this embodiment, water resource supply and demand objects with strong correlation with the control indicators of the control section are screened, including water conservancy projects and zoning units. The specific implementation steps are as follows:

[0099] After determining the regional control section according to the water resources allocation and scheduling requirements, the data of the minimum downstream flow, minimum downstream water volume, and water quality category of the control section are normalized, a projection index function is constructed, and the projection value of each control index is calculated using the vulture search algorithm;

[0100] The DEMATEL-CRITIC method is used to calculate the weights. That is, the DEMATEL method uses expert scoring to establish a standardized impact matrix, and the CRITIC method calculates the coefficient of variation and correlation coefficient to obtain a comprehensive index and the weight of each indicator. Finally, the subjective and objective weights are combined to obtain the comprehensive weights of the minimum downstream flow, minimum downstream water volume, water quality category, and water resource supply and demand objects of the control section control indicators.

[0101] The coupling degree-Spearman correlation coefficient method is used to obtain the coupling degree between the water resources supply and demand objects (water conservancy projects and zoning units) and the control indicators of the control section through the coupling degree model. The formula is as follows:

[0102] ;

[0103] In the formula, and They are the control indicators of the control section and the water resources supply and demand objects. It is the coupling degree between the control index of the management section and each water resource supply and demand object, and its range is [0, 1].

[0104] The formula for calculating the correlation using the Spearman correlation coefficient method is as follows:

[0105] ;

[0106] in , To manage the cross-section control indicators and the ranking of the two types of data on water resources supply and demand objects, , is the average of the ranks of the two types of data, is the length of the column. Take the absolute value of the correlation coefficient For data greater than 0.6, water resource supply and demand objects (water conservancy projects and zoning units) with a strong correlation with the control indicators of the management section are screened out as water users.

[0107] According to one aspect of the present application, step S13 is further:

[0108] Step S13a, using the vulture search-projection pursuit method, standardizing the range of the index data of the influencing factors of the water demand of each partition unit user and the index data of the influencing factors of the water supply from each water source, constructing and optimizing the projection index function, solving it using the vulture search algorithm, obtaining the best projection direction and the projection value of each index, and eliminating the dimensionality influence between different indicators;

[0109] Step S13b, using the barrier model, respectively calculating the exponential barrier of the sensitive factors related to the water demand of each sub-unit user and the exponential barrier of the sensitive factors related to the water supply of each water source, that is, the exponential barrier of the water demand of each sub-unit user and the total population at the end of the year, urbanization rate, rainfall, gross industrial production value, crop planting area, effective irrigation area, gross industrial production value, water consumption per 10,000 yuan of industrial added value, green coverage area, and annual average temperature factors, and the exponential barrier of the water supply of each water source and runoff, precipitation, average air pressure, average temperature, and average relative humidity factors;

[0110] Step S13c, using the matrix of water demand and water inflow as the explained variable and the matrix of influencing factors as the explanatory variable, constructing a relational data measurement model, using the QAP method to compare the corresponding values ​​between the matrices to obtain the correlation coefficient, using the QAP method to perform analysis, comparing the corresponding values ​​between the matrices to obtain the correlation coefficient, and performing a non-parametric test on the coefficient, using the entropy weight method to objectively weight the index barrier degree and correlation coefficient of the influencing factor, and sorting and comparing the data to obtain the sensitive factor.

[0111] In this embodiment, step S13a is implemented with reference to step S12a. The process of data preparation is as follows:

[0112] Collect the index data of the factors affecting the water demand of each sub-unit user, and record it as matrix X1. Collect the index data of the factors affecting the water supply from each water source, and record it as matrix X2.

[0113] In this embodiment, step S13b may be:

[0114] Calculate the mean of each factor: For each factor j in X1 and X2, calculate the mean value xj mean ; Establish the obstacle model: define the exponential obstacle formula: Oj = wj × (1 - xj / xj mean ), where wj is the factor weight and xj is the actual value of the factor;

[0115] Calculate the exponential barrier of water demand-related factors: For each factor in X1 (such as total population at the end of the year, urbanization rate, etc.), calculate Oj;

[0116] Calculate the exponential barrier of water inflow-related factors: For each factor in X2 (such as runoff, precipitation, etc.), calculate Oj;

[0117] Standardization: The calculated index barrier degree is standardized to ensure comparability;

[0118] The index barrier degree of water demand and water supply related factors were ranked to identify the key factors with higher barrier degree.

[0119] In this embodiment, sensitive factors with strong correlation with the water demand of users in each sub-unit and sensitive factors with strong correlation with the water supply of each water source are screened. The specific implementation steps are as follows:

[0120] The index data of the influencing factors of water demand of users in each sub-district unit and the index data of the influencing factors of water supply from each water source are standardized, and the vulture search algorithm is used to solve them, and the projection values ​​of the index data of the influencing factors of water demand of users in each sub-district unit and the influencing factors of water supply from each water source are calculated;

[0121] The barrier model is used to calculate the exponential barrier of the sensitive factors related to the water demand of each partition unit user and the exponential barrier of the sensitive factors related to the water supply of each water source:

[0122] ;

[0123] In the formula, It is the barrier degree of the sensitive factors related to the water demand of users in each sub-unit and the sensitive factors related to the water supply of each water source; is the index deviation, and the calculation formula is , is the normalized value; is the weight, usually indicating the factor contribution.

[0124] The QAP correlation analysis module in UCINET software was used for analysis. The corresponding values ​​between the water demand matrix and the sensitive factor matrix, and between the water supply matrix of each water source and the sensitive factor matrix were compared to obtain the correlation coefficient, and a non-parametric test was performed on the coefficient.

[0125] The entropy weight method was used to objectively weight the data obtained by the obstacle model and the QAP method. Through data sorting and comparison, the sensitive factors related to the water demand of users in each sub-district unit were obtained, including rural population, per capita water consumption of urban residents, per capita water consumption of rural residents, added value of the primary industry, sown area of ​​crops, total output value of agriculture, forestry, animal husbandry and fishery, gross industrial output value, and green coverage area; the sensitive factors related to the water inflow of each water source were runoff, precipitation, average air pressure, average temperature, polar vortex area index in Asia (Zone 1, 6OE-150E), polar vortex area index in North America (Zone 3, 120W-30w), polar vortex area index in the Atlantic and European regions (Zone 4, 30W-6OE), Pacific Decadal Oscillation, Atlantic Multidecadal Oscillation, average sea level temperature in the Pacific [170°W-120W, 5N-5S] region, and El Niño-Southern Oscillation index.

[0126] According to one aspect of the present application, step S2 further comprises:

[0127] Step S21, determine the extractable nodes of a single agent, construct an internal complex network, and use representative indicators of the complex network to quantitatively express the correlation between water resource scheduling variables; construct edges based on the correlation between nodes, obtain the topological relationship of the water resource scheduling project, and draw a complex network structure diagram based on the topological relationship of the water resource scheduling project;

[0128] Step S22: Based on the maximum expected utility criterion, the ML-SSGN learning algorithm is used to complete the behavior selection of a single agent.

[0129] In this embodiment, a single CN-Agent model is constructed using complex network theory, which can not only accurately express the topological structure of the water resources scheduling project, but also effectively capture the complex correlation between water resources scheduling variables. By abstracting the various components in the water resources system (such as reservoir projects, water users, rivers, water pipe networks, etc.) as network nodes and expressing the relationship between them through edges, the structure and function of the entire water resources system can be intuitively and comprehensively described. This networked expression is particularly suitable for dealing with the complex situation of multiple sources, multiple users, and multiple targets in the water resources system, providing a solid foundation for subsequent decision analysis. The ML-SSGN learning algorithm is introduced to complete the behavior selection of a single Agent, which can learn and predict the optimal behavior of the Agent based on historical data and current status. The advantage of the ML-SSGN algorithm is that it can handle high-dimensional, nonlinear decision spaces, which just meets the characteristics of the water resources scheduling system. Through continuous learning and optimization, each Agent can make the most reasonable scheduling decision based on the current water resources situation and system requirements.

[0130] It solves the problem that traditional water resource scheduling models are difficult to deal with the high complexity and dynamics of the system. Traditional methods often use simplified linear or nonlinear programming models, which make it difficult to fully consider the complex interactions between the components of the system. This method uses complex network theory to not only describe these complex relationships, but also analyze their impact on the overall system performance. At the same time, the introduction of the ML-SSGN algorithm enables the model to be adaptive and learnable, and can continuously optimize the scheduling strategy based on historical experience and real-time data. It is of great significance for responding to uncertain factors such as climate change and fluctuations in water demand. In addition, it has strong scalability and can easily incorporate new water sources or water users to adapt to the dynamic changes of the water resource system.

[0131] like Figure 2 As shown, according to one aspect of the present application, the step S21 is further:

[0132] Step S21a, determining nodes based on the Agent corresponding to each supply and demand object in the water resource system, including: for the water source CN-Agent, the scheduling variables include the amount of water entering the reservoir, the amount of water stored at the end of the period, the amount of water discharged, and the amount of water supplied in a certain period, and the above variables are discretely decomposed to obtain finite nodes; for the user CN-Agent, the scheduling variable is the amount of water supplied to the user in a certain period, and the discrete finite nodes are obtained according to the change in the amount of water demanded by the user from different water sources during the process of balancing the supply and demand of water resources;

[0133] Step S21b, respectively calculate the degree distribution, shortest path length and clustering coefficient of the complex network, use the Z-score-EWM comprehensive method to eliminate the influence of the dimension, calculate the comprehensive reflection coefficient of the correlation between the nodes, and use this coefficient to characterize the correlation between the nodes; based on the node correlation, draw edges for the associated nodes with related relationships, use the dynamic observation method of time series analysis to determine the direction of the edges, and draw a complex network structure diagram.

[0134] In this embodiment, let the water inflow in period t be The water storage at the end of the period is The amount of water discharged is and water supply , the complex network structure constructed is shown in Figure 2 .

[0135] The specific implementation steps for calculating the node correlation comprehensive reflection coefficient are as follows:

[0136] Calculate the degree distribution, shortest path length, and clustering coefficient of the complex network, and calculate the mean of each series and standard deviation , the dimensionless Z-score series is calculated by the following formula:

[0137] ;

[0138] Where x ij represents the jth value of the i-th indicator series, where , n is the number of indicators; , m is the number of indicator series;

[0139] The proportion of each indicator series is calculated according to the following formula:

[0140] ;

[0141] In the formula, is the proportion of the jth value in the i-th indicator series.

[0142] The entropy value of each indicator is calculated according to the following formula:

[0143] ;

[0144] In the formula, is the entropy value of the jth value; .

[0145] The information entropy redundancy (difference) and weight are calculated as follows:

[0146] ; ;

[0147] In the formula, and are the information entropy redundancy and weight of the j-th value respectively.

[0148] Finally, the weight is multiplied by the initial Z-score series to obtain the correlation reflection coefficient C ij , as a basis for reflecting the strength of the correlation between nodes.

[0149] According to one aspect of the present application, step S22 is further:

[0150] Step S22a: Based on the sensitive factors, the water supply and demand of a single water resource supply and demand object CN-Agent is predicted, and the water supply and demand information during the scheduling period is obtained and used as the information input of the CN-Agent; the real-time water and rainfall information and user information are extracted and input into the CN-Agent, and the knowledge base of the CN-Agent is updated;

[0151] Step S22b: perform belief reasoning based on the complex network structure, call the ML-SSGN learning algorithm for learning, and update the behavior state of the CN-Agent; use the updated CN-Agent to calculate the model attribute indicators and perform correlation reasoning; calculate the utility function corresponding to each possible value of the node in the CN-Agent model based on the maximum expected utility criterion, and select the behavior with the largest utility value from the action set as the behavior choice for the next state of the single CN-Agent;

[0152] Step S22c: repeat steps S22a to S22b to complete the autonomous behavior response process of a single CN-Agent.

[0153] In this embodiment, the ML-SSGN learning algorithm is used to achieve complex network structure learning, and a very small data set can be used to quickly adapt to new tasks, and the optimization learning is performed according to the following optimization model:

[0154] ; .

[0155] Based on the meta-learning algorithm, it is integrated with the graph layout algorithm. While achieving the learning purpose, it can better maintain the global structure of complex networks and pay more attention to the role of distant node pairs.

[0156] The utility function corresponding to the possible values ​​of the node is calculated according to the maximum utility criterion. The function expression is as follows:

[0157] ;

[0158] In the formula, , represents the nodes contained in CN-Agent; , represents the action set of CN-Agent; represents the utility function.

[0159] According to one aspect of the present application, step S3 further comprises:

[0160] Step S31, using MAS theory to couple multiple water resource supply and demand object CN-Agents, dynamically establish a regional water resource configuration and scheduling system, and build an intelligent decomposition MAS model; using ACL communication language to establish a communication mode between multiple CN-Agents;

[0161] Step S32: Adopt double-echelon logic theory and evolutionary game theory to build a dynamic collaboration and organization mechanism of multiple CN-Agents, and generate a set of regional water resources allocation and scheduling solutions.

[0162] In this embodiment, the double-echelon logic theory used as an asymmetric group game framework can effectively solve the optimization decision-making problem involving multiple types of objects. Therefore, it is also suitable for solving the many-to-many collaboration and organization scenarios between supply and demand object CN-Agents in water resource scheduling and allocation. The use of evolutionary game theory within the framework provided by the double-echelon logic theory can make the interests of the groups represented by multiple types of objects be fully taken into account, thereby better approaching the group equilibrium solution in the process of the game.

[0163] Each plan in the generated plan set contains detailed calculation results information of the balance of water resources supply and demand, including water inflow, water supply, water abandonment and water storage information of various water sources, water demand and water shortage information of various users, flow information of various nodes and sections, detailed water supply information of water sources to users, and total water supply and total water demand information of each partition unit; various indicators of the plan can be statistically obtained from this.

[0164] In this embodiment, the MAS theory is used to dynamically construct a regional water resources configuration and scheduling system, and each entity in the water resources system (such as reservoir projects, water users, rivers, etc.) is abstracted into an agent with autonomous decision-making capabilities, so that the system can more flexibly respond to the complex and changing water resources environment. The advantage of MAS is that it can simulate the autonomy, sociality and initiative of each entity in the water resources system, thereby more realistically reflecting the decision-making process in actual water resources management. The communication mode between CN-Agents is established based on the ACL communication language, and the standardized communication mechanism improves the efficiency and accuracy of information exchange within the system. The use of ACL language ensures that different types of agents (such as water source agents and user agents) can effectively transmit and analyze various complex water resources information, such as water quantity, water quality, demand, etc., so as to support more accurate decision-making. The method of combining double-echelon logic theory with evolutionary game theory is used to construct a dynamic collaboration and organization mechanism of multiple CN-Agents, which can effectively handle the complex game relationship between supply and demand in the water resources system. The dual-echelon logic theory takes into account the decision-making logic at two levels: water supply and user demand, while the evolutionary game theory simulates the strategy evolution process of each agent in long-term interaction. This dynamic game mechanism enables the system to continuously optimize resource allocation strategies and gradually move towards the global optimal solution.

[0165] In short, the traditional water resource scheduling model is difficult to deal with the complex problems of multiple subjects, multiple objectives and dynamic changes. Traditional methods often use centralized optimization models, which are difficult to fully consider the individual decision-making behaviors and mutual influences of various stakeholders. However, this method can not only simulate the autonomous decision-making process of each subject through MAS and game theory, but also analyze the competition and cooperation relationship between them, so as to more realistically reflect the complex dynamics of water resource allocation. Especially in the face of water shortage and intensified water use conflicts, it can achieve fair and reasonable allocation of water resources while ensuring basic water demand through dynamic collaboration mechanisms. The dynamic and adaptive nature of the method enables it to effectively respond to emergencies (such as droughts and floods) and long-term changes (such as climate change and economic restructuring), providing more flexible and reliable decision-making support for water resource management departments.

[0166] According to one aspect of the present application, step S31 is further:

[0167] Step S31a, based on the MAS theory, the water resources supply and demand object CN-Agent is organized into a regional water resources allocation and scheduling system, and an intelligent decomposition MAS model is constructed;

[0168] Step S31b: set a unique identity for each CN-Agent in turn, determine the communication address of each Agent based on the syntax of the ACL communication language, and open a message request port to other Agents;

[0169] Step S31c, setting the message primitive of the ACL communication language, using parameter declaration method to indicate the type of message transmission in each communication, the type includes: information sender identification and address, information receiver identification and address, sender's behavior status, sender's intention, information content, information interaction status and language name;

[0170] Step S31d: Set the message content that can be transmitted by various CN-Agents during information interaction, including: the communication address, type, capability, status, environment, request and response information of the sender Agent.

[0171] In this embodiment, the intelligent decomposition model constructed based on MAS theory enables the system to better adapt to the complexity and dynamics of water resources management. Each CN-Agent represents an independent entity in the water resources system (such as a reservoir, water user, etc.), has autonomous decision-making capabilities, and improves the flexibility and robustness of the system. By assigning a unique identifier and communication address to each CN-Agent, a clear and efficient Agent network topology is established. It not only facilitates accurate communication between agents, but also lays the foundation for the scalability of the system, so that new water resource entities can be easily integrated into the existing system. The message transmission type defined by the ACL communication language and parameter declaration method provides a standardized protocol for information exchange between agents. This protocol covers all key aspects of communication, such as the identity, behavior status, and willingness of the sender and receiver, ensuring the integrity and accuracy of information transmission. By clearly defining the message content that can be transmitted by various CN-Agents, a comprehensive information interaction framework is established. This framework not only includes the basic attribute information of the Agent, but also covers dynamic information such as its capabilities, status, and environment, providing rich data support for complex water resource decision-making processes. In the specific scenario of regional water resources allocation and scheduling, this approach solves the limitations of traditional centralized decision-making models when facing large-scale, multivariable water resources systems. It can effectively handle uncertainties and dynamic changes in water resources systems, such as sudden water pollution incidents or seasonal fluctuations in water demand. Especially in complex situations where multiple stakeholders (such as life, agriculture, industry, and ecological water use) need to be coordinated, this distributed decision-making and efficient communication mechanism can improve the efficiency and fairness of decision-making. For example, when emergency water transfer is required during the dry season, the system can quickly collect the status information of each agent and coordinate the actions of all parties through efficient communication to maximize the efficiency of water resource utilization. In general, this innovative approach has significant advantages in improving the intelligence, adaptability, and collaborative efficiency of water resources allocation.

[0172] According to one aspect of the present application, step S32 is further:

[0173] Step S32a: Based on the communication mode among multiple agents, direct communication is used to build a multi-agent collaboration channel and cooperation mechanism;

[0174] Step S32b, based on the double-echelon logic framework, a double-echelon game system for supply and demand objects is constructed, with the water source CN-Agent as the supplier and the user CN-Agent as the demander, forming a many-to-many supply and demand group game space; based on the evolutionary game theory, collaborative strategies are formulated for various CN-Agents, including cooperation strategies and betrayal strategies, and the benefits of the two parties in the game when adopting different strategies are calculated based on the double-echelon logic theory, and the benefit matrix in each game is constructed, and a dynamic replication equation is established based on the Fermi rule;

[0175] Step S32c, setting the scheduling period of regional water resources allocation and scheduling as the game cycle, based on the game cycle, the CN-Agent that receives the collaboration request will continuously repeat the above dynamic adjustment and strategy update process until an equilibrium solution is found, and serve as the actual response made by the CN-Agent in the collaboration; through the collaborative operation of each CN-Agent in the system, a series of regional water resources allocation and scheduling schemes that are feasible under the existing supply and demand conditions are finally generated.

[0176] In this embodiment, the two echelons of the game in the double-echelon game system are first determined to be water sources and users. Since there is a many-to-many supply and demand relationship between water sources and users, a multi-group game space can be formed; the game group usually has multiple benefit goals, including water supply benefits, water supply efficiency, ecological protection benefits, and production benefits of user water use. In contrast, there are various types of benefit losses, including water supply costs, water transmission costs, economic losses from abandoned water, and economic benefit losses caused by water shortages for users. Using the comprehensive utility function, multiple benefit goals and multiple benefit losses are converted into single comprehensive benefit goals and comprehensive benefit losses, respectively.

[0177] For user CN-Agent, when it adopts a cooperation strategy, it means making a behavioral choice to share the water shortage, so that the overall water shortage rate of users is minimized and the overall production efficiency is maximized. When it adopts a betrayal strategy, it means making a behavioral choice to occupy water supply on demand, which only maximizes the individual production efficiency. For water source CN-Agent, when it adopts a cooperation strategy, it means choosing to share the system water supply task with other water sources, so that the overall water shortage rate of users is minimized and the overall water supply efficiency of water sources is maximized. When it adopts a betrayal strategy, it means not participating in the macro-control of supply and demand balance, only ensuring that its own water supply request is met, so that the individual water supply efficiency is maximized without considering the overall water supply efficiency and production efficiency.

[0178] Secondly, according to the double-echelon logic theory, the benefits that suppliers and demanders can obtain under different strategic scenarios are calculated. Let the user be a and the water source be b, and the benefits of both parties when adopting various collaborative strategies are calculated according to the following formula:

[0179] ;

[0180] ;

[0181] ;

[0182] ;

[0183] ;

[0184] ;

[0185] In the formula, , are the benefits of a and b when both parties in the game adopt cooperative strategies; , are the payoffs of a and b when both parties in the game adopt the defection strategy; , are the benefits of a and b when the strategies adopted by the two parties in the game are different; is the sensitivity coefficient of water source to user decision; The unit water supply operation cost of the water source; is the priority number of user i; Q is the total water supply of all water sources; is the water flow from water source s; is the water demand of user i; is the unit water supply revenue of water source s; is the unit water production benefit of user i; is the unit water supply cost of water source s; is the unit water cost of user i; is the average water production benefit of the user; d is the overall benefit loss coefficient when the user adopts the betrayal strategy; m and n are the number of users and water sources participating in the collaboration, respectively.

[0186] The profit matrix is ​​constructed as follows:

[0187] ;

[0188] Finally, according to the Fermi rule, the dynamic replication equation in the game process is established as follows:

[0189] ;

[0190] Therefore, the probability of the next round of decision-making is:

[0191] ;

[0192] In the above formulas, It represents the probability that a will adopt the strategy made by b in the next game cycle; , They represent the average returns of a and b in this game respectively; k is the noise intensity.

[0193] According to the above steps, the game strategy is continuously adjusted and updated until the group equilibrium is reached, thus completing a system collaboration process of multiple CN-Agents.

[0194] According to one aspect of the present application, step S4 is further:

[0195] Step S41, based on the regional water resources allocation and scheduling scheme set, construct an evaluation index set, the evaluation index set includes: the total water shortage and total water shortage rate of the region, the water shortage and water shortage rate of each sub-zone, the external water transfer volume, the water transfer cost, the unconventional water utilization, the unconventional water utilization cost, the domestic water guarantee rate, the industrial water guarantee rate, the agricultural water guarantee rate, the ecological water guarantee rate, the groundwater exploitation rate, the discharge flow and water level of the important control section; based on the characteristics of the indicators, respectively construct an absolute indicator matrix and a relative indicator matrix, and set a threshold parameter for each relative indicator, and use the absolute value of the difference between the relative indicator and the parameter as the value of the relative indicator, thereby constructing an initial evaluation matrix; normalize the initial evaluation matrix to obtain a standard evaluation matrix; use the FCM clustering method based on the whale optimization algorithm to classify various indicators, and use the PCA method to find the principal components with a cumulative variance contribution rate of more than 85% in various indicators, thereby forming a comprehensive indicator evaluation matrix;

[0196] Step S42: Use the Delphi method to score the importance of each indicator, and repeat the consultation and reaffirmation process until the expert opinion concentration reaches 5.0 points or more, and then end the consultation; use the decision laboratory method to calculate the comprehensive weight of each evaluation indicator in turn to obtain the final weight matrix;

[0197] Step S43, using the VIKOR method to calculate the index weighted matrix, and calculate the maximum group benefit and the minimum individual loss, and use the weighted Z-score method to calculate the compromise coefficient of each plan, and finally calculate the compromise feasible solution of each plan;

[0198] Step S44: sort the compromise feasible solutions corresponding to the various schemes from largest to smallest, wherein the scheme with the smallest compromise feasible solution is the optimal scheme for regional water resources allocation and scheduling, and is used as the final implementation plan.

[0199] In this embodiment, the FCM (Fuzzy C-means Clustering) method is used to classify the evaluation indicators, which can effectively deal with the fuzziness and uncertainty in the water resources system, classify similar indicators into one category, and improve the accuracy and interpretability of the evaluation. The advantage of FCM is that it can deal with the cross-influence between indicators and adapt to the complexity of the water resources system. The PCA (Principal Component Analysis) method is introduced to extract the main components from various indicators, effectively reduce redundant information, highlight key factors, and make the evaluation results more focused and effective. The use of PCA not only simplifies the evaluation process, but also retains the main information of the original data, providing a reliable basis for subsequent decision-making. Thirdly, the VIKOR method is used for scheme sorting and selection. This multi-criteria decision-making method can find the best compromise solution while considering multiple evaluation criteria that may conflict with each other. The characteristics of the VIKOR method are that it not only considers the maximization of group utility, but also pays attention to the minimization of individual interests, which is highly consistent with the characteristics of balancing the needs of different stakeholders in water resources allocation.

[0200] In short, the problem that traditional evaluation methods are difficult to comprehensively and objectively evaluate complex water resource allocation schemes has been solved. Traditional methods are often too simplified or subjective, and it is difficult to fully consider the multi-objective and multi-constrained characteristics of water resource systems. However, through the combination of FCM-PCA-VIKOR, this method can not only comprehensively consider indicators in multiple aspects such as water balance, economic benefits, ecological environment, and social equity, but also find the best balance between these potentially conflicting goals. Especially in the complex situation of water shortage and diversified water demand, it can help decision makers weigh different allocation schemes and choose the best implementation strategy. For example, when it is necessary to consider multiple demands such as life, industry, agricultural irrigation, and ecological water use at the same time, this method can comprehensively evaluate the impact of each scheme on different water use sectors and find the overall optimal allocation scheme. In addition, the objectivity and scientific nature of the method can also help improve the credibility and acceptability of water resource allocation decisions and reduce potential water use conflicts and disputes.

[0201] In this embodiment, let the initial evaluation matrix be , where the elements represents the value of the m indicator in the n scheme, , , M and N are both integers, representing the total number of indicators and the total number of solutions respectively;

[0202] For the benefit evaluation index, the following formula is used for normalization:

[0203] ;

[0204] For the cost evaluation index, the following formula is used to achieve normalization:

[0205] ;

[0206] In the above formula, and are the mth row and nth column elements of the evaluation matrix before and after normalization respectively; and are the minimum and maximum values ​​of the nth column of the initial evaluation matrix respectively. Thus, the standard evaluation matrix is ​​obtained. .

[0207] When using the FCM clustering method to classify indicators, the objective function used is:

[0208] ;

[0209] in, The iterative optimization formula is:

[0210] ; ;

[0211] In the formula, is the membership degree of index j in the i-th category; is the Euclidean distance between index j and cluster center in the i-th class; is the cluster center of the i-th category after the l-th iteration; is the value of the jth indicator. The whale optimization algorithm is used to optimize the above optimization problem to determine the best clustering, and the category to which each indicator belongs and the total number of categories are determined based on the obtained clustering.

[0212] When using the PCA method to find the principal components, first calculate the correlation coefficients between the indicators to form a correlation coefficient matrix , the calculation formula is as follows:

[0213] ;

[0214] Calculate the eigenvalues ​​and eigenvectors of the matrix R, and the eigenvectors form n principal components ; The variance contribution rate of each principal component is calculated using the following formula, and the principal components with cumulative variance contribution rates greater than 85% in the two types of indicators are selected to form a new comprehensive indicator evaluation matrix , q is the number of principal components finally selected.

[0215] ;

[0216] In the formula, is the variance contribution rate of the i-th principal component; is the i-th component of the eigenvector.

[0217] The direct impact matrix B is established through expert scoring. The integer levels of 0 to 4 are defined to represent no impact, weak impact, medium impact, strong impact and very strong impact, that is,

[0218] ;

[0219] In the formula is the influence relationship between the i-th index and the j-th index.

[0220] Normalize the direct influence matrix B, and record the normalized direct influence matrix as Y, which is expressed as:

[0221] ;

[0222] The comprehensive influence matrix T can be obtained by multiplying and adding the normative influence matrix Y by itself, and is calculated as follows:

[0223] ;

[0224] Calculate centrality and cause degree , the expression is

[0225] ;

[0226] In the formula, For the impact, ; For the degree of influence, .

[0227] Calculate the subjective weights and get the final weight matrix. The formula is as follows:

[0228] ;

[0229] Finally, the compromise feasible solution corresponding to each scheme can be calculated. The calculation steps are as follows: ;

[0230] ;

[0231] ;

[0232] ;

[0233] In the formula, is the indicator weighting matrix; , and They are respectively the maximization of group benefit, minimization of individual loss and compromise feasible solution of scheme i; For the matrix The element in the i-th row and j-th column of ; and The matrices are The maximum and minimum values ​​of the jth column; and Respectively, vector The maximum and minimum values ​​of ; and Respectively, vector The maximum and minimum values ​​of ; is the compromise coefficient of scheme i, and the calculation formula is as follows:

[0234] ; ;

[0235] In the formula, For the matrix The Z-score of the element in row i and column j of is its normalized value; and The matrices are The mean and standard deviation of the j-th column elements of .

[0236] According to another aspect of the present application, a regional water resources allocation and scheduling system dynamic modeling system is characterized by comprising:

[0237] at least one processor;

[0238] and a memory communicatively coupled to at least one of the processors;

[0239] Among them, the memory stores instructions that can be executed by the processor, and the instructions are used to be executed by the processor to implement the dynamic modeling method of the regional water resources allocation and scheduling system described in any of the above technical solutions.

[0240] The preferred embodiments of the present invention are described in detail above; however, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, various equivalent transformations can be made to the technical solutions of the present invention, and these equivalent transformations all belong to the protection scope of the present invention.

Claims

1. A dynamic modeling method for regional water resources allocation and scheduling system, characterized in that: The steps include: Step S1, collect data on the study area, determine the regional control section according to water resource allocation and scheduling needs, and use the coupling degree-Spearman correlation coefficient method to dynamically screen out water resource supply and demand objects with strong correlation with the control indicators of the control section; use the obstacle degree model-QAP method to respectively select the influencing factors with strong correlation with the water demand of users in each sub-unit and the influencing factors with strong correlation with the water supply of each water source as sensitive factors; Step S2: Based on complex network theory, a single CN-Agent model of water resources supply and demand objects is constructed that conforms to the topological structure of water resources scheduling engineering and effectively expresses the correlation between water resources scheduling variables, and the behavior selection of a single agent is completed based on complex network theory and ML-SSGN learning algorithm; Step S3: dynamically construct a regional water resources allocation and scheduling system based on MAS theory, and establish the communication mode between CN-Agents based on ACL communication language; adopt a method combining double-echelon logic theory and evolutionary game theory to construct a dynamic collaboration and organization mechanism of multiple CN-Agents, and generate a set of regional water resources allocation and scheduling solutions; Step S4, construct a multi-dimensional evaluation index set, use FCM clustering and PCA methods to form a comprehensive index evaluation matrix; use Delphi method and decision laboratory method to determine the index weights; apply VIKOR method to calculate the compromise feasible solution of each scheme; According to the sorting of compromise feasible solutions, the optimal solution is selected as the final implementation plan for regional water resources allocation and scheduling; The step S1 is further as follows: Step S11: Collect multi-dimensional data of the study area, including natural geography, hydrology, engineering and socio-economic data; obtain control indicator data of important control sections; analyze user needs, determine the scheduling period, time scale and system operation parameters, and provide basic data support for regional water resources allocation and scheduling system modeling; Step S12, obtaining water resources supply and demand object indicator data, using vulture search-projection pursuit method and DEMATEL-CRITIC method for data processing and weight calculation; applying coupling degree-Spearman correlation coefficient method, calculating the correlation between the control index of the control section and each water resources supply and demand object, and screening out objects with strong correlation; Step S13, collecting data on factors affecting user water demand and water source water supply, and performing data standardization and barrier calculation using the vulture search-projection pursuit method and barrier model; analyzing the correlation of influencing factors using the QAP method and entropy weight method, and determining the final sensitive factor; The step S12 is further as follows: Step S12a, using the vulture search-projection pursuit method to standardize and normalize the index data range of the water resources supply and demand object, construct and optimize the projection index function, use the vulture search algorithm to solve the projection index function, calculate the best projection direction and the projection value of each index, and eliminate the dimensionality influence between different indicators; Step S12b, using the DEMATEL method, constructing the influence matrix of water resources supply and demand object indicators through expert scoring, and performing normalization processing to obtain the standard influence matrix, calculating the standard influence matrix to obtain the comprehensive influence matrix of water resources supply and demand object indicators and the weight of each indicator, and using the CRITIC method to calculate the coefficient of variation and correlation coefficient, deriving the comprehensive index and the weight of each indicator, and obtaining the comprehensive weight based on the combination of subjective and objective weights; Step S12c, using the coupling degree-Spearman correlation coefficient method, assigning a comprehensive weight to each water resource supply and demand object indicator, using the coupling degree model and the Spearman correlation coefficient method to solve the correlation between the control index of the control section and each water resource supply and demand object, and screening the water resource supply and demand objects with an absolute value of the correlation greater than a threshold as the water resource supply and demand objects with a strong correlation with the control index of the control section; The step S13 is further as follows: Step S13a, using the vulture search-projection pursuit method, standardizing the range of the index data of the influencing factors of the water demand of each partition unit user and the index data of the influencing factors of the water supply from each water source, constructing and optimizing the projection index function, solving it using the vulture search algorithm, obtaining the best projection direction and the projection value of each index, and eliminating the dimensionality influence between different indicators; Step S13b, using the barrier model, respectively calculating the exponential barrier of the sensitive factors related to the water demand of each sub-unit user and the exponential barrier of the sensitive factors related to the water supply of each water source, that is, the exponential barrier of the water demand of each sub-unit user and the total population at the end of the year, urbanization rate, rainfall, gross industrial production value, crop planting area, effective irrigation area, gross industrial production value, water consumption per 10,000 yuan of industrial added value, green coverage area, and annual average temperature factors, and the exponential barrier of the water supply of each water source and runoff, precipitation, average air pressure, average temperature, and average relative humidity factors; Step S13c, using the matrix of water demand and water supply as explained variables and the matrix of influencing factors as explanatory variables, constructing a relational data measurement model, using the QAP method to compare the corresponding values ​​between the matrices to obtain the correlation coefficient, using the QAP method to perform analysis, comparing the corresponding values ​​between the matrices to obtain the correlation coefficient, and performing a non-parametric test on the coefficient, using the entropy weight method to objectively weight the index barrier degree and correlation coefficient of the influencing factor, and sorting and comparing the data to obtain the sensitive factor; The step S2 is further as follows: Step S21, determine the CN-Agent nodes based on the supply and demand objects in the water resources system, including the scheduling variables of the water source and the user agent; calculate the attribute index of the complex network, and use the Z-score-EWM method to obtain the correlation coefficient between nodes; draw the edges according to the node correlation, use time series analysis to determine the edge direction, and construct a complex network structure diagram; Step S22, obtaining sensitive factor data and real-time water and rainfall information, predicting the water inflow and water demand of CN-Agent, and updating its knowledge base; Based on the complex network structure and ML-SSGN algorithm, belief reasoning and learning are performed to update the behavior state of CN-Agent; the optimal behavior is selected using the maximum expected utility criterion; and the autonomous behavior response of CN-Agent is completed through an iterative process; The step S21 is further as follows: Step S21a, determining nodes based on the Agent corresponding to each supply and demand object in the water resource system, including: for the water source CN-Agent, the scheduling variables include the amount of water entering the reservoir, the amount of water stored at the end of the period, the amount of water discharged, and the amount of water supplied in a certain period, and the above variables are discretely decomposed to obtain finite nodes; for the user CN-Agent, the scheduling variable is the amount of water supplied to the user in a certain period, and the discrete finite nodes are obtained according to the change in the amount of water demanded by the user from different water sources during the process of balancing the supply and demand of water resources; Step S21b, respectively calculating the degree distribution, shortest path length and clustering coefficient of the complex network, using the Z-score-EWM comprehensive method to eliminate the influence of the dimension, calculating the comprehensive reflection coefficient of the correlation between the nodes, and using the coefficient to characterize the correlation between the nodes; based on the node correlation, drawing edges for the associated nodes with correlation, using the dynamic observation method of time series analysis to determine the direction of the edges, and drawing a complex network structure diagram; The step S22 is further as follows: Step S22a: Based on the sensitive factors, the water supply and demand of a single water resource supply and demand object CN-Agent is predicted, and the water supply and demand information during the scheduling period is obtained and used as the information input of the CN-Agent; the real-time water and rainfall information and user information are extracted and input into the CN-Agent, and the knowledge base of the CN-Agent is updated; Step S22b: perform belief reasoning based on the complex network structure, call the ML-SSGN learning algorithm for learning, and update the behavior state of the CN-Agent; use the updated CN-Agent to calculate the model attribute indicators and perform correlation reasoning; calculate the utility function corresponding to each possible value of the node in the CN-Agent model based on the maximum expected utility criterion, and select the behavior with the largest utility value from the action set as the behavior choice for the next state of the single CN-Agent; Step S22c, repeating steps S22a to S22b to complete the autonomous behavior response process of a single CN-Agent; The step S3 is further as follows: Step S31: construct a water resources allocation and scheduling system based on MAS theory, assign a unique identifier and communication address to each CN-Agent; set the message primitive and parameter declaration method of the ACL communication language, and define the message transmission type; establish the information interaction content of each CN-Agent, including Agent attributes and communication data, to form a complete regional water resources allocation and scheduling system communication framework; Step S32: construct a collaborative channel for direct communication between multiple CN-Agents; establish a supply and demand group game system based on the dual-echelon logic framework and evolutionary game theory, formulate collaborative strategies for CN-Agents and calculate the profit matrix; seek equilibrium solutions through dynamic adjustment and strategy update within the set scheduling period; and finally generate a feasible set of regional water resources allocation and scheduling solutions; The step S31 is further as follows: Step S31a, based on the MAS theory, the water resources supply and demand object CN-Agent is organized into a regional water resources allocation and scheduling system, and an intelligent decomposition MAS model is constructed; Step S31b: set a unique identity for each CN-Agent in turn, determine the communication address of each Agent based on the syntax of the ACL communication language, and open a message request port to other Agents; Step S31c, setting the message primitive of the ACL communication language, using parameter declaration method to indicate the type of message transmission in each communication, the type includes: information sender identification and address, information receiver identification and address, sender's behavior status, sender's intention, information content, information interaction status and language name; Step S31d, setting the message content that can be transmitted by various CN-Agents during information exchange, including: the communication address, type, capability, status, environment, request and response information of the sender Agent; The step S32 is further as follows: Step S32a: Based on the communication mode among multiple agents, direct communication is used to build a multi-agent collaboration channel and cooperation mechanism; Step S32b, based on the double-echelon logic framework, a double-echelon game system for supply and demand objects is constructed, with the water source CN-Agent as the supplier and the user CN-Agent as the demander, forming a many-to-many supply and demand group game space; based on the evolutionary game theory, collaborative strategies are formulated for various CN-Agents, including cooperation strategies and betrayal strategies, and the benefits of the two parties in the game when adopting different strategies are calculated based on the double-echelon logic theory, and the benefit matrix in each game is constructed, and a dynamic replication equation is established based on the Fermi rule; Step S32c, setting the scheduling period of regional water resources allocation and scheduling as the game cycle, and repeating the above dynamic adjustment and strategy update process of the CN-Agent that receives the cooperation request based on the game cycle until an equilibrium solution is found, which serves as the actual response made by the CN-Agent in the cooperation; through the cooperative operation of each CN-Agent in the system, a series of regional water resources allocation and scheduling schemes that are feasible under the existing supply and demand conditions are finally generated; The step S4 is further as follows: Step S41, construct a multi-dimensional evaluation index set, including water shortage, water use guarantee rate and water resource utilization cost; establish absolute and relative index matrices, set threshold parameters and normalize them; use the FCM clustering method of the whale optimization algorithm to classify the indicators, combine the PCA method to extract the principal components, and form a comprehensive index evaluation matrix; Step S42: Use the Delphi method to score the importance of each indicator, and repeat the consultation and reaffirmation process until the expert opinion concentration reaches 5.0 points or more, and then end the consultation; use the decision laboratory method to calculate the comprehensive weight of each evaluation indicator in turn to obtain the final weight matrix; Step S43, using the VIKOR method to calculate the index weighted matrix, and calculate the maximum group benefit and the minimum individual loss, and use the weighted Z-score method to calculate the compromise coefficient of each plan, and finally calculate the compromise feasible solution of each plan; Step S44: sort the compromise feasible solutions corresponding to the various schemes from largest to smallest, wherein the scheme with the smallest compromise feasible solution is the optimal scheme for regional water resources allocation and scheduling, and is used as the final implementation plan.

2. Regional water resources allocation and scheduling system dynamic modeling system, characterized by: include: at least one processor; and a memory communicatively coupled to at least one of the processors; Wherein, the memory stores instructions that can be executed by the processor, and the instructions are used to be executed by the processor to implement the dynamic modeling method of the regional water resources allocation and scheduling system described in claim 1.