A logistics trolley processing and welding equipment
By designing the clamping and pressing structure of the logistics trolley processing and welding equipment, the problem of the position deviation of the pusher and the base plate during the welding process of the manual logistics trolley is solved, and the welding quality and efficiency are improved.
Patent Information
- Application Number
- CN202411230822.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2044-09-04
AI Technical Summary
During the welding process, the existing hand flow trolleys have low manual support stability and limited clamping effect, which leads to offset the welding positions of the pushers and bottom plates, affecting the welding quality.
A logistics car processing welding equipment is designed, including the base, the first clip component, and the component tight welding component. Through the first clip component, the bottom and rear clamping of the cart of the cart, the second clamp component clamped the cart's armrest, and applied the tightening of the buses to the arm of the vehicle to form a stable clamping. And tight structure.
Effectively prevent the bottom plate of the vehicle and the hand armrest of the vehicle during welding processing, improve the holding efficiency and welding quality, and ensure the stability of the welding position of the cart.
Smart Images

Figure CN118720609B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of logistics trolley processing, and in particular to a logistics trolley processing welding device. Background Art
[0002] Manual logistics trolleys are a tool widely used in logistics, warehousing, manufacturing and other industries to carry and transport goods, especially when the goods need to be moved within a smaller range, or when carrying items of moderate weight and small size. This type of trolley does not require electricity or other power sources, but relies on manpower to push or pull. The manual logistics trolley is mainly composed of a base plate and a pusher, both of which are mainly processed by welding.
[0003] At present, during the welding process of the manual logistics trolley, in order to ensure the stable connection between the push handle and the base plate during the welding process, it is usually necessary to limit the base plate and manually support the push handle. However, the stability of manual support is not high, and the effect of limiting clamping is limited; secondly, in order to ensure the tightness of the welding at the connection between the base plate and the push handle during the welding process, the connection between the two needs to be tightly fitted, but the pressure is limited through manual support and pressing, and a good tight connection effect cannot be achieved. During the welding process, the clamping will be loose, and then the stability of the welding between the push handle and the base plate cannot be ensured. The welding position of the push handle and the base plate will be offset, which is not conducive to improving the welding quality. Summary of the invention
[0004] The purpose of the present invention is to solve the problems existing in the prior art and to propose a logistics trolley processing and welding equipment.
[0005] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a logistics trolley processing and welding equipment, including a base and a first clamping assembly, the top outer wall of the base is fixedly connected to a placing rack, and the placing rack is provided with a first clamping assembly for clamping the bottom plate of the trolley; the first clamping assembly includes a pulling rack, the pulling rack is slidably connected to the top of the base, and the pulling rack is slidably connected to the top of the base, the front and rear sides of the pulling rack are fixed with a first tooth plate, the outer walls of the first tooth plate are meshed and connected with a first gear, and the bottom wall of the first gear is rotatably connected to the base The top of the base, the left side of the first gear is meshed with the second gear, and the bottom wall of the second gear is rotatably connected to the top of the base, the left outer wall of the second gear is meshed with the second tooth plate, and the first traction frame is fixed on the side away from the second tooth plate, the first traction frame is T-shaped, and the top two ends of the first traction frame are slidably connected with clamping plates, a first return spring sleeved on the clamping plate is connected between the clamping plate and the corresponding first traction frame, the vertical section of the first traction frame slides through the top of the placement frame, and the bottom end of the first traction frame is slidably connected to the inside of the base.
[0006] The trolley handrail is composed of an inverted U-rod, a middle cross bar and an inverted V-rod connected at the two bottom ends of the inverted U-rod. A second clamping assembly for clamping the trolley handrail is arranged between the placement frame and the base. A centering and pressing welding assembly for centering, pressing and assisting welding of the trolley handrail is installed on the top of the placement frame.
[0007] In the above-mentioned logistics trolley processing and welding equipment, the first clamping assembly and the centering and pressing welding assembly are connected by a locking assembly, and the locking assembly is installed between the base and the right side of the placement rack.
[0008] In the above-mentioned logistics trolley processing and welding equipment, the second clamping assembly includes a third gear, the right side outer wall of the first gear is meshed and connected with the third gear, and the bottom wall of the third gear is rotatably connected to the top of the base, the right side outer wall of the third gear is meshed and connected with the third tooth plate, and the right side outer wall of the third tooth plate is fixed with a second traction frame, the second traction frame is I-shaped, and the bottom of the second traction frame is slidably connected to the top of the base, the vertical section of the second traction frame is slidably connected with a balancing frame, a second return spring is connected between the second traction frame and the balancing frame, and the top outer wall of the balancing frame is fixedly connected to the bottom wall of the placement frame.
[0009] In the above-mentioned logistics trolley processing and welding equipment, a clamping piece is fixed to the top outer wall of the second traction frame, and the clamping piece is in an inverted L shape. The horizontal section of the clamping piece extends to the left, and an arc groove is provided on the side away from the left end of the clamping piece. The vertical section of the clamping piece passes through the top of the placement frame and is located on the right side of the clamping plate.
[0010] In the above-mentioned logistics trolley processing and welding equipment, the centering and clamping welding assembly includes a hydraulic rod and a welding gun, a hydraulic rod is installed on the top of the placing frame, and a connecting rod is fixed on the top of the hydraulic rod, a first clamping piece is fixed on the top of the connecting rod, the first clamping piece is located between the clamping pieces, and the bottom of the first clamping piece is connected to a fitting piece, and the fitting piece is an arc-shaped plate that fits with the middle cross bar of the trolley handrail, the bottom of the first clamping piece is snap-connected with a stabilizing frame, and the stabilizing frame is composed of an inverted V segment and an inverted U segment connected from top to bottom, a second clamping piece is fixed to the bottom outer wall of the stabilizing frame, and the bottom of the second clamping piece is an inclined arc plate that fits with the inverted V rod of the trolley handrail.
[0011] In the above-mentioned logistics trolley processing and welding equipment, the locking assembly includes a support block, a support block is fixed to the right top of the base, and the support block is Y-shaped, the right end of the pulling frame is slidably connected to the inside of the support block, and the front and rear outer walls of the support block are connected to a third reset spring, and a moving mother part is provided at the end of the third reset spring, and the upper end of the side of the moving mother part away from each other is inclined, and a positioning key is fixed to the outer wall of the side of the moving mother part close to each other, and the front and rear outer walls of the support block are both provided with a first positioning hole, and the positioning key and the first positioning hole are adapted to each other.
[0012] In the above-mentioned logistics trolley processing and welding equipment, a plurality of second positioning holes equidistantly arranged from left to right are opened on the outer wall of the right end of the pulling frame, and the aperture of the second positioning hole is consistent with the aperture of the first positioning hole, and the pulling frame is fixed on the support block through the cooperation between the positioning key, the first positioning hole and the corresponding second positioning hole; the right end of the first clamping member is connected to a traction rod, and the traction rod vertically slides through the bottom of the placement frame, and a moving sub-component is fixed to the bottom of the traction rod, and the bottom inner wall of the moving sub-component is an inclined surface that fits the inclined outer wall of the moving mother component.
[0013] In the above-mentioned logistics trolley processing and welding equipment, a limit plate is arranged on the upper end of the placement frame, and the limit plate is located on the left side of the hydraulic rod.
[0014] Compared with the existing technology, the advantages of the present invention are: 1: by pushing the pulling frame, the clamping plate is driven to be close to the front outer wall and the rear outer wall of the trolley bottom plate, so that the front and rear clamping of the trolley bottom plate by the clamping plate is realized, and the trolley bottom plate is prevented from being offset during the welding process. At the same time, the pulling frame drives the clamping member to move. When the clamping member moves to be close to the outer wall of the inverted U rod of the trolley handrail, the two clamping members clamp the trolley handrail to prevent the trolley handrail from being offset during the welding process. The first clamping assembly and the second clamping assembly simultaneously limit the trolley bottom plate and the trolley handrail, thereby improving the clamping efficiency and the welding process efficiency.
[0015] 2: The centering compression welding assembly cooperates with the second clamping assembly to stably limit the position of the trolley handrail. While the first compression member and the fitting member apply downward pressure to the middle cross bar to compress it, the second compression member also applies downward pressure to the inverted V-bar of the trolley handrail to compress it. The downward compression in the middle and at both ends form a triangular stable structure, which further stabilizes the position of the trolley handrail and improves the quality of welding.
[0016] 3: The locking assembly cooperates with the first clamping assembly and the second clamping assembly to lock the clamped state of the trolley bottom plate and the trolley armrest, and the pulling frame is supported by the support block. When the first clamping member moves downward, the moving sub-member moves downward accordingly, and the moving mother member is pushed closer. The positioning key limits the position of the pulling frame, and then the first clamping assembly and the second clamping assembly are locked, ensuring that the trolley bottom plate and the trolley armrest will not be deviated in position due to loose clamping during the welding process.
[0017] In summary, the present invention firstly clamps the cart bottom plate front and back through the clamping plate to prevent the cart bottom plate from shifting during the welding process. The above clamping member clamps the cart armrest to prevent the cart armrest from shifting during the welding process. Then, the first clamping assembly and the second clamping assembly simultaneously limit the cart bottom plate and the cart armrest to improve the clamping effect; secondly, the first clamping member and the fitting member apply downward pressure to the middle cross bar, and the second clamping member also applies downward pressure to the inverted V-bar of the cart armrest to clamp it, so as to further stabilize the position of the cart armrest and improve the quality of welding; further, the locking assembly cooperates with the first clamping assembly and the second clamping assembly to lock the clamped state of the cart bottom plate and the cart armrest. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The specific embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings, wherein: Figure 1 This is a schematic diagram of the overall structure of a logistics trolley processing and welding equipment proposed by the present invention.
[0019] Figure 2 This is a structural schematic diagram of a logistics trolley processing and welding equipment trolley bottom plate and trolley handrail proposed by the present invention.
[0020] Figure 3 This is a schematic structural diagram of a clamping plate and a clamping member of a logistics trolley processing and welding device proposed by the present invention.
[0021] Figure 4 This is a structural schematic diagram of a balance frame of a logistics trolley processing and welding equipment proposed by the present invention.
[0022] Figure 5 This is a structural schematic diagram of a first clamping assembly and a second clamping assembly of a logistics trolley processing welding device proposed by the present invention.
[0023] Figure 6 This is a schematic structural diagram of a first clamping member of a logistics trolley processing and welding device proposed by the present invention.
[0024] Figure 7 This is a schematic diagram of the exploded structure of a centering and clamping welding assembly of a logistics trolley processing welding equipment proposed by the present invention.
[0025] Figure 8 This is a schematic structural diagram of a support block of a logistics trolley processing and welding device proposed by the present invention.
[0026] Fig. 9 This is a structural schematic diagram of a locking assembly of a logistics trolley processing welding device proposed by the present invention.
[0027] In the figure: 1, base; 2, placing rack; 3, cart bottom plate; 4, cart handrail; 5, first clamping assembly; 51, pulling frame; 52, first tooth plate; 53, first gear; 54, second gear; 55, second tooth plate; 56, first traction frame; 57, clamping plate; 58, first return spring; 6, second clamping assembly; 61, third gear; 62, third tooth plate; 63, second traction frame; 64, second return spring; 65 , balancing frame; 66, clamping part; 7, centering and clamping welding assembly; 71, hydraulic rod; 72, connecting rod; 73, first clamping part; 74, fitting part; 75, stabilizing frame; 76, second clamping part; 77, welding gun; 8, locking assembly; 81, supporting block; 82, third return spring; 83, moving mother part; 84, positioning key; 85, first positioning hole; 86, second positioning hole; 87, moving sub-component; 88, traction rod. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] Reference Figure 1 to Figure 2 A logistics trolley processing and welding device includes a base 1 and a first clamping component 5. The top outer wall of the base 1 is fixedly connected to a placing rack 2, and the placing rack 2 is provided with a first clamping component 5 for clamping a trolley bottom plate 3.
[0030] The trolley handrail 4 is composed of an inverted U-rod, a middle cross bar connected inside the inverted U-rod, and an inverted V-rod connected at the two bottom ends of the inverted U-rod. A second clamping assembly 6 for clamping the trolley handrail 4 is arranged between the placement rack 2 and the base 1. A centering and pressing welding assembly 7 for centering, pressing and assisting welding of the trolley handrail 4 is installed on the top of the placement rack 2. The first clamping assembly 5 and the centering and pressing welding assembly 7 are connected by a locking assembly 8, and the locking assembly 8 is installed between the base 1 and the right side of the placement rack 2.
[0031] First, when in use, place the base 1 and the placement rack 2 on the horizontal ground, place the trolley bottom plate 3 on the top of the placement rack 2, and place the trolley armrest 4 on the top of the trolley bottom plate 3 to be welded. The front and rear outer walls of the trolley bottom plate 3 are clamped and limited by the first clamping component 5. At the same time, the first clamping component 5 drives the second clamping component 6, and the second clamping component 6 clamps the inner side of the trolley armrest 4 horizontally in the front and rear directions, ensuring the stable placement of the trolley bottom plate 3 while preventing the trolley armrest 4 from being offset during the welding connection with the trolley bottom plate 3.
[0032] The middle cross bar of the trolley armrest 4 is pressed downward and limited by the centering and tightening welding assembly 7, and the bottom inverted V-bar of the trolley armrest 4 is also pressed downward and limited. The downward pressing of the middle part and the downward pressing of the two ends form a triangular stable structure, which cooperates with the second clamping assembly 6 to further stabilize the position of the trolley armrest 4 and improve the quality of welding. The centering and tightening welding assembly 7 drives the locking assembly 8 to move downward, and the locking assembly 8 locks the position of the first clamping assembly 5 and the second clamping assembly 6. After the processing is completed, the centering and tightening welding assembly 7 moves up to drive the locking assembly 8 to unlock, so that the first clamping assembly 5, the second clamping assembly 6 and the centering and tightening welding assembly 7 cooperate to limit the welding position of the trolley bottom plate 3 and the trolley armrest 4, thereby improving the processing efficiency.
[0033] Reference Figures 1 to 5 The first clamping assembly 5 includes a pulling frame 51, which is arranged between the base 1 and the placing frame 2. The pulling frame 51 is slidably connected to the top of the base 1. The front and rear sides of the pulling frame 51 are fixed with first tooth plates 52. The outer walls of the first tooth plates 52 are meshed with first gears 53. The bottom wall of the first gear 53 is rotatably connected to the top of the base 1. The left side of the first gear 53 is meshed with a second gear 54. The bottom wall of the second gear 54 is rotatably connected to the top of the base 1. The left outer wall of 54 is meshed with a second tooth plate 55, and a first traction frame 56 is fixed on the side away from the second tooth plate 55. The first traction frame 56 is T-shaped, and both ends of the top of the first traction frame 56 are slidably connected with clamping plates 57. A first return spring 58 sleeved on the clamping plate 57 is connected between the clamping plate 57 and the corresponding first traction frame 56. The vertical section of the first traction frame 56 slides through the top of the placement frame 2, and the bottom end of the first traction frame 56 is slidably connected to the inside of the base 1.
[0034] During operation, the pulling frame 51 is pushed leftward, and the first toothed plate 52 on the rear side drives the first gear 53 engaged on the rear side to rotate clockwise, and the second gear 54 on the rear side rotates counterclockwise, and the second toothed plate 55 on the rear side drives the first traction frame 56 to slide along the base 1, and the first traction frame 56 and the clamping plate 57 approach the rear side of the trolley bottom plate 3; the first gear 53 engaged on the front side rotates counterclockwise, and the second gear 54 on the front side rotates clockwise, and the second toothed plate 55 on the front side drives the first traction frame 56 to slide along the base 1, and the first traction frame 56 and the clamping plate 57 approach the front side of the trolley bottom plate 3; when the two clamping plates 57 are respectively close to the front outer wall and the rear outer wall of the trolley bottom plate 3, the clamping plate 57 clamps the trolley bottom plate 3 front and back to prevent the trolley bottom plate 3 from deflecting during the welding process. In order to improve the clamping and limiting effect of the cart bottom plate 3, a limiting plate is set at the upper end of the placement rack 2. When the cart bottom plate 3 is placed on the top of the placement rack 2, the right end of the cart bottom plate 3 is made to contact the left end of the limiting plate, and the cart bottom plate 3 is limited by the limiting plate.
[0035] Reference Figures 1 to 5 The second clamping assembly 6 includes a third gear 61, the right side outer wall of the first gear 53 is meshedly connected with the third gear 61, the bottom wall of the third gear 61 is rotatably connected to the top of the base 1, the right side outer wall of the third gear 61 is meshedly connected with the third toothed plate 62, and the right side outer wall of the third toothed plate 62 is fixed with a second traction frame 63, the second traction frame 63 is in an I-shape, the bottom of the second traction frame 63 is slidably connected to the top of the base 1, and the vertical section of the second traction frame 63 is slidably connected with a balancing frame 65, and the balancing frame 65 consists of two transverse axes and a shaft connected to the two transverse axes. The second traction frame 63 and the corresponding balancing frame 65 are composed of a connecting plate connected together, and a second return spring 64 is connected between the connecting plates of the second traction frame 63 and the corresponding balancing frame 65, and the top outer wall of the balancing frame 65 is fixedly connected to the bottom wall of the placement frame 2. A clamping member 66 is fixed to the top outer wall of the second traction frame 63. The clamping member 66 is in an inverted L shape, and the horizontal section of the clamping member 66 extends to the left. An arc groove is provided on the side away from the left end of the clamping member 66, and the vertical section of the clamping member 66 passes through the top of the placement frame 2 and is located on the right side of the clamping plate 57.
[0036] When the pulling frame 51 is pushed, the first gear 53 drives the third gear 61 meshed on its right side to rotate, the front third gear 61 rotates clockwise, the front third tooth plate 62 drives the second traction frame 63 to slide along the base 1, the second traction frame 63 and the clamping member 66 move forward close to the trolley armrest 4; the rear third gear 61 rotates counterclockwise, the rear third tooth plate 62 drives the second traction frame 63 to slide along the base 1, the second traction frame 63 and the clamping member 66 move backward close to the trolley armrest 4; the balancing frame 65 fixed to the bottom wall of the placement frame 2 ensures the balance of the second traction frame 63 when sliding, and when the clamping member 66 is close to the outer wall of the vertical section of the inverted U rod of the trolley armrest 4, the two clamping members 66 clamp the trolley armrest 4 to prevent the trolley armrest 4 from deflecting during the welding process.
[0037] Reference Figure 1 , Figure 6 and Figure 7 The centering and clamping welding assembly 7 includes a hydraulic rod 71 and a welding gun 77. A hydraulic rod 71 is installed on the top of the placement rack 2. A connecting rod 72 is fixed on the top of the hydraulic rod 71. A first clamping member 73 is fixed on the top of the connecting rod 72. The first clamping member 73 is located between the clamping members 66. The bottom of the first clamping member 73 is connected to a fitting member 74, which is an arc-shaped plate that fits the middle cross bar of the trolley handrail 4. The bottom of the first clamping member 73 is engaged with a stabilizing frame 75, which is composed of an inverted V segment and an inverted U segment connected from top to bottom. A second clamping member 76 is fixed to the bottom outer wall of the stabilizing frame 75. The bottom of the second clamping member 76 is an inclined arc plate that fits the inverted V rod of the trolley handrail 4. The welding gun 77 is installed on the placement rack 2 by existing manipulators and other equipment, and the welding gun 77 is located between the hydraulic rod 71 and the limit plate.
[0038] The stabilizing frame 75 is sleeved on the outside of the trolley handrail 4, and the second pressing member 76 is close to the two inverted V rods of the trolley handrail 4. Then the hydraulic rod 71 contracts to drive the connecting rod 72 and the first pressing member 73 to move downward. When the first pressing member 73 moves downward, the bottom of the first pressing member 73 is engaged with the top of the stabilizing frame 75, and the fitting member 74 is close to the middle cross bar of the trolley handrail 4. When the first pressing member 73 applies downward pressure to the middle cross bar of the trolley handrail 4 through the fitting member 74, the second pressing member 76 also applies downward pressure to the inverted V rod of the trolley handrail 4. The downward pressing of the middle and the two ends form a triangular stable structure, and the position of the trolley handrail 4 is further stabilized in cooperation with the second clamping assembly 6. Then, the welding gun 77 is controlled by a manipulator or other equipment to weld the connection between the trolley handrail 4 and the trolley bottom plate 3.
[0039] Reference Figure 1 , Figure 8 and Fig. 9The locking assembly 8 includes a support block 81, a support block 81 is fixed to the right top of the base 1, the support block 81 is Y-shaped, the right end of the pulling frame 51 is slidably connected to the inside of the support block 81, the front and rear outer walls of the support block 81 are connected to the third return spring 82, and the end of the third return spring 82 is provided with a moving mother piece 83, the upper end of the side away from the moving mother piece 83 is inclined, and the outer wall of the side close to the moving mother piece 83 is fixed with a positioning key 84, the front and rear outer walls of the support block 81 are provided with a first positioning hole 85, the positioning key 84 and the first positioning hole 85 are adapted, and the pulling frame 5 The outer wall of the right end of the support frame 1 is provided with a plurality of second positioning holes 86 arranged equidistantly from left to right, the aperture of the second positioning holes 86 is consistent with the aperture of the first positioning holes 85, the pulling frame 51 is fixed on the supporting block 81 through the cooperation between the positioning key 84, the first positioning hole 85 and the corresponding second positioning hole 86, the right end of the first pressing member 73 is connected with a traction rod 88, the traction rod 88 vertically slides through the bottom of the placing frame 2, the bottom of the traction rod 88 is fixed with a moving sub-component 87, and the bottom inner wall of the moving sub-component 87 is an inclined surface that fits the inclined outer wall of the moving mother component 83.
[0040] When the first clamping member 73 moves, the traction rod 88 and the moving sub-member 87 also move downward. The moving sub-member 87 moves downward to contact the inclined surface of the moving mother member 83. The two moving mother members 83 are pushed close to each other, and the moving mother member 83 slides along the top of the base 1. The third reset spring 82 is compressed, and the positioning key 84 gradually enters the first positioning hole 85 as the moving mother member 83 moves, and then enters the second positioning hole 86 corresponding to the end of the pulling frame 51. The positioning key 84 and the first positioning hole 85 and the second positioning hole 86 cooperate to limit the position of the pulling frame 51, and then lock the first clamping assembly 5 and the second clamping assembly 6, thereby controlling the clamping degree of the first clamping assembly 5 and the second clamping assembly 6, and ensuring that the cart bottom plate 3 and the cart armrest 4 will not deviate due to loose clamping during the welding process.
[0041] The specific operation steps of the logistics trolley processing and welding equipment are as follows: place the trolley bottom plate 3 on the placement rack 2, the right outer wall of the trolley bottom plate 3 is close to the top limit horizontal plate of the placement rack 2, and the trolley handrail 4 is placed at the top of the trolley bottom plate 3 to be welded. The first clamping assembly 5 and the second clamping assembly 6 are driven to move simultaneously by pushing the pulling frame 51. When the clamping plate 57 is close to the front outer wall and the rear outer wall of the trolley bottom plate 3, the clamping plate 57 clamps the trolley bottom plate 3 front and back to prevent the trolley bottom plate 3 from shifting during the welding process. When the clamping member 66 is close to the outer wall of the inverted U rod of the trolley handrail 4, the two clamping members 66 clamp the trolley handrail 4 to prevent the trolley handrail 4 from shifting during the welding process.
[0042] The hydraulic rod 71 drives the centering and pressing welding assembly 7 and the locking assembly 8 to move simultaneously. When the first pressing member 73 and the fitting member 74 apply downward pressure to the middle crossbar of the cart handrail 4, the second pressing member 76 also applies downward pressure to the inverted V-bar of the cart handrail 4, thereby further stabilizing the position of the cart handrail 4. The positioning key 84 gradually enters the first positioning hole 85 along with the movement of the moving mother member 83, and then enters the second positioning hole 86 opened at the end of the pulling frame 51. The positioning key 84 limits the position of the pulling frame 51, and then the welding gun 77 welds the connection between the cart handrail 4 and the cart bottom plate 3.
[0043] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A logistics trolley processing and welding device, comprising a base (1) and a first clamping assembly (5), characterized in that: The top outer wall of the base (1) is fixedly connected to a placement rack (2), and the placement rack (2) is provided with a first clamping component (5) for clamping the cart bottom plate (3); The first clamping assembly (5) comprises a pulling frame (51), the pulling frame (51) is arranged between the base (1) and the placing frame (2), and the pulling frame (51) is slidably connected to the top of the base (1), the front and rear sides of the pulling frame (51) are fixed with first tooth plates (52), the outer walls of the first tooth plates (52) are meshedly connected with first gears (53), and the bottom wall of the first gear (53) is rotatably connected to the top of the base (1), the left side of the first gear (53) is meshedly connected with a second gear (54), and the bottom wall of the second gear (54) is rotatably connected to the top of the base (1), The left outer wall of the second gear (54) is meshedly connected with a second tooth plate (55), and a first traction frame (56) is fixed on the side away from the second tooth plate (55), the first traction frame (56) is T-shaped, and the top two ends of the first traction frame (56) are slidably connected with clamping plates (57), and a first return spring (58) sleeved on the clamping plate (57) is connected between the clamping plate (57) and the corresponding first traction frame (56), the vertical section of the first traction frame (56) slides through the top of the placement frame (2), and the bottom end of the first traction frame (56) is slidably connected to the inside of the base (1); A second clamping assembly (6) for clamping the trolley handrail (4) is arranged between the placing frame (2) and the base (1), and a centering and pressing welding assembly (7) for centering, pressing and assisting welding of the trolley handrail (4) is installed on the top of the placing frame (2); The second clamping assembly (6) comprises a third gear (61), the right side outer wall of the first gear (53) is meshedly connected with the third gear (61), and the bottom wall of the third gear (61) is rotatably connected to the top of the base (1), the right side outer wall of the third gear (61) is meshedly connected with a third toothed plate (62), and the right side outer wall of the third toothed plate (62) is fixed with a second traction frame (63), the second traction frame (63) is in an I-shape, and the bottom wall of the second traction frame (63) is The second traction frame (63) is slidably connected to the top of the base (1); the vertical section of the second traction frame (63) is slidably connected to a balancing frame (65), and the balancing frame (65) is composed of two cross bars and two connecting plates connected to the ends of the two cross bars; a second return spring (64) sleeved on the outer wall of the cross bar of the balancing frame (65) is connected between the second traction frame (63) and the corresponding connecting plate of the balancing frame (65); and the top outer wall of the balancing frame (65) is fixedly connected to the bottom wall of the placement frame (2); A clamping member (66) is fixed to the top outer wall of the second traction frame (63), and the clamping member (66) is in an inverted L-shape, the horizontal section of the clamping member (66) extends to the left, and an arc groove is provided on the side away from the left end of the clamping member (66), and the vertical section of the clamping member (66) passes through the top of the placement frame (2) and is located on the right side of the clamping plate (57); The centering and clamping welding assembly (7) comprises a hydraulic rod (71) and a welding gun (77); the hydraulic rod (71) is installed on the top of the placing rack (2); a connecting rod (72) is fixed on the top of the hydraulic rod (71); a first clamping member (73) is fixed on the top of the connecting rod (72); the first clamping member (73) is located between the clamping members (66); the bottom of the first clamping member (73) is connected to a fitting member (74); the bottom of the first clamping member (73) is snap-connected to a stabilizing frame (75); The stabilizing frame (75) is composed of an inverted V segment and an inverted U segment connected from top to bottom, and a second pressing member (76) is fixed to the bottom outer wall of the stabilizing frame (75); The fitting member (74) is an arc-shaped plate fitting with the middle crossbar of the cart handrail (4), and the bottom of the second pressing member (76) is an inclined arc-shaped plate fitting with the inverted V-bar of the cart handrail (4).
2. The logistics trolley processing and welding equipment according to claim 1 is characterized in that: The first clamping assembly (5) and the centering and pressing welding assembly (7) are connected via a locking assembly (8), and the locking assembly (8) is installed between the base (1) and the right side of the placement rack (2). When the centering and pressing welding assembly (7) performs centering and pressing, the locking assembly (8) is synchronously driven to move downward to lock the positions of the first clamping assembly (5) and the second clamping assembly (6).
3. The logistics trolley processing and welding equipment according to claim 2 is characterized in that: The locking assembly (8) includes a support block (81), a support block (81) is fixed to the right top of the base (1), and the support block (81) is Y-shaped, the right end of the pulling frame (51) is slidably connected to the inside of the support block (81), and the front and rear outer walls of the support block (81) are connected to a third return spring (82), the end of the third return spring (82) is provided with a moving mother part (83), and the upper end of the side away from the moving mother part (83) is inclined, and the outer wall of the side close to the moving mother part (83) is fixed with a positioning key (84), and the front and rear outer walls of the support block (81) are both provided with a first positioning hole (85), and the positioning key (84) and the first positioning hole (85) are adapted to each other.
4. The logistics trolley processing and welding equipment according to claim 3 is characterized in that: The outer wall of the right end of the pulling frame (51) is provided with a plurality of second positioning holes (86) arranged equidistantly from left to right, and the diameter of the second positioning holes (86) is consistent with the diameter of the first positioning holes (85). The pulling frame (51) is fixed on the support block (81) through the cooperation between the positioning key (84), the first positioning hole (85) and the corresponding second positioning hole (86), and the right end of the first clamping member (73) is connected with a traction rod (88), the traction rod (88) vertically slides through the bottom of the placement frame (2), and a moving sub-member (87) is fixed to the bottom of the traction rod (88), and the bottom inner wall of the moving sub-member (87) is an inclined surface that fits the inclined outer wall of the moving mother member (83).
5. The logistics trolley processing and welding equipment according to claim 1 is characterized in that: A limit plate is arranged on the upper end of the placing frame (2), and the limit plate is located on the left side of the hydraulic rod (71).
Citation Information
Patent Citations
Wheelchair manufacturing and processing equipment
CN117961420A
Double-layer steel trolley assembly welding tool
CN212858360U