Method for optimizing temporary plugging scheme using visual temporary plugging experiment

By simulating the migration and plugging process of temporary plugging agent downhole through true triaxial hydraulic fracturing experiments and CT scanning technology, the problem of large pressure fluctuations during temporary plugging fracturing construction in existing technologies has been solved, and the optimization and safety of downhole multi-stage temporary plugging fracturing have been achieved.

CN118728313BActive Publication Date: 2024-11-01KARAMAY GAS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411218687.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-01
Estimated Expiration
2044-09-02

AI Technical Summary

Technical Problem

Existing technologies cannot effectively simulate the dynamic migration and plugging process of temporary plugging agents under complex downhole conditions, resulting in large pressure fluctuations during temporary plugging fracturing operations and making it impossible to optimize the temporary plugging scheme.

Method used

A true triaxial hydraulic fracturing experiment was used in conjunction with CT scanning and imaging technology to simulate the entire process of temporary plugging fracturing. The pumping pressure curve and fracture morphology analysis were used to determine the stage and timing of temporary plugging fracturing.

Benefits of technology

It provides visualized optimization of temporary plugging schemes, ensuring the effectiveness and safety of downhole multi-stage temporary plugging fracturing and improving reservoir stimulation results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728313B_ABST
    Figure CN118728313B_ABST
Patent Text Reader

Abstract

The invention discloses a method for optimizing a temporary plugging scheme by using a visualized temporary plugging experiment, comprising: taking an underground full-diameter core as an experimental core sample, simulating the entire temporary plugging fracturing process based on a true triaxial hydraulic fracturing plugging experiment, and determining whether the well is suitable for temporary plugging fracturing through a simulation result; when the well is suitable for temporary plugging fracturing, determining the number of temporary plugging fracturing times and the timing of adding a temporary plugging agent; determining a final temporary plugging fracturing stage based on a pumping pressure curve of the entire experimental process and the crack morphology of the cubic rock sample; and guiding on-site multi-stage temporary plugging pressure through the final temporary plugging fracturing stage, thereby providing an optimized temporary plugging scheme for on-site multi-stage temporary plugging fracturing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention specifically relates to the field of oil and natural gas development, and is a method for optimizing a temporary plugging scheme by using a visualized temporary plugging experiment. Background Art

[0002] The core of the efficient transformation technology of tight reservoirs is to form a complex fracture network and increase the oil and gas seepage channels through fracturing. Temporary plugging fracturing is an effective means to achieve fracture network fracturing transformation. Theory and practice show that multi-stage temporary plugging can effectively block the flow of fluid in the fracture to increase the net pressure in the fracture, effectively activate the natural weak surface, and improve the overall transformation effect of the reservoir. The key to multi-stage temporary plugging and fracturing is that effective plugging in the fracture is to inhibit the expansion of the main fracture and the net pressure in the fracture reaches the activation condition of the natural weak surface. However, in the actual construction process, due to the complexity of the downhole (reservoir heterogeneity, pipeline friction change and pumping parameter adjustment), the construction pressure fluctuates greatly, the migration and bridging rules of the temporary plugging agent in the fracture are complex, and the temporary plugging formation criteria and temporary plugging strength change characteristics are unclear.

[0003] Traditional numerical simulation methods are difficult to characterize the dynamic migration and plugging process of temporary plugging agents, and cannot simulate the entire process of temporary plugging and fracturing. Traditional physical modeling experimental methods also have certain limitations. The slot plugging test in the traditional physical modeling experimental method cannot reflect the influence of the actual fracture wall morphology, and the size of the fracture model is too small. The pipeline in the split fracture plugging experiment is directly connected to the fracture mouth, which cannot simulate the dynamic process of the temporary plugging agent from the wellbore into the fracture and change direction. The wedge-shaped fracture design ignores the influence of the throttling effect of the fracture mouth; although the 3D printed fracture model can reconstruct the rough surface of the fracture, the fracture surface is not a three-dimensional structure, and the temporary plugging agent flows in a single direction in the fracture. Summary of the invention

[0004] The purpose of the present invention is to address the deficiencies of the prior art and provide a method for optimizing a temporary plugging scheme using a visualized temporary plugging experiment. The present invention can provide an optimized temporary plugging scheme for on-site multi-stage temporary plugging fracturing and determine whether the well is suitable for temporary plugging fracturing; if it is suitable for temporary plugging fracturing, the number of temporary plugging fracturing times and the timing of additional injection of temporary plugging agents can be determined.

[0005] The method for optimizing the temporary plugging scheme by using a visualized temporary plugging experiment provided by the present invention is based on a true triaxial hydraulic fracturing plugging experiment and can simulate the entire temporary plugging fracturing process, including pumping fracturing fluid to generate hydraulic fractures. During temporary plugging fracturing, the temporary plugging agent in the pumped temporary plugging fracturing fluid can plug the fractures, and the carrying fluid can generate new fractures. The rock samples after fracturing are processed by means of multiple technology integration means such as photography and CT scanning technology, and the crack expansion and turning rules of the whole process of multiple temporary plugging fracturing can be intuitively observed, and the surface crack morphology and internal crack morphology characteristics of the rock samples can be obtained, providing an optimization plan for the on-site multi-stage temporary plugging fracturing process construction.

[0006] The present invention provides a method for optimizing a temporary plugging scheme by using a visualized temporary plugging experiment, comprising the following steps:

[0007] Step 1, making a cubic sample from a full-diameter downhole core, drilling a cylindrical hole in the cubic sample to form a core wellbore, fixing an aluminum metal wellbore in the core wellbore, and reserving an open hole section in the core wellbore to obtain a cubic rock sample;

[0008] Step 2, performing CT scanning on the cubic rock sample to obtain the internal natural fracture development of the cubic rock sample in its original state;

[0009] Step 3, perform initial fracturing on the cubic rock sample, apply triaxial stress to the cubic rock sample using true triaxial hydraulic test equipment according to the reservoir stress, and pump fracturing fluid into the core wellbore of the cubic rock sample, and obtain the cubic rock sample after the initial fracturing after the pumping pressure curve of the initial fracturing shows a sudden drop, stop pumping the fracturing fluid, unload the pressure, record the pumping pressure curve of the initial fracturing, and use CT to scan the cubic rock sample to obtain the internal crack morphology after the initial fracturing;

[0010] Step 4, performing a temporary plugging fracturing on the cube rock sample after the initial fracturing, applying triaxial stress to the cube rock sample using a true triaxial hydraulic test device, applying confining pressure, pumping temporary plugging fracturing fluid, and obtaining a cube rock sample after a temporary plugging fracturing after a sudden drop in the pumping pressure curve of the temporary plugging fracturing, unloading the pressure, recording the pumping pressure curve of the temporary plugging fracturing, and scanning the cube rock sample after the temporary plugging fracturing using CT to obtain the internal crack morphology after the temporary plugging fracturing;

[0011] Step 5, repeating the above step 4 to carry out temporary plugging and fracturing for two or more times, and after all the experiments are completed, taking out the cubic rock sample, obtaining the pumping pressure curve of the whole process and the fracture morphology of the cubic rock sample;

[0012] The final temporary plugging fracturing stage is determined by the pumping pressure curve of the whole process and the fracture morphology of the cubic rock sample.

[0013] Preferably, the pumping pressure curve of the entire process includes the pumping pressure curve of the initial fracturing and the pumping pressure curve of each temporary plugging fracturing; the crack morphology of the cubic rock sample includes the crack morphology of the initial fracturing and each temporary plugging fracturing, and the crack morphology includes the surface crack morphology data and internal crack morphology of the cubic rock sample.

[0014] The surface crack morphology data of cubic rock samples can be obtained by taking photos.

[0015] Preferably, the temporary plugging fracturing level A is determined by the fracture morphology of the cubic rock sample, as follows:

[0016] If the angle between the cracks of the cube rock sample after the first temporary plugging and fracturing and the cracks of the cube rock sample after the initial fracturing does not reach the angle D, it means that it is difficult to form an effective turning fracture by temporary plugging, and the well is not suitable for temporary plugging;

[0017] If the angle between the cracks of the cubic rock sample after the first temporary plugging fracturing and the cracks of the cubic rock sample after the initial fracturing reaches angle D, it means that the temporary plugging has formed an effective turning joint, and the well is suitable for temporary plugging and can continue to perform temporary plugging and fracturing. When the temporary plugging and fracturing is continued, when the angle between the cracks of the cubic rock sample after n temporary plugging and fracturing and the cracks of the cubic rock sample after n-1 temporary plugging and fracturing does not reach angle D, it means that it is difficult for the temporary plugging and fracturing to form an effective turning joint after n fracturing, and the temporary plugging and fracturing experiment ends, and the temporary plugging and fracturing level A is determined, and the temporary plugging and fracturing level A is n-1.

[0018] The temporary plugging fracturing stage B is determined by the pumping pressure curve of temporary plugging fracturing, as follows:

[0019] Obtain the maximum value of the bursting pressure corresponding to the new cracks formed after each temporary plugging and fracturing, the maximum value of the bursting pressure is the maximum value of the pumping pressure of the pumping pressure curve of this temporary plugging and fracturing, and calculate the wellhead pressure using the maximum value of the bursting pressure. If the calculated wellhead pressure exceeds the wellhead pressure limit, determine the temporary plugging and fracturing level B, temporary plugging and fracturing level B = the number of temporary plugging and fracturing times this time - 1;

[0020] The final temporary plugging fracturing stage C is the smaller value of the temporary plugging fracturing stage A and the temporary plugging fracturing stage B.

[0021] Preferably, the angle D is ≥ 30°.

[0022] Preferably, on-site multi-stage temporary plugging fracturing is carried out with the determined final temporary plugging fracturing stage C. During the implementation of the on-site multi-stage temporary plugging fracturing, the turning direction of the newly added cracks after each temporary plugging fracturing is monitored. When it is monitored that the angle between the newly added cracks after this temporary plugging fracturing and the current cracks does not reach the angle D, the temporary plugging agent is added until the angle between the newly added cracks after this temporary plugging fracturing and the current cracks reaches the angle D.

[0023] The direction of crack turning can be monitored on site through microseismic monitoring.

[0024] Preferably, in step 1, a full-diameter downhole core is obtained, and the full-diameter core is made into a 100 mm×100 mm×100 mm cubic sample by epoxy resin gel and wire cutting.

[0025] Preferably, in step 1, a drilling device is used to process the cubic sample, and a cylindrical hole with a diameter of 16 mm and a length of 60 mm is drilled at the center point of the cubic sample to form a core wellbore, and an aluminum metal wellbore with a length of 80 mm, an inner diameter of 10 mm, and an outer diameter of 14 mm is fixed in the core wellbore with epoxy resin.

[0026] A cylindrical hole with a diameter of 16 mm and a length of 60 mm was drilled at the center of the cubic specimen to simulate the drilling process.

[0027] The method for optimizing a temporary plugging scheme by using a visualized temporary plugging experiment of the present invention obtains the internal crack morphology of a cubic rock sample by using CT scanning, thereby achieving the purpose of visualizing the internal crack morphology of the cubic rock sample.

[0028] The present invention can provide an optimized temporary plugging scheme for on-site multi-stage temporary plugging fracturing, determine whether the well is suitable for temporary plugging fracturing; if it is suitable for temporary plugging fracturing, determine the number of temporary plugging fracturing and the timing of adding temporary plugging agent.

[0029] The final temporary plugging fracturing stage is determined based on the pumping pressure curve of the entire experimental process and the fracture morphology of the cubic rock sample, and the final temporary plugging fracturing stage is used to guide the on-site multi-stage temporary plugging fracturing. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 A cubic specimen prepared before fracturing in a specific embodiment;

[0031] Figure 2 It is a CT scan slice of the initial fracturing and two temporary plugging fracturing in a specific embodiment;

[0032] Figure 3 It is a pumping pressure curve diagram of a complete repeated fracturing process in a specific embodiment.

[0033] Figure 2 In the figure, the blue part is the crack formed by the first fracturing, the green part is the crack formed by the first temporary plugging fracturing, and the red part is the crack formed by the second temporary plugging fracturing. DETAILED DESCRIPTION

[0034] In the present invention, unless otherwise specified, the equipment used are all conventional equipment, such as the true triaxial hydraulic test equipment is the true triaxial hydraulic test equipment used in the true triaxial fracturing physical simulation system; the maximum triaxial stress that can be applied by the confining pressure pump of the true triaxial hydraulic test equipment is 30 MPa, with an accuracy of 0.1 MPa; the maximum injection pressure of the ISCO pump (plunger pump) is 70 MPa, and the maximum pumping displacement is 204 mL / min. Example

[0035] Step 1: In order to obtain fracture morphology similar to repeated fracturing in real reservoirs and realize uniform loading of triaxial stress, full-diameter downhole cores of different lithology reservoirs in the old area of ​​Xinjiang Oilfield are obtained by full-diameter downhole coring. The lithology of the full-diameter downhole cores is sandstone, conglomerate and andesite, the porosity of the cores is between 5% and 10%, and the permeability of the cores is between 0.005mD and 0.01mD. Epoxy resin gel is poured around the full-diameter downhole cores to cast the full-diameter downhole cores. After the epoxy resin solidifies, the full-diameter downhole cores are polished into 100cm×100cm×100cm cubic samples to obtain cubic specimens (see Figure 1 ).

[0036] Step 2, use drilling equipment to process the cubic sample, drill a cylindrical hole with a diameter of 16mm and a length of 60mm at the center point of the cubic sample to form a core wellbore, fix an aluminum metal wellbore with a length of 80mm, an inner diameter of 10mm and an outer diameter of 14mm in the core wellbore with epoxy resin, and fix the aluminum metal wellbore in the core wellbore with epoxy resin glue, and reserve an open hole section in the core wellbore to obtain a cubic rock sample. The cubic rock sample is as follows: Figure 1 shown.

[0037] Slippery water commonly used in repeated fracturing on-site construction in old areas was selected as the fracturing fluid (viscosity of 10 mPa·s). The temporary plugging fracturing fluid included a temporary plugging agent and a carrying fluid. The temporary plugging agent was composed of 40 to 70 mesh polyacrylamide powder and 5 mm polypropylene fiber, and the carrying fluid was cross-linked guar gum. The viscosity of the temporary plugging fracturing fluid was 40 mPa·s.

[0038] Step 3, the cubic rock sample is subjected to initial fracturing. Based on the true triaxial hydraulic test equipment, the same triaxial stress is applied to the cubic rock sample, wherein the maximum horizontal principal stress is 15 MPa, the minimum horizontal principal stress is 9 MPa, and the vertical stress is 21 MPa (along the wellbore direction of the cubic sample). At the same time, slick water (viscosity of 10 mPa·s) is pumped at a displacement of 20 mL / min using an ISCO pump, and the pumping pressure curve of the initial fracturing is observed. After the initial fracturing pumping pressure curve drops suddenly (i.e., the cubic rock sample shows obvious fracture characteristics), the slick water pumping is stopped, the pressure is unloaded, the cubic rock sample of the initial fracturing is taken out, the surface crack morphology of the cubic rock sample is recorded by photographing, and the cubic rock sample is scanned by CT to obtain the internal crack morphology after the initial fracturing. The CT scan of the initial fracturing is as follows: Figure 2 shown.

[0039] Step 4, perform a temporary plugging fracturing on the cube rock sample after the initial fracturing, re-install the cube rock sample after the initial fracturing into the true triaxial hydraulic test equipment, load different stresses in the X, Y, and Z directions, which are 21 MPa, 15 MPa, and 9 MPa respectively, and pump the temporary plugging fracturing fluid (viscosity is 40 mPa·s) until the pumping pressure curve of the temporary plugging fracturing shows a sudden drop again, and then obtain the cube rock sample after the temporary plugging fracturing, unload the pressure, take out the cube rock sample after the temporary plugging fracturing, take pictures to record the surface cracks of the cube rock sample after the temporary plugging fracturing, and CT scan the cube rock sample after the temporary plugging fracturing to obtain the internal crack morphology after the first temporary plugging fracturing. The CT scan of the temporary plugging fracturing is as follows: Figure 2 shown.

[0040] Step 5, repeat the above step 4 to carry out secondary temporary plugging fracturing. After the test is completed, the cubic rock sample is taken out from the test device to obtain the temporary plugging fracturing pumping pressure curve of the secondary temporary plugging fracturing. The cubic rock sample after the secondary temporary plugging pressure is subjected to CT scanning to obtain the internal crack morphology of the cubic rock sample after the secondary temporary plugging fracturing. The CT scanning of the secondary temporary plugging fracturing is as follows: Figure 2 The pumping pressure curve of the cube rock sample during the whole process is shown in Figure 3 shown.

[0041] Depend on Figure 2 It can be seen that the angle between the cracks formed by the first fracturing and the cracks formed by the first temporary plugging fracturing is greater than 30°, indicating that the well is suitable for temporary plugging; the angle between the cracks formed by the first temporary plugging fracturing and the cracks formed by the second temporary plugging fracturing is greater than 30°. Based on this, the cubic rock sample can continue to undergo a third temporary plugging fracturing until the angle between the cracks formed by the nth temporary plugging fracturing and the cracks formed by the n-1th temporary plugging fracturing is less than 30°, and the temporary plugging fracturing level A is n-1.

[0042] Depend on Figure 3 From the temporary plugging fracturing pumping pressure curve of the secondary temporary plugging fracturing, it can be seen that the maximum pumping pressure of the second temporary plugging pressure is 28.66MPa. The wellhead pressure is calculated according to the following formula:

[0043] PH=PB-PL+PF

[0044] Wherein, PH is the wellhead pressure, PB is the maximum value of the fracture pressure, PL is the static liquid column pressure, and PF is the friction resistance along the way; when PH is greater than the wellhead pressure limit value PN, the temporary plugging fracturing is terminated to ensure the safety of the wellhead. Accordingly, the temporary plugging fracturing level B = the number of temporary plugging fracturing times this time - 1.

[0045] The final temporary plugging fracturing stage C is the smaller value of the temporary plugging fracturing stage A and the temporary plugging fracturing stage B.

Claims

1. A method for optimizing temporary plugging scheme using a visualized temporary plugging experiment, characterized in that: The following steps are involved: Step 1, making a cubic sample from a full-diameter downhole core, drilling a cylindrical hole in the cubic sample to form a core wellbore, fixing an aluminum metal wellbore in the core wellbore, and reserving an open hole section in the core wellbore to obtain a cubic rock sample; Step 2, performing CT scanning on the cubic rock sample to obtain the internal natural fracture development of the cubic rock sample in its original state; Step 3, perform initial fracturing on the cubic rock sample, apply triaxial stress to the cubic rock sample using true triaxial hydraulic test equipment according to the reservoir stress, and pump fracturing fluid into the core wellbore of the cubic rock sample, and obtain the cubic rock sample after the initial fracturing after the pumping pressure curve of the initial fracturing shows a sudden drop, stop pumping the fracturing fluid, unload the pressure, record the pumping pressure curve of the initial fracturing, and use CT to scan the cubic rock sample to obtain the internal crack morphology after the initial fracturing; Step 4, performing a temporary plugging fracturing on the cube rock sample after the initial fracturing, applying triaxial stress to the cube rock sample using a true triaxial hydraulic test device, applying confining pressure, pumping temporary plugging fracturing fluid, and obtaining a cube rock sample after a temporary plugging fracturing after a sudden drop in the pumping pressure curve of the temporary plugging fracturing, unloading the pressure, recording the pumping pressure curve of the temporary plugging fracturing, and scanning the cube rock sample after the temporary plugging fracturing using CT to obtain the internal crack morphology after the temporary plugging fracturing; Step 5, repeating the above step 4 to carry out temporary plugging and fracturing for two or more times, and after all the experiments are completed, taking out the cubic rock sample, obtaining the pumping pressure curve of the whole process and the fracture morphology of the cubic rock sample; Determine the final temporary plugging fracturing stage through the pumping pressure curve of the whole process and the fracture morphology of the cubic rock sample; The pumping pressure curve of the whole process includes the pumping pressure curve of the initial fracturing and the pumping pressure curve of each temporary plugging fracturing; the crack morphology of the cubic rock sample includes the crack morphology of the initial fracturing and each temporary plugging fracturing, and the crack morphology includes the surface crack morphology data and the internal crack morphology of the cubic rock sample; The temporary plugging fracturing level A is determined by the fracture morphology of the cubic rock sample, as follows: If the angle between the cracks of the cube rock sample after the first temporary plugging and fracturing and the cracks of the cube rock sample after the initial fracturing does not reach the angle D, it means that it is difficult to form an effective turning fracture by temporary plugging, and the well is not suitable for temporary plugging; If the angle between the cracks of the cube rock sample after the first temporary plugging and fracturing and the cracks of the cube rock sample after the initial fracturing reaches the angle D, it means that the temporary plugging has formed an effective turning seam, and the well is suitable for temporary plugging and can continue to perform temporary plugging and fracturing. When the temporary plugging and fracturing is continued, when the angle between the cracks of the cube rock sample after the nth temporary plugging and fracturing and the cracks of the cube rock sample after the n-1th temporary plugging and fracturing does not reach the angle D, it means that the temporary plugging and fracturing of the nth fracturing is difficult to form an effective turning seam, and the temporary plugging and fracturing experiment is ended, and the temporary plugging and fracturing level A is determined, and the temporary plugging and fracturing level A is n-1; The temporary plugging fracturing stage B is determined by the pumping pressure curve of temporary plugging fracturing, as follows: Obtain the maximum value of the bursting pressure corresponding to the new cracks formed after each temporary plugging and fracturing, the maximum value of the bursting pressure is the maximum value of the pumping pressure of the pumping pressure curve of this temporary plugging and fracturing, and calculate the wellhead pressure using the maximum value of the bursting pressure. If the calculated wellhead pressure exceeds the wellhead pressure limit, determine the temporary plugging and fracturing level B, temporary plugging and fracturing level B = the number of temporary plugging and fracturing times this time - 1; The final temporary plugging fracturing stage C is the smaller value of the temporary plugging fracturing stage A and the temporary plugging fracturing stage B.

2. The method for optimizing temporary blocking scheme by using visual temporary blocking experiment according to claim 1, characterized in that: The final temporary plugging fracturing stage C is determined to implement on-site multi-stage temporary plugging fracturing. During the implementation of the on-site multi-stage temporary plugging fracturing, the turning direction of the newly added cracks after each temporary plugging fracturing is monitored. When it is monitored that the angle between the newly added cracks after this temporary plugging fracturing and the current cracks does not reach the angle D, the temporary plugging agent is added until the angle between the newly added cracks after this temporary plugging fracturing and the current cracks reaches the angle D.

3. The method for optimizing temporary blocking scheme by using visual temporary blocking experiment according to claim 1 or 2, characterized in that: The angle D is ≥ 30°.

4. The method for optimizing temporary blocking scheme by using visual temporary blocking experiment according to claim 1 or 2, characterized in that: In step 1, a full-diameter downhole core is obtained, and the full-diameter core is made into a 100 mm×100 mm×100 mm cubic sample by epoxy resin gel and wire cutting.

5. The method for optimizing temporary blocking scheme by using visual temporary blocking experiment according to claim 3, characterized in that: In step 1, a full-diameter downhole core is obtained, and the full-diameter core is made into a 100 mm×100 mm×100 mm cubic sample by epoxy resin gel and wire cutting.

6. The method for optimizing temporary plugging scheme by using visual temporary plugging experiment according to claim 1, 2 or 5, characterized in that: In step 1, the cubic sample is processed by drilling equipment, and a cylindrical hole with a diameter of 16 mm and a length of 60 mm is drilled at the center point of the cubic sample to form a core wellbore. An aluminum metal wellbore with a length of 80 mm, an inner diameter of 10 mm, and an outer diameter of 14 mm is fixed in the core wellbore with epoxy resin.

7. The method for optimizing temporary blocking scheme by using visual temporary blocking experiment according to claim 3, characterized in that: In step 1, the cubic sample is processed by drilling equipment, and a cylindrical hole with a diameter of 16 mm and a length of 60 mm is drilled at the center point of the cubic sample to form a core wellbore. An aluminum metal wellbore with a length of 80 mm, an inner diameter of 10 mm, and an outer diameter of 14 mm is fixed in the core wellbore with epoxy resin.

8. The method for optimizing temporary blocking scheme by using visual temporary blocking experiment according to claim 4, characterized in that: In step 1, the cubic sample is processed by drilling equipment, and a cylindrical hole with a diameter of 16 mm and a length of 60 mm is drilled at the center point of the cubic sample to form a core wellbore. An aluminum metal wellbore with a length of 80 mm, an inner diameter of 10 mm, and an outer diameter of 14 mm is fixed in the core wellbore with epoxy resin.