Construction method for pier column formwork in complex wind field area

By using highly adaptable pier formwork and wind guide devices in complex wind field areas, combined with wind force and wind direction detection, the impact of wind on pier formwork is solved, safe installation and stability of pier formwork is achieved, and construction costs are reduced. risk.

CN118745819APending Publication Date: 2024-10-08FUZHOU ZUOHAI CONSTR INVESTMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410907805.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

When installing piers and columns in complex wind field areas, the impact of strong winds increases the difficulty of construction and safety risks. It is difficult to effectively prevent the collapse of pier column formwork when the wind force is too strong with existing technology.

Method used

Adopting a highly adaptable and structurally stable pier formwork design, combined with wind force and wind direction detection and wind guide devices, the wind speed and direction are monitored in real time through the detection mechanism, and when the wind force is too strong, the wind guide blades are adjusted to divert the wind force away and ensure the formwork stability and security.

Benefits of technology

It achieves safe installation and stability of pier column formwork in complex wind field areas, reduces the impact of wind on construction, improves operating efficiency and safety, and avoids the risk of formwork collapse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745819A_ABST
    Figure CN118745819A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of pier column construction, and particularly relates to a complex wind field area pier column formwork construction method which comprises the following steps: S3, wind power and wind direction measuring devices: detecting wind power and wind direction by utilizing a detection mechanism, and S4, pier column wind guide devices: arranging the wind guide devices on the windward side, and adjusting wind guide blades to transfer wind power when the wind power is too large. According to the construction method for the pier column formwork in the complex wind field area, when the wind speed is too high, a rotating motor drives a guide rotating rod connected with the rotating motor to rotate, synchronous rotation of a plurality of shifting rods is achieved through series connection of linkage rods, and therefore the guide rotating rod can be controlled to drive air guide blades to rotate, the rotating angle of the air guide blades is reduced, and then the air inlet amount can be reduced; and the mounting safety of the pier column is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pier column construction, and in particular to a pier column template construction method in a complex wind field area. Background Art

[0002] Complex wind farm areas usually refer to areas with strong winds and complex airflows in the geographical environment. When installing piers in complex wind farm areas, especially in the construction of pier formwork, the following difficulties may be encountered: Influence of strong winds: Complex wind farms are usually affected by strong winds, which will increase the difficulty of pier hoisting and installation, and also increase the risks for operators; Low operating efficiency: Strong winds and complex terrain may lead to low efficiency of pier installation operations, requiring additional time and labor costs to complete the installation tasks; Increased safety risks: During the pier installation process, due to the special environment of complex wind farms, the safety risks to operators and equipment will increase, and safety management and protection measures need to be strengthened.

[0003] In order to cope with these difficulties, it is necessary to fully evaluate the environmental conditions of the wind farm area before installing the piers, formulate a detailed construction plan, and take corresponding preventive measures. However, the existing protective measures are to stop the lifting operation when the wind speed exceeds the safety range until the wind speed drops to a safe level, or to take necessary reinforcement measures during the lifting and installation of the piers to ensure that the piers can remain stable under strong wind conditions. However, the above technical solutions cannot provide timely protection when excessive airflow occurs during the formwork construction process to avoid formwork collapse. Therefore, the proposal of this application provides a timely and effective protective measure. Summary of the invention

[0004] Based on the above-mentioned existing technical problems, the present invention proposes a method for constructing pier column formwork in a complex wind field area.

[0005] The present invention provides a method for constructing a pier column formwork in a complex wind field area, the method comprising the following steps:

[0006] S1. Wind farm area environmental assessment: Before construction, a detailed assessment of the meteorological conditions, topography, soil conditions, etc. of the complex wind farm area is conducted to determine the construction difficulty and risk points.

[0007] S2. Formwork design: Based on the assessment results of the wind field area, design a pier formwork with strong adaptability and stable structure to make it wind-resistant and durable.

[0008] S3. Wind force and wind direction measuring device: Use the detection mechanism to detect wind force and wind direction.

[0009] S4. Pier column wind guide device: A wind guide device is set on the windward side. When the wind is too strong, adjust the wind guide blades to divert the wind.

[0010] S5. Construction preparation: According to the construction plan, prepare the necessary construction equipment, materials and personnel to ensure the normal operation of the communication and safety monitoring systems during the construction process.

[0011] S6. Template installation: Select a suitable construction location in the wind farm area according to the positioning mechanism and install the template according to the design requirements.

[0012] S7. Concrete pouring: After the formwork is installed, concrete pouring is carried out.

[0013] S8. Formwork removal and maintenance: After the concrete reaches the designed strength, the formwork is removed and the pier columns are maintained.

[0014] Preferably, the pier column formwork in S2 uses high-strength steel as the main material, and the pier column formworks are connected by high-strength bolts.

[0015] Through the above technical solution, high-strength steel is used as the pier column formwork, which can make it have good wind resistance and durability and can be used for a long time in harsh environments. In order to ensure the convenience of assembly and disassembly of the formwork and maintain the stability of the structure, high-strength bolt connections are used to improve the firmness of the connection.

[0016] Preferably, the positioning mechanism in S6 includes support beams distributed in a circular array and fixedly connected to the outer surface of the formed pier, the upper surface of the support beams is fixedly connected with a ring-shaped positioning plate, the upper surfaces of the support beams and the positioning plates are respectively provided with evenly distributed positioning holes along their paths, the outer surface of the support beams is fixedly installed with a ring-shaped working platform, and the outer surface of the support beams is evenly spaced and installed with annular clamps.

[0017] Through the above technical scheme, in order to build a working platform on the outer surface of the formed pier column, thereby facilitating the installation of the wind guide device, the working platform is positioned and installed through the positioning holes on the evenly distributed support beams and the installed positioning plates. In order to strengthen the support beams, a clamping hoop is provided to clamp them.

[0018] Preferably, the detection mechanism in S3 includes a rotating disk fixedly connected to the lower surface of the working platform, a ball bearing is arranged inside the rotating disk, an annular mounting ring is fixedly sleeved on the outer surface of the movable outer ring of the rotating disk, and a wind bowl is fixedly connected to the outer surface of the mounting ring in a circular array.

[0019] Through the above technical solution, when installing piers in complex wind fields, they will be hindered by strong winds, making the installation of piers extremely difficult. In order to avoid the influence of wind force in the wind field, it is necessary to detect the wind speed in the wind field, and then take countermeasures to make the installation environment safe. When detecting the wind speed in the wind field, the wind bowl is fixed on a horizontal mounting ring, and a counter is provided between the mounting ring and the rotating disc. When the airflow blows through the wind bowl, the wind bowl will start to rotate under the drag reduction of the ball bearing, and the rotation speed is proportional to the speed of the airflow. The wind speed is determined by measuring the number of rotations of the wind bowl through the counter.

[0020] Preferably, the detection mechanism further comprises a mounting frame fixedly connected to the upper surface of the working platform in four directions, and a wind vane is rotatably connected to the upper surface of one end of the mounting frame.

[0021] Through the above technical scheme, in order to detect the windward side of the pier during installation, it is convenient to use the wind guide device to divert the wind force, so that wind vanes are set in the four directions of east, west, south and north of the working platform. When the airflow blows over, the wind direction can be determined according to the direction of the wind vane.

[0022] Preferably, the wind-guiding device in S4 comprises working rings which are movably sleeved on the outer surface of the wind bowl and are distributed up and down. The relative surfaces of the two working rings are rotatably connected with a guide rotating rod through a bearing. The outer surface of the guide rotating rod is fixedly connected with an air guide plate. The upper and lower surfaces of the air guide plate are respectively slidably connected with one side surface of the two working rings.

[0023] Through the above technical scheme, after the detection mechanism detects the wind speed and wind direction in the wind field area, in order to guide the wind force on the windward side, an annular array of air guide vanes are set between the two working rings, and the air guide vanes are controlled to rotate with the rotation of the guide rotating rod, thereby changing the direction of the air guide vanes to divert the wind force, so as to achieve the effect of diversion.

[0024] Preferably, the air guiding surfaces of the air guide plates are arranged in an arc shape, and a plurality of the air guide plates are rotated to be horizontal to form a closed circular ring, and the air guiding surfaces of the air guide plates are arranged in a rectangular array and are provided with air guiding grooves with arc-shaped corners.

[0025] Through the above technical scheme, when the wind force in the wind field is relatively small, multiple air guide vanes are synchronously rotated 90° to open, thereby realizing the detection of the wind bowl and the wind vane. When the wind force in the wind field is relatively large, the airflow passes through the air guide vanes to blow the wind bowl to rotate, and the rotation speed is proportional to the speed of the airflow. The wind speed is determined by measuring the number of rotations of the wind bowl through a counter. When the wind speed is too large, the rotation of the air guide vanes is controlled to reduce the rotation angle of the air guide vanes, thereby reducing the amount of air intake and ensuring the safety of the pier installation. In order to make the air guiding effect of the air guide vanes better, an angular air guide groove is opened on the surface of the air guide vanes to make the flow effect of the air guide vanes better. At the same time, the air guide vanes can achieve the air guiding effect no matter which angle they are facing. Moreover, when the wind force in the wind field is too complex, the air guide vanes can be controlled to rotate to form a closed circle to achieve the effect of safe operation.

[0026] Preferably, the lower surface of the working ring below is fixedly connected with support rods distributed in a circular array, and the free ends of the support rods are fixedly connected to the outer surface of the clamping hoop; the upper surface of the working ring above is fixedly connected with traction bars distributed in a circular array, and the upper surface of the working platform is fixedly connected with a support beam, and the free ends of the traction bars are fixedly connected to the outer surface of the support beam.

[0027] Through the above technical solution, in order to support the working ring and facilitate the adjustment of the air guide device, the two working rings are connected by the guide rotating rod, and then the support rod supports the lower part of the working ring with force, and the traction reinforcement pulls and fixes the upper surface of the working ring.

[0028] Preferably, the wind guide device further comprises a lever fixedly connected to the outer surface of the lower end of the guide rotating rod, and a linkage rod is hingedly connected to the lower surface of the free end of the adjacent lever.

[0029] Through the above technical solution, in order to drive the air guide plate to adjust the angle at the same time to achieve the purpose of guiding the air, it can be achieved by simultaneously rotating the lever connected to the lower end of the guide rotating rod. In order to realize the linkage of the lever, a linkage rod is set to connect them in series.

[0030] Preferably, a mounting beam is fixedly connected to the lower surface of the lower working ring, a rotating motor is mounted on the surface of the mounting beam, and an outer surface of an output shaft of the rotating motor is fixedly connected to an outer surface of one of the guide rotating rods via a coupling.

[0031] Through the above technical scheme, in order to control the rotation of multiple levers and realize the guide rotating rod driving the air guide vane to rotate, the rotating motor installed by the mounting beam supports the guide rotating rod connected thereto to rotate, and then the synchronous rotation of multiple levers is realized under the series connection of the linkage rod, thereby completing the angle adjustment of the air guide vane.

[0032] The beneficial effects of the present invention are:

[0033] 1. By setting up a detection mechanism, the wind speed and wind direction in complex wind fields can be detected in real time, which is convenient for timely wind deflection treatment of the windward surface during pier installation. During the adjustment process, the wind bowl is fixed on a horizontal mounting ring, and a counter is set between the mounting ring and the rotating disc. When the airflow blows through the wind bowl, the wind bowl will start to rotate under the drag reduction of the ball bearing. The rotation speed is proportional to the speed of the airflow. The wind speed is determined by measuring the number of rotations of the wind bowl through the counter, and wind vanes are set in the four directions of east, west, south and north of the working platform. When the airflow blows over, the wind direction can be judged according to the direction of the wind vane, so that emergency treatment can be carried out on the windward surface in time.

[0034] 2. By setting up a wind guide device, when the wind force is too strong, the wind force borne by the windward side during the construction of the pier column can be diverted. During the adjustment process, when the wind speed is too high, the guide rotating rod connected to it is driven to rotate by the rotating motor, and then the synchronous rotation of multiple levers is realized under the series connection of the linkage rod, so that the guide rotating rod can be controlled to drive the air guide plate to rotate, reduce the rotation angle of the air guide plate, and then reduce the air intake, ensuring the safety of the pier column during installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 A schematic diagram of a pier column formwork construction method for a complex wind field area proposed by the present invention;

[0036] Figure 2 A three-dimensional diagram of the support beam structure of a complex wind field area pier column formwork construction method proposed by the present invention;

[0037] Figure 3 A three-dimensional diagram of the working ring structure of a pier column formwork construction method in a complex wind field area proposed by the present invention;

[0038] Figure 4 A three-dimensional diagram of the linkage rod structure of a complex wind field area pier column formwork construction method proposed by the present invention;

[0039] Figure 5 A three-dimensional diagram of the wind guide plate structure of a pier column formwork construction method in a complex wind field area proposed by the present invention;

[0040] Figure 6 A three-dimensional diagram of the lever structure of a complex wind field pier column formwork construction method proposed by the present invention;

[0041] Figure 7 A three-dimensional diagram of the wind guide groove structure of a pier column formwork construction method in a complex wind field area proposed by the present invention;

[0042] Figure 8 A three-dimensional diagram of the wind bowl structure of a complex wind field area pier column formwork construction method proposed by the present invention;

[0043] Fig. 9A three-dimensional diagram of the ball bearing structure of a pier column formwork construction method for a complex wind field area proposed by the present invention.

[0044] In the figure: 1. positioning mechanism; 11. support beam; 12. positioning plate; 13. positioning hole; 14. working platform; 15. clamping hoop; 2. detection mechanism; 21. rotating disc; 22. ball bearing; 23. mounting ring; 24. wind bowl; 25. mounting frame; 26. weather vane; 3. wind guide device; 31. working ring; 32. guide rotating rod; 33. wind guide plate; 34. wind guide groove; 35. support rod; 36. traction bar; 37. support beam; 38. lever; 39. linkage rod; 40. mounting beam; 41. rotating motor. DETAILED DESCRIPTION

[0045] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0046] A method for constructing a pier column formwork in a complex wind field area, the construction method comprising the following steps:

[0047] S1. Wind farm area environmental assessment: Before construction, a detailed assessment of the meteorological conditions, topography, soil conditions, etc. of the complex wind farm area is conducted to determine the construction difficulty and risk points.

[0048] S2. Formwork design: Based on the assessment results of the wind field area, design a pier formwork with strong adaptability and stable structure to make it wind-resistant and durable.

[0049] S3, wind force and wind direction measuring device: use the detection mechanism 2 to detect wind force and wind direction.

[0050] S4. Pier column wind guide device 3: A wind guide device 3 is set on the windward side. When the wind is too strong, the wind guide blades are adjusted to divert the wind.

[0051] S5. Construction preparation: According to the construction plan, prepare the necessary construction equipment, materials and personnel to ensure the normal operation of the communication and safety monitoring systems during the construction process.

[0052] S6. Template installation: Select a suitable construction location in the wind farm area according to the positioning mechanism 1, and install the template according to the design requirements.

[0053] S7. Concrete pouring: After the formwork is installed, concrete pouring is carried out.

[0054] S8. Formwork removal and maintenance: After the concrete reaches the designed strength, the formwork is removed and the pier columns are maintained.

[0055] The pier formwork in S2 uses high-strength steel as the main material, and the pier formworks are connected by high-strength bolts. Using high-strength steel as the pier formwork can make it have good wind resistance and durability, and can be used for a long time in harsh environments. In order to ensure the convenience of assembly and disassembly of the formwork and maintain the stability of the structure, high-strength bolts are used to improve the firmness of the connection.

[0056] Reference Figure 1-Figure 9 In order to build a working platform 14 on the outer surface of the formed pier, thereby facilitating the installation of the wind guide device 3, the positioning mechanism 1 in S6 includes support beams 11 distributed in a ring array and fixedly connected to the outer surface of the formed pier, and the upper surface of the support beams 11 is fixedly connected with a ring-shaped positioning plate 12, and the upper surfaces of the support beams 11 and the positioning plates 12 are respectively penetrated along their paths with evenly distributed positioning holes 13, and the outer surface of the support beams 11 is fixedly installed with a ring-shaped working platform 14, and the working platform 14 is positioned and installed through the positioning holes 13 on the evenly distributed support beams 11 and the installed positioning plates 12. In order to strengthen the support beams 11, the outer surface of the support beams 11 is evenly spaced and installed with annular clamps 15.

[0057] When installing piers in a complex wind field, they will be hindered by strong winds, making the installation of piers extremely difficult. In order to avoid the influence of wind force in the wind field, it is necessary to detect the wind speed in the wind field, and then take countermeasures to ensure the safety of the installation environment. The detection mechanism 2 in S3 includes a rotating disk 21 fixedly connected to the lower surface of the working platform 14, and a ball 22 is arranged inside the rotating disk 21. The outer surface of the movable outer ring of the rotating disk 21 is fixedly sleeved with an annular mounting ring 23, and the outer surface of the mounting ring 23 is distributed in an annular array and fixedly connected with a wind bowl 24. When detecting the wind speed in the wind field, the wind bowl 24 is fixed to the horizontal mounting ring 23, and a counter is arranged between the mounting ring 23 and the rotating disk 21. When the airflow blows through the wind bowl 24, the wind bowl 24 will start to rotate under the drag reduction of the ball 22, and the rotation speed is proportional to the speed of the airflow. The wind speed is determined by measuring the number of rotations of the wind bowl 24 by the counter.

[0058] In order to detect the windward side of the pier during installation and facilitate the use of the wind guide device 3 to divert the wind force, the detection mechanism 2 also includes a mounting frame 25 fixedly connected to the upper surface of the working platform 14 in four directions. A wind vane 26 is rotatably connected to the upper surface of one end of the mounting frame 25. The wind vanes 26 are arranged in the four directions of east, west, south and north of the working platform 14. When the airflow blows over, the wind direction can be determined according to the direction of the wind vane 26.

[0059] By setting up the detection mechanism 2, the wind speed and wind direction in the complex wind field area can be detected in real time, so as to facilitate timely wind deflection treatment of the windward surface when the pier is installed. During the adjustment process, the wind bowl 24 is fixed on the horizontal mounting ring 23, and a counter is arranged between the mounting ring 23 and the rotating disk 21. When the airflow blows through the wind bowl 24, the wind bowl 24 will start to rotate under the drag reduction of the ball 22, and the rotation speed is proportional to the speed of the airflow. The wind speed is determined by measuring the number of rotations of the wind bowl 24 by the counter, and a wind vane 26 is arranged in the four directions of east, west, south and north of the working platform 14. When the airflow blows over, the wind direction can be judged according to the direction of the wind vane 26, so that emergency treatment can be carried out on the windward surface in time.

[0060] After the detection mechanism 2 detects the wind speed and wind direction in the wind field area, in order to guide the wind force on the windward side, the wind guiding device 3 in S4 includes an operating ring 31 that is movably mounted on the outer surface of the wind bowl 24 and is distributed up and down. The relative surfaces of the two operating rings 31 are rotatably connected to the guide rotating rod 32 through bearings. The outer surface of the guide rotating rod 32 is fixedly connected to an air guide plate 33. The upper and lower surfaces of the air guide plate 33 are respectively slidably connected to one side surface of the two operating rings 31. An annular array of air guide plates 33 is arranged between the two operating rings 31. The air guide plates 33 are controlled to rotate with the rotation of the guide rotating rod 32, thereby changing the direction of the air guide plates 33 to divert the wind force, thereby achieving the effect of guiding the flow.

[0061] The wind guide surface of the wind guide blade 33 is set in an arc shape. After the multiple wind guide blades 33 are rotated to the horizontal, a closed ring is formed. When the wind force in the wind field is small, the multiple wind guide blades 33 are synchronously rotated 90 degrees to open, so that the detection of the wind bowl 24 and the wind vane 26 can be realized. When the wind force in the wind field is large, the airflow passes through the wind guide blade 33 to blow the wind bowl 24 to rotate. The rotation speed is proportional to the speed of the airflow. The number of rotations of the wind bowl 24 is measured by a counter to determine the size of the wind speed. When the wind speed is too large, the wind guide blade 33 is controlled to rotate to reduce the wind guide blade 3 3, thereby reducing the amount of wind intake and ensuring the safety of the pier column during installation. In order to make the wind guiding effect of the wind guide piece 33 better, the wind guiding surface of the wind guide piece 33 is distributed in a rectangular array with arc-shaped wind guide grooves 34, and the surface of the wind guide piece 33 is provided with an angle-shaped wind guide groove 34, so that the flow effect of the wind guide piece 33 is better. At the same time, the wind guide piece 33 can achieve the wind guiding effect no matter which angle it is facing, and when the wind force in the wind field area is too complicated, the wind guide piece 33 can be controlled to rotate to form a closed ring to achieve the effect of safe operation.

[0062] In order to support the working ring 31 and facilitate the adjustment of the air guide device 3, the lower surface of the lower working ring 31 is fixedly connected with support rods 35 distributed in a circular array, and the free ends of the support rods 35 are fixedly connected to the outer surface of the clamping hoop 15. The upper surface of the upper working ring 31 is fixedly connected with traction bars 36 distributed in a circular array. The upper surface of the working platform 14 is fixedly connected with a support beam 37, and the free ends of the traction bars 36 are fixedly connected to the outer surface of the support beam 37. The two working rings 31 are connected by a guide rotating rod 32, and the support rods 35 support the lower side of the working ring 31, and the traction bars 36 pull and fix the upper surface of the working ring 31.

[0063] In order to drive the air guide plate 33 to adjust the angle at the same time to achieve the purpose of guiding air, the air guide device 3 also includes a lever 38 fixedly connected to the outer surface of the lower end of the guide rotating rod 32, and a linkage rod 39 is hinged on the lower surface of the free end of the adjacent lever 38, which can be achieved by rotating the lever 38 connected to the lower end of the guide rotating rod 32 at the same time. In order to realize the linkage of the lever 38, a linkage rod 39 is set to connect them in series.

[0064] In order to control the rotation of multiple levers 38 and realize the guide rotating rod 32 to drive the air guide plate 33 to rotate, the lower surface of the lower working ring 31 is fixedly connected with a mounting beam 40, and a rotating motor 41 is installed on the surface of the mounting beam 40. The outer surface of the output shaft of the rotating motor 41 is fixedly connected to the outer surface of one of the guide rotating rods 32 through a coupling. The rotating motor 41 supported and installed by the mounting beam 40 drives the connected guide rotating rod 32 to rotate, and then the synchronous rotation of multiple levers 38 is realized under the series connection of the linkage rod 39, thereby completing the angle adjustment of the air guide plate 33.

[0065] By setting up the wind guide device 3, when the wind force is too strong, the wind force borne by the windward side during the construction of the pier can be diverted. During the adjustment process, when the wind speed is too high, the guide rotating rod 32 connected to it is driven to rotate by the rotating motor 41, and then the synchronous rotation of multiple levers 38 is realized under the series connection of the linkage rod 39, so that the guide rotating rod 32 can be controlled to drive the air guide plate 33 to rotate, reduce the rotation angle of the air guide plate 33, and then reduce the air intake, thereby ensuring the safety of the pier installation.

[0066] Working principle: In a specific embodiment of the present invention, a support beam 11 and a positioning plate 12 are built on the outer surface of the formed pier column, and a clamping hoop 15 is installed through the positioning hole 13 to strengthen the support of the support beam 11, and then the two connected working rings 31 are supported by the support rod 35 and the traction bar 36;

[0067] During the construction of the pier column formwork, when the wind force in the wind field is relatively small, the multiple wind guide blades 33 are synchronously rotated 90 degrees to open. At this time, the wind bowl 24 is fixed to the horizontal mounting ring 23. A counter is arranged between the mounting ring 23 and the rotating disc 21. When the airflow blows through the wind bowl 24, the wind bowl 24 will start to rotate under the drag reduction of the ball 22. The speed of rotation is proportional to the speed of the airflow. The wind speed is determined by measuring the number of rotations of the wind bowl 24 through the counter. In addition, wind vanes 26 are arranged in the four directions of east, west, south and north of the working platform 14. When the airflow blows over, the wind direction can be determined according to the direction of the wind vane 26.

[0068] Furthermore, under the detection of the wind bowl 24 and the wind vane 26, when the wind force in the wind field area is strong, the wind bowl 24 rotates at high speed, thereby driving the guide rotating rod 32 connected thereto to rotate through the rotating motor 41 supported and installed by the mounting beam 40. Then, the synchronous rotation of multiple levers 38 is realized under the series connection of the linkage rod 39, and then the lever 38 drives the air guide plate 33 to rotate to a suitable angle. According to the distribution of the air guide groove 34, the wind force on the windward side can be diverted, so that the working environment of the pier column formwork is safe.

[0069] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for constructing pier column formwork in a complex wind farm area. Features: The construction method comprises the following steps: S1. Wind farm area environmental assessment: Before construction, a detailed assessment of the meteorological conditions, topography, and soil conditions of the complex wind farm area is conducted to determine the construction difficulty and risk points; S2. Formwork design: Based on the assessment results of the wind field area, design a pier formwork with strong adaptability and stable structure to make it wind-resistant and durable; S3, wind force and wind direction measuring device: using the detection mechanism (2) to detect wind force and wind direction; S4, pier column wind guide device (3): a wind guide device (3) is provided on the windward side. When the wind force is too strong, the wind guide blades are adjusted to divert the wind force; S5. Construction preparation: Prepare the necessary construction equipment, materials and personnel according to the construction plan, and ensure the normal operation of the communication and safety monitoring systems during the construction process; S6. Formwork installation: Select a suitable construction location in the wind farm area according to the positioning mechanism (1) and install the formwork according to the design requirements; S7, concrete pouring: after the formwork is installed, concrete pouring is carried out; S8. Formwork removal and maintenance: After the concrete reaches the designed strength, the formwork is removed and the pier columns are maintained.

2. A method for constructing pier column formwork in a complex wind field area according to claim 1, Features: The pier column formwork in S2 uses high-strength steel as the main material, and the pier column formworks are connected by high-strength bolts.

3. A method for constructing pier column formwork in a complex wind field area according to claim 1, Features: The positioning mechanism (1) in S6 comprises support beams (11) distributed in an annular array and fixedly connected to the outer surface of the formed pier column, the upper surface of the support beams (11) is fixedly connected to a ring-shaped positioning plate (12), the upper surfaces of the support beams (11) and the positioning plates (12) are respectively provided with evenly distributed positioning holes (13) along their paths, the outer surface of the support beams (11) is fixedly installed with an annular working platform (14), and the outer surface of the support beams (11) is evenly spaced and installed with annular clamps (15).

4. A method for constructing pier column formwork in a complex wind field area according to claim 3, Features: The detection mechanism (2) in S3 comprises a rotating disc (21) fixedly connected to the lower surface of the working platform (14), a ball bearing (22) is arranged inside the rotating disc (21), an annular mounting ring (23) is fixedly sleeved on the outer surface of the movable outer ring of the rotating disc (21), and a wind bowl (24) is fixedly connected to the outer surface of the mounting ring (23) in a circular array.

5. A method for constructing pier column formwork in a complex wind field area according to claim 4, Features: The detection mechanism (2) also includes a mounting frame (25) fixedly connected to the upper surface of the working platform (14) in four directions, and a weather vane (26) is rotatably connected to the upper surface of one end of the mounting frame (25).

6. A method for constructing pier column formwork in a complex wind field area according to claim 5, Features: The wind guide device (3) in S4 comprises an operating ring (31) which is movably sleeved on the outer surface of the wind bowl (24) in an upper and lower distribution, the opposing surfaces of the two operating rings (31) are rotatably connected to a guide rotating rod (32) via a bearing, the outer surface of the guide rotating rod (32) is fixedly connected to an air guide plate (33), and the upper and lower surfaces of the air guide plate (33) are respectively slidably connected to one side surface of the two operating rings (31).

7. A method for constructing pier column formwork in a complex wind field area according to claim 6, Features: The air guiding surfaces of the air guiding pieces (33) are arranged in an arc shape, and a plurality of the air guiding pieces (33) are rotated to a horizontal position to form a closed circular ring, and the air guiding surfaces of the air guiding pieces (33) are arranged in a rectangular array and are provided with air guiding grooves (34) in the shape of arc angles.

8. A method for constructing pier column formwork in a complex wind field area according to claim 7, Features: The lower surface of the working ring (31) at the bottom is fixedly connected to support rods (35) distributed in an annular array, and the free ends of the support rods (35) are fixedly connected to the outer surface of the clamping hoop (15). The upper surface of the working ring (31) at the top is fixedly connected to traction bars (36) distributed in an annular array, and the upper surface of the working platform (14) is fixedly connected to a support beam (37), and the free ends of the traction bars (36) are fixedly connected to the outer surface of the support beam (37).

9. A method for constructing pier column formwork in a complex wind field area according to claim 8, Features: The wind guide device (3) also includes a lever (38) fixedly connected to the outer surface of the lower end of the guide rotating rod (32), and a linkage rod (39) is hingedly connected to the lower surface of the free end adjacent to the lever (38).

10. A method for constructing pier column formwork in a complex wind field area according to claim 9, Features: A mounting beam (40) is fixedly connected to the lower surface of the lower working ring (31), a rotating motor (41) is mounted on the surface of the mounting beam (40), and the outer surface of the output shaft of the rotating motor (41) is fixedly connected to the outer surface of one of the guide rotating rods (32) via a coupling.