Prefabricated concrete slab mounting equipment and mounting method

By designing precast concrete panel installation equipment and using mobile carriers, placement platforms, jacking systems, and lifting systems, the problems of low installation efficiency and poor accuracy have been solved, and efficient, low-damage installation of precast concrete panels has been achieved.

CN118745825APending Publication Date: 2024-10-08CHINA FIRST METALLURGICAL GROUP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410933692.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

During the installation process of precast concrete panels, the existing technology has problems such as low installation efficiency, poor accuracy and damage to the panels.

Method used

A precast concrete panel installation equipment is designed, including a mobile carrier, a placement platform, a jacking system and a lifting system. Through these systems, the precast concrete panels can be flexibly adjusted and fixed to ensure installation accuracy and efficiency.

Benefits of technology

It improves the installation efficiency and quality of precast concrete panels, reduces panel losses, and ensures installation accuracy and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745825A_ABST
    Figure CN118745825A_ABST
Patent Text Reader

Abstract

The invention discloses precast concrete slab mounting equipment and a mounting method. The precast concrete slab mounting equipment comprises a movable carrier, a placement platform, a jacking system and a lifting system. And the precast concrete planks are mounted on the moving carrier, and the moving carrier transports the precast concrete planks to the precast concrete plank to-be-mounted area. And the precast concrete planks are overturned to the inclination angle the same as the installation state of the precast concrete planks through the jacking system, and the precast concrete planks are adjusted to the height close to the to-be-installed area through the lifting system. And the position of the moving carrier is adjusted so that the precast concrete planks can be moved to the to-be-installed area in the direction right facing the to-be-installed area. The height of the precast concrete plank is adjusted through the lifting system, the precast concrete plank is placed at the installation position, and wooden wedges are arranged above and below the precast concrete plank for temporary fixation. By adopting the precast concrete slab mounting equipment and the mounting method, the mounting efficiency and the mounting quality of the precast concrete slab are effectively improved, and the loss of the precast concrete slab is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of precast concrete slab installation, and in particular to precast concrete slab installation equipment and an installation method. Background Art

[0002] Precast concrete panels are a new type of lightweight, porous, green and environmentally friendly building material that uses cement, lime, silica sand and other materials as the main raw materials, and then adds different amounts of anti-corrosion treated steel mesh according to structural requirements. After high temperature, high pressure and steam curing, the autoclaved aerated concrete panels with porous crystals are produced. Their density is lower than that of general cementitious materials, and they have excellent fire resistance, fire prevention, sound insulation, heat insulation, and thermal insulation.

[0003] In the actual construction process, the installation of precast concrete panels is generally done by lifting the precast concrete panels with a small crane, and then the construction workers use a crowbar to move the precast concrete panels to the installation location. The precast concrete panels are easily damaged during the lifting process, and the construction workers push the precast concrete panels to the installation location, which not only has low installation efficiency but also poor installation accuracy. Summary of the invention

[0004] In view of the above-mentioned defects in the prior art, a precast concrete slab installation device and an installation method are provided to achieve the purpose of improving the installation efficiency and installation quality of the precast concrete slab and reducing the loss of the precast concrete slab.

[0005] The technical solution adopted by the present invention to solve the above technical problems is:

[0006] Prefabricated concrete panel installation equipment, characterized in that:

[0007] A mobile carrier, wherein a plurality of universal wheels are provided at the bottom of the mobile carrier;

[0008] A placing platform, on which the precast concrete slab is placed; the placing platform is arranged on a mobile carrier, and the placing platform and the mobile carrier are rotatably connected;

[0009] A jacking system, which is disposed between the placement platform and the mobile carrier, and is used to control the tilt angle of the placement platform around the rotating connection;

[0010] The lifting system, the placement platform is divided into two layers, the lifting system is arranged between the lower structure and the upper structure; one end of the lower structure is rotatably connected to the mobile carrier, and the other end of the lower structure is connected to the placement platform through the jacking system; the precast concrete slab is installed on the upper structure, and the lifting system is used to control the upper structure to slide relative to the lower structure.

[0011] According to the above technical scheme, the upper structure of the placement platform includes multiple support rods, cross bars connected between the support rods, fixed limit cards arranged at the bottom of the support rods, and movable limit cards arranged at the top of the support rods; the connecting end of the support rod and the movable limit card is provided with an inner cavity matching the connection of the movable limit card, the movable limit card slides in the inner cavity, and multiple groups of connecting through holes are arranged on the movable limit card and the inner cavity wall at intervals; the spacing of the connecting through holes is determined according to the height of the common precast concrete slabs, and the spacing between the fixed limit card and the movable limit card is adjusted by passing bolts through the through holes;

[0012] The lower structure of the placement platform is a frame structure composed of multiple square steels. One side of the frame structure is rotatably connected to the mobile carrier, and the other side of the frame structure is connected to the mobile carrier through a jacking system.

[0013] According to the above technical solution, the rotation connection between the frame structure and the mobile vehicle is arranged at the front edge of the moving direction of the mobile vehicle, and the connection between the jacking system and the frame structure is located in the middle area of ​​the frame structure.

[0014] According to the above technical solution, the jacking system includes a jack, a slide groove arranged on the frame structure, and a slider fixed on the telescopic end of the jack, and the slider is rotatably connected to the end of the jack; the jack is arranged obliquely on a vertical plane parallel to the vertical plane where the support rod is located, and the higher end of the jack is close to the fixed limit card.

[0015] According to the above technical scheme, the lifting system includes a rack fixed on the frame structure, a mounting plate fixed on the support rod, gears and rollers rotatably connected to the mounting plate, a motor driving the gears to rotate, and multiple sets of sliding limit brackets; the frame structure is located between the mounting plate and the support rod, the mounting plate is fixed on the support rod, and the two limit the up and down movement of the frame structure, the gears and rollers are respectively located on both sides of the square steel where the rack is located, the gears are meshed with the rack, and the motor is fixed on the mounting plate.

[0016] According to the above technical solution, a sliding limit bracket is provided between the frame structure and the support rod. The sliding limit bracket includes a sleeve and a connecting rod. The size of the sleeve matches the square steel size of the frame structure. Both ends of the connecting rod are fixedly connected between the sleeve and the support rod.

[0017] According to the above technical solution, it also includes a control system, which is composed of batteries, wires, and switches. The batteries are set on the bottom steel plate of the mobile vehicle, and the switches are set on the upper square steel frame of the trolley. The motor and jack are connected to the batteries through wires, and the switches are connected to the batteries through wires to control the motor and jack.

[0018] According to the above technical solution, the mobile carrier is formed by welding square steels, a steel plate is arranged at the bottom of the mobile carrier, and a counterweight is arranged on the steel plate.

[0019] Precast concrete slab installation method,

[0020] Place the precast concrete slab on a mobile carrier, and use the mobile carrier to move the precast concrete to the area to be installed;

[0021] The precast concrete slab is adjusted to the same inclination angle as the set installation state by the jacking system;

[0022] The height of the precast concrete slab is adjusted to a height close to the set position by the lifting system;

[0023] Adjust the moving direction of the mobile vehicle to ensure that the spatial posture of the precast concrete slab is the same as the set installation posture;

[0024] A wooden wedge is arranged at the bottom of the position where the precast concrete panel is to be installed, by switching the supporting member of the precast concrete panel from the placement platform to the wooden wedge;

[0025] Drive off the mobile carrier and set wooden wedges on top of the precast concrete slab to secure it.

[0026] The present invention has the following beneficial effects:

[0027] First, the precast concrete panel is installed on the mobile carrier, and the mobile carrier transports the precast concrete panel to the area where the precast concrete panel is to be installed. Secondly, the precast concrete panel is flipped to the same inclination angle as the state where the precast concrete panel needs to be installed by using the jacking system, and the precast concrete panel is adjusted to a height close to the area to be installed by using the lifting system. Subsequently, the position of the mobile carrier is adjusted to face the direction of the area to be installed, and the precast concrete panel is moved to the area to be installed. Finally, the height of the precast concrete panel is adjusted by the lifting system, and the precast concrete panel is placed at the installation position, and wooden wedges are set above and below the precast concrete panel for temporary fixation.

[0028] In this process, firstly, by setting up a placement platform, the precast concrete slab is fixed on the placement platform, which is convenient for transportation to the installation site and prevents the precast concrete slab from falling and being damaged during transportation. Secondly, by setting up a jacking system, the precast concrete slab is jacked up to a vertical state (the installation state of the precast concrete slab in the figure can also be an inclined state), which is convenient for workers to install the precast concrete slab and avoids damage to the precast concrete slab when the crane lifts the precast concrete slab and the crowbar pries the precast concrete slab. Thirdly, by setting up a lifting system, the placement height of the precast concrete slab is adjusted to ensure the accurate installation position of the precast concrete slab and improve the installation efficiency.

[0029] In summary, compared with the method of installing precast concrete panels in the prior art, the precast concrete panel installation equipment described in the present application can effectively improve the installation efficiency and quality of precast concrete panels and reduce the loss of precast concrete panels.

[0030] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. The specific implementation of the present invention is given in detail by the following embodiments and their accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The drawings described herein are used to provide further understanding of the present invention and constitute a part of this application. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0032] Figure 1 It is a structural schematic diagram of an embodiment provided by the present invention;

[0033] Figure 2 It is a structural schematic diagram of a lifting system provided in an embodiment of the present invention;

[0034] Figure 3 It is a structural schematic diagram of a jacking system according to an embodiment of the present invention;

[0035] Figure 4 It is a schematic diagram of the working state of an embodiment provided by the present invention;

[0036] Figure 5 It is a front view of an embodiment provided by the present invention;

[0037] Figure 6 is a top view of an embodiment provided by the present invention;

[0038] Figure 7 is a side view of an embodiment provided by the present invention;

[0039] In the figure, 1. mobile carrier; 2. universal wheel; 3. placement platform; 3-1. support rod; 3-2. fixed limit card; 3-3. movable limit card; 3-4. frame structure; 4. jacking system; 4-1. jack; 4-2. slide; 4-3. slider; 5. lifting system; 5-1. rack; 5-2. mounting plate; 5-3. gear; 5-4. roller; 6. counterweight block; 7. precast concrete slab. DETAILED DESCRIPTION

[0040] The following is combined with Figure 1-7 The principles and features of the present invention are described, and the examples are only used to explain the present invention and are not used to limit the scope of the present invention. In the following paragraphs, the present invention is described in more detail by way of example with reference to the accompanying drawings. The advantages and features of the present invention will become clearer according to the following description and claims. It should be noted that the drawings are all in a very simplified form and are not in precise proportions, and are only used to facilitate and clearly assist in explaining the purpose of the embodiments of the present invention.

[0041] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a component centered. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may also be a component centered. When a component is considered to be "set on" another component, it may be directly set on the other component or there may also be a component centered. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0042] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0043] Reference Figure 1 to Figure 7 As shown, the prefabricated concrete panel installation equipment provided by the present invention.

[0044] Example 1

[0045] It comprises a mobile vehicle 1, and a plurality of universal wheels 2 are arranged at the bottom of the mobile vehicle;

[0046] A placement platform 3, on which the precast concrete slab 7 is placed; the placement platform is arranged on a mobile carrier, and the placement platform and the mobile carrier are rotatably connected;

[0047] A jacking system 4, which is disposed between the placement platform and the mobile carrier, and is used to control the tilt angle of the placement platform around the rotating connection;

[0048] Lifting system 5, the placement platform is divided into an upper and lower structure, and the lifting system is arranged between the lower structure and the upper structure; one end of the lower structure is rotatably connected to the mobile carrier, and the other end of the lower structure is connected to the placement platform through the jacking system; the precast concrete slab is installed on the upper structure, and the lifting system is used to control the upper structure to slide relative to the lower structure.

[0049] In this embodiment, first, the precast concrete panel is installed on a mobile carrier, and the mobile carrier transports the precast concrete panel to the area where the precast concrete panel is to be installed. Secondly, the precast concrete panel is flipped to the same inclination angle as the state where the precast concrete panel needs to be installed by using a jacking system, and the precast concrete panel is adjusted to a height close to the area to be installed by using a lifting system. Subsequently, the position of the mobile carrier is adjusted to face the direction of the area to be installed, and the precast concrete panel is moved to the area to be installed. Finally, a wooden wedge is placed under the precast concrete panel, and the precast concrete is gradually transferred from the upper structure to the wooden wedge below by the lifting system, and a wooden wedge is also placed above the precast concrete panel.

[0050] In this process, firstly, by setting up a placement platform, the precast concrete slab is fixed on the placement platform, which is convenient for transportation to the installation site and prevents the precast concrete slab from falling and being damaged during transportation. Secondly, by setting up a jacking system, the precast concrete slab is jacked up to a vertical state (the installation state of the precast concrete slab in the figure can also be an inclined state), which is convenient for workers to install the precast concrete slab and avoids damage to the precast concrete slab when the crane lifts the precast concrete slab and the crowbar pries the precast concrete slab. Thirdly, by setting up a lifting system, the placement height of the precast concrete slab is adjusted to ensure the accurate installation position of the precast concrete slab and improve the installation efficiency.

[0051] In summary, compared with the method of installing precast concrete panels in the prior art, the precast concrete panel installation equipment described in the present application can effectively improve the installation efficiency and quality of precast concrete panels and reduce the loss of precast concrete panels.

[0052] Example 2

[0053] The structure and principle of Example 2 are similar to those of Example 1, except that: a preferred structural form of a placing platform is provided, and the upper structure of the placing platform includes a plurality of support rods 3-1, a cross bar connected between the support rods (not shown in the cross bar diagram), a fixed limit card 3-2 arranged at the bottom of the support rod, and a movable limit card 3-3 arranged at the top of the support rod; the connecting end of the support rod and the movable limit card is provided with an inner cavity matching the connection of the movable limit card, the movable limit card slides in the inner cavity, and a plurality of groups of connecting through holes are provided at intervals on the movable limit card and the inner cavity wall; the spacing of the connecting through holes is determined according to the height of the common precast concrete slabs, and the spacing between the fixed limit card and the movable limit card is adjusted by passing bolts through the through holes;

[0054] The lower structure of the placement platform is composed of a frame structure 3-4 composed of multiple square steels. One side of the frame structure is rotatably connected to the mobile carrier (the embodiment in the figure is connected by a rotating shaft), and the other side of the frame structure is connected to the mobile carrier through a jacking system.

[0055] In this embodiment, the end of the support rod is designed in the form of a fixed limit card and a movable limit card, which is suitable for prefabricated panels of various height specifications, thereby improving the applicability of the device.

[0056] In Example 2, in order to facilitate the direct transportation of precast concrete panels to the area to be installed by a mobile carrier, the rotational connection between the frame structure and the mobile carrier is arranged at the front edge of the moving direction of the mobile carrier, and the connection between the jacking system and the frame structure is located in the middle area of ​​the frame structure.

[0057] In Examples 1 and 2, a preferred structural form of the jacking system is given; the jacking system includes a jack 4-1, a slide 4-2 provided on the frame structure, and a slider 4-3 fixed to the telescopic end of the jack, the slider being rotatably connected to the end of the jack; the jack is arranged obliquely on a vertical plane parallel to the vertical plane where the support rod is located, and the higher end of the jack is close to the fixed limit card. In the embodiment shown in the figure, the slider is rotatably connected to the end of the jack through a rotating shaft, and during the extension of the jack, the slider slides in the slide, thereby pushing the frame structure to rotate around its rotation connection with the mobile carrier until the precast concrete slab fixed on the upper side of the frame structure is adjusted to the same as the set installation state. At this time, the mobile carrier is pushed to complete the subsequent installation steps of the precast concrete slab.

[0058] In Examples 1 and 2, a preferred structural form of a lifting system is given; the lifting system includes a rack 5-1 fixed on the frame structure, a mounting plate 5-2 fixed on the support rod, a gear 5-3 and a roller 5-4 rotatably connected to the mounting plate, a motor driving the gear to rotate, and multiple sets of sliding limit brackets; the frame structure is located between the mounting plate and the support rod, the mounting plate is fixed on the support rod, and the two limit the up and down movement of the frame structure, the gear and the roller are respectively located on both sides of the square steel where the rack is located, the gear is meshed with the rack, and the motor is fixed on the mounting plate.

[0059] In this embodiment, a connecting plate is fixed between the support rods. When the connecting plate is located directly above the mounting plate, the connecting plate and the mounting plate are connected by bolts to fix the mounting plate on the support rods, and the up and down displacement of the frame structure is limited by the connecting plate and the mounting plate. Subsequently, the moving direction of the support rod is further limited by the gear and the roller, and the motor on the support plate drives the gear to rotate, thereby driving the movement of the support rod on the frame structure, thereby achieving the purpose of adjusting the height of the precast concrete slab.

[0060] The lifting system can also adopt a threaded drive form, for example, a screw that can only rotate and a motor that drives the screw to rotate are provided on the frame structure, and a slider with a threaded hole is fixed on the support rod, and the movement of the threaded block and the support rod is driven by the rotation of the screw.

[0061] Furthermore, in order to further limit the support rod to move only along the length direction of the rack, a sliding limit bracket is provided between the frame structure and the support rod. The sliding limit bracket includes a sleeve and a connecting rod. The size of the sleeve matches the square steel size of the frame structure. The two ends of the connecting rod are fixedly connected between the sleeve and the support rod.

[0062] Example 3

[0063] The structure and principle of Example 3 are similar to those of Example 1 or 2, except that: it also includes a control system, which is composed of batteries, wires, and switches. The batteries are arranged on the bottom steel plate of the mobile vehicle, and the switches are arranged on the upper square steel frame of the trolley. The motor and the jack are connected to the batteries through wires, and the switches are connected to the batteries through wires to control the motors and the jacks.

[0064] In Examples 1-3, the moving carrier is formed by welding square steels, a steel plate is provided at the bottom of the moving carrier, and a counterweight 6 is provided on the steel plate.

[0065] The present invention also provides a method for installing a prefabricated concrete slab.

[0066] Place the precast concrete slab on a mobile carrier, and use the mobile carrier to move the precast concrete to the area to be installed;

[0067] The precast concrete slab is adjusted to the same inclination angle as the set installation state by the jacking system;

[0068] The height of the precast concrete slab is adjusted to a height close to the set position by the lifting system;

[0069] Adjust the moving direction of the mobile vehicle to ensure that the spatial posture of the precast concrete slab is the same as the set installation posture;

[0070] A wooden wedge is arranged at the bottom of the position where the precast concrete panel is to be installed, by switching the supporting member of the precast concrete panel from the placement platform to the wooden wedge;

[0071] Drive off the mobile carrier and set wooden wedges on top of the precast concrete slab to secure it.

[0072] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any ordinary technician in the industry can smoothly implement the present invention as shown in the drawings and described above. However, any equivalent changes, modifications and evolutions made by technicians familiar with the profession without departing from the scope of the technical solution of the present invention using the technical content disclosed above are all equivalent embodiments of the present invention. At the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the present invention are still within the protection scope of the technical solution of the present invention.

Claims

1. Prefabricated concrete panel installation equipment, characterized by: include A mobile carrier, wherein a plurality of universal wheels are provided at the bottom of the mobile carrier; A placing platform, on which the precast concrete slab is placed; the placing platform is arranged on a mobile carrier, and the placing platform and the mobile carrier are rotatably connected; A jacking system, which is disposed between the placement platform and the mobile carrier, and is used to control the tilt angle of the placement platform around the rotating connection; The lifting system, the placement platform is divided into two layers, the lifting system is arranged between the lower structure and the upper structure; one end of the lower structure is rotatably connected to the mobile carrier, and the other end of the lower structure is connected to the placement platform through the jacking system; the precast concrete slab is installed on the upper structure, and the lifting system is used to control the upper structure to slide relative to the lower structure.

2. The precast concrete panel installation device according to claim 1, characterized in that: The upper structure of the placement platform includes a plurality of support rods, a cross bar connected between the support rods, a fixed limit card arranged at the bottom of the support rods, and a movable limit card arranged at the top of the support rods; the connecting end of the support rod and the movable limit card is provided with an inner cavity matching the connection of the movable limit card, the movable limit card slides in the inner cavity, and a plurality of groups of connecting through holes are arranged at intervals on the movable limit card and the inner cavity wall; the spacing of the connecting through holes is determined according to the height of the common precast concrete slabs, and the spacing between the fixed limit card and the movable limit card is adjusted by passing bolts through the through holes; The lower structure of the placement platform is a frame structure composed of multiple square steels. One side of the frame structure is rotatably connected to the mobile carrier, and the other side of the frame structure is connected to the mobile carrier through a jacking system.

3. The precast concrete panel installation device according to claim 2, characterized in that: The rotation connection between the frame structure and the mobile carrier is arranged at the front edge of the moving direction of the mobile carrier, and the connection between the jacking system and the frame structure is located in the middle area of ​​the frame structure.

4. The precast concrete panel installation device according to claim 2, characterized in that: The jacking system includes a jack, a slide groove arranged on the frame structure, and a slider fixed on the telescopic end of the jack, and the slider is rotatably connected to the end of the jack; the jack is arranged obliquely on a vertical plane parallel to the vertical plane where the support rod is located, and the higher end of the jack is close to the fixed limit card.

5. The precast concrete panel installation device according to claim 2, characterized in that: The lifting system includes a rack fixed on the frame structure, a mounting plate fixed on the support rod, a gear and a roller rotatably connected to the mounting plate, a motor driving the gear to rotate, and multiple sets of sliding limit brackets; the frame structure is located between the mounting plate and the support rod, the mounting plate is fixed on the support rod, and the two limit the up and down movement of the frame structure, the gear and the roller are respectively located on both sides of the square steel where the rack is located, the gear is meshed with the rack, and the motor is fixed on the mounting plate.

6. The precast concrete panel installation device according to claim 5, characterized in that: A sliding limit bracket is provided between the frame structure and the support rod. The sliding limit bracket comprises a sleeve and a connecting rod. The size of the sleeve matches the size of the square steel of the frame structure. Both ends of the connecting rod are fixedly connected between the sleeve and the support rod.

7. The precast concrete panel installation device according to claim 1, characterized in that: It also includes a control system, which consists of batteries, wires, and switches. The batteries are set on the bottom steel plate of the mobile vehicle, the switches are set on the upper square steel frame of the trolley, the motors and jacks are connected to the batteries through wires, and the switches are connected to the batteries through wires to control the motors and jacks.

8. The precast concrete panel installation device according to claim 1, characterized in that: The mobile carrier is formed by welding square steels, a steel plate is arranged at the bottom of the mobile carrier, and a counterweight block is arranged on the steel plate.

9. A method for installing a precast concrete panel, characterized in that: Place the precast concrete slab on a mobile carrier, and use the mobile carrier to move the precast concrete to the area to be installed; The precast concrete slab is adjusted to the same inclination angle as the set installation state by the jacking system; The height of the precast concrete slab is adjusted to a height close to the set position by the lifting system; Adjust the moving direction of the mobile vehicle to ensure that the spatial posture of the precast concrete slab is the same as the set installation posture; A wooden wedge is arranged at the bottom of the position where the precast concrete panel is to be installed, by switching the supporting member of the precast concrete panel from the placement platform to the wooden wedge; Drive off the mobile carrier and set wooden wedges on top of the precast concrete slab to secure it.

Citation Information

Patent Citations

  • Wall surface construction device

    CN116464247A

  • Assembly type structure's prefabricated plate aided adjustment erection equipment

    CN208310249U

  • Building decoration wallboard mounting device

    CN210659165U

  • Auxiliary device facilitating position adjustment of integrated house floor

    CN215926797U

  • A transshipment platform

    CN218809228U