Grouting control method for roof alluvial-pluvial layer

Through comprehensive analysis of parameters such as lithology and spatial location of the grouting section, a targeted grouting plan was formulated, which solved the problem of poor applicability of existing grouting control methods and achieved efficient and low-cost grouting effects.

CN118745878APending Publication Date: 2024-10-08XIAN RES INST OF CHINA COAL TECH & ENG GRP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410875426.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

Existing grouting control methods have poor applicability and lack of pertinence during the grouting process of roof alluvial layers, resulting in high costs and difficulty in achieving effective results.

Method used

Through a comprehensive analysis of the lithological combination, spatial location, pressure water test, density and other parameters of the grouting section, a grouting control method suitable for each section is formulated to achieve targeted grouting, including drilling, sweeping, and treatment. Comprehensive analysis of sections, formulation of parameters and inspection of grouting effects.

Benefits of technology

It achieves refined grouting construction, reduces grouting costs, improves construction efficiency, and significantly improves the grouting effect of the alluvial layer on the coal seam roof.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745878A_ABST
    Figure CN118745878A_ABST
Patent Text Reader

Abstract

The invention discloses a grouting control method for a roof alluvial-pluvial layer. The grouting control method comprises the steps of drilling and well completion; hole sweeping and downward extending coring drilling are conducted, specifically, after hole sweeping, downward extending drilling is conducted by 4-8 m to form a treatment section, and meanwhile well logging and coring are conducted; comprehensive analysis of the treatment section: lithology analysis, spatial analysis and water pressure test are carried out; according to the comprehensive analysis result of the treatment section, parameters such as the grouting flow, the grout proportion, the total grouting amount and the grouting stopping pressure are formulated, and different parameter combinations are selected as grouting control standards; grouting and effect inspection are conducted, specifically, grouting is conducted according to the parameters, and after grouting is finished, the grouting effect is inspected through coring and water pressing; and the steps are repeated to achieve subsection downward-extending grouting. According to the method, the parameters such as the grouting flow, the grout proportion, the total grouting amount and the grouting pressure suitable for different grouting holes are obtained based on comprehensive analysis of the parameters such as the lithology, the spatial position and the water pressing test of the treatment section, grouting construction is refined, the grouting cost is reduced, the construction efficiency is improved, and the purpose of transforming the alluvial-pluvial layer of the coal seam roof through grouting is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal mine water prevention and control, and relates to a method for controlling grouting of a roof alluvial layer. Background Art

[0002] The alluvial layer on the roof of the coal seam contains a lot of sand and is rich in water. It is the main source of water and sand in the process of coal mining. In the past, the treatment method for the alluvial layer on the roof of the coal seam was mainly to leave waterproof and sand-proof coal pillars according to industry regulations such as coal mine safety regulations and coal mine water prevention and control regulations. However, this method covers a large amount of resources and causes a large amount of coal resources to be wasted.

[0003] In the past, grouting treatment projects were mostly based on engineering experience. The entire treatment section was divided into several small sections, and grouting was carried out in sections. The grouting control parameters of each section were mostly selected based on engineering experience, and the values ​​were relatively fixed, and the grouting control was relatively blind. In actual projects, the formation anisotropy is extremely strong, and the lithology of each section is quite different, which leads to the consumption of more grouting raw materials based on fixed parameters, the cost is too high, and the grouting effect is difficult to show. Summary of the invention

[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a roof alluvial layer grouting control method to solve the problems of poor applicability and lack of specificity of traditional grouting control methods in the process of roof alluvial layer grouting. By comprehensively analyzing the lithology combination, spatial position, water pressure test, density and other parameters of the grouting section, a grouting control method suitable for each section is obtained, and "one section, one policy" is implemented to achieve the purpose of targeted grouting, providing a new control method and basis for the roof alluvial layer grouting project.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions to achieve the above problems:

[0006] A roof alluvial layer grouting control method comprises the following steps:

[0007] S1, Drilling and well completion: The drilling adopts a two-opening straight hole structure. The first opening section is to the top of the treatment section, and the casing is lowered. Cement slurry is injected through the drill pipe down to the bottom of the hole until the cement slurry returns to the surface from the outer ring of the casing to complete the cementing, and the cement is left to solidify for 48 hours;

[0008] S2, hole sweeping and downward coring drilling: Use PDC drill bit to drill and sweep out the cement in the casing; after drilling to the previous hole depth, start downward drilling for 4 to 8 meters as a treatment section, and carry out logging and coring at the same time during downward drilling;

[0009] S3, comprehensive analysis of the treatment section: rock type analysis is performed to obtain the rock type ratio and looseness, spatial analysis is performed to obtain the spatial relative position data of the treatment section, and the pressure bearing capacity P of the treatment section is tested by water pressure test 0 ;

[0010] S4, according to the comprehensive analysis results of the treatment section, formulate the parameters of grouting flow rate, slurry ratio, total grouting volume and stop pressure respectively, and select different parameter combinations as grouting control standards;

[0011] S5, grouting and effect inspection: grouting is performed using the above parameters, and after completion, the grouting effect is inspected by coring and water pressure to determine whether repeated grouting is required;

[0012] S6, repeat S2-S5 to achieve segmented downward grouting.

[0013] The present invention includes the following technical features:

[0014] Specifically, in S3, the lithology ratio is:

[0015]

[0016] Among them, P i is the length ratio of the ith lithology in the treatment section, L is the length of the treatment section, unit: m, l i is the length of the ith lithology section, unit: m; the lithology of the treatment section is divided into three types: soil, sand and gravel.

[0017] Specifically, in S3, the looseness refers to the density of rock and soil, and the density of rock and soil is divided into three states: loose + fluid plastic, semi-cemented + plastic, and completely cemented + hard plastic.

[0018] Specifically, in S3, the spatial relative position data of the treatment section includes: the horizontal distance D between the treatment section and the mining working face tunnel h , the distance between the treatment section and the coal seam D m , thickness of underlying bedrock H j , horizontal distance D between the treatment section and the special structure f , horizontal distance D between treatment section and goaf c , Distance D from the bottom of the treatment section to the bedrock surface j , the total length of the alluvial layer management section D.

[0019] Specifically, the grouting flow rate in S4 is:

[0020]

[0021] Where: q 0 It is the intermediate flow rate of the grouting pump during normal grouting, in L / min; P i is the length ratio of the ith lithology in the treatment section, y i is the lithology score, m iIt is the looseness score; the lithology score and looseness score corresponding to the grouting flow rate are: the lithology score of soil is 1.2-1.6, and the looseness score of loose + plastic is 0.7-0.9; the lithology score of sand is 0.8-1.2, and the looseness score of semi-cemented + plastic is 0.9-1.1; the lithology score of gravel is 0.4-0.8, and the looseness score of fully cemented + hard plastic is 1.1-1.3.

[0022] Specifically, in the slurry ratio, the grouting materials are cement and fly ash, and the fly ash mixing ratio is R f for:

[0023] R f =0.3r h r v (8)

[0024] In the formula, r v D is the distance from the bottom of the treatment section to the bedrock surface j The ratio of the total length D of the alluvial layer treatment section, r h is the distance D between the treatment section and the special structure f The distance D between the treatment section and the working face tunnel h The ratio of the minimum of the two to the hole spacing.

[0025] Specifically, the total grouting volume Q is:

[0026]

[0027] In the formula, Q 0 The grouting volume per meter of the semi-cemented sand layer obtained by the experimental grouting at the beginning of the project, unit: t / m; r c D is the distance between the treatment section and the goaf c Ratio to twice the hole spacing, r v D is the distance from the bottom of the treatment section to the bedrock surface j The ratio of the total length D of the alluvial layer treatment section, P i is the length ratio of the ith lithology in the treatment section, y i ' is the lithology score corresponding to the total grouting volume, m i ' is the looseness score corresponding to the total grouting volume; the lithology score and looseness score corresponding to the total grouting volume are: the lithology score of soil is 0.4-0.8, and the looseness score of loose + plastic is 1.1-1.3; the lithology score of sand is 0.8-1.2, and the looseness score of semi-cemented + plastic is 0.9-1.1; the lithology score of gravel is 1.2-1.6, and the looseness score of fully cemented + hard plastic is 0.7-0.9.

[0028] Specifically, the injection stop pressure is:

[0029]

[0030] Where P 0 Stabilize the pressure for water pressure test.

[0031] Specifically, in S4, different parameter combinations are selected as grouting control standards, including: when the distance between the grouting hole and the goaf, or the tunnel of the working face being mined, or the ground infrastructure is less than 2 times the hole spacing, the grouting end standard of each section of the grouting hole is determined by the total grouting volume Q; the remaining grouting holes are terminated after each treatment section simultaneously meets the total grouting volume Q and the stop pressure P.

[0032] Compared with the prior art, the present invention has the following technical effects:

[0033] The present invention solves the problem of parameter determination during the grouting of the roof alluvial-diluvial layer. In the existing loose layer grouting method, the selection of grouting parameters for a single grouting section mostly adopts the analogy method, and the parameter selection is relatively blind and lacks flexibility, making it difficult to achieve targeted grouting, which often makes it difficult to control the engineering cost and achieve the grouting effect. The present invention provides parameters such as grouting flow, slurry ratio, total grouting volume and grouting pressure corresponding to different grouting sections based on parameters such as grouting section lithology, spatial position, and water pressure test through empirical formulas; it can realize refined grouting construction, reduce grouting costs, improve construction efficiency, and achieve the purpose of grouting to transform the alluvial-diluvial layer of the coal seam roof. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a schematic diagram of the method of the present invention.

[0035] Figure 2 It is a spatial position relationship diagram of the grouting section of the present invention.

[0036] Figure 3 It is the relationship curve of specimen stone rate / compressive strength-fly ash ratio.

[0037] Figure 4 It is the relationship curve between grouting pressure and pressure before injection.

[0038] Figure 5 This is a comparison of the core before and after grouting.

[0039] The meaning of each number in the figure is:

[0040] 1. Distance D from the bottom of the grouting section to the bedrock surface j , 2. The total length of the alluvial layer treatment section D, 3. The distance between the borehole and the important geological structure D f , 4. The distance D between the borehole and the designed working face h , 5. Distance D from drilling hole to goaf c . DETAILED DESCRIPTION

[0041] The present invention provides a method for controlling grouting of alluvial layers on a roof, such as Figure 1 and 2 As shown, the following steps are included:

[0042] S1, drilling and well completion: The drilling adopts a two-opening straight hole structure, with the first opening section to the top of the treatment section, the hole diameter is Φ215.9mm, and a Φ177.8mm×8.05mm casing is inserted. PO42.5 pure cement slurry is injected through the drill pipe down to the bottom of the hole until the cement slurry returns to the surface from the outer ring of the casing to complete the cementing, and wait for 48 hours;

[0043] S2, hole sweeping and downward coring drilling: Use Φ152mm PDC drill bit to drill and sweep out the cement in the casing; after drilling to the previous hole depth, start downward drilling for 4 to 8 meters as a treatment section, and carry out logging and coring at the same time during downward drilling;

[0044] S3, comprehensive analysis of the treatment section: rock type analysis is performed to obtain the rock type ratio and looseness, spatial analysis is performed to obtain the spatial relative position data of the treatment section, and the pressure bearing capacity P of the treatment section is tested by water pressure test 0 ;

[0045] S4, according to the comprehensive analysis results of the treatment section, formulate parameters such as grouting flow rate, slurry ratio, total grouting volume, stop pressure, etc., and select different parameter combinations as grouting control standards;

[0046] S5, grouting and effect inspection: grouting is performed using the above parameters, and after completion, the grouting effect is inspected by coring and water pressure to determine whether repeated grouting is required;

[0047] S6, repeat S2-S5 to achieve segmented downward grouting.

[0048] Specifically, in S3, the lithology analysis is performed to obtain the lithology ratio and looseness, including:

[0049] The lithology ratio is:

[0050]

[0051] Among them, P i is the length ratio of the ith lithology in the treatment section, L is the length of the treatment section, unit: m, l i is the length of the ith lithology section, unit: m; the alluvial-diluvian layer is generally an alternating deposition of soil, sand and gravel, and the lithology of the treatment section is divided into three types: soil, sand and gravel.

[0052] The degree of looseness is: the density of rock and soil. The density of rock and soil is divided into three states: "loose + fluid plastic", "semi-cemented + plastic", and "completely cemented + hard plastic". The grouting diffusion mechanism in different states is different. The slurry in the loose + fluid plastic state is mainly characterized by penetration and compaction, the slurry in the semi-cemented + plastic state is mainly characterized by compaction and splitting, and the slurry in the completely cemented + hard plastic state is mainly characterized by splitting.

[0053] Spatial relative position data of the treatment section: horizontal distance D between the treatment section and the mining face tunnel h , the distance between the treatment section and the coal seam D m , thickness of underlying bedrock H j , the distance D between the treatment section and special structures (such as faults) f , the distance between the treatment section and the goaf D c , Distance D from the bottom of the treatment section to the bedrock surface j , the total length D of the alluvial layer management section, etc.

[0054] Specifically, in S4: grouting flow rate, slurry ratio, total grouting volume, and stop grouting pressure are calculated as follows:

[0055] The grouting flow rate is determined based on two parameters: rock type ratio and looseness. The rock type ranges from soil to sand to gravel. The larger the pores, the better the slurry fluidity, and the more likely it is to cause ineffective diffusion. Therefore, it is necessary to control the flow rate of grouting, and its score weight decreases as the pores become larger. Different degrees of density cause differences in the slurry diffusion mechanism. "Completely cemented, hard plastic" corresponds to large-flow splitting grouting, and its score weight is larger, while "loose, fluid plastic" corresponds to small-flow osmotic pressure grouting, and its score weight is smaller. The score weights corresponding to the two factors can be referred to the following table:

[0056] Table 1 Grouting flow score weight

[0057] Lithology earth sand gravel <![CDATA[Lithology score (y i )]]> 1.2~1.6 0.8~1.2 0.4~0.8 Looseness Loose, plastic Semi-cemented, plastic Fully bonded, hard plastic <![CDATA[Looseness score (m i )]]> 0.7~0.9 0.9~1.1 1.1~1.3

[0058] In summary, the grouting flow rate of a certain treatment section is determined as:

[0059]

[0060] Where: q 0 It is the intermediate flow rate of the grouting pump during normal grouting, in L / min; P i is the length ratio of the ith lithology in the treatment section, y i is the lithology score, m iIt is the looseness score; the lithology score and looseness score corresponding to the grouting flow rate are: the lithology score of soil is 1.2-1.6, and the looseness score of loose + plastic is 0.7-0.9; the lithology score of sand is 0.8-1.2, and the looseness score of semi-cemented + plastic is 0.9-1.1; the lithology score of gravel is 0.4-0.8, and the looseness score of fully cemented + hard plastic is 1.1-1.3.

[0061] Determination of slurry ratio: The grouting materials are cement and fly ash, among which cement is composite silicate PC 32.5 cement or higher specification cement. Its quality conforms to the national standard GB175-2007, and fly ash is secondary fly ash. Its quality conforms to the national standard GB / T 1596-2017. The consumption of cement for ground high-pressure grouting is large. In order to save material costs and improve the economic benefits of the project, fly ash is usually added to the slurry during grouting construction to reduce cement consumption. In order to determine the reasonable mixing ratio of fly ash, the compressive strength and solidification rate of fly ash with a mixing ratio of 0-40% (interval of 5%) were tested respectively. The compressive strength can indirectly reflect the consolidation ability of the slurry injected into the ground for the flowing sand layer after solidification; the solidification rate is the percentage of the remaining solid volume after the slurry solidifies to the original slurry volume, which can indirectly reflect the water-displacing ability of the slurry. Such as Figure 3 As shown in the figure, with the increase of fly ash content, the compressive strength of the slurry specimens showed a downward trend, on the contrary, the solidity rate increased.

[0062] According to the above results, it can be seen that the compressive strength is lower than 4Mpa after the fly ash ratio reaches 35%. At the same time, considering that the increase in fly ash content will increase the waiting time and reduce the grouting efficiency. For the sake of safety, the fly ash mixing ratio during the grouting process is generally not more than 30%. The specific fly ash mixing ratio is controlled according to the distance between the grouting section and the key area. Including the distance D from the bottom of the grouting section to the bedrock surface j , Distance D from special structure f , Distance D from working face tunnel h , thickness of underlying bedrock H j .

[0063]

[0064] r v D is the distance from the bottom of the alluvial layer grouting section to the bedrock surface j The ratio of the distance from the lower end of the casing to the bedrock surface (unit: m) to the total length of the treatment section D (unit: m) is 0 to 1. The closer the grouting section is to the upper end, the greater the length of the treatment section. v The larger it is, the higher the corresponding fly ash proportion in the slurry.

[0065] Distance D between treatment section and special structure f (Unit: m), distance D between treatment section and working face tunnelh (Unit: m) The smaller the value, the higher the criticality of the segment. h The smaller of the above distances and the hole spacing D B (Unit: m) ratio, ranging from 0 to 1, r h The larger the borehole, the less critical it is and the higher the percentage of fly ash.

[0066]

[0067] Fly ash mixing ratio R in treatment section f for:

[0068] R f =0.3r h r v (15)

[0069] In the formula, r v D is the distance from the bottom of the treatment section to the bedrock surface j The ratio of the total length D of the alluvial layer treatment section, r h is the distance D between the treatment section and the special structure f The distance D between the treatment section and the working face tunnel h The ratio of the minimum of the two to the hole spacing.

[0070] Determination of total grouting volume: The total grouting volume takes into account parameters such as lithology, looseness, and criticality of the treatment section. The more developed the pores in the rock mass, from soil to sand to gravel, the greater the corresponding grouting volume. The looser the rock mass, the greater the corresponding grouting volume. The closer the grouting section is to the bottom, the greater the corresponding grouting volume.

[0071] Table 2 Total grouting volume score weight

[0072] Lithology earth sand gravel <![CDATA[Lithology score (y i ’)]]> 0.4~0.8 0.8~1.2 1.2~1.6 Looseness Loose, plastic Semi-cemented, plastic Fully bonded, hard plastic <![CDATA[Looseness score (m i ’)]]> 1.1~1.3 0.9~1.1 0.7~0.9

[0073] When the grouting section is close to the goaf or in the running tunnel, in order to prevent the grout from flowing underground, the grouting volume needs to be reduced in a controlled manner. c is the distance from the grouting hole to the goaf. Generally, D c Should be greater than 0.5 times the drilling spacing D B , when D c When it is greater than twice the hole spacing, the impact on the goaf can be ignored. c D is the distance between the borehole and the goaf c Ratio of twice the hole spacing 2D B. The value ranges from 0.25 to 1, r c The smaller the borehole is and the closer it is to the goaf, the smaller the total grouting volume will be.

[0074]

[0075] The total grouting volume Q corresponding to a certain treatment section:

[0076]

[0077] In the formula, Q 0 The grouting volume per meter of the semi-cemented sand layer obtained by the experimental grouting at the beginning of the project, unit: t / m; r c D is the distance between the treatment section and the goaf c Ratio to twice the hole spacing, r v D is the distance from the bottom of the treatment section to the bedrock surface j The ratio of the total length D of the alluvial layer treatment section, P i is the length ratio of the ith lithology in the treatment section, y i ' is the lithology score corresponding to the total grouting volume, m i ' is the looseness score corresponding to the total grouting volume; the lithology score and looseness score corresponding to the total grouting volume are: the lithology score of soil is 0.4-0.8, and the looseness score of loose + plastic is 1.1-1.3; the lithology score of sand is 0.8-1.2, and the looseness score of semi-cemented + plastic is 0.9-1.1; the lithology score of gravel is 1.2-1.6, and the looseness score of fully cemented + hard plastic is 0.7-0.9.

[0078] Stop injection pressure:

[0079]

[0080] Where P 0 It is the stable pressure of the water pressure test, specifically the stable pressure when the water is pressed at a flow rate of 160L / min for 5 minutes, unit: MPa; Figure 4 As shown, the relationship curve between grouting pressure and pressure before injection.

[0081] In S4, different parameter combinations are selected as grouting control standards, including:

[0082] When the distance between the grouting hole and the goaf, the working face tunnel being mined, and the ground infrastructure is less than 2 times the hole spacing D B The grouting end standard of each section of the hole is determined by the total grouting volume Q. The remaining parts can only be ended after the grouting volume Q and grouting pressure P are met at the same time.

[0083] Specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent changes made on the basis of the technical solution of this application fall within the protection scope of the present invention.

[0084] Example:

[0085] This embodiment provides a roof alluvial layer grouting control method, comprising the following steps:

[0086] 1. Drilling and well completion: Drilling construction is carried out at the designed point: the drilling adopts a two-opening straight hole structure, with an opening section from the top of the treatment section, a hole diameter of Φ215.9mm, and a Φ177.8mm×8.05mm casing is inserted. PO42.5 pure cement slurry is injected through the drill pipe to the bottom of the hole until the cement slurry returns to the surface from the outer ring of the casing to complete the cementing, and wait for 48 hours.

[0087] 2. Borehole sweeping and downward coring: Use Φ152mm PDC drill bit to drill and sweep out the cement in the casing. After drilling to the last hole depth, start downward coring. 5m is a grouting section. During the downward drilling, logging and coring are carried out at the same time.

[0088] 3. Comprehensive analysis of the treatment section: Analyze the lithology of the grouting section based on the core and logging data, such as Figure 2 As shown, the grouting section can be divided into four different lithology sections. 1 ~l 4 The lithology is l 1 :0.5m, gravel, loose; l 2 :1.5m, clay, hard plastic; l 3 :1.5m, sand, semi-cemented; l 4 : 1.5m, sand, loose.

[0089] From the bottom of the grouting section to the bedrock surface D j = 12m, the total length of the treatment section is D = 40m, and the distances from the borehole to the designed tunnel, fault, and goaf are D h =15m, D f =30m, D c =30m, drilling distance D B =40m.

[0090] The static water level was measured before grouting, and the static water pressure was estimated to be P w =0.8MPa, install a pressure gauge at the orifice and conduct a water pressure test. When the pressure gauge is stable, the reading is P 0 =1.8MPa.

[0091] 4. According to the comprehensive analysis results of the treatment section, the parameters such as grouting flow rate, slurry ratio, total grouting volume, stop grouting pressure, etc. are formulated respectively, and different parameter combinations are selected as grouting control standards;

[0092] 4.1: Determination of grouting flow rate, using lithology ratio and looseness to control grouting flow rate. According to Table 1, score the lithology segment to obtain the y value of each lithology segment. i and m i Score, calculate the length proportion p of each lithology according to formula (11) i The grouting flow rate score calculation table is as follows. The actual grouting flow rate is calculated by referring to formula (12), where q 0is the middle flow rate, with a value of 160L / min. Based on this, the grouting flow rate q of this section is calculated to be 175L / min.

[0093] Table 3 Grouting section flow score calculation table

[0094]

[0095] 4.2: Determine the slurry ratio, and calculate r according to formula (13) and formula (14) respectively v =0.3, r h =0.38; According to formula (15), the fly ash ratio R f =3%.

[0096] 4.3: The total grouting volume should be determined by considering the lithology ratio and looseness on the one hand, and the spatial location of the borehole on the other hand. According to Table 2, the lithology segments are scored to obtain the y of each lithology segment. i ' and m i ' score, calculate the length proportion p of each lithology according to formula (11) i , the total grouting volume score calculation table is as follows:

[0097] Table 4 Calculation table of total grouting volume score of grouting section

[0098]

[0099] Drilling distance from goaf c =30m, according to formula (16) we can calculate r c =0.38. v =0.3, the total grouting volume Q is calculated according to formula (17), where Q 0 The value is 60t / m, and based on this, the grouting volume Q of this section is calculated to be 198t.

[0100] 4.4: Determine the stop injection pressure. Calculate the grouting pressure P = 3.12 MPa according to formula (18).

[0101] 4.5: D c =30m, D B =40m, D c <2D B Therefore, controlled grouting is adopted in this section, and the grouting is terminated when the grouting volume reaches Q=198t.

[0102] 5. Grouting and effect inspection: Use the above parameters for grouting, and then inspect the grouting effect through coring in the surrounding holes and water pressure. If cement slurry veins are found in the coring at the same layer of the surrounding holes or the stable water pressure of the next borehole sweep to the original hole depth exceeds 2MPa before grouting, the grouting of this section is completed. Otherwise, repeat the grouting according to the above steps.

[0103] Taking the drilling near the goaf in the treatment area as an example, the distances from the drilling hole to the designed tunnel, fault, and goaf are D h =15m, D f =30m, D c =30m, drilling distance D B =40m, the total length of the treatment section D = 25m, divided into 5 sections for downward grouting, each section is 5m long. The lithology sections of the treatment section and the corresponding parameter values ​​are shown in the table below.

[0104] Table 5 Lithology parameters and grouting volume of a grouting hole treatment section

[0105]

[0106] The grouting volume of the hole is calculated from Table 5 to be 988.2t, and the unit grouting volume is 39.5t / m, which is significantly reduced compared with the traditional grouting method. The coring situation of the inspection hole 55m away from the grouting hole before and after grouting is as follows: Figure 5 a is before grouting, Figure 5 b: After grouting, the grouting material is split under high pressure to form cement slurry veins in the loose layer, and the loose layer is effectively consolidated by cement.

[0107] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, a variety of simple modifications can be made to the technical solution of the present invention, and these simple modifications all belong to the protection scope of the present invention.

[0108] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations.

[0109] In addition, various embodiments of the present invention may be arbitrarily combined, and as long as they do not violate the concept of the present invention, they should also be regarded as the contents disclosed by the present invention.

Claims

1. A roof alluvial layer grouting control method, characterized in that: The following steps are involved: S1, Drilling and well completion: The drilling adopts a two-opening straight hole structure. The first opening section is to the top of the treatment section, and the casing is lowered. Cement slurry is injected through the drill pipe down to the bottom of the hole until the cement slurry returns to the surface from the outer ring of the casing to complete the cementing, and the cement is left to solidify for 48 hours; S2, hole sweeping and downward coring drilling: Use PDC drill bit to drill and sweep out the cement in the casing; after drilling to the previous hole depth, start downward drilling for 4 to 8 meters as a treatment section, and carry out logging and coring at the same time during downward drilling; S3, comprehensive analysis of the treatment section: lithology analysis is performed to obtain the lithology ratio and looseness, spatial analysis is performed to obtain the spatial relative position data of the treatment section, and the pressure bearing capacity P0 of the treatment section is tested by water pressure test; S4, according to the comprehensive analysis results of the treatment section, formulate the parameters of grouting flow rate, slurry ratio, total grouting volume and stop pressure respectively, and select different parameter combinations as grouting control standards; S5, grouting and effect inspection: grouting is performed using the above parameters, and after completion, the grouting effect is inspected by coring and water pressure to determine whether repeated grouting is required; S6, repeat S2-S5 to achieve segmented downward grouting.

2. The roof alluvial layer grouting control method according to claim 1, characterized in that: In S3, the lithology ratio is: Among them, P i is the length ratio of the ith lithology in the treatment section, L is the length of the treatment section, unit: m, l i is the length of the ith lithology section, unit: m; the lithology of the treatment section is divided into three types: soil, sand and gravel.

3. The roof alluvial layer grouting control method according to claim 2, characterized in that: In S3, the looseness refers to the density of rock and soil, and the density of rock and soil is divided into three states: loose + fluid plastic, semi-cemented + plastic, and completely cemented + hard plastic.

4. The roof alluvial layer grouting control method according to claim 3, characterized in that: In S3, the spatial relative position data of the treatment section includes: the horizontal distance D between the treatment section and the mining working face tunnel h , the distance between the treatment section and the coal seam D m , thickness of underlying bedrock H j , horizontal distance D between the treatment section and the special structure f , horizontal distance D between treatment section and goaf c , Distance D from the bottom of the treatment section to the bedrock surface j , the total length of the alluvial layer management section D.

5. The roof alluvial layer grouting control method according to claim 4, characterized in that: The grouting flow rate in S4 is: Where: q0 is the intermediate flow rate of the grouting pump during normal grouting, unit L / min; P i is the length ratio of the ith lithology in the treatment section, y i is the lithology score, m i It is the looseness score; the lithology score and looseness score corresponding to the grouting flow rate are: the lithology score of soil is 1.2-1.6, and the looseness score of loose + plastic is 0.7-0.9; the lithology score of sand is 0.8-1.2, and the looseness score of semi-cemented + plastic is 0.9-1.1; the lithology score of gravel is 0.4-0.8, and the looseness score of fully cemented + hard plastic is 1.1-1.

3.

6. The roof alluvial layer grouting control method according to claim 4, characterized in that: In the slurry ratio, the grouting materials are cement and fly ash, and the fly ash mixing ratio is R f for: R f =0.3r h r v (3) In the formula, r v D is the distance from the bottom of the treatment section to the bedrock surface j The ratio of the total length D of the alluvial layer treatment section, r h is the distance D between the treatment section and the special structure f The distance D between the treatment section and the working face tunnel h The ratio of the minimum of the two to the hole spacing.

7. The roof alluvial layer grouting control method according to claim 4, characterized in that: The total grouting volume Q: Where Q0 is the grouting volume per meter of the semi-cemented sand layer obtained by experimental grouting at the beginning of the project, unit: t / m; r c D is the distance between the treatment section and the goaf c Ratio to twice the hole spacing, r v D is the distance from the bottom of the treatment section to the bedrock surface j The ratio of the total length D of the alluvial layer treatment section, P i is the length ratio of the ith lithology in the treatment section, y i ' is the lithology score corresponding to the total grouting volume, m i ' is the looseness score corresponding to the total grouting volume; The lithology score and looseness score corresponding to the total grouting volume are as follows: the lithology score of soil is 0.4-0.8, and the looseness score of loose + plastic is 1.1-1.3; the lithology score of sand is 0.8-1.2, and the looseness score of semi-cemented + plastic is 0.9-1.1; the lithology score of gravel is 1.2-1.6, and the looseness score of fully cemented + hard plastic is 0.7-0.

9.

8. The roof alluvial layer grouting control method according to claim 4, characterized in that: The stop injection pressure: Where P0 is the stable pressure of the water pressure test.

9. The roof alluvial layer grouting control method according to claim 4, characterized in that: In S4, different parameter combinations are selected as grouting control standards, including: when the distance between the grouting hole and the goaf, or the tunnel of the working face being mined, or the ground infrastructure is less than 2 times the hole spacing, the grouting end standard of each section of the grouting hole is determined by the total grouting volume Q; the remaining grouting holes are terminated after each treatment section simultaneously meets the total grouting volume Q and the stop pressure P.