Scene reconstruction method and system based on historical and cultural building

Using high-precision laser scanners to obtain point cloud data of buildings and surrounding environments, construct and merge models, solving the problem of low modeling effectiveness in existing technologies, and achieving accurate digital modeling of historical and cultural buildings and their surrounding environments. , improving analytical capabilities.

CN118747788APending Publication Date: 2024-10-08FUTURE CITY METASPACE (SHANGHAI) DATA TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410700209.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The existing technology fails to effectively consider the surrounding environment of the building when digitally modeling historical and cultural buildings, resulting in low modeling effectiveness and the inability to fully analyze the impact of the surrounding environment on the building.

Method used

Use a high-precision first laser scanner to obtain building point cloud data, and use a lower-precision second laser scanner to obtain surrounding environment point cloud data, build a point cloud model of the building and surrounding environment, and then merge it to generate a comprehensive model to improve Modeling accuracy.

Benefits of technology

It achieves accurate digital modeling of historical and cultural buildings and their surrounding environment, improves the effectiveness of modeling, and facilitates subsequent analysis of the impact of the surrounding environment on the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118747788A_ABST
    Figure CN118747788A_ABST
Patent Text Reader

Abstract

The invention is suitable for the technical field of model reconstruction, and provides a scene reconstruction method and system based on a historical and cultural building, and the method comprises the steps: firstly obtaining first laser point cloud data information of a target building and second laser point cloud data information of a surrounding environment of the building, and then carrying out the reconstruction of the target building according to the first laser point cloud data information; and according to the first laser point cloud data information, first point cloud model information of the target building is rapidly constructed, second point cloud model information of the surrounding environment of the building is rapidly constructed according to the second laser point cloud data information, and finally the first point cloud model information and the second point cloud model information are combined to accurately generate building point cloud comprehensive model information. According to the method, high-precision digital modeling processing can be carried out on the body of the historical and cultural building and the surrounding environment of the historical and cultural building, so that the modeling effectiveness is improved, and the details of the historical and cultural building and the related surrounding environment can be more intuitively displayed in combination with virtual reality and augmented reality technologies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of model reconstruction, and in particular, to a scene reconstruction method and system based on historical and cultural buildings. Background Art

[0002] In order to provide researchers and students with detailed reference materials on historical and cultural buildings, facilitate historical, cultural and architectural research and learning of historical and cultural buildings, and provide accurate data support for future restoration and reconstruction, it is usually necessary to perform digital modeling operations on historical and cultural buildings.

[0003] At present, digital modeling operations are usually only performed on the main body of historical and cultural buildings, without involving the surrounding environment of historical and cultural buildings. This is not conducive to the subsequent analysis of the impact of the surrounding environment on historical and cultural buildings. There is a problem of low modeling effectiveness, which needs further improvement. Summary of the invention

[0004] Based on this, an embodiment of the present application provides a scene reconstruction method and system based on historical and cultural buildings to solve the problem of low modeling effectiveness in the prior art.

[0005] In a first aspect, an embodiment of the present application provides a scene reconstruction method based on historical and cultural buildings, the method comprising:

[0006] Based on a preset first laser scanner, first laser point cloud data information of a target building is obtained, and based on a preset second laser scanner, second laser point cloud data information of a surrounding environment of the building is obtained, wherein the scanning accuracy of the first laser scanner is greater than the scanning accuracy of the second laser scanner;

[0007] Constructing first point cloud model information of the target building according to the first laser point cloud data information, and constructing second point cloud model information of the surrounding environment of the building according to the second laser point cloud data information;

[0008] The first point cloud model information and the second point cloud model information are combined to generate building point cloud comprehensive model information.

[0009] Compared with the prior art, the beneficial effect is as follows: in the scene reconstruction method based on historical and cultural buildings provided in the embodiment of the present application, the terminal device can first obtain the first laser point cloud data information of the target building based on the first laser scanner, and at the same time obtain the second laser point cloud data information of the surrounding environment of the building based on the second laser scanner, and then quickly construct the first point cloud model information of the target building according to the first laser point cloud data information, and at the same time quickly construct the second point cloud model information of the surrounding environment of the building according to the second laser point cloud data information, and finally merge the first point cloud model information and the second point cloud model information to accurately generate the building point cloud comprehensive model information, thereby realizing accurate digital modeling of the historical and cultural building body and its surrounding environment, improving the effectiveness of modeling, facilitating the subsequent analysis of the impact of the surrounding environment on the historical and cultural buildings, and to a certain extent solving the problem of low current modeling effectiveness.

[0010] In a second aspect, an embodiment of the present application provides a scene reconstruction system based on historical and cultural buildings, the system comprising:

[0011] Laser point cloud data information acquisition module: used to acquire first laser point cloud data information of a target building based on a preset first laser scanner, and to acquire second laser point cloud data information of the surrounding environment of the building based on a preset second laser scanner, wherein the scanning accuracy of the first laser scanner is greater than the scanning accuracy of the second laser scanner;

[0012] Point cloud model information construction module: used to construct first point cloud model information of the target building according to the first laser point cloud data information, and to construct second point cloud model information of the surrounding environment of the building according to the second laser point cloud data information;

[0013] Building point cloud comprehensive model information generation module: used to merge the first point cloud model information and the second point cloud model information to generate building point cloud comprehensive model information.

[0014] In a third aspect, an embodiment of the present application provides a terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method of the first aspect described above when executing the computer program.

[0015] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method of the first aspect described above are implemented.

[0016] It can be understood that the beneficial effects of the second to fourth aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.

[0018] Figure 1 is a flow chart of a scene reconstruction method provided by an embodiment of the present application;

[0019] Figure 2 It is a schematic diagram of the flow chart before step S300 in the scene reconstruction method provided in one embodiment of the present application;

[0020] Figure 3 is a schematic diagram of the flow chart after step S310 in the scene reconstruction method provided in one embodiment of the present application;

[0021] Figure 4 is a flowchart after step S200 in the scene reconstruction method provided in one embodiment of the present application;

[0022] Figure 5 is a flowchart after step S220 in the scene reconstruction method provided in one embodiment of the present application;

[0023] Figure 6 is a module block diagram of a scene reconstruction system provided by an embodiment of the present application;

[0024] Figure 7 It is a schematic diagram of a terminal device provided in one embodiment of the present application. DETAILED DESCRIPTION

[0025] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0026] In the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0027] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0028] In order to illustrate the technical solution described in this application, a specific embodiment is provided below for illustration.

[0029] See also Figure 1 , Figure 1 : is a flow chart of a scene reconstruction method based on historical and cultural buildings provided in an embodiment of the present application. In this embodiment, the execution subject of the scene reconstruction method is a terminal device. It is understandable that the types of terminal devices include but are not limited to mobile phones, tablet computers, laptops, ultra-mobile personal computers (Ultra-Mobile Personal Computer, UMPC), netbooks, personal digital assistants (Personal Digital Assistant, PDA), etc., and the embodiments of the present application do not impose any restrictions on the specific types of terminal devices.

[0030] See also Figure 1 The scene reconstruction method provided in the embodiment of the present application includes but is not limited to the following steps:

[0031] In S100, first laser point cloud data information of a target building is acquired based on a preset first laser scanner, and second laser point cloud data information of a surrounding environment of the building is acquired based on a preset second laser scanner.

[0032] Without loss of generality, the surveying and mapping personnel may first use the first laser scanner to perform laser scanning processing on the target building, and then use the second laser scanner to perform laser scanning processing on the surrounding environment of the building.

[0033] Specifically, the terminal device can obtain the first laser point cloud data information of the target building based on the preset first laser scanner, and at the same time obtain the second laser point cloud data information of the surrounding environment of the building based on the preset second laser scanner, wherein the target building may be a historical and cultural building; the first laser point cloud data information is used to describe the point cloud data obtained by the first laser scanner performing laser scanning on the target building; the second laser point cloud data information is used to describe the point cloud data obtained by the second laser scanner performing laser scanning on the surrounding environment of the building; the scanning accuracy of the first laser scanner is greater than the scanning accuracy of the second laser scanner; the surrounding environment of the building may be a perfect circular area with the target building as the center and a specified distance as the radius.

[0034] In S200, first point cloud model information of the target building is constructed according to the first laser point cloud data information, and second point cloud model information of the surrounding environment of the building is constructed according to the second laser point cloud data information.

[0035] Specifically, after the terminal device obtains the first laser point cloud data information of the target building, the terminal device can effectively construct the first point cloud model information of the target building based on the first laser point cloud data information. At the same time, after the terminal device obtains the second laser point cloud data information of the target building, the terminal device can effectively construct the second point cloud model information of the surrounding environment of the building based on the second laser point cloud data information. Among them, the construction of a three-dimensional point cloud model using point cloud data can adopt existing technology, so it is not repeated; the first point cloud model information is used to describe the three-dimensional point cloud model constructed based on the first laser point cloud data information; the second point cloud model information is used to describe the three-dimensional point cloud model constructed based on the second laser point cloud data information.

[0036] In S300, the first point cloud model information and the second point cloud model information are combined to generate building point cloud comprehensive model information.

[0037] Specifically, the terminal device can merge the first point cloud model information and the second point cloud model information to quickly generate comprehensive building point cloud model information, thereby realizing accurate digital modeling of the historical and cultural building and its surrounding environment, improving the effectiveness of modeling, and facilitating subsequent analysis of the impact of the surrounding environment on historical and cultural buildings.

[0038] In some possible implementations, to further improve the effectiveness of modeling, see Figure 2 Before step S300, the method further includes but is not limited to the following steps:

[0039] In S301, component position information and component material information of building components are obtained.

[0040] Specifically, the terminal device can obtain the component location information and component material information of the building components, where the building components are used to describe the parts that constitute the historical and cultural buildings; the component location information is used to describe the specific location of the component; the component material information is used to describe the specific material of the component; the component location information and the component material information can be customized by the surveying and mapping personnel according to the actual historical and cultural buildings.

[0041] In S302, based on the component position information, the first point cloud model information and the component material information are associated to generate optimized point cloud model information.

[0042] Specifically, the terminal device can determine the position of the building component in the first point cloud model information based on the component position information of the building component, and then associate the component material information with the building component in the first point cloud model information to quickly generate optimized point cloud model information, wherein the optimized point cloud model information is used to describe the first point cloud model information after the first point cloud model information and the component material information are associated.

[0043] Accordingly, the above step S300 includes but is not limited to the following steps:

[0044] In S310, the optimized point cloud model information and the second point cloud model information are combined to generate building point cloud comprehensive model information.

[0045] Specifically, the terminal device can merge the optimized point cloud model information and the second point cloud model information to effectively generate the building point cloud comprehensive model information, wherein the building point cloud comprehensive model information is used to describe the three-dimensional point cloud model obtained after merging the optimized point cloud model information and the second point cloud model information.

[0046] In some possible implementations, in order to facilitate the timely restoration of historical and cultural buildings, please refer to Figure 3 After step S310, the method further includes but is not limited to the following steps:

[0047] In S311, for each building component: based on the component material information, theoretical service life information of the building component is obtained.

[0048] Specifically, the terminal device can perform this processing on each building component in the building point cloud comprehensive model information: based on the component material information of the building component, obtain the theoretical service life information of the building component, wherein the theoretical service life information is used to describe the theoretical service life of the component material information; in one possible implementation method, the theoretical service life information can be customized in advance.

[0049] In S312, the existence duration information of the target building is obtained.

[0050] Specifically, the terminal device can obtain the existence duration information of the target building, wherein the existence duration information is used to describe the total duration from the completion of the target building to the current moment.

[0051] In S313, predicted remaining useful life information is generated based on the theoretical useful life information and the existence time information.

[0052] Specifically, after the terminal device obtains the existence duration information of the target building, the terminal device can quickly generate predicted remaining service life information based on the difference between the theoretical service life information and the existence duration information, where the predicted remaining service life information is used to describe the predicted life of the target building.

[0053] It should be noted that when the theoretical service life information of various building components is different, the minimum theoretical service life information can be taken as the basic object for generating the predicted remaining service life information.

[0054] In S314, the predicted remaining useful life information is compared with the preset useful life threshold information.

[0055] Specifically, the terminal device may compare the predicted remaining useful life information with preset useful life threshold information, wherein the useful life threshold information may be customized in advance.

[0056] In S315, if the predicted remaining useful life information is less than or equal to the useful life threshold information, advance maintenance warning information is generated.

[0057] Specifically, if the predicted remaining service life information is less than or equal to the service life threshold information, the terminal device can generate early maintenance warning information, wherein the early maintenance warning information is used to warn that the historical and cultural buildings need to be repaired in advance.

[0058] In some possible implementations, to further improve the accuracy of modeling, please refer to Figure 4 After step S200, the method further includes but is not limited to the following steps:

[0059] In S210, edge contour line set information of the first point cloud model information is obtained based on a preset edge contour detection algorithm.

[0060] Specifically, the terminal device can effectively obtain edge contour line set information of the first point cloud model information based on a preset edge contour detection algorithm, wherein the edge contour line set information includes multiple edge contour line information, and the edge contour line information can be a boundary at the junction of the roof and the wall, a boundary at the junction of the window frame and the wall, a boundary at the junction of the chimney and the roof, or a boundary at the junction of the door panel and the wall. The edge contour detection algorithm can be an edge contour detection algorithm based on Fast Point Feature Histograms (FPFH), Surface Normal Analys is, or Marching Cubes operator.

[0061] In S220 , re-inspection suggestion information is generated based on the edge contour line set information.

[0062] Specifically, based on the edge contour line set information, the terminal device can determine that the area corresponding to the edge contour line set information is an area that needs to be re-inspected and re-precisely modeled, and generate re-inspection suggestion information, wherein the re-inspection suggestion information is used to describe the area that is recommended for re-inspection. If the result of the re-inspection does not meet the expectations of high accuracy, the area needs to be re-modeled.

[0063] In some possible implementations, to further ensure high modeling accuracy, please refer to Figure 5 After step S220, the method further includes but is not limited to the following steps:

[0064] In S221, based on the preset first laser scanner, a plurality of third laser point cloud data information of the target building is acquired.

[0065] Without loss of generality, after generating the re-inspection suggestion information, the surveying and mapping personnel may re-scan the area that needs to be re-modeled based on the first laser scanner.

[0066] Specifically, the terminal device can obtain multiple third laser point cloud data information of the target building based on the preset first laser scanner, wherein the scanning time of the third laser point cloud data information is later than the scanning time of the first laser point cloud data information.

[0067] In S222, for each piece of third laser point cloud data information: construct edge area point cloud sub-model information of the edge contour area according to the third laser point cloud data information.

[0068] Specifically, the terminal device can perform this processing on the third laser point cloud data information obtained in each round of scanning: construct edge area point cloud sub-model information of the edge contour area based on the third laser point cloud data information, wherein the edge area point cloud sub-model information is used to describe the three-dimensional point cloud model constructed based on the third laser point cloud data information.

[0069] In S223, multiple edge region point cloud sub-model information is merged to generate edge region model information.

[0070] Specifically, the terminal device can merge multiple edge area point cloud sub-model information and quickly generate edge area model information, thereby avoiding missing a certain local situation and improving the accuracy of modeling. Among them, the edge area model information is used to describe the three-dimensional point cloud model obtained after merging multiple edge area point cloud sub-model information.

[0071] In S224, the first point cloud model information is updated according to the edge area model information to generate improved point cloud model information.

[0072] Specifically, the terminal device can update the first point cloud model information according to the edge area model information, replace the local areas corresponding to each edge in the first point cloud model information with the edge area model information, and effectively generate improved point cloud model information with high precision.

[0073] Accordingly, the above step S300 includes but is not limited to the following steps:

[0074] In S3001, the improved point cloud model information and the second point cloud model information are combined to generate improved point cloud comprehensive model information.

[0075] Specifically, the terminal device can merge the improved point cloud model information and the second point cloud model information to effectively generate accurate improved point cloud comprehensive model information.

[0076] The implementation principle of the scene reconstruction method based on historical and cultural buildings in the embodiment of the present application is as follows: the terminal device can first obtain the first laser point cloud data information of the target building based on the first laser scanner, and at the same time obtain the second laser point cloud data information of the surrounding environment of the building based on the second laser scanner, and then quickly construct the first point cloud model information of the target building according to the first laser point cloud data information, and at the same time quickly construct the second point cloud model information of the surrounding environment of the building according to the second laser point cloud data information, and finally merge the first point cloud model information and the second point cloud model information to accurately generate the building point cloud comprehensive model information, thereby realizing high-precision digital modeling processing of the historical and cultural building body and its surrounding environment, improving the effectiveness of modeling, and facilitating the subsequent analysis of the impact of the surrounding environment on the historical and cultural buildings.

[0077] It should be noted that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0078] The embodiment of the present application also provides a scene reconstruction system based on historical and cultural buildings. For ease of description, only the parts related to the present application are shown, such as Figure 6 As shown, the system 60 includes:

[0079] The laser point cloud data information acquisition module 61 is used to acquire first laser point cloud data information of the target building based on a preset first laser scanner, and acquire second laser point cloud data information of the surrounding environment of the building based on a preset second laser scanner, wherein the scanning accuracy of the first laser scanner is greater than the scanning accuracy of the second laser scanner;

[0080] Point cloud model information construction module 62: used to construct first point cloud model information of the target building according to the first laser point cloud data information, and to construct second point cloud model information of the surrounding environment of the building according to the second laser point cloud data information;

[0081] The building point cloud comprehensive model information generating module 63 is used to merge the first point cloud model information and the second point cloud model information to generate the building point cloud comprehensive model information.

[0082] Optionally, the system 60 further includes:

[0083] Component location information acquisition module: used to obtain component location information and component material information of building components;

[0084] An optimized point cloud model information generation module is used to associate the first point cloud model information with the component material information based on the component position information to generate optimized point cloud model information;

[0085] Correspondingly, the building point cloud comprehensive model information generation module includes

[0086] Building point cloud comprehensive model information generation submodule: used to merge the optimized point cloud model information and the second point cloud model information to generate building point cloud comprehensive model information.

[0087] Optionally, the system 60 further includes:

[0088] Theoretical service life information acquisition module: used for obtaining theoretical service life information of building components based on component material information for each building component;

[0089] Existence duration information acquisition module: used to obtain the existence duration information of the target building;

[0090] Predicted remaining service life information generation module: used to generate predicted remaining service life information based on theoretical service life information and existence duration information;

[0091] Predicted remaining useful life information comparison module: used to compare the predicted remaining useful life information with the preset useful life threshold information;

[0092] The early maintenance warning information generation module is used to generate early maintenance warning information if the predicted remaining service life information is less than or equal to the service life threshold information.

[0093] Optionally, the system 60 further includes:

[0094] An edge contour line set information acquisition module is used to acquire edge contour line set information of the first point cloud model information based on a preset edge contour detection algorithm, wherein the edge contour line set information includes a plurality of edge contour line information;

[0095] Re-inspection suggestion information generation module: used to generate re-inspection suggestion information based on edge contour line set information.

[0096] Optionally, the system 60 further includes:

[0097] A third laser point cloud data information acquisition module: used to acquire a plurality of third laser point cloud data information of the target building based on a preset first laser scanner, wherein the scanning time of the third laser point cloud data information is later than the scanning time of the first laser point cloud data information;

[0098] The edge area point cloud sub-model information construction module is used for constructing the edge area point cloud sub-model information of the edge contour area according to the third laser point cloud data information for each third laser point cloud data information;

[0099] Edge area model information generation module: used to merge multiple edge area point cloud sub-model information to generate edge area model information;

[0100] Improved point cloud model information generation module: used to update the first point cloud model information according to the edge area model information to generate improved point cloud model information;

[0101] Accordingly, the above-mentioned building point cloud comprehensive model information generation module 63 includes:

[0102] Improved point cloud comprehensive model information generation submodule: used to merge the improved point cloud model information and the second point cloud model information to generate improved point cloud comprehensive model information.

[0103] It should be noted that the information interaction, execution process and other contents between the above-mentioned modules are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0104] The present application also provides a terminal device, such as Figure 7As shown, the terminal device 70 of this embodiment includes: a processor 71, a memory 72, and a computer program 73 stored in the memory 72 and executable on the processor 71. When the processor 71 executes the computer program 73, the steps in the above-mentioned scene reconstruction method embodiment are implemented, for example Figure 1 Steps S100 to S300 shown; or, when the processor 71 executes the computer program 73, the functions of each module in the above device are realized, for example Figure 6 The functions of modules 61 to 63 are shown.

[0105] The terminal device 70 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server, and the terminal device 70 includes but is not limited to a processor 71 and a memory 72. Those skilled in the art will appreciate that Figure 7 It is only an example of the terminal device 70 and does not constitute a limitation of the terminal device 70. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the terminal device 70 may also include input and output devices, network access devices, buses, etc.

[0106] Among them, the processor 71 can be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc.; the general-purpose processor can be a microprocessor or the processor can also be any conventional processor, etc.

[0107] The memory 72 may be an internal storage unit of the terminal device 70, such as a hard disk or memory of the terminal device 70, or the memory 72 may be an external storage device of the terminal device 70, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the terminal device 70; further, the memory 72 may also include both an internal storage unit and an external storage device of the terminal device 70, and the memory 72 may also store a computer program 73 and other programs and data required by the terminal device 70, and the memory 72 may also be used to temporarily store data that has been output or is to be output.

[0108] One embodiment of the present application also provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the steps of each of the above method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc.; the computer-readable medium may include: any entity or device that can carry computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc.

[0109] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, all equivalent changes made according to the methods, principles, and structures of the present application should be included in the protection scope of the present application.

Claims

1. A scene reconstruction method based on historical and cultural buildings, characterized in that: The method comprises: Based on a preset first laser scanner, first laser point cloud data information of a target building is obtained, and based on a preset second laser scanner, second laser point cloud data information of a surrounding environment of the building is obtained, wherein the scanning accuracy of the first laser scanner is greater than the scanning accuracy of the second laser scanner; Constructing first point cloud model information of the target building according to the first laser point cloud data information, and constructing second point cloud model information of the surrounding environment of the building according to the second laser point cloud data information; The first point cloud model information and the second point cloud model information are combined to generate building point cloud comprehensive model information.

2. The method according to claim 1, characterized in that: Before merging the first point cloud model information and the second point cloud model information to generate the building point cloud comprehensive model information, the method further includes: Obtaining component location information and component material information of building components; Based on the component position information, associating the first point cloud model information with the component material information to generate optimized point cloud model information; Accordingly, the first point cloud model information and the second point cloud model information are combined to generate building point cloud comprehensive model information, including The optimized point cloud model information and the second point cloud model information are combined to generate building point cloud comprehensive model information.

3. The method according to claim 2, characterized in that After merging the optimized point cloud model information and the second point cloud model information to generate building point cloud comprehensive model information, the method further includes: For each of the building components: based on the material information of the component, obtaining theoretical service life information of the building component; Obtaining the existence duration information of the target building; Generate predicted remaining useful life information according to the theoretical useful life information and the existence duration information; Comparing the predicted remaining useful life information with preset useful life threshold information; If the predicted remaining useful life information is less than or equal to the useful life threshold information, an advance maintenance warning information is generated.

4. The method according to claim 3, characterized in that After constructing the first point cloud model information of the target building according to the first laser point cloud data information, and constructing the second point cloud model information of the surrounding environment of the building according to the second laser point cloud data information, the method further includes: Based on a preset edge contour detection algorithm, acquiring edge contour line set information of the first point cloud model information, wherein the edge contour line set information includes a plurality of edge contour line information; Based on the edge contour line set information, re-inspection suggestion information is generated.

5. The method according to claim 4, characterized in that After generating the re-inspection suggestion information based on the edge contour line set information, the method further includes: Based on a preset first laser scanner, a plurality of third laser point cloud data information of the target building is acquired, wherein the scanning time of the third laser point cloud data information is later than the scanning time of the first laser point cloud data information; For each of the third laser point cloud data information: constructing edge area point cloud sub-model information of the edge contour area according to the third laser point cloud data information; Merging a plurality of edge region point cloud sub-model information to generate edge region model information; Update the first point cloud model information according to the edge area model information to generate improved point cloud model information; Accordingly, the merging of the first point cloud model information and the second point cloud model information to generate building point cloud comprehensive model information includes: The improved point cloud model information and the second point cloud model information are combined to generate improved point cloud comprehensive model information.

6. A scene reconstruction system based on historical and cultural buildings, characterized in that: The system comprises: Laser point cloud data information acquisition module: used to acquire first laser point cloud data information of a target building based on a preset first laser scanner, and to acquire second laser point cloud data information of the surrounding environment of the building based on a preset second laser scanner, wherein the scanning accuracy of the first laser scanner is greater than the scanning accuracy of the second laser scanner; Point cloud model information construction module: used to construct first point cloud model information of the target building according to the first laser point cloud data information, and to construct second point cloud model information of the surrounding environment of the building according to the second laser point cloud data information; Building point cloud comprehensive model information generation module: used to merge the first point cloud model information and the second point cloud model information to generate building point cloud comprehensive model information.

7. The system according to claim 6, characterized in that The system further comprises: Component location information acquisition module: used to obtain component location information and component material information of building components; An optimized point cloud model information generation module is used to associate the first point cloud model information with the component material information based on the component position information to generate optimized point cloud model information; Accordingly, the building point cloud comprehensive model information generation module includes: The building point cloud comprehensive model information generation submodule is used to merge the optimized point cloud model information and the second point cloud model information to generate the building point cloud comprehensive model information.

8. A terminal device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 5 are implemented.

9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.