Region emergency power supply one-key sequential control grid-connected and off-grid uninterrupted power supply operation method
By setting up a quick interface box and a generator car control device in the power supply system of the Taiwan District, the synchronous operation of the generator car and the mains power is realized, which solves the problem of low-voltage load power outage when the generator car is off-grid, reduces risks, and improves operating efficiency and safety. sex.
Patent Information
- Application Number
- CN202410764970.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-10-08
AI Technical Summary
The existing power supply system in the Taiwan area cannot perform secondary simultaneous operations with the city power when the generator vehicle is off-grid, resulting in short-term power outages for low-voltage loads, which poses a high risk of personal injury and equipment accidents.
By setting up a quick interface box JK box next to the JP cabinet, and using the generator car control device ZKQ to achieve primary synchronization with the grid and secondary synchronization with the grid, the operation process is simplified, ensuring the synchronous operation of the generator car and the mains, and reducing manual operation risks.
It realizes fast and reliable connection and separation between the power generation vehicle and the mains power, ensures uninterrupted power supply to low-voltage loads, reduces the risk of personal casualties and equipment accidents, simplifies the switching operation logic, and improves the safety and efficiency of operations.
Smart Images

Figure CN118748463A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power operation, and in particular to a method for one-key sequential control and off-grid uninterrupted power supply operation of an emergency power supply in a substation. Background Art
[0002] At present, the typical power supply system in the substation is as follows: Figure 1 As shown, it includes 10kV medium voltage line, medium voltage disconnector QS and drop-out fuse FF, distribution transformer T (referred to as distribution transformer T, which converts 10kV medium voltage into 400V low voltage), 400V JP cabinet and ABCN three-phase four-wire 400V low voltage distribution line, low voltage main circuit breaker QF, low voltage load, etc. When inspecting and repairing the 10kV medium voltage line, distribution transformer T, QS and FF in the above-mentioned power supply system, it is necessary to use a diesel emergency generator car (referred to as generator car) to ensure power supply to the JP cabinet and 400V low voltage load.
[0003] In order to prevent short-term power outages of low-voltage loads, it is necessary to adjust the output power of the generator car, and after synchronizing with the 400V low-voltage power supply system (referred to as the mains) in the substation (this is called primary synchronization), close the circuit breaker QFf on the generator car side to achieve grid-connected power generation. After it becomes a low-voltage load together with the mains, gradually open the low-voltage side QF of the distribution transformer and the high-voltage side FF and QS, and then carry out maintenance work to achieve uninterrupted and imperceptible power supply to the low-voltage load. However, when the maintenance is completed, the mains power supply needs to be restored, and the generator car is out of operation, that is, when the generator car is off the grid, it is impossible to synchronize with the mains for the second time, and it is necessary to first open the QFf on the generator car side, and then close the QF on the mains side. At this time, the low-voltage load suffers a short power outage.
[0004] In order to achieve the off-grid operation of the generator car without interrupting the low-voltage load, the generator car needs to be synchronized with the mains for a second time. Professionals are required to perform live operations and complex switching operations with error-free sequential logic. This process carries a high risk and probability of personal injury and equipment accidents. Summary of the invention
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies in the prior art, the present invention provides a method for one-key sequential control and off-grid uninterrupted power supply operation of the emergency power supply in the substation area. The method comprises the following steps: the generator vehicle is connected to the grid for power generation, the city power is withdrawn, and the generator vehicle is connected to the grid for power generation for the second time and then switches to city power supply. The generator vehicle is withdrawn. The operating personnel only need to operate with one key on the generator vehicle side. Not only is the process fast, but it is also fast and reliable.
[0007] (II) Technical solution
[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions: a method for one-key sequential control and off-grid uninterrupted power supply operation of an emergency power supply in a substation, specifically comprising the following steps:
[0009] S1. In the early stage, a quick interface box, namely, a JK box, needs to be placed next to the original JP cabinet. The JK box is fixed on the cement pole with angle iron and clamps. Then the low-voltage connecting cable from the original distribution transformer T to the pile head of the JP cabinet is disconnected, and the JK box is connected in series between the low-voltage side of the distribution transformer T and the JP cabinet. The power generation car is composed of a diesel generator set G, a synchronous grid-connected control device ZKQ, a power generation car output circuit breaker QFc, a panel socket and an aviation socket. Among them, the control device ZKQ includes: a primary synchronous grid-connected power generation control button SB1 of the power generation car, a secondary synchronous off-grid exit control button SB2 of the power generation car, a human-machine interface, a control board and an aviation socket;
[0010] S2, the city power supplies the low-voltage load, the QS, FF, QF, QF1-QF3 on both sides of the distribution transformer T, the JK box and the JP cabinet are all in the closed position, and the secondary cable and the primary cable are used to reliably connect the generator car and the JK box in a plug-in and pull-out manner. The operator checks the vehicle through the generator car control device ZKQ to see if there is any abnormality, the generator car circuit breaker QFf is in the open position, and presses the generator car primary synchronous grid-connected power generation control button SB1;
[0011] S3, start the diesel generator set and put the unit in standby mode, sample and adjust the output voltage Uf of the generator car according to the three-phase voltage Us on the pile head of QFj to achieve primary synchronization with the mains. After determining that the generator car meets the primary synchronization conditions, the control device ZKQ issues a closing command to close the generator car outlet circuit breaker QFf. At this time, the generator car is parallel to the mains and supplies power to the low-voltage load at the same time.
[0012] S4, sample the three-phase voltage Us and current Is at the pile head of QFj, calculate the low-voltage load power Ps at this time, record the low-voltage load power at the moment before closing the switch as Ps1, and use it as the power benchmark for the generator car to generate electricity. The control device ZKQ adjusts and gradually increases the output power of the generator car to approach Ps1, and gradually transfers the low-voltage load from the city power to the generator car for power supply. At the same time, it also proves that the primary cable and secondary cable between the generator car and the JK box are reliably connected.
[0013] S5. The control device ZKQ sends an opening command to QFj. QFj receives the opening command and performs the opening operation through its own electric operating mechanism JKd. The control device ZKQ detects whether the QFj status signal changes from the closing position to the opening position, and at the same time collects whether the three-phase current signal of the pile head on QFj disappears. Two different types of judgments prove that QFj has been reliably opened, and the control device ZKQ human-machine interface gives a prompt information of QFj reliable opening. At this time, the low-voltage load is completely independently powered by the generator car;
[0014] S6. Open the JK box door, check and confirm again that QFj is in the open position (the manual control handle has been adjusted from the upper closing position to the lower opening position), pull open the knife switch QSj, and after checking that there is no electricity, hang the ground wire PE on the QSj pole, pull open the FF and QS on the high-voltage side of the distribution transformer T, and the distribution transformer T and the 10kV medium-voltage line are gradually transferred to the maintenance state;
[0015] S7. The generator car supplies power to the low-voltage load independently. After the maintenance of the distribution transformer T and the medium-voltage line is completed, the ground wire on the medium-voltage side of the distribution transformer T and the ground wire on the pile head of the JK box QSj are removed one by one. The FF, QS on the medium-voltage side of the distribution transformer T and the QFj and QSj in the JK box are all in the open position. The generator car needs to perform a secondary synchronous off-grid exit operation. The low-voltage load is supplied by the generator car to the mains to complete the secondary synchronous off-grid parking operation of the generator car.
[0016] Preferably, the JK box in step S1 includes: 1 intelligent circuit breaker QFj, 1 knife switch QSj, a set of 4 ABCN panel-type quick interface devices (referred to as panel interfaces) and 1 multi-core aviation connector (referred to as aviation plug).
[0017] Preferably, steps S3-S5 are all automatically completed by the power generation vehicle control device ZKQ.
[0018] Preferably, step S6 is completed by manual operation.
[0019] Preferably, the secondary synchronous off-grid parking operation of the power generation vehicle in step S7 specifically includes the following steps:
[0020] T1. Manually confirm that all ground wires on both sides of distribution transformer T have been removed, close FF and QS on the medium voltage side of distribution transformer T, close QSj in JK box, and deliver city power to the pile head of QFj. The operator presses the secondary synchronous grid-connected power generation control button SB2 of the generator car on the control device ZKQ;
[0021] T2, sampling and adjusting the output voltage of the generator car according to the three-phase voltage of the QFj pile head to achieve secondary synchronization with the city power. After judging that the generator car meets the secondary synchronization conditions, the control device ZKQ issues a closing command to close QFj. At this time, the city power and the generator car are in parallel and supply power to the low-voltage load at the same time. The control device ZKQ detects whether the QFj state signal changes from the open state to the closed state, and respectively collects the three-phase voltage and current of the pile heads of QFf and QFj, and calculates the power Pf and Ps provided by the generator car and the city power to the low-voltage load respectively, where the instantaneous power of the generator car after closing is recorded as Pf1;
[0022] T3, the generator car gradually reduces its own power output Pf. If Ps is found to increase significantly, and the QFj closing position signal is closed, two different types of criteria can determine that QFj has been reliably closed, and the city power has reliably supplied power to the low-voltage load, and the low-voltage load is gradually transferred from the generator car to the city power supply. When the output of the generator car drops below 5% Pf1 of the low-voltage load, the control device ZKQ sends an opening command to QFf and stops the generator set to exit operation;
[0023] T4. Manually unplug the primary cable and secondary cable to disconnect the electrical connection between the generator car and the JK box.
[0024] Preferably, steps T2 and T3 are both automatically completed by the power generation vehicle control device ZKQ program.
[0025] Preferably, the intelligent circuit breaker QFj is equipped with an electric operating mechanism JKd, which receives node control signals to implement closing and opening operations of QFj, and provides the status node of QFj closing and opening to the outside. In order to ensure that JKd always has power during the entire switching operation, power is supplied to it from the lower pile head of QFj.
[0026] Preferably, the ABCN panel-type quick interface device is divided into two parts, a plug and a socket. The socket part of the panel interface is provided on both the JK box and the generator car. The plug part of the ABCN panel-type quick interface device is installed at both ends of the flexible connecting cable. The four ABCN flexible cables are plugged in and out to quickly connect the three-phase four-wire power lines between the JK box and the generator car, avoiding the original long time and the need for live working cable copper nose and bolt connection operation on the power receiving device.
[0027] Preferably, the multi-core aviation connector is divided into two parts, a socket and a plug. Multi-core aviation plug sockets are provided on both sides of the JK box and the generator car. The sockets should have a fool-proof design to prevent the internal signal terminals from being inserted incorrectly. The JK box and the generator car are connected through a multi-core secondary cable (secondary cable) with multi-core aviation plugs at both ends. The multi-core aviation plug and secondary cable are mainly used to enable the generator car to collect the three-phase voltage and three-phase current of the pile head ABC on QFj, and whether the QFj body is in an open state or a closed state, and the generator car sends an open command or a closing command to QFj.
[0028] Preferably, the knife switch QSj provides an obvious disconnection point when it is disconnected, which is a necessary condition for power switching operation and maintenance safety measures. A grounding terminal PE is set on the upper pile head of QSj to facilitate the hanging of the grounding wire and provide grounding protection for the maintenance of the part above QSj.
[0029] (III) Beneficial effects
[0030] The present invention provides a method for one-key sequential control of an emergency power supply in a substation area and off-grid uninterrupted power supply operation. Compared with the prior art, it has the following beneficial effects:
[0031] (1) The one-button sequential control and off-grid uninterrupted power supply operation method of the substation area emergency power supply makes the connection between the emergency generator truck and the substation area power supply system simple, quick and safe. It only needs to connect 4 primary cables and 1 multi-core secondary cable by plugging and unplugging, avoiding the operator to make live connections between the cable copper nose and the exposed bolts of the receiving equipment (or clamp the exposed copper busbar of the receiving equipment with a busbar clamp).
[0032] (2) The emergency power supply of this substation has a one-button sequential control method for connecting and disconnecting the grid for uninterrupted power supply. The generator truck can achieve primary synchronization and secondary synchronization for grid-connected power generation and off-grid exit, respectively, and can realize uninterrupted and imperceptible power supply to low-voltage loads.
[0033] (3) The emergency power supply of this substation adopts a one-button sequential control method for uninterrupted power supply operation when it is connected to the grid and exits the grid (primary synchronization and secondary synchronization). Except for simple cable connection and ground wire hanging and removal, all switching operations only require one-button operation on the generator car side. The logical sequence and reliability of the switching operation are guaranteed by the control device ZKQ and its control program, which greatly reduces the risk of personal injury and the risk of switching error operation.
[0034] (4) The one-button sequential control and off-grid uninterrupted power supply operation method of the emergency power supply in this area collects electrical quantities in real time and calculates the low-voltage load power, which is used to uniformly load the generator set before the first grid connection and uniformly reduce the load of the generator set after the second grid connection. Diesel generator sets generally have large mechanical inertia, which prevents the sudden grid connection and load from causing a major impact on the unit, such as Figure 7 shown. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 This is a schematic diagram of a typical existing power supply system in a substation area;
[0036] Figure 2 A schematic diagram of the one-button sequential control and off-grid uninterrupted power supply scheme of the station area emergency power supply of the present invention;
[0037] Figure 3 This is a schematic diagram of the quick interface box of the present invention;
[0038] Figure 4 It is a schematic diagram of the power generation vehicle control device ZKQ of the present invention;
[0039] Figure 5 This is a flow chart of the primary synchronous grid-connected power generation of the power generation vehicle of the present invention;
[0040] Figure 6 This is a flow chart of the secondary synchronous off-grid parking of the power generation vehicle of the present invention;
[0041] Figure 7 This is a schematic diagram of the power generation situation of the power generation vehicle of the present invention when connected to the grid in the same period. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] See also Figure 1-7 The embodiment of the present invention provides two technical solutions: a method for one-key sequential control of an emergency power supply in a substation area and off-grid uninterrupted power supply operation, specifically including the following embodiments:
[0044] Example 1
[0045] A method for one-key sequential control of an emergency power supply in a substation area and off-grid uninterrupted power supply operation, specifically comprising the following steps:
[0046] S1. In the early stage, a quick interface box, namely, a JK box, needs to be placed next to the original JP cabinet. The JK box is fixed on the cement pole with angle iron and clamps. Then the low-voltage connecting cable from the original distribution transformer T to the pile head of the JP cabinet is disconnected, and the JK box is connected in series between the low-voltage side of the distribution transformer T and the JP cabinet. The power generation car is composed of a diesel generator set G, a synchronous grid-connected control device ZKQ, a power generation car output circuit breaker QFc, a panel socket and an aviation socket. Among them, the control device ZKQ includes: a primary synchronous grid-connected power generation control button SB1 of the power generation car, a secondary synchronous off-grid exit control button SB2 of the power generation car, a human-machine interface, a control board and an aviation socket;
[0047] S2, the city power supplies the low-voltage load, the QS, FF, QF, QF1-QF3 on both sides of the distribution transformer T, the JK box and the JP cabinet are all in the closed position, and the secondary cable and the primary cable are used to reliably connect the generator car and the JK box in a plug-in and pull-out manner. The operator checks the vehicle through the generator car control device ZKQ to see if there is any abnormality, the generator car circuit breaker QFf is in the open position, and presses the generator car primary synchronous grid-connected power generation control button SB1;
[0048] S3, start the diesel generator set and put the unit in standby mode, sample and adjust the output voltage Uf of the generator car according to the three-phase voltage Us on the pile head of QFj to achieve primary synchronization with the mains. After determining that the generator car meets the primary synchronization conditions, the control device ZKQ issues a closing command to close the generator car outlet circuit breaker QFf. At this time, the generator car is parallel to the mains and supplies power to the low-voltage load at the same time.
[0049] S4, sample the three-phase voltage Us and current Is at the pile head of QFj, calculate the low-voltage load power Ps at this time, record the low-voltage load power at the moment before closing the switch as Ps1, and use it as the power benchmark for the generator car to generate electricity. The control device ZKQ adjusts and gradually increases the output power of the generator car to approach Ps1, and gradually transfers the low-voltage load from the city power to the generator car for power supply. At the same time, it also proves that the primary cable and secondary cable between the generator car and the JK box are reliably connected.
[0050] S5. The control device ZKQ sends an opening command to QFj. QFj receives the opening command and performs the opening operation through its own electric operating mechanism JKd. The control device ZKQ detects whether the QFj status signal changes from the closing position to the opening position, and at the same time collects whether the three-phase current signal of the pile head on QFj disappears. Two different types of judgments prove that QFj has been reliably opened, and the control device ZKQ human-machine interface gives a prompt information of QFj reliable opening. At this time, the low-voltage load is completely independently powered by the generator car;
[0051] S6. Open the JK box door, check and confirm again that QFj is in the open position (the manual control handle has been adjusted from the upper closing position to the lower opening position), pull open the knife switch QSj, and after the pole head of QSj is tested and no electricity is found, hang the ground wire PE, pull open the FF and QS on the high-voltage side of the distribution transformer T, and the distribution transformer T and 10kV medium-voltage line are gradually transferred to the maintenance state;
[0052] S7. The generator car supplies power to the low-voltage load independently. After the maintenance of the distribution transformer T and the medium-voltage line is completed, the ground wire on the medium-voltage side of the distribution transformer T and the ground wire on the pile head of the JK box QSj are removed one by one. The FF, QS on the medium-voltage side of the distribution transformer T and the QFj and QSj in the JK box are all in the open position. The generator car needs to perform a secondary synchronous off-grid exit operation. The low-voltage load is supplied by the generator car to the mains to complete the secondary synchronous off-grid parking operation of the generator car.
[0053] In the embodiment of the present invention, in step S1, the JK box includes: 1 intelligent circuit breaker QFj, 1 knife switch QSj, a group of 4 ABCN panel-type quick interface devices (referred to as panel interface) and 1 multi-core aviation connector (referred to as aviation plug), the intelligent circuit breaker QFj is provided with an electric operating mechanism JKd, which receives a node control signal to realize the closing operation and the opening operation of QFj, and provides the state node of the closing and opening of QFj to the outside, in order to ensure that JKd is always powered during the entire switching operation, the lower pile head of QFj is used to supply power to it, the ABCN panel-type quick interface device is divided into two parts, a plug and a socket, the socket part of the panel interface is provided in the JK box and the power generation vehicle, the plug part of the ABCN panel-type quick interface device is installed at both ends of the flexible connecting cable, and the four ABCN flexible cables are connected quickly by plugging and unplugging the three-phase four-wire power lines between the JK box and the power generation vehicle, avoiding the original long time and the need for live operation. The multi-core aviation connector is divided into two parts: a socket and a plug. Multi-core aviation plug sockets are provided on both sides of the JK box and the generator car. The socket should have a fool-proof design to prevent the internal signal terminal from being inserted incorrectly. The JK box and the generator car are connected through a multi-core secondary cable (secondary cable) with multi-core aviation plugs at both ends. The multi-core aviation plug and secondary cable are mainly used by the generator car to collect the three-phase voltage and current of the ABC on the upper pile of QFj, as well as whether the QFj body is in the open state or the closed state, and the generator car sends an open or closed command to QFj. The specific electrical signals of the multi-core aviation plug and its secondary cable are shown in Table 1. When the knife switch QSj is disconnected, an obvious disconnection point is provided, which is a necessary condition for power switching operation and maintenance safety measures. A grounding terminal PE is provided on the upper pile of QSj to facilitate the hanging of the grounding wire and provide grounding protection for the maintenance of the part above QSj.
[0054] Table 1 Specific electrical signals of multi-core aviation plugs and their secondary cables
[0055]
[0056]
[0057] In the embodiment of the present invention, steps S3-S5 are all automatically completed by the power generation vehicle control device ZKQ.
[0058] In the embodiment of the present invention, step S6 is completed by manual operation.
[0059] Example 2
[0060] The technical solution of the embodiment of the present invention is different from that of the first embodiment in that the secondary synchronous off-grid parking operation of the power generation vehicle specifically includes the following steps:
[0061] T1. Manually confirm that all ground wires on both sides of distribution transformer T have been removed, close FF and QS on the medium voltage side of distribution transformer T, close QSj in JK box, and deliver city power to the pile head of QFj. The operator presses the secondary synchronous grid-connected power generation control button SB2 of the generator car on the control device ZKQ;
[0062] T2, sampling and adjusting the output voltage of the generator car according to the three-phase voltage of the QFj pile head to achieve secondary synchronization with the city power. After judging that the generator car meets the secondary synchronization conditions, the control device ZKQ issues a closing command to close QFj. At this time, the city power and the generator car are in parallel and supply power to the low-voltage load at the same time. The control device ZKQ detects whether the QFj state signal changes from the open state to the closed state, and respectively collects the three-phase voltage and current of the pile heads of QFf and QFj, and calculates the power Pf and Ps provided by the generator car and the city power to the low-voltage load respectively, where the instantaneous power of the generator car after closing is recorded as Pf1;
[0063] T3, the generator car gradually reduces its own power output Pf. If Ps is found to increase significantly, and the QFj closing position signal is closed, two different criteria can determine that QFj has been reliably closed, and the city power has reliably supplied power to the low-voltage load, and the low-voltage load is gradually transferred from the generator car to the city power supply. When the output of the generator car drops below 5% Pf1 of the low-voltage load, the control device ZKQ sends an opening command to QFf and stops the generator set to exit operation;
[0064] T4. Manually unplug the primary cable and secondary cable to disconnect the electrical connection between the generator car and the JK box.
[0065] In the embodiment of the present invention, steps T2 and T3 are both automatically completed by the ZKQ program of the power generation vehicle control device.
[0066] It should be pointed out that the output power of the generator truck can be gradually reduced when it is off the grid. However, if the changes in the power at the pile head on QFj are not monitored, it is impossible to determine whether QFj can be reliably closed, and whether the low-voltage load is gradually and effectively transferred to the mains circuit for power supply. If the generator truck outlet circuit breaker QFf and the generator are shut down and exited rashly, power imbalance may easily occur, resulting in load shedding.
[0067] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0068] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0069] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for one-key sequential control of an emergency power supply in a substation area and off-grid uninterrupted power supply operation, characterized in that: The specific steps include: S1. In the early stage, a quick interface box, namely, a JK box, needs to be placed next to the original JP cabinet. The JK box is fixed on the cement pole with angle iron and clamps. Then the low-voltage connecting cable from the original distribution transformer T to the pile head of the JP cabinet is disconnected, and the JK box is connected in series between the low-voltage side of the distribution transformer T and the JP cabinet. The power generation car is composed of a diesel generator set G, a synchronous grid-connected control device ZKQ, a power generation car output circuit breaker QFc, a panel socket and an aviation socket. Among them, the control device ZKQ includes: a primary synchronous grid-connected power generation control button SB1 of the power generation car, a secondary synchronous off-grid exit control button SB2 of the power generation car, a human-machine interface, a control board and an aviation socket; S2, the city power supplies the low-voltage load, the QS, FF, QF, QF1-QF3 on both sides of the distribution transformer T, the JK box and the JP cabinet are all in the closed position, and the secondary cable and the primary cable are used to reliably connect the generator car and the JK box in a plug-in and pull-out manner. The operator checks the vehicle through the generator car control device ZKQ to see if there is any abnormality, the generator car circuit breaker QFf is in the open position, and presses the generator car primary synchronous grid-connected power generation control button SB1; S3, start the diesel generator set and put the unit in standby mode, sample and adjust the output voltage Uf of the generator car according to the three-phase voltage Us on the pile head of QFj to achieve primary synchronization with the mains. After determining that the generator car meets the primary synchronization conditions, the control device ZKQ issues a closing command to close the generator car outlet circuit breaker QFf. At this time, the generator car is parallel to the mains and supplies power to the low-voltage load at the same time. S4, sample the three-phase voltage Us and current Is at the pile head of QFj, calculate the low-voltage load power Ps at this time, record the low-voltage load power at the moment before closing the switch as Ps1, and use it as the power benchmark for the generator car to generate electricity. The control device ZKQ adjusts and gradually increases the output power of the generator car to approach Ps1, and gradually transfers the low-voltage load from the city power to the generator car for power supply. At the same time, it also proves that the primary cable and secondary cable between the generator car and the JK box are reliably connected. S5. The control device ZKQ sends an opening command to QFj. QFj receives the opening command and performs the opening operation through its own electric operating mechanism JKd. The control device ZKQ detects whether the QFj status signal changes from the closing position to the opening position, and at the same time collects whether the three-phase current signal of the pile head on QFj disappears. Two different types of judgments prove that QFj has been reliably opened, and the control device ZKQ human-machine interface gives a prompt information of QFj reliable opening. At this time, the low-voltage load is completely independently powered by the generator car; S6. Open the JK box door, check and confirm again that QFj is in the open position, pull open the knife switch QSj, and after the pole head of QSj is tested and found to be without electricity, hang the ground wire PE, pull open the FF and QS on the high-voltage side of the distribution transformer T, and the distribution transformer T and 10kV medium-voltage line are gradually transferred to the maintenance state; S7. The generator car supplies power to the low-voltage load independently. After the maintenance of the distribution transformer T and the medium-voltage line is completed, the ground wire on the medium-voltage side of the distribution transformer T and the ground wire on the pile head of the JK box QSj are removed one by one. The FF, QS on the medium-voltage side of the distribution transformer T and the QFj and QSj in the JK box are all in the open position. The generator car needs to perform a secondary synchronous off-grid exit operation with the city power. The low-voltage load is powered by the generator car and switched to the city power to complete the secondary synchronous off-grid parking operation of the generator car.
2. According to claim 1, a method for one-key sequential control and off-grid uninterrupted power supply operation of a substation emergency power supply is characterized in that: In step S1, the JK box includes: 1 intelligent circuit breaker QFj, 1 knife switch QSj, a set of 4 ABCN panel-type quick interface devices and 1 multi-core aviation connector.
3. According to claim 1, a method for one-key sequential control and off-grid uninterrupted power supply operation of a substation emergency power supply is characterized in that: The steps S3-S5 are all automatically completed by the power generation vehicle control device ZKQ.
4. According to claim 1, a method for one-key sequential control and off-grid uninterrupted power supply operation of a substation emergency power supply is characterized in that: The step S6 is completed by manual operation.
5. According to claim 1, a method for one-key sequential control and off-grid uninterrupted power supply operation of a substation emergency power supply is characterized in that: The secondary synchronous off-grid parking operation of the power generation vehicle in step S7 specifically includes the following steps: T1. Manually confirm that all ground wires on both sides of distribution transformer T have been removed, close FF and QS on the medium voltage side of distribution transformer T, close QSj in JK box, and deliver city power to the pile head of QFj. The operator presses the secondary synchronous grid-connected power generation control button SB2 of the generator car on the control device ZKQ; T2, sampling and adjusting the output voltage of the generator car according to the three-phase voltage of the QFj pile head to achieve secondary synchronization with the city power. After judging that the generator car meets the secondary synchronization conditions, the control device ZKQ issues a closing command to close QFj. At this time, the city power and the generator car are in parallel and supply power to the low-voltage load at the same time. The control device ZKQ detects whether the QFj state signal changes from the open state to the closed state, and respectively collects the three-phase voltage and current of the pile heads of QFf and QFj, and calculates the power Pf and Ps provided by the generator car and the city power to the low-voltage load respectively, where the instantaneous power of the generator car after closing is recorded as Pf1; T3, the generator car gradually reduces its own power output Pf. If Ps is found to increase significantly, and the QFj closing position signal is closed, two different types of criteria can determine that QFj has been reliably closed, and the city power has reliably supplied power to the low-voltage load, and the low-voltage load is gradually transferred from the generator car to the city power supply. When the output of the generator car drops below 5% Pf1 of the low-voltage load, the control device ZKQ sends an opening command to QFf and stops the generator set to exit operation; T4. Manually unplug the primary cable and secondary cable to disconnect the electrical connection between the generator car and the JK box.
6. The method for one-key sequential control and off-grid uninterrupted power supply operation of a substation emergency power supply according to claim 5 is characterized in that: The steps T2 and T3 are both automatically completed by the ZKQ program of the power generation vehicle control device.
7. The method for one-key sequential control and off-grid uninterrupted power supply operation of a substation emergency power supply according to claim 2 is characterized in that: The intelligent circuit breaker QFj is equipped with an electric operating mechanism JKd, which receives node control signals to realize the closing and opening operations of QFj, and provides the state nodes of QFj's closing and opening to the outside. In order to ensure that JKd always has power during the entire switching operation, power is supplied to it from the lower pile head of QFj.
8. The method for one-key sequential control and off-grid uninterrupted power supply operation of a substation emergency power supply according to claim 2 is characterized in that: The ABCN panel-type quick interface device is divided into two parts, a plug and a socket. The socket part of the panel interface is provided on both the JK box and the generator car. The plug part of the ABCN panel-type quick interface device is installed at both ends of the flexible connecting cable. The four ABCN flexible cables are used to quickly connect the three-phase four-wire power lines between the JK box and the generator car by plugging and unplugging, avoiding the original long-time and live-working cable copper nose and bolt connection operation on the power receiving device.
9. The method for one-key sequential control and off-grid uninterrupted power supply operation of a substation emergency power supply according to claim 2 is characterized in that: The multi-core aviation connector is divided into two parts, a socket and a plug. Multi-core aviation plug sockets are arranged on both sides of the JK box and the generator car. The socket should have an anti-foolproof design to prevent the internal signal terminal from being inserted incorrectly. The JK box and the generator car are connected by a multi-core secondary cable with multi-core aviation plugs at both ends. The multi-core aviation plug and secondary cable are mainly used by the generator car to collect the three-phase voltage and three-phase current of the pile head ABC on QFj, and whether the QFj body is in the open state or the closed state, and the generator car sends an open command or a closing command to QFj.
10. The method for one-key sequential control and off-grid uninterrupted power supply operation of a substation emergency power supply according to claim 2, characterized in that: When the knife switch QSj is disconnected, an obvious disconnection point is provided, which is a necessary condition for power switching operation and maintenance safety measures. A grounding terminal PE is set on the upper pile head of QSj to facilitate the hanging of the grounding wire and provide grounding protection for the maintenance of the part above QSj.