Real-time live line measurement of current and voltage transformers

Real-time monitoring of the errors of current transformers and voltage transformers through GNSS time stamp technology solves the problem of electrical power and energy measurement errors in electricity billing, and improves the accuracy and efficiency of power grid management.

CN118749072APending Publication Date: 2024-10-08乌罗什·科瓦切维奇 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380023502.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-02-28
Filing Date
2023-02-27
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

Existing technology makes it difficult to accurately monitor and calibrate current transformers and voltage transformers in real time, leading to errors in electrical power and energy measurement and affecting the accuracy of power billing.

Method used

The Global Navigation Satellite System (GNSS) signal is used to assign timestamps to the upstream and downstream current and voltage data points, calculate the phase displacement error and ratio error of the transformer, and determine the sum of electrical power caused by the current transformer and voltage transformer through real-time data comparison. Energy measurement error, enabling online live measurement and calibration.

Benefits of technology

It realizes real-time live measurement of current transformers and voltage transformers, accurately determines errors in electrical power and energy transmission, and improves the accuracy of power billing and the efficiency of power grid management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118749072A_ABST
    Figure CN118749072A_ABST
Patent Text Reader

Abstract

An online live method analyzes characteristics of a substation (200). The method obtains a series of upstream current data points and a series of upstream voltage data points during a first time period using an upstream current sensor (330) and an upstream voltage sensor (430), and imparts respective GNSS timestamps to the data points provided by the first GNSS signal receiver and the second GNSS signal receiver. The method obtains a series of downstream current data points and a series of downstream voltage data points during a first time period using a downstream current sensor (340) and a downstream voltage sensor (440), and imparts respective GNSS timestamps to the data points provided by the third GNSS signal receiver and the fourth GNSS signal receiver. The method calculates a current transformer phase displacement error, a current transformer ratio error, a voltage transformer phase displacement error, and a voltage transformer ratio error. The method also calculates upstream active power data and reactive power data, and calculates downstream active power data and reactive power data.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] A method and related apparatus for obtaining real-time live measurements of the metrological characteristics of voltage transformers and current transformers is disclosed. Also disclosed is a method for using these real-time live measurements to determine error components of the measurement of electrical power and energy caused by current transformers, voltage transformers, and energy meters. Background Art

[0002] Current transformers and voltage transformers play a key role in power transmission and distribution networks.

[0003] Electricity can be transmitted from power stations at so-called extra-high voltage (usually above 400 kV). Electricity can be transmitted to industrial power plants and other energy-intensive facilities at so-called high voltage (at least 110 kV). Electricity can be distributed to urban networks at so-called medium voltage (below 110 kV and above 10 kV) and to consumers at household voltage (110 V or 230 V). The current flowing through the transmission and distribution networks can range from a few hundred amperes to several thousand amperes.

[0004] Therefore, the power grid uses a series of instrument transformers for both transforming voltage and transforming current.

[0005] Current transformers and voltage transformers may be provided with ratings that define the transformation performed by the instrument transformer.The metering performance of an instrument transformer may deteriorate over time relative to the nominal ratings.

[0006] When dealing with high wattages, small deviations from the actual rating of an instrument transformer can have a significant impact on the measurement uncertainty in power and energy measurements. This directly affects the accuracy of the measurement and billing of electrical power and energy.

[0007] It is known to perform live measurements on an electricity meter to determine errors in active and reactive power caused by an imperfect electricity meter. However, the errors in active and reactive power caused by an imperfect electricity meter may not be large compared to the errors in active and reactive power caused by voltage and current transformers.

[0008] Therefore, it is helpful to be able to make live measurements of voltage and current and calculate the error in the measurement of electrical power and energy when using instrument transformers. This method enables the transformer to be tested without being offline. Summary of the invention

[0009] In this context, a system for real-time live measurement of the characteristics of current transformer assemblies and voltage transformer assemblies is provided. This also enables the determination of the error between the expected power and energy transfer and the actual power and energy transfer.

[0010] In particular, in a first aspect of the present disclosure, there is provided an online live method for analyzing characteristics of a substation including a current transformer and a voltage transformer, the substation being configured to transform an upstream current and an upstream voltage into a downstream current and a downstream voltage, the method comprising:

[0011] obtaining a series of upstream current data points during a first time period using an upstream current sensor, and assigning each of the series of upstream current data points a timestamp provided by a first global navigation satellite system (GNSS) signal receiver;

[0012] obtaining a series of downstream current data points during a first time period using a downstream current sensor, and assigning each of the series of downstream current data points a timestamp provided by a second GNSS signal receiver;

[0013] obtaining a series of upstream voltage data points during a first time period using an upstream voltage sensor, and assigning each of the series of upstream voltage data points a timestamp provided by a third GNSS signal receiver;

[0014] obtaining a series of downstream voltage data points during a first time period using a downstream voltage sensor and assigning each of the series of upstream current data points a timestamp provided by a fourth GNSS signal receiver;

[0015] calculating a current transformer phase shift error between a series of time-stamped upstream current data points and a series of time-stamped downstream current data points;

[0016] calculating a current transformer ratio error by comparing a rated current ratio of the current transformer to a measured ratio determined using a series of time-stamped upstream current data points and a series of time-stamped downstream current data points;

[0017] calculating a voltage transformer phase shift error between a series of time-stamped upstream voltage data points and a series of time-stamped downstream voltage data points;

[0018] calculating a voltage transformer ratio error by comparing a rated voltage ratio of the voltage transformer to a measured voltage ratio determined using a series of time-stamped upstream voltage data points and a series of time-stamped downstream voltage data points;

[0019] generating calculated upstream active power data and reactive power data using the time-stamped series of upstream current data points and the time-stamped series of upstream voltage data points;

[0020] The time-stamped series of downstream current data points and the time-stamped series of downstream voltage data points are used to generate calculated downstream active power data and reactive power data.

[0021] In this way, the method enables the error components of the measurement of electrical power and energy caused by current transformers, voltage transformers and energy meters to be determined live in real time.

[0022] Optionally, the method may include using:

[0023] The calculated current transformer phase displacement error; and

[0024] Calculated current transformer ratio error;

[0025] To calculate the errors in active and reactive power measurement caused by current transformers.

[0026] Optionally, the method may include using:

[0027] calculated voltage transformer phase shift error; and

[0028] Calculated voltage transformer ratio error;

[0029] To calculate the errors in active and reactive power measurement caused by the voltage transformer.

[0030] Optionally, the method may include obtaining measured active power data and reactive power data from an electric meter downstream of the substation, the electric meter being configured to meter power supplied by the substation.

[0031] Optionally, the method may include using:

[0032] Calculated upstream active and reactive power data; and

[0033] Active and reactive power data from downstream electricity meters;

[0034] To calculate the total error of active power measurement and reactive power measurement.

[0035] Optionally, the method may include using:

[0036] Calculated downstream active and reactive power data; and

[0037] Active and reactive power data from downstream electricity meters;

[0038] To calculate the error components of the active power measurement and reactive power measurement of the downstream electricity meter.

[0039] In this way, the error of the actual active and reactive energy from the expected active and reactive energy can be quantified. Therefore, the error in the energy cost calculation can be used to correct for billing inaccuracies.

[0040] Optionally, the method may further include performing a calibration process to quantify an upstream current sensor error, a downstream current sensor error, an upstream voltage sensor error, and a downstream voltage sensor error.

[0041] Optionally:

[0042] A series of upstream current data points with time stamps are adjusted to compensate for upstream current sensor errors;

[0043] A series of downstream current data points with time stamps are adjusted to compensate for downstream current sensor errors;

[0044] A series of upstream voltage data points with time stamps adjusted to compensate for upstream voltage sensor errors; and

[0045] The time-stamped series of downstream voltage data points are adjusted to compensate for downstream voltage sensor errors.

[0046] Optionally, the measured ratio is the ratio of:

[0047] The RMS value of a series of upstream data points; and

[0048] The RMS value of a series of downstream data points.

[0049] Optionally, the current transformer phase shift error / voltage transformer phase shift error is proportional to the time difference between at least one pair of consecutive zero crossings of the time-stamped upstream data and the time-stamped downstream data, wherein the accuracy of the time reference is less than 100 nanoseconds and preferably approximately 10 nanoseconds.

[0050] Optionally, each of the upstream current or voltage data point stream and the downstream current or voltage data point stream comprises at least 20,000 data points per AC cycle, preferably 40,000 data points per AC cycle.

[0051] Optionally, the substation may be a three-phase substation;

[0052] Wherein, the current transformer and the voltage transformer are a first-phase current transformer and a first-phase voltage transformer;

[0053] Wherein, the three-phase substation includes a second-phase current transformer, a second-phase voltage transformer, a third-phase current transformer and a third-phase voltage transformer;

[0054] The method includes deploying the method described for a single phase on each of the three phases.

[0055] Optionally, the method deployment for the three phases is performed simultaneously on each of the three phases.

[0056] Optionally, the method includes one or both of the following:

[0057] Calculating upstream active energy data and reactive energy data using the calculated upstream active power data and reactive power data;

[0058] The downstream active energy data and reactive energy data are calculated using the calculated downstream active power data and reactive power data.

[0059] In a second aspect of the present disclosure, there is provided a kit of parts for performing the method, the kit of parts comprising:

[0060] an upstream current sensor module comprising an upstream current sensor and a first global navigation satellite system (GNSS) signal receiver, wherein the upstream current sensor is configured to obtain a series of upstream current data points during a first time period, and the first GNSS signal receiver is configured to assign a time stamp to each of the series of upstream current data points;

[0061] a downstream current sensor module comprising a downstream current sensor and a second GNSS signal receiver, wherein the downstream current sensor is configured to obtain a series of downstream current data points during a first time period, and the second GNSS signal receiver is configured to assign a time stamp to each of the series of downstream current data points;

[0062] an upstream voltage sensor module, the upstream voltage sensor module comprising an upstream voltage sensor and a first global navigation satellite system (GNSS) signal receiver, wherein the upstream voltage sensor is configured to obtain a series of upstream voltage data points during a first time period, and the first GNSS signal receiver is configured to assign a time stamp to each of the series of upstream voltage data points;

[0063] A downstream voltage sensor module includes a downstream voltage sensor and a second GNSS signal receiver, wherein the downstream voltage sensor is configured to obtain a series of downstream voltage data points during a first time period, and the second GNSS signal receiver is configured to assign a time stamp to each of the series of downstream voltage data points.

[0064] In this way, it is possible to determine the error components of the measurement of electric power and energy caused by current transformers, voltage transformers and energy meters in real time and live.

[0065] Optionally:

[0066] The upstream current sensor module further includes an upstream current measurement unit configured to digitize a series of upstream current data points;

[0067] The downstream current sensor module further includes a downstream current measurement unit configured to digitize a series of downstream current data points;

[0068] The upstream voltage sensor module further includes an upstream voltage measurement unit configured to digitize a series of upstream voltage data points;

[0069] The downstream voltage sensor module also includes a downstream voltage measurement unit configured to digitize a series of downstream voltage data points.

[0070] Optionally, each of the upstream current sensor module, the downstream current sensor module, the upstream voltage sensor module and the downstream voltage sensor module includes wireless communication functionality for receiving instructions regarding measurements to be performed and for transmitting a series of data points with timestamps for continued processing.

[0071] Optionally, one of the upstream current sensor module and the downstream current sensor module receives the time-stamped current data provided by the other of the upstream current sensor module and the downstream current sensor module and is configured to:

[0072] calculating a current transformer phase shift error between a time-stamped series of upstream current data points and a time-stamped series of downstream current data points; and

[0073] The current transformer ratio error is calculated by comparing the rated current ratio of the current transformer to a measured ratio determined using a time-stamped series of upstream current data points and a time-stamped series of downstream current data points.

[0074] Optionally, one of the upstream voltage sensor module and the downstream voltage sensor module receives the time-stamped voltage data provided by the other of the upstream voltage sensor module and the downstream voltage sensor module, and is configured to:

[0075] calculating a voltage transformer phase shift error between a time-stamped series of upstream voltage data points and a time-stamped series of downstream voltage data points; and

[0076] The voltage transformer ratio error is calculated by comparing the rated current ratio of the voltage transformer to a measured ratio determined using a time-stamped series of upstream voltage data points and a time-stamped series of downstream voltage data points.

[0077] Optionally, the kit further comprises a processor configured to receive:

[0078] Time-stamped current data provided by the upstream current sensor module;

[0079] Time-stamped current data provided by downstream current sensor modules;

[0080] time-stamped voltage data provided by an upstream voltage sensor module; and

[0081] Time-stamped voltage data provided by downstream voltage sensor modules;

[0082] And is configured as:

[0083] calculating a current transformer phase shift error between a time-stamped series of upstream current data points and a time-stamped series of downstream current data points; and

[0084] calculating a current transformer ratio error by comparing a rated current ratio of the current transformer to a measured current ratio determined using a series of time-stamped upstream current data points and a series of time-stamped downstream current data points;

[0085] calculating a voltage transformer phase shift error between a time-stamped series of upstream voltage data points and a time-stamped series of downstream voltage data points; and

[0086] The voltage transformer ratio error is calculated by comparing the rated voltage ratio of the voltage transformer to a measured voltage ratio determined using a time-stamped series of upstream voltage data points and a time-stamped series of downstream voltage data points.

[0087] Optionally, the processor is further configured to:

[0088] generating calculated upstream active power data and reactive power data using the time-stamped series of upstream current data points and the time-stamped series of upstream voltage data points;

[0089] The time-stamped series of downstream current data points and the time-stamped series of downstream voltage data points are used to generate calculated downstream active power data and reactive power data.

[0090] Optionally, the processor is further configured to calculate errors in active power measurement and reactive power measurement caused by the current transformer using the calculated current transformer phase shift error and the calculated current transformer ratio error.

[0091] Optionally, the processor is further configured to calculate errors in active power measurement and reactive power measurement caused by the voltage transformer using the calculated voltage transformer phase shift error and the calculated voltage transformer ratio error.

[0092] Optionally, the processor is further configured to obtain measured active power data and reactive power data from an electric meter downstream of the substation, the electric meter being configured to meter power supplied by the substation.

[0093] Optionally, the processor is also configured to calculate a total error in active power measurement and reactive power measurement using the calculated upstream active power data and reactive power data and the active power data and reactive power data from the downstream meter, and optionally, the processor is also configured to calculate an error component of the active power measurement and reactive power measurement of the downstream meter using the calculated downstream active power data and reactive power data and the active power data and reactive power data from the downstream meter.

[0094] Optionally, the processor is further configured to compensate for known errors in measurements provided by the upstream current sensor module, the downstream current sensor module, the upstream voltage sensor module, and the downstream voltage sensor module. BRIEF DESCRIPTION OF THE DRAWINGS

[0095] Embodiments of the present disclosure will now be described with reference to the following drawings:

[0096] Figure 1 shows a schematic representation of a portion of a power transmission / distribution network including current transformers and voltage transformers;

[0097] Figure 2 shows a schematic representation of a current transformer and an apparatus for measuring a current transformer according to the present disclosure;

[0098] Figure 3 shows a schematic representation of a voltage transformer and an apparatus for measuring a voltage transformer according to the present disclosure;

[0099] Figure 4 A primary current sensor module, a secondary current sensor module, a primary voltage sensor module and a secondary voltage sensor module for in-situ measurement of a current transformer and a voltage transformer are shown;

[0100] Figure 5 A high-level flow chart is shown illustrating aspects of a method of the present disclosure for measuring a current transformer or a voltage transformer;

[0101] Figure 6 In more detail, the current transformer is shown Figure 5 The measurement unit of the flowchart;

[0102] Figure 7 In more detail, the measurement of voltage transformers is shown. Figure 5 The measurement unit of the flowchart;

[0103] Figure 8 shows a schematic representation of determining current transformer, voltage transformer, and energy meter accuracy using data determined from a primary current sensor module, a secondary current sensor module, a primary voltage sensor module, and a secondary voltage sensor module;

[0104] Fig. 9 Schematically represents data used to calculate the high voltage side power error;

[0105] Fig.10 Schematically represents data used to calculate current transformer error;

[0106] Fig.11 schematically represents data used to calculate voltage transformer errors;

[0107] Fig.12 Schematically represents data used to calculate the low voltage side power error;

[0108] Fig.13 shows a schematic representation of an upstream / primary current sensor module according to the present disclosure;

[0109] Fig.14 shows a schematic representation of a downstream / secondary current sensor module according to the present disclosure;

[0110] Fig.15 shows a schematic representation of an upstream / primary voltage sensor module according to the present disclosure;

[0111] Fig.16 shows a schematic representation of a downstream / secondary voltage sensor module according to the present disclosure;

[0112] Fig.17 An edge gateway device is shown;

[0113] Fig.18 shows a simplified electrical scheme, by which one can obtain Fig.13 and Fig.14 , wherein one of the pair of current sensor modules is a primary current sensing module and the other of the pair of current sensor modules is a secondary current sensing module;

[0114] Fig.19 shows a simplified electrical scheme, by which one can obtain Fig.15 and Fig.16 , wherein one of the pair of voltage sensor modules is a primary voltage sensing module and the other of the pair of voltage sensor modules is a secondary voltage sensing module;

[0115] Fig.20a and Fig.20b An example of using linear interpolation to accurately determine the result data of the current sensing module is shown;

[0116] Fig.21a and Figure 21b An example of using linear interpolation to accurately determine the result data of the voltage sensing module is shown; and

[0117] Fig. 22 A schematic representation of the deployment of the method of the present disclosure in the context of a three-phase system is shown. DETAILED DESCRIPTION

[0118] Figure 1 Shown is a schematic representation of a portion of a power transmission or distribution network comprising a current transformer (CTx) 300 and a voltage transformer (VTx) 400. The power transmission or distribution network may operate at medium voltage (MV), high voltage (HV) or extra high voltage (EHV).

[0119] The upstream conductors may be part of a longer distance power network at medium or high voltage and high current. The downstream conductors may be used for local power supply at lower voltage and lower current over shorter distances, for example in the context of power meters, protection relays, SCADA systems, PMU systems. High voltage may be between approximately 1 kV and 1000 kV. Low voltage may be approximately 100 V, V, 110V, 200V, V or similar. The current flowing through the transmission / distribution network can be from hundreds of amperes to thousands of amperes. The current flowing through the low voltage network can be 1 ampere to 5 amperes.

[0120] The method of the present disclosure is also applicable to the case where the voltage of the upstream conductor is lower than that of the downstream conductor. However, the example described here is based on the voltage of the upstream conductor being higher than that of the downstream conductor.

[0121] The current transformer 300 and the voltage transformer 400 may together form a substation 200 for supplying power to a downstream power grid 500. The downstream power grid 500 may include an electric meter 510.

[0122] Figure 2 Shown is a schematic representation of a current transformer 300 (isolated from a voltage transformer 400) and an arrangement for measuring the current transformer.

[0123] exist Figure 2In the arrangement, the current transformer under test 300 can be configured to transform the upstream current in the upstream conductor 310 (which can be part of a longer distance power network at higher current and medium or high voltage) into a downstream current in the downstream conductor 320 (for local power supply over shorter distances at lower current and low voltage, for example in the context of power meters, protection relays, SCADA systems, PMU systems).

[0124] The upstream sensing module 330 (also referred to as the primary sensing module) is positioned to sense the upstream conductor 310. The downstream sensing module 340 (also referred to as the secondary sensing module) is positioned to sense the downstream conductor 320.

[0125] Signals from a GNSS (eg, GPS 350) are received by the upstream sensing module 330 and the downstream sensing module 340, respectively. As such, the current data values ​​sensed by the upstream sensing module 330 and the downstream sensing module 340 are each given a highly accurate time stamp provided by the GNSS signal.

[0126] The time stamped upstream current data value from the upstream current sensing module 330 may be transmitted to the secondary current sensing module 340. Alternatively, the time stamped upstream current data value and the time stamped downstream current data value may be transmitted to a separate processor (e.g., labeled edge gateway device 600) or mobile device 370 or cloud server 360. In any case, the time stamped upstream current data value and the time stamped downstream current data value are aggregated and used to determine a ratio error and a phase shift error between the upstream current and the downstream current.

[0127] The measured current ratio error may be the ratio of the RMS value of a series of upstream current data points to the RMS value of a series of downstream current data points. Similarly, the measured voltage ratio error may be the ratio of the RMS value of a series of upstream voltage data points to the RMS value of a series of downstream voltage data points.

[0128] The current transformer phase shift error is proportional to the time difference between at least one pair of consecutive zero crossings of the time-stamped upstream current data and the time-stamped downstream current data. The accuracy of the time reference may be less than 100 nanoseconds, and preferably about 10 nanoseconds. Similarly, the voltage transformer phase shift error is proportional to the time difference between at least one pair of consecutive zero crossings of the time-stamped upstream voltage data and the time-stamped downstream voltage data. The accuracy of the time reference may be less than 100 nanoseconds, and preferably about 10 nanoseconds.

[0129] Each of the upstream current data point stream and the downstream current data point stream comprises at least 20,000 data points per AC cycle, preferably 40,000 data points per AC cycle. Similarly, each of the upstream voltage data point stream and the downstream voltage data point stream comprises at least 20,000 data points per AC cycle, preferably 40,000 data points per AC cycle.

[0130] Example hardware that may be deployed for the upstream current sensing module and the downstream current sensing module is described at the end of this specification and in Fig.13 and Fig.14 Schematically shown in FIG. 1 and discussed in more detail later.

[0131] Figure 3 Shown is a schematic representation of a voltage transformer 400 (isolated from the current transformer 300) and an arrangement for measuring the voltage transformer.

[0132] exist Figure 3 In the arrangement, the voltage transformer under test 400 is configured to transform an upstream voltage Up(t) (between an upstream conductor 410 and ground) into a downstream voltage Us(t) (between a first conductor 422 and a second conductor 424 forming a downstream circuit 420).

[0133] The upstream voltage sensing module 430 is attached between the upstream conductor 410 and ground. The downstream voltage sensing module 440 is attached between the first conductor 422 and the second conductor 424 forming a downstream circuit.

[0134] Signals from GNSS (eg, GPS 450) are received by upstream voltage sensing module 430 and downstream voltage sensing module 440, respectively. Thus, the voltage data values ​​sensed by upstream voltage sensing module 430 and downstream voltage sensing module 440 are each given a highly accurate time stamp provided by the GNSS signal.

[0135] The time stamped upstream voltage data value from the upstream voltage sensing module 430 may be transmitted to the downstream voltage sensing module 440. Alternatively, the time stamped upstream voltage data value and the time stamped downstream voltage data value may be transmitted to a separate processor (e.g., labeled edge gateway device 600) or mobile device 370 or cloud server 360. In any case, the time stamped upstream voltage data value and the time stamped downstream voltage data value are aggregated and used to determine a ratio error and a phase shift error between the upstream voltage and the downstream voltage.

[0136] Example hardware that may be deployed for the upstream voltage sensing module and the downstream voltage sensing module is described at the end of this specification and in Fig.15 and Fig.16 Schematically shown in FIG. 1 and discussed in more detail later.

[0137] Figure 4 Shown with Figure 1 The substation is similar to the substation 200, and current transformer testing and voltage transformer testing are carried out simultaneously.

[0138] Figure 5 shows the process performed to measure the current transformer 300 ( Figure 2 ) or voltage transformer 400( Figure 3 ) is a high level schematic representation of method 100 of the characteristics of FIG. Figure 5 A high level schematic representation of the substation 200 ( Figure 1 and Figure 4 ) to determine error components of electrical power and energy caused by a current transformer 300, a voltage transformer 400 and an electric meter 510, the electric meter 510 being configured to meter the electrical power supply at a substation.

[0139] The method 100 includes a sensing module selection step 110. In particular, this step includes selecting an appropriate upstream sensing module to sense the current / voltage in an upstream conductor upstream of the current / voltage transformer under test. This step also includes selecting an appropriate downstream sensing module to sense the current / voltage in a downstream conductor downstream of the current / voltage transformer under test. In each case, the sensing module needs to be suitable for the geometry of the relevant conductor and for the magnitude of the current carried in the relevant conductor.

[0140] At step 120, a calibration process is performed. This is explained in more detail below. For some tests, it may be necessary to perform a calibration process on a particular pair of sensing modules that have been selected. The frequency with which calibration is performed will depend on a variety of factors.

[0141] At step 130, a global navigation satellite system (GNSS), such as the Global Positioning System (GPS) TM ) receives a signal. The signal includes highly accurate and precise time information that enables events to be assigned a precise and accurate time within 10ns.

[0142] At step 140 , a measurement is performed by each of the two current / voltage sensing modules. Figure 6 The measurement steps for current sensing are described in more detail, and Figure 7 The measurement steps for voltage sensing are described in more detail.For each sensing module, a large number of current / voltage readings are taken and each reading is given an accurate time stamp as provided by the GNSS signal.

[0143] In a first option, one sensing module (which is configured to measure upstream current / voltage or configured to measure downstream current / voltage) can be configured to transmit its time-stamped data points to another sensing module. The receiving sensing module can then be configured to package the time-stamped data points from both the upstream sensing module and the downstream sensing module and output the aggregated data.

[0144] In a preferred implementation of the first option, the sensing module that receives and aggregates the data is a sensor configured to measure the lower of the two currents / voltages. This is because the higher current / voltage may be at a higher voltage and generate more electromagnetic interference than the lower current / voltage. Therefore, it may be appropriate to perform fewer functions in locations where electromagnetic interference is higher, and more functions in locations where the voltage is lower and the electromagnetic interference is lower.

[0145] In a second option, instead of sending data from one sensing module to another sensing module, all time-stamped data can be sent from the sensing module to a processor independent of the sensing module, such as an edge gateway device 600, a mobile device 370 for processing, or to a cloud server 360 for processing.

[0146] Back to Figure 5 , the aggregated data is used to calculate the current / voltage transformer ratio error ε ctx / ε vtx and current / voltage transformer phase shift error

[0147] Current / voltage transformer ratio error ε CTx / ε VTx and current / voltage transformer phase shift error The calculation of the test also requires additional information related to the test type. This information can be obtained by the user using Figure 2 (current) or Figure 3 (voltage) is provided by the mobile device 370 shown in FIG. The user-provided information may be provided back to the sensing module and on to the processor.

[0148] This information will include details of the current / voltage transformer being tested and details of the type of test being performed.

[0149] For current transformers, this information may include:

[0150] k nCTx ——Rated transformation ratio of the current transformer under test

[0151] k ns ——Rated transformation ratio of the sensor

[0152] Measurement types, including:

[0153] Number of measurements,

[0154] Measuring time interval,

[0155] Measuring mode (slow / fast).

[0156] k nCTtx and k ns For selecting the appropriate calibration table and calculating ε CTx and

[0157] The current ratio error ε is defined as:

[0158]

[0159] Voltage phase shift error is defined as:

[0160]

[0161] in:

[0162] k n is the rated transformation ratio (k n =I pn / I sn ),

[0163] I pn ,I sn are the rated values ​​of primary and secondary currents respectively,

[0164] I p ,I s are the effective values ​​(true RMS) of the primary and secondary currents, respectively,

[0165] f is the fundamental power frequency of the current in the network (50Hz or 60Hz),

[0166] t 0p and t 0s are the consecutive zero-crossing times (points) of the primary current and the secondary current respectively.

[0167] Relative current

[0168] It can also perform error compensation and correction (in Figure 5 In an embodiment, this is performed on the cloud server 360), as further explained below.

[0169] For voltage transformers, this information may include:

[0170] k nVTx ——Rated transformation ratio of the voltage transformer under test

[0171] k ns - Rated ratio of the sensor, measurement type, including:

[0172] Number of measurements,

[0173] Measuring time interval,

[0174] Measuring mode (slow / fast).

[0175] k nVTx and k ns For selecting the appropriate calibration table and calculating ε VTx and

[0176] The voltage ratio error ε is defined as:

[0177]

[0178] Voltage phase shift error is defined as:

[0179]

[0180] in:

[0181] k n is the rated transformation ratio (k n =V pn / V sn ),

[0182] V pn 、V sn are the rated values ​​of the primary and secondary voltages, respectively,

[0183] V p 、V s are the effective values ​​(true RMS) of the primary and secondary voltages, respectively,

[0184] f is the fundamental power frequency of the voltage in the network (50Hz or 60Hz),

[0185] t 0p and t 0s are the consecutive zero-crossing times (points) of the primary voltage and the secondary voltage respectively.

[0186] Relative voltage

[0187] It is also possible to perform error compensation and correction on the sensed data (in Figure 5 In an embodiment, this is performed in the cloud server 360) to take into account known inaccuracies in the sensing modules, as further explained below.

[0188] Figure 4Four sensing modules (upstream current sensing module 330 , downstream current sensing module 340 , upstream voltage sensing module 430 , and downstream voltage sensing module 440 ) are shown in situ taking measurements on substation 200 .

[0189] Figure 8 Shows from Figure 4 How the data obtained by the four sensing modules (330, 340, 430, 440) are transmitted together with the data from the electric meter 510 for subsequent calculation.

[0190] A further application of the data obtained from the sensing module may be for calculating active power data and reactive power data.Another application may be for calculating active energy data and reactive energy data.

[0191] The active electric power P and reactive electric power Q are calculated using the following formulas:

[0192] P=U*I*cos(θ) Formula 5

[0193] Q=U*I*sin(θ) Formula 6

[0194] in:

[0195] U = RMS value of voltage

[0196] I = RMS value of current

[0197] cos(θ)=load power factor

[0198] (θ p = Angle between primary current and primary voltage

[0199] θ s = the angle between the secondary current and the secondary voltage)

[0200] Then, the active energy E Wh and reactive energy E VArh The calculations are as follows:

[0201] E Wh =P*Δt Formula 7

[0202] E VArh =Q*Δt Formula 8

[0203] Where Δt is the time interval for calculating the energy.

[0204] By using the method of the present invention, not only can the active energy and / or power and the reactive energy and / or power be measured, but also the errors of the expected active energy / power data and the reactive energy / power data caused by the current transformers, voltage transformers and energy meters for grid metering and billing can be quantified individually. In addition, these errors can be determined live in real time under actual operating conditions (with actual current, voltage and power factor) and actual loads of the secondary circuits of the current transformers and voltage transformers.

[0205] Total error in the measurement of consumed electrical energy / power (active or reactive) measured by indirect methods (e p , e q ) consists of three components: the measurement error of the current transformer Measurement error of voltage transformer and the measurement error of the low voltage side energy meter

[0206] This is expressed in the following formula.

[0207] Total error in active electrical power measurement:

[0208]

[0209] Total error in reactive electrical power measurement:

[0210]

[0211] in:

[0212]

[0213]

[0214] as well as

[0215]

[0216] The evaluation of the total error may be performed by four separate processes, each of which uses data from some of the sensing modules and from others of the processes.

[0217] The four processes are high voltage data processing, current transformer data processing, voltage transformer data processing and low voltage data processing.

[0218] Fig. 9 A schematic representation of high voltage data processing is shown.

[0219] Fig.10 A schematic representation of current transformer data processing is shown.

[0220] Fig.11A schematic representation of voltage transformer data processing is shown.

[0221] Fig.12 A schematic representation of low voltage data processing is shown.

[0222] High Voltage Data Processing ( Fig. 9 )

[0223] High voltage data processing is used to determine the total error in the electric power calculations at MV and HV by comparing the results with the measurements shown by the electric power meter at low voltage.

[0224] Therefore, the total error of the measurement of active power or reactive power is determined as e p (%) and e q (%).

[0225] High voltage data processing uses equations 5 and 6 to determine the active power P on the high voltage side. HV and reactive power Q HV .

[0226] Therefore, the digitized time-synchronized primary current data values ​​i from the PCSM and PVSM are used. p(n) * The primary voltage data value u is synchronized with the digital time p(n) * , and upload the meter indication under LV, high voltage data processing calculation e p (%), e q (%). (It should be noted that i p(n) * and u p(n) * In * denotes that these are their corresponding analog counterparts as obtained by the sensor i p(n) and u p(n) The digitized value of .

[0227] High voltage data processing measurements:

[0228] I p and U p The RMS value of

[0229] Zero crossing t 0ip and t 0up , then calculate θ p =w*Δt=2πf*(t 0ip -t 0up ).

[0230] Then, using Equation 5 and Equation 6:

[0231] P HV =Up*Ip*cos(θp )

[0232] Q HV =Up*Ip*sin(θ p )

[0233] In addition, the active power and reactive power values ​​measured by the energy meter under LV (P EM and Q EM ) is obtained from the LV energy meter.

[0234] The total error in the electrical power measurement is then calculated as:

[0235] Total error in active electrical power measurement as well as

[0236] Total error in reactive power measurement Current transformer data processing ( Fig.10 )

[0237] Current transformer data processing is used to determine the amplitude error ε of the current transformer under test CTx and phase shift error Therefore, the error components of the measurement of active and reactive power caused by the current transformer can be calculated: and

[0238] Therefore, the digitized time-synchronized primary current data values ​​i from the PCSM and SCSM are used p(n) * The secondary current data value i is synchronized with the digitized time s(n) * , and upload the load power factor θ from the high voltage data processing p , Current transformer data processing calculation

[0239] Current transformer data processing converts the current transformer ratio error ε CTx (%) and phase shift error (As explained in more detail below, these values ​​may be measured values ​​that are corrected to compensate for errors of the current sensing module. Error compensation may be obtained by calibration of the current sensing module, as explained elsewhere.)

[0240] Then, the error component of the active power measurement caused by the measured current transformer is The calculation is as follows:

[0241]

[0242] in

[0243] Then, the error component of the reactive power measurement caused by the measured current transformer is The calculation is as follows:

[0244]

[0245] in Voltage transformer data processing ( Fig.11 )

[0246] Voltage transformer data processing is used to determine the amplitude error ε of the voltage transformer under test VTx and phase shift error Therefore, the error components of the active and reactive power measurements caused by the voltage transformer under test can be calculated: and

[0247] Therefore, the digitized time-synchronized primary voltage data values ​​u from the PVSM and SVSM are used, respectively. p(n) * The secondary voltage data value u is synchronized with the digitized time s(n) * , and upload the load power factor θ from the high voltage data processing p , voltage transformer data processing calculation

[0248] The voltage transformer data processing converts the ratio error ε of the voltage transformer into VTx (%) and phase shift error (As explained in more detail below, these values ​​may be measured values ​​that are corrected to compensate for errors of the current sensing module. Error compensation may be obtained by calibration of the current sensing module, as explained elsewhere.)

[0249] Then, the error component of the active power measurement caused by the voltage transformer under test is The calculation is as follows:

[0250]

[0251] in

[0252] Then, the error component of the reactive power measurement caused by the voltage transformer under test is The calculation is as follows:

[0253]

[0254] in Low Voltage Data Processing ( Fig.12 )

[0255] The low voltage data processing is used to determine the error in the LV electric power calculation by comparing the result with the measured value shown by the electric power meter at low voltage.

[0256] Therefore, the measurement error of active power or reactive power caused by the measured electric meter is determined as and

[0257] Low voltage data processing uses equations 5 and 6 to determine the active power P on the low voltage side. LV and reactive power Q LV .

[0258] Therefore, using the digitized time-synchronized secondary current data i from the SCSM and SVSM, respectively s(n) * The secondary voltage data value u is synchronized with the digitized time s(n) * , and upload the meter indication under LV, low voltage data processing calculation

[0259] Low voltage data processing measurements:

[0260] I s and U s RMS value

[0261] Zero crossing t 0is and t 0us

[0262] Then calculate θ s =w*Δt=2πf*(t 0is -t 0us )

[0263] Then, using Equations 5 and 6, the active and reactive energies on the low voltage side (P LV and Q LV ) is calculated as follows:

[0264] P LV =k nVTx *U s *k nCTx *I s *cos(θ s )

[0265] Q LV =k nVTx *U s *k nCTx *I s *sin(θ s )

[0266] In addition, the active power and reactive power values ​​measured by the energy meter under LV (PEM and Q EM ) is obtained from the LV energy meter.

[0267] Then, the error component for active energy caused by the energy meter is and the error component for the reactive energy The calculation is as follows:

[0268]

[0269] hardware

[0270] Aspects of the hardware of the primary / upstream current sensing module (PCSM) 330 , the secondary / downstream sensing module (SCSM) 340 , the primary / upstream voltage sensing module (PVSM) 430 , and the secondary / downstream voltage sensing module (SVSM) 440 are now described.

[0271] Fig.13 and Fig.14 A high-level schematic diagram of features of the primary current sensing module 330 and the secondary current sensing module 340 is shown, respectively. Each of the primary current sensing module 330 and the secondary current sensing module 340 may include a sensor 331, a measurement unit 332, a battery 333, a control unit 334, a memory unit 335, and an interface unit 336. The interface unit 336 may include a GNSS interface device 337, a radio frequency (RF) interface device 338, and a WiFi interface device 339. The GNSS interface device 337 may be configured to receive GNSS data, including timestamp data. The sensor 331 may be configured to obtain analog current data. The measurement unit 332 may be configured to convert the analog current data into digital current data. The control unit 334 may be configured to ensure that each current data point is given a timestamp provided via the GNSS interface device 337. The RF interface device 338 and / or the WiFi device interface 339 can be configured to transmit / receive timestamped current data from one current sensing module (e.g., primary / secondary sensing module) to another current sensing module (e.g., secondary / primary sensing module) and / or transmit timestamped current data to the edge gateway device 600 and / or to the cloud server 360.

[0272] In some embodiments, the aggregation and alignment of the time-stamped primary and secondary current data may occur in one of the PCSM and the SCSM. Alternatively, the aggregation and alignment of the time-stamped primary and secondary current data may be performed externally, such as in a PCSM. Figure 4 and Figure 8 The process is performed in a so-called edge gateway device 600 shown in FIG.

[0273] Fig.15 and Fig.16A high-level schematic diagram of features of the primary voltage sensing module 430 and the secondary voltage sensing module 440 is shown, respectively. Each of the primary voltage sensing module 430 and the secondary voltage sensing module 440 may include a sensor 441, a measurement unit 442, a battery 443, a control unit 444, a memory unit 445, and an interface unit 446. The interface unit 446 may include a GNSS interface device 447, a radio frequency (RF) interface device 448, and a WiFi interface device 449. The GNSS interface device 447 may be configured to receive GNSS data, including timestamp data. The sensor 441 may be configured to obtain analog voltage data. The measurement unit 442 may be configured to convert the analog voltage data into digital voltage data. The control unit 444 may be configured to ensure that each voltage data point is given a timestamp provided via the GNSS interface device 447. The RF interface device 448 and / or the WiFi device interface 449 can be configured to transmit / receive timestamped voltage data from one sensing module (e.g., primary / secondary sensing module) to another voltage sensing module (e.g., secondary / primary sensing module) and / or transmit timestamped voltage data to the edge gateway device 600 and / or to the cloud server 360.

[0274] In some embodiments, the aggregation and alignment of the time-stamped primary and secondary current data may occur in one of the PVSM 430 and the SVSM 440. Alternatively, the aggregation and alignment of the time-stamped primary and secondary current data may be performed externally, such as in a Figure 4 and Figure 8 The process is performed in a so-called edge gateway device 600 shown in FIG.

[0275] It should be noted that while the aggregation and alignment of the timestamped current and voltage data streams can be performed anywhere (e.g., remotely in the cloud), the timestamping of the current or voltage data is not. In particular, each of the primary and secondary current and voltage sensing modules 330, 340, 430, 440 has its own GNSS interface device 337, 447, and the timestamping of the current / voltage data is performed in the sensing module 330, 340, 430, 440 on which the current / voltage sensing is performed, rather than remotely. This maximizes the accuracy of the timestamping of each current / voltage data point.

[0276] Fig.17An edge gateway device 600 is shown, which may include a processor configured to aggregate and align data provided by the primary current sensing module 330, the secondary current sensing module 340, the primary voltage sensing module 430, and the secondary voltage sensing module 440. The edge gateway device 600 may be configured to package the data, or data derived therefrom, for onward transmission to, for example, a cloud server 360.

[0277] The edge gateway device 600 includes a battery 643, a control unit 644, a memory unit 645, and an interface unit 646. The interface unit 646 includes a radio frequency (RF) interface device 648 and a WiFi device interface 649. One or both of the radio frequency (RF) interface device 648 and the WiFi device interface 649 may be configured to receive time-stamped data from any one of the primary current sensing module 330, the secondary current sensing module 340, the primary voltage sensing module 430, and the secondary voltage sensing module 440. The WiFi device interface 649 may be configured to receive data from a user and / or a server, and may also be configured to transmit data to a user and / or a server.

[0278] Calibration of a pair of primary current sensing modules and secondary current sensing modules

[0279] Fig.18 A calibration setup is shown that can be used to calibrate a pair of primary and secondary current sensing modules. In view of the high accuracy required by the test method, it is necessary to ensure that the sensing device is correctly calibrated.

[0280] The calibration setup includes an AC current source 910 and a series circuit 920 including a coil 930. The calibration process requires the primary current sensing module 330 to sense the current in the coil 930, and the secondary current sensing module 340 to simultaneously be used to sense the current elsewhere in the circuit 320. In this way, errors from the measurement device can be quantified and removed from the calculation of the error in the behavior of the current transformer being measured.

[0281] Fig.18 The coil in (N=Kn) should ensure that the current flowing through the primary current sensing module is kn times the current flowing through the secondary current sensing module.

[0282] Therefore, a coil with N=Kn turns simulates a CTx with a transformation ratio of kn. The coil with N=kn acts as a standard transformer and can have a smaller ratio error and a smaller phase shift error.

[0283] When calibrating a coil with N=kn turns with a smaller standard transformer error, the errors of the test system are recorded. These errors are transmitted to a software error compensation and correction (SECC) block, which can be located on the cloud server 360, such as Figure 1 These error values ​​are then used by the SECC to compensate for the known errors when testing a CTx with a transformation ratio kn under actual operating conditions.

[0284] In more detail, as part of the calibration process, a series of time-stamped upstream current data points and a series of time-stamped downstream current data points are obtained to populate a calibration table (LUT lookup table) comprising rows and columns. The number of columns can be equal to the number of calibration points obtained during the calibration process, wherein each calibration point can be at a different relative current depending on the current supplied by the AC current source 910. Each calibration point K from the first (1) to the last (n) contains three data points: the relative current at calibration point k (i k ), the ratio error of the system at the calibration point k (ε k ), the phase shift error of the system at the calibration point k For each k∈(1,n), a set of calibration values ​​is formed

[0285] The number of calibration points (n) and the relative current value (i k ) can be selected arbitrarily. The preferred values ​​of n can be n=5, 10, 15, and i k The values ​​are a minimum of 0.05 and a maximum of 1.5 of the rated primary current.

[0286] The compensation value is determined based on linear interpolation between two known consecutive calibration points from the calibration table, as shown in FIG20 .

[0287] Calibration of a pair of primary and secondary voltage sensing modules

[0288] Fig.19 There is shown a calibration setup that can be used to calibrate a pair of primary voltage sensing modules 430 and secondary voltage sensing modules 440. In view of the high accuracy required by the testing method, it is necessary to ensure that the sensing device is properly calibrated.

[0289] The calibration circuit 900 includes an AC high voltage source 910 and a high voltage conductor 920. The high voltage conductor 920 includes a transformer with a transformation ratio K n The calibration process requires the primary voltage sensing module 430 to sense the voltage at the high voltage conductor 920 and the secondary voltage sensing module 440 to simultaneously sense the voltage at the low voltage side of the standard high voltage transformer 930.

[0290] The standard high-voltage transformer VTs 930 is selected to have the same rated ratio Knvtx as the rated ratio Knvtx of the transformer VTx 400 to be tested. nHowever, the standard high voltage transformer VTs 930 is selected due to its smaller ratio error and phase shift error, and its accuracy level is at least 0.05%. Therefore, when the calibration is performed, the error in sensing is attributed to the primary voltage sensing module 430 and the secondary voltage sensing module 440, rather than the standard high voltage transformer VTs 930. The error determined in this manner is transmitted to a software error compensation and correction (SECC) block, which can be located on the cloud server 360, such as Figure 1 shown.

[0291] Then, when the primary voltage sensing module 430 and the secondary voltage sensing module 440 are used to test the voltage transformer (VTx) under actual operating conditions, the SECC effectively removes the errors obtained in the calibration process from the measured data so as to obtain the ratio error and phase shift error (and thus the transformation ratio K) of the measured VTx. nvtx ) provides high accuracy.

[0292] In more detail, the calibration process involves obtaining a series of time-stamped upstream voltage data points and a series of time-stamped downstream voltage data points of the VTs to populate a calibration table (LUT lookup table) including rows and columns. The number of columns can be equal to the number of calibration points obtained during the calibration process, wherein each calibration point can be at a different relative voltage depending on the voltage supplied by the AC high voltage source 910. Each calibration point K from the first (1) to the last (n) contains three data points: for each k∈(1,n), the relative voltage (u) at the calibration point k k ), the ratio error of the system at the calibration point k (ε k ), the phase shift error of the system at the calibration point k In this way, a set of calibration values ​​is formed

[0293] The number of calibration points (n) and the relative voltage value (u k ) can be selected arbitrarily. The preferred values ​​of n can be n=5, 10, 15, and u k Values ​​are a minimum of 0.1 and a maximum of 1.2 of the rated primary voltage.

[0294] Once the primary voltage sensing module 430 and the secondary voltage sensing module 440 are located at their respective positions on either side of the voltage transformer VTx 400 under test, time-stamped upstream voltage data points and downstream voltage data points are obtained from the primary voltage sensing module 430 and the secondary voltage sensing module 440, and the measured ratio error, phase shift error, and relative voltage are calculated using the uncompensated values.

[0295] Next, the calibration data obtained through the calibration process is used to remove the known errors.

[0296] In this way, highly accurate ratio error and phase shift error of the voltage transformer under test can be obtained.

[0297] The compensation value is determined based on linear interpolation between two known consecutive calibration points from the calibration table, as shown in Figure 21.

[0298] Linear interpolation method for obtaining compensation values ​​from calibration data

[0299] An example of a calibration table (in this case for a voltage sensor, but the same principles apply to a current sensor) is provided in Table 1, showing five calibration points:

[0300]

[0301] Table 1

[0302] The following is an explanation of how calibration values ​​can be used to compensate and correct known errors.

[0303] like Fig.21a and Figure 21b As shown, the compensation value ε for any relative value of the primary voltage (u=Up / Upn) is determined based on linear interpolation between two known consecutive calibration points (k and k+1) from the calibration table. c and

[0304] The actual relative value of the primary voltage (u=Up / Upn) can be u k+1 ≥u≥u k , where k is the kth calibration point.

[0305] Use as Fig.21a and Figure 21b The linear interpolation shown, ε c and The calculation is as follows:

[0306] For u k+1 ≥u≥u k ;

[0307] For u=u k ; ε c =ε k ;

[0308] For u=u k+1 ; ε c =ε k+1 ;

[0309] If u<u1, the linear extrapolation uses the calibration points u1 and u2.

[0310] If u>u n , then the linear extrapolation uses the calibration point u n-1 and u n .

[0311] ε ctx =ε m -ε c

[0312]

[0313] An exemplary dataset of SECC results is shown in Table 3:

[0314]

[0315] Table 2

[0316] in:

[0317] ε m and - measured values ​​of ratio error and phase shift error,

[0318] ε c and ——Compensation value of ratio error and phase shift error,

[0319] ε VTx and ——The values ​​of the ratio error and phase shift error of the voltage transformer under test.

[0320] exist Fig.21a In FIG. 1 , curve 1 represents the ratio error of the test system before calibration as a function of relative voltage, and curve 2 represents the ratio error of the test system after calibration.

[0321] exist Figure 21b In FIG. 1 , curve 1 represents the phase shift error of the test system before calibration as a function of relative voltage, and curve 2 represents the phase shift error of the test system after calibration.

[0322] The authors demonstrate through extensive experiments that the proposed calibration and correction methods improve the accuracy of the test system by whole orders of magnitude.

[0323] Working example of the method for determining the error components when measuring active and reactive power under real conditions in a 110 kV substation

[0324] In such Figure 4 In the substation shown, the total error in the measurement of active and reactive power is a combination of:

[0325] 1. Errors in measuring active power and reactive power caused by current transformers

[0326] 2. Errors in the measurement of active power and reactive power caused by voltage transformers

[0327] 3. Errors in measuring active power and reactive power caused by the meter

[0328] A practical working example was performed by carrying out the method of the present disclosure on a 110 kV substation.

[0329] The characteristics of the equipment installed at the point where the measurements are performed are as follows:

[0330] Electric meter: accuracy level 0.1%

[0331] Current transformer:

[0332] Nominal rated voltage U pn =110kV, nominal rated current 400A

[0333] Nominal rated ratio

[0334] The accuracy level of the measuring core is 0.5;

[0335] Voltage transformer:

[0336] Nominal rated voltage U pn 110kV

[0337] Nominal rated ratio

[0338] The accuracy level of the measuring core is 0.5;

[0339] Live measurements are performed under actual operating conditions, with actual secondary loads, without untying the conductors.

[0340] Table 3 shows the actual measurement results obtained from all of the following items: High Voltage Data Processing ( Fig. 9 )、Current transformer data processing( Fig.10 )、voltage transformer data processing( Fig.11 ) and low voltage data processing ( Fig.12 The first three pairs of rows identify the active power error and reactive power error caused by the current transformer, voltage transformer, and meter, respectively. The fourth pair of rows identifies the total active power and reactive power error (e) which is the sum of the errors caused by the first three pairs of rows. p and e q ).

[0341]

[0342] Table 3

[0343] Obviously, the error caused by the meter (i.e. and ) in the total error (i.e. e p =3.04% and e q =-1.8%) accounts for a very small proportion.

[0344] Thus, through this example, it is clear that the approach of simply identifying the errors in active and reactive power originating from an electric meter - which is quite common - is highly inaccurate. This is because a large portion of the total error in the measurement of active and reactive power is beyond the measurement capabilities of existing approaches. In contrast, by employing the approach of the present disclosure, significantly higher accuracy in the quantification of the errors in active and reactive power can be achieved.

[0345] In finance, an error of 0.17% per year The error is 3.04% (=e p ) is significant. At an average market price of 100 € / MWh for active energy, a total error of 3% would equate to an annual price difference of 267,000 €.

[0346] Three-phase

[0347] For simplicity and ease of understanding, the method of the present disclosure has been explained and illustrated only for a single-phase electrical system so far. The method is also applicable to a three-phase system. Fig. 22 A possible implementation of the method in the context of a three-phase system is shown.

[0348] To perform a three-phase test, the method can be applied to each of the three phases in turn. Alternatively, 12 sensing modules can be deployed (three primary current sensing modules, one per phase; three secondary sensing modules, one per phase; three primary voltage sensing modules, one per phase; and three secondary voltage sensing modules, one per phase). Each of the 12 sensing modules has its own means of receiving a global navigation satellite system for time stamping its data.

[0349] A single device (e.g. a single edge gateway device) can be deployed to receive data from all 12 sensing modules and from the meter and perform the above calculations, but now for all three phases. Other Applications of Active and Reactive Power Measurement

[0350] Although the present disclosure focuses primarily on the measurement of active and reactive power to assess errors in power metering, there are other uses for this data. For example, this data can be used for power quality analysis. In addition, while the method can be used as a one-time, infrequent test to obtain an indication of current system errors, the method can also be used to assess electrical parameters over days, weeks, months, or longer periods of time.

[0351] Alternatives

[0352] Although the examples described herein involve conversion from a higher voltage to a lower voltage, the methods described herein are equally applicable to conversion from a lower voltage to a higher voltage.

[0353] Although the calculations described in detail herein relate to the calculation of active power and reactive power (and active power error and reactive power error), the method is equally applicable to the calculation of active energy and reactive energy (and active energy error and reactive energy error) by simply adding a time component to the calculation.

Claims

1. An online live method for analyzing characteristics of a substation including a current transformer and a voltage transformer, the substation being configured to transform an upstream current and an upstream voltage into a downstream current and a downstream voltage, the method comprising: obtaining a series of upstream current data points during a first time period using an upstream current sensor and assigning to each of the series of upstream current data points a timestamp provided by a first global navigation satellite system signal receiver; obtaining a series of downstream current data points during the first time period using a downstream current sensor and assigning to each of the series of downstream current data points a timestamp provided by a second global navigation satellite system signal receiver; obtaining a series of upstream voltage data points during the first time period using an upstream voltage sensor and assigning to each of the series of upstream voltage data points a timestamp provided by a third global navigation satellite system signal receiver; obtaining a series of downstream voltage data points during said first time period using a downstream voltage sensor and assigning to each of said series of upstream current data points a timestamp provided by a fourth global navigation satellite system signal receiver; calculating a current transformer phase shift error between a series of time-stamped upstream current data points and a series of time-stamped downstream current data points; calculating a current transformer ratio error by comparing a rated current ratio of the current transformer to a measured ratio determined using the time-stamped series of upstream current data points and the time-stamped series of downstream current data points; calculating a voltage transformer phase shift error between a series of time-stamped upstream voltage data points and a series of time-stamped downstream voltage data points; calculating a voltage transformer ratio error by comparing a rated voltage ratio of the voltage transformer to a measured voltage ratio determined using the time-stamped series of upstream voltage data points and the time-stamped series of downstream voltage data points; generating calculated upstream active power data and reactive power data using the time-stamped series of upstream current data points and the time-stamped series of upstream voltage data points; Calculated downstream active power data and reactive power data are generated using the time-stamped series of downstream current data points and the time-stamped series of downstream voltage data points.

2. A method according to any preceding claim, further comprising using: the calculated current transformer phase shift error; and The calculated current transformer ratio error, To calculate the errors of active power measurement and reactive power measurement caused by the current transformer.

3. The method according to claim 1 or claim 2, further comprising using: the calculated voltage transformer phase shift error; and The calculated voltage transformer ratio error, To calculate the errors of active power measurement and reactive power measurement caused by the voltage transformer.

4. A method according to any preceding claim, further comprising obtaining measured active and reactive power data from an electricity meter downstream of the substation, the electricity meter being configured to meter power supplied by the substation.

5. The method according to claim 4, further comprising using: Calculated upstream active power data and reactive power data; and Active power data and reactive power data from downstream electricity meters, To calculate the total error of active power measurement and reactive power measurement.

6. The method according to claim 5, further comprising using: Calculated downstream active power data and reactive power data; and active power data and reactive power data from the downstream electric meter, To calculate the error components of the active power measurement and reactive power measurement of the downstream electric meter.

7. A method according to any preceding claim, further comprising performing a calibration process to quantify an upstream current sensor error, a downstream current sensor error, an upstream voltage sensor error and a downstream voltage sensor error.

8. The method according to claim 7, wherein: A series of upstream current data points with time stamps are adjusted to compensate for the upstream current sensor error; A series of downstream current data points with time stamps are adjusted to compensate for the downstream current sensor error; A series of upstream voltage data points with time stamps are adjusted to compensate for the upstream voltage sensor error; and The time-stamped series of downstream voltage data points are adjusted to compensate for the downstream voltage sensor error.

9. A method according to any preceding claim, wherein: The measurement ratio is the ratio of the root mean square value of the series of upstream data points to the root mean square value of the series of downstream data points.

10. A method according to any preceding claim, wherein: The current transformer phase shift error / the voltage transformer phase shift error is proportional to the time difference between at least one pair of consecutive zero crossings of the time-stamped upstream data and the time-stamped downstream data, wherein the accuracy of the time reference is less than 100 nanoseconds and preferably approximately 10 nanoseconds.

11. A method according to any preceding claim, wherein: Each of the upstream current or voltage data point stream and the downstream current or voltage data point stream comprises at least 20,000 data points per AC cycle, preferably 40,000 data points per AC cycle.

12. A method according to any preceding claim, wherein: The substation is a three-phase substation; Wherein, the current transformer and the voltage transformer described in any of the preceding claims are a first-phase current transformer and a first-phase voltage transformer; Wherein, the three-phase substation includes a second-phase current transformer, a second-phase voltage transformer, a third-phase current transformer and a third-phase voltage transformer; The method comprises deploying the method of any one of claims 1 to 10 on each of the three phases.

13. The method according to claim 12, wherein: The deployment of the method of any one of claims 1 to 10 is performed simultaneously on each of the three phases.

14. The method according to any preceding claim, further comprising one or both of the following: calculating upstream active energy data and reactive energy data using the calculated upstream active power data and reactive power data; The downstream active energy data and reactive energy data are calculated using the calculated downstream active power data and reactive power data.

15. A kit of parts for performing the method of any preceding claim, the kit of parts comprising: an upstream current sensor module, the upstream current sensor module comprising an upstream current sensor and a first global navigation satellite system signal receiver, wherein the upstream current sensor is configured to obtain a series of upstream current data points during a first time period, and the first global navigation satellite system signal receiver is configured to assign a time stamp to each of the series of upstream current data points; a downstream current sensor module, the downstream current sensor module comprising a downstream current sensor and a second global navigation satellite system signal receiver, wherein the downstream current sensor is configured to obtain a series of downstream current data points during a first time period, and the second global navigation satellite system signal receiver is configured to assign a time stamp to each of the series of downstream current data points; an upstream voltage sensor module, the upstream voltage sensor module comprising an upstream voltage sensor and a first global navigation satellite system signal receiver, wherein the upstream voltage sensor is configured to obtain a series of upstream voltage data points during a first time period, and the first global navigation satellite system signal receiver is configured to assign a time stamp to each of the series of upstream voltage data points; A downstream voltage sensor module includes a downstream voltage sensor and a second global navigation satellite system signal receiver, wherein the downstream voltage sensor is configured to obtain a series of downstream voltage data points during a first time period, and the second global navigation satellite system signal receiver is configured to assign a time stamp to each of the series of downstream voltage data points.

16. The kit of parts according to claim 15, wherein: The upstream current sensor module further includes an upstream current measurement unit configured to digitize the series of upstream current data points; The downstream current sensor module further includes a downstream current measurement unit configured to digitize the series of downstream current data points; The upstream voltage sensor module further includes an upstream voltage measurement unit configured to digitize the series of upstream voltage data points; The downstream voltage sensor module also includes a downstream voltage measurement unit configured to digitize the series of downstream voltage data points.

17. A kit of parts according to claim 15 or claim 16, wherein: Each of the upstream current sensor module, the downstream current sensor module, the upstream voltage sensor module and the downstream voltage sensor module includes wireless communication functionality for receiving instructions regarding measurements to be performed and for transmitting a series of data points with timestamps for continued processing.

18. A kit of parts according to any one of claims 15 to 17, wherein One of the upstream current sensor module and the downstream current sensor module receives the time-stamped current data provided by the other of the upstream current sensor module and the downstream current sensor module and is configured to: calculating a current transformer phase shift error between the time-stamped series of upstream current data points and the time-stamped series of downstream current data points; as well as A current transformer ratio error is calculated by comparing a rated current ratio of the current transformer to a measured ratio determined using the time-stamped series of upstream current data points and the time-stamped series of downstream current data points.

19. A kit of parts according to any one of claims 15 to 18, wherein: One of the upstream voltage sensor module and the downstream voltage sensor module receives time-stamped voltage data provided by the other of the upstream voltage sensor module and the downstream voltage sensor module and is configured to: calculating a voltage transformer phase shift error between the time-stamped series of upstream voltage data points and the time-stamped series of downstream voltage data points; as well as A voltage transformer ratio error is calculated by comparing a rated current ratio of the voltage transformer to a measured ratio determined using the time-stamped series of upstream voltage data points and the time-stamped series of downstream voltage data points.

20. The kit of parts according to any one of claims 15 to 19, further comprising a processor configured to receive: time-stamped current data provided by the upstream current sensor module; time-stamped current data provided by the downstream current sensor module; time-stamped voltage data provided by the upstream voltage sensor module; and time-stamped voltage data provided by the downstream voltage sensor module; And is configured as: calculating a current transformer phase shift error between the time-stamped series of upstream current data points and the time-stamped series of downstream current data points; as well as calculating a current transformer ratio error by comparing a rated current ratio of the current transformer to a measured current ratio determined using the time-stamped series of upstream current data points and the time-stamped series of downstream current data points; calculating a voltage transformer phase shift error between the time-stamped series of upstream voltage data points and the time-stamped series of downstream voltage data points; as well as A voltage transformer ratio error is calculated by comparing a rated voltage ratio of the voltage transformer to a measured voltage ratio determined using the time-stamped series of upstream voltage data points and the time-stamped series of downstream voltage data points.

21. The kit of parts according to claim 20, wherein: The processor is further configured to: generating calculated upstream active power data and reactive power data using the time-stamped series of upstream current data points and the time-stamped series of upstream voltage data points; Calculated downstream active power data and reactive power data are generated using the time-stamped series of downstream current data points and the time-stamped series of downstream voltage data points.

22. A kit of parts according to any one of claims 15 to 21, wherein The processor is further configured to calculate errors in active power measurement and reactive power measurement caused by the current transformer using the calculated current transformer phase shift error and the calculated current transformer ratio error.

23. A kit of parts according to any one of claims 15 to 22, wherein: The processor is further configured to calculate errors in active power measurement and reactive power measurement caused by the voltage transformer using the calculated voltage transformer phase shift error and the calculated voltage transformer ratio error.

24. A kit of parts according to any one of claims 15 to 23, wherein: The processor is further configured to obtain measured active power data and reactive power data from an electric meter downstream of the substation, the electric meter being configured to meter power supplied by the substation.

25. The kit of parts according to claim 24, wherein: The processor is also configured to calculate a total error in active power measurement and reactive power measurement using the calculated upstream active power data and reactive power data and the active power data and reactive power data from the downstream meter, and optionally, the processor is also configured to calculate an error component of the active power measurement and reactive power measurement of the downstream meter using the calculated downstream active power data and reactive power data and the active power data and reactive power data from the downstream meter.

26. A kit of parts according to any one of claims 15 to 25, wherein: The processor is also configured to compensate for known errors in measurements provided by the upstream current sensor module, the downstream current sensor module, the upstream voltage sensor module, and the downstream voltage sensor module.