Shell fixing jig and detection device
By designing the housing fixing fixture of the support block and connecting structure, and cooperating with related equipment, the problem of poor versatility of the fixture during the housing fixing and testing process in battery production is solved, the efficient installation and testing of the explosion-proof valve is achieved, and the production efficiency is improved.
Patent Information
- Application Number
- CN202410779141.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-17
- Publication Date
- 2024-10-11
AI Technical Summary
In the battery production process, multiple jigs are needed to fix the shell during the installation of explosion-proof valves, air tightness testing and burst pressure testing, resulting in poor versatility of the jigs and affecting production efficiency.
Design a shell fixing fixture, which includes a support block and a connecting structure. Air holes and connection holes are formed through the first groove and the second groove. It cooperates with air extraction equipment, helium injection equipment and inflatable explosion detection equipment to realize the explosion-proof valve installation, air tightness testing and burst pressure testing, and does not require the shell to be transferred between jigs.
The production efficiency is improved, the installation of explosion-proof valves, air tightness testing and burst pressure testing are facilitated, ensuring that the shell does not need to be transferred during the entire process, improving detection accuracy and production efficiency.
Smart Images

Figure CN118752431A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of battery production auxiliary equipment, and in particular to a shell fixing fixture and a detection device. Background Art
[0002] During the production process of batteries, it is necessary to install an explosion-proof valve on the battery casing, and to test the air tightness and bursting pressure of the explosion-proof valve. In the related art, different jigs are needed to fix the casing during the installation process, air tightness test process and bursting pressure test process of the explosion-proof valve. As a result, the versatility of the jigs is poor, resulting in the need to transfer the battery casing between multiple jigs during the production process of the battery, thus affecting production efficiency. Summary of the invention
[0003] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a housing fixing fixture that can be used in the installation process of the explosion-proof valve, the air tightness detection process, and the bursting pressure detection process.
[0004] The present application also proposes a detection device having the above-mentioned housing fixing fixture.
[0005] The housing fixing jig according to the first aspect of the present application includes: a support block and a connecting structure.
[0006] A first groove is formed at the upper end of the support block, a flow channel is formed inside the support block, one end of the flow channel penetrates the bottom of the first groove to form a first air hole at the bottom of the first groove, and the other end of the flow channel penetrates the side of the support block to form a first connection hole on the side of the support block;
[0007] A second groove is formed at the lower end of the connecting structure, and an air passage is formed inside the connecting structure. One end of the air passage passes through the bottom of the second groove to form a second air hole at the bottom of the second groove, and the other end passes through the side of the connecting structure to form a second connection hole on the side of the connecting structure.
[0008] Wherein, the support block is used to enter the interior of the shell so that the inner wall of the shell abuts against the upper end of the support block, and the first groove and the second groove correspond to the explosion-proof valve setting on the shell, and the connecting structure can approach or move away from the support block to clamp the shell.
[0009] The shell fixing fixture according to the first aspect of the present application has at least the following beneficial effects: the first connection hole on the support block is selectively connected to the vacuum equipment, the helium injection equipment or the breathing detection equipment, and the second connection hole on the connecting structure is selectively connected to the inflation bursting detection equipment or the breathing detection equipment, so that the first groove and the second groove form negative pressure or high pressure or atmospheric pressure respectively, so as to facilitate the installation, air tightness detection, bursting pressure detection or breathing detection of the explosion-proof valve, and the shell can be transferred without transfer during the installation and detection process, thereby improving production efficiency.
[0010] According to some embodiments of the present application, a first sealing ring is provided at the upper end of the support block, and the first sealing ring surrounds the first groove.
[0011] According to some embodiments of the present application, a buffer pad is provided at the lower end of the connecting structure, and the buffer pad is used to abut against the outer shell on the supporting block.
[0012] According to some embodiments of the present application, a second sealing ring is provided at the lower end of the connecting structure, and the second sealing ring surrounds the second groove.
[0013] According to some embodiments of the present application, the positions of the first sealing ring and the second sealing ring correspond to each other.
[0014] According to some embodiments of the present application, the connection structure includes two, wherein a buffer pad is disposed at the lower end of one of the connection structures, and a second sealing ring is disposed at the lower end of the other connection structure.
[0015] According to some embodiments of the present application, a bracket is further included, and the support block is arranged above the bracket, and a gap is formed between the upper end of the bracket and the lower end of the support block.
[0016] According to some embodiments of the present application, the groove width of the first groove is smaller than the groove width of the second groove.
[0017] According to some embodiments of the present application, the length of the lower end surface of the connecting structure is smaller than the length of the upper end surface of the supporting block.
[0018] The detection device according to the second aspect embodiment of the present application includes the shell fixing fixture, the air suction device, the helium injection device, the helium detection device, the inflation burst detection device, and the breathing detection device of the first aspect embodiment, wherein the first connection hole can be connected to the air suction device, the helium injection device or the breathing detection device, and the second connection hole can be connected to the inflation burst detection device or the breathing detection device.
[0019] The detection device according to the second aspect of the present application has at least the following beneficial effects: including all the beneficial effects of the shell fixing fixture of the first aspect, which will not be repeated here.
[0020] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The present application is further described below with reference to the accompanying drawings and embodiments, wherein:
[0022] Figure 1 A three-dimensional diagram of a housing fixing fixture according to an embodiment of the present application;
[0023] Figure 2 for Figure 1 A cross-sectional view of the middle housing fixing fixture;
[0024] Figure 3 A cross-sectional view of one of the connection structures of the housing fixing fixture according to an embodiment of the present application;
[0025] Figure 4 A cross-sectional view of another connection structure of the housing fixing fixture according to an embodiment of the present application;
[0026] Figure 5 for Figure 1 Schematic diagram of part of the structure of the middle shell fixing fixture.
[0027] Reference numerals:
[0028] Support block 100, first groove 110, flow channel 120, first air hole 130, first connection hole 140; first sealing ring 150;
[0029] The connecting structure 200, the second groove 210, the air channel 220, the second air hole 230, the second connecting hole 240; the second sealing ring 250; and the buffer pad 260;
[0030] Support 300 and spacer 310 . DETAILED DESCRIPTION
[0031] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.
[0032] In the description of the present application, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0033] In the description of this application, "several" means more than one, "more" means more than two, "greater than", "less than", "exceed", etc. are understood to exclude the number itself, and "above", "below", "within", etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0034] In the description of this application, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in this application based on the specific content of the technical solution.
[0035] In the description of the present application, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0036] Reference Figures 1 to 5 According to the first aspect of the present application, the housing fixing fixture includes: a support block 100 and a connecting structure 200.
[0037] A first groove 110 is formed at the upper end of the support block 100, and a flow channel 120 is formed inside the support block 100. One end of the flow channel 120 penetrates the bottom of the first groove 110 to form a first air hole 130 at the bottom of the first groove 110, and the other end penetrates the side of the support block 100 to form a first connection hole 140 on the side of the support block 100.
[0038] A second groove 210 is formed at the lower end of the connection structure 200, and an air passage 220 is formed inside the connection structure 200. One end of the air passage 220 penetrates the groove bottom of the second groove 210 to form a second air hole 230 at the groove bottom of the second groove 210, and the other end penetrates the side surface of the connection structure 200 to form a second connection hole 240 at the side surface of the connection structure 200.
[0039] Among them, the support block 100 is used to enter the interior of the shell so that the inner wall of the shell abuts against the upper end of the support block 100, and the first groove 110 and the second groove 210 correspond to the explosion-proof valve setting on the shell, and the connecting structure 200 can approach or move away from the support block 100 to clamp the shell.
[0040] It should be noted that the outer shell is formed by four integrally formed side walls, so that the outer shell is a rectangular parallelepiped with a hollow interior, and openings are formed at both ends of the outer shell. At least one side wall on the outer shell is formed with a mounting hole, which is used to install the explosion-proof valve, and the size of the mounting hole is smaller than the size of the first groove 110.
[0041] It is understandable that the housing fixing fixture of the present application can be used to fix the housing during the installation process of the explosion-proof valve. Specifically, since openings are formed at both ends of the housing, the support block 100 can enter the interior of the housing through one of the openings of the housing, and then the housing is placed on the support block 100, the support block 100 supports the side wall of the housing, and the first groove 110 on the support block 100 corresponds to the mounting hole on the housing. Next, since the first connection hole 140 is formed on the side of the support block 100 and openings are formed at both ends of the housing, the first connection hole 140 leaks out, enabling the exhaust device to connect to the first connection hole 140. The exhaust device exhausts air. Since the first connection hole 140, the flow channel 120, the first air hole 130 and the first groove 110 are connected in sequence, the first groove 110 will generate suction, and because the size of the mounting hole is smaller than the size of the first groove 110, the side wall portion of the shell is located above the first groove 110. When the first groove 110 generates suction, it can produce an adsorption effect on the side wall of the shell with the mounting hole. Therefore, under the adsorption effect of the first groove 110 and the self-gravity of the shell, it can be closely attached to the support block 100 to achieve the fixing of the shell. After the shell is fixed, it is convenient to install the explosion-proof valve to the mounting hole on the shell, and in the process of placing the explosion-proof valve, the explosion-proof valve will also be less likely to deviate relative to the side wall of the shell under the adsorption effect of the first groove 110, thereby improving the accuracy of the installation. After the explosion-proof valve is placed at the mounting hole, due to the adsorption effect of the first groove 110, the explosion-proof valve can be fixed relative to the shell, so that the explosion-proof valve can be welded to the shell later. In summary, the first connection hole 140 on the support block 100 is connected to the exhaust device to fix the housing, thereby facilitating welding of the explosion-proof valve to the housing.
[0042] It can be understood that the housing fixing fixture of the present application can be used to fix the housing during the air tightness test of the explosion-proof valve, and can cooperate with the helium detection equipment and the helium injection equipment to detect the air tightness of the explosion-proof valve. Specifically, the housing is placed on the support block 100 so that the explosion-proof valve on the housing corresponds to the first groove 110. In some embodiments, the air tightness test can also be performed immediately after the explosion-proof valve is welded on the housing, thereby reducing the steps of placing the housing. And, the first connection hole 140 is connected to the helium detection equipment, and the second connection hole 240 is connected to the helium injection equipment. Then, the connection structure 200 approaches the support block 100, the connection structure 200 abuts against the upper end of the side wall of the housing, cooperates with the support block 100 to clamp the housing, and the second groove 210 on the connection structure 200 corresponds to the explosion-proof valve on the housing, thereby, the explosion-proof valve and the side wall of the housing will separate the first groove 110 and the second groove 210. The helium injection device injects helium, and the helium enters the second groove 210 through the second connection hole 240, the air channel 220, and the second air hole 230 in sequence, so that the helium fills the second groove 210; at the same time, the helium detection device inhales air, and the helium detection device is connected to the first groove 110, so that the first groove 110 generates an adsorption force, which can make the shell tightly adsorbed on the support block 100. It should be understood that since the explosion-proof valve and the side wall of the shell separate the first groove 110 and the second groove 210, if the explosion-proof valve has no air leakage problem and there is no gap at the connection position of the explosion-proof valve and the shell, the first groove 110 and the second groove 210 are not connected, and the helium in the second groove 210 cannot enter the first groove 110, so that the helium detection device connected to the first groove 110 will not detect the presence of helium, indicating that the explosion-proof valve can be used normally and the connection between the explosion-proof valve and the shell is good. Accordingly, if the explosion-proof valve has a leakage problem or there is a gap at the connection position between the explosion-proof valve and the shell, the first groove 110 and the second groove 210 will be connected, and the helium in the second groove 210 will enter the first groove 110 and enter the helium detection device. The helium detection device will sense the presence of helium, which means that the explosion-proof valve has a leakage problem or there is a gap at the connection position between the explosion-proof valve and the shell. In summary, by connecting the first connection hole 140 on the support block 100 to the helium detection device, and connecting the second connection hole 240 on the connection structure 200 to the helium injection device, the shell fixing fixture of the present application can cooperate with the helium detection device and the helium injection device to detect the air tightness of the explosion-proof valve and the sealing of the connection between the explosion-proof valve and the shell.
[0043] It is understandable that the housing fixing fixture of the present application can be used to fix the housing during the bursting pressure detection process of the explosion-proof valve, and can cooperate with the inflation bursting detection equipment to perform bursting pressure detection. Specifically, the housing is placed on the support block 100 so that the explosion-proof valve on the housing corresponds to the first groove 110. In some embodiments, the bursting pressure detection can also be performed immediately after the explosion-proof valve is welded to the housing, thereby reducing the steps of placing the housing. Also, the first connection hole 140 is connected to the inflation bursting detection equipment, and the second connection hole 240 is connected to the outside. Then, the connection structure 200 is close to the support block 100, and cooperates with the support block 100 to clamp the side wall of the housing. The inflation bursting detection device inflates air toward the first connecting hole 140 and continuously applies pressure to form a high pressure at the first groove 110 to simulate the situation where the air pressure inside the battery casing is too high due to a fault. After the air pressure reaches a certain level, the explosion-proof valve will burst open, and the first groove 110 will be connected to the second groove 210. The first groove 110 will be connected to the outside through the second groove 210 and the airway 220 to make the air pressure in the first groove 110 drop to the same as the atmosphere. The inflation bursting detection device can detect the drop in air pressure in the first groove 110 and record the maximum air pressure that the explosion-proof valve withstands before it bursts, so as to realize the bursting pressure detection of the explosion-proof valve, and under the pressure of the connecting structure 200, the casing will not fly out under the pressure. In summary, by connecting the first connection hole 140 on the support block 100 to the inflation burst detection equipment, and connecting the second connection hole 240 on the connection structure 200 to the outside, the shell fixing fixture of the present application can cooperate with the inflation burst detection equipment to detect the bursting pressure of the explosion-proof valve.
[0044] It is understandable that the housing fixing fixture of the present application can be used to fix the housing during the breathing detection process of the explosion-proof valve, and can cooperate with the breathing detection equipment to perform bursting pressure detection. Specifically, the housing is placed on the support block 100 so that the explosion-proof valve on the housing corresponds to the first groove 110. In some embodiments, the bursting pressure detection can also be performed immediately after the explosion-proof valve is welded to the housing, thereby reducing the steps of placing the housing. And, the first connection hole 140 and the second connection hole 240 are both connected to the breathing detection equipment. Then, the connecting structure 200 is close to the support block 100, and cooperates with the support block 100 to clamp the side wall of the housing. The breathing detection equipment will alternately supply air to the first connection hole 140 and the second connection hole 240, and can simultaneously detect the air pressure in the first groove 110 and the second groove 210, and through multiple cycles, the fatigue resistance of the explosion-proof valve and the stability of the explosion-proof valve can be detected. In summary, by connecting the first connection hole 140 on the support block 100 and the second connection hole 240 on the connection structure 200 to the breathing detection equipment, the housing fixing fixture of the present application can cooperate with the breathing detection equipment to detect the fatigue resistance and stability of the explosion-proof valve.
[0045] It should also be understood that the present application supports the shell by passing the support block 100 through the inside of the shell, and the width of the support block 100 is smaller than the width of the shell, so that the support block 100 can enter the inside of the shell, so that the support block 100 can adapt to shells of different sizes, thereby improving the versatility of the support block 100. In addition, the present application forms a first groove 110 corresponding to the position of the explosion-proof valve on the support block 100 and forms a second groove 210 corresponding to the position of the explosion-proof valve on the connecting structure 200, so that only negative pressure or high pressure is needed at the positions of the first groove 110 and the second groove 210 to achieve both fixing of the shell and detection of the explosion-proof valve, so as to reduce unnecessary energy loss and improve the accuracy of the detection position.
[0046] Reference Figure 1 and Figure 2 According to some embodiments of the present application, a first sealing ring 150 is disposed at the upper end of the support block 100 , and the first sealing ring 150 surrounds the first groove 110 .
[0047] It can be understood that by arranging the first sealing ring 150 at the upper end of the support block 100, the first sealing ring 150 can be abutted against the lower end of the side wall of the outer shell, and because the first sealing ring 150 surrounds the first groove 110, the adsorption effect at the first groove 110 is improved and the sealing between the first groove 110 and the outer shell is improved.
[0048] Reference Figure 4 According to some embodiments of the present application, a buffer pad 260 is provided at the lower end of the connection structure 200 , and the buffer pad 260 is used to abut against the outer shell on the support block 100 .
[0049] It should be noted that in order to improve the reliability of the connection structure 200, the connection structure 200 is made of metal. It is understandable that a buffer pad 260 is provided at the lower end of the connection structure 200, so that when the connection structure 200 cooperates with the support block 100 to clamp the side wall of the shell, the buffer pad 260 can abut against the upper end of the side wall of the shell, so that the connection structure 200 will not directly abut against the shell, thereby avoiding the connection structure 200 from damaging the shell. In addition, it should be understood that a through hole is provided in the position of the buffer pad 260 corresponding to the second groove 210 to ensure that the second groove 210 can correspond to the explosion-proof valve. And, the buffer pad 260 can improve the sealing between the connection structure 200 and the shell.
[0050] Reference Figure 3 According to some embodiments of the present application, a second sealing ring 250 is provided at the lower end of the connection structure 200 , and the second sealing ring 250 surrounds the second groove 210 .
[0051] It can be understood that by setting the first sealing ring 150 at the upper end of the support block 100, the second sealing ring 250 can be abutted against the upper end of the side wall of the shell when the connecting structure 200 cooperates with the support block 100 to clamp the side wall of the shell. Since the second sealing ring 250 surrounds the second groove 210, the adsorption effect at the second groove 210 is improved, and the sealing between the second groove 210 and the shell is improved.
[0052] Reference Figure 5 According to some embodiments of the present application, the positions of the first sealing ring 150 and the second sealing ring 250 correspond.
[0053] It can be understood that the positions of the first sealing ring 150 and the second sealing ring are made to correspond to each other, so that in the process of the connecting structure 200 cooperating with the support block 100 to clamp the side wall of the shell, the force positions of the side walls of the shell are the same or similar, thereby avoiding damage to the shell due to uneven force, or causing a certain bending of the side walls of the shell, thereby affecting the sealing between the first groove 110 and the second groove 210 and the shell.
[0054] Reference Figure 3 and Figure 4 According to some embodiments of the present application, the connection structure 200 includes two, wherein a buffer pad 260 is disposed at the lower end of one of the connection structures 200 , and a second sealing ring 250 is disposed at the lower end of the other connection structure 200 .
[0055] It is understandable that, in the present embodiment, the connection structure 200 includes two, wherein only a buffer pad 260 is provided at the lower end of one of the connection structures 200, and only a second sealing ring 250 is provided at the lower end of the other connection structure 200. It should be understood that the air tightness detection of the explosion-proof valve is a non-destructive detection, which will not damage the explosion-proof valve. Therefore, in the process of air tightness detection of the explosion-proof valve, the connection structure 200 with the buffer pad 260 is used to cooperate with the support block 100 to clamp the shell, and the buffer pad 260 can play a role in protecting the shell. The breathing detection of the explosion-proof valve requires good sealing between the connection structure 200 and the shell. Therefore, in the process of breathing detection of the explosion-proof valve, the connection structure 200 with the second sealing ring 250 is used to cooperate with the support block 100 to clamp the shell, so that the sealing between the connection structure 200 and the shell is better. During the bursting pressure detection process of the explosion-proof valve, the explosion-proof valve will be damaged, and the sealing between the connection structure 200 and the housing will not affect the detection accuracy. Therefore, any connection structure 200 can be used in the bursting pressure detection process of the explosion-proof valve.
[0056] Reference Figure 1According to some embodiments of the present application, a bracket 300 is further included, and the support block 100 is arranged above the bracket 300, and a gap 310 is formed between the upper end of the bracket 300 and the lower end of the support block 100.
[0057] It is understandable that the support block 100 is supported by the bracket 300 so that the upper end of the bracket 300 and the lower end of the support block 100 form a gap 310, so that the side wall at the lower end of the shell can enter the gap 310, so that the support block 100 can enter the interior of the shell.
[0058] Reference Figure 5 According to some embodiments of the present application, the groove width of the first groove 110 is smaller than the groove width of the second groove 210 .
[0059] It can be understood that since the groove width of the first groove 110 is smaller than the groove width of the second groove 210, the upper end surface of the support block 100 will partially correspond to the second groove 210. When the connecting structure 200 cooperates with the support block 100 to clamp the side wall of the shell, the side wall of the shell corresponding to the second groove 210 will be partially located on the upper end surface of the support block 100 and supported by the support block 100. Therefore, during the detection process, the supporting effect of the support block 100 on the shell is guaranteed.
[0060] Reference Figure 1 According to some embodiments of the present application, the length of the lower end surface of the connection structure 200 is smaller than the length of the upper end surface of the support block 100 .
[0061] It is understandable that the length of the lower end surface of the connection structure 200 is less than the length of the upper end surface of the support block 100, so that the connection structure 200 can be shorter than the support block 100 in the length direction, so that the connection structure 200 can only be pressed on the position of the shell on the support block 100 in the length direction to ensure the fixing effect of the shell. It should also be understood that the length of the shell is much longer than the length of the explosion-proof valve. During the detection process, it is only necessary to press the connection structure 200 on the position of the shell corresponding to the periphery of the explosion-proof valve, shortening the length of the connection structure 200, so as to reduce the production cost of the connection structure 200.
[0062] It can also be understood that the width of the shell is only slightly larger than the width of the explosion-proof valve. Therefore, the width of the lower end face of the connecting structure 200 is longer than the length of the upper end face of the supporting block 100 to ensure that the second groove 210 on the connecting structure 200 can correspond to the explosion-proof valve, to ensure that the explosion-proof valve can enter the second groove 210, and to ensure that the connecting structure 200 can be against the side wall of the shell.
[0063] The detection device according to the second aspect embodiment of the present application includes the shell fixing fixture, the vacuum device, the helium injection device, the helium detection device, the inflation burst detection device, and the breathing detection device of the first aspect embodiment, wherein the first connection hole 140 can be connected to the vacuum device, the helium injection device or the breathing detection device, and the second connection hole 240 can be connected to the inflation burst detection device or the breathing detection device.
[0064] The detection device according to the second aspect of the present application has at least the following beneficial effects: including all the beneficial effects of the shell fixing fixture of the first aspect, which will not be repeated here.
[0065] Specifically, the first connection hole 140 on the support block 100 can be connected to the exhaust device to achieve the fixing of the shell, so as to facilitate the welding of the explosion-proof valve to the shell. By connecting the first connection hole 140 on the support block 100 to the helium detection device, and the second connection hole 240 on the connection structure 200 to the helium injection device, the shell fixing fixture can cooperate with the helium detection device and the helium injection device to detect the air tightness of the explosion-proof valve and the sealing of the connection between the explosion-proof valve and the shell. By connecting the first connection hole 140 on the support block 100 to the inflation burst detection device, and the second connection hole 240 on the connection structure 200 to the outside, the shell fixing fixture can cooperate with the inflation burst detection device to detect the bursting pressure of the explosion-proof valve. By connecting the first connection hole 140 on the support block 100 and the second connection hole 240 on the connection structure 200 to the breathing detection device, the shell fixing fixture can cooperate with the breathing detection device to detect the fatigue resistance and stability of the explosion-proof valve.
[0066] In summary, the housing fixing fixture is used in conjunction with the air extraction equipment, helium injection equipment, helium detection equipment, inflation burst detection equipment, and breathing detection equipment to facilitate the installation, air tightness detection, burst pressure detection, and breathing detection of the explosion-proof valve. Specifically, the first connection hole 140 on the support block 100 is selectively connected to the air extraction equipment, helium injection equipment, or breathing detection equipment, and the second connection hole 240 on the connection structure 200 is selectively connected to the inflation burst detection equipment or the breathing detection equipment, so that the first groove 110 and the second groove 210 form negative pressure or high pressure or atmospheric pressure respectively, so as to facilitate the installation, air tightness detection, burst pressure detection, or breathing detection of the explosion-proof valve, and the housing can be moved during the installation and detection process, thereby improving production efficiency.
[0067] The embodiments of the present application are described in detail above in conjunction with the accompanying drawings, but the present application is not limited to the above embodiments. Various changes can be made within the knowledge of ordinary technicians in the relevant technical field without departing from the purpose of the present application. In addition, the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
Claims
1. A housing fixing fixture, characterized in that: include: A support block, wherein a first groove is formed at the upper end of the support block, a flow channel is formed inside the support block, one end of the flow channel penetrates through the bottom of the first groove to form a first air hole at the bottom of the first groove, and the other end of the flow channel penetrates through the side of the support block to form a first connection hole on the side of the support block; A connecting structure, wherein a second groove is formed at the lower end of the connecting structure, an air passage is formed inside the connecting structure, one end of the air passage passes through the groove bottom of the second groove to form a second air hole at the groove bottom of the second groove, and the other end of the air passage passes through the side surface of the connecting structure to form a second connection hole on the side surface of the connecting structure; Wherein, the support block is used to enter the interior of the shell so that the inner wall of the shell abuts against the upper end of the support block, and the first groove and the second groove correspond to the explosion-proof valve setting on the shell, and the connecting structure can approach or move away from the support block to clamp the shell.
2. The housing fixing fixture according to claim 1, characterized in that: A first sealing ring is disposed at the upper end of the support block, and the first sealing ring surrounds the first groove.
3. The housing fixing fixture according to claim 1, characterized in that: A buffer pad is arranged at the lower end of the connection structure, and the buffer pad is used to abut against the outer shell on the support block.
4. The housing fixing fixture according to claim 2, characterized in that: A second sealing ring is disposed at the lower end of the connecting structure, and the second sealing ring surrounds the second groove.
5. The housing fixing fixture according to claim 4, characterized in that: The first sealing ring corresponds to the second sealing ring in position.
6. The housing fixing fixture according to claim 1, characterized in that: The connection structures include two, a buffer pad is arranged at the lower end of one of the connection structures, and a second sealing ring is arranged at the lower end of the other connection structure.
7. The housing fixing fixture according to claim 1, characterized in that: It also includes a bracket, the support block is arranged above the bracket, and a gap is formed between the upper end of the bracket and the lower end of the support block.
8. The housing fixing fixture according to claim 1, characterized in that: The groove width of the first groove is smaller than the groove width of the second groove.
9. The housing fixing fixture according to claim 1, characterized in that: The length of the lower end surface of the connecting structure is smaller than the length of the upper end surface of the supporting block.
10. A detection device, characterized in that It comprises the shell fixing fixture described in any one of claims 1 to 9, and also an air suction device, a helium injection device, a helium detection device, an inflation burst detection device and a breathing detection device, wherein the first connection hole can be connected to the air suction device, the helium injection device or the breathing detection device, and the second connection hole can be connected to the inflation burst detection device or the breathing detection device.
Citation Information
Patent Citations
Test carrier for explosion-proof valve
CN211401669U
Explosion-proof valve respiration test fixture
CN211425847U
Helium detection jig for explosion-proof valve of power battery case
CN220602841U
Explosion-proof valve airtightness test tool
CN221099997U