Pipe gallery segment installation construction system
Through the implementation of the pipe gallery segment installation and construction system, the problems of cumbersome construction steps and low efficiency in the existing technology are solved. Welding connections, ultrasonic testing, waterproof sealing and other means are used to improve the construction efficiency and structural stability, and achieve high efficiency. transshipment and long-term reliable operation.
Patent Information
- Application Number
- CN202410894903.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-11
AI Technical Summary
The installation and construction steps of the existing pipe gallery segments are cumbersome, resulting in low transfer efficiency and low overall installation and construction efficiency.
A pipe gallery segment installation and construction system is proposed, including transportation and hoisting, segment docking and installation, support and fixation, follow-up processing, anti-corrosion and insulation, regular maintenance and other steps, using welded connections, ultrasonic weld detection, waterproof sealants Sealing, temporary support structure, quality inspection, anti-corrosion treatment and maintenance, combined with traveling mechanism and plug-in mechanism to achieve efficient docking and transfer of segments.
It improves the installation and construction efficiency of pipe gallery segments, ensures structural strength and stability, prevents water vapor intrusion, realizes efficient transfer and precise docking of pipe gallery, extends the service life, and ensures the thermal efficiency and long-term reliable operation of the system.
Smart Images

Figure CN118756751A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of pipe gallery construction, and in particular to a pipe gallery segment installation construction system. Background Art
[0002] A comprehensive pipeline corridor is an underground urban pipeline corridor, which is an accessible space built underground in the city, integrating various engineering pipelines such as electricity, communications, gas, heating, water supply and drainage, and is equipped with special inspection ports, lifting ports and monitoring systems. It is an important infrastructure and lifeline to ensure the operation of the city.
[0003] The existing pipe gallery segment installation and construction steps are complicated, and the transportation efficiency of the pipe gallery is low, resulting in low overall installation and construction efficiency. Therefore, the present invention solves the shortcomings of the above technical problems. Summary of the invention
[0004] Based on the above-mentioned existing technical problems, the present invention proposes a pipe gallery segment installation construction system.
[0005] The present invention provides a pipe gallery segment installation construction system, which comprises the following steps:
[0006] S1. Transportation and hoisting: Transport the tunnel segments from the manufacturing plant to the construction site, and select hoisting equipment according to the weight and size of the tunnel segments.
[0007] S2. Segment docking and installation: According to the design requirements, the tunnel segments are docked together and welded to firmly connect the segments to ensure structural strength and stability. Ultrasonic weld inspection is carried out in accordance with the specifications, and the interfaces are sealed with waterproof sealant to prevent water vapor intrusion.
[0008] S3. Support and fixation: During the segment installation process, a temporary support structure is used to ensure its stability, and a secondary pouring of concrete is carried out after the tunnel segment is installed to further enhance the structural stability.
[0009] S4. Subsequent processing: Conduct quality inspection on each installation link to ensure compliance with design and construction specifications. At the same time, conduct water pressure test on the pipeline system in the corridor to ensure that there is no water leakage. Perform functional test on the electrical system in the corridor to ensure the normal operation of the equipment. Then write and submit an acceptance report to record the entire construction process and inspection results.
[0010] S5. Anti-corrosion and insulation: Carry out anti-corrosion treatment on the surface of the pipe gallery to extend its service life, and carry out insulation treatment on the parts that need insulation according to the design requirements to ensure the thermal efficiency of the system.
[0011] S6. Regular maintenance: Regularly inspect the pipeline corridor to identify and repair potential problems, and then perform regular maintenance and necessary repairs based on usage to ensure the long-term reliable operation of the pipeline corridor. Archive maintenance records and establish a complete maintenance file to facilitate subsequent management and tracking.
[0012] Preferably, the hoisting equipment includes a supporting road for supporting the corridor segment to move, the lower surface of the corridor segment is in sliding contact with the upper surface of the supporting road, hoisting beams are symmetrically distributed above the supporting road, support beams are fixedly installed on the lower surface of the hoisting beams at evenly spaced intervals, a walking mechanism is provided on the outer surface of the hoisting beam, and a plug-in mechanism is provided below the walking mechanism.
[0013] The walking mechanism moves in a straight line on the outer surface of the hoisting beam, thereby driving the pipe gallery segment forward.
[0014] The plug-in mechanism connects the walking mechanism with the pipe gallery segment, so that the pipe gallery segments are docked with each other.
[0015] Preferably, the walking mechanism includes a supporting base plate erected above the parallel lifting beam, the lower surfaces of the four right-angle ends of the supporting base plate are respectively fixedly connected with supporting ear plates, the surfaces of the supporting ear plates are fixedly connected with rotating shafts, the outer surfaces of the two ends of the rotating shaft are respectively fixedly sleeved with rollers, the middle outer surface of the rotating shaft is fixedly sleeved with guide wheels, and the outer surfaces of the rollers and the guide wheels are slidably connected to the outer surface of the lifting beam.
[0016] Through the above technical scheme, in order to control the walking mechanism to walk on the surface of the lifting beam and realize the mobile docking of the corridor segment, the rotating shaft on the surface of the supporting ear plate is driven to rotate, and then the roller and guide wheel are driven to rotate to realize forward movement. At the same time, the guide wheel and the convex surface of the lifting beam are slidably engaged, thereby guiding and limiting the walking mechanism.
[0017] Preferably, the walking mechanism further comprises a driven gear fixedly sleeved on the outer surfaces of the two rotating shafts at the rear end, and movable holes are symmetrically distributed through the rear end surface of the supporting base plate, and the upper outer surface of the driven gear passes through the movable holes.
[0018] Through the above technical solution, in order to drive the rotating shaft to rotate and realize the rotation of the roller and the guide wheel, the rotation of the rotating shaft can be realized by controlling the two driven gear wheels on the upper surface of the supporting base plate.
[0019] Preferably, the walking mechanism also includes a synchronous motor symmetrically distributed and fixedly connected to the upper surface of the support base plate, the outer surface of the output shaft of the synchronous motor is fixedly connected to a driving gear through a coupling, and the lower end outer surface of the driving gear passes through the movable hole to mesh with the driven gear.
[0020] Through the above technical solution, in order to drive the roller and the guide wheel, the two synchronous motors can respectively drive the driving gear to rotate, so that the driven gear in meshing can be controlled to drive the rotating shaft to rotate, thereby realizing the advancement of the walking mechanism.
[0021] Preferably, the plug-in mechanism includes an H-shaped support panel fixedly connected to the lower surface of the support base plate, one side surface of the support panel is symmetrically distributed and fixedly connected with a linear slide rail, the outer surface of the linear slide rail is slidably engaged with a support slider, one side surface of the support slider is fixedly connected with a push plate, and one side surface of the push plate is in sliding contact with one side surface of the pipe gallery segment.
[0022] Through the above technical scheme, in order to control the synchronous movement of the tunnel segment and the walking mechanism to complete the docking, the support slider is controlled to move linearly up and down on the outer surface of the linear slide rail, and the height of the push plate is adjusted, so that the push plate can be made to contact one side of the tunnel segment, and then the tunnel segment is pushed to dock as the walking mechanism moves forward.
[0023] Preferably, the plug-in mechanism further comprises a plug-in rod for diverting traffic on both sides of the supporting road, one side surface of the plug-in rod is fixedly connected to one side surface of the push plate, and a drag reduction wheel is fixedly connected to the lower surface of the plug-in rod.
[0024] Through the above technical scheme, in order to connect the walking mechanism with the corridor segment, as the walking mechanism moves, the connecting rods supporting both sides of the road are inserted into the connecting structure of the corridor segment, and in order to reduce the movement resistance of the walking mechanism, a rotating drag-reducing wheel is set on the lower surface of the connecting rod.
[0025] Preferably, the plug-in mechanism also includes an opening penetrating through the upper surface of the support base plate, the upper surface of the support base plate is fixedly connected to the support base frame, the upper surface of the support base frame is respectively fixedly connected to the reduction motor and the winding roller, the outer surface of the output shaft of the reduction motor and the outer surface of the roller shaft of the winding roller are installed with a pulley housing, the upper end of one side surface of the push plate is fixedly connected to a connecting roller through a bracket, the outer surface of the connecting roller is fixedly sleeved with a Y-shaped steel cable, and the steel cable is wound on the outer surface of the winding roller.
[0026] Through the above technical scheme, in order to control the linear movement of the supporting slider and thus facilitate the plug-in of the plug-in rod, a pulley assembly is set inside the pulley housing, so that the reduction motor drives the winding roller to rotate through the pulley assembly, so that the steel cable is wound and unwound on its outer surface, and then the connecting roller can be pulled together with the push plate to adjust the height, thereby facilitating the moving and unloading of materials in the corridor section.
[0027] Preferably, the plug-in mechanism also includes supporting telescopic rods installed laterally and vertically on the inner surface of the pipe gallery segment by fixing bolts, and L-shaped connecting plates are fixedly installed on the outer surface of the four right angles of the pipe gallery segment by fixing bolts, and the lower surfaces of the four connecting plates are symmetrically distributed on the left and right and are provided with two plug-in platforms, and the lower surfaces of the plug-in platforms are slidably plugged with the outer surfaces of the plug-in rods corresponding to the positions through the opened plug-in grooves, and the upper surfaces of the plug-in platforms are fixedly connected with movable slide rails in a front-to-back symmetrical distribution, and the outer surface of the movable slide rails is slidably clamped with movable sliders, and the upper surfaces of the movable sliders are fixedly connected to the lower surfaces of the connecting plates.
[0028] Through the above technical scheme, in order to improve the stability of the overall structure of the corridor segment, a supporting telescopic rod is set to support the corridor body. In order to facilitate the connection between the corridor segment and the walking mechanism, a plug-in platform is set on the lower surface of the corridor segment. With the height adjustment and horizontal movement of the walking mechanism, the plug-in rod can be inserted into the plug-in groove of the plug-in platform, and then the walking mechanism can push the corridor segment forward when moving forward. In order to control the two corridor segments to dock accurately, a left and right moving structure is set on the upper surface of the plug-in platform to control the moving slider to move left and right on the outer surface of the moving slide rail, and then the corridor segment connected by the connecting plate can be lifted and moved left and right until it docks with the previous corridor segment.
[0029] Preferably, a pushing cylinder is fixedly connected to the upper surface of one of the docking platforms in a front-to-back symmetrical distribution, the outer surface of the piston rod of the pushing cylinder is fixedly connected to one side surface of the connecting plate, and a support pad is fixedly installed on the outer surface of one end of the movable slide rail through a mounting plate, and the lower surface of the pipe gallery segment is in sliding contact with the upper surface of the support pad.
[0030] Through the above technical solution, in order to push the connecting plate to realize the movement of the corridor segment, the two pushing cylinders on one side are synchronously operated to pull or push the connecting plate, so that the position of the corridor segment can be adjusted to realize its docking. In order to support the corridor segment with force, a support pad is set on the upper surface of one end of the movable slide rail for support.
[0031] The beneficial effects of the present invention are:
[0032] 1. According to the design requirements, the pipe gallery segments are butt-joined and welded to firmly connect the segments to ensure structural strength and stability. Ultrasonic weld detection is performed in accordance with the specifications. At the same time, waterproof sealant is used to seal the interface to prevent water vapor intrusion, thereby improving the overall installation and construction efficiency of the pipe gallery segments.
[0033] 2. By setting up a walking mechanism, it can walk in a straight line on the outer surface of the lifting beam, thereby driving the pipe gallery segment forward to complete the transportation of the pipe gallery. During the adjustment process, through the action of two synchronous motors, the driving gears can be driven to rotate respectively, so that the driven gears in meshing are controlled to drive the rotating shaft to rotate, and then the rollers and guide wheels are driven to rotate to achieve forward movement, which can push the pipe gallery segment forward and dock.
[0034] 3. By setting up the plug-in mechanism, the material shifting and unloading of the pipe gallery segment can be realized, and its position can be adjusted for precise docking. During the adjustment process, the reduction motor drives the winding roller to rotate through the pulley assembly, so that the steel cable is wound and unwound on its outer surface, and then the connecting roller and the push plate can be pulled to adjust the height. As the walking mechanism moves, the plug-in rods supporting both sides of the road are inserted into the plug-in grooves of the plug-in platform, and then the walking mechanism can push the pipe gallery segment forward when moving forward. In order to control the two pipe gallery segments for precise docking, the two pushing cylinders on one side are synchronously actuated to pull or push the connecting plate, so that the position of the pipe gallery segment can be adjusted to achieve its docking, thereby improving the transportation efficiency of the pipe gallery segment. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 A schematic diagram of a pipe gallery segment installation construction system proposed by the present invention;
[0036] Figure 2 A three-dimensional diagram of the support telescopic rod structure of a pipe gallery segment installation construction system proposed by the present invention;
[0037] Figure 3 A three-dimensional diagram of the supporting base plate structure of a pipe gallery segment installation construction system proposed by the present invention;
[0038] Figure 4 A three-dimensional diagram of the steel cable structure of a pipe gallery segment installation construction system proposed by the present invention;
[0039] Figure 5 A stereoscopic diagram of the driving gear structure of a pipe gallery segment installation construction system proposed by the present invention;
[0040] Figure 6 A three-dimensional diagram of the pulley housing structure of a pipe gallery segment installation construction system proposed by the present invention;
[0041] Figure 7 This is a three-dimensional diagram of the synchronous motor structure of the pipeline gallery segment installation construction system proposed by the present invention.
[0042] In the figure: 1. Pipe gallery segment; 2. Support road; 3. Hoisting beam; 31. Support beam; 4. Walking mechanism; 41. Support base plate; 42. Support ear plate; 43. Rotating shaft; 44. Roller; 45. Guide wheel; 46. Driven gear; 47. Movable hole; 48. Synchronous motor; 49. Driving gear; 5. Plug-in mechanism; 51. Support panel; 52. Linear slide rail; 53. Support slider; 54. Push plate; 55. Plug-in rod; 56. Drag reduction wheel; 57. Opening hole; 58. Support base frame; 59. Speed reduction motor; 60. Winding roller; 61. Pulley housing; 62. Connecting roller; 63. Steel cable; 64. Support telescopic rod; 65. Connecting plate; 66. Plug-in platform; 67. Moving slide rail; 68. Moving slider; 69. Push cylinder; 70. Support pad. DETAILED DESCRIPTION
[0043] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0044] Reference Figure 1-3 , a pipe gallery segment installation and construction system, the pipe gallery segment installation and construction system comprises the following steps:
[0045] S1. Transportation and hoisting: Transport the tunnel segment 1 from the manufacturing plant to the construction site, and select hoisting equipment according to the weight and size of the tunnel segment 1.
[0046] S2. Segment docking and installation: According to the design requirements, the tunnel segments 1 are docked together and connected by welding to firmly connect the segments to ensure structural strength and stability. Ultrasonic weld testing is performed in accordance with specifications, and the interfaces are sealed with waterproof sealant to prevent water vapor intrusion.
[0047] S3. Support and fixation: During the segment installation process, a temporary support structure is used to ensure its stability, and a secondary pouring of concrete is carried out after the installation of tunnel segment 1 to further enhance the structural stability.
[0048] S4. Subsequent processing: Conduct quality inspection on each installation link to ensure compliance with design and construction specifications. At the same time, conduct water pressure test on the pipeline system in the corridor to ensure that there is no water leakage. Perform functional test on the electrical system in the corridor to ensure the normal operation of the equipment. Then write and submit an acceptance report to record the entire construction process and inspection results.
[0049] S5. Anti-corrosion and insulation: Carry out anti-corrosion treatment on the surface of the pipe gallery to extend its service life, and carry out insulation treatment on the parts that need insulation according to the design requirements to ensure the thermal efficiency of the system.
[0050] S6. Regular maintenance: Regularly inspect the pipeline corridor to identify and repair potential problems, and then perform regular maintenance and necessary repairs based on usage to ensure the long-term reliable operation of the pipeline corridor. Archive maintenance records and establish a complete maintenance file to facilitate subsequent management and tracking.
[0051] According to the design requirements, the tunnel segments 1 are butt-jointed and welded together to firmly connect the segments, ensuring structural strength and stability. Ultrasonic weld detection is performed in accordance with specifications, and the interfaces are sealed with waterproof sealant to prevent water vapor intrusion, thereby improving the overall installation and construction efficiency of the tunnel segment 1.
[0052] The hoisting equipment includes a supporting road 2 for supporting the tunnel segment 1 for walking. The lower surface of the tunnel segment 1 is in sliding contact with the upper surface of the supporting road 2. Hoisting beams 3 are symmetrically distributed above the supporting road 2. Support beams 31 are fixedly installed on the lower surface of the hoisting beams 3 at uniform intervals. A walking mechanism 4 is provided on the outer surface of the hoisting beam 3, and a plug-in mechanism 5 is provided below the walking mechanism 4.
[0053] The walking mechanism 4 moves in a straight line on the outer surface of the hoisting beam 3 , thereby driving the pipe gallery segment 1 forward.
[0054] In order to control the walking mechanism 4 to walk on the surface of the hoisting beam 3 and realize the mobile docking of the pipeline corridor segment 1, the walking mechanism 4 includes a supporting base plate 41 erected above the parallel hoisting beam 3, and the lower surfaces of the four right-angle ends of the supporting base plate 41 are respectively fixedly connected with supporting ear plates 42, and the surface of the supporting ear plates 42 is fixedly connected with a rotating shaft 43, and the outer surfaces of the two ends of the rotating shaft 43 are respectively fixedly sleeved with rollers 44, and the middle outer surface of the rotating shaft 43 is fixedly sleeved with a guide wheel 45. The outer surfaces of the rollers 44 and the guide wheels 45 are both slidably connected with the outer surface of the hoisting beam 3, driving the rotating shaft 43 on the surface of the supporting ear plate 42 to rotate, thereby driving the rollers 44 and the guide wheels 45 to rotate to realize forward movement, and at the same time, the guide wheels 45 are slidably engaged with the convex surface of the hoisting beam 3, thereby guiding and limiting the walking mechanism 4.
[0055] In order to drive the rotating shaft 43 to rotate and realize the rotation of the roller 44 and the guide wheel 45, the walking mechanism 4 also includes a driven gear 46 fixedly sleeved on the outer surfaces of the two rotating shafts 43 at the rear end, and the rear end surface of the supporting base plate 41 is symmetrically distributed with movable holes 47. The upper outer surface of the driven gear 46 passes through the movable hole 47. The rotation of the rotating shaft 43 can be realized by controlling the two driven gears 46 wheels on the upper surface of the supporting base plate 41.
[0056] In order to drive the roller 44 and the guide wheel 45, the walking mechanism 4 also includes synchronous motors 48 symmetrically distributed and fixedly connected to the upper surface of the support base plate 41. The outer surface of the output shaft of the synchronous motor 48 is fixedly connected to a driving gear 49 through a coupling. The outer surface of the lower end of the driving gear 49 passes through a movable hole 47 and meshes with the driven gear 46. Through the operation of the two synchronous motors 48, the driving gears 49 can be driven to rotate respectively, so that the driven gears 46 that control the meshing are driven to drive the rotating shaft 43 to rotate, thereby realizing the advancement of the walking mechanism 4.
[0057] By setting up a walking mechanism 4, it can walk in a straight line on the outer surface of the lifting beam 3, thereby driving the corridor segment 1 forward to complete the transportation of the corridor. During the adjustment process, through the operation of two synchronous motors 48, the driving gear 49 can be driven to rotate respectively, so that the driven gear 46 in meshing can be controlled to drive the rotating shaft 43 to rotate, and then the roller 44 and the guide wheel 45 can be driven to rotate to achieve forward movement, which can push the corridor segment 1 forward to dock.
[0058] The plug-in mechanism 5 connects the traveling mechanism 4 with the pipe gallery segment 1 , so that the pipe gallery segments 1 are docked with each other.
[0059] In order to control the synchronous movement of the tunnel segment 1 and the walking mechanism 4 to complete the docking, the plug-in mechanism 5 includes an H-shaped support panel 51 fixedly connected to the lower surface of the support base plate 41, and one side surface of the support panel 51 is symmetrically distributed and fixedly connected with a linear slide rail 52, and the outer surface of the linear slide rail 52 is slidably clamped with a support slider 53, and one side surface of the support slider 53 is fixedly connected with a push plate 54, and one side surface of the push plate 54 is in sliding contact with one side surface of the tunnel segment 1. By controlling the support slider 53 to move linearly up and down on the outer surface of the linear slide rail 52, the height of the push plate 54 is adjusted, so that the push plate 54 can be made to contact one side of the tunnel segment 1, and then the tunnel segment 1 is pushed to dock as the walking mechanism 4 moves forward.
[0060] In order to connect the traveling mechanism 4 with the tunnel segment 1, the plug-in mechanism 5 also includes a plug-in rod 55 for diverting on both sides of the supporting road 2. One side surface of the plug-in rod 55 is fixedly connected to one side surface of the push plate 54. As the traveling mechanism 4 moves, the plug-in rods 55 on both sides of the supporting road 2 are inserted into the connecting structure of the tunnel segment 1. In order to reduce the moving resistance of the traveling mechanism 4, a drag reduction wheel 56 is fixedly connected to the lower surface of the plug-in rod 55.
[0061] In order to control the linear movement of the support slider 53, thereby facilitating the plug-in of the plug-in rod 55, the plug-in mechanism 5 also includes an opening 57 that penetrates and is opened on the upper surface of the support base plate 41. The upper surface of the support base plate 41 is fixedly connected with a support base frame 58. The upper surface of the support base frame 58 is respectively fixedly connected with a reduction motor 59 and a winding roller 60. The outer surface of the output shaft of the reduction motor 59 and the outer surface of the roller shaft of the winding roller 60 are installed with a pulley housing 61. The upper end of the surface of one side of the push plate 54 is fixedly connected with a connecting roller 62 through a bracket. The outer surface of the connecting roller 62 is fixedly sleeved with a Y-shaped steel cable 63. The steel cable 63 is wound on the outer surface of the winding roller 60. A pulley assembly is arranged inside the control pulley housing 61, so that the reduction motor 59 drives the winding roller 60 to rotate through the pulley assembly, so that the steel cable 63 is wound and unwound on its outer surface, and then the connecting roller 62 can be pulled together with the push plate 54 for height adjustment, thereby facilitating the moving and unloading of materials in the pipe gallery segment 1.
[0062] In order to improve the stability of the overall structure of the pipe gallery segment 1, the plug-in mechanism 5 also includes a supporting telescopic rod 64 that is installed on the inner surface of the pipe gallery segment 1 in a horizontal and vertical distribution through fixing bolts. The supporting telescopic rod 64 is provided to support the gallery body. In order to facilitate the connection between the pipe gallery segment 1 and the walking mechanism 4, an L-shaped connecting plate 65 is fixedly installed on the outer surface of the four right angles of the pipe gallery segment 1 through fixing bolts. The lower surfaces of the four connecting plates 65 are symmetrically distributed and provided with two plug-in platforms 66. The lower surfaces of the plug-in platforms 66 are slidably plugged with the outer surfaces of the plug-in rods 55 corresponding to the positions through the plug-in grooves provided. By providing the plug-in platform on the lower surface of the pipe gallery segment 1, the plug-in platform 66 is connected to the outer surface of the plug-in rod 55 corresponding to the position. Platform 66, with the height adjustment and horizontal movement of the walking mechanism 4, the connecting rod 55 can be inserted into the connecting groove of the connecting platform 66, and then the walking mechanism 4 can push the corridor segment 1 forward when moving forward. In order to control the two corridor segments 1 to be accurately docked, the upper surface of the connecting platform 66 is symmetrically distributed front and back and fixedly connected with a movable slide rail 67, and the outer surface of the movable slide rail 67 is slidably clamped with a movable slider 68. The upper surface of the movable slider 68 is fixedly connected to the lower surface of the connecting plate 65, and the movable slider 68 is controlled to move left and right on the outer surface of the movable slide rail 67, and then the corridor segment 1 connected to the connecting plate 65 can be lifted to move left and right until it docks with the previous corridor segment 1.
[0063] In order to push the connecting plate 65 to realize the movement of the corridor segment 1, the upper surface of one of the plug-in platforms 66 is fixedly connected with a pushing cylinder 69 in a front-to-back symmetrical distribution, and the outer surface of the piston rod of the pushing cylinder 69 is fixedly connected to the one side surface of the connecting plate 65. The two pushing cylinders 69 on one side act synchronously to pull or push the connecting plate 65, so that the position of the corridor segment 1 can be adjusted to realize its docking. In order to support the corridor segment 1 with force, a support pad 70 is fixedly installed on the outer surface of one end of the movable slide rail 67 through a mounting plate, and the lower surface of the corridor segment 1 is in sliding contact with the upper surface of the support pad 70.
[0064] By setting up the plug-in mechanism 5, the material shifting and unloading of the tunnel segment 1 can be realized, and its position can be adjusted to facilitate precise docking. During the adjustment process, the reduction motor 59 drives the winding roller 60 to rotate through the pulley assembly, so that the steel cable 63 is wound and unwound on its outer surface, and then the connecting roller 62 and the push plate 54 can be pulled to adjust the height, so that with the movement of the walking mechanism 4, the plug-in rods 55 on both sides of the supporting road 2 are inserted into the plug-in grooves of the plug-in platform 66, and then the walking mechanism 4 can push the tunnel segment 1 forward when moving forward. In order to control the two tunnel segments 1 to be precisely docked, the two pushing cylinders 69 on one side are synchronously actuated to pull or push the connecting plate 65, so that the position of the tunnel segment 1 can be adjusted to achieve its docking, thereby improving the transportation efficiency of the tunnel segment 1.
[0065] Working principle: In a specific embodiment of the present invention, four connecting plates 65 are installed on the lower surface of the four right angles of the pipe gallery segment 1 by fixing bolts, so that the pipe gallery segment 1 is connected to the plug-in platform 66, and then the plug-in platform 66 with the pipe gallery segment 1 is moved to one end of the supporting road 2 by a trailer, and at this time, the walking mechanism 4 is at the rear side of the pipe gallery segment 1;
[0066] Then, the two synchronous motors 48 on the upper surface of the supporting base plate 41 can respectively drive the driving gear 49 to rotate, so that the driven gear 46 that controls the meshing drives the rotating shaft 43 to rotate. After the rotating shaft 43 rotates, the roller 44 and the guide wheel 45 can be driven to roll forward on the outer surface of the lifting beam 3, so that the plug-in rod 55 moves horizontally on one side of the plug-in platform 66. Then, the reduction motor 59 controls the pulley assembly inside the pulley housing 61 to rotate, and then drives the winding roller 60 to rotate, so that the steel cable 63 is wound and unwound on its outer surface, and the connecting roller 62 can be pulled together with the push plate 54 for height adjustment, so that the plug-in rod 55 can be docked with the plug-in slot of the plug-in platform 66. As the roller 44 and the guide wheel 45 continue to roll forward, the plug-in rod 55 can be inserted into the plug-in slot of the plug-in platform 66, and at the same time, the drag reduction wheel 56 contacts the ground to reduce drag.
[0067] At this time, one side of the push plate 54 contacts with one side of the pipe gallery segment 1, and then the walking mechanism 4 can push the pipe gallery segment 1 forward when moving forward, and dock with one side of the previous pipe gallery segment 1. In order to dock the joint, the two pushing cylinders 69 on one side act synchronously to pull or push the connecting plate 65, so that the position of the pipe gallery segment 1 can be adjusted to achieve its docking. After the docking is completed, welding is used to firmly connect the segments together to ensure structural strength and stability. Ultrasonic detection is used for weld detection in accordance with specifications, and the interface is sealed with waterproof sealant to prevent water vapor intrusion.
[0068] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A pipe gallery segment installation construction system, characterized in that: The pipe gallery segment installation construction system comprises the following steps: S1. Transportation and hoisting: transport the pipe gallery segment (1) from the manufacturing plant to the construction site, and select hoisting equipment according to the weight and size of the pipe gallery segment (1); S2. Segment docking and installation: According to the design requirements, the pipe gallery segments (1) are docked together and welded to firmly connect the segments to ensure structural strength and stability. Ultrasonic testing is performed on the welds in accordance with the specifications. At the same time, waterproof sealant is used to seal the interfaces to prevent water vapor intrusion. S3, support and fixation: During the segment installation process, a temporary support structure is used to ensure its stability, and a secondary pouring of concrete is performed after the tunnel segment (1) is installed to further enhance the structural stability; S4. Subsequent processing: Conduct quality inspection on each installation link to ensure compliance with design and construction specifications. At the same time, conduct water pressure test on the pipeline system in the corridor to ensure no water leakage. Perform functional test on the electrical system in the corridor to ensure normal operation of the equipment. Then write and submit an acceptance report to record the entire construction process and inspection results. S5. Anti-corrosion and insulation: Anti-corrosion treatment is carried out on the surface of the pipe gallery to extend its service life. Insulation treatment is carried out on the parts that need insulation according to design requirements to ensure the thermal efficiency of the system. S6. Regular maintenance: Regularly inspect the pipeline corridor to identify and repair potential problems, and then perform regular maintenance and necessary repairs based on usage to ensure the long-term reliable operation of the pipeline corridor. Archive maintenance records and establish a complete maintenance file to facilitate subsequent management and tracking.
2. A pipe gallery segment installation construction system according to claim 1, characterized in that: The hoisting equipment comprises a support road (2) for supporting the pipe gallery segment (1) to travel, the lower surface of the pipe gallery segment (1) being in sliding contact with the upper surface of the support road (2), hoisting beams (3) being symmetrically arranged above the support road (2), support beams (31) being evenly spaced and fixedly installed on the lower surface of the hoisting beam (3), a traveling mechanism (4) being arranged on the outer surface of the hoisting beam (3), and a plug-in mechanism (5) being arranged below the traveling mechanism (4); The walking mechanism (4) walks in a straight line on the outer surface of the hoisting beam (3), thereby driving the pipe gallery segment (1) forward; The plug-in mechanism (5) connects the walking mechanism (4) with the pipe gallery segment (1), so that the pipe gallery segments (1) are butt-jointed.
3. A pipe gallery segment installation construction system according to claim 2, characterized in that: The walking mechanism (4) comprises a supporting base plate (41) mounted above the parallel hoisting beam (3); the lower surfaces of the four right-angled ends of the supporting base plate (41) are respectively fixedly connected with supporting ear plates (42); the surfaces of the supporting ear plates (42) are fixedly connected with rotating shafts (43); the outer surfaces of both ends of the rotating shaft (43) are respectively fixedly sleeved with rollers (44); the outer surface of the middle part of the rotating shaft (43) is fixedly sleeved with a guide wheel (45); the outer surfaces of the rollers (44) and the guide wheels (45) are both slidably connected with the outer surface of the hoisting beam (3).
4. A pipe gallery segment installation construction system according to claim 3, characterized in that: The walking mechanism (4) further comprises a driven gear (46) fixedly sleeved on the outer surfaces of the two rotating shafts (43) at the rear end, and movable holes (47) are symmetrically distributed and penetrated through the rear end surface of the supporting base plate (41), and the upper outer surface of the driven gear (46) passes through the movable hole (47).
5. A pipe gallery segment installation construction system according to claim 4, characterized in that: The walking mechanism (4) further comprises a synchronous motor (48) symmetrically distributed and fixedly connected to the upper surface of the supporting base plate (41); the outer surface of the output shaft of the synchronous motor (48) is fixedly connected to a driving gear (49) via a coupling; the outer surface of the lower end of the driving gear (49) passes through the movable hole (47) and meshes with the driven gear (46).
6. A pipe gallery segment installation construction system according to claim 5, characterized in that: The plug-in mechanism (5) comprises an H-shaped support panel (51) fixedly connected to the lower surface of the support base plate (41); a linear slide rail (52) is symmetrically distributed and fixedly connected to one side surface of the support panel (51); a support slider (53) is slidably engaged on the outer surface of the linear slide rail (52); a push plate (54) is fixedly connected to one side surface of the support slider (53); and a push plate (54) is slidably contacted to one side surface of the pipe gallery segment (1).
7. A pipe gallery segment installation construction system according to claim 6, characterized in that: The plug-in mechanism (5) further comprises a plug-in rod (55) for diverting traffic on both sides of the supporting road (2); one side surface of the plug-in rod (55) is fixedly connected to one side surface of the push plate (54); and a drag reduction wheel (56) is fixedly connected to the lower surface of the plug-in rod (55).
8. A pipe gallery segment installation construction system according to claim 7, characterized in that: The plug-in mechanism (5) also includes an opening (57) extending through the upper surface of the support base plate (41); the upper surface of the support base plate (41) is fixedly connected to a support base frame (58); the upper surface of the support base frame (58) is respectively fixedly connected to a reduction motor (59) and a winding roller (60); a pulley housing (61) is installed on the outer surface of the output shaft of the reduction motor (59) and the outer surface of the roller shaft of the winding roller (60); the upper end of one side surface of the push plate (54) is fixedly connected to a connecting roller (62) through a bracket; the outer surface of the connecting roller (62) is fixedly sleeved with a Y-shaped steel cable (63); the steel cable (63) is wound on the outer surface of the winding roller (60).
9. A pipe gallery segment installation construction system according to claim 8, characterized in that: The plug-in mechanism (5) also includes supporting telescopic rods (64) which are installed on the inner surface of the pipe gallery segment (1) in a horizontal and vertical distribution by fixing bolts. The outer surface of the four right angles of the pipe gallery segment (1) is fixedly installed with L-shaped connecting plates (65) by fixing bolts. The lower surfaces of the four connecting plates (65) are symmetrically distributed on the left and right and are provided with two plug-in platforms (66). The lower surfaces of the plug-in platforms (66) are slidably plugged with the outer surfaces of the corresponding plug-in rods (55) through the provided plug-in grooves. The upper surfaces of the plug-in platforms (66) are fixedly connected with movable slide rails (67) in a front-to-back symmetrical distribution. The outer surface of the movable slide rail (67) is slidably engaged with a movable slider (68). The upper surface of the movable slider (68) is fixedly connected with the lower surface of the connecting plate (65).
10. A pipe gallery segment installation construction system according to claim 9, characterized in that: The upper surface of one of the plug-in platforms (66) is fixedly connected to a push cylinder (69) in a front-to-back symmetrical distribution, the outer surface of the piston rod of the push cylinder (69) is fixedly connected to a side surface of the connecting plate (65), and the outer surface of one end of the movable slide rail (67) is fixedly mounted with a support pad (70) via a mounting plate, and the lower surface of the pipe gallery segment (1) is in sliding contact with the upper surface of the support pad (70).