Novel laboratory remote monitoring and operation maintenance management system based on Internet of Things

Through the Internet of Things remote monitoring system combined with the cyclic network model and the PID control model, the problem of low accuracy caused by environmental factors and rate effects in laboratory environmental control is solved, and higher control precision and accuracy are achieved.

CN118760016AActive Publication Date: 2024-10-11WUXI INSTITUTE OF TECHNOLOGY

Patent Information

Application Number
CN202411113233.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-10-11
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

When the existing technology regulates the laboratory environment, due to the influence of environmental factors in the laboratory and the control rate, it is difficult to ensure an accurate match between the internal environmental parameters of the laboratory and the target value during the parameter regulation process, and the monitoring and control accuracy is low.

Method used

Using a remote monitoring system based on the Internet of Things, combined with parameter acquisition module, control equipment, parameter prediction module and PID controller, the subsequent change curve of the controlled parameters is predicted through the cyclic network model, the reference period is set and the control strategy is adjusted, and PID control is used The model optimizes control parameters and improves control accuracy.

Benefits of technology

Through the prediction of the cyclic network model and the optimization of the PID control model, the control strategy with the highest accuracy can be selected under different reference periods, significantly improving the monitoring and control accuracy of the controlled parameters of the laboratory's internal environment, and ensuring that the parameter values ​​​​are more consistent with the target values. Good match.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760016A_ABST
    Figure CN118760016A_ABST
Patent Text Reader

Abstract

The invention discloses a novel laboratory remote monitoring and operation maintenance management system based on the Internet of Things, which belongs to the technical field of laboratory monitoring and control and is provided with a parameter acquisition module, regulation and control equipment, a parameter prediction module, a regulation and analysis module and a PID (Proportion Integration Differentiation) controller, the parameter prediction module predicts a follow-up change curve of the reference value of the controlled parameter in the laboratory based on the reference value curve of the current controlled parameter by adopting the trained circulating network model; and adjusting the analysis module, setting and correcting a reference period T1, and calculating the controlled parameter reference value at the time point t0 + T1 based on the predicted subsequent change curve of the controlled parameter reference value as a final reference value. According to the method, the reference period T1 with the highest accuracy rate is screened out as the final reference period numerical value by calculating the deviation rate of the numerical value curve of the controlled parameter numerical value under different reference periods T1 and the subsequent change curve of the controlled parameter reference value, and the monitoring, regulating and controlling precision of the laboratory internal environment controlled parameter is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of laboratory monitoring, and in particular to a novel laboratory remote monitoring and operation maintenance management system based on the Internet of Things. Background Art

[0002] Laboratory items and equipment are usually stored in laboratories. Some flammable substances and precious materials may be present in these items and equipment. In order to ensure the safety of the laboratory, it is necessary to monitor the laboratory or have laboratory supervisors inspect the laboratory. Laboratory monitoring equipment generally uses cameras to view the internal environment of the laboratory. However, since the monitoring server cannot observe the laboratory image at all times, it is impossible to take corresponding emergency measures in time according to changes in the internal environment of the laboratory.

[0003] To solve the above problems, the existing technology usually installs specific temperature sensors, humidity sensors and other structures at different locations in the laboratory to monitor the internal environment of the laboratory. In addition, the internal environment of the laboratory is regulated by corresponding control equipment such as fans and air conditioners to achieve the best experimental environment or storage environment for experimental items and equipment inside the laboratory.

[0004] Taking the internal temperature parameters of the laboratory as an example, the temperature in the laboratory is detected by a temperature sensor, and then the temperature change curve is set according to the required temperature of the laboratory. For example, the temperature target value is set to 25°C during the experiment, 28°C after the experiment, and 23°C at night to ensure that the internal environment of the laboratory in different time periods adapts to the different states inside the laboratory. The temperature in the laboratory is controlled by the control equipment driven by the target value. However, during the control process, the parameter control process is affected by the environmental factors and control rate in the laboratory. The parameter control process cannot ensure that its own control rate can match the required state of the environment, resulting in a large deviation between the internal environmental parameters of the laboratory and the actual parameter target values ​​to be adjusted, and the accuracy of the internal environmental monitoring and control of the laboratory is low. Summary of the invention

[0005] To this end, the present invention provides a novel laboratory remote monitoring and operation and maintenance management system based on the Internet of Things, which effectively solves the technical problems in the prior art that the control process is affected by the environmental factors and control rate in the laboratory, the parameter control process cannot ensure that its own control rate can match the required state of the environment, resulting in a large deviation between the internal environmental parameters of the laboratory and the actual target values ​​of the parameters to be adjusted, and the accuracy of the internal environmental monitoring and control of the laboratory is low.

[0006] In order to solve the above technical problems, the present invention specifically provides the following technical solutions: a new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things, having:

[0007] Parameter acquisition module, used to collect the controlled parameter values ​​at time point t0 in the laboratory;

[0008] Control equipment, used to control the values ​​of controlled parameters in the laboratory;

[0009] A parameter prediction module introduces a cyclic network model, wherein the parameter prediction module obtains several groups of historical controlled parameter reference values ​​as training sets and trains the cyclic network model based on the training sets, and uses the trained cyclic network model to predict subsequent change curves of the controlled parameter reference values ​​in the laboratory based on the reference value curve of the current controlled parameter;

[0010] The adjustment analysis module sets and modifies the reference period T1, and calculates the reference value of the controlled parameter at the time point t0+T1 as the final reference value based on the subsequent change curve of the predicted reference value of the controlled parameter;

[0011] A PID controller is connected in series with the parameter acquisition module and the control device, and the PID controller controls the control device to adjust the value of the controlled parameter in the laboratory based on the comparison between the controlled parameter data and the final reference value;

[0012] Among them, in the correction process of the reference period T1, the reference period T1 is initialized, and the controlled parameter reference value at the time point t0+T1 is calculated according to the subsequent change curve of the predicted controlled parameter reference value, and the numerical curve of the controlled parameter value in the simulation control period T2 is based on the controlled parameter reference value, and the deviation rate between the numerical curve of the controlled parameter value and the subsequent change curve of the controlled parameter reference value is calculated, and the above process is repeated to measure the accuracy of the controlled parameter value under different reference periods T1 to select the reference period T1 with the highest accuracy as the final reference period value of the current control period T2.

[0013] Further,

[0014] The numerical curve of the controlled parameter value in the simulation control period T2 includes the following steps:

[0015] Establish the state transfer matrix of the laboratory parameter control system:

[0016]

[0017] In the formula, T represents the reference value of the controlled parameter, T1 represents the value of the corresponding parameter outside the laboratory, T2 represents the value of the controlled parameter in the laboratory, β represents the relationship between the controlled parameter value in the laboratory and the reference value of the controlled parameter, τ represents the power output power of the control equipment, and μ represents the relationship between the voltage load of the control equipment and the value of the controlled parameter;

[0018] The state transfer matrix of the laboratory parameter control system is used to establish a laboratory parameter change rate model in combination with the changes in the values ​​of the controlled parameters:

[0019]

[0020] Where L(t) represents the sum of environmental variables, and V(p) represents the function of regulating the output of the device.

[0021] Further,

[0022] The parameter change rate at time point t0 is calculated based on the laboratory parameter change rate model, and the numerical curve of the controlled parameter value within the control period T2 is drawn backward in combination with the controlled parameter value at time point t0.

[0023] Further,

[0024] The calculation process of the deviation rate specifically includes the following steps:

[0025] Based on the numerical curve of the controlled parameter value and the subsequent change curve of the controlled parameter reference value, the difference between the controlled parameter value and the controlled parameter reference value corresponding to each control time node in the current control cycle T2 is calculated;

[0026] Set the upper limit of the difference;

[0027] The ratio of the number of differences exceeding the upper limit of the difference within the control period T2 to the total number of differences is calculated to obtain the deviation rate a%.

[0028] Further,

[0029] Taking (1-a%) as the accuracy of the controlled parameter value in the current reference period, the reference period Tx with the highest accuracy is selected in turn;

[0030] In each deviation rate calculation process, if the reference period T1 with the highest accuracy rate finally screened out exceeds one, the upper limit of the difference is reset and the deviation rate and accuracy rate are recalculated.

[0031] Further,

[0032] The specific implementation steps of the PID controller for remote parameter monitoring include:

[0033] Constructing PID control model:

[0034]

[0035] In the formula, u(t) is the control quantity, e(t) is the error signal, K p , K i , K d They are proportional coefficient, integral coefficient, differential coefficient, K p eYtY is a proportional term, is the integral term, is the differential term;

[0036] The network performance indicators are calculated using the RBF neural network:

[0037] Where J represents the network performance index, Y represents the RBF neural network output, represents the Gaussian function, yYkY represents the center of the kth radial basis function, and y m YkY represents the center of the mth radial basis function, s i represents the i-th perceptual variable, c i represents the center of the i-th radial basis function;

[0038] Calculate the change sensitivity of the controlled parameters based on the Jacobian matrix, and adjust the parameters of the PID control model according to the change sensitivity and network performance indicators;

[0039] The sensitivity is expressed as w represents the parameter adjustment amount, C represents the parameter adjustment ratio, g represents the momentum factor, and η represents the learning factor.

[0040] Further,

[0041] The parameters of the adjusted PID control model are ΔK p , ΔK i , ΔK d Respectively represent K p , K i , K d The adjustment amount, , and represent the learning rates of proportion, integration, and differentiation respectively.

[0042] Further,

[0043] The construction and training process of the recurrent network model includes the following steps:

[0044] Create a three-layer neural network consisting of an input layer, a hidden layer, and an output layer;

[0045] Set the training function, connection function and output function of the hidden layer, connection layer and output layer;

[0046] Set the network's expected minimum error, maximum number of iterations, and learning rate;

[0047] Input the training set into the recurrent network model and train it;

[0048] Adjust the weights of each layer in the recurrent network model according to the error;

[0049] Determine whether the recurrent network model has converged, and the training is completed after convergence;

[0050] Among them, when the error is less than the minimum expected error, the algorithm converges;

[0051] When the maximum number of iterations is reached, the algorithm ends.

[0052] Further,

[0053] Inputting the reference values ​​of the controlled parameters within the time period into the trained recurrent network model in sequence, and outputting subsequent predicted values ​​of the reference values ​​of the controlled parameters;

[0054] Based on the subsequent predicted values ​​of the reference values ​​of the controlled parameters, a subsequent change curve of the reference values ​​of the controlled parameters in the laboratory is drawn.

[0055] Further,

[0056] Before the parameter control work at time point t0 is performed, the actual value of the reference value of the controlled parameter at time point t0 is obtained and input into the trained recurrent network model to predict the subsequent change curve of the reference value of the controlled parameter.

[0057] Compared with the prior art, the present invention has the following beneficial effects:

[0058] In the present invention, a subsequent change curve of a controlled parameter reference value is predicted by a cyclic network model, and a certain reference period T1 is set. The controlled parameter reference value at the time point t0+T1 is calculated on the subsequent change curve of the controlled parameter reference value as the final reference value, and the controlled parameter value in the laboratory is regulated according to the final reference value, wherein the accuracy of the controlled parameter value under different reference periods T1 is measured by calculating the deviation rate between the numerical curve of the controlled parameter value under different reference periods T1 and the subsequent change curve of the controlled parameter reference value, so as to screen out the reference period T1 with the highest accuracy as the final reference period value, and realize the correction of the reference period T1 value. The final reference value obtained under the corrected reference period T1 is the best reference value after training analysis, which can make the controlled parameter value change in the process of controlled parameter regulation in the change state closest to the reference value curve of the controlled parameter, thereby improving the monitoring and control accuracy of the controlled parameters in the internal environment of the laboratory. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0060] Figure 1 A structural block diagram of a novel laboratory remote monitoring and operation and maintenance management system based on the Internet of Things provided by an embodiment of the present invention;

[0061] Figure 2 It is a numerical curve diagram of the controlled parameter value predicted in the control period T2 in the embodiment of the present invention when the controlled parameter reference value remains unchanged;

[0062] Figure 3 is a numerical curve diagram of the controlled parameter value when the controlled parameter reference value predicted in the control period T2 in the embodiment of the present invention changes;

[0063] Figure 4 It is a schematic diagram of a subsequent change curve of a reference value of a controlled parameter and a numerical curve of a numerical value of the controlled parameter in an embodiment of the present invention. DETAILED DESCRIPTION

[0064] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0065] like Figure 1 As shown, the present invention provides a novel laboratory remote monitoring and operation maintenance management system based on the Internet of Things, which is equipped with a parameter acquisition module, a control device, a parameter prediction module, a regulation analysis module and a PID controller.

[0066] The parameter acquisition module is used to collect the value of the controlled parameter at time point t0 in the laboratory. Assuming that the controlled parameter is temperature, the parameter acquisition module uses a temperature sensor. Assuming that the controlled parameter is humidity, the corresponding parameter acquisition module uses a humidity sensor.

[0067] The control equipment is used to control the values ​​of the controlled parameters in the laboratory, and control equipment such as fans and air conditioners can be used.

[0068] The parameter prediction module introduces a recurrent network model. The parameter prediction module obtains several groups of historical controlled parameter reference values ​​as training sets and trains the recurrent network model based on the training sets. The trained recurrent network model is used to predict the subsequent change curve of the controlled parameter reference value in the laboratory based on the reference value curve of the current controlled parameter.

[0069] The adjustment and analysis module sets and modifies the reference period T1, and calculates the reference value of the controlled parameter at time point t0+T1 as the final reference value based on the subsequent change curve of the predicted reference value of the controlled parameter;

[0070] The PID controller is connected in series with the parameter acquisition module and the control device. The PID controller controls the control device to adjust the value of the controlled parameter in the laboratory based on the comparison between the controlled parameter data and the final reference value;

[0071] Among them, in the correction process of reference period T1, the reference period T1 is initialized, and the controlled parameter reference value at the time point t0+T1 is calculated according to the predicted subsequent change curve of the controlled parameter reference value, and the numerical curve of the controlled parameter value in the control period T2 is simulated based on the controlled parameter reference value, and the deviation rate between the numerical curve of the controlled parameter value and the subsequent change curve of the controlled parameter reference value is calculated. The above process is repeated to measure the accuracy of the controlled parameter value under different reference periods T1 and select the reference period T1 with the highest accuracy as the final reference period value of the current control period T2.

[0072] In the present invention, a subsequent change curve of a controlled parameter reference value is predicted by a cyclic network model, and a certain reference period T1 is set. The controlled parameter reference value at the time point t0+T1 is calculated on the subsequent change curve of the controlled parameter reference value as the final reference value, and the controlled parameter value in the laboratory is regulated according to the final reference value, wherein the accuracy of the controlled parameter value under different reference periods T1 is measured by calculating the deviation rate between the numerical curve of the controlled parameter value under different reference periods T1 and the subsequent change curve of the controlled parameter reference value, so as to screen out the reference period T1 with the highest accuracy as the final reference period value, and realize the correction of the reference period T1 value. The final reference value obtained under the corrected reference period T1 is the best reference value after training analysis, which can make the controlled parameter value change in the process of controlled parameter regulation in the change state closest to the reference value curve of the controlled parameter, thereby improving the monitoring and control accuracy of the controlled parameters in the internal environment of the laboratory.

[0073] In the present invention, the controlled parameter value refers to the value of the controlled parameter, such as the temperature value, humidity value, etc., and the controlled parameter reference value refers to the reference value of the controlled parameter, and the controlled parameter can be regulated according to the reference value.

[0074] In the present invention, the numerical curve of the controlled parameter value within the simulation control period T2 includes the following steps:

[0075] Establish the state transfer matrix of the laboratory parameter control system:

[0076]

[0077] In the formula, T represents the reference value of the controlled parameter, T1 represents the value of the corresponding parameter outside the laboratory, T2 represents the value of the controlled parameter in the laboratory, β represents the relationship between the controlled parameter value in the laboratory and the reference value of the controlled parameter, τ represents the power output power of the control equipment, and μ represents the relationship between the voltage load of the control equipment and the value of the controlled parameter;

[0078] The state transfer matrix of the laboratory parameter control system is used to establish a laboratory parameter change rate model in combination with the changes in the values ​​of the controlled parameters:

[0079]

[0080] Where L(t) represents the sum of environmental variables, and V(p) represents the function of regulating the output of the device.

[0081] The parameter change rate at time point t0 is calculated based on the laboratory parameter change rate model, and the numerical curve of the controlled parameter value within the control period T2 is drawn backward in combination with the controlled parameter value at time point t0.

[0082] In the above embodiments, the values ​​of corresponding parameters outside the laboratory, the relevant parameters of the controlled parameter value control equipment in the laboratory, and the sum of the environmental variables in the laboratory are introduced, and the influence of the indoor and outdoor environment and the operating rate of the control equipment itself on the laboratory parameter change rate is considered. In this way, a laboratory parameter change rate model is constructed, and the parameter change rate at time point t0 can be calculated according to the laboratory parameter change rate model, and the numerical curve of the controlled parameter value within the control period T2 can be drawn backward in combination with the controlled parameter value at time point t0.

[0083] In the process of actual control equipment, the value of the controlled parameter generally changes at a certain parameter change rate. Assuming that the reference value of the controlled parameter predicted within the control period T2 does not change, such as Figure 2 As shown, after knowing the parameter change rate at time point t0 and the controlled parameter value at time point t0, it is possible to draw a straight line with a specific starting point and a specific slope backward as a numerical curve of the controlled parameter value within the control period T2.

[0084] In addition, since the reference value of the controlled parameter predicted within the control cycle T2 may change, the reference value of the controlled parameter predicted within the control cycle T2 changes, thereby causing the laboratory parameter conversion rate to change, such as Figure 3 As shown, before the time point when the change occurs, an inclined line segment is drawn backwards with the parameter change rate at time point t0 and the controlled parameter value at time point t0, and after the time point when the change occurs, the slope of the curve is adjusted according to the recalculated laboratory parameter change rate, and the inclined straight line continues to be drawn backwards.

[0085] The drawing of the numerical curves of the above two controlled parameter values ​​is carried out when other conditions inside and outside the laboratory remain unchanged. However, in actual application, since this process is a process of simulating the drawing of the numerical curve of the controlled parameter values, it can be assumed that the values ​​of the corresponding parameters outside the laboratory and other data with little relevance remain unchanged. The controlled parameter value T2 in the laboratory will inevitably change with the regulation process. Therefore, the laboratory parameter change rate changes in real time within the regulation cycle T2. Therefore, in the process of simulating the drawing of the numerical curve of the controlled parameter value within the regulation cycle T2, the slope can be continuously adjusted according to the calculated parameter change rate value to form an adaptive simulation numerical curve, which is more consistent with the change process of the actual controlled parameter value.

[0086] After drawing the numerical curve of the controlled parameter value within the control period T2, it is necessary to calculate the deviation rate between the numerical curve of the controlled parameter value and the subsequent change curve of the controlled parameter reference value.

[0087] The calculation process of the deviation rate specifically includes the following steps:

[0088] Based on the numerical curve of the controlled parameter value, calculate the difference between the controlled parameter value corresponding to each control time node in the current control cycle T2 and the controlled parameter reference value;

[0089] Set the upper limit of the difference;

[0090] The ratio of the number of differences exceeding the upper limit of the difference within the control period T2 to the total number of differences is calculated to obtain the deviation rate a%.

[0091] by Figure 4 Take as an example, the dotted straight line at the top is the subsequent change curve of the reference value of the controlled parameter, and the solid curve at the bottom is the numerical curve of the simulated controlled parameter value. The vertical distance between the two lines corresponding to each control time node (the position of the hollow point in the figure) on the numerical curve of the controlled parameter value is calculated, that is, the difference between the controlled parameter value and the controlled parameter reference value corresponding to each control time node is calculated, and the upper limit value y of the difference is set. Assuming that the difference exceeding the upper limit value of the difference within the control period T2 is the difference at the first point, the deviation rate is the ratio of the number of differences exceeding the upper limit value of the difference to the total number of differences, and the deviation rate is 20%.

[0092] The above process is an example of the calculation process of the deviation rate. In actual application, within the control cycle T2, each time a monitoring time node is reached, the current time point is taken as t0, and the controlled parameter reference value at time point t0+T1 is calculated based on the subsequent change curve of the predicted controlled parameter reference value. The laboratory parameter change rate is calculated based on the controlled parameter reference value, and the numerical curve of the corresponding simulated controlled parameter value changes.

[0093] Afterwards, (1-a%) is used as the accuracy of the controlled parameter value in the current reference period, and the reference period T1 with the highest accuracy is selected in turn. According to the above example, 80% is used as the accuracy of the controlled parameter value in the reference period.

[0094] According to the above steps, different reference values ​​of controlled parameters under different reference periods T1 are calculated.

[0095] In each deviation rate calculation process, if the reference period T1 with the highest accuracy rate finally screened out exceeds one, the upper limit of the difference will be reset and the deviation rate and accuracy will be recalculated until the reference period T1 with the highest accuracy rate screened out is one, which will be used as the final reference value. In actual control, the control equipment will perform control work based on this final reference value.

[0096] From the above implementation process, the remote monitoring process of the controlled parameters of the laboratory is as follows:

[0097] (1) Assuming that the reference value of the controlled parameter (the actual reference value of the controlled parameter) has been set at time t0, it is input into the recurrent network model, combined with historical data to form a training set, and the subsequent change curve of the reference value of the controlled parameter is predicted;

[0098] (2) setting a reference period T1 value, and calculating the controlled parameter reference value at time point t0+T1 on the subsequent change curve of the controlled parameter reference value according to the set reference period T1 value and the subsequent change curve of the controlled parameter reference value;

[0099] Substitute the calculated controlled parameter reference value into the laboratory parameter change rate model to calculate the parameter change rate at time t0, and draw a numerical curve of the controlled parameter value within the control period T2 backward in combination with the controlled parameter value at time t0 (the detected controlled parameter value);

[0100] In the process of simulating the drawing of the numerical curve of the controlled parameter value, time nodes with equal time intervals can be set. At the first time node, the numerical curve of the controlled parameter value is drawn backwards with the first calculated parameter change rate and the actual controlled parameter value. After reaching the second time node, this point is taken as the time point t0 again, and the controlled parameter reference value at the time point t0+T1 on the subsequent change curve of the controlled parameter reference value is calculated. The parameter change rate is calculated with the calculated controlled parameter reference value, and the numerical curve of the controlled parameter value is drawn backwards with the second calculated parameter change rate and the current curve endpoint position, and so on, until the numerical curves of all the controlled parameter values ​​in the control period T2 are drawn;

[0101] The above time node can be set as an actual control time node or other time node. The control time node refers to the time node of each control action in the actual control.

[0102] (3) adjusting the value of the reference period T1 and repeating step (2), thereby obtaining a numerical curve of the controlled parameter values ​​corresponding to the values ​​of the reference period T1;

[0103] (4) Calculate the deviation rate between the numerical curve of the controlled parameter value corresponding to each reference period T1 value and the subsequent change curve of the controlled parameter reference value according to the steps, so as to obtain the accuracy rate of the numerical curve of the controlled parameter value corresponding to each reference period T1 value;

[0104] Adjust the upper limit of the difference until the numerical curve of the controlled parameter value with the highest accuracy is screened out, and use the value of the reference period T1 corresponding to it as the final reference value;

[0105] (5) The PID controller uses the final reference value as the target value and controls the control equipment to adjust the value of the controlled parameter in the laboratory based on the current laboratory controlled parameter data.

[0106] In the above embodiment, only the numerical curves of all the controlled parameter values ​​within the control period T2 are screened, and the control period T2 can also be adjusted according to actual conditions. If the controlled parameter fluctuates greatly within a certain period of time, the control period T2 can be shortened. If the controlled parameter fluctuates little within a certain period of time, the control period T2 can be increased. On the one hand, it can avoid the influence of excessive fluctuations on the results, and on the other hand, it can improve the screening accuracy by increasing the period.

[0107] In the prior art, the reference value of the controlled parameter set at time t0 is usually the value that the controlled parameter in the laboratory is expected to reach. If the next control action is performed before the value is reached when the next control time node arrives, it will cause the overall change curve of the controlled parameter to deviate too much from the reference value curve of the controlled parameter. Therefore, in the present invention, the reference value of the controlled parameter set at time t0 is not used as the expected value that the controlled parameter in the current laboratory reaches, but the reference value of the controlled parameter predicted at time t0+T1 is used as the target value. Taking the process of increasing the value of the controlled parameter driven by the control device as an example, theoretically, the reference value of the controlled parameter predicted at time t0+T1 must be greater than the reference value of the controlled parameter set at time t0. By increasing the reference value of the controlled parameter and increasing the target value, the control rate of the control device can be accelerated, so that the controlled parameter Reaching this value in a more optimized state, changing the control process by changing the target value of the control equipment mentioned above will not cause over-adjustment of the controlled parameter, because under continuous training and analysis, the controlled parameter adjustment continues to adjust to the target value after reaching the initially set reference value of the controlled parameter, and will enter the next control before the deviation is too large, and T1 can take the value of 0. At this time, the initially set controlled reference value is used as the expected value of the controlled parameter in the current laboratory. That is to say, in the process of selecting the most suitable reference period T1, the initially set reference value of the controlled parameter itself will be used as the target value to simulate the numerical curve of the controlled parameter value, and compared with the numerical curves of the controlled parameter values ​​obtained when the reference value of the controlled parameter is increased, so as to obtain the target value with the highest accuracy and the lowest deviation, which is the final reference value.

[0108] In the present invention, the specific implementation steps of the PID controller for remote parameter monitoring include:

[0109] Constructing PID control model:

[0110]

[0111] In the formula, u(t) is the control quantity, e(t) is the error signal, K p , K i , K d They are proportional coefficient, integral coefficient, differential coefficient, K p eYtY is a proportional term, is the integral term, is the differential term;

[0112] The network performance indicators are calculated using the RBF neural network:

[0113] Where J represents the network performance index, Y represents the RBF neural network output, represents the Gaussian function, yYkY represents the center of the kth radial basis function, and y mYkY represents the center of the mth radial basis function, s i represents the i-th perceptual variable, c i represents the center of the i-th radial basis function;

[0114] Calculate the change sensitivity of the controlled parameters based on the Jacobian matrix, and adjust the parameters of the PID control model according to the change sensitivity and network performance indicators;

[0115] The sensitivity is expressed as w represents the parameter adjustment amount, C represents the parameter adjustment ratio, g represents the momentum factor, and η represents the learning factor.

[0116] The parameters of the adjusted PID control model are ΔK p , ΔK i , ΔK d Respectively represent K p , K i , K d The adjustment amount, , and represent the learning rates of proportion, integration, and differentiation respectively.

[0117] The above steps complete the establishment of the PID control model and the adjustment of its parameters. In the specific implementation process, the performance indicators of the neural network can determine the adjustment of the PID control model parameters, thereby controlling the working rate of the entire model.

[0118] In the present invention, a parameter prediction module introduces a cyclic network model. The parameter prediction module obtains several groups of historical controlled parameter reference values ​​as training sets and trains the cyclic network model based on the training sets. The trained cyclic network model is used to predict the subsequent change curve of the controlled parameter reference value in the laboratory based on the reference value curve of the current controlled parameter.

[0119] The construction and training process of the recurrent network model specifically includes the following steps:

[0120] Create a three-layer neural network consisting of an input layer, a hidden layer, and an output layer;

[0121] Set the training function, connection function and output function of the hidden layer, connection layer and output layer;

[0122] Set the network's expected minimum error, maximum number of iterations, and learning rate;

[0123] Input the training set into the recurrent network model and train it;

[0124] Adjust the weights of each layer in the recurrent network model according to the error;

[0125] Determine whether the recurrent network model has converged, and the training is completed after convergence;

[0126] Among them, when the error is less than the minimum expected error, the algorithm converges;

[0127] When the maximum number of iterations is reached, the algorithm ends.

[0128] The reference values ​​of the controlled parameters within the time period are sequentially input into the trained cyclic network model, and the subsequent predicted values ​​of the reference values ​​of the controlled parameters are output. Based on the subsequent predicted values ​​of the reference values ​​of the controlled parameters, the subsequent change curve of the reference values ​​of the controlled parameters in the laboratory is drawn.

[0129] In the present invention, before the parameter control work at time point t0 is carried out, the actual value of the controlled parameter reference value at time point t0 is obtained and input into the trained recurrent network model to predict the subsequent change curve of the controlled parameter reference value, which can improve the prediction accuracy of the subsequent change curve of the controlled parameter reference value.

[0130] The above embodiments are only exemplary embodiments of the present application and are not intended to limit the present application. The protection scope of the present application is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present application within the essence and protection scope of the present application, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present application.

Claims

1. A new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things, characterized in that: have: Parameter acquisition module, used to collect the controlled parameter values ​​at time point t0 in the laboratory; Control equipment, used to control the values ​​of controlled parameters in the laboratory; A parameter prediction module introduces a cyclic network model, wherein the parameter prediction module obtains several groups of historical controlled parameter reference values ​​as training sets and trains the cyclic network model based on the training sets, and uses the trained cyclic network model to predict subsequent change curves of the controlled parameter reference values ​​in the laboratory based on the reference value curve of the current controlled parameter; The adjustment analysis module sets and modifies the reference period T1, and calculates the reference value of the controlled parameter at the time point t0+T1 as the final reference value based on the subsequent change curve of the predicted reference value of the controlled parameter; A PID controller is connected in series with the parameter acquisition module and the control device, and the PID controller controls the control device to adjust the value of the controlled parameter in the laboratory based on the comparison between the controlled parameter data and the final reference value; Among them, in the correction process of the reference period T1, the reference period T1 is initialized, and the controlled parameter reference value at the time point t0+T1 is calculated according to the subsequent change curve of the predicted controlled parameter reference value, and the numerical curve of the controlled parameter value in the simulation control period T2 is based on the controlled parameter reference value, and the deviation rate between the numerical curve of the controlled parameter value and the subsequent change curve of the controlled parameter reference value is calculated, and the above process is repeated to measure the accuracy of the controlled parameter value under different reference periods T1 to select the reference period T1 with the highest accuracy as the final reference period value of the current control period T2.

2. According to the new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things in claim 1, it is characterized in that: The numerical curve of the controlled parameter value in the simulation control period T2 includes the following steps: Establish the state transfer matrix of the laboratory parameter control system: In the formula, T represents the reference value of the controlled parameter, T1 represents the value of the corresponding parameter outside the laboratory, T2 represents the value of the controlled parameter in the laboratory, β represents the relationship between the controlled parameter value in the laboratory and the reference value of the controlled parameter, τ represents the power output power of the control equipment, and μ represents the relationship between the voltage load of the control equipment and the value of the controlled parameter; The state transfer matrix of the laboratory parameter control system is used to establish a laboratory parameter change rate model in combination with the changes in the values ​​of the controlled parameters: Where L(t) represents the sum of environmental variables, and V(p) represents the function of regulating the output of the device.

3. The new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things according to claim 2 is characterized in that: The parameter change rate at time point t0 is calculated based on the laboratory parameter change rate model, and the numerical curve of the controlled parameter value within the control period T2 is drawn backward in combination with the controlled parameter value at time point t0.

4. The new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things according to claim 1 is characterized in that: The calculation process of the deviation rate specifically includes the following steps: Based on the numerical curve of the controlled parameter value and the subsequent change curve of the controlled parameter reference value, the difference between the controlled parameter value and the controlled parameter reference value corresponding to each control time node in the current control cycle T2 is calculated; Set the upper limit of the difference; The ratio of the number of differences exceeding the upper limit of the difference within the control period T2 to the total number of differences is calculated to obtain the deviation rate a%.

5. The new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things according to claim 4 is characterized in that: Taking (1-a%) as the accuracy of the controlled parameter value in the current reference period, the reference period T1 with the highest accuracy is selected in turn; In each deviation rate calculation process, if the reference period T1 with the highest accuracy rate finally screened out exceeds one, the upper limit of the difference is reset and the deviation rate and accuracy rate are recalculated.

6. The new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things according to claim 1 is characterized in that: The specific implementation steps of the PID controller for remote parameter monitoring include: Constructing PID control model: In the formula, u(t) is the control quantity, e(t) is the error signal, K p , K i , K d They are proportional coefficient, integral coefficient, differential coefficient, K p eYtY is a proportional term, is the integral term, is the differential term; The network performance indicators are calculated using the RBF neural network: Where J represents the network performance index, Y represents the RBF neural network output, represents the Gaussian function, yYkY represents the center of the kth radial basis function, and y m YkY represents the center of the mth radial basis function, s i represents the i-th perceptual variable, c i represents the center of the i-th radial basis function; Calculate the change sensitivity of the controlled parameters based on the Jacobian matrix, and adjust the parameters of the PID control model according to the change sensitivity and network performance indicators; The sensitivity is expressed as w represents the parameter adjustment amount, C represents the parameter adjustment ratio, g represents the momentum factor, and η represents the learning factor.

7. The new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things according to claim 6 is characterized in that: The parameters of the adjusted PID control model are ΔK p , ΔK i , ΔK d Respectively represent K p , K i , K d The adjustment amount, , and represent the learning rates of proportion, integration, and differentiation respectively.

8. The new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things according to claim 1 is characterized in that: The construction and training process of the recurrent network model includes the following steps: Create a three-layer neural network consisting of an input layer, a hidden layer, and an output layer; Set the training function, connection function and output function of the hidden layer, connection layer and output layer; Set the network's expected minimum error, maximum number of iterations, and learning rate; Input the training set into the recurrent network model and train it; Adjust the weights of each layer in the recurrent network model according to the error; Determine whether the recurrent network model has converged, and the training is completed after convergence; Among them, when the error is less than the minimum expected error, the algorithm converges; When the maximum number of iterations is reached, the algorithm ends.

9. The new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things according to claim 8 is characterized in that: Inputting the reference values ​​of the controlled parameters within the time period into the trained recurrent network model in sequence, and outputting subsequent predicted values ​​of the reference values ​​of the controlled parameters; Based on the subsequent predicted values ​​of the reference values ​​of the controlled parameters, a subsequent change curve of the reference values ​​of the controlled parameters in the laboratory is drawn.

10. The new type of laboratory remote monitoring and operation maintenance management system based on the Internet of Things according to claim 9 is characterized in that: Before the parameter control work at time point t0 is performed, the actual value of the reference value of the controlled parameter at time point t0 is obtained and input into the trained recurrent network model to predict the subsequent change curve of the reference value of the controlled parameter.

Citation Information

Patent Citations

  • Livestock and poultry house breeding environment temperature prediction control system and regulation and control method thereof

    CN112817354A

  • Environment regulation and control method and system for precise instrument laboratory

    CN114371752A

  • Power supply emergency repair environment monitoring method and system for guaranteeing life safety

    CN116777088A

  • Environment regulation and control system of animal laboratory

    CN117687461A

  • Laboratory fault prediction operation and maintenance system and method

    CN118350800A

Cited By

  • Intelligent regulation and control system and method for laboratory environment

    CN120276541A