Group control equipment process formula management and control method and equipment based on Internet of Things, and medium

Through the Internet of Things technology, process recipes are automatically managed, which solves the problems of information dispersion and manual errors in traditional process recipe management, realizes equipment adaptive control, and improves production efficiency and quality.

CN118760093APending Publication Date: 2024-10-11INSPUR GENERSOFT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410975207.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The management of process recipes in traditional non-IoT environments has problems such as information dispersion, inconsistent version updates, and manual input errors, which makes it difficult to guarantee production quality, especially the lack of automated adjustment capabilities at the equipment level.

Method used

Adopt the process recipe management and control method of group control equipment based on the Internet of Things, and automatically adjust the process recipe through basic process recipe database calls, monitoring equipment to collect external environment data, and train compensation models to reduce manual intervention and improve the adaptive ability of production equipment.

Benefits of technology

It realizes the automated management of process recipes, improves the adaptive ability of production equipment, reduces manual errors, improves production efficiency and parameter compensation accuracy, and ensures product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760093A_ABST
    Figure CN118760093A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses a group control equipment process formula management and control method based on the Internet of Things, equipment and a medium, relates to the technical field of intelligent production, and is used for solving the problem of high error rate of an existing manual compensation process formula. The method comprises the following steps: calling a basic process formula corresponding to a to-be-produced product to determine a plurality of target production devices; external environment data are collected and compared to obtain external change environment data; determining artificial compensation parameters according to a historical basic process formula and a historical equipment process formula, and extracting the external change environment data based on an association relationship between the external change environment data and the artificial compensation parameters to obtain external environment influence data; determining to-be-controlled target production equipment based on the existing equipment process formula data and the inclusion relation between the current environment influence data and the external environment influence data; and inputting the basic process formula and the current external environment influence data into the compensation model to obtain the equipment process formula of the to-be-controlled target production equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent production technology, and in particular to a group control equipment process recipe control method, equipment and medium based on the Internet of Things. Background Art

[0002] In traditional non-IoT environments, the transmission and management of process recipes usually rely on a series of manual and semi-automated processes. In terms of management, process recipes often exist in the form of paper documents or electronic documents. Before production begins, process personnel need to manually input these recipe information into the control system of production equipment. How to control and distribute process recipes is an important part of improving the production quality of group control equipment under large-scale production.

[0003] At present, in terms of transmission control of process formulas, the transmission of the same process formula from one device to another mainly relies on the process personnel to transmit it through a USB flash drive. However, this traditional management method has many limitations: first, since the formula information is scattered in multiple documents or systems, it is difficult to manage it in a unified manner, and information sharing and collaborative work are restricted, affecting production efficiency; second, the update and change of the formula version also requires manual recording and notification, which is prone to information inconsistency or omission; third, manual input and transmission are prone to errors, leading to quality problems in the production process. In addition, since the currently stored process formulas are generally basic process formulas, they are generally affected by changes in the external environmental factors of production. It is generally necessary to manually correct the formula parameters on different production equipment. However, this manual correction method lacks the management of specific process formulas at the equipment level, and does not rule out quality problems caused by manual input errors at the equipment level. Therefore, there is a need for a process formula control method that can achieve adaptive control and automatic adjustment of equipment processes while reducing manual intervention. Summary of the invention

[0004] In order to solve the above technical problems, one or more embodiments of this specification provide a group control equipment process recipe control method, equipment and medium based on the Internet of Things.

[0005] One or more embodiments of this specification adopt the following technical solutions:

[0006] One or more embodiments of this specification provide a group control equipment process recipe control method based on the Internet of Things, the method comprising:

[0007] Calling the basic process formula corresponding to the product to be produced through the basic process formula database, and determining multiple target production equipment based on the basic process formula and the equipment information of the current workshop;

[0008] Based on the monitoring equipment and the sensor equipment corresponding to the target production equipment, the external environment data of the multiple target production equipment are collected, and the external environment data are arranged and compared based on the time sequence to obtain the external change environment data;

[0009] Determine the artificial compensation parameters of each of the target production equipment according to the historical basic process formula and the historical equipment process formula of each of the target production equipment, and extract the external change environment data based on the correlation between the external change environment data and the artificial compensation parameters to obtain external environment impact data;

[0010] Query the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database, and determine the target production equipment to be controlled in the target production equipment based on the existing equipment process formula data and the inclusion relationship between the current environmental impact data and the external environmental impact data;

[0011] The external environment impact data, the historical basic process formula and the historical equipment process formula are input into a preset decision tree model for training to obtain a compensation model, and the basic process formula and the current external environment impact data are input into the compensation model to obtain the equipment process formula of the target production equipment to be controlled.

[0012] Optionally, in one or more embodiments of the present specification, before calling the basic process formula corresponding to the product to be produced through the basic process formula database, the method further includes:

[0013] Receiving process description information of a product to be produced, splitting the process description information based on the process flow processing stages contained in the process description information, and obtaining multiple segments of process description sub-information;

[0014] The process description sub-information is split twice according to a preset segmentation length to obtain process description segmentations corresponding to each process processing stage, and the process description segmentations are filtered according to the part-of-speech information corresponding to each process description segmentation to obtain valid process description segmentations;

[0015] Translate the effective process description segmentation words based on a preset translation interface to obtain multi-dimensional translation data corresponding to the effective process description segmentation words;

[0016] Obtaining the segmentation vectors corresponding to the effective description segmentation and the multidimensional translation data, and performing similarity matching in the process word library corresponding to each process processing flow stage based on the segmentation vectors to determine the process parameters of each process processing stage;

[0017] Based on the effective process description segmentation of each process flow processing stage, the context information of each process parameter is determined, so as to determine the basic process formula corresponding to the product to be produced based on the context information of each process parameter.

[0018] Optionally, in one or more embodiments of this specification, based on the basic process recipe and the equipment information of the current workshop, multiple target production equipment are determined, specifically including:

[0019] Determining the allowable processing range corresponding to each process parameter based on the parameter value corresponding to each process parameter in the basic process formula and the fault tolerance range corresponding to the parameter value;

[0020] Comparing the allowed processing range with the equipment information of the current workshop to determine whether the equipment information of the current workshop covers the allowed processing range;

[0021] If yes, the production equipment corresponding to the equipment information is used as the initial target production equipment;

[0022] According to the work-rest mechanism and the reference equipment load rate of each of the initial target equipment, the idle processing start time of each of the initial target production equipment is determined, so as to determine a plurality of target production equipment based on the idle processing start time.

[0023] Optionally, in one or more embodiments of the present specification, the manual compensation parameters of each target production equipment are determined according to the historical basic process formula and the historical equipment process formula of each target production equipment, and based on the correlation between the external change environment data and the manual compensation parameters, the external change environment data is extracted to obtain the external environment impact data, specifically including:

[0024] Group and match the historical basic process formula and historical equipment process formula of each target production equipment, multiple groups of historical basic process formula and historical equipment process formula;

[0025] Obtain the difference between each group of historical basic process recipe data and the historical equipment process recipe, summarize the process parameters corresponding to the difference, and determine the manual compensation parameters of each target production equipment;

[0026] Based on the historical external change environment data corresponding to each historical equipment process recipe and the spatial information corresponding to the historical external change environment data, determine the multi-dimensional spatial environment information corresponding to the historical external change environment data;

[0027] Acquire the spatial position information corresponding to the artificial compensation parameter and the parameter attributes corresponding to the artificial compensation parameter;

[0028] Determining a first degree of association based on the association relationship between the spatial position information and the multidimensional spatial environment information, and determining a second degree of association based on the association relationship between the parameter attribute and the historical external change environment data;

[0029] The correlation degree between the correlation relationship between the external change environment data and the artificial compensation parameter is determined according to the product of the first correlation degree and the second correlation degree, and the external change environment data is extracted based on the correlation degree to obtain external environment impact data.

[0030] Optionally, in one or more embodiments of the present specification, querying the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database, and determining the target production equipment to be controlled in the target production equipment based on the existing equipment process formula data and the inclusion relationship between the current environmental impact data and the external environmental impact data, specifically includes:

[0031] Querying the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database to determine whether the existing equipment process formula data corresponds to the target production equipment;

[0032] If yes, the target production equipment corresponding to the existing equipment process recipe data is used as the first target production equipment, and the remaining target production equipment is used as the second target production equipment;

[0033] Acquire current environmental impact data of the first target production equipment and the second target generation equipment, and determine whether there is an inclusion relationship between the current environmental impact data and the external environmental impact data; wherein the inclusion relationship includes: a cross relationship and an overlay relationship;

[0034] If it is determined that the current environmental impact data of the first target production equipment or the second target production equipment has an inclusion relationship with the external environmental impact data, the first target production equipment or the second target production equipment is used as the target production equipment to be controlled;

[0035] If it is determined that the current environmental impact data of the first target production equipment does not have an inclusion relationship with the external environmental impact data, then transmitting the existing equipment process recipe data to the first target production equipment;

[0036] If it is determined that the current environmental impact data of the second target production equipment does not have an inclusion relationship with the external environmental impact data, the second target production equipment is used as the target production equipment to be controlled.

[0037] Optionally, in one or more embodiments of the present specification, the external impact environment data, the historical basic process recipe and the historical equipment process recipe are input into a preset decision tree model for training to obtain a compensation model, specifically including:

[0038] The external impact environment data, the historical basic process formula and the historical equipment process formula are divided based on a preset ratio to obtain a training set and a test set;

[0039] Determine the sample features of the training set and the categories of the artificial compensation parameters in the historical equipment process recipe based on the feature extraction layer of the preset decision tree model, determine the probability estimate of each sample feature being predicted as a different artificial compensation parameter category according to the category to which each sample feature belongs, and determine the Gini index corresponding to each decision tree node based on the probability estimate;

[0040] Determine the importance of each of the sample features according to the change rate of the Gini index of the adjacent branches of each of the decision tree nodes, extract important sample features based on the importance and input them into the hidden layer of the preset decision tree model, and perform training based on the activation function of the hidden layer to obtain an initial compensation model;

[0041] The initial compensation model is tested based on the test set. If, based on the test result, it is determined that there is a gap between the actual change of the equipment process formula and the compensation parameters of the equipment process formula predicted by the initial compensation model, and the gap exceeds a set limit, the external influencing environment data, the historical basic process formula and the historical equipment process formula are updated, and the initial compensation model is iteratively trained to obtain a compensation model.

[0042] Optionally, in one or more embodiments of the present specification, after inputting the basic process formula and the current external environment impact data into the compensation model to obtain the equipment process formula of the target production equipment to be controlled, the method further includes:

[0043] Determine whether the target production equipment to be controlled has received the downloaded equipment process formula;

[0044] If yes, then read the equipment process formula downloaded from the target production equipment to be controlled and compare it with the equipment process formula of the target production equipment to be controlled, so as to realize the verification of the equipment process formula;

[0045] If the verification passes, the target production equipment to be controlled will produce based on the downloaded equipment process formula, and record the downloaded equipment process formula.

[0046] Optionally, in one or more embodiments of this specification, after recording the downloaded equipment process formula, the method further includes:

[0047] Based on the configuration information of the target production equipment to be controlled, determine the uploadable process parameters of the equipment process recipe after the download and upload the uploadable process parameters to the equipment process recipe database;

[0048] Based on the number of calls of the uploadable process parameters in the equipment process recipe database and a preset call number threshold, triggering an upload request for the target production equipment to be controlled;

[0049] Determine the upper-level role information associated with the upload request according to the login information corresponding to the upload request and the role authority information of the target production equipment to be controlled;

[0050] The upload request is forwarded based on the login terminal corresponding to the upper-layer role information to receive the authorization information replied by the login terminal corresponding to the upper-layer role information, and the downloaded equipment process recipe is re-uploaded according to the authorization information.

[0051] One or more embodiments of this specification provide a group control equipment process recipe control device based on the Internet of Things, including:

[0052] at least one processor; and,

[0053] a memory communicatively connected to the at least one processor; wherein,

[0054] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to: execute any of the above-mentioned methods.

[0055] One or more embodiments of the present specification provide a non-volatile computer storage medium storing computer executable instructions, wherein the computer executable instructions are configured to execute any of the above-described methods.

[0056] At least one of the above technical solutions adopted in the embodiments of this specification can achieve the following beneficial effects:

[0057] According to the basic process formula and the equipment information of the current workshop, the relevant equipment that can achieve the process parameters in the basic process formula is selected as the target production equipment to ensure the production quality of subsequent products. Timely acquisition of changes in the external environment helps to quickly make compensation adjustments to the process formula, and arranging and comparing the external environment data in chronological order can more accurately discover the changing trend of the external environment and avoid the limitations of data at a single time point. Extracting the external change environment data based on the correlation degree can more accurately obtain the external environment impact data that affects the process parameters, avoiding unnecessary data interference and errors. By querying the preset equipment process formula database to determine whether the existing equipment process formula data corresponds to the target production equipment, the target production equipment that needs to be controlled can be quickly determined to improve production efficiency. Automatic compensation for the basic process formula based on the compensation model avoids the shortcomings of manual compensation and improves the efficiency and accuracy of parameter compensation. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solutions in the embodiments of this specification or the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art description. Obviously, the drawings described below are only some embodiments recorded in this specification. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. In the drawings:

[0059] Figure 1 A schematic diagram of a process recipe control method for group control equipment based on the Internet of Things provided in an embodiment of this specification;

[0060] Figure 2 A schematic diagram of the artificial compensation structure of a process recipe of a group control device provided in an embodiment of this specification;

[0061] Figure 3 A process recipe compensation model training diagram for a group control device provided in an embodiment of this specification;

[0062] Figure 4 A schematic diagram of a model compensation structure of a process recipe of a group control device provided in an embodiment of this specification;

[0063] Figure 5 A schematic diagram of the structure of a group control equipment process recipe control device based on the Internet of Things provided in the embodiments of this specification;

[0064] Figure 6 A schematic diagram of the structure of a non-volatile storage medium provided in an embodiment of this specification. DETAILED DESCRIPTION

[0065] The embodiments of this specification provide a method, device and medium for controlling a process recipe of a group control device based on the Internet of Things.

[0066] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this specification, not all of the embodiments. Based on the embodiments of this specification, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of this specification.

[0067] like Figure 1 As shown, the embodiment of this specification provides a schematic diagram of a process recipe control method for group control equipment based on the Internet of Things. Figure 1 It can be seen that the methods include:

[0068] S101: calling a basic process formula corresponding to a product to be produced through a basic process formula database, and determining a plurality of target production equipment based on the basic process formula and equipment information of a current workshop.

[0069] First, in order to determine the target production equipment to which the process recipe needs to be assigned, the basic process recipe corresponding to the product to be produced is called through the basic process recipe database in the embodiment of this specification. Then, based on the basic process recipe and the equipment information of the current workshop, the relevant equipment that can achieve the process parameters in the basic process recipe is screened as the target production equipment to ensure the production quality of subsequent products.

[0070] Furthermore, in one or more embodiments of the present specification, before calling the basic process recipe corresponding to the product to be produced through the basic process recipe database, the method further includes the following process:

[0071] First, in order to match the corresponding basic process formula, the embodiment of this specification receives the process description information of the product to be produced, and then splits the process description information according to the process flow processing stage contained in the process description information to obtain multiple segments of process description sub-information. Then, the process description sub-information is split twice according to the preset segmentation length to obtain the process description segmentation corresponding to each process processing stage, and the process description segmentation is filtered according to the part-of-speech information corresponding to each process description segmentation to obtain the effective process description segmentation. Based on the gradual splitting of the process description information, the complex process description information can be decomposed into multiple stages, and then the process description self-information is split and filtered twice, which can avoid the interference of irrelevant information and extract effective information more accurately. Then, in order to achieve the expansion of the effective process description segmentation, thereby improving the accuracy of the match, after obtaining the effective process description segmentation, the effective process description segmentation is translated based on the preset translation interface to obtain the multi-dimensional translation data corresponding to the effective process description segmentation. Then, by obtaining the segmentation vectors corresponding to the effective description segmentation and the multidimensional translation data, the segmentation vectors are matched for similarity in the process word library corresponding to each process processing stage to determine the process parameters of each process processing stage. It should be noted that the process word library contains relevant words involved in different processes, for example, the chemical process flow contains relevant words such as "reaction, reagent, product, catalyst, temperature, pressure, concentration, solution-stirring, filtration, evaporation, crystallization, distillation, extraction, purification, separation, organic chemistry, inorganic chemistry, physical chemistry, analytical chemistry, chemical equilibrium, chemical kinetics". According to the effective process description segmentation of each process processing stage, the context information of each process parameter is determined to determine the basic process formula corresponding to the product to be produced based on the context information of each process parameter. By considering the actual application environment and contextual relationship of the process parameters, the basic process formula has a higher rationality.

[0072] Specifically, in one or more embodiments of this specification, based on the basic process recipe and the equipment information of the current workshop, multiple target production equipment are determined, which specifically includes the following process:

[0073] Based on the parameter values ​​corresponding to each process parameter in the basic process recipe and the fault tolerance range corresponding to each parameter value, the allowable processing range corresponding to each process parameter is determined. Then the allowable processing range is compared with the equipment information of the current workshop to determine whether the equipment information of the current workshop covers the allowable processing range, that is, based on the equipment information of the current workshop, it is determined whether the equipment has the relevant ability to execute the process parameter. If the allowable processing range is covered, the production equipment corresponding to the equipment information is used as the initial target production equipment. At the same time, according to the work and rest mechanism of each initial target equipment and the benchmark equipment load rate, the idle processing start time of each initial target production equipment is determined. By determining the idle processing start time, further equipment screening is performed to obtain multiple target production equipment, which can avoid equipment idleness and waiting time and improve production efficiency.

[0074] S102: Based on the monitoring equipment and the sensor equipment corresponding to the target production equipment, the external environment data of the multiple target production equipment are collected, and the external environment data are arranged and compared based on the time sequence to obtain the external change environment data.

[0075] Since the production of products will be affected by the external environment, in order to ensure product quality, it is necessary to compensate and adjust the basic process formula based on the external environment change data. Therefore, it is necessary to determine the external change environment data in real time. Therefore, in the embodiment of this specification, the external environment corresponding to multiple target production equipment is collected according to the monitoring equipment and sensing equipment corresponding to the target production equipment. Among them, it should be noted that the external environment data comes from multiple sources such as real-time monitoring, sensor collection, and historical records in the production process. These external environmental factors may be voltage, temperature, humidity, equipment loss, etc., and the collected external environment data needs to go through data cleaning, normalization, and removal of outliers. The process ensures the quality and consistency of the data. After obtaining the external environment data, the external environment data is arranged and compared according to the time sequence to obtain the external change environment data. The external environment data is collected in real time by the monitoring equipment and sensing equipment corresponding to the target production equipment, and the changes in the external environment can be obtained in time, so as to quickly compensate and adjust the process formula. Arrange and compare the external environment data according to the time sequence, and the changing trend of the external environment can be more accurately discovered, avoiding the limitations of the data at a single time point.

[0076] S103: Determine the artificial compensation parameters of each of the target production equipment according to the historical basic process formula and the historical equipment process formula, and extract the external change environment data based on the correlation between the external change environment data and the artificial compensation parameters to obtain external environment impact data.

[0077] In the embodiments of this specification Figure 2As shown, the artificial compensation parameters of each target production equipment are determined based on the historical basic process formula and historical equipment process formula of each target production equipment. In order to determine the external environmental data that has an impact on the process formula, thereby reducing the calculation cost of the compensation analysis, the external change environment data will be extracted based on the correlation between the external change environment data and the artificial compensation parameters to obtain the external environment impact data.

[0078] Specifically, in one or more embodiments of the present specification, the manual compensation parameters of each target production equipment are determined according to the historical basic process formula and the historical equipment process formula of each target production equipment, and based on the correlation between the external change environment data and the manual compensation parameters, the external change environment data is extracted to obtain the external environment impact data, which specifically includes the following processes:

[0079] First, the historical basic process formulas and historical equipment process formulas of each target production equipment are grouped and matched to obtain multiple groups of historical basic process formulas and historical equipment process formulas. Then, by obtaining the difference between each group of historical basic process formula data and the historical equipment process formula, the process parameters corresponding to the difference are summarized to determine the artificial compensation parameters of each target production equipment. It can be understood that if Figure 2The artificial compensation parameters shown are parameter compensations for process recipes in historical production processes. Therefore, analysis based on artificial compensation parameters can not only make subsequent compensations based on historical experience, but also avoid errors caused by continuing to use artificial input. In order to determine whether the external environment data has an impact on the process parameters, the embodiment of this specification determines the multidimensional spatial environment information corresponding to the historical external change environment data based on the historical external change environment data corresponding to the process recipes of each historical equipment and the spatial information corresponding to the historical external change environment data. The spatial position information corresponding to the artificial compensation parameters and the parameter attributes corresponding to the artificial compensation parameters are obtained. Then, according to the correlation between the spatial position information and the multidimensional spatial environment information, the first correlation is determined. And based on the correlation between the parameter attributes and the historical external change environment data, the second correlation is determined. Among them, the determination method of the first correlation and the second correlation can be determined based on a preset neural network model. According to the product of the determined first correlation and the second correlation, the correlation between the external change environment data and the correlation between the artificial compensation parameters is determined, and the external change environment data is extracted based on the correlation to obtain the external environment impact data. By calculating the correlation between spatial location information and multidimensional spatial environment information, as well as the correlation between parameter attributes and historical external change environment data, we can deeply analyze the relationship between external environment data and artificial compensation parameters, rather than simply judging whether there is an impact. By extracting external change environment data based on the correlation, we can more accurately obtain external environment impact data that affects process parameters, avoiding unnecessary data interference and errors.

[0080] S104: Query the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database, and determine the target production equipment to be controlled in the target production equipment based on the existing equipment process formula data and the inclusion relationship between the current environmental impact data and the external environmental impact data.

[0081] In the process of group control equipment process recipe management based on the Internet of Things, the process recipe upload process is to read the process parameters configured by the specified equipment process recipe from the specified production equipment and save them to the equipment process recipe database. To upload the process recipe, it is necessary to first determine whether the target equipment process recipe and process parameters are allowed to be uploaded. If the target equipment process recipe is configured to prohibit uploading from the production equipment, the process recipe cannot be uploaded; if the target equipment process recipe is allowed to be uploaded, but some of the process parameters are configured to prohibit uploading from the production equipment, only the process parameters that are not prohibited from uploading in the equipment process recipe are uploaded. The process recipe upload process is as follows: Determine the target production equipment 1 and the target basic process recipe A, and then determine the target equipment process recipe A1. Determine whether to allow the recipe to be uploaded. If the equipment process recipe A1 is configured to prohibit uploading from the production equipment, exit the process recipe upload. Determine the process parameters that are prohibited from uploading in the equipment process recipe A1, and take the remaining process parameters to continue uploading the process recipe. The process recipe transmission module establishes a TCP connection with the production equipment 1. Concurrently upload the process parameters that are allowed to be uploaded in the equipment process recipe A1. Close the TCP connection with the target production equipment 1. That is to say, some target production equipment may already have equipment process formulas corresponding to the products to be produced, so the subsequent compensation analysis process may not be performed on the target production equipment with equipment process formulas. Therefore, in the embodiments of this specification, the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database will be queried, so as to determine the target production equipment to be controlled in the target production equipment according to the existing equipment process formula data and the inclusion relationship between the current environmental impact data and the external environmental impact data.

[0082] Specifically, in one or more embodiments of the present specification, the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database is queried, and based on the existing equipment process formula data and the inclusion relationship between the current environmental impact data and the external environmental impact data, the target production equipment to be controlled in the target production equipment is determined, which specifically includes the following processes:

[0083] Query the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database to determine whether the existing equipment process formula data corresponds to the target production equipment. If it corresponds, then the target production equipment corresponding to the existing equipment process formula data is used as the first target production equipment, and the remaining target production equipment is used as the second target production equipment. At the same time, obtain the current environmental impact data of the first target production equipment and the second target generation equipment, and determine whether there is an inclusion relationship between the current environmental impact data and the external environmental impact data. Among them, it should be noted that the inclusion relationship includes: cross relationship and overlay relationship. If it is determined that the current environmental impact data of the first target production equipment or the second target production equipment has an inclusion relationship with the external environmental impact data, then the first target production equipment or the second target production equipment is used as the target production equipment to be controlled. If it is determined that the current environmental impact data of the first target production equipment does not have an inclusion relationship with the external environmental impact data, then the existing equipment process formula data is transferred to the first target production equipment at this time. If it is determined that the current environmental impact data of the second target production equipment does not have an inclusion relationship with the external environmental impact data, then the second target production equipment is used as the target production equipment to be controlled.

[0084] In the above process, by querying the preset equipment process formula database to determine whether the existing equipment process formula data corresponds to the target production equipment, the target production equipment that needs to be controlled can be quickly determined to improve production efficiency. Determine whether there is an inclusion relationship between the current environmental impact data and the external environmental impact data. If so, the target production equipment is used as the target production equipment to be controlled. In this way, the equipment that is greatly affected by the external environment can be controlled in time to ensure product quality. By transferring the existing equipment process formula data to the first target production equipment, rather than re-compensating the basic process formula to obtain the equipment process formula, production costs can be reduced.

[0085] S105: Input the external environment impact data, the historical basic process formula and the historical equipment process formula into a preset decision tree model for training to obtain a compensation model, input the basic process formula and the current external environment impact data into the compensation model to obtain the equipment process formula of the target production equipment to be controlled.

[0086] In order to automatically compensate the existing equipment process formula based on the new external environmental influencing factors and the basic process formula after detecting changes in the external environmental influencing factors, the embodiment of this specification firstly Figure 3As shown, the basic process recipe data, equipment process recipe data, and external environment influencing factor data are used to select a suitable algorithm to train a machine learning model of the impact of changes in external environment influencing factors on the equipment process recipe data. That is, in a certain embodiment of this specification, the external influencing environment data, historical basic process recipes, and historical equipment process recipes are input into a preset decision tree model for training to obtain a compensation model, and then as Figure 4 As shown, by inputting the basic process formula and the current external environment impact data into the compensation model, the equipment process formula of the target production equipment to be controlled can be obtained.

[0087] Specifically, in one or more embodiments of the present specification, the external impact environment data, the historical basic process recipe and the historical equipment process recipe are input into a preset decision tree model for training to obtain a compensation model, which specifically includes the following process:

[0088] First, the external influencing environment data, historical basic process formula and historical equipment process formula are divided based on the preset ratio to obtain the training set and the test set. Then, the sample features of the training set and the categories of the artificial compensation parameters in the historical equipment process formula are determined according to the feature extraction layer of the preset decision tree model. The probability estimate of each sample feature predicted as a different category of artificial compensation parameters is determined according to the category to which each sample feature belongs, and the Gini index corresponding to each decision tree node is determined based on the probability estimate. At the same time, the importance of each sample feature is determined according to the change rate of the Gini index of the adjacent branches of each decision tree node, and the important sample features are extracted based on the importance and input into the hidden layer of the preset decision tree model, and the initial compensation model is obtained based on the activation function of the hidden layer. By determining the categories of sample features and artificial compensation parameters, as well as the predicted probability estimate, it is helpful to understand the characteristics and patterns of the data, and the Gini index is used to evaluate the purity of the decision tree nodes. The calculation of the importance helps to focus on the features that have an important impact on the performance of the model, and then the important sample features are taken and input into the hidden layer for training, which can improve the accuracy and convergence speed of the model. The initial compensation model is tested with a test set. If the actual change in the equipment process formula is determined according to the test results to be different from the compensation parameters of the equipment process formula predicted by the initial compensation model, and the difference exceeds the set limit, the external influencing environment data, historical basic process formula and historical equipment process formula are updated and the initial compensation model is iteratively trained to obtain a compensation model. Repeated training and updating of the model can adapt it to different data sets and external environment changes, improving the generalization ability and accuracy of the model.

[0089] Further, in one or more embodiments of the present specification, after the basic process formula and the current external environment impact data are input into the compensation model to obtain the equipment process formula of the target production equipment to be controlled, the method further includes:

[0090] For the download of equipment process recipes, based on the communication protocols supported by the production equipment, including Siemens communication protocol, Omron communication protocol, and Inovance communication protocol, bidirectional data transmission from the process recipe parameters of the autonomously controlled equipment to the production equipment is realized during the download process, ensuring that the recipe used on the production site is always the latest version, eliminating the quality problems that may be caused by manual input errors on the production equipment. The download of process recipes is to send the process parameters of the specified equipment process recipe to the specified production equipment. To download the process recipe, the operating status of the target production equipment must be determined first. The equipment in operation is prohibited from downloading the process recipe. After the process recipe is downloaded, the process parameters of the target production equipment are read again for verification to ensure the integrity and accuracy of the downloaded process recipe. The process recipe download process is as follows: Determine the target basic process recipe A and the target production equipment 1, and then determine the target equipment process recipe A1. The process recipe transmission module establishes a TCP connection with the production equipment 1. Determine the operating status of the production equipment 1. The equipment in operation is prohibited from downloading the process recipe. Enable the equipment remote transmission recipe. Concurrently download the process parameters of the equipment process recipe A1. Disable the equipment remote transmission recipe. Read the process parameters of production equipment 1 and compare them with the equipment process formula A1 to ensure the integrity and accuracy of the downloaded process formula. Close the TCP connection with the target production equipment 1.

[0091] Therefore, in the embodiments of this specification, after the equipment process formula is generated and issued, it is determined whether the target production equipment to be controlled has received the downloaded equipment process formula. If the equipment process formula is received, then the equipment process formula downloaded from the target production equipment to be controlled is read and compared with the equipment process formula of the target production equipment to be controlled, thereby realizing the verification of the equipment process formula. If the verification passes, the target production equipment to be controlled can produce based on the downloaded equipment process formula and record the downloaded equipment process formula. An accurate process formula is the key to ensuring product quality. By comparing and verifying, it can be ensured that the equipment process formula received by the target production equipment to be controlled is consistent with the formula generated by the system, reducing the occurrence of errors and deviations. In addition, recording the downloaded equipment process formula provides traceability of the production process, which is convenient for quality tracing and problem troubleshooting when necessary.

[0092] Furthermore, in one or more embodiments of the present specification, after recording the downloaded equipment process recipe, the method further includes:

[0093] In order to facilitate the next use of the equipment process formula and reduce the computing power cost consumed by the compensation analysis process, based on the configuration information of the target production equipment to be controlled, the uploadable process parameters of the equipment process formula after the download are determined and the uploadable process parameters are uploaded to the equipment process formula database. In other words, by uploading the uploadable process parameters of the equipment process formula to the database, data synchronization and sharing between different devices are realized, which is conducive to improving the coordination and efficiency of the production process. Then, based on the number of calls of the uploadable process parameters in the equipment process formula database and the preset number of calls, the upload request of the target production equipment to be controlled is triggered. According to the login information corresponding to the upload request and the role authority information of the target production equipment to be controlled, the upper-level role information associated with the upload request is determined. Then, the upload request is forwarded based on the login terminal corresponding to the upper-level role information, so as to receive the authorization information replied by the login terminal corresponding to the upper-level role information, and the downloaded equipment process formula is re-uploaded according to the authorization information. The login terminal corresponding to the upper-level role information can reply to the authorization information according to actual needs, agree or reject the upload request, and realize flexible authority management to adapt to different business scenarios and security policies.

[0094] like Figure 5 As shown, the embodiment of this specification provides a schematic diagram of the internal structure of a group control equipment process recipe control device based on the Internet of Things. Figure 5 It can be seen that in one or more embodiments of this specification, a group control equipment process recipe control device based on the Internet of Things includes:

[0095] at least one processor; and,

[0096] a memory communicatively connected to the at least one processor; wherein,

[0097] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to: execute any of the above-mentioned methods.

[0098] like Figure 6 As shown, the embodiment of this specification provides a schematic diagram of the internal structure of a non-volatile storage medium. Figure 6 It can be seen that in one or more embodiments of this specification, a non-volatile storage medium stores computer executable instructions 601, and the computer executable instructions 601 can execute any of the methods described above.

[0099] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, equipment, and non-volatile computer storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0100] The above is a description of a specific embodiment of the specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0101] The above description is only one or more embodiments of this specification and is not intended to limit this specification. For those skilled in the art, one or more embodiments of this specification may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of one or more embodiments of this specification shall be included in the scope of the claims of this specification.

Claims

1. A group control equipment process recipe control method based on the Internet of Things, characterized in that: The method comprises: Calling the basic process formula corresponding to the product to be produced through the basic process formula database, and determining multiple target production equipment based on the basic process formula and the equipment information of the current workshop; Based on the monitoring equipment and the sensor equipment corresponding to the target production equipment, the external environment data of the multiple target production equipment are collected, and the external environment data are arranged and compared based on the time sequence to obtain the external change environment data; Determine the artificial compensation parameters of each of the target production equipment according to the historical basic process formula and the historical equipment process formula of each of the target production equipment, and extract the external change environment data based on the correlation between the external change environment data and the artificial compensation parameters to obtain external environment impact data; Query the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database, and determine the target production equipment to be controlled in the target production equipment based on the existing equipment process formula data and the inclusion relationship between the current environmental impact data and the external environmental impact data; The external environment impact data, the historical basic process formula and the historical equipment process formula are input into a preset decision tree model for training to obtain a compensation model, and the basic process formula and the current external environment impact data are input into the compensation model to obtain the equipment process formula of the target production equipment to be controlled.

2. According to a method for controlling a process recipe of a group control equipment based on the Internet of Things according to claim 1, it is characterized in that: Before calling the basic process formula corresponding to the product to be produced through the basic process formula database, the method further includes: Receiving process description information of a product to be produced, splitting the process description information based on the process flow processing stages contained in the process description information to obtain multiple segments of process description sub-information; The process description sub-information is split twice according to a preset segmentation length to obtain process description segmentations corresponding to each process processing stage, and the process description segmentations are filtered according to the part-of-speech information corresponding to each process description segmentation to obtain valid process description segmentations; Translate the effective process description segmentation words based on a preset translation interface to obtain multi-dimensional translation data corresponding to the effective process description segmentation words; Obtaining the segmentation vectors corresponding to the effective description segmentation and the multidimensional translation data, and performing similarity matching in the process word library corresponding to each process processing flow stage based on the segmentation vectors to determine the process parameters of each process processing stage; Based on the effective process description segmentation of each process flow processing stage, the context information of each process parameter is determined, so as to determine the basic process formula corresponding to the product to be produced based on the context information of each process parameter.

3. The process recipe control method for group control equipment based on the Internet of Things according to claim 1 is characterized in that: Based on the basic process formula and the equipment information of the current workshop, multiple target production equipment are determined, including: Determining the allowable processing range corresponding to each process parameter based on the parameter value corresponding to each process parameter in the basic process formula and the fault tolerance range corresponding to the parameter value; Comparing the allowed processing range with the equipment information of the current workshop to determine whether the equipment information of the current workshop covers the allowed processing range; If yes, the production equipment corresponding to the equipment information is used as the initial target production equipment; According to the work-rest mechanism and the reference equipment load rate of each of the initial target equipment, the idle processing start time of each of the initial target production equipment is determined, so as to determine a plurality of target production equipment based on the idle processing start time.

4. The process recipe control method for group control equipment based on the Internet of Things according to claim 1 is characterized in that: According to the historical basic process formula and the historical equipment process formula of each of the target production equipment, the artificial compensation parameters of each of the target production equipment are determined, and based on the correlation between the external change environment data and the artificial compensation parameters, the external change environment data is extracted to obtain the external environment impact data, specifically including: Group and match the historical basic process formula and historical equipment process formula of each target production equipment, multiple groups of historical basic process formula and historical equipment process formula; Obtain the difference between each group of historical basic process recipe data and the historical equipment process recipe, summarize the process parameters corresponding to the difference, and determine the manual compensation parameters of each target production equipment; Based on the historical external change environment data corresponding to each historical equipment process recipe and the spatial information corresponding to the historical external change environment data, determine the multi-dimensional spatial environment information corresponding to the historical external change environment data; Acquire the spatial position information corresponding to the artificial compensation parameter and the parameter attributes corresponding to the artificial compensation parameter; Determining a first degree of association based on the association relationship between the spatial position information and the multidimensional spatial environment information, and determining a second degree of association based on the association relationship between the parameter attribute and the historical external change environment data; The correlation degree between the correlation relationship between the external change environment data and the artificial compensation parameter is determined according to the product of the first correlation degree and the second correlation degree, and the external change environment data is extracted based on the correlation degree to obtain external environment impact data.

5. The method for controlling a process recipe of a group control equipment based on the Internet of Things according to claim 1, characterized in that: The querying of the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database, and determining the target production equipment to be controlled in the target production equipment based on the existing equipment process formula data and the inclusion relationship between the current environmental impact data and the external environmental impact data, specifically includes: Querying the existing equipment process formula data corresponding to each target production equipment in the preset equipment process formula database to determine whether the existing equipment process formula data corresponds to the target production equipment; If yes, the target production equipment corresponding to the existing equipment process recipe data is used as the first target production equipment, and the remaining target production equipment is used as the second target production equipment; Acquire current environmental impact data of the first target production equipment and the second target generation equipment, and determine whether there is an inclusion relationship between the current environmental impact data and the external environmental impact data; wherein the inclusion relationship includes: a cross relationship and an overlay relationship; If it is determined that the current environmental impact data of the first target production equipment or the second target production equipment has an inclusion relationship with the external environmental impact data, the first target production equipment or the second target production equipment is used as the target production equipment to be controlled; If it is determined that the current environmental impact data of the first target production equipment does not have an inclusion relationship with the external environmental impact data, then transmitting the existing equipment process recipe data to the first target production equipment; If it is determined that the current environmental impact data of the second target production equipment does not have an inclusion relationship with the external environmental impact data, the second target production equipment is used as the target production equipment to be controlled.

6. The method for controlling the process formula of group control equipment based on the Internet of Things according to claim 1 is characterized in that: The external impact environment data, the historical basic process formula and the historical equipment process formula are input into a preset decision tree model for training to obtain a compensation model, specifically including: The external impact environment data, the historical basic process formula and the historical equipment process formula are divided based on a preset ratio to obtain a training set and a test set; Determine the sample features of the training set and the categories of the artificial compensation parameters in the historical equipment process recipe based on the feature extraction layer of the preset decision tree model, determine the probability estimate of each sample feature being predicted as a different artificial compensation parameter category according to the category to which each sample feature belongs, and determine the Gini index corresponding to each decision tree node based on the probability estimate; Determine the importance of each of the sample features according to the change rate of the Gini index of the adjacent branches of each of the decision tree nodes, extract important sample features based on the importance and input them into the hidden layer of the preset decision tree model, and perform training based on the activation function of the hidden layer to obtain an initial compensation model; The initial compensation model is tested based on the test set. If, based on the test result, it is determined that there is a gap between the actual change of the equipment process formula and the compensation parameters of the equipment process formula predicted by the initial compensation model, and the gap exceeds a set limit, the external influencing environment data, the historical basic process formula and the historical equipment process formula are updated, and the initial compensation model is iteratively trained to obtain a compensation model.

7. The method for controlling the process formula of group control equipment based on the Internet of Things according to claim 1 is characterized in that: After inputting the basic process formula and the current external environment impact data into the compensation model to obtain the equipment process formula of the target production equipment to be controlled, the method further includes: Determine whether the target production equipment to be controlled has received the downloaded equipment process formula; If yes, then read the equipment process formula downloaded from the target production equipment to be controlled and compare it with the equipment process formula of the target production equipment to be controlled, so as to realize the verification of the equipment process formula; If the verification passes, the target production equipment to be controlled will produce based on the downloaded equipment process formula, and record the downloaded equipment process formula.

8. The method for controlling the process formula of group control equipment based on the Internet of Things according to claim 7 is characterized in that: After recording the downloaded equipment process formula, the method further includes: Based on the configuration information of the target production equipment to be controlled, determine the uploadable process parameters of the equipment process recipe after the download and upload the uploadable process parameters to the equipment process recipe database; Based on the number of calls of the uploadable process parameters in the equipment process recipe database and a preset call number threshold, triggering an upload request for the target production equipment to be controlled; Determine the upper-level role information associated with the upload request according to the login information corresponding to the upload request and the role authority information of the target production equipment to be controlled; The upload request is forwarded based on the login terminal corresponding to the upper-layer role information to receive the authorization information replied by the login terminal corresponding to the upper-layer role information, and the downloaded equipment process recipe is re-uploaded according to the authorization information.

9. A group control equipment process recipe control device based on the Internet of Things, characterized in that: The device comprises: at least one processor; and, a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can: execute any of the methods described in claims 1-8.

10. A non-volatile storage medium storing computer executable instructions, characterized in that: The computer executable instructions can: execute the method described in any one of claims 1 to 8.