Building fire safety assessment method based on big data analysis
Through big data analysis and neural network models, combined with temperature range analysis, the problem of inaccurate wire temperature assessment in traditional methods is solved, achieving high-precision assessment of building fire safety, identifying and correcting false breakthrough phenomena, and enhancing Accuracy of fire safety assessments.
Patent Information
- Application Number
- CN202411244996.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-09-06
AI Technical Summary
When the traditional method evaluates the electrical fire safety of buildings, due to the floating conductor temperature and the single-point phenomenon of temperature sensor measurement, the accuracy of the assessment of building fire safety is low, especially when the conductor temperature is prone to fire in a short period of time, it is difficult to accurately identify false alarms. Breakthrough phenomenon.
Using a method based on big data analysis, by collecting voltage, current and residual current data of electrical lines, using a neural network model to predict the temperature, and determining the false breakthrough coefficient through temperature range analysis, correcting the temperature sequence, calculating the fire temperature assessment sequence and Safety determination coefficient for accurate assessment.
It improves the accuracy of building fire safety assessments, identifies and corrects false breakthroughs, enhances the accuracy of building electrical conductor temperatures, and reduces errors in fire risk assessments.
Smart Images

Figure CN118760834A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of electronic digital data processing, and in particular to a building fire safety assessment method based on big data analysis. Background Art
[0002] With the development of power technology in recent years, "electricity" has been integrated into all aspects of people's daily life. However, the electrical safety issues that come with it cannot be ignored. Therefore, for the fire safety of buildings, it is necessary not only to assess the number and installation location of fire-fighting equipment, but also to evaluate the "electrical" fire safety of the building. When the temperature of the electrical circuit in the building reaches the flammable temperature, a fire will occur. In order to reduce the risk of electrical fires in buildings and protect people's personal safety and property safety, the temperature of the electrical circuit is monitored to evaluate the safety of electrical fire protection in buildings.
[0003] The traditional method evaluates electrical safety by taking the average value of the wire temperature over a certain period of time. Since the temperature of the wire is floating, it is not fixed. And the temperature of the wire is measured by a temperature sensor, which can usually only measure the temperature at one location. Therefore, the traditional method usually uses the current and voltage data of the wire to predict the temperature data of the wire. When using high-power electrical appliances, the wire temperature may exceed the fire-prone temperature value of the wire in a short period of time. This phenomenon is called a false breakthrough phenomenon. When using fixed weights to estimate the temperature of the building's wires in a short period of time, there will be the sensitivity of the fixed weights to short-term temperature fluctuations, resulting in a low accuracy in estimating the false breakthrough phenomenon of the building's wire temperature, thereby reducing the accuracy of the building's fire safety assessment. Summary of the invention
[0004] In order to solve the above technical problems, a building fire safety assessment method based on big data analysis is provided to solve the existing problems.
[0005] The solution to the technical problem of this application is to provide a building fire safety assessment method based on big data analysis, including the following steps: Collect electrical parameter data of electrical circuits, obtain predicted temperature of electrical circuits at each moment, and obtain safe temperature sequence of conductors; According to the distribution difference of the temperature at each moment in the conductor safety temperature sequence, the conductor temperature false breakthrough coefficient is determined to obtain the false breakthrough temperature sequence; According to the mapping distribution of the temperature at each moment in each false breakthrough temperature sequence and the false breakthrough coefficient of the conductor temperature, the corrected temperature at each moment in the conductor safety temperature sequence is determined to obtain a fire protection temperature evaluation sequence; Based on the corrected temperature at each moment in the fire temperature assessment sequence, the fire safety determination coefficient is determined to evaluate the building fire safety.
[0006] Preferably, the method for obtaining the wire safety temperature sequence is: The voltage, current and residual current collected in real time at each moment are subjected to a neural network model to obtain the predicted temperature of the electrical circuit at each moment; Arrange the predicted temperatures at all times in chronological order to form a conductor safety temperature sequence.
[0007] Preferably, determining the conductor temperature false breakthrough coefficient to obtain the false breakthrough temperature sequence includes: The conductor safety temperature sequence is evenly divided into multiple subsequences, which are recorded as breakthrough temperature sequences; Get the range of each breakthrough temperature series respectively to form a temperature range set; Determining a judgment condition gain coefficient according to the difference characteristics between the quartile difference and the range of the temperature range set; Calculate the mean of the temperature extreme difference set, and record it as the first mean; The first mean value is combined with the judgment condition gain coefficient to determine the conductor temperature false breakthrough coefficient; All breakthrough temperature sequences whose ranges are greater than the temperature false breakthrough judgment coefficient are recorded as false breakthrough temperature sequences.
[0008] Preferably, the determination of the judgment condition gain coefficient includes: Record the ratio of twice the interquartile difference of the temperature extreme difference set to the extreme difference of the temperature extreme difference set as a first ratio; If the first ratio is greater than or equal to the preset judgment threshold, the judgment condition gain coefficient is the first ratio; if the first ratio is less than the preset judgment threshold or the range of the temperature extreme set is 0, the judgment condition gain coefficient is assigned a value of 1.
[0009] Preferably, the step of determining the corrected temperature at each moment in the conductor safety temperature sequence to obtain a fire protection temperature assessment sequence includes: Determine the fire protection temperature breakthrough index at each moment in each false breakthrough temperature sequence based on the temperature at each moment in the false breakthrough temperature sequence, the minimum value of the false breakthrough temperature sequence and the false breakthrough coefficient of the conductor temperature; The calculation result of the sigmoid function of the temperature at each moment in each pseudo-breakthrough temperature sequence is recorded as the first function value; Determine the correction factor at each moment in each false breakthrough temperature sequence based on the minimum value of each false breakthrough temperature sequence, the fire protection temperature breakthrough index, and the first function value; If the fire temperature breakthrough index is greater than or equal to 0, the temperature corrected at the corresponding moment is the correction factor; otherwise, the temperature at the corresponding moment remains unchanged; and the corrected temperature at each moment in the conductor safety temperature sequence is obtained; The corrected temperatures at multiple moments are selected from the conductor safety temperature sequence from the back to the front to form a fire protection temperature assessment sequence.
[0010] Preferably, the determining of the fire protection temperature breakthrough index at each moment in each pseudo-breakthrough temperature sequence comprises: According to the difference between the temperature at each moment in each pseudo-breakthrough temperature sequence and the minimum value of its pseudo-breakthrough temperature sequence, the relative difference degree at each moment is determined; The difference between the relative difference and the conductor temperature false breakthrough coefficient is used as the fire protection temperature breakthrough index at each moment in each false breakthrough temperature sequence.
[0011] Preferably, the correction factor at each moment in each false breakthrough temperature sequence is a fusion result of the minimum value of each false breakthrough temperature sequence, the false breakthrough coefficient of the conductor temperature, and the first function value.
[0012] Preferably, the determining of the fire safety determination coefficient and the assessment of the building fire safety include: Determining a fire weight assessment coefficient at each moment in the fire temperature assessment sequence based on the corrected temperature at each moment in the fire temperature assessment sequence; Based on the fire weight assessment coefficient, determining the adaptive weight at each moment in the fire temperature assessment sequence; Based on the corrected temperature at each moment in the fire temperature assessment sequence and the adaptive weight at the corresponding moment, a weighted average algorithm is used to determine the fire safety determination coefficient; The fire safety determination coefficient is normalized. If the normalized result is greater than a preset fire risk threshold, there is a fire hazard in the building. Otherwise, there is no fire hazard in the building.
[0013] Preferably, the determination of the fire weight evaluation coefficient at each moment in the fire temperature evaluation sequence includes: Analyze the difference between the corrected value and the mean value at each moment in the fire temperature assessment sequence as the absolute temperature difference at each moment; The fire weight assessment coefficient at each moment is positively correlated with the corrected temperature at the corresponding moment, and negatively correlated with the absolute temperature difference.
[0014] Preferably, the step of determining the adaptive weight at each moment in the fire temperature assessment sequence includes: The mean of the fire weight assessment coefficients at all moments in the fire temperature assessment sequence is recorded as the second mean; The ratio of the fire weight evaluation coefficient at each moment in the fire temperature evaluation sequence to the second mean value is used as the adaptive weight at each moment in the fire temperature evaluation sequence.
[0015] This application has at least the following beneficial effects: The present application predicts the temperature of the electrical circuit by using a neural network model based on the voltage, current and residual current collected in real time. The beneficial effect of the application is that the error caused by obtaining the temperature of the electrical circuit at a certain point only through a temperature sensor is avoided, which is conducive to improving the accuracy of the subsequent fire safety assessment. The false breakthrough coefficient of the wire temperature is determined by the temperature of the electrical circuit at each moment, and a false breakthrough temperature sequence is obtained. The beneficial effect of the application is that the temperature data with false breakthroughs can be identified and distinguished. According to the temperature data with false breakthroughs, the temperature data is corrected to determine the corrected temperature at each moment in the wire safety temperature sequence, and a fire temperature assessment sequence is obtained. The beneficial effect of the application is that the false breakthrough coefficient of the wire temperature is determined by the temperature of the electrical circuit at each moment, and a false breakthrough temperature sequence is obtained. By correcting the temperature with false breakthroughs, the influence of false breakthroughs is eliminated and the accuracy of fire safety assessment is improved; based on the corrected temperature at each moment in the fire temperature assessment sequence of the last period, the adaptive weights at each moment are calculated to determine the fire safety determination coefficient. The beneficial effect is that based on the different weights corresponding to the corrected temperatures at different moments, the fire safety of the building can be evaluated more accurately and comprehensively; based on the fire safety determination coefficient, the fire safety assessment coefficient is determined, the fire safety risk level is constructed, and the fire safety of the building is evaluated. The beneficial effect is that the accuracy of the temperature measurement of the building's electrical wires is improved, thereby making the fire safety assessment of the building more accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The building fire safety assessment method based on big data analysis of the present application is further described in detail below in conjunction with the accompanying drawings.
[0017] Figure 1 A flowchart of the steps of the building fire safety assessment method based on big data analysis provided for this application; Figure 2 A flow chart of the steps for predicting the temperature of an electrical circuit provided for this application; Figure 3 Schematic diagram of the false breakthrough of the predicted temperature of the electrical circuit provided for this application; Figure 4 A flowchart of the steps of the method for obtaining the conductor temperature pseudo-breakthrough coefficient provided in the present application; Figure 5 A flowchart of the steps of the method for obtaining the fire safety determination coefficient provided in this application. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solutions and advantages of this application more clear, the following is a further detailed description of the building fire safety assessment method based on big data analysis proposed in this application in conjunction with the accompanying drawings and implementation examples. It should be understood that the specific embodiments described here are only used to explain this application and are not used to limit this application.
[0019] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
[0020] See also Figure 1 , which shows a flowchart of a method for building fire safety assessment based on big data analysis provided by an embodiment of the present application, the method comprising the following steps: Step 1: Collect electrical parameter data of the electrical circuit, obtain the predicted temperature of the electrical circuit, and obtain the safe temperature sequence of the conductor.
[0021] By installing voltage sensors, current sensors, temperature sensors, and residual current devices (RCD) on the building's electrical circuits, the voltage, current, temperature, and residual current of the building's electrical circuits are collected and transmitted to the big data platform. The voltage, current, residual current, temperature, and other data in the big data platform are trained using a neural network model. The voltage, current, and residual current collected in real time are input to obtain the predicted temperature of the electrical circuit.
[0022] Preferably, as an embodiment of the present application, a long short-term memory network is used for training, and voltage, current, and residual current data are collected in real time, and the predicted temperature of the building electrical line is obtained through the long short-term memory network. The frequency of real-time collection is 0.5s / time, and the total collection time is 10min. All predicted temperatures are arranged in the order of the time of data collection, and recorded as the wire safety temperature sequence; the calculation of the long short-term memory network is a well-known technology, and the specific calculation process is not repeated.
[0023] Further, the flowchart of the steps of predicting the temperature of the electrical circuit provided in the embodiment of the present application is as follows: Figure 2 shown.
[0024] At this point, the safe temperature sequence of the wire is obtained.
[0025] Step 2: According to the distribution difference of the temperature at each moment in the conductor safety temperature sequence, the conductor temperature false breakthrough coefficient is determined to obtain the false breakthrough temperature sequence.
[0026] In building electrical systems, especially in fire protection design, it is crucial to ensure circuit safety. When a high-power appliance, such as a central air conditioning system, is suddenly connected, the current in the circuit will increase sharply. According to Joule's law, when current passes through a wire, heat is generated, and the heat is proportional to the square of the current, the resistance of the wire, and the power-on time. Since the temperature of the wire is calculated by the current and voltage, the calculated wire temperature will increase. When the appliance is started, the current will drop back to normal levels. Therefore, the wire temperature of the building will temporarily exceed the preset range, but it is within the normal range.
[0027] Since the temperature of the building conductor breaks through in a very short time, the temperature value breakthrough in a short time is called a false breakthrough. This false breakthrough does not bring safety problems to fire protection. Therefore, when evaluating the fire safety of buildings, the impact of this false breakthrough should be eliminated.
[0028] Further, the schematic diagram of the electrical circuit temperature prediction provided by the present application is as follows: Figure 3 shown.
[0029] The conductor safety temperature sequence is evenly divided into multiple subsequences, which are recorded as breakthrough temperature sequences; Preferably, as an embodiment of the present application, the wire safety temperature sequence is evenly divided into 60 subsequences. As other implementation methods, the implementer can set the number of subsequences according to actual conditions, and this embodiment does not impose any special restrictions on this.
[0030] Obtain the range of each breakthrough temperature sequence respectively, and form a temperature range set with all the ranges; When a false breakthrough occurs, the range of the breakthrough temperature sequence in the false breakthrough area will be very large, and there is a large difference between the range values of the conductor temperature in other normal areas. Therefore, the judgment condition gain coefficient is calculated based on the difference between the range values, which is: Record the ratio of twice the interquartile difference of the temperature extreme difference set to the extreme difference of the temperature extreme difference set as a first ratio; If the first ratio is greater than or equal to a preset determination threshold, the determination condition gain coefficient is the first ratio; if the first ratio is less than the preset determination threshold or the extreme difference of the temperature extreme difference set is 0, the determination condition gain coefficient is assigned a value of 1; Preferably, as an embodiment of the present application, the preset determination threshold value is 1; wherein, the calculation method of the interquartile range is a well-known technology and will not be described in detail.
[0031] It should be noted that when the first ratio is greater than or equal to 1, it indicates that the ranges in the temperature range set are relatively close and the distribution is relatively concentrated, which means that the fluctuation of the range data is small and the possibility of false breakthrough is low. On the contrary, when the first ratio is less than 1, it means that there are significant outliers in the temperature range set, which may represent abnormal fluctuations or false breakthroughs, thereby increasing the probability of false breakthroughs.
[0032] Data with false breakthrough characteristics refer to the characteristics of short-term and high values in the conductor temperature. Therefore, false breakthrough data have the characteristics of outliers. In order to identify whether the breakthrough temperature sequence is a false breakthrough temperature, the false breakthrough coefficient of the conductor temperature is calculated, which is: Calculate the mean of the temperature extreme difference set, recorded as the first mean; The first mean value is combined with the judgment condition gain coefficient to determine the conductor temperature false breakthrough coefficient; It is understandable that fusion can represent a multiplication relationship, an addition relationship, and the idempotence of an exponential function, and this application does not impose any special restrictions on this.
[0033] Preferably, as an embodiment of the present application, the product of the first mean value and the determination condition gain coefficient is used as the conductor temperature false breakthrough coefficient.
[0034] Furthermore, the method for obtaining the false breakthrough coefficient of the conductor temperature provided by the present application is shown in the flowchart of the steps. Figure 4 shown.
[0035] All breakthrough temperature sequences whose range is greater than the false temperature breakthrough judgment coefficient are recorded as false breakthrough temperature sequences; It should be noted that the first mean value can reflect the intermediate data characteristics of the conductor temperature. Secondly, when there is no false breakthrough, the first mean value cannot make all the data normal data. Therefore, the judgment condition gain coefficient of the breakthrough temperature sequence is used to correct the mean value so that the normal data can be classified into the normal data through the false breakthrough coefficient of the conductor temperature. When the range of the breakthrough temperature sequence is greater than the false breakthrough coefficient of the conductor temperature, it means that the data in the breakthrough temperature sequence may be false breakthrough data, and the greater the difference between the range of the breakthrough temperature sequence and the false breakthrough coefficient of the conductor temperature, the higher the probability of false breakthrough in the breakthrough temperature sequence.
[0036] At this point, the conductor temperature false breakthrough coefficient is obtained and the false breakthrough temperature sequence is determined.
[0037] Step 3: According to the mapping distribution of the temperature at each moment in each false breakthrough temperature sequence and the false breakthrough coefficient of the conductor temperature, the corrected temperature at each moment in the conductor safety temperature sequence is determined to obtain a fire protection temperature evaluation sequence.
[0038] For the breakthrough temperature sequence with false breakthrough, it is actually within the normal range for the safety of wires in fire fighting, and its fire fighting risk is relatively low. Therefore, the data in the breakthrough temperature sequence with false breakthrough can be corrected, specifically: Determine the relative difference degree of each moment in each pseudo-breakthrough temperature sequence according to the difference between the temperature at each moment in each pseudo-breakthrough temperature sequence and the minimum value of the pseudo-breakthrough temperature sequence; Preferably, as an embodiment of the present application, the relative difference between each moment in each false breakthrough temperature sequence is the difference between the temperature at each moment in each false breakthrough temperature sequence and the minimum value of the false breakthrough temperature sequence.
[0039] The difference between the relative difference and the conductor temperature false breakthrough coefficient is used as the fire protection temperature breakthrough index at each moment in each false breakthrough temperature sequence.
[0040] Preferably, as an embodiment of the present application, the fire protection temperature breakthrough index at each moment in each false breakthrough temperature sequence is the difference between the relative difference and the false breakthrough coefficient of the conductor temperature.
[0041] It should be noted that the smaller the fire temperature breakthrough index is, the smaller the gap between the temperature at each moment in the false breakthrough temperature sequence and the temperature false breakthrough judgment coefficient is, thereby increasing the possibility that it belongs to normal temperature fluctuations, thus representing that the temperature at that moment is more likely to be normal data.
[0042] Furthermore, based on the fire protection temperature breakthrough index, the temperature at each moment in the false breakthrough temperature sequence is corrected, specifically: The calculation result of the sigmoid function of the temperature at each moment in each pseudo-breakthrough temperature sequence is recorded as the first function value; The minimum value of each false breakthrough temperature sequence, the false breakthrough coefficient of the conductor temperature and the first function value are combined to determine the correction factor at each moment in each false breakthrough temperature sequence; Preferably, as an embodiment of the present application, the product of the first function value at each moment in each false breakthrough temperature sequence and the wire temperature false breakthrough coefficient is recorded as the first product at each moment in each false breakthrough temperature sequence, and the first product and the minimum value of each false breakthrough temperature sequence are used as the correction factor at each moment in each false breakthrough temperature sequence.
[0043] If the fire temperature breakthrough index is greater than or equal to 0, the temperature corrected at the corresponding moment is the correction factor; if the fire temperature breakthrough index is less than 0, the temperature at the corresponding moment remains unchanged; It should be noted that the larger the corrected temperature at each moment in the false breakthrough temperature sequence, the higher the wire temperature, which increases the risk of fire. And higher temperatures may indicate a lower fire safety level. Therefore, the fire safety of a building can be evaluated by the corrected wire temperature.
[0044] Based on the corrected temperature at each moment, the temperature at the corresponding moment in the conductor safety temperature sequence is replaced to obtain the corrected temperature at each moment in the conductor safety temperature sequence; Select multiple corrected temperatures from the conductor safety temperature sequence from the back to the front to form a fire protection temperature assessment sequence; Preferably, as an embodiment of the present application, the corrected temperatures of the last 120 moments in the wire safety temperature sequence constitute a fire temperature assessment sequence, that is, the corrected temperatures of the last 1 minute constitute the fire temperature assessment sequence; as other implementation methods, the implementer can set the length of the fire temperature assessment sequence according to actual conditions.
[0045] At this point, the corrected temperature at each moment in the conductor safety temperature sequence is determined, and the fire protection temperature evaluation sequence is obtained.
[0046] Step 4: Determine the fire safety determination coefficient based on the corrected temperature at each moment in the fire temperature assessment sequence, and evaluate the fire safety of the building.
[0047] Furthermore, when the temperature of the wire increases, its insulation performance may decrease, increasing the risk of current leakage and short circuit, thereby reducing fire safety. As the temperature continues to rise, the wire material may soften or even melt, which may lead to poor contact at the wire connection, further increasing the probability of fire. Therefore, the fire weight assessment coefficient is calculated based on the corrected temperature of the building wire at each moment, specifically: Determining the absolute temperature difference at each moment in the fire temperature assessment sequence according to the difference between the corrected temperature at each moment in the fire temperature assessment sequence and the mean value of the fire temperature assessment sequence; Preferably, as an embodiment of the present application, the absolute value of the difference between the corrected temperature at each moment in the fire temperature assessment sequence and the mean of the fire temperature assessment sequence is used as the absolute temperature difference at each moment in the fire temperature assessment sequence.
[0048] The fire weight assessment coefficient at each moment in the fire temperature assessment sequence is positively correlated with the corrected temperature at the corresponding moment, and negatively correlated with the absolute temperature difference; Preferably, as an embodiment of the present application, the ratio between the corrected temperature at each moment in the fire temperature evaluation sequence and the absolute temperature difference is used as the fire weight assessment coefficient at each moment in the fire temperature evaluation sequence.
[0049] Preferably, as another embodiment of the present application, the ratio of the corrected absolute temperature difference at each moment in the fire temperature assessment sequence is recorded as the second ratio; the calculation result of an exponential function with a natural constant as the base and the second ratio as the exponent is used as the fire weight assessment coefficient at each moment in the fire temperature assessment sequence.
[0050] It can be understood that a positive relationship indicates that the dependent variable will increase as the independent variable increases, and the dependent variable will decrease as the independent variable decreases. The specific relationship in the process can be a multiplication relationship, an addition relationship, or the power of an exponential function, which is determined by actual application; a negative relationship indicates that the dependent variable will decrease as the independent variable increases, and the dependent variable will increase as the independent variable decreases. The specific relationship can be a subtraction relationship, a division relationship, or a negative exponential power, which is determined by actual application, and this application does not impose any special restrictions on this.
[0051] It should be noted that the greater the corrected temperature at each moment in the fire temperature assessment sequence, the higher the fire risk at that moment, and if the temperature at that moment is in a more concentrated part of the fire temperature assessment sequence, it means that the fire risk at that moment is higher and the safety of building fire protection is lower. Therefore, the greater the fire weight assessment coefficient.
[0052] The larger the fire weight assessment coefficient is, the higher the fire risk is at that moment. Therefore, the adaptive weight at each moment is calculated based on the distribution of the fire weight assessment coefficient, as follows: The mean of the fire weight assessment coefficients at all moments in the fire temperature assessment sequence is recorded as the second mean; The ratio of the fire weight evaluation coefficient at each moment in the fire temperature evaluation sequence to the second mean value is used as the adaptive weight at each moment in the fire temperature evaluation sequence; It should be noted that the larger the adaptive weight is, the higher the temperature value is at that moment, which means that the fire risk at that moment is higher than that at other moments in the fire temperature assessment sequence, and the fire safety is lower.
[0053] Based on the corrected temperature at each moment in the fire temperature assessment sequence and the adaptive weight at the corresponding moment, the moving weighted average algorithm is used to determine the fire safety determination coefficient; Further, the step flow chart of the method for obtaining the fire safety determination coefficient provided in this application is as follows: Figure 5 shown.
[0054] Furthermore, based on the fire safety determination coefficient, the fire safety of the building is evaluated as follows: The fire safety determination coefficient is normalized. If the normalized result is greater than the preset fire risk threshold, there is a fire hazard in the building, and the wires are checked to prevent electrical fires. If the normalized result is greater than the preset fire risk threshold, there is no fire hazard in the building.
[0055] Preferably, as an embodiment of the present application, the preset fire risk threshold value is 0.4; due to the different materials used for the conductors of different electrical circuits, the fire risk temperature thresholds of the conductors are also different, that is, the fire risk temperature threshold is set according to the conductor material of the building. Therefore, as other implementation methods, the implementer can set it according to the actual situation.
[0056] Therefore, the fire safety determination coefficient is calculated once every certain period of time to evaluate the fire safety of the building.
[0057] Preferably, as an embodiment of the present application, the fire safety of the building is evaluated once every 1 minute. As other implementation methods, the implementer can set the interval time according to the actual situation.
[0058] It should be understood that although Figure 1 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 1 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.
[0059] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0060] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the present application. It should be pointed out that, for those of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present application. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present application without departing from the content of the technical solution of the present application, shall fall within the protection scope of the technical solution of the present application.
Claims
1. A building fire safety assessment method based on big data analysis, characterized in that: The method comprises the following steps: Collect electrical parameter data of electrical circuits, obtain predicted temperature of electrical circuits at each moment, and obtain safe temperature sequence of conductors; According to the distribution difference of the temperature at each moment in the conductor safety temperature sequence, the conductor temperature false breakthrough coefficient is determined to obtain the false breakthrough temperature sequence; According to the mapping distribution of the temperature at each moment in each false breakthrough temperature sequence and the false breakthrough coefficient of the conductor temperature, the corrected temperature at each moment in the conductor safety temperature sequence is determined to obtain a fire protection temperature evaluation sequence; Based on the corrected temperature at each moment in the fire temperature assessment sequence, the fire safety determination coefficient is determined to evaluate the building fire safety.
2. The building fire safety assessment method based on big data analysis according to claim 1 is characterized in that: The method for obtaining the wire safety temperature sequence is: The voltage, current and residual current collected in real time at each moment are subjected to a neural network model to obtain the predicted temperature of the electrical circuit at each moment; Arrange the predicted temperatures at all times in chronological order to form a conductor safety temperature sequence.
3. The building fire safety assessment method based on big data analysis according to claim 1 is characterized in that: The method of determining the false breakthrough coefficient of the conductor temperature and obtaining the false breakthrough temperature sequence includes: The conductor safety temperature sequence is evenly divided into multiple subsequences, which are recorded as breakthrough temperature sequences; Get the range of each breakthrough temperature series respectively to form a temperature range set; Determining a judgment condition gain coefficient according to the difference characteristics between the quartile difference and the range of the temperature range set; Calculate the mean of the temperature extreme difference set, and record it as the first mean; The first mean value is combined with the judgment condition gain coefficient to determine the conductor temperature false breakthrough coefficient; All breakthrough temperature sequences whose ranges are greater than the temperature false breakthrough judgment coefficient are recorded as false breakthrough temperature sequences.
4. The building fire safety assessment method based on big data analysis as claimed in claim 3 is characterized in that: The step of determining the judgment condition gain coefficient comprises: Record the ratio of twice the interquartile difference of the temperature extreme difference set to the extreme difference of the temperature extreme difference set as a first ratio; If the first ratio is greater than or equal to the preset judgment threshold, the judgment condition gain coefficient is the first ratio; if the first ratio is less than the preset judgment threshold or the range of the temperature extreme set is 0, the judgment condition gain coefficient is assigned a value of 1.
5. The building fire safety assessment method based on big data analysis according to claim 1, characterized in that: The method of determining the corrected temperature at each moment in the conductor safety temperature sequence to obtain a fire protection temperature assessment sequence includes: Determine the fire protection temperature breakthrough index at each moment in each false breakthrough temperature sequence based on the temperature at each moment in the false breakthrough temperature sequence, the minimum value of the false breakthrough temperature sequence and the false breakthrough coefficient of the conductor temperature; The calculation result of the sigmoid function of the temperature at each moment in each pseudo-breakthrough temperature sequence is recorded as the first function value; Determine the correction factor at each moment in each false breakthrough temperature sequence based on the minimum value of each false breakthrough temperature sequence, the fire protection temperature breakthrough index, and the first function value; If the fire temperature breakthrough index is greater than or equal to 0, the temperature corrected at the corresponding moment is the correction factor; otherwise, the temperature at the corresponding moment remains unchanged; and the corrected temperature at each moment in the conductor safety temperature sequence is obtained; The corrected temperatures at multiple moments are selected from the conductor safety temperature sequence from the back to the front to form a fire protection temperature assessment sequence.
6. The building fire safety assessment method based on big data analysis according to claim 5 is characterized in that: Determining the fire protection temperature breakthrough index at each moment in each false breakthrough temperature sequence includes: According to the difference between the temperature at each moment in each pseudo-breakthrough temperature sequence and the minimum value of its pseudo-breakthrough temperature sequence, the relative difference degree at each moment is determined; The difference between the relative difference and the conductor temperature false breakthrough coefficient is used as the fire protection temperature breakthrough index at each moment in each false breakthrough temperature sequence.
7. The building fire safety assessment method based on big data analysis according to claim 5, characterized in that: The correction factor at each moment in each false breakthrough temperature sequence is a fusion result of the minimum value of each false breakthrough temperature sequence, the false breakthrough coefficient of the conductor temperature, and the first function value.
8. The building fire safety assessment method based on big data analysis according to claim 1, characterized in that: The determination of the fire safety determination coefficient and the assessment of building fire safety include: Determining a fire weight assessment coefficient at each moment in the fire temperature assessment sequence based on the corrected temperature at each moment in the fire temperature assessment sequence; Based on the fire weight assessment coefficient, determining the adaptive weight at each moment in the fire temperature assessment sequence; Based on the corrected temperature at each moment in the fire temperature assessment sequence and the adaptive weight at the corresponding moment, a weighted average algorithm is used to determine the fire safety determination coefficient; The fire safety determination coefficient is normalized. If the normalized result is greater than a preset fire risk threshold, there is a fire hazard in the building. Otherwise, there is no fire hazard in the building.
9. The building fire safety assessment method based on big data analysis according to claim 8, characterized in that: The method of determining the fire weight evaluation coefficient at each moment in the fire temperature evaluation sequence includes: Analyze the difference between the corrected value and the mean value at each moment in the fire temperature assessment sequence as the absolute temperature difference at each moment; The fire weight assessment coefficient at each moment is positively correlated with the corrected temperature at the corresponding moment, and negatively correlated with the absolute temperature difference.
10. The building fire safety assessment method based on big data analysis according to claim 8, characterized in that: The step of determining the adaptive weight at each moment in the fire temperature assessment sequence includes: The mean of the fire weight assessment coefficients at all moments in the fire temperature assessment sequence is recorded as the second mean; The ratio of the fire weight evaluation coefficient at each moment in the fire temperature evaluation sequence to the second mean value is used as the adaptive weight at each moment in the fire temperature evaluation sequence.
Citation Information
Patent Citations
Photovoltaic power station fire hazard monitoring method and system based on computer vision
CN116469058A
Resin production safety risk intelligent assessment method and system based on data driving
CN116911621A
Intelligent fire risk early warning method and system based on multi-source data fusion
CN117746602A
Fire detector incorporating a gas sensor
US20090261980A1
Cited By
Intelligent data management system for building fire safety monitoring
CN119026810A