Thermal power plant operation and maintenance data early warning method and device

By acquiring and predicting the temperature data of each system of the thermal power plant, and using early warning model fusion features, the problem of ignoring the correlation between devices in the existing technology is solved, global early warning of thermal power plant equipment is achieved, and monitoring efficiency is improved.

CN118760882APending Publication Date: 2024-10-11NAT ENERGY GRP INNER MONGOLIA SHANGHAI TEMPLE POWER GENERATION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410947405.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

Existing thermal power plants ignore the correlation between various devices in safety monitoring, resulting in temperature monitoring alone being insufficient to provide early warning of potential problems.

Method used

The temperature data of each system is obtained and short-term prediction is made through the trained temperature prediction model, and the features are combined with the early warning model to obtain the early warning results of the overall thermal power plant.

Benefits of technology

In addition to the monitoring of individual equipment, the overall thermal power plant equipment monitoring is realized, and the early warning capability of the thermal power plant equipment status is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118760882A_ABST
    Figure CN118760882A_ABST
Patent Text Reader

Abstract

The invention discloses a thermal power plant operation and maintenance data early warning method and device. The thermal power plant operation and maintenance data early warning method comprises the steps that electrical system temperature data, steam-water system temperature data and combustion system temperature data are acquired; acquiring a temperature prediction model group for an electrical system, a steam-water system temperature prediction model group and a combustion system temperature prediction model group; obtaining short-term electrical system temperature prediction data, short-term steam-water system temperature prediction data and short-term steam combustion system temperature prediction data; obtaining an early warning model; extracting temperature prediction characteristics of the electrical system; extracting temperature prediction characteristics of the steam-water system; extracting prediction characteristics of the steam combustion system; fusing the electrical system temperature prediction characteristics, the steam-water system temperature prediction characteristics and the steam combustion system prediction characteristics to obtain fusion characteristics; and inputting the fusion feature into the early warning model to obtain an early warning result. According to the invention, the monitoring of the whole thermal power plant equipment except the independent monitoring of each equipment is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of thermal power plant operation and maintenance data early warning, and in particular to a thermal power plant operation and maintenance data early warning method and a thermal power plant operation and maintenance data early warning device. Background Art

[0002] When modern thermal power plants conduct safety monitoring, they only monitor the temperature of each device individually, and then determine whether the corresponding device has a problem based on the temperature of each device. However, in reality, the various devices in a thermal power plant work in coordination with each other, and their temperatures are interrelated. Simply monitoring each device will ignore the correlation between the devices.

[0003] Therefore, it is hoped that a technical solution can be provided to solve or at least alleviate the above-mentioned deficiencies of the prior art. Summary of the invention

[0004] The purpose of the present invention is to provide a thermal power plant operation and maintenance data early warning method to at least solve one of the above-mentioned technical problems.

[0005] The present invention provides the following scheme:

[0006] The present application provides a thermal power plant operation and maintenance data early warning method, the thermal power plant operation and maintenance data early warning method comprising:

[0007] Get the current time point information;

[0008] Obtain temperature data of electrical system, steam-water system and combustion system;

[0009] According to the information of the current time point, a trained temperature prediction model group for the electrical system, a trained temperature prediction model group for the steam-water system, and a trained temperature prediction model group for the combustion system are obtained;

[0010] Acquire short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group;

[0011] Acquire short-term steam-water system temperature prediction data based on the steam-water system temperature data and the steam-water system temperature prediction model group;

[0012] Acquire short-term steam combustion system temperature prediction data based on the combustion system temperature data and the combustion system temperature prediction model group;

[0013] Obtain trained early warning models;

[0014] extracting electrical system temperature prediction features of the short-term electrical system temperature prediction data;

[0015] Extracting the steam-water system temperature prediction features of the short-term steam-water system temperature prediction data;

[0016] Extracting the steam combustion system prediction characteristics of the short-term steam combustion system temperature prediction data;

[0017] The electrical system temperature prediction feature, the steam-water system temperature prediction feature and the steam combustion system prediction feature are fused to obtain a fusion feature;

[0018] The fused features are input into the early warning model to obtain early warning results.

[0019] Optionally, the combustion system temperature data includes coal mill temperature data, air preheater temperature data, boiler temperature data, dust collector temperature data, induced draft fan temperature data, ash pump temperature data, and pulverized coal exhaust fan temperature data;

[0020] The combustion system temperature prediction model group includes:

[0021] Coal mill temperature prediction model, boiler temperature prediction model, blower temperature prediction model, dust collector temperature prediction model, induced draft fan temperature prediction model, ash pump temperature prediction model, air preheater temperature prediction model, pulverized dust fan temperature prediction model;

[0022] The acquiring of short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group comprises:

[0023] The coal mill temperature data is input into the coal mill temperature prediction model to obtain short-term coal mill temperature prediction data;

[0024] The boiler temperature data is input into the boiler temperature prediction model to obtain short-term boiler temperature prediction data;

[0025] The air preheater temperature data is input into the air preheater temperature prediction model to obtain short-term air preheater temperature prediction data;

[0026] The dust collector temperature data is input into the dust collector temperature prediction model to obtain short-term dust collector temperature prediction data;

[0027] The induced draft fan temperature data is input into the induced draft fan temperature prediction model to obtain short-term induced draft fan temperature prediction data;

[0028] The ash pump temperature data is input into the ash pump temperature prediction model to obtain short-term ash pump temperature prediction data;

[0029] The powder exhaust fan temperature data is input into the powder exhaust fan temperature prediction model to obtain short-term powder exhaust fan temperature prediction data; wherein,

[0030] The short-term coal mill temperature prediction data, short-term boiler temperature prediction data, short-term air preheater temperature prediction data, short-term dust collector temperature prediction data, short-term induced draft fan temperature prediction data, short-term ash pump temperature prediction data and short-term pulverized dust fan temperature prediction data constitute the short-term combustion system temperature prediction data.

[0031] Optionally, the steam-water system temperature data includes boiler temperature data, high-pressure heater temperature data, feed water pump temperature data, deaerator temperature data, low-pressure heater temperature data, condensate pump temperature data, condenser temperature data, circulating water pump temperature data, turbine temperature data, and generator temperature data;

[0032] The steam-water system temperature prediction model group includes:

[0033] Boiler temperature prediction model, high-pressure heater temperature prediction model, feed water pump temperature prediction model, deaerator temperature prediction model, low-pressure heater temperature prediction model, condensate pump temperature prediction model, condenser temperature prediction model, circulating water pump temperature prediction model, turbine temperature prediction model, generator temperature prediction model;

[0034] The obtaining of short-term steam-water system temperature prediction data based on the steam-water system temperature data and the steam-water system temperature prediction model group comprises:

[0035] Inputting the boiler temperature data into the boiler temperature prediction model to obtain short-term boiler temperature prediction data;

[0036] Inputting the high-pressure heater temperature data into the high-pressure heater temperature prediction model to obtain short-term high-pressure heater temperature prediction data;

[0037] Inputting the feedwater pump temperature data into the feedwater pump temperature prediction model to obtain short-term feedwater pump temperature prediction data;

[0038] Inputting the deaerator temperature data into the deaerator temperature prediction model to obtain short-term deaerator temperature prediction data;

[0039] Inputting the low-pressure heater temperature data into the low-pressure heater temperature prediction model to obtain short-term low-pressure heater temperature prediction data;

[0040] Inputting the condensate pump temperature data into the condensate pump temperature prediction model to obtain short-term condensate pump temperature prediction data;

[0041] Inputting the condenser temperature data into the condenser temperature prediction model to obtain short-term condenser temperature prediction data;

[0042] Inputting the circulating water pump temperature data into the circulating water pump temperature prediction model to obtain short-term circulating water pump temperature prediction data;

[0043] Inputting the steam turbine temperature data into the steam turbine temperature prediction model to obtain short-term steam turbine temperature prediction data;

[0044] The generator temperature data is input into the generator temperature prediction model to obtain short-term generator temperature prediction data; wherein,

[0045] The short-term boiler temperature prediction data, short-term high-pressure heater temperature prediction data, short-term deaerator temperature prediction data, short-term feed water pump temperature prediction data, short-term low-pressure heater temperature prediction data, short-term condensate pump temperature prediction data, short-term condenser temperature prediction data, short-term circulating water pump temperature prediction data, short-term turbine temperature prediction data and short-term generator temperature prediction data constitute the short-term steam-water system temperature prediction data.

[0046] Optionally, the electrical system temperature data includes excitation device temperature data, generator temperature data, main transformer temperature data, and plant transformer temperature data;

[0047] The temperature prediction model group for the electrical system includes an excitation device temperature prediction model, a generator temperature prediction model, a main transformer temperature prediction model, and a plant transformer temperature prediction model;

[0048] The acquiring of short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group comprises:

[0049] Inputting the excitation device temperature data into the excitation device temperature prediction model to obtain short-term excitation device temperature prediction data;

[0050] Inputting the generator temperature data into the generator temperature prediction model to obtain short-term generator temperature prediction data;

[0051] Inputting the main transformer temperature data into the main transformer temperature prediction model to obtain short-term main transformer temperature prediction data;

[0052] The plant transformer temperature data is input into the plant transformer temperature prediction model to obtain short-term plant transformer temperature prediction data.

[0053] Optionally, each prediction model in the temperature prediction model group for the electrical system uses a Transformer model;

[0054] Each prediction model in the steam-water system temperature prediction model group uses a Transformer model;

[0055] Each prediction model in the combustion system temperature prediction model group uses a Transformer model.

[0056] Optionally, acquiring a trained temperature prediction model group for an electrical system according to the current time point information includes:

[0057] Acquire an electrical system model and temperature association database, wherein the electrical system model and temperature association database includes at least two electrical system models and a time interval associated with each electrical system model;

[0058] Get the electrical system model corresponding to the time interval of the current time point information.

[0059] Optionally, the step of acquiring a trained prediction model group for the temperature of a soda-water system according to the current time point information includes:

[0060] Acquire a soda system model and temperature association database, wherein the soda system model and temperature association database includes at least two soda system models and a time interval associated with each soda system model;

[0061] Get the soda system model corresponding to the time interval of the current time point information.

[0062] Optionally, the step of acquiring a trained prediction model group for the temperature of a soda-water system according to the current time point information includes:

[0063] Acquire a combustion system model and temperature association database, wherein the combustion system model and temperature association database includes at least two combustion system models and a time interval associated with each combustion system model;

[0064] Get the combustion system model corresponding to the time interval of the current time point information.

[0065] Optionally, the early warning model is a BP neural network.

[0066] The present application also provides a thermal power plant operation and maintenance data early warning device, the thermal power plant operation and maintenance data early warning device comprising:

[0067] A current time point information acquisition module, wherein the current time point information acquisition module is used to acquire current time point information;

[0068] A data acquisition module, the data acquisition module is used to acquire the temperature data of the electrical system, the temperature data of the steam-water system, and the temperature data of the combustion system;

[0069] A prediction model group acquisition module, the prediction model group acquisition module is used to acquire a trained temperature prediction model group for an electrical system, a trained temperature prediction model group for a steam-water system, and a trained temperature prediction model group for a combustion system according to information at a current time point;

[0070] A short-term electrical system temperature prediction module, the short-term electrical system temperature prediction module is used to obtain short-term electrical system temperature prediction data based on the electrical system temperature data and a temperature prediction model group for the electrical system;

[0071] A short-term steam-water system temperature prediction module, the short-term steam-water system temperature prediction module is used to obtain short-term steam-water system temperature prediction data based on the steam-water system temperature data and a steam-water system temperature prediction model group;

[0072] A short-term steam combustion system temperature prediction module, the short-term steam combustion system temperature prediction module is used to obtain short-term steam combustion system temperature prediction data based on the combustion system temperature data and the combustion system temperature prediction model group;

[0073] An early warning model acquisition module, wherein the early warning model acquisition module is used to acquire a trained early warning model;

[0074] A feature extraction module, the feature extraction module is used to extract the electrical system temperature prediction features of the short-term electrical system temperature prediction data, extract the steam-water system temperature prediction features of the short-term steam-water system temperature prediction data, and extract the steam combustion system prediction features of the short-term steam combustion system temperature prediction data;

[0075] A fusion module, the fusion module is used to fuse the electrical system temperature prediction feature, the steam-water system temperature prediction feature and the steam combustion system prediction feature, so as to obtain a fusion feature;

[0076] The early warning module is used to input the fusion features into the early warning model to obtain the early warning result.

[0077] The thermal power plant operation and maintenance data early warning method of the present application first obtains the future short-term temperature of each system through a temperature prediction model, and then uses the future short-term temperature of each system as the input of the early warning model, thereby obtaining the early warning situation given by the entire thermal power plant combined with each device, thereby realizing the overall thermal power plant equipment monitoring in addition to the individual monitoring of each device. BRIEF DESCRIPTION OF THE DRAWINGS

[0078] Figure 1 It is a flow chart of a thermal power plant operation and maintenance data early warning method in one embodiment of the present application.

[0079] Figure 2 It is used to realize Figure 1The electronic device schematic diagram of the thermal power plant operation and maintenance data early warning method is shown.

[0080] Figure 3 It is a schematic diagram of the electrical system of a thermal power plant in one embodiment of the present application.

[0081] Figure 4 It is a schematic diagram of a steam-water system of a thermal power plant in one embodiment of the present application.

[0082] Figure 5 It is a schematic diagram of a combustion system of a thermal power plant in one embodiment of the present application. DETAILED DESCRIPTION

[0083] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0084] Figure 1 It is a flow chart of a thermal power plant operation and maintenance data early warning method in one embodiment of the present application.

[0085] like Figure 1 The thermal power plant operation and maintenance data early warning method shown includes:

[0086] Step 1: Get the current time point information;

[0087] Step 2: Obtain the temperature data of the electrical system, the steam-water system, and the combustion system;

[0088] Step 3: Obtain a trained temperature prediction model group for the electrical system, a trained temperature prediction model group for the steam-water system, and a trained temperature prediction model group for the combustion system according to the information at the current time point;

[0089] Step 4: acquiring short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group;

[0090] Step 5: obtaining short-term soda-water system temperature prediction data based on the soda-water system temperature data and the soda-water system temperature prediction model group;

[0091] Step 6: Obtain short-term steam combustion system temperature prediction data based on the combustion system temperature data and the combustion system temperature prediction model group;

[0092] Step 7: Obtain the trained early warning model;

[0093] Step 8: extracting electrical system temperature prediction features of the short-term electrical system temperature prediction data;

[0094] Step 9: extracting the soda-water system temperature prediction features of the short-term soda-water system temperature prediction data;

[0095] Step 10: extracting the steam combustion system prediction features of the short-term steam combustion system temperature prediction data;

[0096] Step 11: Fusing the electrical system temperature prediction feature, the steam-water system temperature prediction feature, and the steam combustion system prediction feature to obtain a fusion feature;

[0097] Step 12: Input the fusion features into the early warning model to obtain early warning results.

[0098] The thermal power plant operation and maintenance data early warning method of the present application first obtains the future short-term temperature of each system through a temperature prediction model, and then uses the future short-term temperature of each system as the input of the early warning model, thereby obtaining the early warning situation given by the entire thermal power plant combined with each device, thereby realizing the overall thermal power plant equipment monitoring in addition to the individual monitoring of each device.

[0099] See also Figures 2 to 4 In this embodiment, the combustion system temperature data includes coal mill temperature data, air preheater temperature data, boiler temperature data, dust collector temperature data, induced draft fan temperature data, ash pump temperature data, and pulverized dust exhaust fan temperature data;

[0100] The combustion system temperature prediction model group includes:

[0101] Coal mill temperature prediction model, boiler temperature prediction model, blower temperature prediction model, dust collector temperature prediction model, induced draft fan temperature prediction model, ash pump temperature prediction model, air preheater temperature prediction model, pulverized dust fan temperature prediction model;

[0102] The acquiring of short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group comprises:

[0103] The coal mill temperature data is input into the coal mill temperature prediction model to obtain short-term coal mill temperature prediction data;

[0104] The boiler temperature data is input into the boiler temperature prediction model to obtain short-term boiler temperature prediction data;

[0105] The air preheater temperature data is input into the air preheater temperature prediction model to obtain short-term air preheater temperature prediction data;

[0106] The dust collector temperature data is input into the dust collector temperature prediction model to obtain short-term dust collector temperature prediction data;

[0107] The induced draft fan temperature data is input into the induced draft fan temperature prediction model to obtain short-term induced draft fan temperature prediction data;

[0108] The ash pump temperature data is input into the ash pump temperature prediction model to obtain short-term ash pump temperature prediction data;

[0109] The powder exhaust fan temperature data is input into the powder exhaust fan temperature prediction model to obtain short-term powder exhaust fan temperature prediction data; wherein,

[0110] The short-term coal mill temperature prediction data, short-term boiler temperature prediction data, short-term air preheater temperature prediction data, short-term dust collector temperature prediction data, short-term induced draft fan temperature prediction data, short-term ash pump temperature prediction data and short-term pulverized dust fan temperature prediction data constitute the short-term combustion system temperature prediction data.

[0111] In this embodiment, the steam-water system temperature data includes boiler temperature data, high-pressure heater temperature data, feed water pump temperature data, deaerator temperature data, low-pressure heater temperature data, condensate pump temperature data, condenser temperature data, circulating water pump temperature data, turbine temperature data, and generator temperature data;

[0112] The steam-water system temperature prediction model group includes:

[0113] Boiler temperature prediction model, high-pressure heater temperature prediction model, feed water pump temperature prediction model, deaerator temperature prediction model, low-pressure heater temperature prediction model, condensate pump temperature prediction model, condenser temperature prediction model, circulating water pump temperature prediction model, turbine temperature prediction model, generator temperature prediction model;

[0114] The obtaining of short-term steam-water system temperature prediction data based on the steam-water system temperature data and the steam-water system temperature prediction model group comprises:

[0115] Inputting the boiler temperature data into the boiler temperature prediction model to obtain short-term boiler temperature prediction data;

[0116] Inputting the high-pressure heater temperature data into the high-pressure heater temperature prediction model to obtain short-term high-pressure heater temperature prediction data;

[0117] Inputting the feedwater pump temperature data into the feedwater pump temperature prediction model to obtain short-term feedwater pump temperature prediction data;

[0118] Inputting the deaerator temperature data into the deaerator temperature prediction model to obtain short-term deaerator temperature prediction data;

[0119] Inputting the low-pressure heater temperature data into the low-pressure heater temperature prediction model to obtain short-term low-pressure heater temperature prediction data;

[0120] Inputting the condensate pump temperature data into the condensate pump temperature prediction model to obtain short-term condensate pump temperature prediction data;

[0121] Inputting the condenser temperature data into the condenser temperature prediction model to obtain short-term condenser temperature prediction data;

[0122] Inputting the circulating water pump temperature data into the circulating water pump temperature prediction model to obtain short-term circulating water pump temperature prediction data;

[0123] Inputting the steam turbine temperature data into the steam turbine temperature prediction model to obtain short-term steam turbine temperature prediction data;

[0124] The generator temperature data is input into the generator temperature prediction model to obtain short-term generator temperature prediction data; wherein,

[0125] The short-term boiler temperature prediction data, short-term high-pressure heater temperature prediction data, short-term deaerator temperature prediction data, short-term feed water pump temperature prediction data, short-term low-pressure heater temperature prediction data, short-term condensate pump temperature prediction data, short-term condenser temperature prediction data, short-term circulating water pump temperature prediction data, short-term turbine temperature prediction data and short-term generator temperature prediction data constitute the short-term steam-water system temperature prediction data.

[0126] In this embodiment, the electrical system temperature data includes excitation device temperature data, generator temperature data, main transformer temperature data, and plant transformer temperature data;

[0127] The temperature prediction model group for the electrical system includes an excitation device temperature prediction model, a generator temperature prediction model, a main transformer temperature prediction model, and a plant transformer temperature prediction model;

[0128] The acquiring of short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group comprises:

[0129] Inputting the excitation device temperature data into the excitation device temperature prediction model to obtain short-term excitation device temperature prediction data;

[0130] Inputting the generator temperature data into the generator temperature prediction model to obtain short-term generator temperature prediction data;

[0131] Inputting the main transformer temperature data into the main transformer temperature prediction model to obtain short-term main transformer temperature prediction data;

[0132] The plant transformer temperature data is input into the plant transformer temperature prediction model to obtain short-term plant transformer temperature prediction data.

[0133] In this embodiment, each prediction model in the temperature prediction model group for the electrical system uses a Transformer model;

[0134] Each prediction model in the steam-water system temperature prediction model group uses a Transformer model;

[0135] Each prediction model in the combustion system temperature prediction model group uses the Transformer model. In this embodiment, the Transformer is a model that uses a self-attention mechanism (Self-Attention) and position encoding. At the same time, the Transformer also adopts an encoder-decoder architecture. The self-attention mechanism directly represents the connection between any two time points through a calculation result during the calculation process. The distance between long-distance dependent features is greatly shortened, which is conducive to the effective use of these features. The prediction result of each time step output by the Transformer is the aggregation of all historical data before the time step.

[0136] In this embodiment, the electrical system temperature data, the steam-water system temperature data, and the combustion system temperature data can all be data of a certain time period, but all three need to be data of the same time period. For example, if the electrical system temperature data is data from 12:00 to 14:00 on March 3, 2021, then the other data also need to be data from 12:00 to 14:00 on March 3, 2021.

[0137] In this embodiment, obtaining a trained temperature prediction model group for an electrical system according to the current time point information includes:

[0138] Acquire an electrical system model and temperature association database, wherein the electrical system model and temperature association database includes at least two electrical system models and a time interval associated with each electrical system model;

[0139] Get the electrical system model corresponding to the time interval of the current time point information.

[0140] In this embodiment, the step of obtaining a trained prediction model group for the temperature of a soda-water system according to the current time point information includes:

[0141] Acquire a soda system model and temperature association database, wherein the soda system model and temperature association database includes at least two soda system models and a time interval associated with each soda system model;

[0142] Get the soda system model corresponding to the time interval of the current time point information.

[0143] In this embodiment, the step of obtaining a trained prediction model group for the temperature of a soda-water system according to the current time point information includes:

[0144] Acquire a combustion system model and temperature association database, wherein the combustion system model and temperature association database includes at least two combustion system models and a time interval associated with each combustion system model;

[0145] Get the combustion system model corresponding to the time interval of the current time point information.

[0146] In this embodiment, different times correspond to different operating states of the thermal power plant. For example, in a certain season, the overall operating power of the thermal power plant is A, and in another season, the overall operating power of the thermal power plant is B. Then, different operating powers may cause the same device to have different temperatures. Therefore, different training will be performed during model training.

[0147] For example, assuming the time interval is from January to March of each year, there is a corresponding model corresponding to the time interval, and the training data and test data used to train the model also use the data from January to March of the previous year.

[0148] If there is a corresponding model corresponding to April to June of each year, the training data and test data used to train the model also use the data from April to June of the previous year.

[0149] In this embodiment, the early warning model may use a BP neural network model.

[0150] The present application also provides a thermal power plant operation and maintenance data early warning device, which includes a current time point information acquisition module, a data acquisition module, a prediction model group acquisition module, a short-term electrical system temperature prediction module, a short-term steam-water system temperature prediction module, a short-term steam combustion system temperature prediction module, an early warning model acquisition module, a feature extraction module, a fusion module and an early warning module, wherein:

[0151] The current time point information acquisition module is used to obtain the current time point information;

[0152] The data acquisition module is used to obtain the temperature data of the electrical system, the temperature data of the steam-water system, and the temperature data of the combustion system;

[0153] The prediction model group acquisition module is used to acquire a trained temperature prediction model group for an electrical system, a trained temperature prediction model group for a steam-water system, and a trained temperature prediction model group for a combustion system according to information at a current time point;

[0154] The short-term electrical system temperature prediction module is used to obtain short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group;

[0155] The short-term steam-water system temperature prediction module is used to obtain short-term steam-water system temperature prediction data based on the steam-water system temperature data and the steam-water system temperature prediction model group;

[0156] The short-term steam combustion system temperature prediction module is used to obtain short-term steam combustion system temperature prediction data based on the combustion system temperature data and the combustion system temperature prediction model group;

[0157] The early warning model acquisition module is used to obtain the trained early warning model;

[0158] The feature extraction module is used to extract the electrical system temperature prediction features of the short-term electrical system temperature prediction data, extract the steam-water system temperature prediction features of the short-term steam-water system temperature prediction data, and extract the steam combustion system prediction features of the short-term steam combustion system temperature prediction data;

[0159] The fusion module is used to fuse the electrical system temperature prediction feature, the steam-water system temperature prediction feature and the steam combustion system prediction feature, so as to obtain a fusion feature;

[0160] The early warning module is used to input the fusion features into the early warning model to obtain the early warning result.

[0161] It should be noted that the above explanations of the method embodiment are also applicable to the device of this embodiment and will not be repeated here.

[0162] The present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and capable of running on the processor. When the processor executes the computer program, the above-mentioned thermal power plant operation and maintenance data early warning method is implemented.

[0163] The present application also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, it can implement the above-mentioned thermal power plant operation and maintenance data early warning method.

[0164] Figure 2 It is an exemplary structural diagram of an electronic device that can implement the thermal power plant operation and maintenance data early warning method provided according to an embodiment of the present application.

[0165] like Figure 2 As shown, the electronic device includes an input device 501, an input interface 502, a central processor 503, a memory 504, an output interface 505, and an output device 506. The input interface 502, the central processor 503, the memory 504, and the output interface 505 are interconnected through a bus 507, and the input device 501 and the output device 506 are connected to the bus 507 through the input interface 502 and the output interface 505, respectively, and then connected to other components of the electronic device. Specifically, the input device 504 receives input information from the outside, and transmits the input information to the central processor 503 through the input interface 502; the central processor 503 processes the input information based on the computer executable instructions stored in the memory 504 to generate output information, temporarily or permanently stores the output information in the memory 504, and then transmits the output information to the output device 506 through the output interface 505; the output device 506 outputs the output information to the outside of the electronic device for use by the user.

[0166] That is to say, Figure 2 The electronic device shown can also be implemented as comprising: a memory storing computer executable instructions; and one or more processors, which can implement the combination when executing the computer executable instructions. Figure 1 The thermal power plant operation and maintenance data early warning method described in the present invention.

[0167] In one embodiment, Figure 2 The electronic device shown can be implemented to include: a memory 504, configured to store executable program code; one or more processors 503, configured to run the executable program code stored in the memory 504 to execute the thermal power plant operation and maintenance data early warning method in the above embodiment.

[0168] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0169] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0170] Computer readable media include permanent and non-permanent, removable and non-removable, and the media can be implemented by any method or technology to store information. The information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, read-only compact disk read-only memory (CD-ROM), data versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device.

[0171] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0172] In addition, it is obvious that the word "comprising" does not exclude other units or steps. Multiple units, modules or devices stated in the device claim can also be implemented by one unit or the overall device through software or hardware.

[0173] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and a module, a program segment or a part of a code includes one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes identified in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or the total flow chart can be implemented with a dedicated hardware-based system that performs the specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0174] The processor referred to in this embodiment may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0175] The memory can be used to store computer programs and / or modules. The processor realizes various functions of the device / terminal equipment by running or executing the computer programs and / or modules stored in the memory and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0176] In this embodiment, if the module / unit integrated in the device / terminal equipment is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the process in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can be executed by the processor. The steps of the above-mentioned various method embodiments. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device that can carry computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. Although the present application is disclosed as above in terms of a preferred embodiment, it is not intended to limit the present application. Any technical personnel in this field may make possible changes and modifications without departing from the spirit and scope of the present application. Therefore, the scope of protection of the present application shall be based on the scope defined by the claims of the present application.

[0177] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0178] In addition, it is obvious that the word "comprising" does not exclude other units or steps. Multiple units, modules or devices stated in the device claim can also be implemented by one unit or the overall device through software or hardware.

[0179] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A thermal power plant operation and maintenance data early warning method, characterized in that: The thermal power plant operation and maintenance data early warning method comprises: Get the current time point information; Obtain temperature data of electrical system, steam-water system and combustion system; According to the information of the current time point, a trained temperature prediction model group for the electrical system, a trained temperature prediction model group for the steam-water system, and a trained temperature prediction model group for the combustion system are obtained; Acquire short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group; Acquire short-term steam-water system temperature prediction data based on the steam-water system temperature data and the steam-water system temperature prediction model group; Acquire short-term steam combustion system temperature prediction data based on the combustion system temperature data and the combustion system temperature prediction model group; Obtain trained early warning models; extracting electrical system temperature prediction features of the short-term electrical system temperature prediction data; Extracting the steam-water system temperature prediction features of the short-term steam-water system temperature prediction data; Extracting the steam combustion system prediction characteristics of the short-term steam combustion system temperature prediction data; The electrical system temperature prediction feature, the steam-water system temperature prediction feature and the steam combustion system prediction feature are fused to obtain a fusion feature; The fused features are input into the early warning model to obtain early warning results.

2. The thermal power plant operation and maintenance data early warning method according to claim 1, characterized in that: The combustion system temperature data includes coal mill temperature data, air preheater temperature data, boiler temperature data, dust collector temperature data, induced draft fan temperature data, ash pump temperature data, and pulverized coal exhaust fan temperature data; The combustion system temperature prediction model group includes: Coal mill temperature prediction model, boiler temperature prediction model, blower temperature prediction model, dust collector temperature prediction model, induced draft fan temperature prediction model, ash pump temperature prediction model, air preheater temperature prediction model, pulverized dust fan temperature prediction model; The acquiring of short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group comprises: The coal mill temperature data is input into the coal mill temperature prediction model to obtain short-term coal mill temperature prediction data; The boiler temperature data is input into the boiler temperature prediction model to obtain short-term boiler temperature prediction data; The air preheater temperature data is input into the air preheater temperature prediction model to obtain short-term air preheater temperature prediction data; The dust collector temperature data is input into the dust collector temperature prediction model to obtain short-term dust collector temperature prediction data; The induced draft fan temperature data is input into the induced draft fan temperature prediction model to obtain short-term induced draft fan temperature prediction data; The ash pump temperature data is input into the ash pump temperature prediction model to obtain short-term ash pump temperature prediction data; The powder exhaust fan temperature data is input into the powder exhaust fan temperature prediction model to obtain short-term powder exhaust fan temperature prediction data; wherein, The short-term coal mill temperature prediction data, short-term boiler temperature prediction data, short-term air preheater temperature prediction data, short-term dust collector temperature prediction data, short-term induced draft fan temperature prediction data, short-term ash pump temperature prediction data and short-term pulverized dust fan temperature prediction data constitute the short-term combustion system temperature prediction data.

3. The thermal power plant operation and maintenance data early warning method according to claim 2, characterized in that: The steam-water system temperature data includes boiler temperature data, high-pressure heater temperature data, feed water pump temperature data, deaerator temperature data, low-pressure heater temperature data, condensate pump temperature data, condenser temperature data, circulating water pump temperature data, turbine temperature data, and generator temperature data; The steam-water system temperature prediction model group includes: Boiler temperature prediction model, high-pressure heater temperature prediction model, feed water pump temperature prediction model, deaerator temperature prediction model, low-pressure heater temperature prediction model, condensate pump temperature prediction model, condenser temperature prediction model, circulating water pump temperature prediction model, turbine temperature prediction model, generator temperature prediction model; The obtaining of short-term steam-water system temperature prediction data based on the steam-water system temperature data and the steam-water system temperature prediction model group comprises: Inputting the boiler temperature data into the boiler temperature prediction model to obtain short-term boiler temperature prediction data; Inputting the high-pressure heater temperature data into the high-pressure heater temperature prediction model to obtain short-term high-pressure heater temperature prediction data; Inputting the feedwater pump temperature data into the feedwater pump temperature prediction model to obtain short-term feedwater pump temperature prediction data; Inputting the deaerator temperature data into the deaerator temperature prediction model to obtain short-term deaerator temperature prediction data; Inputting the low-pressure heater temperature data into the low-pressure heater temperature prediction model to obtain short-term low-pressure heater temperature prediction data; Inputting the condensate pump temperature data into the condensate pump temperature prediction model to obtain short-term condensate pump temperature prediction data; Inputting the condenser temperature data into the condenser temperature prediction model to obtain short-term condenser temperature prediction data; Inputting the circulating water pump temperature data into the circulating water pump temperature prediction model to obtain short-term circulating water pump temperature prediction data; Inputting the steam turbine temperature data into the steam turbine temperature prediction model to obtain short-term steam turbine temperature prediction data; The generator temperature data is input into the generator temperature prediction model to obtain short-term generator temperature prediction data; wherein, The short-term boiler temperature prediction data, short-term high-pressure heater temperature prediction data, short-term deaerator temperature prediction data, short-term feed water pump temperature prediction data, short-term low-pressure heater temperature prediction data, short-term condensate pump temperature prediction data, short-term condenser temperature prediction data, short-term circulating water pump temperature prediction data, short-term turbine temperature prediction data and short-term generator temperature prediction data constitute the short-term steam-water system temperature prediction data.

4. The thermal power plant operation and maintenance data early warning method according to claim 3, characterized in that: The electrical system temperature data includes excitation device temperature data, generator temperature data, main transformer temperature data, and plant transformer temperature data; The temperature prediction model group for the electrical system includes an excitation device temperature prediction model, a generator temperature prediction model, a main transformer temperature prediction model, and a plant transformer temperature prediction model; The acquiring of short-term electrical system temperature prediction data based on the electrical system temperature data and the electrical system temperature prediction model group comprises: Inputting the excitation device temperature data into the excitation device temperature prediction model to obtain short-term excitation device temperature prediction data; Inputting the generator temperature data into the generator temperature prediction model to obtain short-term generator temperature prediction data; Inputting the main transformer temperature data into the main transformer temperature prediction model to obtain short-term main transformer temperature prediction data; The plant transformer temperature data is input into the plant transformer temperature prediction model to obtain short-term plant transformer temperature prediction data.

5. The thermal power plant operation and maintenance data early warning method according to claim 1, characterized in that: Each prediction model in the temperature prediction model group for the electrical system uses a Transformer model; Each prediction model in the steam-water system temperature prediction model group uses a Transformer model; Each prediction model in the combustion system temperature prediction model group uses a Transformer model.

6. The thermal power plant operation and maintenance data early warning method according to claim 1, characterized in that: The step of obtaining a trained temperature prediction model group for an electrical system according to information at a current time point includes: Acquire an electrical system model and temperature association database, wherein the electrical system model and temperature association database includes at least two electrical system models and a time interval associated with each electrical system model; Get the electrical system model corresponding to the time interval of the current time point information.

7. The thermal power plant operation and maintenance data early warning method according to claim 6, characterized in that: The step of obtaining a trained prediction model group for the temperature of a soda-water system according to the current time point information includes: Acquire a soda system model and temperature association database, wherein the soda system model and temperature association database includes at least two soda system models and a time interval associated with each soda system model; Get the soda system model corresponding to the time interval of the current time point information.

8. The thermal power plant operation and maintenance data early warning method according to claim 7, characterized in that: The step of obtaining a trained prediction model group for the temperature of a soda-water system according to the current time point information includes: Acquire a combustion system model and temperature association database, wherein the combustion system model and temperature association database includes at least two combustion system models and a time interval associated with each combustion system model; Get the combustion system model corresponding to the time interval of the current time point information.

9. The thermal power plant operation and maintenance data early warning method according to claim 1, characterized in that: The early warning model is a BP neural network.

10. A thermal power plant operation and maintenance data early warning device, characterized in that: The thermal power plant operation and maintenance data early warning device comprises: A current time point information acquisition module, wherein the current time point information acquisition module is used to acquire current time point information; A data acquisition module, the data acquisition module is used to acquire the temperature data of the electrical system, the temperature data of the steam-water system, and the temperature data of the combustion system; A prediction model group acquisition module, the prediction model group acquisition module is used to acquire a trained temperature prediction model group for an electrical system, a trained temperature prediction model group for a steam-water system, and a trained temperature prediction model group for a combustion system according to information at a current time point; A short-term electrical system temperature prediction module, the short-term electrical system temperature prediction module is used to obtain short-term electrical system temperature prediction data based on the electrical system temperature data and a temperature prediction model group for the electrical system; A short-term steam-water system temperature prediction module, the short-term steam-water system temperature prediction module is used to obtain short-term steam-water system temperature prediction data based on the steam-water system temperature data and a steam-water system temperature prediction model group; A short-term steam combustion system temperature prediction module, the short-term steam combustion system temperature prediction module is used to obtain short-term steam combustion system temperature prediction data based on the combustion system temperature data and the combustion system temperature prediction model group; An early warning model acquisition module, wherein the early warning model acquisition module is used to acquire a trained early warning model; A feature extraction module, the feature extraction module is used to extract the electrical system temperature prediction features of the short-term electrical system temperature prediction data, extract the steam-water system temperature prediction features of the short-term steam-water system temperature prediction data, and extract the steam combustion system prediction features of the short-term steam combustion system temperature prediction data; A fusion module, the fusion module is used to fuse the electrical system temperature prediction feature, the steam-water system temperature prediction feature and the steam combustion system prediction feature, so as to obtain a fusion feature; The early warning module is used to input the fusion features into the early warning model to obtain the early warning result.