Task data processing method and device, equipment and storage medium

By obtaining the requirements items and business functions of the target task, combined with the actual attendance data, the second target workload evaluation value is calculated, the rationality of the initial workload evaluation value is judged and the model is optimized, which solves the problem of inaccurate initial workload evaluation value. , improving the optimization accuracy of the workload assessment model.

CN118761501APending Publication Date: 2024-10-11CCB FINTECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410871025.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

The initial workload evaluation value of a task in the prior art is inaccurate, resulting in the inability to accurately determine whether the workload evaluation model needs to be optimized.

Method used

By obtaining multiple demand items and corresponding business functions of the target task, combined with the actual attendance data and the initial workload evaluation value, the second target workload evaluation value is calculated, the rationality of the first target workload evaluation value is judged, and Optimize the workload evaluation model when it is unreasonable.

Benefits of technology

It improves the accuracy of workload assessment model optimization and ensures rational judgment of task data processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761501A_ABST
    Figure CN118761501A_ABST
Patent Text Reader

Abstract

The invention provides a task data processing method and device, equipment and a storage medium. Relates to the technical field of big data. The method comprises the following steps: accurately determining a second target workload evaluation value corresponding to a target task when all demand items are completed by combining actual attendance data of each demand item, an initial workload evaluation value and a first workload evaluation value of a business function corresponding to each demand item; therefore, the accuracy of rationality judgment on the first target workload evaluation value based on the second target workload evaluation value can be improved, and then the accuracy of determining whether to optimize the workload evaluation model is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of big data technology, and in particular to a task data processing method, device, equipment and storage medium. Background Art

[0002] At present, in task management, the task management end usually determines the initial workload assessment value of the task based on the workload assessment model, and uses a manual method to analyze the implementation of the task to evaluate the new workload assessment value of the task, and based on the new workload assessment value, the rationality of the initial workload assessment value is judged, and based on the rationality judgment result, it is determined whether to optimize the workload assessment model. However, in this scheme, the new workload assessment value is determined manually, and the determined new workload assessment value may be inaccurate, which leads to inaccurate rationality judgment of the initial workload assessment value of the task, and further leads to the inability to accurately determine whether to optimize the workload assessment model. Summary of the invention

[0003] The present application provides a task data processing method, device, equipment and storage medium to solve the problem in the related art that the rationality judgment of the initial workload assessment value of the task is inaccurate, resulting in the inability to accurately determine whether to optimize the workload assessment model.

[0004] In a first aspect, the present application provides a task data processing method, the method comprising: obtaining multiple requirement items proposed for a target task, and obtaining a first target workload assessment value corresponding to the target task when all the requirement items are completed, wherein the first target workload assessment value is obtained by summing up the initial workload assessment values ​​corresponding to the target task when each of the requirement items is completed, and the initial workload assessment value corresponding to the target task when the requirement items are completed is obtained by performing workload assessment on the requirement items using a preset workload assessment model; for each requirement item, obtaining at least one business function corresponding to the requirement item; and according to the target task, obtaining a first target workload assessment value corresponding to the target task when all the requirement items are completed. Determine the second workload assessment value corresponding to the target task when completing the requirement items based on the first workload assessment value corresponding to the target task when completing each of the business functions; obtain the actual attendance data corresponding to the target task when completing each of the requirement items; determine the second target workload assessment value corresponding to the target task when completing all the requirement items based on the second workload assessment value, the actual attendance data and the initial workload assessment value; determine whether the first target workload assessment value is reasonable based on the second target workload assessment value; and optimize the workload assessment model when it is determined that the first target workload assessment value is unreasonable.

[0005] In a second aspect, the present application provides a task data processing device, the device comprising: a first acquisition module, used to acquire multiple requirement items proposed for a target task, and to acquire a first target workload assessment value corresponding to the target task when all the requirement items are completed, wherein the first target workload assessment value is obtained by summing up the initial workload assessment values ​​corresponding to the target task when each of the requirement items is completed, and the initial workload assessment value corresponding to the target task when the requirement items are completed is obtained by workload assessment of the requirement items using a preset workload assessment model; a second acquisition module, used to acquire, for each requirement item, at least one business function corresponding to the requirement item; a first determination module, used to determine the workload assessment value corresponding to the target task when the target task is completed based on the workload assessment value. The first workload assessment value corresponding to each of the business functions is used to determine the second workload assessment value corresponding to the target task when completing the requirement items; a third acquisition module is used to obtain the actual attendance data corresponding to the target task when completing each of the requirement items; a second determination module is used to determine the second target workload assessment value corresponding to the target task when completing all the requirement items according to the second workload assessment value, the actual attendance data and the initial workload assessment value; the third determination module is used to determine whether the first target workload assessment value is reasonable according to the second target workload assessment value; a model optimization module is used to optimize the workload assessment model when it is determined that the first target workload assessment value is unreasonable.

[0006] In a third aspect, the present application provides an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the task data processing method disclosed in an embodiment of the present application.

[0007] In a fourth aspect, the present application provides a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the task data processing method disclosed in the embodiment of the present application.

[0008] In a fifth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the task data processing method disclosed in the embodiment of the present application.

[0009] The technical solution of this application has the following advantages or beneficial effects:

[0010] When it is necessary to determine whether to optimize the workload assessment model, obtain multiple demand items proposed for the target task, and obtain at least one business function corresponding to the demand item, and determine the second workload assessment value corresponding to the target task when completing the demand item based on the first workload assessment value corresponding to the target task when completing each business function, and determine the actual attendance data corresponding to the target task when completing each demand item; determine the second target workload assessment value corresponding to the target task when completing all demand items based on the second workload assessment value, the actual attendance data and the initial workload assessment value; determine whether the first target workload assessment value is reasonable based on the second target workload assessment value, and if it is determined that the first target workload assessment value is unreasonable, optimize the initial workload assessment model. Therefore, by combining the actual attendance data of each requirement item, the initial workload assessment value and the first workload assessment value of the business function corresponding to each requirement item, the second target workload assessment value corresponding to the target task when all requirement items are completed is accurately determined, thereby improving the accuracy of the rationality judgment of the first target workload assessment value based on the second target workload assessment value, and then improving the accuracy of determining whether to optimize the workload assessment model. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0012] Figure 1 The process of the task data processing method provided in the embodiment of the present application Figure 1 ;

[0013] Figure 2 The process of the task data processing method provided in the embodiment of the present application Figure 2 ;

[0014] Figure 3 The process of the task data processing method provided in the embodiment of the present application Figure 3 ;

[0015] Figure 4 A schematic diagram of the structure of a task data processing device provided in an embodiment of the present application;

[0016] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application.

[0017] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0018] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0019] It should be noted that the acquisition, transmission, storage, use, and processing of data in the technical solution of this application comply with the relevant provisions of relevant laws and regulations.

[0020] It should be noted that in the embodiments of the present application, certain software, components, models and other existing solutions in the industry may be mentioned, and they should be regarded as exemplary. Their purpose is only to illustrate the feasibility of implementing the technical solution of the present application, but it does not mean that the applicant has or will necessarily use the solution.

[0021] In the related art, in task management, the task management end usually determines the initial workload assessment value of the task based on the workload assessment model, and uses a manual method to analyze the implementation of the task to evaluate the new workload assessment value of the task, and based on the new workload assessment value, the rationality of the initial workload assessment value is judged, and based on the rationality judgment result, it is determined whether to optimize the workload assessment model. However, in this scheme, the new workload assessment value is determined manually, and the determined new workload assessment value may be inaccurate, which leads to inaccurate rationality judgment of the initial workload assessment value of the task, and further leads to the inability to accurately determine whether to optimize the workload assessment model.

[0022] In order to improve the accuracy of determining whether to optimize the initial workload model, the present application proposes a task data processing method, which proposes the following technical concepts: when it is necessary to determine whether to optimize the workload assessment model, multiple requirement items proposed for the target task are obtained, and at least one business function corresponding to the requirement item is obtained, and according to the first workload assessment value corresponding to the target task when completing each business function, the second workload assessment value corresponding to the target task when completing the requirement item is determined, and the actual attendance data corresponding to the target task when completing each requirement item is determined; according to the second workload assessment value, the actual attendance data and the initial workload assessment value, the second target workload assessment value corresponding to the target task when completing all requirement items is determined; according to the second workload assessment value, whether the first target workload assessment value is reasonable is determined, and when it is determined that the first target workload assessment value is unreasonable, the initial workload assessment model is optimized. Therefore, by combining the actual attendance data of each requirement item, the initial workload assessment value and the first workload assessment value of the business function corresponding to each requirement item, the second target workload assessment value corresponding to the target task when all requirement items are completed is accurately determined, thereby improving the accuracy of the rationality judgment of the first target workload assessment value based on the second target workload assessment value, and then improving the accuracy of determining whether to optimize the workload assessment model.

[0023] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.

[0024] First combine Figure 1 , an exemplary description is given of the task data processing method provided in the embodiment of the present application.

[0025] Figure 1 The process of the task data processing method provided in the embodiment of the present application Figure 1 .

[0026] It should be noted that the task data processing method provided in the embodiment of the present application can be executed by a task data processing device, wherein the task data processing device can be configured in the task management end, or can be the task management end.

[0027] The task management end in this embodiment may be an electronic device, or may be configured in an electronic device.

[0028] The electronic device may be any device with computing capability, such as a terminal device, a server, etc. This embodiment does not specifically limit the electronic device.

[0029] like Figure 1 As shown, the task data processing method includes the following steps:

[0030] S101, obtain multiple requirement items proposed for the target task, and obtain a first target workload assessment value corresponding to the target task when all requirement items are completed, wherein the first target workload assessment value is obtained by summing up the initial workload assessment values ​​corresponding to the target task when each requirement item is completed, and the initial workload assessment value corresponding to the target task when completing the requirement items is obtained by performing workload assessment on the requirement items using a preset workload assessment model.

[0031] The target task refers to a task set to achieve a certain goal. The target task can be a software project in any field. For example, the target task can be a financial software project in the financial field.

[0032] In one embodiment of the present application, a requirement document for the target task may be obtained, and the requirement document may be analyzed to obtain a plurality of requirement items proposed for the target task.

[0033] The workload assessment model preset in this embodiment may correspond to the task type of the target task.

[0034] In this embodiment, the task type of the target task may be acquired in, for example, a manner of: determining the task type of the target task according to business feature information of the target task.

[0035] For example, the target task is a financial task, and correspondingly, the task type of the target task can be one of management, transaction, data analysis, process management, channel, etc.

[0036] S102: For each requirement item, obtain at least one business function corresponding to the requirement item.

[0037] The business function is used to realize the requirement item, that is, the business function includes a series of system operations or processes required to realize the requirement item.

[0038] It can be understood that the number of the service functions may be one or more, and this embodiment does not specifically limit the number of service functions.

[0039] In this embodiment, at least one business function corresponding to the requirement item may be obtained from a pre-saved correspondence between the requirement item and the business function.

[0040] S103, determining a second workload assessment value corresponding to the target task when completing the requirement item according to the first workload assessment value corresponding to the target task when completing each business function.

[0041] In one embodiment of the present application, the first workload assessment values ​​corresponding to the target task when completing each business function may be summed to obtain the second workload assessment value corresponding to the target task when completing the requirement item.

[0042] S104, obtaining the actual attendance data corresponding to the target task when each requirement item is completed.

[0043] S105, determining a second target workload assessment value corresponding to the target task when all requirement items are completed according to the second workload assessment value, the actual attendance data and the initial workload assessment value.

[0044] In one embodiment of the present application, in order to accurately determine the second target workload assessment value corresponding to the target task when all requirement items are completed, a possible implementation method of the above step 105 is: based on the second workload assessment value and the actual attendance data, determine the first intermediate workload assessment value corresponding to the target task when each requirement item is completed; based on the first intermediate workload assessment value and the initial workload assessment value, determine the second intermediate workload assessment value corresponding to the target task when each requirement item is completed; sum the second intermediate workload assessment values ​​corresponding to the target task when each requirement item is completed to obtain the second target workload assessment value corresponding to the target task when all requirement items are completed.

[0045] In one embodiment of the present application, a possible implementation method for determining the first intermediate workload assessment value corresponding to the target task when completing each requirement item according to the second workload assessment value and the actual attendance data is as follows: an adjustment coefficient can be determined according to the second workload assessment value and the actual attendance data, and according to the adjustment coefficient, the second workload assessment value corresponding to the target task when completing each requirement item is weighted to obtain the first intermediate workload assessment value corresponding to the target task when completing each requirement item. Thus, the first intermediate workload assessment value is accurately determined.

[0046] It can be understood that in different application scenarios, the implementation methods of determining the adjustment coefficient according to the second workload evaluation value and the actual attendance data are different, and an exemplary description is as follows:

[0047] As an example, the second workload assessment value and actual attendance data corresponding to the target task when each requirement item is completed may be input into a calculation formula for calculating an adjustment coefficient, so as to obtain the corresponding adjustment coefficient through the calculation formula.

[0048] For example, an example of a calculation formula for calculating the adjustment factor A is as follows:

[0049]

[0050] Among them, B in this formula i represents the actual attendance data corresponding to the target task when the i-th requirement item is completed; C i It represents the second workload assessment value corresponding to the target task when completing the i-th requirement item; N represents the total number of requirement items.

[0051] As another example, the second workload assessment values ​​may be summed to obtain a first summation result; the actual attendance data corresponding to the target task when each requirement item is completed may be summed to obtain a second summation result; and the adjustment coefficient may be determined based on the second summation result and the first summation result. Thus, the adjustment coefficient is accurately determined.

[0052] In this embodiment, the ratio of the second summation result to the first summation result may be used as the adjustment coefficient.

[0053] Among them, it can be understood that in different application scenarios, according to the first intermediate workload assessment value and the initial workload assessment value, the implementation method of the second intermediate workload assessment value corresponding to the target task when completing each requirement item is determined. For example, for each requirement item, the smaller value of the first intermediate workload assessment value and the initial workload assessment value corresponding to the target task when completing the requirement item can be used as the second intermediate workload assessment value corresponding to the target task when completing the requirement item. For another example, the first intermediate workload assessment value and the initial workload assessment value corresponding to the target task when completing the requirement item are averaged to obtain the second intermediate workload assessment value corresponding to the target task when completing the requirement item.

[0054] S106: Determine whether the first target workload evaluation value is reasonable based on the second target workload evaluation value.

[0055] In one embodiment of the present application, in order to improve the accuracy of the rationality judgment of the first target workload evaluation value, a possible implementation method for determining whether the first target workload evaluation value is reasonable is as follows: determining the deviation value between the second target workload evaluation value and the first target workload evaluation value; obtaining the corresponding deviation threshold value according to the task type of the target task; and determining that the first target workload evaluation value is reasonable when the deviation value is less than or equal to the deviation threshold value. Thus, by combining the deviation threshold value corresponding to the task type, the rationality judgment of the first target workload evaluation value can further improve the accuracy of the rationality result judged.

[0056] It is understandable that the deviation thresholds corresponding to different task types are usually different.

[0057] In addition, when the deviation value is greater than the deviation threshold, the first target workload assessment value is determined to be unreasonable, and a prompt message is output, so that the corresponding personnel can conveniently view the unreasonable first target workload assessment value based on the prompt message and perform subsequent processing.

[0058] In one embodiment of the present application, in order to enable the corresponding personnel to know the rationality judgment result of the initial workload assessment value for the corresponding requirement item, correspondingly, the corresponding target deviation threshold can be obtained based on the task type and requirement item of the target task, and the difference between the second workload assessment value and the initial workload assessment value is determined, and the difference is determined to be less than or equal to the target deviation threshold. If so, it is determined that the initial workload assessment value of the requirement item is reasonable. In addition, if not, it is determined that the initial workload assessment value of the requirement item is unreasonable, and the corresponding prompt information is output to facilitate the corresponding personnel to view the unreasonable initial workload assessment value through the prompt information.

[0059] S107: When it is determined that the first target workload evaluation value is unreasonable, the workload evaluation model is optimized.

[0060] That is to say, when it is determined that the first target workload assessment value is unreasonable, it indicates that the workload assessment model needs to be optimized. Here, it can be determined that the workload assessment model is to be optimized, and the workload assessment model is optimized.

[0061] In some embodiments, in order to enable the corresponding personnel to know the results of whether the workload assessment model is optimized, a prompt message can also be sent to the client of the corresponding personnel, wherein the prompt message is used to prompt that the workload assessment model needs to be optimized, so that the corresponding personnel can perform subsequent processing of the workload assessment model based on the prompt message.

[0062] It should be noted that, when it is determined that the first target workload assessment value is reasonable, it means that the first target workload assessment value determined based on the initial workload assessment model is relatively reasonable. At this time, it can be determined that there is no need to optimize the initial workload assessment model.

[0063] It should be noted that the method of optimizing the workload assessment model can be found in the relevant description in the relevant technology, which will not be repeated here.

[0064] The task data processing method provided in the embodiment of the present application obtains multiple requirement items proposed for the target task and obtains at least one business function corresponding to the requirement item when it needs to determine whether to optimize the workload assessment model, and determines the second workload assessment value corresponding to the target task when completing the requirement item based on the first workload assessment value corresponding to the target task when completing each business function, and determines the actual attendance data corresponding to the target task when completing each requirement item; determines the second target workload assessment value corresponding to the target task when completing all requirement items based on the second workload assessment value, the actual attendance data and the initial workload assessment value; determines whether the first target workload assessment value is reasonable based on the second target workload assessment value, and optimizes the initial workload assessment model when it is determined that the first target workload assessment value is unreasonable. Therefore, by combining the actual attendance data of each requirement item, the initial workload assessment value and the first workload assessment value of the business function corresponding to each requirement item, the second target workload assessment value corresponding to the target task when all requirement items are completed is accurately determined, thereby improving the accuracy of the rationality judgment of the first target workload assessment value based on the second target workload assessment value, and then improving the accuracy of determining whether to optimize the workload assessment model.

[0065] Based on the above embodiment, in order to accurately determine the second workload evaluation value corresponding to the target task when completing the requirement item, the following is combined with Figure 2 A possible implementation of step 103 is described exemplarily.

[0066] Figure 2 The process of the task data processing method provided in the embodiment of the present application Figure 2 .

[0067] like Figure 2 As shown, a possible implementation of step 103 may be:

[0068] S201, determining the actual transformation complexity corresponding to the target task when completing the business function.

[0069] In one embodiment of the present application, after each requirement item of the target task is put into production, for the business function corresponding to the corresponding requirement item, the number of related systems that need to be transformed when the target task actually completes the business function and the difficulty of transforming the corresponding related systems can be obtained, and based on the number of related systems and the difficulty of transformation, the actual transformation complexity corresponding to the target task when completing the business function is determined.

[0070] S202: Determine a first workload assessment value corresponding to the target task when completing the business function according to the actual transformation complexity.

[0071] Among them, it can be understood that when completing the same business function in tasks of different task types, the workload required is usually different. Therefore, in order to accurately determine the first workload assessment value corresponding to the target task when completing the business function, a possible implementation method of S202 is: obtain a workload table corresponding to the task type and business function of the target task, wherein the workload table includes multiple transformation complexities and workload baselines corresponding to each transformation complexity; query the workload table according to the actual transformation complexity to obtain the first workload assessment value. Thus, based on the workload table corresponding to the business function in the task type, the first workload assessment value corresponding to the target task when completing the business function is accurately obtained.

[0072] It should be noted that the workload table is established by analyzing the transformation complexity and the corresponding actual workload of multiple historical tasks when completing the business function, wherein the task types of the multiple historical tasks are the same as the task type of the target task.

[0073] It can be understood that, when the target task is a software project as an example, the corresponding historical task is a historical software project.

[0074] S203, summing up the first workload assessment values ​​corresponding to the target task when completing each business function, to obtain a second workload assessment value corresponding to the target task when completing the requirement item.

[0075] Based on the above description, it can be seen that in this embodiment, when determining the second workload assessment value corresponding to the target task when completing a requirement item, combined with the actual transformation complexity corresponding to the target task when completing each business function corresponding to the requirement item, the second workload assessment value corresponding to the target task when completing the requirement item is accurately determined, thereby further improving the accuracy of the subsequent rationality judgment results.

[0076] Figure 3 The process of the task data processing method provided in the embodiment of the present application Figure 3 .

[0077] like Figure 3 As shown, the task data processing method may include:

[0078] S301, obtain multiple requirement items proposed for the target task, and obtain a first target workload assessment value corresponding to the target task when all requirement items are completed, wherein the first target workload assessment value is obtained by summing up the initial workload assessment values ​​corresponding to the target task when each requirement item is completed, and the initial workload assessment value corresponding to the target task when completing the requirement items is obtained by performing workload assessment on the requirement items using a preset workload assessment model.

[0079] S302: For each requirement item, obtain at least one business function corresponding to the requirement item.

[0080] S303: Determine a second workload assessment value corresponding to the target task when completing the requirement item based on the first workload assessment value corresponding to the target task when completing each business function.

[0081] S304, obtaining the actual attendance data corresponding to the target task when each requirement item is completed.

[0082] S305 , for each requirement item, obtain a historical task that has the same task type as the target task and has the requirement item.

[0083] S306, averaging the implementation period corresponding to each historical task in completing the requirement item to obtain an average implementation period.

[0084] S307, based on the average implementation period, the actual attendance data corresponding to the target task when the requirement item is completed is corrected.

[0085] Among them, it can be understood that the actual attendance data obtained in this embodiment is the actual attendance data counted for the corresponding demand items during the implementation of the project. However, some demand items require manpower before the implementation of the project. Therefore, in order to further improve the accuracy of the determined adjustment coefficient, this embodiment combines the average implementation cycle of historical tasks of the same task type to realize the correction of the actual attendance data, which is convenient for the subsequent accurate determination of the adjustment coefficient based on the corrected actual attendance data.

[0086] For example, for the i-th requirement in the target task, assuming that B i represents the actual attendance data corresponding to the i-th requirement item. After correcting the actual attendance data, B i ' represents the corrected actual attendance data corresponding to the i-th demand item. After determining the second workload assessment value and the corrected actual attendance data corresponding to each demand item, the second workload assessment value and the corrected actual attendance data corresponding to each demand item can be input into the calculation formula for calculating the adjustment coefficient, so as to calculate the adjustment coefficient through the calculation formula. In this example, the calculation formula for calculating the adjustment coefficient A can be expressed as: Among them, C i It represents the second workload evaluation value corresponding to the target task when completing the i-th requirement item, and N represents the total number of requirement items.

[0087] In one embodiment of the present application, an exemplary implementation method for correcting the actual attendance data corresponding to the target task when completing the requirement item according to the average implementation period may be: the average implementation period and the actual attendance data may be input into a preset correction formula, and the value obtained by the correction formula may be used as the corrected actual attendance data. The preset correction formula may be: i '=B i +D×w, where D in the formula represents the average implementation period, B i ' represents the corrected actual attendance data corresponding to the i-th requirement item; B i represents the actual attendance data corresponding to the i-th requirement item; w represents the preset correction coefficient.

[0088] S308: Determine an adjustment coefficient according to the second workload evaluation value and the corrected actual attendance data.

[0089] In one embodiment of the present application, each second workload assessment value is summed to obtain a first summation result, and the corrected actual attendance data corresponding to the target task when completing each requirement item is summed to obtain a second summation result; based on the second summation result and the first summation result, the adjustment coefficient is determined.

[0090] S309, weighting the second workload assessment value corresponding to the target task when each requirement item is completed according to the adjustment coefficient, so as to obtain the first intermediate workload assessment value corresponding to the target task when each requirement item is completed.

[0091] S310, determining, based on the first intermediate workload assessment value and the initial workload assessment value, a second intermediate workload assessment value corresponding to the target task when each requirement item is completed.

[0092] In this embodiment, for each requirement item, the smaller value between the first intermediate workload assessment value and the initial workload assessment value corresponding to the target task when completing the requirement item can be used as the second intermediate workload assessment value corresponding to the target task when completing the requirement item.

[0093] S311, summing up the second intermediate workload assessment values ​​corresponding to the target task when each requirement item is completed, to obtain the second target workload assessment value corresponding to the target task when all requirement items are completed.

[0094] S312: Determine whether the first target workload evaluation value is reasonable based on the second target workload evaluation value.

[0095] S313: When it is determined that the first target workload evaluation value is unreasonable, the workload evaluation model is optimized.

[0096] Based on the above description, it can be seen that in this embodiment, the actual attendance data is corrected in combination with the average implementation period of historical tasks of the same task type, and the adjustment coefficient is determined based on the corrected actual attendance data, thereby improving the accuracy of the determined adjustment coefficient, and then improving the accuracy of the second target workload assessment value determined based on the adjustment coefficient, thereby improving the accuracy of the rationality judgment of the first target workload assessment value based on the second target workload assessment value, and further improving the accuracy of determining whether to optimize the workload assessment model.

[0097] Figure 4 This is a schematic diagram of the structure of the task data processing device provided in the embodiment of the present application. It should be noted that the task data processing device in this embodiment can execute the task data processing method in the above-mentioned embodiment.

[0098] like Figure 4 As shown, the task data processing device 400 may include:

[0099] The first acquisition module 401 is used to obtain multiple requirement items proposed for the target task, and obtain a first target workload assessment value corresponding to the target task when all requirement items are completed, wherein the first target workload assessment value is obtained by summing up the initial workload assessment values ​​corresponding to the target task when each requirement item is completed, and the initial workload assessment value corresponding to the target task when completing the requirement items is obtained by performing workload assessment on the requirement items using a preset workload assessment model.

[0100] The second acquisition module 402 is used to acquire, for each requirement item, at least one business function corresponding to the requirement item.

[0101] The first determination module 403 is used to determine the second workload assessment value corresponding to the target task when completing the requirement item according to the first workload assessment value corresponding to the target task when completing each business function.

[0102] The third acquisition module 404 is used to acquire the actual attendance data corresponding to the target task when each requirement item is completed.

[0103] The second determination module 405 is used to determine the second target workload assessment value corresponding to the target task when all requirement items are completed according to the second workload assessment value, the actual attendance data and the initial workload assessment value.

[0104] The third determination module 406 is used to determine whether the first target workload assessment value is reasonable according to the second target workload assessment value.

[0105] The model optimization module 407 is used to optimize the workload evaluation model when it is determined that the first target workload evaluation value is unreasonable.

[0106] In one embodiment of the present application, the first determining module 403 includes:

[0107] A first determination unit is used to determine the actual transformation complexity corresponding to the target task when completing the business function;

[0108] A second determination unit is used to determine a first workload assessment value corresponding to the target task when completing the business function according to the actual transformation complexity;

[0109] The first summing unit is used to sum the first workload assessment values ​​corresponding to the target task when completing various business functions to obtain a second workload assessment value.

[0110] In one embodiment of the present application, the second determination unit is specifically used to: obtain a workload table corresponding to the task type and business function of the target task, wherein the workload table includes multiple transformation complexities and workload baselines corresponding to each transformation complexity; query the workload table according to the actual transformation complexity to obtain a first workload evaluation value.

[0111] In one embodiment of the present application, the second determining module 405 includes:

[0112] A third determining unit is used to determine a first intermediate workload evaluation value corresponding to the target task when each requirement item is completed according to the second workload evaluation value and the actual attendance data;

[0113] A fourth determining unit, configured to determine, based on the first intermediate workload assessment value and the initial workload assessment value, a second intermediate workload assessment value corresponding to the target task when each requirement item is completed;

[0114] The second summing unit is used to sum the second intermediate workload assessment values ​​corresponding to the target task when each requirement item is completed, so as to obtain the second target workload assessment value corresponding to the target task when all requirement items are completed.

[0115] In one embodiment of the present application, the third determination unit is specifically used to: determine the adjustment coefficient based on the second workload assessment value and the actual attendance data; and according to the adjustment coefficient, weightedly process the second workload assessment value corresponding to the target task when completing each requirement item to obtain the first intermediate workload assessment value corresponding to the target task when completing each requirement item.

[0116] In one embodiment of the present application, an adjustment coefficient is determined based on the second workload assessment value and the actual attendance data, including: summing up the second workload assessment values ​​to obtain a first summation result; summing up the actual attendance data corresponding to the target task when completing each requirement item to obtain a second summation result; and determining the adjustment coefficient based on the second summation result and the first summation result.

[0117] In one embodiment of the present application, the device may further include:

[0118] The correction module is used to obtain historical tasks with the same task type as the target task and the requirement items for each requirement item; average the implementation cycles corresponding to each historical task in completing the requirement items to obtain the average implementation cycle; based on the average implementation cycle, correct the actual attendance data corresponding to the target task when completing the requirement items.

[0119] In one embodiment of the present application, based on the first intermediate workload assessment value and the initial workload assessment value, the second intermediate workload assessment value corresponding to the target task when completing each requirement item is determined, including: the smaller value of the first intermediate workload assessment value and the initial workload assessment value corresponding to the target task when completing the requirement item is determined as the second intermediate workload assessment value corresponding to the target task when completing the requirement item.

[0120] In one embodiment of the present application, the third determination module 406 is specifically used to: determine the deviation value between the second target workload assessment value and the first target workload assessment value; obtain the corresponding deviation threshold value according to the task type of the target task; and determine that the first target workload assessment value is reasonable when the deviation value is less than or equal to the deviation threshold value.

[0121] In one embodiment of the present application, the third determination module 406 is further used to: when the deviation value is greater than the deviation threshold, determine that the first target workload assessment value is unreasonable and output a prompt message.

[0122] The task data processing device provided in the embodiment of the present application can be used to execute the technical solution of the task data processing method in the above embodiment. Its implementation principle and technical effect are similar and will not be repeated here.

[0123] It should be noted that it should be understood that the division of the various modules of the above device is only a division of logical functions. In actual implementation, they can be fully or partially integrated into one physical entity, or they can be physically separated. And these modules can all be implemented in the form of software called by processing elements; they can also be all implemented in the form of hardware; some modules can also be implemented in the form of software called by processing elements, and some modules can be implemented in the form of hardware. For example, the second determination module 405 can be a separately established processing element, or it can be integrated in a chip of the above device. In addition, it can also be stored in the memory of the above device in the form of program code, and called and executed by a processing element of the above device. The function of the second determination module 405. The implementation of other modules is similar. In addition, these modules can be fully or partially integrated together, or they can be implemented independently. The processing element here can be an integrated circuit with signal processing capabilities. In the implementation process, each step of the above method or each module above can be completed by an integrated logic circuit of hardware in the processor element or instructions in the form of software.

[0124] Figure 5 The electronic device in this embodiment may be a terminal device or a server.

[0125] like Figure 5 As shown, the electronic device may include: a transceiver 121 , a processor 122 , and a memory 123 .

[0126] The processor 122 executes the computer execution instructions stored in the memory, so that the processor 122 executes the scheme in the above embodiment. The processor 122 can be a general-purpose processor, including a central processing unit CPU, a network processor (network processor, NP), etc.; it can also be a digital signal processor DSP, an application-specific integrated circuit ASIC, a field programmable gate array FPGA or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components.

[0127] The memory 123 is connected to the processor 122 via a system bus and completes communication between them. The memory 123 is used to store computer program instructions.

[0128] The transceiver 121 may be used to obtain tasks to be executed and configuration information of the tasks to be executed.

[0129] The system bus can be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The system bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, only one thick line is used in the figure, but it does not mean that there is only one bus or one type of bus. The transceiver is used to realize the communication between the database access device and other computers (such as clients, read-write libraries, and read-only libraries). The memory may include random access memory (RAM) and may also include non-volatile memory.

[0130] An embodiment of the present application also provides a chip for executing instructions, which is used to execute the technical solution of the task data processing method in the above embodiment.

[0131] An embodiment of the present application also provides a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the technical solution of the task data processing method in the above embodiment.

[0132] An embodiment of the present application also provides a computer program product, which includes a computer program stored in a computer-readable storage medium. At least one processor can read the computer program from the computer-readable storage medium. When at least one processor executes the computer program, it can implement the technical solution of the task data processing method in the above embodiment.

[0133] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the invention disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the following claims.

[0134] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.

Claims

1. A task data processing method, characterized in that: The method comprises: Obtain multiple requirement items proposed for the target task, and obtain a first target workload assessment value corresponding to the target task when all the requirement items are completed, wherein the first target workload assessment value is obtained by summing up the initial workload assessment values ​​corresponding to the target task when each of the requirement items is completed, and the initial workload assessment value corresponding to the target task when the requirement items are completed is obtained by performing workload assessment on the requirement items using a preset workload assessment model; For each requirement item, obtaining at least one business function corresponding to the requirement item; Determine, according to the first workload assessment value corresponding to the target task when completing each of the business functions, the second workload assessment value corresponding to the target task when completing the requirement item; Obtaining the actual attendance data corresponding to the target task when each of the requirement items is completed; Determine, according to the second workload assessment value, the actual attendance data and the initial workload assessment value, a second target workload assessment value corresponding to the target task when all the requirement items are completed; Determining whether the first target workload assessment value is reasonable according to the second target workload assessment value; When it is determined that the first target workload assessment value is unreasonable, the workload assessment model is optimized.

2. The method according to claim 1, characterized in that The determining, according to the first workload evaluation value corresponding to the target task when completing each of the business functions, a second workload evaluation value corresponding to the target task when completing the requirement item comprises: Determine the actual transformation complexity corresponding to the target task when completing the business function; Determining, according to the actual transformation complexity, a first workload assessment value corresponding to the target task when completing the business function; The first workload assessment values ​​corresponding to the target task when completing each of the business functions are summed to obtain the second workload assessment value.

3. The method according to claim 2, characterized in that The determining, according to the actual transformation complexity, a first workload assessment value corresponding to the target task when completing the business function includes: Acquire a workload table corresponding to the task type of the target task and the business function, wherein the workload table includes a plurality of transformation complexities and a workload baseline corresponding to each of the transformation complexities; The workload table is queried according to the actual transformation complexity to obtain the first workload assessment value.

4. The method according to claim 1, characterized in that The determining, according to the second workload assessment value, the actual attendance data and the initial workload assessment value, a second target workload assessment value corresponding to the target task when all the requirement items are completed, comprises: Determine, according to the second workload assessment value and the actual attendance data, a first intermediate workload assessment value corresponding to the target task when each of the requirement items is completed; Determining, according to the first intermediate workload assessment value and the initial workload assessment value, a second intermediate workload assessment value corresponding to the target task when each of the requirement items is completed; The second intermediate workload assessment values ​​corresponding to the target task when each of the requirement items is completed are summed to obtain the second target workload assessment value corresponding to the target task when all of the requirement items are completed.

5. The method according to claim 4, characterized in that The step of determining, based on the second workload evaluation value and the actual attendance data, a first intermediate workload evaluation value corresponding to the target task when each of the requirement items is completed, comprises: Determining an adjustment coefficient according to the second workload assessment value and the actual attendance data; According to the adjustment coefficient, the second workload assessment value corresponding to the target task when each of the requirement items is completed is weighted to obtain the first intermediate workload assessment value corresponding to the target task when each of the requirement items is completed.

6. The method according to claim 5, characterized in that The step of determining the adjustment coefficient according to the second workload evaluation value and the actual attendance data includes: Summing each of the second workload assessment values ​​to obtain a first summation result; Summing the actual attendance data corresponding to the target task when each of the requirement items is completed to obtain a second summation result; The adjustment coefficient is determined according to the second summation result and the first summation result.

7. The method according to claim 5, characterized in that Before determining the adjustment coefficient according to the second workload evaluation value and the actual attendance data, the method further includes: For each requirement item, obtain a historical task that has the same task type as the target task and has the requirement item; The implementation period corresponding to each of the historical tasks in completing the requirement items is averaged to obtain an average implementation period; According to the average implementation period, the actual attendance data corresponding to the target task when the requirement item is completed is corrected.

8. The method according to claim 4, characterized in that The determining, according to the first intermediate workload assessment value and the initial workload assessment value, a second intermediate workload assessment value corresponding to the target task when each of the requirement items is completed, comprises: The smaller value between the first intermediate workload assessment value and the initial workload assessment value corresponding to the target task when the requirement item is completed is determined as the second intermediate workload assessment value corresponding to the target task when the requirement item is completed.

9. The method according to claim 1, characterized in that The determining, according to the second target workload assessment value, whether the first target workload assessment value is reasonable includes: Determine a deviation value between the second target workload assessment value and the first target workload assessment value; According to the task type of the target task, a corresponding deviation threshold is obtained; When the deviation value is less than or equal to the deviation threshold, it is determined that the first target workload assessment value is reasonable.

10. The method according to claim 9, characterized in that The method further comprises: When the deviation value is greater than the deviation threshold, it is determined that the first target workload assessment value is unreasonable, and a prompt message is output.

11. A task data processing device, characterized in that: The device comprises: A first acquisition module is used to acquire multiple requirement items proposed for a target task, and to acquire a first target workload assessment value corresponding to the target task when all the requirement items are completed, wherein the first target workload assessment value is obtained by summing up the initial workload assessment values ​​corresponding to the target task when each of the requirement items is completed, and the initial workload assessment value corresponding to the target task when the requirement items are completed is obtained by performing workload assessment on the requirement items using a preset workload assessment model; A second acquisition module is used to acquire, for each requirement item, at least one business function corresponding to the requirement item; A first determination module is used to determine a second workload assessment value corresponding to the target task when completing the requirement item according to the first workload assessment value corresponding to the target task when completing each of the business functions; A third acquisition module is used to obtain the actual attendance data corresponding to the target task when each of the requirement items is completed; A second determination module is used to determine a second target workload assessment value corresponding to the target task when all the requirements are completed according to the second workload assessment value, the actual attendance data and the initial workload assessment value; A third determination module, configured to determine whether the first target workload assessment value is reasonable according to the second target workload assessment value; The model optimization module is used to optimize the workload evaluation model when it is determined that the first target workload evaluation value is unreasonable.

12. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 10.

13. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 10 when executed by a processor.

14. A computer program product, characterized in that The invention comprises a computer program, which, when executed by a processor, implements the method according to any one of claims 1 to 10.