Power supply demand intelligent mining method and system based on power grid driving
By dividing the total electricity consumption area into top-level points of electricity demand and subdividing it into electricity sub-areas, we build an electricity network, import historical electricity consumption data, and use the LSTM model to predict electricity demand, which solves the problem of insufficient analysis precision in traditional methods. It solves high-level problems and achieves more accurate analysis of electricity demand.
Patent Information
- Application Number
- CN202410896976.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-11
AI Technical Summary
Traditional power supply demand analysis methods rely on static historical power consumption data and are difficult to adapt to rapid changes in power usage patterns, resulting in low analysis precision and a lack of methods to improve the precision of power demand analysis.
By dividing the total area of electricity consumption into top points of electricity demand, performing geographical division, forming electricity sub-regions, and subdividing them according to the type of residential electricity or commercial electricity, constructing residential electricity network and commercial electricity network, and introducing Historical electricity consumption data is used to predict electricity demand using the LSTM model.
It improves the precision of power demand analysis, enables more accurate understanding and prediction of power consumption dynamics in the power grid, and achieves more accurate power demand analysis.
Smart Images

Figure CN118761585A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a method and system for intelligent mining of power supply demand driven by a power grid, belonging to the technical field of power consumption data analysis. Background Art
[0002] In modern power grid systems, power demand analysis is a key link to ensure stable operation of the power grid and reliability of power supply. With economic development and population growth, power demand continues to rise, showing more complex and dynamic characteristics. Accurate power demand analysis can help grid operators optimize the allocation of power resources, improve the dispatching efficiency of the power grid, reduce energy waste, and improve user satisfaction with electricity consumption.
[0003] Although power demand analysis is crucial for power grid management, traditional power demand analysis methods often rely on static historical power consumption data and are difficult to adapt to rapid changes in power consumption patterns, resulting in low precision in the analysis of power demand results. In detail, the traditional power supply analysis method first obtains the historical power consumption data of a certain area, and then analyzes the historical power consumption data of the area based on a deep learning model or a machine learning model to obtain the power consumption of the area at a certain moment in the future. Although this method can complete a certain degree of power demand analysis, it cannot refine the power consumption analysis of the area.
[0004] That is, there is still a lack of a method that can improve the precision of the analysis of electricity demand in a certain area. Summary of the invention
[0005] The present invention provides a method and system for intelligent mining of power supply demand driven by a power grid, the main purpose of which is to improve the precision of analysis of power demand in a certain area.
[0006] To achieve the above object, the present invention provides a method for intelligent mining of power supply demand driven by a power grid, comprising:
[0007] The total electricity consumption area is determined as the top point of electricity demand, and the total electricity consumption area is divided into geographical locations to obtain multiple electricity consumption sub-areas, and the electricity consumption sub-areas are determined as the middle point of electricity demand, and the electricity consumption sub-areas are divided into two types according to residential electricity consumption or commercial electricity consumption, to obtain multiple residential electricity consumption points and multiple commercial electricity consumption points, and the residential electricity consumption points are determined as the bottom point of residential electricity consumption, and the commercial electricity consumption points are determined as the bottom point of commercial electricity consumption;
[0008] Based on the top point of electricity demand, the middle point of electricity demand, the bottom point of residential electricity demand and the bottom point of commercial electricity demand, the residential electricity network and the commercial electricity network of the transmission substation are constructed respectively, and the historical electricity consumption data are imported into the residential electricity network and the commercial electricity network respectively to obtain the residential electricity data network and the commercial electricity data network;
[0009] Predict the electricity demand of residential electricity data network and commercial electricity data network and obtain electricity consumption results.
[0010] Optionally, the total electricity consumption area is divided into multiple electricity consumption sub-areas by geographical location, including:
[0011] Obtaining geographic location data of the total electricity consumption area, wherein the geographic location data includes latitude and longitude data, and administrative division data of the total electricity consumption area;
[0012] Determine the location of the transmission substation in the total power consumption area and obtain the substation location data;
[0013] Send the geographic location data and substation location data to the initiator of the mining command, and wait for the division basis sent back by the initiator. There are two types of division basis: the first is to divide the total power consumption area according to the latitude and longitude data, and the second is to divide the total power consumption area according to the administrative division data;
[0014] The total electricity consumption area is divided based on the division basis to obtain a plurality of electricity consumption sub-areas.
[0015] Optionally, the dividing of the electricity consumption types by area according to the two types of residential electricity consumption or commercial electricity consumption to obtain a plurality of residential electricity consumption points and a plurality of commercial electricity consumption points includes:
[0016] Based on the power grid driving principle, all electricity meters in the electricity consumption area and the geographical coordinates of each electricity meter are obtained to obtain the geographical coordinates of the meter;
[0017] According to different types of electricity consumption, electricity meters are divided into commercial meters and residential meters;
[0018] According to the geographic coordinates of the electric meters, a clustering operation is performed on all commercial electric meters, and a clustering operation is performed on all residential electric meters, to obtain a plurality of commercial power points and a plurality of residential power points, respectively, wherein the clustering operation is performed on all commercial electric meters, including:
[0019] Receive the number of iterations set by the initiator of the mining instruction, the number of cluster centers set according to all commercial electricity meters, and the geographical coordinates of each cluster center;
[0020] Calculate the distance between the geographic coordinates of each commercial electric meter and the geographic coordinates of each cluster center;
[0021] Adjust the cluster center to which each commercial electricity meter belongs according to the distance value;
[0022] Determine the relationship between the number of times the center of the cluster to which each commercial electric meter belongs is adjusted and the number of iterations, and if the number of times the center of the cluster to which each commercial electric meter belongs is adjusted is less than the number of iterations, return to the step of calculating the distance value;
[0023] When the number of adjustments to the cluster center to which each commercial electricity meter belongs is greater than or equal to the number of iterations, the cluster center without commercial electricity meters is eliminated, and the remaining cluster centers are sequentially determined as a commercial electricity point, and each commercial electricity point includes at least one commercial electricity meter.
[0024] Optionally, the residential power network and the commercial power network of the transmission substation are constructed based on the top power demand point, the middle power demand point, the residential power bottom point and the commercial power bottom point, respectively, including:
[0025] Calculate the number of middle points of electricity demand, the number of residential electricity bottom points and the number of commercial electricity bottom points respectively, and obtain the number of middle points, the number of residential points and the number of commercial points;
[0026] Generate a three-level residential network and a three-level commercial network, wherein the first level of each of the three-level residential network and the three-level commercial network has only one location point, the number of location points of the second level is the same as the number of the intermediate points, the number of location points of the third level of the three-level residential network is the same as the number of residential points, and the number of location points of the third level of the three-level commercial network is the same as the number of commercial points;
[0027] Fill the top point of electricity demand and the middle point of electricity demand into the first and second levels of the three-level residential network and the three-level commercial network respectively;
[0028] Fill in the residential electricity bottom-level points into the third level of the residential three-level network, and fill in the commercial electricity bottom-level points into the third level of the commercial three-level network, and
[0029] Based on the relationship between the middle point of electricity demand and the underlying point of residential electricity consumption, as well as between the middle point of electricity demand and the underlying point of commercial electricity consumption, the second and third levels of the residential three-level network and the commercial three-level network are connected respectively to obtain the residential electricity network and the commercial electricity network.
[0030] Optionally, the first level and the second level of the residential power network and the commercial power network are the same, and the first level and the second level are represented as follows:
[0031] note1=(Top point )
[0032]
[0033] Among them, note1 and note2 represent the first and second levels of residential power networks and commercial power networks respectively. point represents the top point of electricity demand, represents the i-th electricity demand midpoint, and the number of electricity demand midpoints is n, and n is a positive integer greater than or equal to 1.
[0034] Optionally, the third level of the residential power network and the commercial power network are respectively:
[0035]
[0036] in, Indicates the third level of the commercial electricity network, Indicates the third level of the residential electricity network, represents the ith commercial power bottom point in the commercial power network, represents the i-th residential electricity underlying point in the residential electricity network, m is the number of commercial electricity underlying points, and h represents the number of residential electricity underlying points.
[0037] Optionally, the residential power network and the commercial power network are represented as follows:
[0038]
[0039]
[0040] Among them, U Net represents the residential electricity network, C Net Represents a commercial electricity network, It indicates the relationship between the middle point of electricity demand in the residential electricity network and the underlying point of residential electricity demand. It indicates the relationship between the middle point of electricity demand in the commercial electricity network and the underlying point of commercial electricity consumption.
[0041] Optionally, the step of importing the historical electricity consumption data into a residential electricity consumption network and a commercial electricity consumption network respectively to obtain a residential electricity consumption data network and a commercial electricity consumption data network includes:
[0042] Obtain the predicted time point of electricity consumption input by the initiator of the mining instruction, and obtain historical electricity consumption data from each commercial electricity meter and residential electricity meter according to the predicted time point to obtain commercial electricity consumption and residential electricity consumption respectively, wherein the commercial electricity consumption and residential electricity consumption have a one-to-one correspondence with the commercial electricity meter and the residential electricity meter;
[0043] The commercial power consumption belonging to the same commercial power consumption bottom layer point is added to obtain the commercial bottom layer power consumption, wherein the commercial bottom layer power consumption and the commercial power consumption bottom layer point have a one-to-one correspondence;
[0044] Add up the civil electricity consumption belonging to the same residential electricity bottom point to obtain the civil bottom electricity consumption, where the civil bottom electricity consumption has a one-to-one correspondence with the residential electricity bottom point;
[0045] Add all commercial bottom-level electricity consumption and civil bottom-level electricity consumption belonging to the same midpoint of electricity demand to obtain the midpoint electricity consumption, wherein the midpoint electricity consumption has a one-to-one correspondence with the midpoint of electricity demand;
[0046] Importing the electricity consumption at the intermediate points and the commercial bottom-layer electricity consumption into the commercial electricity network to obtain a commercial electricity data network;
[0047] The intermediate point electricity consumption and the civilian bottom-level electricity consumption are imported into the residential electricity network to obtain a residential electricity data network, and the residential electricity data network and the commercial electricity data network have the same intermediate point electricity consumption.
[0048] Optionally, the predicting the electricity demand of the residential electricity data network and the commercial electricity data network to obtain the electricity consumption result includes:
[0049] Receiving a power consumption analysis instruction input by an initiator of the mining instruction, and starting a pre-built power consumption prediction model according to the power consumption analysis instruction, wherein the power consumption prediction model is built based on an LSTM model;
[0050] The residential electricity consumption data network and the commercial electricity consumption data network are respectively used as input data of the electricity consumption prediction model, and the electricity consumption results are obtained by analyzing the electricity consumption prediction model, wherein the electricity consumption results are the electricity consumption at the midpoint of the electricity demand at the predicted time point, the residential electricity bottom point and the commercial electricity bottom point.
[0051] To achieve the above object, the present invention also provides an intelligent mining system based on power supply demand driven by a power grid, comprising:
[0052] The power consumption area division module is used to determine the total power consumption area as the top point of power consumption demand, and perform geographical division on the total power consumption area to obtain multiple power consumption sub-areas, and determine the power consumption sub-area as the middle point of power consumption demand;
[0053] The electricity point confirmation module is used to perform electricity type classification on the electricity consumption area according to the two types of residential electricity or commercial electricity, obtain multiple residential electricity points and multiple commercial electricity points, determine the residential electricity points as the residential electricity bottom-level points, and determine the commercial electricity points as the commercial electricity bottom-level points:
[0054] The power consumption network construction module is used to construct the residential power consumption network and the commercial power consumption network of the transmission substation based on the top point of power consumption demand, the middle point of power consumption demand, the bottom point of residential power consumption and the bottom point of commercial power consumption, and import the historical power consumption data into the residential power consumption network and the commercial power consumption network respectively to obtain the residential power consumption data network and the commercial power consumption data network;
[0055] The electricity consumption analysis module is used to predict the electricity demand of the residential electricity consumption data network and the commercial electricity consumption data network and obtain the electricity consumption results.
[0056] In order to solve the above problem, the present invention further provides an electronic device, the electronic device comprising:
[0057] at least one processor; and,
[0058] a memory communicatively connected to the at least one processor; wherein,
[0059] The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor to implement the above-mentioned power supply demand intelligent mining method driven by the power grid.
[0060] In order to solve the above problems, the present invention also provides a computer-readable storage medium, in which at least one instruction is stored. The at least one instruction is executed by a processor in an electronic device to implement the above-mentioned intelligent mining method of power supply demand driven by the power grid.
[0061] Compared with the problem described in the background technology, the present invention first determines the total power consumption area as the top point of power demand, and performs geographical division on the total power consumption area to obtain multiple power consumption sub-areas, and determines the power consumption sub-areas as the middle point of power demand. It can be seen that the present invention performs geographical division on the total power consumption area to obtain multiple power consumption sub-areas, thereby performing detailed analysis for different geographical locations, thereby improving the accuracy of power demand prediction. Then, the power consumption sub-areas are divided into two types according to residential power consumption or commercial power consumption, and multiple residential power consumption points and multiple commercial power consumption points are obtained. The residential power consumption points are determined as the bottom points of residential power consumption, and the commercial power consumption points are determined as the bottom points of commercial power consumption. It can be seen that the present invention further subdivides the power consumption sub-areas according to the power consumption type, that is, residential power consumption or commercial power consumption, based on the power grid driving principle, so as to respectively consider the characteristics and power consumption behaviors of different power consumption types, and realize more accurate power demand analysis. Furthermore, based on the top point of electricity demand, the middle point of electricity demand, the bottom point of residential electricity demand and the bottom point of commercial electricity demand, the residential electricity network and the commercial electricity network of the transmission substation are constructed respectively. According to the structure of the residential electricity network and the commercial electricity network, the historical electricity consumption data are respectively imported into the residential electricity network and the commercial electricity network to obtain the residential electricity data network and the commercial electricity data network. Since the residential electricity network and the commercial electricity network of the transmission substation are constructed, the real power grid structure is simulated, thereby achieving a more detailed understanding and analysis of the power consumption dynamics in the power grid, and the historical electricity consumption data are respectively imported into the residential electricity network and the commercial electricity network. The driving method based on the data network can provide richer information to achieve more accurate power consumption prediction. Therefore, the intelligent mining method and system of power supply demand based on power grid drive proposed in the present invention mainly aims to improve the precision of the analysis of power demand in a certain area. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 A schematic diagram of a flow chart of a method for intelligent mining of power supply demand driven by a power grid provided in an embodiment of the present invention;
[0063] Figure 2 A functional module diagram of a power supply demand intelligent mining system based on power grid drive provided by an embodiment of the present invention;
[0064] Figure 3 A schematic diagram of the structure of an electronic device for implementing the power supply demand intelligent mining method driven by a power grid provided in an embodiment of the present invention.
[0065] The purpose, features and advantages of the present invention will be further described with reference to the accompanying drawings in conjunction with the embodiments. DETAILED DESCRIPTION
[0066] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0067] The embodiment of the present application provides a method for intelligent mining of power supply demand driven by the power grid. The execution subject of the method for intelligent mining of power supply demand driven by the power grid includes but is not limited to at least one of the electronic devices such as the server and the terminal that can be configured to execute the method provided by the embodiment of the present application. In other words, the method for intelligent mining of power supply demand driven by the power grid can be executed by software or hardware installed in the terminal device or the server device. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc.
[0068] Embodiment 1:
[0069] Reference Figure 1 FIG. 1 is a flow chart of a method for intelligently mining power demand driven by a power grid according to an embodiment of the present invention. In this embodiment, the method for intelligently mining power demand driven by a power grid includes:
[0070] S1. Receive a mining instruction for power supply demand, and determine a transmission substation and a total power consumption area corresponding to the transmission substation according to the mining instruction.
[0071] It should be explained that the mining instruction for power supply demand is generally initiated by the manager of the transmission substation. For example, Xiao Zhang is the manager of the 220KV transmission substation in Town A, and the electricity generated by the 220KV transmission substation serves the town. In order to confirm the electricity demand of the town in advance and evaluate the working hours of the 220KV transmission substation, Xiao Zhang initiated the mining instruction for power supply demand. It is understandable that Town A where Xiao Zhang is located is the total electricity consumption area described in the embodiment of the present invention.
[0072] S2. Determine the total electricity consumption area as the top point of electricity demand, and perform geographical division on the total electricity consumption area to obtain multiple electricity consumption sub-areas, and determine the electricity consumption sub-areas as the middle points of electricity demand, wherein the number of the middle points of electricity demand is greater than or equal to the number of the top points of electricity demand.
[0073] For example, the town A where Xiao Zhang is located is determined as the top point of electricity demand. Specifically, the top point of electricity demand is the maximum range served by the transmission substation. Further, the total electricity consumption area is divided into geographical locations to obtain multiple electricity consumption sub-areas, including:
[0074] Obtaining geographic location data of the total electricity consumption area, wherein the geographic location data includes latitude and longitude data, and administrative division data of the total electricity consumption area;
[0075] Determine the location of the transmission substation in the total power consumption area and obtain the substation location data;
[0076] Send the geographic location data and substation location data to the initiator of the mining command, and wait for the division basis sent back by the initiator. There are two types of division basis: the first is to divide the total power consumption area according to the latitude and longitude data, and the second is to divide the total power consumption area according to the administrative division data;
[0077] The total electricity consumption area is divided based on the division basis to obtain a plurality of electricity consumption sub-areas.
[0078] In the embodiment of the present invention, the division process of the power consumption sub-region is a method combining a geographic information system (GIS) and data analysis, the purpose of which is to subdivide a larger total power consumption area into multiple smaller power consumption sub-regions, so as to more accurately determine the power demand for the transmission substation. Further, the geographical location data of the total power consumption area is collected, and the geographical location data includes latitude and longitude information and administrative division information, wherein the latitude and longitude data helps to determine the precise geographical location of the area, and the administrative division data involves the boundaries and divisions of the administrative regions. Then, the specific location of the transmission substation in the total power consumption area is determined, which includes collecting the geographic coordinate data of the substation, so that the location of the transmission substation in the total power consumption area can be determined, and the substation location data can be obtained. Finally, the key point is that there are two types of division basis: the first is to divide according to the longitude and latitude data, and the second is to divide according to the administrative division data, wherein the longitude and latitude division may be based on geographical features, such as natural boundaries such as mountains and rivers, and the administrative division is based on existing administrative divisions, such as cities, towns, etc.
[0079] For example, Xiao Zhang's town A has 5 villages, so Xiao Zhang divides town A into 5 electricity consumption sub-regions according to the administrative division data, and each electricity consumption sub-region represents a village. Further, the 5 electricity consumption sub-regions are respectively determined as 5 electricity demand midpoints. It can be seen that the number of electricity demand midpoints is greater than or equal to the number of electricity demand top-level points.
[0080] S3. Based on the power grid driving principle, the power consumption types are divided into two types: residential power consumption and commercial power consumption, and multiple residential power consumption points and multiple commercial power consumption points are obtained.
[0081] It is understandable that under the power grid drive, it is effective to know whether each power point is residential power or commercial power. Therefore, based on the power grid drive principle, the power consumption type is divided into two types of residential power or commercial power, and multiple residential power points and multiple commercial power points are obtained, including:
[0082] Based on the power grid driving principle, all electricity meters in the electricity consumption area and the geographical coordinates of each electricity meter are obtained to obtain the geographical coordinates of the meter;
[0083] According to different types of electricity consumption, electricity meters are divided into commercial meters and residential meters;
[0084] According to the geographic coordinates of the electric meters, a clustering operation is performed on all commercial electric meters, and a clustering operation is performed on all residential electric meters, to obtain a plurality of commercial power points and a plurality of residential power points, respectively, wherein the clustering operation is performed on all commercial electric meters, including:
[0085] Receive the number of iterations set by the initiator of the mining instruction, the number of cluster centers set according to all commercial electricity meters, and the geographical coordinates of each cluster center;
[0086] Calculate the distance between the geographic coordinates of each commercial electric meter and the geographic coordinates of each cluster center;
[0087] Adjust the cluster center to which each commercial electricity meter belongs according to the distance value;
[0088] Determine the relationship between the number of times the center of the cluster to which each commercial electric meter belongs is adjusted and the number of iterations, and if the number of times the center of the cluster to which each commercial electric meter belongs is adjusted is less than the number of iterations, return to the step of calculating the distance value;
[0089] When the number of adjustments to the cluster center to which each commercial electricity meter belongs is greater than or equal to the number of iterations, the cluster center without commercial electricity meters is eliminated, and the remaining cluster centers are sequentially determined as a commercial electricity point, and each commercial electricity point includes at least one commercial electricity meter.
[0090] For example, Xiao Zhang's town A has 5 villages, and 5 electricity consumption sub-areas are obtained according to administrative data. It is assumed that there are 1,000 electricity meters in the first electricity consumption sub-area, and according to the power grid driving principle of the first electricity consumption sub-area, it is determined that there are 950 civil electricity meters and 50 commercial electricity meters. Therefore, clustering operations can be performed on the 50 commercial electricity meters and 950 civil electricity meters in turn. It should be explained that the clustering operation performed on all civil electricity meters is similar to the above-mentioned commercial electricity meters, and the clustering operation implemented in the embodiment of the present invention mainly relies on the K-Means algorithm, so it will not be repeated here.
[0091] Furthermore, assuming that Xiao Zhang sets the number of cluster centers of 50 commercial electricity meters to 8 and the number of iterations to 60, it is found after the above clustering operation that the second cluster center does not include any commercial electricity meter. Therefore, the second cluster center is eliminated, and the remaining 7 cluster centers are respectively determined as 7 commercial electricity points. It can be seen that each commercial electricity point has at least 1 commercial electricity meter.
[0092] S4. Residential electricity use points are identified as the underlying points for residential electricity use, and commercial electricity use points are identified as the underlying points for commercial electricity use.
[0093] For example, there are 7 commercial power points under the first power consumption sub-area of town A where Xiao Zhang is located. Then the 7 commercial power points are directly determined as commercial power bottom-level points. Similarly, one or more residential power points are determined as residential power bottom-level points.
[0094] S5. Based on the top point of electricity demand, the middle point of electricity demand, the bottom point of residential electricity demand and the bottom point of commercial electricity demand, the residential electricity network and the commercial electricity network of the transmission substation are constructed respectively.
[0095] In detail, the residential power network and the commercial power network of the transmission substation are constructed based on the top point of power demand, the middle point of power demand, the bottom point of residential power demand and the bottom point of commercial power demand, respectively, including:
[0096] Calculate the number of middle points of electricity demand, the number of residential electricity bottom points and the number of commercial electricity bottom points respectively, and obtain the number of middle points, the number of residential points and the number of commercial points;
[0097] Generate a three-level residential network and a three-level commercial network, wherein the first level of each of the three-level residential network and the three-level commercial network has only one location point, the number of location points of the second level is the same as the number of the intermediate points, the number of location points of the third level of the three-level residential network is the same as the number of residential points, and the number of location points of the third level of the three-level commercial network is the same as the number of commercial points;
[0098] Fill the top point of electricity demand and the middle point of electricity demand into the first and second levels of the three-level residential network and the three-level commercial network respectively;
[0099] Fill in the residential electricity bottom-level points into the third level of the residential three-level network, and fill in the commercial electricity bottom-level points into the third level of the commercial three-level network, and
[0100] Based on the relationship between the middle point of electricity demand and the underlying point of residential electricity consumption, as well as between the middle point of electricity demand and the underlying point of commercial electricity consumption, the second and third levels of the residential three-level network and the commercial three-level network are connected respectively to obtain the residential electricity network and the commercial electricity network.
[0101] It can be seen that the first-level and second-level data of residential power networks and commercial power networks are the same, both of which are the top-level points and the middle-level points of power demand. For example, Xiao Zhang's town A is determined as the top-level point of power demand, so town A is at the first level in both the residential power network and the commercial power network. At the same time, town A is divided into 5 power sub-regions through administrative data, and the 5 power sub-regions are determined as the middle-level points of power demand, and the 5 middle-level points of power demand are also located at the second level of the residential power network and the commercial power network.
[0102] Furthermore, the first level and the second level of the residential power network and the commercial power network are the same, and the first level and the second level are represented as follows:
[0103] note1=(Top Point )
[0104]
[0105] Among them, note1 and note2 represent the first and second levels of residential power networks and commercial power networks respectively. point represents the top point of electricity demand, represents the i-th electricity demand midpoint, and the number of electricity demand midpoints is n, and n is a positive integer greater than or equal to 1.
[0106] For example, town A is the top point of electricity demand. point They are filled into the first-level note1 of the residential power network and the commercial power network respectively. There are 5 intermediate points of power demand under Town A, which are filled into the second-level note2 of the residential power network and the commercial power network respectively.
[0107] Furthermore, the third level of the residential power network and the commercial power network are respectively:
[0108]
[0109]
[0110] in, Indicates the third level of the commercial electricity network, Indicates the third level of the residential electricity network, represents the ith commercial power bottom point in the commercial power network, represents the i-th residential electricity underlying point in the residential electricity network, m is the number of commercial electricity underlying points, and h represents the number of residential electricity underlying points.
[0111] For example, if there are 7 commercial power bottom points under the first power demand midpoint of town A, 6 commercial power bottom points under the second power demand midpoint, ..., and 3 commercial power bottom points under the fifth power demand midpoint, then all the above commercial power bottom points are filled into the third level of the commercial power network. middle.
[0112] Importantly, the embodiment of the present invention also connects the second and third levels of the residential three-level network and the commercial three-level network respectively, so as to realize the attribution relationship between each power demand intermediate point in the second level and the third-level commercial power bottom point or the residential power bottom point. For example, there are 7 commercial power bottom points under the first power demand intermediate point, then and Seven of the commercial electricity underlying points are connected to obtain a commercial electricity network.
[0113] Furthermore, the representations of the residential power network and the commercial power network are respectively:
[0114]
[0115] Among them, U Net represents the residential electricity network, C Net Represents a commercial electricity network, It indicates the relationship between the middle point of electricity demand in the residential electricity network and the underlying point of residential electricity demand. It indicates the relationship between the middle point of electricity demand in the commercial electricity network and the underlying point of commercial electricity consumption.
[0116] It should be explained that the ownership relationship in the embodiment of the present invention needs to depend on the structure of the specific power consumption network. For example, there are 7 commercial power consumption bottom-level points under the first power consumption demand middle point, and the 7 commercial power consumption bottom-level points are respectively The attribution relationship can be expressed as:
[0117]
[0118] The above formula indicates that there are 7 commercial electricity underlying points under the first electricity demand midpoint in the commercial electricity network, and | is a conditional identifier, indicating all commercial electricity underlying points or residential electricity underlying points under the first electricity demand midpoint.
[0119] S6. According to the structures of the residential power network and the commercial power network, the historical power consumption data are respectively imported into the residential power network and the commercial power network to obtain a residential power consumption data network and a commercial power consumption data network.
[0120] In detail, the historical electricity consumption data is imported into the residential electricity consumption network and the commercial electricity consumption network respectively according to the structure of the residential electricity consumption network and the commercial electricity consumption network to obtain the residential electricity consumption data network and the commercial electricity consumption data network, including:
[0121] Obtain the predicted time point of electricity consumption input by the initiator of the mining instruction, and obtain historical electricity consumption data from each commercial electricity meter and residential electricity meter according to the predicted time point to obtain commercial electricity consumption and residential electricity consumption respectively, wherein the commercial electricity consumption and residential electricity consumption have a one-to-one correspondence with the commercial electricity meter and the residential electricity meter;
[0122] The commercial power consumption belonging to the same commercial power consumption bottom layer point is added to obtain the commercial bottom layer power consumption, wherein the commercial bottom layer power consumption and the commercial power consumption bottom layer point have a one-to-one correspondence;
[0123] Add up the civil electricity consumption belonging to the same residential electricity bottom point to obtain the civil bottom electricity consumption, where the civil bottom electricity consumption has a one-to-one correspondence with the residential electricity bottom point;
[0124] Add all commercial bottom-level electricity consumption and civil bottom-level electricity consumption belonging to the same midpoint of electricity demand to obtain the midpoint electricity consumption, wherein the midpoint electricity consumption has a one-to-one correspondence with the midpoint of electricity demand;
[0125] Importing the electricity consumption at the intermediate points and the commercial bottom-layer electricity consumption into the commercial electricity network to obtain a commercial electricity data network;
[0126] The intermediate point electricity consumption and the civilian bottom-level electricity consumption are imported into the residential electricity network to obtain a residential electricity data network, and the residential electricity data network and the commercial electricity data network have the same intermediate point electricity consumption.
[0127] For example, if Xiao Zhang plans to analyze the power consumption of each area of Town A at 10 a.m., the input prediction time point is 10 a.m. If Town A has a total of 5 power demand midpoints, assuming that the second power demand midpoint includes 3 commercial power bottom points and 4 residential power bottom points, and the first commercial power bottom point of the second power demand midpoint includes 10 commercial electricity meters, the power consumption of the 10 commercial electricity meters at 10 a.m. in the historical time will be obtained, thereby obtaining the commercial power consumption, and there are 10 groups of commercial power consumption, which have a one-to-one correspondence with the 10 commercial electricity meters.
[0128] Furthermore, the 10 groups of commercial electricity consumption are added together to obtain the electricity consumption of the first commercial electricity bottom point, which is the commercial bottom electricity consumption. It can be deduced that the three commercial electricity bottom points have a total of three groups of commercial bottom electricity consumption. Similarly, the second electricity demand midpoint mentioned above has a total of three commercial electricity bottom points and four residential electricity bottom points. Therefore, the three groups of commercial bottom electricity consumption and the four groups of residential bottom electricity consumption are added together to obtain the electricity consumption of the second electricity demand midpoint, which is the electricity consumption of the midpoint.
[0129] According to the analysis of S5 above, the commercial electricity network and the residential electricity network have the same top-level electricity demand point and the middle-level electricity demand point. The difference is that the commercial electricity network only includes the commercial electricity bottom-level point, and the residential electricity network only includes the residential electricity bottom-level point. Correspondingly, the residential electricity data network and the commercial electricity data network have the same middle-point electricity consumption.
[0130] S7. According to the pre-built electricity consumption prediction model, the electricity consumption demands of the residential electricity consumption data network and the commercial electricity consumption data network are predicted respectively to obtain the electricity consumption results.
[0131] In detail, the power consumption demand of the residential power consumption data network and the commercial power consumption data network are predicted respectively according to the pre-built power consumption prediction model to obtain the power consumption results, including:
[0132] Receiving a power consumption analysis instruction input by an initiator of the mining instruction, and starting a pre-built power consumption prediction model according to the power consumption analysis instruction, wherein the power consumption prediction model is built based on an LSTM model;
[0133] The residential electricity consumption data network and the commercial electricity consumption data network are respectively used as input data of the electricity consumption prediction model, and the electricity consumption results are obtained by analyzing the electricity consumption prediction model, wherein the electricity consumption results are the electricity consumption at the midpoint of the electricity demand at the predicted time point, the residential electricity bottom point and the commercial electricity bottom point.
[0134] It should be explained that the core advantage of the LSTM model is that it can learn and remember long-term information. Therefore, the embodiment of the present invention uses this model to construct a power consumption prediction model, that is, a linear function is added to the output end of the LSTM model to obtain the power consumption prediction model, and the linear function uses the output end of the LSTM model as an independent variable to calculate the power consumption.
[0135] Furthermore, suppose Xiao Zhang needs to analyze the commercial electricity consumption of Village B in Town A at 10 a.m., so he initiates an electricity consumption analysis command. Assuming that Village B is the third electricity demand midpoint, based on the electricity consumption analysis command, the commercial underlying electricity consumption corresponding to all commercial electricity underlying points under the third electricity demand midpoint is extracted from the commercial electricity data network, and all the extracted commercial underlying electricity consumption is input into the electricity consumption prediction model to obtain the electricity consumption of Village B at 10 a.m. Similarly, the electricity consumption of Village B can be directly analyzed, that is, all the commercial underlying electricity consumption and civil underlying electricity consumption related to Village B are used as input data of the electricity consumption prediction model to calculate the electricity consumption, which is the electricity consumption of Village B.
[0136] Compared with the problem described in the background technology, the present invention first determines the total power consumption area as the top point of power demand, and performs geographical division on the total power consumption area to obtain multiple power consumption sub-areas, and determines the power consumption sub-areas as the middle point of power demand. It can be seen that the present invention performs geographical division on the total power consumption area to obtain multiple power consumption sub-areas, thereby performing detailed analysis for different geographical locations, thereby improving the accuracy of power demand prediction. Then, the power consumption sub-areas are divided into two types according to residential power consumption or commercial power consumption, and multiple residential power consumption points and multiple commercial power consumption points are obtained. The residential power consumption points are determined as the bottom points of residential power consumption, and the commercial power consumption points are determined as the bottom points of commercial power consumption. It can be seen that the present invention further subdivides the power consumption sub-areas according to the power consumption type, that is, residential power consumption or commercial power consumption, based on the power grid driving principle, so as to respectively consider the characteristics and power consumption behaviors of different power consumption types, and realize more accurate power demand analysis. Furthermore, based on the top point of electricity demand, the middle point of electricity demand, the bottom point of residential electricity demand and the bottom point of commercial electricity demand, the residential electricity network and the commercial electricity network of the transmission substation are constructed respectively. According to the structure of the residential electricity network and the commercial electricity network, the historical electricity consumption data are respectively imported into the residential electricity network and the commercial electricity network to obtain the residential electricity data network and the commercial electricity data network. Since the residential electricity network and the commercial electricity network of the transmission substation are constructed, the real power grid structure is simulated, thereby achieving a more detailed understanding and analysis of the power consumption dynamics in the power grid, and the historical electricity consumption data are respectively imported into the residential electricity network and the commercial electricity network. The driving method based on the data network can provide richer information to achieve more accurate power consumption prediction. Therefore, the intelligent mining method and system of power supply demand based on power grid drive proposed in the present invention mainly aims to improve the precision of the analysis of power demand in a certain area.
[0137] Embodiment 2:
[0138] like Figure 2 , which is a functional module diagram of an intelligent mining system for power supply demand driven by a power grid provided by an embodiment of the present invention.
[0139] The power supply demand intelligent mining system 100 driven by the power grid of the present invention can be installed in an electronic device. According to the functions to be implemented, the power supply demand intelligent mining system 100 driven by the power grid can include a power consumption area division module 101, a power consumption point confirmation module 102, a power consumption network construction module 103 and a power consumption analysis module 104. The module of the present invention can also be called a unit, which refers to a series of computer program segments that can be executed by a processor of an electronic device and can complete fixed functions, which are stored in the memory of the electronic device.
[0140] The power consumption area division module 101 is used to determine the total power consumption area as the top point of power demand, and perform geographical division on the total power consumption area to obtain multiple power consumption sub-areas, and determine the power consumption sub-area as the middle point of power demand;
[0141] The power point confirmation module 102 is used to perform power type classification on the power consumption area according to the two types of residential power consumption and commercial power consumption, obtain multiple residential power points and multiple commercial power points, determine the residential power points as the residential power bottom-level points, and determine the commercial power points as the commercial power bottom-level points;
[0142] The power network construction module 103 is used to construct a residential power network and a commercial power network of the transmission substation based on the top point of power demand, the middle point of power demand, the bottom point of residential power demand and the bottom point of commercial power demand, and import the historical power consumption data into the residential power network and the commercial power network to obtain a residential power data network and a commercial power data network;
[0143] The power consumption analysis module 104 is used to predict the power consumption demand of the residential power consumption data network and the commercial power consumption data network to obtain power consumption results.
[0144] In detail, the modules in the power supply demand intelligent mining system 100 driven by the power grid in the embodiment of the present invention are used in the same manner as above. Figure 1 The same technical means as the intelligent mining method of power supply demand driven by the power grid described in the text can produce the same technical effects, so they will not be repeated here.
[0145] Embodiment 3:
[0146] like Figure 3 , which is a schematic diagram of the structure of an electronic device for implementing a method for intelligently mining power supply demand driven by a power grid provided by an embodiment of the present invention.
[0147] The electronic device 1 may include a processor 10, a memory 11, a bus 12 and a communication interface 13, and may also include a computer program stored in the memory 11 and executable on the processor 10, such as an intelligent mining program for power supply demand driven by a power grid.
[0148] Among them, the memory 11 includes at least one type of readable storage medium, and the readable storage medium includes flash memory, mobile hard disk, multimedia card, card-type memory (for example: SD or DX memory, etc.), magnetic memory, disk, optical disk, etc. The memory 11 may be an internal storage unit of the electronic device 1 in some embodiments, such as a mobile hard disk of the electronic device 1. The memory 11 may also be an external storage device of the electronic device 1 in other embodiments, such as a plug-in mobile hard disk, a smart memory card (SmartMediaCard, SMC), a secure digital (SecureDigital, SD) card, a flash card (FlashCard), etc. equipped on the electronic device 1. Further, the memory 11 may also include both an internal storage unit of the electronic device 1 and an external storage device. The memory 11 can not only be used to store application software and various types of data installed in the electronic device 1, such as the code of the intelligent mining program based on the power supply demand driven by the power grid, but also can be used to temporarily store data that has been output or is to be output.
[0149] The processor 10 may be composed of an integrated circuit in some embodiments, for example, a single packaged integrated circuit, or a plurality of packaged integrated circuits with the same or different functions, including one or more central processing units (CPUs), microprocessors, digital processing chips, graphics processors, and combinations of various control chips, etc. The processor 10 is the control core (Control Unit) of the electronic device, and uses various interfaces and lines to connect various components of the entire electronic device, and executes or executes programs or modules stored in the memory 11 (for example, intelligent mining programs based on power supply demand driven by the power grid, etc.), and calls data stored in the memory 11 to execute various functions of the electronic device 1 and process data.
[0150] The bus may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. The bus is configured to realize connection and communication between the memory 11 and at least one processor 10, etc.
[0151] Figure 3 Only an electronic device with components is shown, and those skilled in the art will understand that Figure 2The structure shown does not constitute a limitation on the electronic device 1, and may include fewer or more components than shown in the figure, or combine certain components, or arrange the components differently.
[0152] For example, although not shown, the electronic device 1 may also include a power source (such as a battery) for supplying power to each component. Preferably, the power source may be logically connected to the at least one processor 10 through a power management device, so that the power management device can realize functions such as charging management, discharging management, and power consumption management. The power source may also include any components such as one or more DC or AC power sources, recharging devices, power failure detection circuits, power converters or inverters, power status indicators, etc. The electronic device 1 may also include a variety of sensors, Bluetooth modules, Wi-Fi modules, etc., which will not be repeated here.
[0153] Furthermore, the electronic device 1 may also include a network interface. Optionally, the network interface may include a wired interface and / or a wireless interface (such as a WI-FI interface, a Bluetooth interface, etc.), which is generally used to establish a communication connection between the electronic device 1 and other electronic devices.
[0154] Optionally, the electronic device 1 may further include a user interface, which may be a display (Display), an input unit (such as a keyboard (Keyboard)), and optionally, the user interface may also be a standard wired interface or a wireless interface. Optionally, in some embodiments, the display may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, and an OLED (Organic Light-Emitting Diode) touch device, etc. The display may also be appropriately referred to as a display screen or a display unit, which is used to display information processed in the electronic device 1 and to display a visual user interface.
[0155] It should be understood that the embodiment is for illustration only and the scope of the patent application is not limited to this structure.
[0156] The power supply demand intelligent mining program based on power grid drive stored in the memory 11 of the electronic device 1 is a combination of multiple instructions. When running in the processor 10, it can achieve:
[0157] The total electricity consumption area is determined as the top point of electricity demand, and the total electricity consumption area is divided into geographical locations to obtain multiple electricity consumption sub-areas, and the electricity consumption sub-areas are determined as the middle point of electricity demand, and the electricity consumption sub-areas are divided into two types according to residential electricity consumption or commercial electricity consumption, to obtain multiple residential electricity consumption points and multiple commercial electricity consumption points, and the residential electricity consumption points are determined as the bottom point of residential electricity consumption, and the commercial electricity consumption points are determined as the bottom point of commercial electricity consumption;
[0158] Based on the top point of electricity demand, the middle point of electricity demand, the bottom point of residential electricity demand and the bottom point of commercial electricity demand, the residential electricity network and the commercial electricity network of the transmission substation are constructed respectively, and the historical electricity consumption data are imported into the residential electricity network and the commercial electricity network respectively to obtain the residential electricity data network and the commercial electricity data network;
[0159] Predict the electricity demand of residential electricity data network and commercial electricity data network and obtain electricity consumption results.
[0160] Specifically, the specific implementation method of the processor 10 for the above instructions can refer to Figure 1 to Figure 2 The description of the relevant steps in the corresponding embodiments will not be repeated here.
[0161] Furthermore, if the module / unit integrated in the electronic device 1 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. The computer-readable storage medium can be volatile or non-volatile. For example, the computer-readable medium can include: any entity or device capable of carrying the computer program code, a recording medium, a USB flash drive, a mobile hard disk, a magnetic disk, an optical disk, a computer memory, and a read-only memory (ROM).
[0162] The present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor of an electronic device, the computer program can implement:
[0163] The total electricity consumption area is determined as the top point of electricity demand, and the total electricity consumption area is divided into geographical locations to obtain multiple electricity consumption sub-areas, and the electricity consumption sub-areas are determined as the middle point of electricity demand, and the electricity consumption sub-areas are divided into two types according to residential electricity consumption or commercial electricity consumption, to obtain multiple residential electricity consumption points and multiple commercial electricity consumption points, and the residential electricity consumption points are determined as the bottom point of residential electricity consumption, and the commercial electricity consumption points are determined as the bottom point of commercial electricity consumption;
[0164] Based on the top point of electricity demand, the middle point of electricity demand, the bottom point of residential electricity demand and the bottom point of commercial electricity demand, the residential electricity network and the commercial electricity network of the transmission substation are constructed respectively, and the historical electricity consumption data are imported into the residential electricity network and the commercial electricity network respectively to obtain the residential electricity data network and the commercial electricity data network;
[0165] Predict the electricity demand of residential electricity data network and commercial electricity data network and obtain electricity consumption results.
[0166] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0167] In addition, each functional module in each embodiment of the present invention may be integrated into one processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional modules.
[0168] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.
[0169] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.
Claims
1. A method for intelligent mining of power supply demand driven by power grid, characterized in that: The method comprises: The total electricity consumption area is determined as the top point of electricity demand, and the total electricity consumption area is divided into geographical locations to obtain multiple electricity consumption sub-areas, and the electricity consumption sub-areas are determined as the middle point of electricity demand, and the electricity consumption sub-areas are divided into two types according to residential electricity consumption or commercial electricity consumption, to obtain multiple residential electricity consumption points and multiple commercial electricity consumption points, and the residential electricity consumption points are determined as the bottom point of residential electricity consumption, and the commercial electricity consumption points are determined as the bottom point of commercial electricity consumption; Based on the top point of electricity demand, the middle point of electricity demand, the bottom point of residential electricity demand and the bottom point of commercial electricity demand, the residential electricity network and the commercial electricity network of the transmission substation are constructed respectively, and the historical electricity consumption data are imported into the residential electricity network and the commercial electricity network respectively to obtain the residential electricity data network and the commercial electricity data network; Predict the electricity demand of residential electricity data network and commercial electricity data network and obtain electricity consumption results.
2. The method for intelligent mining of power supply demand based on power grid drive according to claim 1, characterized in that: The total electricity consumption area is divided into geographical locations to obtain multiple electricity consumption sub-areas, including: Obtaining geographic location data of the total electricity consumption area, wherein the geographic location data includes latitude and longitude data, and administrative division data of the total electricity consumption area; Determine the location of the transmission substation in the total power consumption area and obtain the substation location data; Send the geographic location data and substation location data to the initiator of the mining command, and wait for the division basis sent back by the initiator. There are two types of division basis: the first is to divide the total power consumption area according to the latitude and longitude data, and the second is to divide the total power consumption area according to the administrative division data; The total electricity consumption area is divided based on the division basis to obtain a plurality of electricity consumption sub-areas.
3. The method for intelligent mining of power supply demand based on power grid drive according to claim 2, characterized in that: The method of dividing the electricity consumption into two types, residential electricity consumption and commercial electricity consumption, to obtain a plurality of residential electricity consumption points and a plurality of commercial electricity consumption points includes: Based on the power grid driving principle, all electricity meters in the electricity consumption area and the geographical coordinates of each electricity meter are obtained to obtain the geographical coordinates of the meter; According to different types of electricity consumption, electricity meters are divided into commercial meters and residential meters; According to the geographic coordinates of the electric meters, a clustering operation is performed on all commercial electric meters, and a clustering operation is performed on all residential electric meters, to obtain a plurality of commercial power points and a plurality of residential power points, respectively, wherein the clustering operation is performed on all commercial electric meters, including: Receive the number of iterations set by the initiator of the mining instruction, the number of cluster centers set according to all commercial electricity meters, and the geographical coordinates of each cluster center; Calculate the distance between the geographic coordinates of each commercial electric meter and the geographic coordinates of each cluster center; Adjust the cluster center to which each commercial electricity meter belongs according to the distance value; Determine the relationship between the number of times the center of the cluster to which each commercial electric meter belongs is adjusted and the number of iterations, and if the number of times the center of the cluster to which each commercial electric meter belongs is adjusted is less than the number of iterations, return to the step of calculating the distance value; When the number of adjustments to the cluster center to which each commercial electricity meter belongs is greater than or equal to the number of iterations, the cluster center without commercial electricity meters is eliminated, and the remaining cluster centers are sequentially determined as a commercial electricity point, and each commercial electricity point includes at least one commercial electricity meter.
4. The method for intelligent mining of power supply demand driven by power grid according to claim 3, characterized in that: The residential power network and the commercial power network of the transmission substation are constructed based on the top point of power demand, the middle point of power demand, the bottom point of residential power demand and the bottom point of commercial power demand, respectively, including: Calculate the number of middle points of electricity demand, the number of residential electricity bottom points and the number of commercial electricity bottom points respectively, and obtain the number of middle points, the number of residential points and the number of commercial points; Generate a three-level residential network and a three-level commercial network, wherein the first level of each of the three-level residential network and the three-level commercial network has only one location point, the number of location points of the second level is the same as the number of the intermediate points, the number of location points of the third level of the three-level residential network is the same as the number of residential points, and the number of location points of the third level of the three-level commercial network is the same as the number of commercial points; Fill the top point of electricity demand and the middle point of electricity demand into the first and second levels of the three-level residential network and the three-level commercial network respectively; Fill in the residential electricity bottom-level points into the third level of the residential three-level network, and fill in the commercial electricity bottom-level points into the third level of the commercial three-level network, and Based on the relationship between the middle point of electricity demand and the underlying point of residential electricity consumption, as well as between the middle point of electricity demand and the underlying point of commercial electricity consumption, the second and third levels of the residential three-level network and the commercial three-level network are connected respectively to obtain the residential electricity network and the commercial electricity network.
5. The method for intelligent mining of power supply demand based on power grid drive according to claim 4, characterized in that: The first level and the second level of the residential power network and the commercial power network are the same, and the first level and the second level are represented as follows: note1=(Top point ) Among them, note1 and note2 represent the first and second levels of residential power networks and commercial power networks respectively. point represents the top point of electricity demand, represents the i-th electricity demand midpoint, and the number of electricity demand midpoints is n, and n is a positive integer greater than or equal to 1.
6. The method for intelligent mining of power supply demand driven by power grid according to claim 5, characterized in that: The third level of the residential power network and the commercial power network are: in, Indicates the third level of the commercial electricity network, Indicates the third level of the residential electricity network, represents the ith commercial power bottom point in the commercial power network, represents the i-th residential electricity underlying point in the residential electricity network, m is the number of commercial electricity underlying points, and h represents the number of residential electricity underlying points.
7. The method for intelligent mining of power supply demand based on power grid drive according to claim 6, characterized in that: The residential power network and the commercial power network are represented as follows: Among them, U Net represents the residential electricity network, C Net Represents a commercial electricity network, It indicates the relationship between the middle point of electricity demand in the residential electricity network and the underlying point of residential electricity demand. It indicates the relationship between the middle point of electricity demand in the commercial electricity network and the underlying point of commercial electricity consumption.
8. The method for intelligent mining of power supply demand driven by power grid according to claim 7, characterized in that: The method of importing the historical electricity consumption data into the residential electricity consumption network and the commercial electricity consumption network to obtain the residential electricity consumption data network and the commercial electricity consumption data network includes: Obtain the predicted time point of electricity consumption input by the initiator of the mining instruction, and obtain historical electricity consumption data from each commercial electricity meter and residential electricity meter according to the predicted time point to obtain commercial electricity consumption and residential electricity consumption respectively, wherein the commercial electricity consumption and residential electricity consumption have a one-to-one correspondence with the commercial electricity meter and the residential electricity meter; The commercial power consumption belonging to the same commercial power consumption bottom layer point is added to obtain the commercial bottom layer power consumption, wherein the commercial bottom layer power consumption and the commercial power consumption bottom layer point have a one-to-one correspondence; Add up the civil electricity consumption belonging to the same residential electricity bottom point to obtain the civil bottom electricity consumption, where the civil bottom electricity consumption has a one-to-one correspondence with the residential electricity bottom point; Add all commercial bottom-level electricity consumption and civil bottom-level electricity consumption belonging to the same midpoint of electricity demand to obtain the midpoint electricity consumption, wherein the midpoint electricity consumption has a one-to-one correspondence with the midpoint of electricity demand; Importing the electricity consumption at the intermediate points and the commercial bottom-layer electricity consumption into the commercial electricity network to obtain a commercial electricity data network; The intermediate point electricity consumption and the civilian bottom-level electricity consumption are imported into the residential electricity network to obtain a residential electricity data network, and the residential electricity data network and the commercial electricity data network have the same intermediate point electricity consumption.
9. The method for intelligent mining of power supply demand driven by power grid according to claim 8, characterized in that: The predicting of the electricity demand of the residential electricity data network and the commercial electricity data network to obtain the electricity consumption result includes: Receiving a power consumption analysis instruction input by an initiator of the mining instruction, and starting a pre-built power consumption prediction model according to the power consumption analysis instruction, wherein the power consumption prediction model is built based on an LSTM model; The residential electricity consumption data network and the commercial electricity consumption data network are respectively used as input data of the electricity consumption prediction model, and the electricity consumption results are obtained by analyzing the electricity consumption prediction model, wherein the electricity consumption results are the electricity consumption at the midpoint of the electricity demand at the predicted time point, the residential electricity bottom point and the commercial electricity bottom point.
10. An intelligent mining system based on power supply demand driven by power grid, characterized in that: The system comprises: The power consumption area division module is used to determine the total power consumption area as the top point of power consumption demand, and perform geographical division on the total power consumption area to obtain multiple power consumption sub-areas, and determine the power consumption sub-area as the middle point of power consumption demand; The electricity point confirmation module is used to perform electricity type classification on the electricity consumption area according to the two types of residential electricity or commercial electricity, obtain multiple residential electricity points and multiple commercial electricity points, determine the residential electricity points as the residential electricity bottom-level points, and determine the commercial electricity points as the commercial electricity bottom-level points: The power consumption network construction module is used to construct the residential power consumption network and the commercial power consumption network of the transmission substation based on the top point of power consumption demand, the middle point of power consumption demand, the bottom point of residential power consumption and the bottom point of commercial power consumption, and import the historical power consumption data into the residential power consumption network and the commercial power consumption network respectively to obtain the residential power consumption data network and the commercial power consumption data network; The electricity consumption analysis module is used to predict the electricity demand of the residential electricity consumption data network and the commercial electricity consumption data network and obtain the electricity consumption results.