Equipment and financial professional management operation collaboration degree evaluation method, device and equipment

By collecting equipment and financial data, constructing an evaluation matrix, and generating evaluation reports, it solves the problem of lack of coordination between traditional equipment system and financial system management, improves the accuracy and efficiency of enterprise resource allocation, and improves management efficiency.

CN118761678AInactive Publication Date: 2024-10-11GUANGDONG POWER GRID CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411232391.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional equipment system and financial system lack coordination in management, resulting in low optimization performance of enterprise resource weighting and affecting management efficiency.

Method used

By collecting equipment and financial data, we determine the evaluation indicators for management and operation synergy, build an evaluation matrix, generate comprehensive scoring data and generate evaluation reports to improve the accuracy and efficiency of resource allocation.

Benefits of technology

It improves the accuracy of collaborative evaluation between equipment data and financial data, optimizes the balance of corporate resources, and improves management efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118761678A_ABST
    Figure CN118761678A_ABST
Patent Text Reader

Abstract

The invention relates to an equipment and financial professional management operation collaboration degree evaluation method and device, computer equipment and a storage medium. The method comprises the following steps: collecting equipment data of each equipment of an equipment specialty and financial data of a financial specialty related to each equipment; determining an evaluation index according to the equipment data and the financial data, wherein the evaluation index comprises an index representing the management operation collaboration degree between the equipment data and the financial data; constructing an evaluation matrix according to the evaluation indexes corresponding to the devices, the evaluation values corresponding to the evaluation indexes and the weights corresponding to the evaluation indexes, and obtaining comprehensive score data corresponding to the devices according to the evaluation matrix; and generating an evaluation report according to the comprehensive score data of each device, and respectively sending the evaluation report to the device management terminal and the financial management terminal. By adopting the method, the rationality and efficiency of enterprise resource allocation can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, and in particular to a method, device, computer equipment and storage medium for evaluating the degree of coordination between equipment and financial professional management and operation. Background Art

[0002] With the development of data processing technology, collaborative management systems have emerged. Collaborative management systems reorganize the time, space and functional structures of each subsystem in the system to produce a competition-cooperation-coordination capability. Its effect is far greater than the new time, space and functional structure produced by the sum of each subsystem. Multi-project collaborative management involves multiple subsystems and elements. The subsystems or elements within the system influence and interact with each other. The role of some elements can stimulate or supplement the potential of other elements, thereby promoting the realization of management goals.

[0003] In the traditional management of equipment systems and financial systems, they are basically managed separately, and the coordination and cooperation in equipment management and financial management is low. The costs of equipment purchase and maintenance need to be allocated from financial funds, but because the financial system controls more funds, the management tasks of resource allocation such as expense application are heavier. In traditional management, it is impossible to identify the equipment areas that need improvement, which makes it impossible to propose corresponding improvement measures, resulting in low optimization performance of enterprise resource allocation, affecting the management efficiency of the enterprise. Summary of the invention

[0004] Based on this, it is necessary to provide a method, device, computer equipment and storage medium for evaluating the coordination between equipment and financial professional management operations, which can improve the accuracy and efficiency of enterprise resource allocation, in response to the above technical problems.

[0005] In a first aspect, a method for evaluating the coordination between equipment and financial management operations is provided, the method comprising: Collect equipment data of each device in the equipment specialty and financial data of the financial specialty related to each device; Determine evaluation indicators based on equipment data and financial data, where the evaluation indicators include indicators that characterize the management and operation coordination between equipment data and financial data; An evaluation matrix is ​​constructed according to the evaluation indicators corresponding to each device, the evaluation values ​​corresponding to each evaluation indicator, and the weights corresponding to each evaluation indicator, and the comprehensive score data corresponding to each device is obtained according to the evaluation matrix; An evaluation report is generated based on the comprehensive scoring data of each device, and the evaluation report is sent to the device management terminal and the financial management terminal respectively.

[0006] In some embodiments, before determining the evaluation index according to the equipment data and the financial data, the method further includes: Send the management and operation coordination questionnaire to the equipment management terminal and the financial management terminal respectively; Receive survey data returned by the equipment management terminal and the financial management terminal based on the management and operation coordination questionnaire; Reliability analysis is performed based on the survey data, and in response to a reliability coefficient being greater than a preset threshold, a step of determining evaluation indicators based on the equipment data and the financial data is entered.

[0007] In some embodiments, performing reliability analysis based on survey data includes: Reliability analysis was performed according to the following formula: ; in, represents the reliability coefficient, k Indicates the amount of indicator data for the evaluation indicators in the management and operation coordination questionnaire, Indicates that it is j The variance of the scores of the evaluation indicators, It represents the variance of the score of each evaluation indicator.

[0008] In some embodiments, the evaluation indicators include equipment quality indicators, equipment operation capability indicators and financial synergy indicators; wherein, Equipment quality indicators include: at least one of equipment accuracy, equipment function, equipment operation stability, equipment energy saving and equipment environmental protection; and / or The equipment operation capability index includes: at least one of equipment utilization rate, equipment failure rate, and equipment failure downtime; and / or Financial synergy indicators include: at least one of the return on equipment investment and the proportion of equipment maintenance costs to total equipment costs.

[0009] In some embodiments, the equipment data includes at least one of equipment quality data, equipment operating capacity data, equipment failure rate, and equipment maintenance cost; the financial data includes at least one of equipment purchase cost data, equipment depreciation cost data, and equipment maintenance cost data corresponding to each equipment.

[0010] In some embodiments, an evaluation matrix is ​​constructed according to each evaluation indicator corresponding to each device, an evaluation value corresponding to each evaluation indicator, and a weight corresponding to each evaluation indicator, including: Calculate the equipment-finance synergy ratio in each time period based on the equipment data and financial data of each equipment in different time periods; Conduct ratio analysis on the synergy relationship ratios in different time periods to determine the impact of each evaluation indicator on the synergy of management operations; Determine the weight of each evaluation indicator according to its impact on the coordination of management and operation; Assign corresponding evaluation values ​​to each evaluation indicator of each device; An evaluation matrix is ​​constructed according to each evaluation indicator corresponding to each device, an evaluation value corresponding to each evaluation indicator, and a weight corresponding to each evaluation indicator.

[0011] In some embodiments, the method further comprises: Obtaining historical comprehensive scoring data, which is scoring data indicating the degree of coordination between the equipment data and financial data management and operation of each device in multiple historical time periods; Conduct linear regression trend analysis on historical comprehensive score data to predict the trend of coordination between equipment data and financial data management and operation of each device in the future time period.

[0012] In a second aspect, a device for evaluating the coordination between equipment and financial professional management and operation is provided, the device comprising: The data collection module is used to collect the equipment data of each device of the equipment major and the financial data of the financial major related to each device; An indicator determination module, used to determine evaluation indicators based on equipment data and financial data, the evaluation indicators including indicators representing the management and operation coordination between equipment data and financial data; A scoring calculation module is used to construct an evaluation matrix according to the evaluation indicators corresponding to each device, the evaluation values ​​corresponding to each evaluation indicator, and the weights corresponding to each evaluation indicator, and obtain the comprehensive scoring data corresponding to each device according to the evaluation matrix; The report generation module is used to generate an evaluation report based on the comprehensive scoring data of each device, and send the evaluation report to the device management terminal and the financial management terminal respectively.

[0013] In a third aspect, a computer device is provided, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the method for evaluating the degree of coordination between the device and financial professional management operation of the first aspect are implemented.

[0014] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the method for evaluating the degree of coordination between the equipment and financial professional management operations of the first aspect are implemented.

[0015] The above-mentioned method, device, computer equipment and storage medium for evaluating the synergy between the management and operation of equipment and financial professionals collect the equipment data of each device of the equipment profession and the financial data of the financial profession related to each device, analyze the two types of data collected and determine the specific evaluation indicators and corresponding weights used to evaluate the correlation between the management and operation synergy between the two according to business needs and actual conditions, thereby constructing an evaluation matrix for comprehensive evaluation of each device, and then obtaining the comprehensive scoring data of each device based on the management and operation synergy of the equipment data and financial data, and generating a corresponding evaluation report. The adoption of this solution can improve the accuracy of the evaluation of the synergy between equipment data and financial data, thereby improving the rationality and efficiency of enterprise resource allocation, and then deploying the analysis results to the relevant equipment professional departments and financial professional departments, facilitating subsequent improvements and optimizing resource allocation, thereby improving the management efficiency of the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is an application environment diagram of the method for evaluating the coordination degree of equipment and financial professional management operation in some embodiments; Figure 2 It is a flowchart of a method for evaluating the coordination degree of equipment and financial professional management and operation in some embodiments; Figure 3 It is a structural block diagram of a device for evaluating the coordination degree of equipment and financial professional management and operation in some embodiments; Figure 4 1 is a diagram of the internal structure of a computer device in some embodiments. DETAILED DESCRIPTION

[0017] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0018] The equipment and financial management operation coordination evaluation method provided in this application can be applied to Figure 1 In the application environment shown, the server 105, the equipment management system 101, the financial management system 102, the equipment management terminal 103 and the financial management terminal 104 communicate with each other through a network.

[0019] Specifically, the server 105 can collect equipment data of each device from the database of the equipment management system 101, collect financial data related to each device from the database of the financial management system 102, and determine evaluation indicators based on the equipment data and the financial data, where the evaluation indicators are indicators that characterize the management and operation coordination between the equipment data and the financial data; construct an evaluation matrix based on the equipment data of each device, the financial data related to each device, the evaluation indicators corresponding to each device, and the weights corresponding to each evaluation indicator; obtain comprehensive scoring data corresponding to each device for indicating the degree of management and operation coordination between the equipment data and the financial data based on the evaluation matrix; generate an evaluation report based on the comprehensive scoring data of each device, and send the evaluation report to the equipment management terminal 103 and the financial management terminal 104 respectively.

[0020] The terminal may be, but is not limited to, various personal computers, laptops, smart phones, tablet computers, and portable wearable devices, and the server may be implemented as an independent server or a server cluster consisting of multiple servers.

[0021] In some embodiments, Figure 2 As shown in the figure, a method for evaluating the coordination between equipment and financial management operation is provided. Figure 1 The terminal in is used as an example to illustrate, including the following steps: Step S202: Collect equipment data of each device of the equipment specialty and financial data of the financial specialty related to each device.

[0022] Specifically, the evaluation cycle may be determined first, for example, according to the actual situation of the enterprise, and the equipment data of each equipment of the equipment profession and the financial data of the financial profession related to each equipment may be periodically collected according to the determined evaluation cycle.

[0023] For example, the data may be collected through an internal information system of the enterprise, or the data may be collected from an equipment management system of an equipment department and a financial management system of a financial department.

[0024] For example, equipment data refers to data related to the performance of the equipment itself, such as the equipment quality and operating capacity. The equipment data may include but is not limited to equipment quality data, equipment operating capacity data, equipment failure rate, and equipment maintenance cost.

[0025] Exemplarily, financial data refers to data used to reflect capital mobilization, consumption, and expenditure corresponding to each device. The financial data may include, but is not limited to, equipment purchase cost data, equipment depreciation cost data, equipment maintenance cost data, and the like corresponding to each device.

[0026] Step S204: Determine evaluation indicators based on the equipment data and the financial data, where the evaluation indicators include indicators that characterize the management and operation coordination between the equipment data and the financial data.

[0027] In this step, data dimensions that can characterize the correlation between the collected equipment data and financial data can be screened as dimensions of evaluation indicators.

[0028] Exemplarily, the evaluation indicators include equipment quality indicators, equipment operation capability indicators and financial synergy indicators.

[0029] Exemplarily, equipment quality indicators include: at least one of equipment accuracy, equipment function, equipment operation stability, equipment energy saving and equipment environmental protection; equipment operation capacity indicators include: at least one of equipment utilization rate, equipment failure rate and equipment failure downtime; financial coordination indicators include: at least one of equipment investment return rate and the proportion of equipment maintenance costs to total equipment costs.

[0030] Step S206: Construct an evaluation matrix based on the equipment data of each device, the financial data related to each device, the evaluation indicators corresponding to each device, and the weights corresponding to each evaluation indicator, and obtain the comprehensive score data corresponding to each device based on the evaluation matrix, which is used to indicate the degree of coordination between the equipment data and the financial data management and operation.

[0031] Specifically, based on the determined evaluation indicators, by performing ratio analysis on the data corresponding to each evaluation indicator, the synergy relationship data between the equipment data and the financial data of each equipment in different time periods are obtained, and the synergy relationship data corresponding to different time periods are compared to determine the weight of each evaluation indicator, that is, determine the extent of the impact of each evaluation indicator on the synergy relationship, and determine different weight coefficients according to the different impacts of each evaluation indicator on the synergy relationship. For example, the greater the impact of the evaluation indicator on the synergy relationship, the greater the corresponding weight.

[0032] Step S208: Generate an evaluation report based on the comprehensive scoring data of each device, and send the evaluation report to the device management terminal and the financial management terminal respectively.

[0033] Specifically, an evaluation report can be generated based on the comprehensive scoring data of each device, and the scoring results can be output to generate a visual evaluation report and displayed on the terminal, so that enterprise managers can understand and improve existing problems and evaluation status.

[0034] Furthermore, the evaluation report can also be sent to the equipment management terminal and the financial management terminal respectively, and the evaluation result information corresponding to each device can be synchronized to the equipment management personnel and the financial management personnel respectively, so as to remind different departments to conduct improvement tracking for projects with poor management and operation coordination, track the implementation of improvement plans, regularly evaluate the improvement effects, and build a complete evaluation system, thereby providing strong support for improving the coordination between financial and equipment professionals, improving work efficiency, and reducing operational risks.

[0035] The above-mentioned method for evaluating the coordination between the management and operation of equipment and financial professionals collects the equipment data of each device and the financial data related to each of the devices, analyzes the two types of data collected, and determines the specific evaluation indicators and corresponding weights used to evaluate the correlation between the management and operation coordination between the two according to business needs and actual conditions, thereby constructing an evaluation matrix for comprehensive evaluation of each device, and then obtaining the comprehensive scoring data of each device based on the management and operation coordination of the equipment data and financial data, and generating a corresponding evaluation report. The adoption of this solution can improve the accuracy of the evaluation of the coordination between equipment data and financial data, thereby improving the rationality and efficiency of enterprise resource allocation, and then deploying the analysis results to the relevant equipment professional departments and financial professional departments, facilitating subsequent improvements and optimizing resource allocation, thereby improving the management efficiency of the enterprise.

[0036] In some embodiments, before determining the evaluation indicators based on the equipment data and the financial data, the method also includes: sending a management and operation coordination questionnaire to the equipment management terminal and the financial management terminal respectively; receiving survey data returned by the equipment management terminal and the financial management terminal based on the management and operation coordination questionnaire; performing reliability analysis based on the survey data, and in response to a reliability coefficient being greater than a preset threshold, entering the step of determining the evaluation indicators based on the equipment data and the financial data.

[0037] In this embodiment, since the equipment data collected from the equipment management system and the financial management system and the financial data related to each of the equipment may have problems such as data synchronization lag, the management and operation coordination questionnaire can be sent to the equipment management terminal and the financial management terminal respectively, and the required data can be collected from the operating personnel who have the most intuitive understanding of the situation at the end of the system through the management and operation coordination questionnaire. Moreover, the management and operation coordination questionnaire can also include an option to score the content relevance of the equipment data and financial data of the equipment, so as to determine the reliability of the data obtained from various management systems within the enterprise.

[0038] In some embodiments, performing reliability analysis based on survey data includes: Reliability analysis was performed according to the following formula: ; in, represents the reliability coefficient, k Indicates the amount of indicator data for the evaluation indicators in the management and operation coordination questionnaire, Indicates that it is j The variance of the scores of the evaluation indicators, It represents the variance of the score of each evaluation indicator.

[0039] In this embodiment, for example, SPSS (Statistical Product and Service Solutions) software can be used to perform statistics and analysis on the reliability and validity of the questionnaire. The management operation coordination questionnaire can be distributed to the work terminals (financial management terminals) of the company's financial personnel and the work terminals (equipment management terminals) of the company's equipment professionals through WeChat and email. The content of the questionnaire is to score the content relevance of the equipment data and the financial data, and the Cronbach α coefficient (reliability coefficient) is used to perform reliability analysis of the questionnaire.

[0040] in, k Indicates the amount of indicator data for the evaluation indicators in the management and operation coordination questionnaire, Indicates that it is j The variance of the scores of the evaluation indicators, Indicates the variance and reliability coefficient of the scores of each evaluation indicator The value range is between 0 and 1. When <0.5, the reliability is not ideal; 0.5< <0.7, the reliability is acceptable; When ≥0.7, the reliability is good; When ≥0.8, the reliability is very high. The reliability of the data collected by the questionnaire is used to identify areas with high management and operation coordination between equipment and financial management and areas that need improvement. It is also used to determine the authenticity of data collected through the internal information system data of the enterprise and the data systems of related departments (such as equipment management system and financial management system). The reliability coefficient of the above management and operation coordination questionnaire calculated in the enterprise They are all greater than 0.8, which means that the internal consistency reliability of the data is high.

[0041] In the above-mentioned embodiment, data is collected and reliability is calculated through a management and operation coordination questionnaire, and then the authenticity and reliability of the collected data are analyzed according to the results of the progress calculation. When it is determined that the reliability of the collected data reaches a preset threshold, subsequent evaluation is carried out, thereby ensuring the accuracy of the basic data used for evaluation, and further improving the reliability and accuracy of the evaluation results of the management and operation coordination of equipment and financial professionals.

[0042] In some embodiments, after collecting the equipment data of each device and the financial data related to each of the devices, the method may also include: cleaning and integrating the collected data to facilitate the integration of the data obtained in the enterprise's internal information system and the data collected from the equipment management system and the financial management system to facilitate subsequent data analysis.

[0043] In some embodiments, an evaluation matrix is ​​constructed based on each evaluation indicator corresponding to each device, an evaluation value corresponding to each evaluation indicator, and a weight corresponding to each evaluation indicator, including: calculating the equipment-finance coordination relationship ratio in each time period based on the device data and financial data of each device in different time periods; performing ratio analysis on the coordination relationship ratios in different time periods to determine the impact of each evaluation indicator on the management and operation coordination; determining the weight of each evaluation indicator based on the impact of each evaluation indicator on the management and operation coordination; and constructing an evaluation matrix based on each evaluation indicator and the weight corresponding to each evaluation indicator.

[0044] In this embodiment, ratio analysis is to analyze the synergy relationship between the equipment profession and the financial profession by comparing data in different time periods and calculating the ratios between various evaluation indicators (synergy relationship ratios). According to the ratio calculation results of different time periods, the changes before and after the synergy are analyzed. The calculation formula of the synergy relationship ratio may include: The formula for the static return rate of equipment investment is: static return on investment = (total revenue - total cost) / total cost * 100%. The static return on investment includes the difference between the total revenue and total cost brought by the equipment throughout its service life, and is converted into a percentage. The total cost includes the costs related to the purchase, installation, commissioning and maintenance of equipment. These ratios can help corporate investors, creditors and other stakeholders better understand the proportion of equipment capital investment and returns in the company's total financial situation and operating results, such as the total economic benefits expected to be obtained from the equipment during its service life, including sales revenue, labor cost savings, improved production efficiency, etc., so as to make more informed decisions and provide strong decision-making support for enterprises to optimize resource allocation and improve management efficiency.

[0045] For example, if an enterprise purchases a piece of equipment at a purchase price of RMB 100,000, installation and commissioning costs of RMB 20,000, and an estimated service life of 5 years, and the economic benefit it can bring each year is RMB 40,000, then the return on investment of the equipment can be calculated as follows: Static investment return rate = (5 years * 40,000 yuan - 100,000 yuan - 20,000 yuan) / (100,000 yuan + 20,000 yuan) x 100% = 50%; Dynamic return on investment (assuming annual cost is 0) = (40,000 yuan / year*5 years) / 120,000 yuan x 100% = 166.67%. By calculating both static and dynamic return on investment ratios (synergy ratios), we can have a more comprehensive understanding of the economic benefits of equipment investment, thereby more clearly reflecting the synergy between equipment data and financial data.

[0046] Furthermore, a ratio analysis is performed on the synergy relationship ratios in different time periods to determine the impact of each evaluation indicator on the management and operation synergy, and the weight of each evaluation indicator is determined according to the impact of each evaluation indicator on the management and operation synergy. An evaluation matrix is ​​constructed according to each evaluation indicator and the weight corresponding to each evaluation indicator. Specifically, it may include: setting evaluation indicators and weights: n Evaluation objects (devices to be evaluated), m evaluation index, the evaluation index set can be expressed as U= ; Each evaluation indicator has a corresponding weight, indicating its importance, and the weight set can be expressed as A= ,in Indicates i The weights corresponding to the evaluation indicators and satisfy =1.

[0047] Construct an evaluation matrix: For each evaluation object, each evaluation indicator corresponds to an evaluation value, and these evaluation values ​​constitute an evaluation matrix R ,in, Indicates i The evaluation object is j The evaluation value of an evaluation indicator.

[0048] Calculate the comprehensive evaluation value: Use the weighted sum method to calculate the comprehensive evaluation value of each evaluation object. i evaluation object, its comprehensive evaluation value The calculation formula is: ; It is j The weight of the evaluation index, It is i The evaluation object is i The evaluation value on the evaluation index is calculated based on the comprehensive evaluation value , the evaluation objects can be sorted or classified. Furthermore, by setting thresholds, it is possible to judge whether the evaluation objects are "excellent", "good", "average", "poor", etc. Through fuzzy mathematical evaluation, it is convenient to establish an evaluation model, quantify the impact of various factors on the management operation coordination, reduce the impact of adverse factors on the management operation coordination, and improve the efficiency and accuracy of management operation coordination.

[0049] In some embodiments, the method also includes: obtaining historical comprehensive scoring data, the historical comprehensive scoring data is scoring data representing the degree of coordination between the equipment data and financial data management and operation of each device in multiple historical time periods; performing linear regression trend analysis on the historical comprehensive scoring data to predict the trend of coordination between the equipment data and financial data management and operation of each device in future time periods.

[0050] This embodiment, by periodically collecting historical comprehensive scoring data and performing linear regression trend analysis on the historical comprehensive scoring data, can predict the changing trend of future management and operation coordination, improve the rationality of the company's future resource allocation, and can perform customized resource allocation based on the trend of management and operation coordination.

[0051] The above-mentioned evaluation method for the coordination of equipment and financial management operations sorts out the existing work processes of equipment and financial majors, clarifies their respective responsibilities and coordination points, determines specific evaluation indicators and weights based on business needs and actual conditions, and collects and integrates existing data into the system according to the requirements of system functions and evaluation indicators to ensure the accuracy and completeness of the data, evaluates and analyzes the data to ensure the normal operation of various functions, analyzes and optimizes problems based on the evaluation results, deploys the analysis results to relevant equipment professional departments and financial professional departments, and displays the evaluation results to facilitate subsequent improvements, optimize resource allocation, and improve the management efficiency of the enterprise.

[0052] It should be understood that although Figure 2 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 2 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.

[0053] In some embodiments, Figure 3 As shown, a device for evaluating the coordination between equipment and financial professional management and operation is provided, including: a data collection module 310, an indicator determination module 320, a score calculation module 330 and a report generation module 340, wherein: The data collection module 310 is used to collect equipment data of each device of the equipment specialty and financial data of the financial specialty related to each device; An indicator determination module 320, for determining evaluation indicators based on the equipment data and the financial data, wherein the evaluation indicators include indicators representing the management and operation coordination between the equipment data and the financial data; The scoring calculation module 330 is used to construct an evaluation matrix according to the evaluation indicators corresponding to each device, the evaluation values ​​corresponding to each evaluation indicator, and the weights corresponding to each evaluation indicator, and obtain the comprehensive scoring data corresponding to each device according to the evaluation matrix; The report generation module 340 is used to generate an evaluation report according to the comprehensive scoring data of each device, and send the evaluation report to the device management terminal and the financial management terminal respectively.

[0054] In some embodiments, the data collection module 310 is also used to send the management and operation coordination questionnaire to the equipment management terminal and the financial management terminal respectively; receive the survey data returned by the equipment management terminal and the financial management terminal based on the management and operation coordination questionnaire; perform reliability analysis based on the survey data, and in response to the reliability coefficient being greater than a preset threshold, enter the step of determining the evaluation index based on the equipment data and the financial data.

[0055] In some embodiments, the data collection module 310 is further configured to perform reliability analysis according to the following formula: ; in, represents the reliability coefficient, k Indicates the amount of indicator data for the evaluation indicators in the management and operation coordination questionnaire, Indicates that it is j The variance of the scores of the evaluation indicators, It represents the variance of the score of each evaluation indicator.

[0056] In some embodiments, the scoring calculation module 330 is specifically used to calculate the equipment-finance coordination relationship ratio in each time period based on the equipment data and financial data of each device in different time periods; perform ratio analysis on the coordination relationship ratios in different time periods to determine the impact of each evaluation indicator on the management and operation coordination; determine the weight of each evaluation indicator according to the impact of each evaluation indicator on the management and operation coordination; assign corresponding evaluation values ​​to each evaluation indicator of each device; and construct an evaluation matrix according to each evaluation indicator corresponding to each device, the evaluation value corresponding to each evaluation indicator, and the weight corresponding to each evaluation indicator.

[0057] In some embodiments, the scoring calculation module 330 is also used to obtain historical comprehensive scoring data, which is scoring data indicating the degree of coordination between the equipment data and the financial data management and operation of each device in multiple historical time periods; and to perform linear regression trend analysis on the historical comprehensive scoring data to predict the trend of coordination between the equipment data and the financial data management and operation of each device in future time periods.

[0058] For the specific definition of the device for evaluating the coordination between equipment and financial professional management and operation, please refer to the definition of the method for evaluating the coordination between equipment and financial professional management and operation, which will not be repeated here. Each module in the above-mentioned device for evaluating the coordination between equipment and financial professional management and operation can be implemented in whole or in part through software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above-mentioned modules.

[0059] In some embodiments, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 4 As shown. The computer device includes a processor, a memory, and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for evaluating the coordination between equipment and financial professional management and operation is implemented.

[0060] Those skilled in the art will understand that Figure 4 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0061] In some embodiments, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program: collecting equipment data of each device of the equipment specialty and financial data of the financial specialty related to each device; determining evaluation indicators based on the equipment data and the financial data, the evaluation indicators including indicators characterizing the management and operation coordination between the equipment data and the financial data; constructing an evaluation matrix based on each evaluation indicator corresponding to each device, an evaluation value corresponding to each evaluation indicator, and a weight corresponding to each evaluation indicator, and obtaining comprehensive scoring data corresponding to each device based on the evaluation matrix; generating an evaluation report based on the comprehensive scoring data of each device, and sending the evaluation report to the equipment management terminal and the financial management terminal, respectively.

[0062] In some embodiments, when the processor executes the computer program, the following steps are also implemented: sending a management and operation coordination questionnaire to the equipment management terminal and the financial management terminal respectively; receiving survey data returned by the equipment management terminal and the financial management terminal based on the management and operation coordination questionnaire; performing reliability analysis based on the survey data, and in response to a reliability coefficient being greater than a preset threshold, entering the step of determining evaluation indicators based on the equipment data and the financial data.

[0063] In some embodiments, when the processor executes the computer program, the processor further implements the following steps: performing a reliability analysis according to the following formula: ; in, represents the reliability coefficient, k Indicates the amount of indicator data for the evaluation indicators in the management and operation coordination questionnaire, Indicates that it is j The variance of the scores of the evaluation indicators, It represents the variance of the score of each evaluation indicator.

[0064] In some embodiments, when the processor executes the computer program, the following steps are also implemented: calculating the equipment-finance coordination relationship ratio in each time period based on the equipment data and financial data of each device in different time periods; performing ratio analysis on the coordination relationship ratios in different time periods to determine the impact of each evaluation indicator on the management and operation coordination; determining the weight of each evaluation indicator based on the impact of each evaluation indicator on the management and operation coordination; assigning a corresponding evaluation value to each evaluation indicator of each device; and constructing an evaluation matrix based on each evaluation indicator corresponding to each device, the evaluation value corresponding to each evaluation indicator, and the weight corresponding to each evaluation indicator.

[0065] In some embodiments, when the processor executes the computer program, the following steps are also implemented: obtaining historical comprehensive scoring data, which is scoring data indicating the degree of coordination between the equipment data and the financial data management and operation of each device in multiple historical time periods; performing linear regression trend analysis on the historical comprehensive scoring data to predict the trend of coordination between the equipment data and the financial data management and operation of each device in future time periods.

[0066] In some embodiments, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented: collecting equipment data of each device of the equipment profession and financial data of the financial profession related to each device; determining evaluation indicators based on the equipment data and the financial data, the evaluation indicators include indicators that characterize the management and operation coordination between the equipment data and the financial data; constructing an evaluation matrix based on each evaluation indicator corresponding to each device, the evaluation value corresponding to each evaluation indicator, and the weight corresponding to each evaluation indicator, and obtaining comprehensive score data corresponding to each device based on the evaluation matrix; generating an evaluation report based on the comprehensive score data of each device, and sending the evaluation report to the equipment management terminal and the financial management terminal respectively.

[0067] In some embodiments, when the computer program is executed by the processor, the following steps are also implemented: sending a management and operation coordination questionnaire to the equipment management terminal and the financial management terminal respectively; receiving survey data returned by the equipment management terminal and the financial management terminal based on the management and operation coordination questionnaire; performing reliability analysis based on the survey data, and in response to a reliability coefficient being greater than a preset threshold, entering the step of determining evaluation indicators based on the equipment data and the financial data.

[0068] In some embodiments, when the computer program is executed by the processor, the following steps are further implemented: reliability analysis is performed according to the following formula: ; in, represents the reliability coefficient, k Indicates the amount of indicator data for the evaluation indicators in the management and operation coordination questionnaire, Indicates that it is j The variance of the scores of the evaluation indicators, It represents the variance of the score of each evaluation indicator.

[0069] In some embodiments, when the computer program is executed by the processor, the following steps are also implemented: calculating the equipment-finance coordination relationship ratio in each time period based on the equipment data and financial data of each device in different time periods; performing ratio analysis on the coordination relationship ratios in different time periods to determine the impact of each evaluation indicator on the management and operation coordination; determining the weight of each evaluation indicator based on the impact of each evaluation indicator on the management and operation coordination; assigning a corresponding evaluation value to each evaluation indicator of each device; and constructing an evaluation matrix based on each evaluation indicator corresponding to each device, the evaluation value corresponding to each evaluation indicator, and the weight corresponding to each evaluation indicator.

[0070] In some embodiments, when the computer program is executed by the processor, the following steps are also implemented: obtaining historical comprehensive scoring data, which is scoring data indicating the degree of coordination between the equipment data and the financial data management and operation of each device in multiple historical time periods; performing linear regression trend analysis on the historical comprehensive scoring data to predict the trend of coordination between the equipment data and the financial data management and operation of each device in future time periods.

[0071] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0072] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0073] In addition, the term "and / or" in this article is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the characters in this article generally indicate that the associated objects before and after are in an "or" relationship.

[0074] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

[0075] It should be noted that in the embodiments of the present application, data related to user information or user data (for example, historical search behavior, etc.) must be obtained and processed after the user's authorization and consent. When the embodiments of the present application are applied to specific products or technologies, the user's permission or consent must be obtained, and the collection, use and processing of relevant data must comply with the relevant laws, regulations and standards of the relevant countries and regions.

Claims

1. A method for evaluating the synergy between equipment and financial management operations, the method comprising: Collect equipment data of each device of the equipment specialty and financial data of the financial specialty related to each of the said devices; Determine an evaluation index based on the equipment data and the financial data, wherein the evaluation index includes an index representing the management and operation coordination between the equipment data and the financial data; Constructing an evaluation matrix according to the evaluation indicators corresponding to the devices, the evaluation values ​​corresponding to the evaluation indicators, and the weights corresponding to the evaluation indicators, and obtaining comprehensive scoring data corresponding to the devices according to the evaluation matrix; An evaluation report is generated according to the comprehensive scoring data of each of the devices, and the evaluation report is sent to the device management terminal and the financial management terminal respectively.

2. The method according to claim 1, characterized in that Before determining the evaluation index according to the equipment data and the financial data, the method further includes: Send the management and operation coordination questionnaire to the equipment management terminal and the financial management terminal respectively; Receiving survey data returned by the equipment management terminal and the financial management terminal based on the management and operation coordination degree survey questionnaire; Reliability analysis is performed based on the survey data, and in response to a reliability coefficient being greater than a preset threshold, a step of determining an evaluation index based on the equipment data and the financial data is entered.

3. The method according to claim 2, characterized in that The reliability analysis based on the survey data includes: Reliability analysis was performed according to the following formula: ; in, represents the reliability coefficient, k Indicates the amount of index data of the evaluation index in the management and operation coordination questionnaire, Indicates that it is j The variance of the scores of the evaluation indicators, It represents the variance of the score of each evaluation indicator.

4. The method according to claim 1, characterized in that: The evaluation indicators include equipment quality indicators, equipment operation capability indicators and financial coordination indicators; among which, The equipment quality index includes: at least one of equipment accuracy, equipment function, equipment operation stability, equipment energy saving and equipment environmental protection; and / or The equipment operation capability index includes: at least one of equipment utilization rate, equipment failure rate, and equipment failure downtime; and / or The financial synergy index includes: at least one of: equipment investment return rate and the proportion of equipment maintenance cost to total equipment cost.

5. The method according to claim 1, characterized in that The equipment data includes at least one of equipment quality data, equipment operating capacity data, equipment failure rate and equipment maintenance cost; the financial data includes at least one of equipment purchase cost data, equipment depreciation cost data and equipment maintenance cost data corresponding to each equipment.

6. The method according to claim 1, characterized in that The constructing an evaluation matrix according to the evaluation indicators corresponding to the devices, the evaluation values ​​corresponding to the evaluation indicators, and the weights corresponding to the evaluation indicators includes: Calculate the equipment-finance synergy ratio in each time period according to the equipment data and financial data of each of the equipment in different time periods; Conduct ratio analysis on the synergy relationship ratios in different time periods to determine the impact of each evaluation indicator on the synergy of management operations; Determine the weight of each evaluation indicator according to the influence of each evaluation indicator on the management operation coordination degree; Assigning a corresponding evaluation value to each of the evaluation indicators of each of the devices; An evaluation matrix is ​​constructed according to the evaluation indicators corresponding to the devices, the evaluation values ​​corresponding to the evaluation indicators, and the weights corresponding to the evaluation indicators.

7. The method according to claim 1, characterized in that The method further comprises: Acquire historical comprehensive scoring data, wherein the historical comprehensive scoring data is scoring data indicating the degree of coordination between the equipment data and the financial data management and operation of each of the equipment in multiple historical time periods; A linear regression trend analysis is performed on the historical comprehensive score data to predict the trend of the coordination degree between the equipment data and the financial data management operation of each of the equipment in a future time period.

8. A device for evaluating the coordination between equipment and financial management operations, characterized in that: The device comprises: A data collection module, used to collect equipment data of each device of the equipment profession and financial data of the financial profession related to each of the devices; An indicator determination module, used to determine an evaluation indicator based on the equipment data and the financial data, wherein the evaluation indicator includes an indicator representing the management and operation coordination between the equipment data and the financial data; A scoring calculation module, used to construct an evaluation matrix according to the evaluation indicators corresponding to the devices, the evaluation values ​​corresponding to the evaluation indicators, and the weights corresponding to the evaluation indicators, and obtain the comprehensive scoring data corresponding to the devices according to the evaluation matrix; The report generation module is used to generate an evaluation report according to the comprehensive scoring data of each of the devices, and send the evaluation report to the device management terminal and the financial management terminal respectively.

9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Power grid physical asset evaluation method based on analytic hierarchy process

    CN108537437A

  • Power grid asset insurance management and control system and method based on insurance claim settlement big data analysis

    CN115660870A