Material conveying device and method for civil engineering

By designing the alternating cooperation between the slider and the top shaft and the electromagnet-controlled clamping system in the material transport device for civil engineering, the problem that the existing device requires an increase in height to deflect is solved, and the stable rotation of the hopper and the dumping of materials are achieved. The effect is excellent and the service life of the components is extended.

CN118770337AInactive Publication Date: 2024-10-15LONGZHAN CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411244709.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When the existing material transport device for civil engineering is unloading, the socket block needs to rise to a certain height to completely deflect the transport bucket, which causes the overall height of the device to increase, which is not conducive to movement. When the screw rod drives the socket block to rise, the effect The force gradually decreases, and the cooperation between the socket block and the screw rod is not fully utilized.

Method used

A device including a base plate, a rotating hopper, a slider, a top shaft, a connecting pipe, a worm gear and a clamping block is designed. The rotating shaft can selectively cooperate with the casing or connecting pipe through an extrusion unit and an electromagnet to drive the hopper. Deflection, using the alternating cooperation between the slider and the top shaft to continuously drive the hopper to rotate, and keep the force between the top shaft, the casing, and the connecting pipe stable.

Benefits of technology

It achieves stable deflection of the hopper and effective pouring of materials, prolongs the service life of related components, and avoids the problem of increasing the overall height of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118770337A_ABST
    Figure CN118770337A_ABST
Patent Text Reader

Abstract

The invention discloses a material conveying device and method for civil engineering, and belongs to the technical field of material conveying devices.The material conveying device for the civil engineering comprises a bottom plate and a hopper rotationally arranged above the bottom plate, and a sliding block is slidably assembled on the top of the bottom plate; top shafts matched with the hopper are arranged on the two sides of the sliding block, connecting rods matched with the hopper are elastically arranged at the top ends of the top shafts, a rotating shaft is arranged above the bottom plate, and a connecting pipe is slidably assembled on the outer side of the rotating shaft; the sliding block is matched with the top shaft, the hopper can be continuously driven to deflect through alternate matching of the sliding block and the top shaft, and in the process of driving the hopper to rotate, the acting force between the top shaft and the sleeve rod and the acting force between the connecting pipe and the threaded sleeve can be kept relatively stable, so that the service life of related parts is prolonged; through the structure, the top shaft can drive the hopper to rotate to a designated position and pour out materials without being lifted to a high position.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of material conveying devices, and in particular to a material conveying device and a conveying method for civil engineering. Background Art

[0002] Various materials are needed in civil engineering projects, and these materials are basically piled up in one place on the construction site and need to be moved when used.

[0003] Chinese patent CN217672769U discloses a material transport device for civil engineering, including a base, a column, a self-locking spherical wheel, an unloading component, a positioning component, a transport bucket and a handle, wherein the self-locking spherical wheel is arranged on the base, the positioning component is arranged on the base, the column is arranged on the base, the handle is arranged on the column, the unloading component is arranged on the base and the column, and the transport bucket is arranged on the unloading component. The unloading component includes a directional rod, a first sleeve block, a first slider, a first screw rod, a second sleeve block and a second slider, a groove is provided on the base, the directional rod is arranged in the groove, the first sleeve block is slidably sleeved on the directional rod, and a first slide groove is provided in the groove. This scheme saves more manpower when used and has better stability during unloading.

[0004] The above-mentioned device is hinged to the transport bucket through the set socket block, and uses the screw rod to drive the socket block to move upward to cause the transport bucket to deflect, so as to achieve the unloading effect. However, the socket block is always on the side away from the rotation center of the transport bucket, so that the socket block needs to rise to a certain height to cause the transport bucket to fully deflect, thereby causing the overall height of the device to be significantly increased, which is not conducive to the movement of the device, and in the process of the socket block being driven up by the screw rod, the force between the two will gradually decrease. Therefore, the device does not fully utilize the cooperation between the socket block and the screw rod. In summary, the above-mentioned device still has room for improvement.

[0005] Therefore, it is necessary to provide a material conveying device and a conveying method for civil engineering to solve the above technical problems. Summary of the invention

[0006] The object of the present invention is to provide a material conveying device and a conveying method for civil engineering projects, so as to solve the problem that the existing device proposed in the above-mentioned background technology is hinged with the transport bucket by a socket block, and uses a screw rod to drive the socket block to move upward to cause the transport bucket to deflect, so as to achieve the effect of unloading, but the socket block is always on the side away from the rotation center of the transport bucket, so that the socket block needs to rise to a certain height to cause the transport bucket to fully deflect, thereby causing the overall height of the device to increase significantly, which is not conducive to the movement of the device.

[0007] Based on the above ideas, the present invention provides the following technical solutions: a material conveying device for civil engineering, comprising a bottom plate and a hopper rotatably arranged above the bottom plate, a slider is slidably mounted on the top of the bottom plate, and top shafts matching with the hopper are arranged at both sides of the slider, a connecting rod matching with the hopper is elastically arranged at the top of the top shaft, a rotating shaft is arranged above the bottom plate, a connecting pipe is slidably mounted on the outer side of the rotating shaft, the connecting pipe is rotatably connected with the slider, a screw sleeve is fixedly mounted on the bottom plate, the connecting pipe passes through the screw sleeve and is threadedly matched with the screw sleeve, a sleeve is sleeved on the outer side of the top shaft, the top shaft passes through the sleeve and is threadedly matched with the screw sleeve; A worm wheel is sleeved on the outer side of the sleeve, and a worm meshing with the worm wheel is rotatably installed at the center position of the slider. The worm wheel is sleeved on the outer side of the rotating shaft and can slide relative to the rotating shaft. A first clamping block cooperating with the rotating shaft is elastically installed on the connecting pipe, and a second clamping block cooperating with the sleeve is arranged on the worm wheel. Extrusion units are arranged at positions close to the first block and the second block on the slider, and the extrusion unit enables the rotating shaft to selectively cooperate with the sleeve or the connecting pipe according to the pressure of the hopper on the connecting rod.

[0008] As a further solution of the present invention: circular shafts are respectively arranged on both side surfaces of the hopper, a support rod matching the circular shafts is fixedly arranged on the bottom plate, the circular shaft passes through the support rods and rotates with them, and the circular shaft is fixedly installed at the outer edge of the hopper.

[0009] As a further solution of the present invention: sliding frames are fixedly provided on both sides of the bottom surface of the hopper, and a sliding seat is slidably installed in the sliding frame, and the connecting rod is hinged to the sliding seat.

[0010] As a further solution of the present invention: a strip groove is provided on the outer circumferential surface of the rotating shaft, the first clamping block passes through one end of the connecting pipe and is inserted into the strip groove, a plurality of clamping grooves matching with the second clamping block are evenly provided on the outer circumferential surface of the sleeve, and a plug-in block slidingly matching with the strip groove is fixedly provided on the inner wall of the worm.

[0011] As a further solution of the present invention: the extrusion unit includes a pressure ring, and an electromagnet matching the pressure ring is arranged on one side of the pressure ring, the pressure ring and the electromagnet are elastically matched, a magnetic ring is fixedly embedded on the end face of the pressure ring close to the electromagnet, when the electromagnet is energized, the electromagnet and the side opposite to the magnetic ring have the same magnetic pole, the pressure ring is located on the side of the first clamping block close to the electromagnet and the side of the second clamping block close to the electromagnet, the end face of the pressure ring away from the electromagnet is provided with an inclined conical surface, and the end of the first clamping block and the second clamping block close to the pressure ring is set as an inclined slope.

[0012] As a further solution of the present invention: a switch cooperating with the connecting rod is arranged on the top shaft, and the switch is located on the upper and lower sides of the bottom end of the connecting rod. The switch located at the top is electrically connected to the electromagnet at the first block, and the switch located at the bottom is electrically connected to the electromagnet at the second block.

[0013] As a further solution of the present invention: a support spring is sleeved on the outer side of the connecting rod, and the support spring is located between the top end of the connecting rod and the top shaft.

[0014] As a further solution of the present invention: a spring is fixedly arranged between the electromagnet and the pressure ring.

[0015] As a further solution of the present invention: a convex ring portion is fixedly provided on the top end surface of the worm wheel, and the second clamping block passes through the convex ring portion and elastically cooperates with the convex ring portion.

[0016] A method for transporting materials using the material transport device for civil engineering projects comprises the following steps: loading materials into a hopper and pushing the device to a designated area; driving a rotating shaft to rotate, and controlling the electromagnet at a first clamping block or a second clamping block according to the pressure of the hopper on a connecting rod, so that the first clamping block is plugged into a connecting pipe or the second clamping block is plugged into a sleeve, so that the rotating shaft can selectively drive the connecting pipe or the sleeve to rotate, thereby driving the hopper to deflect.

[0017] Compared with the prior art, the beneficial effects of the present invention are: by cooperating with the slider and the top shaft, the alternating cooperation of the two can continuously drive the hopper to deflect, and in the process of driving the hopper to rotate, the force between the top shaft and the sleeve rod, and the force between the connecting pipe and the screw sleeve can remain relatively stable, thereby extending the service life of related components, and through this structure, the top shaft does not need to be raised to a higher position to drive the hopper to rotate to a specified position and pour out the material. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The present invention is further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a three-dimensional structural schematic diagram of the present invention; Figure 3 It is a schematic diagram of the structure of the slide frame and the slide seat of the present invention; Figure 4 This is a schematic diagram of the cooperation between the first clamping block and the connecting pipe of the present invention; Figure 5 This is a schematic diagram of the cooperation between the second clamping block and the pressure ring of the present invention; Figure 6 The present invention Figure 4 A schematic diagram of the enlarged structure at point A; Figure 7The present invention Figure 5 A schematic diagram of the enlarged structure at B; Figure 8 is a schematic diagram of the hopper deflection process of the present invention; Fig. 9 is a cross-sectional view of a slider of the present invention; Fig.10 It is a schematic diagram of the roller structure of the present invention.

[0019] In the figure: 1, hopper; 2, support rod; 3, bottom plate; 4, rotating shaft; 401, strip groove; 5, slider; 6, belt; 7, screw sleeve; 8, slide frame; 9, slide seat; 10, electromagnet; 11, pressure ring; 12, first clamping block; 13, connecting pipe; 14, worm; 15, plug-in block; 16, switch; 17, connecting rod; 18, top shaft; 19, sleeve; 1901, clamping groove; 20, worm wheel; 2001, convex ring; 21, second clamping block; 22, retaining ring; 23, roller. DETAILED DESCRIPTION

[0020] like Figure 1-5 As shown, a material conveying device and method for civil engineering projects include a base plate 3 and a hopper 1 arranged above the base plate 3, circular shafts are respectively arranged on both side surfaces of the hopper 1, and a support rod 2 matched with the circular shaft is fixedly arranged on the base plate 3, the circular shaft passes through the support rod 2 and rotates with it. In actual application, the circular shaft is fixedly installed at the outer edge of the hopper 1, so that the hopper 1 can rotate around the circular shaft to dump materials.

[0021] In order to drive the hopper 1 to deflect, a slider 5 is slidably mounted on the top of the bottom plate 3, and a top shaft 18 matching the hopper 1 is arranged at both sides of the slider 5. Figure 1-5 As shown, slide frames 8 are fixedly provided on both sides of the bottom surface of the hopper 1, and a slide seat 9 is slidably installed in the slide frame 8. A connecting rod 17 is elastically provided at the top of the top shaft 18. The connecting rod 17 is I-shaped as a whole. The connecting rod 17 is hinged to the slide seat 9. Through this structure, when the slider 5 drives the top shaft 18 to slide in the direction of the support rod 2 or the top shaft 18 moves upward relative to the slider 5, it can drive the hopper 1 to deflect, thereby dumping the material.

[0022] A rotating shaft 4 is arranged above the bottom plate 3, and a connecting pipe 13 is slidably mounted on the outer side of the rotating shaft 4, and the connecting pipe 13 is rotatably connected with the slider 5. A screw sleeve 7 is fixedly mounted on the bottom plate 3, so that the connecting pipe 13 passes through the screw sleeve 7 and is threadedly engaged with the screw sleeve 7. Through this structure, when the rotating shaft 4 drives the connecting pipe 13 to rotate, the screw sleeve 7 and the screw sleeve 7 can drive the slider 5 to move on the bottom plate 3. Furthermore, a sleeve 19 is sleeved on the outside of the top shaft 18, and the top shaft 18 passes through the sleeve 19 and is threadedly matched with the sleeve 19. A worm wheel 20 is sleeved on the outside of the sleeve 19, and a worm 14 meshing with the worm wheel 20 is rotatably installed at the center of the slider 5. Specifically, the worm 14 is sleeved on the outside of the rotating shaft 4 and can slide relative to the rotating shaft 4. Through this structure, the sleeve 19 can be driven to rotate by the cooperation of the worm 14 and the worm wheel 20, thereby driving the top shaft 18 to move upward and causing the hopper 1 to deflect. According to the specific usage, it can be known that when the slider 5 is always on the side away from the support rod 2, and only the top shaft 18 moves upward to drive the hopper 1 to deflect, the top shaft 18 is It needs to be raised to a higher position. If the hopper 1 is deflected only by sliding the slider 5 on the bottom plate 3, the pressure of the hopper 1 on the top shaft 18 will be relatively large. Taking the above problems into consideration, the present invention elastically mounts a first block 12 that matches the rotating shaft 4 on the connecting pipe 13, and a second block 21 that matches the sleeve 19 is arranged at the worm gear 20. Through this structure, the rotating shaft 4 can selectively drive the sleeve 19 or the connecting pipe 13 to rotate during rotation. In order for the rotating shaft 4 to selectively match the connecting pipe 13 or the sleeve 19, the present invention arranges extrusion blocks 12 and 21 on the slider 5. In actual use, when the hopper 1 squeezes the connecting rod 17 to move it downward relative to the top shaft 18, the second clamping block 21 can be pushed by the squeezing unit, so that the second clamping block 21 is engaged with the sleeve 19. At this time, the worm gear 20 can synchronously drive the sleeve 19 to rotate during the rotation process, thereby driving the top shaft 18 to move upward, so as to cause the hopper 1 to deflect. Since the distance from the slider 5 to the support rod 2 remains unchanged, as the hopper 1 gradually deflects, a part of the material loaded inside it will be discharged, so that the pressure of the hopper 1 on the connecting rod 17 is reduced, and when the connecting rod 17 moves upward relative to the top shaft 18, the first clamping block 12 can be pushed by the squeezing unit, so that the first The block 12 can cooperate with the rotating shaft 4 so that the rotating shaft 4 can synchronously drive the connecting pipe 13 to rotate, thereby driving the slider 5 to slide on the top of the bottom plate 3 toward the support rod 2. When the slider 5 and the top shaft 18 move toward the support rod 2, the distance between the slider 5 and the support rod 2 decreases, but as the hopper 1 deflects, the material inside it will be discharged. In this case, the pressure of the hopper 1 on the connecting rod 17 is affected by the speed of material discharge, which can be specifically divided into the following two situations: when the material in the hopper 1 is discharged faster, as the slider 5 moves, the pressure of the hopper 1 on the connecting rod 17 gradually decreases or remains relatively stable, and the slider 5 will continue to move on the top of the bottom plate 3;When the material in the hopper 1 is discharged slowly, as the slider 5 moves, the pressure of the hopper 1 on the connecting rod 17 will increase, so that the connecting rod 17 moves downward relative to the top shaft 18, so that the extrusion unit can push the second block 21. At this time, the slider 5 stops moving, and the top shaft 18 moves upward relative to the slider 5 to push the hopper 1 to deflect. In summary, this solution can selectively drive the sleeve 19 or the connecting pipe 13 to rotate according to the pressure of the hopper 1 on the connecting rod 17. In this case, the acting force between the top shaft 18 and the sleeve 19, and the connecting pipe 13 and the screw sleeve 7 can be kept stable. ;

[0023] Reference Figure 4-7 As shown, a strip groove 401 is provided on the outer circumferential surface of the rotating shaft 4, and the first clamping block 12 passes through one end of the connecting tube 13 and is inserted into the strip groove 401, so that the rotating shaft 4 can drive the connecting tube 13 to rotate during the rotation process. Similarly, a plurality of clamping grooves 1901 that cooperate with the second clamping block 21 are evenly provided on the outer circumferential surface of the sleeve 19. When one end of the second clamping block 21 is inserted into the clamping groove 1901, the worm wheel 20 can drive the sleeve 19 to rotate synchronously during the rotation process. In order for the rotating shaft 4 to drive the worm 14 to rotate, in this solution, the worm 14 is set as a hollow structure, and a plug-in block 15 that slides with the strip groove 401 is fixedly provided on the inner wall, so that the rotating shaft 4 can always drive the worm 14 to rotate during the rotation.

[0024] like Figure 3-8 As shown, the extrusion unit includes a pressure ring 11, and an electromagnet 10 matching with the pressure ring 11 is arranged on one side of the pressure ring 11, and the pressure ring 11 and the electromagnet 10 are elastically matched. When used specifically, a magnetic ring can be fixedly embedded on the end face of the pressure ring 11 close to the electromagnet 10. When the electromagnet 10 is energized, the electromagnet 10 has the same magnetic pole on the side opposite to the magnetic ring.

[0025] Of course, the above-mentioned pressure ring 11 is located on the side of the first block 12 close to the electromagnet 10 and on the side of the second block 21 close to the electromagnet 10. The end face of the pressure ring 11 away from the electromagnet 10 is provided with an inclined conical surface, and the end of the first block 12 and the second block 21 close to the pressure ring 11 is set as an inclined slope. Through this structure, the pressure ring 11 can push the first block 12 or the second block 21, so that the rotating shaft 4 can selectively cooperate with the sleeve 19 or the connecting tube 13.

[0026] In addition, in order to trigger the electromagnet 10 at the first card block 12 or the second card block 21, the present solution is provided with a switch 16 on the top shaft 18 that cooperates with the connecting rod 17. The switch 16 is located on the upper and lower sides of the bottom end of the connecting rod 17. Depending on whether the connecting rod 17 moves upward or downward relative to the top shaft 18, it can cooperate with different switches 16. Of course, the switch 16 located at the top is electrically connected to the electromagnet 10 at the first card block 12, while the switch 16 located at the bottom is electrically connected to the electromagnet 10 at the second card block 21.

[0027] In actual use, the material is loaded into the hopper 1. In the initial state, the slider 5 is located at the top of the bottom plate 3 and away from the support rod 2. At this time, the pressure of the hopper 1 on the connecting rod 17 is relatively large, so that the bottom of the connecting rod 17 contacts the switch 16 at the bottom of the top shaft 18. In this state, only the electromagnet 10 at the second clamping block 21 is in an energized state, and the pressure of the pressure ring 11 on the second clamping block 21 enables one end of the second clamping block 21 to be inserted into the clamping groove 1901 on the outer side of the sleeve 19. When the hopper 1 transports the material to the designated area, the rotating shaft 4 can be driven to rotate. The cooperation between the second clamping block 21 and the clamping groove 1901 enables the rotating shaft 4 to drive the sleeve 19 to rotate. During the rotation of the sleeve 19, the top shaft 18 can be driven to move upward, and then the hopper 1 is driven to rotate around the circular axis through the top shaft 18, which is conducive to the discharge of the material in the hopper 1. Since the distance between the slider 5 and the support rod 2 remains unchanged, and the material in the hopper 1 is continuously discharged, the pressure of the hopper 1 on the connecting rod 17 will gradually decrease. When the connecting rod 17 bounces upward relative to the top shaft 18, the bottom end of the connecting rod 17 will contact the switch 16 on the top of the top shaft 18 and trigger the electromagnet 10 at the first card block 12. At this time, the electromagnet 10 at the first card block 12 is in a powered state, while the electromagnet 10 at the second card block 21 is in a de-powered state. When the electromagnet 10 at the first card block 12 is powered, it can push the pressure ring 11. The pressure of the pressure ring 11 on the first card block 12 allows one end of the first card block 12 to be inserted into the strip groove 401. When the electromagnet 10 at the second card block 21 loses power, the second card block 21 will rebound and reset, allowing one end of the second card block 21 to be removed from the card slot 1901. Move out. At this point, the rotating shaft 4 can only drive the connecting pipe 13 to rotate during the rotation process, so that the slider 5 is driven to move at the top of the bottom plate 3 toward the support rod 2 through the threaded cooperation between the connecting pipe 13 and the screw sleeve 7, and the hopper 1 can continue to be driven to deflect during this process. Similarly, when the material discharge speed in the hopper 1 is slow, which increases the pressure of the hopper 1 on the connecting rod 17 again, the rotating shaft 4 can only drive the top shaft 18 to move upward during the rotation process, and repeat the above operation. The hopper 1 can be continuously driven to deflect through the cooperation of the slider 5 and the top shaft 18, and during operation, the pressure of the hopper 1 on the connecting rod 17 can be kept relatively stable, so that the force between the sleeve 19 and the top shaft 18 can be kept relatively stable, which is beneficial to the stable operation of the entire device, and can protect the relevant components of the operation and extend their service life.

[0028] In summary, this device cooperates with the top shaft 18 through the provided slider 5, and the alternating cooperation between the two can continuously drive the hopper 1 to deflect, and in the process of driving the hopper 1 to rotate, the force between the top shaft 18 and the sleeve 19, and the force between the connecting pipe 13 and the screw sleeve 7 can remain relatively stable, thereby extending the service life of related components, and through this structure, the top shaft 18 does not need to be raised to a higher position to drive the hopper 1 to rotate to a specified position and pour out the material.

[0029] like Figure 1-2 As shown, in order to install the rotating shaft 4, bases are provided at both ends of the rotating shaft 4, the bases are fixedly provided on the bottom plate 3, and the rotating shaft 4 passes through the bases and rotates with them, and a motor is fixedly installed on the bottom plate 3, and the rotating shaft 4 passes through one end of the base and the output shaft of the motor are fixedly sleeved with pulleys, and a belt 6 is sleeved between the two pulleys. Through this structure, the motor can drive the rotating shaft 4 to rotate.

[0030] In addition, a support frame is fixedly installed on the top of the bottom plate 3, so that the screw sleeve 7 passes through the support frame and is fixedly connected thereto.

[0031] Reference Figure 1 As shown, a roller is installed at the bottom of the bottom plate 3, and a push rod is fixedly installed on one side of the top of the bottom plate 3; Guide grooves are provided on both sides of the top surface of the bottom plate 3 , and guide blocks that slide in cooperation with the guide grooves are fixedly provided on the bottom surface of the slider 5 . This mechanism is helpful for positioning the sliding path of the slider 5 .

[0032] Reference Figure 3 As shown, a guide rod is fixedly arranged in the slide frame 8, the guide rod passes through the slide seat 9 and slides with it, and a hinged head is fixedly arranged on the top of the I-shaped connecting rod 17, and the hinged head is hinged to the slide seat 9.

[0033] A support spring is sleeved on the outside of the connecting rod 17, and the support spring is located between the top end of the connecting rod 17 and the top shaft 18. Fig. 9 As shown, in order to install the sleeve 19, the connecting pipe 13 and the worm 14, the slider 5 is fixed with two completely symmetrical structures during production, and a plurality of mounting grooves are provided on the slider 5 for mounting the above components. For details, please refer to Fig. 9 First, circular holes are respectively provided along the width and height directions of the slider 5, so that the sleeve 19 and the rotating shaft 4 can pass through the slider 5. The slider 5 is provided with a groove for accommodating the worm gear 20, which is denoted as c. A convex ring portion 2001 is fixedly provided on the top surface of the worm gear 20, and a groove a matching with the convex ring portion 2001 is provided at the top wall of the groove c, so that the convex ring portion 2001 is rotatably provided at the groove a. A groove b is provided on the top wall of the groove c located outside the groove a, and the pressure ring 11 and the electromagnet 10 at the second clamping block 21 are installed at the groove b. Specifically, the electromagnet 10 on one side of the second clamping block 21 is fixedly provided at the groove b, and the pressure ring 11 is slidably provided at the groove b. In actual use, the end of the second clamping block 21 away from the convex ring portion 2001 is located in the groove c, so that the pressure ring 11 can cooperate with the second clamping block 21; Refer again Fig. 9 As shown, a groove f is provided at one end of the slider 5 close to the connecting tube 13, so that the connecting tube 13 passes through the groove f and rotatably cooperates with the slider 5, and a groove e is provided on the inner wall of the groove f for installing the electromagnet 10 and the pressure ring 11 on one side of the first clamping block 12. Specifically, the electromagnet 10 on one side of the first clamping block 12 is fixedly arranged in the groove f, and the pressure ring 11 is slidably arranged at the groove f, and the end of the first clamping block 12 away from the connecting tube 13 extends to the groove f. In actual use, sleeve rings are fixedly arranged at both end faces of the worm 14, and a mounting hole g connected to the groove c is provided on the inner wall of the horizontal circular hole on the slider 5. The mounting hole g is used to install the worm 14, and grooves d cooperating with the sleeve ring are provided on the end faces of both ends of the mounting hole g, so that the sleeve ring can be rotatably installed in the groove d. Of course, the above-mentioned sleeve 19, convex ring portion 2001 and other structures can be rotatably cooperated with the slider 5 through bearings.

[0034] like Figure 4-7 As shown, a spring is fixedly arranged between the electromagnet 10 and the pressure ring 11, the above-mentioned first clamping block 12 passes through the connecting tube 13 and slides with the connecting tube 13, and the second clamping block 21 passes through the convex ring part 2001 and slides with the convex ring part 2001, and the outer sides of the first clamping block 12 and the second clamping block 21 are fixedly sleeved with a retaining ring 22, and the first spring is fixedly arranged between the retaining ring 22 and the connecting tube 13 and between the retaining ring 22 and the convex ring part 2001, and the first spring can be sleeved on the outer sides of the first clamping block 12 and the second clamping block 21.

[0035] The top end surface of the top shaft 18 is provided with a notch matched with the connecting rod 17 , and the cross section of the notch is set to be T-shaped, and the switch 16 is installed between the top wall and the bottom wall inside the notch.

[0036] In actual use, a time relay may be installed between the switch 16 and the corresponding electromagnet 10 to control the delayed start or shutdown of the electromagnet 10 .

[0037] Reference Fig.10 As shown, grooves can be provided on both sides of the end surface of the first block 12 close to the rotating shaft 4 and on both sides of the end surface of the second block 21 close to the sleeve 19, and rollers 23 are rotatably installed in the grooves. This structure can reduce the friction between the first block 12 and the strip groove 401, and the friction between the second block 21 and the groove 1901.

Claims

1. A material conveying device for civil engineering, comprising a bottom plate and a hopper rotatably arranged above the bottom plate, a slider is slidably mounted on the top of the bottom plate, and top shafts cooperating with the hopper are arranged at both sides of the slider, and a connecting rod cooperating with the hopper is elastically arranged at the top of the top shaft, characterized in that: A rotating shaft is arranged above the bottom plate, a connecting pipe is slidably mounted on the outside of the rotating shaft, the connecting pipe is rotatably connected to the slider, a screw sleeve is fixedly mounted on the bottom plate, the connecting pipe passes through the screw sleeve and is threadedly matched with the screw sleeve, a sleeve is sleeved on the outside of the top shaft, the top shaft passes through the sleeve and is threadedly matched with the screw sleeve; A worm wheel is sleeved on the outer side of the sleeve, and a worm meshing with the worm wheel is rotatably installed at the center position of the slider. The worm wheel is sleeved on the outer side of the rotating shaft and can slide relative to the rotating shaft. A first clamping block cooperating with the rotating shaft is elastically installed on the connecting pipe, and a second clamping block cooperating with the sleeve is arranged on the worm wheel. Extrusion units are arranged at positions close to the first block and the second block on the slider, and the extrusion unit enables the rotating shaft to selectively cooperate with the sleeve or the connecting pipe according to the pressure of the hopper on the connecting rod.

2. A material transport device for civil engineering according to claim 1, characterized in that: The two side surfaces of the hopper are respectively provided with round shafts, a support rod matched with the round shaft is fixedly provided on the bottom plate, the round shaft passes through the support rod and rotates with it, and the round shaft is fixedly installed at the outer edge of the hopper.

3. A material transport device for civil engineering according to claim 2, characterized in that: Sliding frames are fixedly arranged on both sides of the bottom surface of the hopper, and a sliding seat is slidably mounted in the sliding frame, and the connecting rod is hinged to the sliding seat.

4. A material transport device for civil engineering according to claim 3, characterized in that: A strip groove is provided on the outer circumferential surface of the rotating shaft, and the first clamping block is inserted into the strip groove through one end of the connecting pipe. A plurality of clamping grooves matching with the second clamping block are evenly provided on the outer circumferential surface of the sleeve, and a plug-in block slidingly matching with the strip groove is fixedly arranged on the inner wall of the worm.

5. A material transport device for civil engineering according to claim 4, characterized in that: The extrusion unit includes a pressure ring, and an electromagnet matching with the pressure ring is arranged on one side of the pressure ring, and the pressure ring and the electromagnet are elastically matched. A magnetic ring is fixedly embedded on the end face of the pressure ring close to the electromagnet. When the electromagnet is energized, the electromagnet and the side opposite to the magnetic ring have the same magnetic pole. The pressure ring is located on the side of the first clamping block close to the electromagnet and the side of the second clamping block close to the electromagnet. The end face of the pressure ring away from the electromagnet is provided with an inclined conical surface, and the end of the first clamping block and the second clamping block close to the pressure ring is set as an inclined slope.

6. A material transport device for civil engineering according to claim 5, characterized in that: A switch matched with the connecting rod is arranged on the top shaft, and the switches are located at the upper and lower sides of the bottom end of the connecting rod. The switch located at the upper side is electrically connected to the electromagnet at the first block, and the switch located at the lower side is electrically connected to the electromagnet at the second block.

7. The material transport device for civil engineering according to claim 1, characterized in that: A support spring is sleeved on the outer side of the connecting rod, and the support spring is located between the top end of the connecting rod and the top shaft.

8. The material transport device for civil engineering according to claim 5, characterized in that: A spring is fixedly arranged between the electromagnet and the pressure ring.

9. The material transport device for civil engineering according to claim 1, characterized in that: A convex ring portion is fixedly arranged on the top end surface of the worm wheel, and the second clamping block passes through the convex ring portion and elastically cooperates with the convex ring portion.

10. A method for transporting materials using the material transport device for civil engineering as claimed in any one of claims 5 to 6, characterized in that: The invention comprises the following steps: loading materials into a hopper and pushing the device to a designated area; driving the rotating shaft to rotate, and controlling the electromagnet at the first clamping block or the second clamping block according to the pressure of the hopper on the connecting rod, so that the first clamping block is plugged into the connecting pipe or the second clamping block is plugged into the sleeve, so that the rotating shaft can selectively drive the connecting pipe or the sleeve to rotate, thereby driving the hopper to deflect.