Sundry prevention device for stay wire of current collection line tower
By installing debris-proof devices on the collector line towers and using grinding and cutting components and telescopic rod systems, the problem of metal wires entangled with debris in the wind is solved, ensuring the stability and safety of the power system.
Patent Information
- Application Number
- CN202410678901.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2024-10-15
AI Technical Summary
The metal cables of collector line towers are easily entangled by environmental debris in windy weather, leading to increased wind resistance, fatigue damage and potential power short circuits, affecting the safety and reliability of the power system.
A cable anti-clutter device including an anti-clutter mechanism and an anti-winding mechanism is designed. The main sleeve, linkage sleeve and grinding and cutting assembly are connected through a telescopic rod and a rotating track, and move along the outer wall of the cable to separate by grinding and cutting. Debris, and release the winding state through the linkage sleeve and positioning assembly.
It effectively prevents debris from getting entangled in the cable, reduces wind resistance, extends the life of the cable, and ensures the stable operation and safety of the power system.
Smart Images

Figure CN118774466A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of a collector line pole tower, and in particular to a collector line pole tower guy wire anti-debris device. Background Art
[0002] In the power transmission system, the collector line tower is a key structure for supporting and fixing cables. These towers usually use metal guy wires to provide additional stability and support to resist the impact of severe weather conditions such as strong winds and earthquakes on the stability of the towers. However, while providing stability, metal guy wires also face some challenges. One major problem is the interference of environmental debris on the power system: in windy weather, various rope-like debris such as plastic bags, branches, vines and other lightweight materials are easily blown up by the wind and may be entangled in the metal guy wires. These debris not only affect the beauty and tidiness of the tower, but more importantly, they may move up along the guy wires due to the wind, and then come into contact with the power lines, causing a short circuit to the ground or between phases. Short circuits may cause power supply interruptions, equipment damage, and even fires, posing a serious threat to public safety and the reliability of the power system.
[0003] In addition, debris entanglement may increase the wind resistance of the guy wire and affect the dynamic performance of the tower. Long-term effects may cause fatigue damage to the metal guy wire and reduce its service life. Therefore, how to effectively manage and remove debris entangled in the guy wire is an important issue that the power industry needs to solve. Summary of the invention
[0004] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0005] In view of the above-mentioned existing problem of how to effectively manage and remove the debris entangled on the pull wire, the present invention is proposed.
[0006] Therefore, the object of the present invention is to provide a device for preventing debris from appearing on the wires of a collector line tower.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: including an anti-debris mechanism, including a main sleeve, a fixed assembly and a first grinding assembly, the main sleeve and the first grinding assembly are connected by a first telescopic rod, the main sleeve is connected to the outer wall of the fixed assembly by a connecting shaft, the fixed assembly is used to be fixed on the outer wall of the pull wire, and the first grinding assembly grinds and separates the debris on the outer wall of the pull wire when it moves up and down along the pull wire wall; an anti-winding mechanism is arranged on the outer wall of the main sleeve, the anti-winding mechanism includes a linkage sleeve, a positioning assembly and a second grinding assembly, the linkage sleeve and the second grinding assembly are connected by a second telescopic rod, the linkage sleeve and the positioning assembly are connected by a third telescopic rod, the positioning assembly is fixedly connected to the outer wall of the main sleeve, and the second grinding assembly is used to release the state of the first grinding assembly being entangled.
[0008] As a preferred solution of the collector line pole tower wire anti-debris device described in the present invention, the main sleeve includes a first sleeve and a second sleeve, the first sleeve side wall is fixedly connected with a first clamping rod, the second sleeve side wall is provided with a first clamping hole, and the outer walls of the first sleeve and the second sleeve are both provided with threads; the first clamping rod is adapted to the first clamping hole.
[0009] As a preferred solution of the collector line pole tower wire anti-debris device described in the present invention, the fixing assembly includes a first fixing cylinder and a second fixing cylinder, the outer walls of the first fixing cylinder and the second fixing cylinder are both provided with a rotating track, the inner walls of the first fixing cylinder and the second fixing cylinder are both provided with a friction layer, and the side wall of the first fixing cylinder is connected with a locking block; the first blocking plate is provided at the position of the rotating track at the end of the first fixing cylinder.
[0010] The rotating track is matched with the connecting shaft.
[0011] As a preferred solution of the collector line pole tower wire anti-debris device described in the present invention, the side wall of the second fixed cylinder is provided with a locking hole, the rotating track is provided with a second blocking piece at the end of the locking hole, and a second spring is fixedly connected between the second blocking piece and the inner wall of the second fixed cylinder.
[0012] As a preferred solution of the collector line pole tower wire pulling anti-debris device described in the present invention, wherein: a locking assembly is also provided at the end of the main sleeve, and the locking assembly includes a pushing block, a pushing plate, a locking ring, a locking block and a locking rail; a movable rail is provided on the second sleeve, the pushing block passes through the movable rail and is fixedly connected to the pushing plate, a locking ring is provided on the side of the pushing block, the locking rail is provided on the first sleeve, the locking block is provided at the end of the first sleeve, and a locking groove is provided on the side wall of the locking block; the locking groove cooperates with the locking ring, and the pushing plate cooperates with the locking rail.
[0013] As a preferred solution of the collector line tower wire pulling wire anti-debris device described in the present invention, the first grinding assembly includes a first grinding sleeve, a first fan blade and a first grinding block, the inner wall of the first grinding sleeve is provided with a rotating thread groove adapted to the pulling wire, the first grinding sleeve is evenly divided into two left and right groups, the first fan blade is provided on the outer wall of the first grinding sleeve, and the first grinding block is fixedly connected to the end of the first grinding sleeve.
[0014] As a preferred solution of the collector line pole tower wire anti-debris device described in the present invention, wherein: the outer wall of the linkage sleeve is fixedly connected to the second fan blade, the inner wall of the linkage sleeve is provided with a linkage thread groove adapted to the outer wall thread of the main sleeve, the linkage sleeve is evenly divided into two groups on the left and right, the side wall of the left linkage sleeve is provided with a second engaging hole, the side wall of the right linkage sleeve is provided with a second engaging rod, and the second engaging hole is adapted to the second engaging rod.
[0015] As a preferred solution of the collector line tower wire anti-debris device of the present invention, the positioning assembly includes a first positioning plate and a second positioning plate, the first positioning plate is fixed to the outer wall of the first sleeve, and the second positioning plate is fixed to the outer wall of the second sleeve.
[0016] As a preferred solution of the collector line tower wire anti-debris device described in the present invention, the second grinding assembly includes a second grinding sleeve and a second grinding block, the second grinding block is arranged at the end of the second grinding sleeve, the second grinding sleeve is evenly divided into left and right sides, the side wall of the left grinding sleeve is provided with a third engaging hole, the side wall of the right grinding sleeve is provided with a third engaging rod, and the third engaging hole is adapted to the third engaging rod.
[0017] As a preferred solution of the collector line pole tower wire anti-debris device described in the present invention, the second grinding sleeve on the left side is evenly divided into two parts, the second grinding sleeve on the right side is evenly divided into two parts, the left grinding sleeve is connected to the left linkage sleeve through the second telescopic rod passing through the second annular groove, and the right grinding sleeve is connected to the right linkage sleeve through the second telescopic rod passing through the second annular groove.
[0018] The beneficial effects of the present invention are as follows: the first blade arranged on the outer wall of the first grinding sleeve plays a role in preventing debris and also plays a role in providing power for the rotation of the first grinding sleeve; when encountering wind, the first grinding sleeve rotates and moves up and down along the outer wall of the cable, and the first grinding block at its end can grind and cut the debris wound on the outer wall of the cable until the debris is separated from the outer wall of the cable, thereby effectively grinding and separating the debris on the outer wall of the cable, and preventing the debris from drifting with the wind and winding on the cable;
[0019] When debris is entangled on the first telescopic rod during the process of the first grinding sleeve rotating downward along the texture of the metal pull wire, causing the first grinding sleeve to be unable to rotate, the second grinding sleeve will rotate downward along the pull wire until the debris wrapped around the first telescopic rod is ground and separated from the pull wire and falls off. At this time, the first grinding sleeve resumes rotation. That is, when the first grinding assembly is entangled by debris and cannot work normally, the second grinding assembly can intervene to release the entanglement and ensure continuous operation of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0021] Figure 1 It is a schematic diagram of the installation state of the collector line tower wire anti-debris device of the present invention.
[0022] Figure 2 The overall structure of the collector line tower wire anti-debris device of the present invention is shown in FIG. Figure 1 .
[0023] Figure 3 Schematic diagram of the anti-debris mechanism of the collector line tower pull wire anti-debris device of the present invention Figure 1 .
[0024] Figure 4 Schematic diagram of the anti-debris mechanism of the collector line tower pull wire anti-debris device of the present invention Figure 2 .
[0025] Figure 5 Schematic diagram of the anti-debris mechanism of the collector line tower pull wire anti-debris device of the present invention Figure 3 .
[0026] Figure 6 It is a schematic diagram of the first sleeve structure of the collector line tower wire anti-debris device of the present invention.
[0027] Figure 7 The second sleeve structure of the collector line tower wire anti-debris device of the present invention is schematically shown. Figure 1 .
[0028] Figure 8 The second sleeve structure of the collector line tower wire anti-debris device of the present invention is schematically shown. Figure 2 .
[0029] Fig. 9 The first grinding sleeve of the anti-debris device for the tower wire of the collector line of the present invention is shown in FIG. Figure 1.
[0030] Fig.10 The first grinding sleeve of the anti-debris device for the tower wire of the collector line of the present invention is shown in FIG. Figure 2 .
[0031] Fig.11 The schematic diagram of the fixing assembly structure of the collector line tower wire anti-debris device of the present invention is shown in FIG. Figure 1 .
[0032] Fig.12 The schematic diagram of the fixing assembly structure of the collector line tower wire anti-debris device of the present invention is shown in FIG. Figure 2 .
[0033] Fig.13 The schematic diagram of the fixing assembly structure of the collector line tower wire anti-debris device of the present invention is shown in FIG. Figure 3 .
[0034] In the figure: 100, anti-debris mechanism; 101, main sleeve; 101a, first sleeve; 101b, second sleeve; 101c, first engaging rod; 101d, first engaging hole; 102, fixing assembly; 102a, first fixing cylinder; 102b, second fixing cylinder; 102c, rotating track; 102d, engaging block; 102e, first blocking piece; 102f, locking hole; 102g, second blocking piece; 102h, second spring; 103, first grinding assembly; 103a, first grinding sleeve; 103b, first fan blade; 103c, first grinding block; 104, first telescopic rod; 105, locking assembly Parts; 105a, pushing block; 105b, pushing plate; 105c, locking ring; 105d, locking block; 105d-1, locking groove; 105e, locking track; 105f, moving track; 200, anti-winding mechanism; 201, linkage sleeve; 201a, second fan blade; 201b, linkage thread groove; 201c, second engaging rod; 202, positioning assembly; 202a, first positioning plate; 202b, second positioning plate; 203, second grinding assembly; 203a, second grinding sleeve; 203b, second grinding block; 203c, third engaging rod; 204, second telescopic rod; 205, third telescopic rod. DETAILED DESCRIPTION
[0035] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0036] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0037] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0038] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0039] Example 1
[0040] Reference Figures 1 to 8 , which is the first embodiment of the present invention, provides a collector line pole tower wire anti-debris device, including an anti-debris mechanism 100, including a main sleeve 101, a fixing assembly 102 and a first grinding assembly 103, the main sleeve 101 and the first grinding assembly 103 are connected through a first telescopic rod 104, the main sleeve 101 is connected to the outer wall of the fixing assembly 102 through a connecting shaft, the fixing assembly 102 is used to be fixed on the outer wall of the wire, and the first grinding assembly 103 grinds and separates the debris on the outer wall of the wire when it moves up and down along the outside of the wire. It is worth noting that a first annular groove is provided at one end of the main sleeve 101 close to the first grinding assembly 103, one end of the first telescopic rod 104 is fixedly connected to the inner wall of the main sleeve 101, and the other end of the first telescopic rod 104 passes through the annular groove and is fixedly connected to the first grinding assembly 103, and the first telescopic rod 104 is elastic.
[0041] Specifically, the anti-winding mechanism 200 is arranged on the outer wall of the main sleeve 101, and the anti-winding mechanism 200 includes a linkage sleeve 201, a positioning assembly 202 and a second grinding assembly 203. The linkage sleeve 201 is connected to the second grinding assembly 203 through a second telescopic rod 204, and the linkage sleeve 201 is connected to the positioning assembly 202 through a third telescopic rod 205. The positioning assembly 202 is fixedly connected to the outer wall of the main sleeve 101. The second grinding assembly 203 is used to release the state where the first grinding assembly 103 is wound. It is worth noting that the linkage sleeve A second annular groove is provided at one end of the tube 201 close to the second grinding assembly 203, one end of the second telescopic rod 204 is fixedly connected to the inner wall of the linkage sleeve 201, the other end of the second telescopic rod 204 passes through the second annular groove and is fixedly connected to the second grinding assembly 203, a third annular groove is provided at the end of the positioning assembly 202, one end of the third telescopic rod 205 is fixedly connected to the inner wall of the positioning assembly 202, the other end of the third telescopic rod 205 passes through the third annular groove and is fixedly connected to the linkage sleeve 201, and both the second telescopic rod 204 and the third telescopic rod 205 are elastic.
[0042] Example 2
[0043] Reference Figures 2 to 11 This embodiment is different from the first embodiment in that: the main sleeve 101 includes a first sleeve 101a and a second sleeve 101b, the side wall of the first sleeve 101a is fixedly connected with a first engaging rod 101c, the side wall of the second sleeve 101b is provided with a first engaging hole 101d, and the outer walls of the first sleeve 101a and the second sleeve 101b are both provided with threads; the first engaging rod 101c is adapted to the first engaging hole 101d.
[0044] Specifically, the fixing assembly 102 includes a first fixing cylinder 102a and a second fixing cylinder 102b, the outer walls of the first fixing cylinder 102a and the second fixing cylinder 102b are both provided with a rotating track 102c, the inner walls of the first fixing cylinder 102a and the second fixing cylinder 102b are both provided with a friction layer, and the side wall of the first fixing cylinder 102a is connected to a locking block 102d; the rotating track 102c is located at the end of the first fixing cylinder 102a and is provided with a first blocking piece 102e. It is worth noting that the end of the locking block 102d close to the first fixing cylinder 102a can push the first blocking piece 102e into the inner wall of the first fixing cylinder 102a, and a first spring is fixedly connected between the first blocking piece 102e and the inner wall of the first fixing cylinder 102a. The locking block 102d can move along the inner wall of the first fixing cylinder 102a under the elastic force of the first spring, and the rotating track 102c is adapted to the connecting shaft.
[0045] It should be noted that the purpose of setting a friction layer on the inner wall of the first fixed tube 102a and the second fixed tube 102b is to increase the friction coefficient between the fixed component 102 and the outer wall of the pull wire by adding the friction layer, so as to better fix the fixed component 102 and the outer wall of the pull wire. The material of the friction layer can be silicone, rubber and other materials.
[0046] Furthermore, a locking hole 102f is provided on the side wall of the second fixed cylinder 102b, a second blocking piece 102g is provided at the end of the locking hole 102f of the rotating track 102c, and a second spring 102h is fixedly connected between the second blocking piece 102g and the inner wall of the second fixed cylinder 102b;
[0047] It is worth noting that the first blocking piece 102e and the second blocking piece 102g are both elastic. When the locking block is fully inserted into the locking hole, it means that the side walls of the first fixed cylinder 102a and the second fixed cylinder 102b are fully fitted. At this time, the second blocking piece 102g is pushed by the locking block 102d to move from the rotating track 102c to the locking hole 102f. At the same time, the first blocking piece 102e is also pushed by the locking block 102d to move from the rotating track 102c to the inner wall of the first fixed cylinder 102a. At this time, the first blocking piece 102e and the second blocking piece 102b are pushed by the locking block 102d to move from the rotating track 102c to the inner wall of the first fixed cylinder 102a. 2g no longer blocks the end of the rotating track 102c, so that the main sleeve 101 can rotate along the rotating track 102c through the connecting shaft. When the engaging block 102d is moved out by the locking block 105d, the first blocking piece 102e and the second blocking piece 102g are restored to the initial state under the elastic force of the first spring and the second spring 102h. The initial state is that the first blocking piece 102e and the second blocking piece 102g are blocked at the end of the rotating track 102c, preventing the connecting shaft from falling off the rotating track 102c, thereby causing the main sleeve 101 to separate from the fixed assembly 102.
[0048] Furthermore, a locking assembly 105 is further provided at the end of the main sleeve 101, and the locking assembly 105 includes a pushing block 105a, a pushing plate 105b, a locking ring 105c, a locking block 105d and a locking track 105e. A moving track 105f is provided on the second sleeve 101b, and the pushing block 105a passes through the moving track 105f and is fixedly connected to the pushing plate 105b. A locking ring 105c is provided on the side of the pushing block 105a, and the locking track 105e is provided on the first sleeve 101a. The locking block 105d is provided at the end of the first sleeve 101a, and the side wall of the locking block 105d is provided. There is a locking groove 105d-1; the locking groove 105d-1 cooperates with the locking ring 105c, and the pushing plate 105b cooperates with the locking track 105e. It should be noted that one end of the locking ring 105c inserted into the inner wall of the pushing block 105a is connected to the inner wall of the pushing block 105a through a spring, so that when the locking ring 105c moves to the end of the locking block 105d, the locking ring 105c can be pulled out in a direction away from the pushing block 105a, so that the locking ring 105c can smoothly move downward along the end of the locking block 105d until it is inserted into the locking groove 105d-1 of the locking block 105d;
[0049] It is worth noting that there are two groups of locking blocks 105d. One group of locking blocks 105d is provided with a clamping rod on the side away from the locking ring 105c, and the other group of locking blocks 105d is provided with a clamping hole on the side close to the clamping rod. The clamping rod cooperates with the clamping hole. When the two groups of locking blocks 105d are fitted together, the positions of the two groups of locking blocks 105d can be fixed by clamping the clamping rod in the clamping hole.
[0050] Furthermore, the first grinding assembly 103 includes a first grinding sleeve 103a, a first fan blade 103b and a first grinding block 103c. The inner wall of the first grinding sleeve 103a is provided with a rotating thread groove adapted to the pull wire. The first grinding sleeve 103a is evenly divided into two left and right groups. The first fan blade 103b is provided on the outer wall of the first grinding sleeve 103a. The first grinding block 103c is fixedly connected to the end of the first grinding sleeve 103a. It is worth noting that the ends of the left and right groups of first grinding sleeves 103a are respectively provided with a first clamping rod 101c and a first clamping hole 101d, and the left and right groups of first grinding sleeves 103a are combined together by matching the first clamping rod 101c and the first clamping hole 101d.
[0051] It should be noted that the first blade 103b on the outer wall of the first grinding sleeve 103a not only plays a role in preventing debris, but also plays a role in providing power for the rotation of the first grinding sleeve 103a. The principle of the first blade 103b preventing debris is to prevent the debris from moving upward along the pull line to a higher position of the pull line from the bottom of the pull line through the first blade 103b. Because when it is windy, rope-like debris will float in the wind and move up with the pull line when encountering the pull line, which may eventually cause the pull line and the collector line to short-circuit to the ground or between phases. The obstruction of the first blade 103b can prevent the rope-like debris from moving up with the pull line. At the same time, when it is windy, the first grinding sleeve 103a rotates up and down along the outer wall of the pull line, and the first grinding block 103c at its end can grind the debris wrapped around the outer wall of the pull line until the debris is detached from the outer wall of the pull line.
[0052] The rest of the structure is the same as that of Example 1.
[0053] Example 3
[0054] Reference Figures 1 to 13 This embodiment is different from the above embodiments in that: a second fan blade 201a is fixedly connected to the outer wall of the linkage sleeve 201, and a linkage thread groove 201b is provided on the inner wall of the linkage sleeve 201 to match the thread of the outer wall of the main sleeve 101. The linkage sleeve 201 is evenly divided into two groups, a second engaging hole is provided on the side wall of the left linkage sleeve, and a second engaging rod 201c is provided on the side wall of the right linkage sleeve 201, and the second engaging hole is matched with the second engaging rod 201c.
[0055] Specifically, the positioning assembly 202 includes a first positioning plate 202a and a second positioning plate 202b. The first positioning plate 202a is fixed to the outer wall of the first sleeve 101a, and the second positioning plate 202b is fixed to the outer wall of the second sleeve 101b. It is worth noting that the first positioning plate 202a and the second positioning plate 202b are both provided with a third annular groove on one side close to the linkage sleeve 201. The left linkage sleeve is connected to the first positioning plate 202a by the third telescopic rod 205 passing through the third annular groove, and the right linkage sleeve 201 is connected to the second positioning plate 202b by the third telescopic rod 205 passing through the third annular groove.
[0056] Furthermore, the second grinding assembly 203 includes a second grinding sleeve 203a and a second grinding block 203b. The second grinding block 203b is arranged at the end of the second grinding sleeve 203a. The second grinding sleeve 203a is evenly divided into left and right sides. The left grinding sleeve side wall is provided with a third locking hole, and the right grinding sleeve side wall is provided with a third locking rod 203c. The third locking hole is adapted to the third locking rod 203c.
[0057] Furthermore, the left grinding sleeve is evenly divided into two parts, and the right grinding sleeve is evenly divided into two parts. The left grinding sleeve is connected to the left linkage sleeve through the second telescopic rod 204 passing through the second annular groove, and the right grinding sleeve is connected to the right linkage sleeve 201 through the second telescopic rod 204 passing through the second annular groove;
[0058] It is worth noting that the left and right grinding sleeves are evenly divided into two parts, the upper and lower parts of the left and right grinding sleeves are connected by a tension spring. The reason for dividing the left and right grinding sleeves evenly into two parts and connecting them with a tension spring is to change the diameter of the left and right grinding sleeves when they are in contact with each other. When the left and right grinding sleeves are in contact with each other and are at the maximum diameter, they can be in contact with the outer wall of the main sleeve 101. When the left and right grinding sleeves are in contact with each other and are at the minimum diameter, they can rotate with the outer walls of the first telescopic rod 104 along both sides of the first grinding sleeve 103a. It should also be noted that the ends of the left and right grinding sleeves close to the linkage sleeve 201 are provided with arc-shaped inclined surfaces. The purpose of such a setting is to facilitate the left and right grinding sleeves to move along the ends of the main sleeve 101 to the outer wall of the main sleeve 101.
[0059] The rest of the structure is the same as that of Example 2.
[0060] Operation process: When installing the device on the collector line tower cable, firstly, manually engage the first sleeve 101a and the second sleeve 101b through the first engaging rod 101c and the first engaging hole 101d. When the first sleeve 101a and the second sleeve 101b are engaged, the first fixed sleeve 102a and the second fixed sleeve 102b are locked by the locking block 105d and the locking hole 102f at the same time. After the first fixed sleeve 102a and the second fixed sleeve 102b are locked, the first fixed sleeve 102a and the second fixed sleeve 102b are locked on the outer wall of the metal cable. It is worth noting that when the first sleeve 101a and the second sleeve 101b are engaged, the first grinding sleeve 103a, the linkage sleeve 201, the positioning assembly 202 and the second grinding sleeve 203a are engaged at the same time, and the engaging principle is the same as that of the first sleeve 101a and the second sleeve 101b. , and then push the pushing block 105a along the moving track 105f on the second sleeve 101b, so that the pushing plate 105b enters the locking track 105e of the first sleeve 101a, until the locking ring 105c on the pushing block 105a contacts the locking block 105d on the first sleeve 101a, at this time, push the locking ring 105c along the track on the pushing block 105a, so that the locking ring 105c moves to the end of the pushing block 105a, and then move the locking ring 105c downward from the end of the locking block 105d to the locking groove 105d-1 of the locking block 105d, at this time, the positions of the pushing block 105a and the locking block 105d are locked, and the pushing plate 105b on the second sleeve 101b is inserted into the locking track 105e on the first sleeve 101a, thereby the first sleeve 101a and the second sleeve 101b are also in a locked state, and the overall installation work is completed.
[0061] In the initial state, the end of the first grinding sleeve 103a fits with the end of the main sleeve 101, the end of the second grinding sleeve 203a fits with the end of the linkage sleeve 201, the end of the linkage sleeve 201 fits with the ends of the first positioning plate 202a and the second positioning plate 202b, and the threads on the outer wall of the main sleeve 101 are engaged with the thread grooves on the inner wall of the linkage sleeve 201.
[0062] When there is wind, the first blade 103b on the outer wall of the first grinding sleeve 103a and the second blade 201a on the outer wall of the linkage sleeve 201 rotate synchronously. At this time, the first grinding sleeve 103a rotates downward along the grain of the metal pull wire. When the first grinding sleeve 103a rotates, it drives the main sleeve 101 to rotate along the rotating track 102c of the outer wall of the first fixed cylinder 102a and the second fixed cylinder 102b at the same time. Since the main sleeve 101 and the linkage sleeve 201 rotate coaxially and synchronously at this time, the relative positions of the main sleeve 101 and the linkage sleeve 201 will not change.
[0063] When the first grinding sleeve 103a rotates downward along the lines of the metal wire, the first grinding block 103c at its end can grind the debris wound around the outer wall of the metal wire, thereby removing the debris from the outer wall of the metal wire.
[0064] If debris is entangled on the first telescopic rod 104 during the process of the first grinding sleeve 103a rotating downward along the grain of the metal pull line, the first grinding sleeve 103a cannot rotate. When the first grinding sleeve 103a cannot rotate, the main sleeve 101 cannot rotate at the same time. At this time, under the action of wind, the linkage sleeve 201 still drives the second grinding sleeve 203a to rotate at the same time, that is, at this time, the main sleeve 101 is in a state of no longer rotating, while the linkage sleeve 201 is still continuously rotating, so that the linkage sleeve 201 moves along the outer wall of the main sleeve 101. The thread of the main sleeve 101 is rotated downward, and when the linkage sleeve 201 rotates downward along the thread of the outer wall of the main sleeve 101, the second grinding sleeve 203a is pushed and rotated downward along the outer wall of the main sleeve 101 until the second grinding sleeve 203a is no longer in contact with the main sleeve 101. When the second grinding sleeve 203a is no longer in contact with the main sleeve 101, the tension spring on the second sleeve 101b shrinks the second sleeve 101b. At this time, the second grinding sleeve 203a is rotated along the two sides of the first grinding sleeve 103a under the combined action of gravity and the rotation force of the linkage sleeve 201. The outer wall of the first telescopic rod 104 rotates downward, and when the second grinding sleeve 203a rotates downward, it encounters debris wrapped around the first telescopic rod 104. At this time, the second grinding sleeve 203a continues to rotate under the force of the wind, and the second grinding block 203b at its end continues to grind the debris until the debris is separated from the first telescopic rod 104 and falls off. At this time, the first grinding sleeve 103a and the second grinding sleeve 203a resume synchronous rotation. When the wind stops or the wind force is reversed, the first grinding sleeve 103a and the second grinding sleeve 203a are on the first telescopic rod. 104 and the second telescopic rod 204 move toward the main sleeve 101 at the same time. When the second grinding sleeve 203a moves to contact with the end of the main sleeve 101, the first grinding sleeve 103a is still moved toward the main sleeve 101 by the pulling force of the first telescopic rod 104. At this time, the first grinding sleeve 103a pushes the second grinding sleeve 203a from the inclined surface of the inner wall of the second grinding sleeve 203a to the outer wall of the main sleeve 101 until the first grinding sleeve 103a is in contact with the end of the main sleeve 101. At this time, the whole device returns to its initial state.
[0065] When it is necessary to remove the device from the outer wall of the pull wire, first, the pushing block 105a and the locking block 105d need to be unlocked. The steps are as follows: pinch the force plate on the outer wall of the locking ring 105c by hand, pull the locking ring 105c out of the locking groove 105d-1 of the locking block 105d, and then move the locking ring 105c upward along the locking block 105d until the locking ring 105c is disengaged from the locking block 105d, and then push the pushing block 105a back to the initial state along the moving track 105f, and then use hands or tools to forcefully pull the two sides of the main sleeve 101 in opposite directions until all the main sleeves 101, the linkage sleeve 201, the first grinding sleeve 103a and the second grinding sleeve 203a are separated on both sides. At this time, the device can be removed from the outer wall of the pull wire.
[0066] Importantly, it should be noted that the construction and arrangement of the present application shown in a plurality of different exemplary embodiments are only exemplary. Although only a few embodiments are described in detail in this disclosure, it should be readily understood by those who refer to this disclosure that many modifications are possible (e.g., the size, scale, structure, shape and proportion of various elements, and parameter values (e.g., temperature, pressure, etc.), installation arrangement, use of materials, color, directional changes, etc.) without substantially departing from the novel teachings and advantages of the subject matter described in the application. For example, the element shown as integrally formed can be composed of multiple parts or elements, the position of the element can be inverted or otherwise changed, and the nature or number or position of the discrete element can be changed or changed. Therefore, all such modifications are intended to be included in the scope of the present invention. The order or sequence of any process or method steps can be changed or reordered according to alternative embodiments. In the claims, any "device plus function" clause is intended to cover the structure of performing the function described herein, and is not only structurally equivalent but also equivalent structure. Without departing from the scope of the present invention, other replacements, modifications, changes and omissions can be made in the design, operating conditions and arrangement of the exemplary embodiments. Therefore, the invention is not limited to a specific embodiment, but extends to several modifications still falling within the scope of the appended claims.
[0067] Additionally, in order to provide a concise description of exemplary embodiments, all features of an actual embodiment (ie, those features that are not relevant to the best mode presently contemplated for carrying out the invention or those that are not relevant to implementing the invention) may not be described.
[0068] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.
[0069] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A collector line tower wire anti-debris device, characterized in that: include, The debris prevention mechanism (100) comprises a main sleeve (101), a fixing assembly (102) and a first grinding assembly (103), wherein the main sleeve (101) and the first grinding assembly (103) are connected via a first telescopic rod (104), the main sleeve (101) is connected to the outer wall of the fixing assembly (102) via a connecting shaft, the fixing assembly (102) is used to be fixed on the outer wall of the cable, and the first grinding assembly (103) grinds and separates debris on the outer wall of the cable when moving up and down along the cable wall; The anti-winding mechanism (200) is arranged on the outer wall of the main sleeve (101), and comprises a linkage sleeve (201), a positioning assembly (202) and a second grinding assembly (203). The linkage sleeve (201) and the second grinding assembly (203) are connected via a second telescopic rod (204), the linkage sleeve (201) and the positioning assembly (202) are connected via a third telescopic rod (205), the positioning assembly (202) is fixedly connected to the outer wall of the main sleeve (101), and the second grinding assembly (203) is used to release the first grinding assembly (103) from a state of being wound.
2. The collector line tower wire anti-debris device according to claim 1, characterized in that: The main sleeve (101) comprises a first sleeve (101a) and a second sleeve (101b); a first engaging rod (101c) is fixedly connected to the side wall of the first sleeve (101a); a first engaging hole (101d) is provided on the side wall of the second sleeve (101b); and outer walls of the first sleeve (101a) and the second sleeve (101b) are both provided with threads; The first engaging rod (101c) is matched with the first engaging hole (101d).
3. The anti-debris device for the collector line tower as claimed in claim 2, characterized in that: The fixing assembly (102) comprises a first fixing cylinder (102a) and a second fixing cylinder (102b), the outer walls of the first fixing cylinder (102a) and the second fixing cylinder (102b) are both provided with a rotating track (102c), the inner walls of the first fixing cylinder (102a) and the second fixing cylinder (102b) are both provided with a friction layer, the side wall of the first fixing cylinder (102a) is connected with a locking block (102d), the rotating track (102c) is located at the end of the first fixing cylinder (102a) and is provided with a first blocking plate (102e), and the rotating track (102c) is adapted to the connecting shaft.
4. The anti-debris device for the collector line tower as claimed in claim 3, characterized in that: A locking hole (102f) is provided on the side wall of the second fixed cylinder (102b); a second blocking piece (102g) is provided on the end of the rotating track (102c) located at the locking hole (102f); and a second spring (102h) is fixedly connected between the second blocking piece (102g) and the inner wall of the second fixed cylinder (102b).
5. The anti-debris device for the collector line tower as claimed in claim 4, characterized in that: A locking assembly (105) is also provided at the end of the main sleeve (101), and the locking assembly (105) comprises a pushing block (105a), a pushing plate (105b), a locking ring (105c), a locking block (105d) and a locking track (105e); a moving track (105f) is provided on the second sleeve (101b); the pushing block (105a) passes through the moving track (105f) and is fixedly connected to the pushing plate (105b); a locking ring (105c) is provided on the side of the pushing block (105a); the locking track (105e) is provided on the first sleeve (101a); the locking block (105d) is provided at the end of the first sleeve (101a); and a locking groove (105d-1) is provided on the side wall of the locking block (105d); The locking groove (105d-1) cooperates with the locking ring (105c), and the pushing plate (105b) cooperates with the locking track (105e).
6. The anti-debris device for the tower cable of the collector line according to claim 5, characterized in that: The first grinding assembly (103) comprises a first grinding sleeve (103a), a first fan blade (103b) and a first grinding block (103c); the inner wall of the first grinding sleeve (103a) is provided with a rotating thread groove adapted to the pull wire; the first grinding sleeve (103a) is evenly divided into two groups, a left group and a right group; the first fan blade (103b) is provided on the outer wall of the first grinding sleeve (103a); and the first grinding block (103c) is fixedly connected to the end of the first grinding sleeve (103a).
7. The anti-debris device for the collector line tower as claimed in claim 6, characterized in that: The outer wall of the linkage sleeve (201) is fixedly connected with a second fan blade (201a); the inner wall of the linkage sleeve (201) is provided with a linkage thread groove (201b) adapted to the thread of the outer wall of the main sleeve (101); the linkage sleeve (201) is evenly divided into two groups, a left group and a right group; the left side wall of the linkage sleeve (201) is provided with a second engaging hole; the right side wall of the linkage sleeve (201) is provided with a second engaging rod (201c); the second engaging hole is adapted to the second engaging rod (201c).
8. The anti-debris device for the collector line tower as claimed in claim 7, characterized in that: The positioning assembly (202) comprises a first positioning plate (202a) and a second positioning plate (202b), wherein the first positioning plate (202a) is fixed to the outer wall of the first sleeve (101a), and the second positioning plate (202b) is fixed to the outer wall of the second sleeve (101b).
9. The collector line tower wire anti-debris device according to claim 8, characterized in that: The second grinding assembly (203) comprises a second grinding sleeve (203a) and a second grinding block (203b). The second grinding block (203b) is arranged at the end of the second grinding sleeve (203a). The second grinding sleeve (203a) is evenly divided into left and right sides. The side wall of the left grinding sleeve is provided with a third engaging hole. The side wall of the right grinding sleeve is provided with a third engaging rod (203c). The third engaging hole is adapted to match the third engaging rod (203c).
10. The collector line tower wire anti-debris device according to claim 9, characterized in that: The second grinding sleeve (203a) on the left side is evenly divided into two parts, and the second grinding sleeve (203a) on the right side is evenly divided into two parts. The left grinding sleeve is connected to the left linkage sleeve through the second telescopic rod (204) passing through the second annular groove, and the right grinding sleeve is connected to the right linkage sleeve (201) through the second telescopic rod (204) passing through the second annular groove.