Method for realizing power grid energy storage peak regulation by utilizing pressurized water energy storage of multi-branch horizontal well
Through multi-branch horizontal well pressurized water energy storage technology, hydraulic fracturing is used to form formation cracks and drive industrial turbine generators, solving the problems of insufficient power supply in the power grid and intermittency of new energy power generation, achieving low-cost, continuous power supply, and adapting to Grid load demand, replacing natural gas peaking power plants.
Patent Information
- Application Number
- CN202410972026.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-10-15
AI Technical Summary
Existing energy storage technologies such as lithium-ion batteries and traditional pumped storage are expensive, unable to meet long-term continuous power supply needs, and are limited by terrain. They cannot effectively solve the problems of insufficient power supply in the grid and intermittency of new energy generation.
Multi-branch horizontal well pressurized water energy storage technology is used to form formation fractures through drilling and hydraulic fracturing. Industrial turbine generators are used to convert the elastic potential energy of the formation into electricity, and combined with power grid load regulation to achieve grid energy storage peak shaving.
It provides low-cost, modular deployment and continuous power supply, adapts to the load demand of the grid, reduces the reliance on natural gas peaking power plants during peak power load periods, and achieves a continuous supply of clean power energy.
Smart Images

Figure CN118774682A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of dual-carbon strategy and peak-shaving supply guarantee, and in particular relates to a technology for water-pressurized energy storage and power generation by multiple segmented horizontal wells in oil production. Background Art
[0002] With the rapid development of the new energy industry, the application of new energy technologies such as hydropower, wind power, and photovoltaics has been increasing. Hydropower, wind power, photovoltaics and other energy sources have the advantages of being green, low-carbon, and renewable, which are in line with the "dual carbon" goals proposed by my country. However, these energy forms have the same disadvantage, that is, their energy generation is intermittent on a daily and seasonal basis. Hydropower, wind power, and photovoltaic power generation are more or less affected by the seasons and climate, and there are peaks and valleys. However, people's demand for electricity is continuous, and power plants need to ensure reliable transmission. Therefore, the demand for power generation technology that can undertake peak-shaving in the power grid is very urgent.
[0003] At present, the general methods of large-scale electricity storage include pumped storage and lead-acid batteries, hydrogen fuel cells, and lithium-ion battery technologies. The traditional method of pumped storage is to use electricity to pump water from a lower location to a higher location when the grid load is at a low point, converting the electrical energy into the gravitational potential energy of the water; lead-acid batteries, hydrogen fuel cells, and lithium-ion battery technologies store excess power from the grid directly in the battery. Among them, battery energy storage technology has not been used on a large scale due to its high investment and operating costs, and its inability to meet the needs of long-term continuous power supply. The traditional pumped storage technology relies on storing energy by converting electrical energy into gravitational potential energy. This method is limited by the terrain structure and cannot be implemented in plain and hilly areas with relatively flat terrain.
[0004] Therefore, there is a need for a technology and method with low investment and maintenance costs, modular deployment, and the ability to provide continuous power supply and peak-shaving energy storage for the power grid. Summary of the invention
[0005] In order to solve the above technical problems, the present invention proposes a method for realizing energy storage and peak regulation of power grid by utilizing multi-branch horizontal well pressurized water energy storage, and realizing the regulation of power in the power grid by circulating pressurized water energy storage and power generation of multi-branch horizontal wells; combining the energy storage and power generation mode provided by the present invention with wind power generation and solar power generation can provide continuous power supply for the power grid, replace the natural gas peak-shaving power plant during the peak period of power load of the power grid, and realize the continuous supply of clean electric energy.
[0006] The technical solution adopted by the present invention is: a method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage, comprising the following steps:
[0007] S1. Drilling: construct a well at a selected site and use drilling technology to complete the drilling operation of a multi-branch horizontal well 11; the multi-branch horizontal well 11 includes a vertical well and horizontal well sections 14 of each target reservoir connected to the vertical well;
[0008] S2. Equipment construction: Build the corresponding equipment above the site where the drilling operation is completed. The corresponding equipment specifically includes:
[0009] A high-pressure pump 6, an industrial turbine generator 7, a power station 9, a water reservoir 10 and a workstation 1. The high-pressure pump 6 and the industrial turbine generator 7 are connected to the power station 9 respectively. One end of the water outlet pipe 8 of the industrial turbine generator 7 is connected to the multi-branched segmented horizontal well 11, and the other end is connected to the water reservoir 10 for storing high-pressure fluid 18. The water reservoir 10 is also connected to the water injection pipe 5. The water injection pipe 5 is connected to the high-pressure pump 6 to inject the high-pressure fluid 18 into the multi-branched segmented horizontal well 11 through the drive of the high-pressure pump 6.
[0010] S3, initial fracturing: hydraulic fracturing is performed on the horizontal well sections 14 of each target reservoir at a site where corresponding equipment has been built, and the rock mass of each target reservoir is compressed by hydraulic fracturing technology to form formation fissures 16;
[0011] S4, secondary fracturing: performing secondary fracturing on each target reservoir rock mass opened by the primary fracturing, adding plugging materials to the high pressure fluid 18 of the secondary fracturing to plug the tips 20 of each fracture;
[0012] When the temporary plugging agent is a granular temporary plugging agent, specifically, 80-200 mesh granular temporary plugging agent is added to the secondary fracturing high pressure fluid 18. When the temporary plugging agent is a fiber temporary plugging agent, specifically, the concentration of the fiber temporary plugging agent in the secondary fracturing high pressure fluid 18 is 0.1%-5%. 0.1%-5% is the concentration calculated by volume.
[0013] S5, pressurized water energy storage: when the workstation 1 detects that the grid load is at a low point, the workstation 1 opens the oil and gas well valve 2 and the water injection pipe valve 3, and uses the electricity stored in the power station 9 to inject sufficient high-pressure fluid 18 into the multi-branched horizontal wells 11, so that a certain pressure exists in the well, and the pressure value does not exceed 80% of the maximum pump pressure of the initial fracturing; after the high-pressure fluid 18 is injected into the oil and gas well, the oil and gas well valve 2 and the water injection pipe valve 3 are closed;
[0014] After the water pressure storage is completed in step S5, a bridge plug 17 is set between each target reservoir section;
[0015] S6. Energy release and power generation: When the workstation 1 detects that the power grid is at peak load, the workstation 1 opens the oil and gas well valve 2 and the water outlet valve 4. After the bridge plug 17 is opened by controlling the closure of the formation fracture 6, the high-pressure fluid 18 injected into the corresponding segmented horizontal well 11 will flow back to the wellhead, and flow to the industrial turbine generator 7 through the oil and gas well valve 2 and the water outlet valve 4, thereby driving the industrial turbine generator 7 to generate electricity and supplement the power of the power station 9.
[0016] The process of setting the bridge plug 17 is as follows:
[0017] The bridge plug 17 comprises: a hollow pipe, upper and lower slips 21 arranged on the outer wall of the hollow pipe, two piston sleeves 24, two floating pistons 22, and bridge plug gunpowder 23; the bridge plug 17 is transported to a designated position through a continuous tubing, and the bridge plug gunpowder 23 is ignited by electric ignition to push the floating pistons 22 at both ends, and the floating pistons 22 at both ends move downward to transmit force to the corresponding piston sleeves 24, squeezing the piston sleeves 24 into the corresponding slips 21, so that the upper and lower slips 21 are tightly bitten on the sleeve, and then the continuous tubing is separated from the bridge plug 17 and retracted, and a small ball is lowered to seal the center of the bridge plug, completing the setting work of the bridge plug.
[0018] The opening process of the bridge plug 17 is as follows: a drill bit is lowered from the wellhead to drill out the bridge plug, thereby opening the bridge plug.
[0019] Preferably, during the hydraulic fracturing construction of the horizontal well sections 14 of each target reservoir in step S3, the workstation 1 controls the bridge plug 17 of the well section of the non-construction target reservoir to be set, thereby separating the high-pressure fluid 18 from the well section of the non-construction target reservoir.
[0020] Preferably, during the energy release and power generation process of step S6, the workstation 1 controls the opening amount of the bridge plug 17 to control the flowback rate, thereby controlling the power generation efficiency.
[0021] The flowback rate calculation formula is:
[0022]
[0023] Where D is the inner diameter of the pipe, C is the high-pressure fluid outflow coefficient, ε is the expansion coefficient, and d i is the anti-discrimination correction coefficient, n i is the number of branch wells, △p i is the pressure difference and ρ is the fluid density.
[0024] Preferably, during the drilling process, the inclination angle of the horizontal well section 14 of each target reservoir is not less than 86°.
[0025] Preferably, in the drilling process of step S1, shale reservoirs that are conducive to hydraulic fracturing to form a complex fracture network are preferentially selected for horizontal drilling construction.
[0026] Preferably, the high pressure fluid 18 in the process of pressurized water energy storage and potential energy power generation includes a drag reducer and a micro-nano drainage aid.
[0027] Preferably, the start mark of the pressurized water storage process is that the grid load is at a low point and the downhole high-pressure fluid pressure is lower than the maximum pump pressure of the initial hydraulic fracturing, and the termination mark is that the grid load is no longer at a low point or the downhole high-pressure fluid pressure is about to reach the maximum pump pressure of the initial hydraulic fracturing.
[0028] Beneficial effects of the invention: The invention provides a technology and method for realizing energy storage peak regulation of power grid by utilizing multi-branch horizontal well water pressure storage. The method realizes power generation and energy storage through residual elastic potential energy by designing industrial turbine generators and power stations, utilizing the residual elastic potential energy of multi-branch horizontal well formations, and using power grid electricity in a staggered manner. This new energy storage power generation scheme can be used to solve problems such as insufficient power supply in the power grid and intermittent supply of wind power generation and solar power generation. Combining this energy storage power generation method with wind power generation and solar power generation can provide a continuous power supply for the power grid, replacing the natural gas peak-shaving power plant during the peak hours of the power grid load, and realizing a continuous supply of clean electric energy.
[0029] Compared with commercially applied lithium battery technology, the hydraulic fracturing energy storage power generation of the present invention is more cost-competitive. Since drilling and hydraulic fracturing and other related technologies are already mature technologies in shale oil and gas development, the cost of energy storage using this method is expected to be controlled at 17.5 to 24.5 million yuan / MW, and through continuous technical improvements, the cost is expected to be reduced to 14 to 18.9 million yuan / MW. The cost of lithium battery technology is about 21 million yuan / MW, and it can only provide power for about 4 hours. Compared with traditional pumped storage technology (18.2 million yuan / MW), its cost is not much different.
[0030] Compared with traditional pumped storage power generation, the method of the present invention can realize modular deployment without being restricted by geographical terrain, and occupies a small site area. It does not need to rely on the potential energy of the mountains to be converted into the kinetic energy of the water flow to drive the turbine generator. It can be deployed in remote areas where electricity is relatively scarce, providing reliable power supply for the local area. The method of the present invention controls the opening and closing of the bridge plug and the opening of the water pipe valve through the ground workstation to achieve precise control of the flow rate and displacement of the reverse high-pressure fluid, provide short-term, high-power power output during the peak load of the power grid, and provide long-term power supply during the stable load of the power grid. Whether it is long-term energy storage or short-term energy storage, this method can adapt well to the load demand of the power grid and improve the load regulation capacity of the power grid. And the multi-branch horizontal wells required by the present invention can not only dig new wells through drilling equipment, but also can appropriately transform abandoned oil wells, natural gas wells and geothermal wells to achieve the same effect, turning them into pressurized water energy storage power stations, and using existing old oil and gas wells for transformation can also greatly shorten the time of site construction.
[0031] In summary, the technology and method provided by the present invention, which utilizes multi-branch horizontal well pressurized water storage to achieve power grid energy storage peak regulation, not only has the "low-carbon" characteristics of clean and renewable, and complies with the "dual carbon" policy proposed by my country, but also has the advantages of low cost, modular deployment, short construction period, long continuous power generation time and flexible control, and can become a new energy storage method that undertakes peak regulation in the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the overall structure of the method of the present invention;
[0033] Figure 2 Schematic diagram of the migration of plugging balls in formation fractures during secondary fracturing ball plugging state;
[0034] Figure 3 It is a schematic diagram of the status of various equipment on the construction site and the migration path of high-pressure fluid under the state of pressurized water storage;
[0035] Figure 4 It is a schematic diagram of the status of each equipment on the construction site and the migration path of high-pressure fluid under the energy-release power generation state;
[0036] Figure 5 It is a schematic diagram of the expansion state of formation fractures and the flow trend of high-pressure fluid in the pressurized water storage state;
[0037] Figure 6 It is a schematic diagram of the expansion state of formation fractures and the flow trend of high-pressure fluid in the energy-releasing power generation state;
[0038] Figure 7 is a schematic diagram of the bridge plug structure;
[0039] Figure 8The invention discloses a flow chart of a technology and method for realizing energy storage peak regulation of power grid by utilizing multi-branch horizontal well water pressure storage.
[0040] Explanation of the accompanying drawings: 1 is a workstation, 2 is an oil and gas well valve, 3 is a water injection pipe valve, 4 is a water outlet pipe valve, 5 is a water injection pipe, 6 is a high-pressure pump, 7 is an industrial turbine generator, 8 is a water outlet pipe, 9 is a power station, 10 is a reservoir, 11 is a multi-branch horizontal well, 12 is a formation, 13 is a target formation, 14 is a branch well section, 15 is a perforation, 16 is a formation fissure, 17 is a bridge plug, 18 is a high-pressure fluid, 19 is a sealing ball, 20 is a fissure tip, 21 is a slip, 22 is a floating piston, 23 is a bridge plug gunpowder, and 24 is a piston cylinder. DETAILED DESCRIPTION
[0041] To facilitate those skilled in the art to understand the technical content of the present invention, the present invention is further explained below with reference to the accompanying drawings.
[0042] A technology and method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage, which is realized by the following steps:
[0043] (1) Drilling: Drilling technology is used to complete the drilling operation of the multi-branch horizontal well 11 at the selected site. During the drilling process, a drilling rig is first used to vertically drill at the preset site. When the vertical drilling reaches a certain depth, the drilling tool is switched, and a special bottom hole power tool and a measurement while drilling instrument are used to drill a horizontal well 14 with a well inclination angle of not less than 86°. The above operation is repeated to form a multi-branch horizontal well 11. The horizontal well 14 is drilled with a well inclination angle of not less than 86°. Since the horizontal well 14 can store water and energy better than the vertical well section, it can discharge a larger amount of fluid when the high-pressure fluid 18 is reversed when the fracture is closed to drive the industrial turbine generator 7 to operate continuously and efficiently. There should be at least one branch well section 14 in the entire multi-branch horizontal well 11, and the target reservoir should preferably be a shale reservoir that is conducive to hydraulic fracturing to form a complex fracture network as the target layer 13;
[0044] (2) Construction of corresponding equipment: Construction of corresponding equipment above the site where the drilling work is completed, such as Figure 1As shown, it includes a high-pressure pump 6, an industrial turbine generator 7, a power station 9, a water reservoir 10 and a workstation 1, and the high-pressure pump 6 and the industrial turbine generator 7 are respectively connected to the power station 9, and one end of the outlet pipe 8 of the industrial turbine generator 7 is connected to a multi-branched segmented horizontal well, and the other end is connected to the water reservoir 10 for storing high-pressure fluid 18. The other end of the water reservoir 10 is connected to the injection pipe 5, and the injection pipe 5 is used to connect the high-pressure pump 6 and the multi-branched segmented horizontal well 11. The function of the injection pipe 5 is to inject the high-pressure fluid 18 into the multi-branched segmented horizontal well 11 through the drive of the high-pressure pump 6. The multi-branched segmented horizontal well 11, the high-pressure pump 6, the water reservoir 10 and the industrial turbine generator 7 form a closed loop through the connection of the injection pipe 5 and the outlet pipe 8. The high-pressure fluid 18 circulates in the closed loop to realize the pressurized water energy storage and energy release power generation functions of the device. The energy that drives the device to operate during the pressurized water storage stage is the electric energy provided by the power station 9, and the energy that drives the device to operate during the energy release and discharge stage is the elastic potential energy of the formation when the cracks 16 are closed after the target formation 13 is fractured. The various functions of the device are uniformly regulated by the ground workstation 1. The workstation 1 regulates the different program responses of the device by monitoring the power load conditions in the power grid, thereby achieving the effect of energy storage and peak regulation of the power grid.
[0045] (3) Initial fracturing: At the completion site, hydraulic fracturing is performed on the branch well sections 14 of each target reservoir 13, and the rock mass of each target reservoir is opened by hydraulic fracturing technology to form a complex fracture network 16. During the fracturing process, the deepest horizontal well section 14 is first selected to perform fracturing in sequence toward the shallow horizontal well sections close to the ground. Before the construction, the horizontal well 14 in the non-construction well section needs to be sealed with a bridge plug 17 to separate the high-pressure fluid 18 from the non-construction well section. During the fracturing of each reservoir, the horizontal well staged fracturing construction technology is used to select the fracturing from the end of the construction horizontal well section 14 to the toe end in sequence;
[0046] (4) Secondary fracturing: After the initial fracturing of each reservoir horizontal section is completed, it is necessary to perform secondary fracturing on each reservoir opened by the initial fracturing. During the secondary fracturing, plugging materials 19 of appropriate concentration and particle size are added to the high-pressure fluid 18 used in the fracturing to plug the tip 20 of the crack 16 formed by the initial hydraulic fracturing construction, thereby preventing the high-pressure fluid 18 from gathering at the tip of the crack 16 and causing splitting damage, thereby limiting the continued extension of the crack 16. Figure 2 shown.
[0047] (5) Modification of high-pressure fluid: In order to improve the efficiency of power generation and energy storage of the device, the high-pressure fluid 18 that is responsible for energy transmission needs to be modified before the device performs water pressure storage and energy release power generation. The specific operation is to add drag reducers and micro-nano drainage agents to the high-pressure fluid 18. The drag reducers are used to minimize the friction along the high-pressure fluid during water pressure and backflow. The micro-nano drainage agents react with the rock matrix to change the water absorption properties of the rock, reduce the filtration loss of the high-pressure fluid during the formation circulation process, and increase the backflow volume, so as to achieve the purpose of improving the energy conversion rate.
[0048] The micro-nano drainage agent is used in combination with the fracturing fluid to reduce the surface tension of the fracturing fluid to below 23Mn / m, so as to increase the drainage effect of the fracturing fluid, which is a physical reaction. At the same time, the active group Si-C bond in the organosilane in the micro-nano drainage agent can react with the hydroxyl group on the rock surface to form a stable adsorption film, making the rock hydrophobic and promoting the drainage of the fracturing fluid, that is, using chemical reagents to improve the hydrophilicity of the rock surface and increase the return fluid, which is a chemical reaction.
[0049] (6) Pressurized water storage: Figure 3 When the workstation 1 detects that the grid load is at a low point, the device starts to operate the pressurized water energy storage. At the beginning, the ground workstation 1 will use the power transmitted from the grid to the ground power station 9 to control the oil and gas well valve 2 and the water injection pipe valve 3 in sequence, so that they are switched to the open state, and then continue to use electricity to drive the high-pressure pump 6 to inject a large amount of high-pressure fluid 18 into the target formation 13 of the multi-branch horizontal well 11 through the water injection pipe 5. After the water enters the multi-branch horizontal well 11 through the water injection pipe 5 and reaches the branch well section 14 of the target formation 13, it will enter the formation fissure 16 formed by the previous fracturing operation through the perforation 15. Figure 5 As the high-pressure fluid 18 is continuously injected into the multi-branch horizontal well 11, the pressure will continue to increase, the cracks 16 in the target formation 13 will continue to expand, and the formation will continue to accumulate elastic potential energy. When the water pressure in the multi-branch horizontal well 11 reaches a certain value (this value needs to be determined according to different working conditions, and its value needs to be controlled to be less than the bursting pressure during the first fracturing and greater than the residual pressure), the injection of water from the water injection pipe 5 is stopped, and the control workstation 1 sequentially closes the oil and gas well valve 2 and the water injection pipe valve 3. In this embodiment, the water pressure in the multi-branch horizontal well 11 needs to be less than 80% of the bursting pressure during the first fracturing.
[0050] (7) Energy release and power generation: Figure 4 When the workstation 1 detects that the power grid load is at a peak, it opens the oil and gas well valve 2 and the water outlet pipe valve 4. Figure 6As shown, due to the closure of the formation fractures 16, the high-pressure fluid in the well will flow back to the branch well section 14 through the perforations 15 and flow back to the wellheads of multiple horizontal wells 11 with a larger displacement, and flow to the industrial turbine generator 7 through the oil and gas well valve 2 and the water outlet valve 4, driving the industrial turbine generator 7 to operate and generate electricity to supplement the power of the power station 9. In this process, the backflow rate of the high-pressure fluid 18 of the device can be adjusted according to the load of the power grid monitored by the workstation 1. When the power grid is in a stable load period, the horizontal well section 14 that does not need to work can be closed by setting the bridge plug 17. One or more horizontal well sections 14 can be selected to work in sequence, so as to reduce the backflow rate of the high-pressure fluid 18 and increase the backflow time to provide a stable and long-term power supply to the power grid. When the power grid is in a peak load period, all or multiple bridge plugs 17 can be opened to make multiple horizontal well sections 14 work at the same time, increase the backflow rate of the high-pressure fluid 18, and provide a short-time, high-power power output for the power grid.
[0051]
[0052] Where D is the inner diameter of the pipe, in meters; C is the high-pressure fluid outflow coefficient; ε is the expansion coefficient; d i is the anti-displacement correction coefficient; n i is the number of branch wells; △p i is the pressure difference, in Pa; ρ is the fluid density, in kg / m 2 ;
[0053] A bridge plug is used to control the opening and closing of a branch well, so the number of branch wells involved in the flowback is n. i That is, it is equal to the number of bridge plugs 17 that are opened.
[0054] like Figure 7 As shown, the bridge plug 17 includes: a hollow pipe, upper and lower slips 21 arranged on the outer wall of the hollow pipe, two piston sleeves 24, two floating pistons 22, and bridge plug gunpowder 23; the bridge plug 17 is transported to the specified position through the continuous oil pipe, and the bridge plug gunpowder 23 is ignited by electric ignition to push the floating pistons 22 at both ends, and the floating pistons 22 at both ends move downward to transmit force to the corresponding piston sleeves 24, squeezing the piston sleeves 24 into the corresponding slips 21, so that the upper and lower slips 21 are tightly bitten on the sleeve, and then the continuous oil pipe is separated from the bridge plug 17 and retracted, and a small ball is lowered to seal the center of the bridge plug, completing the setting work of the bridge plug.
[0055] (8) The power generation and energy storage functions of the method can be completed by continuously repeating the operations of steps (6) and (7). The peak load regulation of the power grid can be achieved by monitoring the power load status in the power grid and controlling the function of the device through the workstation.
[0056] like Figure 8As shown, it is an operation flow chart of the present invention. By reasonably controlling the energy storage and power generation functions of the present invention, the present invention can be used as a new energy storage and power generation mode for peak load regulation in the power grid.
[0057] In summary, the method of the present invention uses multiple horizontal well drilling technology and horizontal well staged fracturing technology to fracture a complex fracture network in several deep strata of the selected site, and uses the method of pressurized water energy storage to use electricity to drive a high-pressure pump to propel the fracture network to convert electrical energy into the elastic potential energy of the stratum. When power generation is required, the energy is released and discharged, and the energy of the closed stratum fracture is used to drive the high-pressure fluid to be discharged back to the wellhead to drive the upper turbine generator to generate electricity, thereby achieving the effect of energy storage and power generation. This new energy storage and power generation scheme can be used to solve the problems of insufficient power supply in the power grid, as well as the intermittent supply of wind power generation and solar power generation. This energy storage and power generation mode is combined with wind power generation and solar power generation to provide a continuous power supply for the power grid, replacing the natural gas peak-shaving power plant at the peak of the power load of the power grid, and realizing the continuous supply of clean electric energy. And this method utilizes the new nano-displacement fluid and drag reducer to react with the rock of the underground stratum to make it produce this property, reduce the friction between the high-pressure fluid and the rock during the circulation process and the adsorption loss of the rock to the fluid, and greatly improve the conversion efficiency between electric energy and the elastic potential energy of the stratum. At the same time, this method incorporates bridge plug isolation technology, which can flexibly control the communication and isolation between horizontal branch wells, and can accurately control the liquid backflow rate according to the needs of the power grid during the energy release and discharge process, providing the power grid with accurate short-term, high-power or long-term power supply. This method has the advantages of low cost, modular deployment, and short construction period, and can become a new energy storage method for peak load regulation in the power grid.
[0058] Those skilled in the art will appreciate that the embodiments described herein are intended to help readers understand the principles of the present invention, and should be understood that the scope of protection of the present invention is not limited to such specific statements and embodiments. For those skilled in the art, the present invention may have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage. It is characterized in that The following steps are involved: S1. Drilling: constructing a well at a selected site and completing the drilling operation of a multi-branch horizontal well (11) using drilling technology; the multi-branch horizontal well (11) includes a vertical well and horizontal well sections (14) of each target reservoir connected to the vertical well; S2. Equipment construction: Build the corresponding equipment above the site where the drilling operation is completed. The corresponding equipment specifically includes: A high-pressure pump (6), an industrial turbine generator (7), a power station (9), a water reservoir (10) and a workstation (1); the high-pressure pump (6) and the industrial turbine generator (7) are connected to the power station (9) respectively; one end of a water outlet pipe (8) of the industrial turbine generator (7) is connected to a multi-branched segmented horizontal well (11), and the other end is connected to a water reservoir (10) for storing high-pressure fluid (18); the water reservoir (10) is also connected to a water injection pipe (5); the water injection pipe (5) is connected to the high-pressure pump (6) and is used to inject the high-pressure fluid (18) into the multi-branched segmented horizontal well (11) through the drive of the high-pressure pump (6); S3, initial fracturing: by setting a bridge plug (17) between each target reservoir well section; hydraulic fracturing construction is carried out on the horizontal well section (14) of each target reservoir at a site where corresponding equipment is built, and the rock mass of each target reservoir is compressed by hydraulic fracturing technology to form formation fissures (16); S4, secondary fracturing: performing secondary fracturing on each target reservoir rock mass opened by the primary fracturing, adding plugging materials to the high pressure fluid (18) of the secondary fracturing to plug the tips (20) of each fracture; S5, pressurized water energy storage: when the workstation (1) detects that the power grid load is at a low point, the workstation (1) opens the oil and gas well valve (2) and the water injection pipe valve (3), and uses the electricity stored in the power station (9) to inject sufficient high-pressure fluid (18) into the multi-branched horizontal wells (11), so that a certain pressure exists in the well, and the pressure value does not exceed the maximum pump pressure of the initial fracturing; after the high-pressure fluid (18) is injected into the oil and gas well, the oil and gas well valve (2) and the water injection pipe valve (3) are closed; S6. Energy release and power generation: When the workstation (1) detects that the power grid load is at a peak, the workstation (1) opens the oil and gas well valve (2) and the water outlet pipe valve (4). After the bridge plug (17) is opened, the high-pressure fluid (18) injected into the corresponding segmented horizontal well (11) will flow back to the wellhead due to the closure of the formation fracture (6), and flow to the industrial turbine generator (7) through the oil and gas well valve (2) and the water outlet valve (4), thereby driving the industrial turbine generator (7) to generate electricity and supplement the power of the power station (9).
2. According to claim 1, a method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage, It is characterized in that When the temporary plugging agent is a granular temporary plugging agent, the granular temporary plugging agent with a mesh size of 80 to 200 is added to the high pressure fluid (18) of the secondary fracturing.
3. According to claim 1, a method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage, It is characterized in that When the temporary plugging agent is a fiber-type temporary plugging agent, the concentration of the fiber-type temporary plugging agent in the high-pressure fluid (18) of the secondary fracturing is calculated by volume and is 0.1% to 5%.
4. A method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage according to claim 2 or 3, It is characterized in that After sufficient high-pressure fluid (18) is injected into the segmented horizontal well (11), the pressure value in the segmented horizontal well (11) does not exceed 80% of the maximum pump pressure of the initial fracturing.
5. A method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage as described in claim 4, It is characterized in that The process of setting the bridge plug (17) is as follows: The bridge plug (17) comprises: a hollow pipe, upper and lower slips (21) symmetrically arranged on the outer wall of the hollow pipe, two piston sleeves (24), two floating pistons (22), and bridge plug gunpowder (23); the bridge plug (17) is transported to a designated position in the casing in the well through a continuous oil pipe, the bridge plug gunpowder (23) is ignited by electric ignition to push the floating pistons (22) at both ends, and the floating pistons (22) at both ends transmit force to the corresponding piston sleeves (24), thereby squeezing the piston sleeves (24) into the corresponding slips (21), so that the upper and lower slips (21) are tightly bitten on the casing, and then the continuous oil pipe is separated from the bridge plug (17) and retracted, and then a small ball is put into the casing to seal the center of the bridge plug, thereby completing the setting work of the bridge plug.
6. A method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage as claimed in claim 5, It is characterized in that The process of opening the bridge plug (17) is as follows: a drill bit is lowered from the wellhead to drill out the bridge plug (17), thereby opening the bridge plug (17).
7. A method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage as claimed in claim 6, It is characterized in that In the energy release and power generation process of step S6, the flowback rate is controlled by controlling the number of bridge plugs (17) opened, thereby controlling the power generation efficiency.
8. A method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage as described in claim 7, It is characterized in that The flowback rate calculation formula is: Where D is the inner diameter of the pipe, C is the high-pressure fluid outflow coefficient, ε is the expansion coefficient, and d i is the anti-displacement correction coefficient, n i is the number of branch wells, △p i is the pressure difference and ρ is the fluid density.
9. A method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage as claimed in claim 8, It is characterized in that The high-pressure fluid (18) in the process of pressurized water energy storage and potential energy power generation includes a drag reducer and a micro-nano drainage aid.
10. A method for realizing power grid energy storage peak regulation by using multi-branch horizontal well water pressure storage as claimed in claim 9, It is characterized in that The start sign of the pressurized water storage process is that the power grid load is at a low point and the downhole high-pressure fluid pressure is lower than the maximum pump pressure of the initial hydraulic fracturing. The termination sign is that the power grid load is no longer at a low point or the downhole high-pressure fluid pressure is about to reach the maximum pump pressure of the initial hydraulic fracturing.
Citation Information
Patent Citations
Method and system for storing and releasing energy through formation
CN114016988A
Horizontal well energy increasing method and device and computer readable storage medium
CN114526045A
Compressed air energy storage system utilizing abandoned mine laneway
CN115434752A
Method and system for storing and releasing energy through existing original stratum fracture of stratum
CN116545125A
Fracturing system and method therefor
US20210324718A1
Cited By
Enhanced geothermal system and method for power grid energy storage peak regulation
CN121296241A
