LNG loading control system with lightning static electricity monitoring function

By monitoring lightning-induced current, human body static electricity and ground grid resistance in the LNG loading control system, the loading and unloading pipeline is automatically closed, which solves the problem of spark discharge caused by excessive lightning static electricity, prevents explosion accidents, and realizes the optimization of LNG loading operations. Safety and security.

CN118775747AInactive Publication Date: 2024-10-15CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202310367452.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-07
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the LNG loading process, excessive lightning static electricity caused a spark discharge between the tail end of the loading and unloading arm and the entrance of the tanker, causing an explosion accident, which cannot be effectively prevented by existing technology.

Method used

Design an LNG loading control system with lightning static electricity monitoring function, including switch device, monitoring device and control device. By monitoring the lightning induced current of the loading skid, the electrostatic charge of the human body and the ground grid resistance value, when the preset threshold is exceeded, Automatically close the loading and unloading pipeline to prevent spark discharge.

Benefits of technology

It can effectively prevent explosion accidents caused by liquefied hydrocarbon leakage, ensure the safety of LNG loading operations, and is widely used in the field of LNG loading and unloading.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775747A_ABST
    Figure CN118775747A_ABST
Patent Text Reader

Abstract

The invention provides an LNG (Liquefied Natural Gas) loading control system with a thunder static monitoring function, which comprises a switch device, which is arranged between a tank car end ball valve and a loading arm tail end ball valve of a loading pry and is used for conducting or closing a pipeline between the tank car and the loading pry so as to start and stop liquefied hydrocarbon loading operation; the monitoring device is used for monitoring the lightning induction current of the loading pry, the human body static electricity carrying capacity carried by the loading operator and the earth screen resistance value of the earth screen connected with the loading pry; and the control device is used for controlling the switch device to close the pipeline between the tank car and the loading pry when any one of the thunder and lightning induction current, the human body static electricity carrying capacity and the earth screen resistance value exceeds a preset threshold value. Methane possibly existing in the working environment can be prevented from being ignited by lightning electrostatic discharge, explosion accidents caused by liquefied hydrocarbon leakage can be effectively prevented, and the LNG loading and unloading device can be widely applied to the field of LNG loading and unloading.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of liquefied hydrocarbon loading and unloading safety protection, and in particular to an LNG loading control system with a lightning static electricity monitoring function. Background Art

[0002] The LNG loading skid is a special frame structure that integrates instruments and equipment in the loading bay. It is a special device used for LNG (Liquefied Natural Gas) batch loading process control. During loading, the tank truck end and the loading and unloading arm end use the ball valves at their respective ends to open and close the liquefied hydrocarbon transportation, and the middle is a straight-through metal quick connector. During the LNG loading process, if the connector falls off, the straight-through connector cannot cut off the transportation of liquefied hydrocarbons in time, resulting in a leakage accident, forming a flammable and explosive dangerous environment in the LNG loading and unloading area, and an explosion may occur once it encounters an ignition source such as lightning static electricity.

[0003] The vicinity of the quick connector for loading liquefied hydrocarbons belongs to Zone 1 explosion-hazardous areas, which may cause explosions when encountering ignition sources. Lightning static electricity is the main ignition source in the loading area of ​​liquefied hydrocarbons. When lightning strikes, huge energy is released, and the induced lightning current can reach up to 20kA, causing a potential difference between the loading skid and the tank car and causing discharge, igniting leaked and volatilized liquefied hydrocarbons. At the same time, if liquefied hydrocarbon loading and unloading personnel wear unqualified anti-static labor protection products, it will also cause human body static electricity, especially in the dry winter season. Therefore, liquefied hydrocarbon workplaces should prevent excessive human body static electricity from causing static electricity discharge.

[0004] In view of the problems of the prior art, the present invention provides a LNG loading control system with a lightning static electricity monitoring function. Summary of the invention

[0005] In order to overcome the defects of the prior art, the present invention provides an LNG loading control system with a lightning static monitoring function, the system comprising:

[0006] A switch device, which is installed between the ball valve at the tank truck end and the ball valve at the tail end of the loading arm of the loading skid, is used to open or close the pipeline between the tank truck and the loading skid to start and stop the liquefied hydrocarbon loading operation;

[0007] A monitoring device is used to monitor the lightning induced current of the loading skid, the static electricity of the loading workers, and the grounding resistance value of the loading skid connected to the grounding grid;

[0008] The control device is used to control the switch device to close the pipeline between the tank truck and the loading skid when any one of the lightning induced current, the human body static charge, and the ground grid resistance value exceeds a preset threshold.

[0009] According to one embodiment of the present invention, the switch device comprises:

[0010] The liquid phase arm shut-off valve is installed between the liquid phase arm side ball valve at the tail end of the loading skid liquid phase arm and the lower liquid inlet ball valve of the tank truck liquefied hydrocarbon inlet, and is used to open or cut off the pipeline between the loading skid liquid phase arm and the tank truck liquefied hydrocarbon inlet.

[0011] According to one embodiment of the present invention, the switch device comprises:

[0012] The gas recovery arm shut-off valve is installed between the gas recovery arm side ball valve at the tail end of the gas recovery arm of the loading skid and the gas outlet valve of the tank truck gasified hydrocarbon outlet, and is used to open or cut off the pipeline between the gas recovery arm of the loading skid and the gasified hydrocarbon outlet of the tank truck.

[0013] According to one embodiment of the present invention, the monitoring device comprises:

[0014] A lightning current monitor is installed on a loading skid and is used to monitor the lightning induced current flowing through the loading skid when the loading shed where the loading skid is located is struck by lightning. The lightning current monitor uses a Rogowski coil lightning current sensor.

[0015] According to one embodiment of the present invention, the monitoring device comprises:

[0016] A human body static electricity monitor is used to monitor the static electricity charge on the human body of the loading operator before the liquefied hydrocarbon loading operation, wherein the human body static electricity monitor adopts a contact type static electricity sensor.

[0017] According to one embodiment of the present invention, the monitoring device comprises:

[0018] The ground grid resistance monitor is used to monitor the ground grid resistance value of the ground grid connected to the loading skid, wherein the ground grid resistance monitor adopts a resistance sensor and the monitoring frequency is once a day.

[0019] According to an embodiment of the present invention, the control device is connected to the switch device and the monitoring device via a shielded cable with an insulating sheath.

[0020] According to one embodiment of the present invention, the control device comprises:

[0021] The setting module supports respectively setting preset thresholds of the lightning induced current, the human body static electricity charge, and the ground grid resistance value.

[0022] According to one embodiment of the present invention, the control device comprises:

[0023] The alarm module is used to generate an alarm prompt when any one of the lightning induced current, the human body static charge, and the ground grid resistance value exceeds the preset threshold.

[0024] According to one embodiment of the present invention, the control device comprises:

[0025] The instruction module is used to generate a closing instruction to close the switch device and cut off the pipeline between the tank truck and the loading skid when any one of the lightning induced current, the human body static charge, and the ground grid resistance value exceeds the preset threshold.

[0026] According to another aspect of the present invention, there is also provided a LNG loading control method with a lightning static monitoring function, which is executed by a system as described in any one of the above items, and the method comprises the following steps:

[0027] The pipeline between the tank truck and the loading skid is opened or closed by the switch device installed between the ball valve at the end of the tank truck and the ball valve at the tail end of the loading arm of the loading skid to start or stop the liquefied hydrocarbon loading operation;

[0028] The monitoring device is used to monitor the lightning induced current of the loading skid, the static electricity of the human body carried by the loading operator, and the grounding resistance value of the grounding grid connecting the loading skid;

[0029] When any one of the lightning induced current, the electrostatic charge of the human body, and the ground grid resistance value exceeds a preset threshold, the control device controls the switch device to close the pipeline between the tank truck and the loading skid.

[0030] According to one embodiment of the present invention, the method comprises the following steps:

[0031] Step a, judging whether the lightning induced current of the loading skid exceeds a preset threshold value, if the judgment result is no, proceeding to step b, if the judgment result is yes, proceeding to step e;

[0032] Step b, judging whether the electrostatic charge of the human body carried by the loading operator before the liquefied hydrocarbon loading operation exceeds a preset threshold value, if the judgment result is no, proceeding to step c, if the judgment result is yes, proceeding to step e;

[0033] Step c, judging whether the ground network resistance value of the ground network connected to the loading skid exceeds a preset threshold value, if the judgment result is no, proceeding to step d, if the judgment result is yes, proceeding to step e;

[0034] Step d, turning on the switch device, so that the loading operator can carry out the liquefied hydrocarbon loading operation;

[0035] Step e: issuing an alarm and a closing command to close the switch device, cut off the pipeline between the tank truck and the loading skid, and the loading operator cannot carry out the liquefied hydrocarbon loading operation.

[0036] According to another aspect of the present invention, a storage medium is provided, which contains a series of instructions for executing the method steps as described in any one of the above.

[0037] The present invention provides an LNG loading control system with a lightning static electricity monitoring function. Compared with the prior art, the present invention has the following advantages: the present invention can monitor the lightning induced current of the loading skid, the static electricity charge of the operator's body before loading and unloading operations, and the ground grid resistance value of the loading skid. When a certain monitoring value exceeds a preset threshold, the loading and unloading pipeline is automatically closed to prevent the methane that may exist in the working environment from being ignited by lightning static electricity discharge, and can effectively prevent explosion accidents caused by liquefied hydrocarbon leakage. The present invention can be widely used in the field of LNG loading and unloading.

[0038] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0040] Figure 1 A schematic diagram of the structure of an LNG loading control system with a lightning static electricity monitoring function according to an embodiment of the present invention is shown;

[0041] Figure 2 A flowchart of a LNG loading control method with a lightning static electricity monitoring function according to an embodiment of the present invention is shown;

[0042] Figure 3 A flowchart of a LNG loading control method with a lightning static electricity monitoring function according to another embodiment of the present invention is shown;

[0043] Figure 4 A flowchart of the steps of a method for monitoring and controlling the lightning induced current, ground grid resistance, and human body electrostatic charge of a loading skid in a liquefied hydrocarbon loading area according to an embodiment of the present invention is shown.

[0044] In the accompanying drawings, the same components are marked with the same reference numerals. In addition, the accompanying drawings are not drawn according to the actual scale. The meanings of the reference numerals in the accompanying drawings are as follows: 1-ground grid resistance monitor; 2-lightning current monitor; 3-loading skid; 4-control device; 5-liquid phase arm side ball valve; 6-gas recovery arm side ball valve; 7-human body static electricity monitor; 8-liquid phase arm cut-off valve; 9-gas recovery arm cut-off valve; 10-boosting ball valve; 11-lower liquid inlet ball valve; 12-upper liquid inlet ball valve; 13-gas outlet valve; 14-tank car; 401~406-shielded cable. DETAILED DESCRIPTION

[0045] To make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention are further described in detail below with reference to the accompanying drawings.

[0046] Prior art CN206781603U provides a natural gas liquefaction transportation system, including a tank truck and a storage tank located in the tank truck; the tank truck includes a tractor and a semi-trailer chassis connected to the tractor, and the semi-trailer chassis is connected to the storage tank; the semi-trailer chassis includes a bottom plate, a wheel arranged at the bottom of the bottom plate, and a support device arranged on the bottom plate, the support device includes a frame and a support block, the frame is an M-shaped structure, and the middle bend of the M-shaped structure is an arc-shaped transition, and a buffer layer is provided at the arc-shaped transition; the support block is connected to the bottom of the M-shaped structure; an anti-static device is provided on the buffer layer, and the anti-static device includes a bolt arranged at the bottom of the buffer layer, and a discharge electrode support plate is provided at one end of the bolt away from the buffer layer, and a discharge spring is also sleeved on the bolt. However, this prior art cannot prevent the explosion accident caused by spark discharge between the tail end of the loading and unloading arm and the tank truck entrance due to excessive lightning static electricity during LNG loading operations, nor can it ensure the safety of LNG loading operations.

[0047] Prior art CN113437642A provides a comprehensive lightning protection device for an LNG liquefied natural gas station, including a first direction rotating assembly, a second direction rotating assembly, a self-rotating assembly, and a lightning rod. The first direction rotating assembly is installed above the natural gas storage tank, the second direction rotating assembly is slidably installed on the first direction rotating assembly, the self-rotating assembly is installed on the second direction rotating assembly, and the lightning rod is installed on the self-rotating assembly. The power source of the second direction rotating assembly drives the self-rotating assembly to drive the lightning rod to rotate around its own axis. Under the action of the first direction rotating assembly and the second direction rotating assembly, the lightning rod can rotate to any point on the semi-spherical surface above the natural gas tank, and the self-rotating assembly prevents electric shock accidents in thunderstorms. However, this prior art cannot prevent the explosion caused by spark discharge between the tail end of the loading and unloading arm and the tank truck entrance due to excessive lightning static electricity during LNG loading operations, nor can it ensure the safety of LNG loading operations.

[0048] Prior art CN215579549U provides a tower lightning protection and grounding device for LNG, including a main box, a component frame and a lightning tower, an inspection door is provided on one side of the main box, a component frame is constructed at a central position on a side of the inspection door away from the main box, a connecting plate is constructed on the inner end of the component frame facing the main box, a lightning tower is provided on the top of the upper end surface of the main box, a lightning short pin is provided on the end of the lightning tower away from the main box, a lead wire is provided inside the lightning tower, a group of grounding wires are respectively plugged in on both sides of the main box, a discharge mechanism is provided at the inner center of the main box, the discharge mechanism is a multi-section split structure, the outer edge surface of each section of the discharge mechanism is constructed with a cross-shaped discharge end, and each section of the discharge mechanism is fixed by threaded docking. However, this prior art cannot prevent the explosion accident caused by spark discharge between the tail end of the loading and unloading arm and the tank truck entrance due to excessive lightning static electricity during LNG loading operations, nor can it ensure the safety of LNG loading operations.

[0049] In summary, the present invention aims at the potential safety hazard of explosion accidents caused by spark discharge between the tail end of the loading and unloading arm and the entrance of the tank truck due to excessive lightning static safety risk during LNG loading operations. An LNG loading control system with a lightning static safety monitoring function is proposed to ensure the safety of LNG loading operations and effectively avoid liquefied hydrocarbon leakage accidents.

[0050] Figure 1 A schematic structural diagram of an LNG loading control system with a lightning static electricity monitoring function according to an embodiment of the present invention is shown.

[0051] A LNG loading control system with a lightning static electricity monitoring function comprises: a switch device, a monitoring device, and a control device 4.

[0052] The switch device is installed between the ball valve at the tank truck end and the ball valve at the tail end of the loading and unloading arm of the loading skid 3, and is used to open or close the pipeline between the tank truck 14 and the loading skid 3 to start and stop the liquefied hydrocarbon loading operation.

[0053] In one embodiment, Figure 1 As shown, the switch device includes: a liquid phase arm cut-off valve 8, which is installed between the liquid phase arm side ball valve 5 at the tail end of the liquid phase arm of the loading skid 3 and the lower liquid inlet ball valve 11 of the liquefied hydrocarbon inlet of the tank truck, and is used to conduct or cut off the pipeline between the liquid phase arm of the loading skid and the liquefied hydrocarbon inlet of the tank truck. Specifically, the liquid phase arm cut-off valve 8 is fixedly installed between the liquid phase arm side ball valve 5 at the tail end of the liquid phase arm and the lower liquid inlet ball valve 11 of the gasified liquefied hydrocarbon outlet of the tank truck, and is used to conduct or cut off the pipeline between the liquid phase arm and the liquefied hydrocarbon inlet of the tank truck.

[0054] Furthermore, if Figure 1 As shown, the upper liquid inlet ball valve 12 is arranged above the lower liquid inlet ball valve 11, and is used to open or close the liquefied hydrocarbon inlet of the tank truck. The booster ball valve 10 is arranged at the liquefied hydrocarbon inlet of the tank truck.

[0055] In one embodiment, Figure 1 As shown, the switch device includes: a gas phase recovery arm cut-off valve 9, which is installed between the gas recovery arm side ball valve 6 at the tail end of the gas recovery arm of the loading skid and the gas outlet valve 13 of the gasified hydrocarbon outlet of the tank truck, and is used to conduct or cut off the pipeline between the gas recovery arm of the loading skid and the gasified hydrocarbon outlet of the tank truck. Specifically, the gas phase recovery arm cut-off valve 9 is fixedly installed between the tail end of the gas recovery arm and the gasified liquefied hydrocarbon outlet of the tank truck, and is used to conduct or cut off the pipeline between the gas recovery arm side ball valve 6 and the gas outlet valve 13 of the gasified liquefied hydrocarbon outlet of the tank truck.

[0056] The monitoring device is used to monitor the lightning induced current of the loading skid 3, the static electricity charge of the human body carried by the loading workers, and the ground grid resistance value of the loading skid connected to the ground grid.

[0057] In one embodiment, Figure 1 As shown, the monitoring device includes: a lightning current monitor 2, which is installed on the loading skid 3, and is used to monitor the lightning induced current flowing through the loading skid 3 when the loading shed where the loading skid 3 is located is struck by lightning. The lightning current monitor 2 uses a Rogowski coil lightning current sensor, which can monitor the induced lightning current flowing through the loading skid 3 in real time when lightning strikes.

[0058] In one embodiment, Figure 1 As shown, the monitoring device includes: a human body static electricity monitor 7, which is used to monitor the human body static electricity charge carried by the loading workers before the liquefied hydrocarbon loading operation, wherein the human body static electricity monitor 7 adopts a contact static electricity sensor, and the loading and unloading workers touch the human body static electricity monitor 7 to detect the human body static electricity charge, such as the human body potential, before the operation.

[0059] In one embodiment, Figure 1 As shown, the monitoring device includes: a ground grid resistance monitor 1, which is used to monitor the ground grid resistance value of the ground grid connected to the loading skid 3, wherein the ground grid resistance monitor 1 adopts a resistance sensor, and the monitoring frequency is once a day.

[0060] The control device 4 is used to control the switch device to close the pipeline between the tank car 14 and the loading skid 3 when any one of the lightning induced current, the static electricity of the human body, and the ground grid resistance value exceeds a preset threshold. Specifically, the control device 4 may include but is not limited to a general processor, a dedicated processor, a controller, a microcontroller, a digital signal processor, multiple microprocessors, one or more microprocessors associated with a DSP core, a controller, a microcontroller, an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) circuit, any other type of integrated circuit (IC), a state machine, etc. Further, the control device 4 can be installed in an explosion-proof junction box on site or in a non-explosion-proof place (control room).

[0061] In one embodiment, the control device 4 includes: a setting module, which supports setting preset thresholds of lightning induced current, human body static electricity charge, and ground grid resistance value. Specifically, the setting module supports the operator to set the preset thresholds of lightning induced current, human body static electricity charge, and ground grid resistance value through a display screen configured by the control device 4 or other external devices communicating with the control device 4.

[0062] In one embodiment, the control device 4 includes: an alarm module, which is used to generate an alarm prompt when any one of the lightning induced current, the static electricity charge of the human body, and the ground grid resistance value exceeds a preset threshold. Specifically, the control device 4 has an alarm device, and when any one of the lightning induced current, the static electricity charge of the human body, and the ground grid resistance value exceeds the respective preset thresholds, an audible and visual alarm is generated, which enables the on-site LNG loading and unloading operators to receive the alarm prompt more promptly and notify them to stop the operation in time.

[0063] In one embodiment, the control device 4 includes: an instruction module, which is used to generate a closing instruction when any one of the lightning induced current, the human body static electricity charge, and the ground grid resistance value exceeds a preset threshold value, so as to close the switch device and cut off the pipeline between the tank car 14 and the loading skid 3. Specifically, the control device 4 monitors the electrical signals transmitted from the lightning current monitor 2, the human body static electricity monitor 7, and the ground grid resistance monitor 1 in real time. When a monitoring value exceeds the preset threshold value, the alarm module issues an alarm prompt, and generates a closing instruction through the instruction module after a preset time (for example, 10s) to close the liquid phase arm cut-off valve 8 and the gas recovery arm cut-off valve 9.

[0064] Furthermore, when the lightning induced current monitoring data value exceeds a preset threshold, the command module controls the switch device to close the pipeline between the tank truck 14 and the loading skid 3, thereby stopping the loading operation of the liquefied hydrocarbon, wherein the pipeline between the gas recovery arm and the gasified liquefied hydrocarbon outlet of the tank truck is cut off by controlling the gas recovery arm cut-off valve 9 fixedly installed between the tail end of the gas recovery arm and the gasified liquefied hydrocarbon outlet of the tank truck, and the pipeline between the liquid phase arm and the liquefied hydrocarbon inlet of the tank truck is cut off by controlling the liquid phase arm cut-off valve 8 fixedly installed between the tail end of the liquid phase arm and the gasified liquefied hydrocarbon outlet of the tank truck.

[0065] Furthermore, when the monitoring data value of the static electricity charge on the human body exceeds a preset threshold, the command module controls the switch device to close the pipeline between the tank truck 14 and the loading skid 3, thereby stopping the loading operation of the liquefied hydrocarbons, wherein the gas recovery arm cut-off valve 9 fixedly installed between the tail end of the gas recovery arm and the gasified liquefied hydrocarbon outlet of the tank truck is controlled to cut off the pipeline between the gas recovery arm and the gasified liquefied hydrocarbon outlet of the tank truck, and the liquid phase arm cut-off valve 8 fixedly installed between the tail end of the liquid phase arm and the gasified liquefied hydrocarbon outlet of the tank truck is controlled to cut off the pipeline between the liquid phase arm and the liquefied hydrocarbon inlet of the tank truck.

[0066] Furthermore, when the monitoring data value of the grounding grid resistance value exceeds a preset threshold value, the command module controls the switch device to close the pipeline between the tank truck 14 and the loading skid 3, thereby stopping the loading operation of the liquefied hydrocarbons, wherein the pipeline between the gas recovery arm and the gasified liquefied hydrocarbon outlet of the tank truck is cut off by controlling the gas recovery arm cut-off valve 9 fixedly installed between the tail end of the gas recovery arm and the gasified liquefied hydrocarbon outlet of the tank truck, and the pipeline between the liquid phase arm and the liquefied hydrocarbon inlet of the tank truck is cut off by controlling the liquid phase arm cut-off valve 8 fixedly installed between the tail end of the liquid phase arm and the gasified liquefied hydrocarbon outlet of the tank truck.

[0067] In one embodiment, Figure 1 As shown, the control device 4 is connected to the switch device and the monitoring device through shielded cables 401-406 with insulating sheaths. Figure 1 As shown, the control device 4 is connected to the ground grid resistance monitor 1 through a shielded cable 401 with an insulating sheath, and receives the measured ground grid resistance value transmitted by the ground grid resistance monitor 1. The control device 4 is connected to the lightning current monitor 2 through a shielded cable 402 with an insulating sheath, and receives the measured lightning induced current transmitted by the lightning current monitor 2. The control device 4 is connected to the human body static electricity monitor 7 through a shielded cable 403 with an insulating sheath, and receives the measured human body static electricity charge transmitted by the human body static electricity monitor 7.

[0068] Furthermore, if Figure 1 As shown, the control device 4 is connected to the external device through a shielded cable 404 with an insulating sheath, which is used for the operator to transmit control instructions to the control device 4 or for the operator to set preset thresholds of lightning induced current, human body static electricity, and ground grid resistance respectively. The control device 4 is connected to the liquid phase arm cut-off valve 8 through a shielded cable 405 with an insulating sheath, and transmits an open / close instruction to the liquid phase arm cut-off valve 8 to open / close the liquid phase arm cut-off valve 8 to connect / cut off the liquid phase pipeline between the tank car 14 and the loading skid 3. The control device 4 is connected to the gas phase recovery arm cut-off valve 9 through a shielded cable 406 with an insulating sheath, and transmits an open / close instruction to the gas phase recovery arm cut-off valve 9 to open / close the gas phase recovery arm cut-off valve 9 to connect / cut off the gas phase pipeline between the tank car 14 and the loading skid 3.

[0069] Furthermore, the shielding layers of the shielded cables 401 to 406 should be grounded to prevent damage. The installation, use and maintenance of the equipment in the LNG loading control system with lightning static monitoring function provided by the present invention should comply with the product manual and the requirements of the following relevant standards and specifications: GB3836.13-2013 Explosive atmospheres Part 13: Repair, overhaul, restoration and modification of equipment; GB3836.15-2000 Electrical equipment for explosive gas environments Part 15: Electrical installation in hazardous locations (except coal mines); GB3836.16-2006 Electrical equipment for explosive gas environments Part 16: Inspection and maintenance of electrical devices (except coal mines); GB50257-2014 Electrical equipment installation engineering Explosion and fire hazardous environment electrical equipment construction and acceptance specifications.

[0070] The present invention provides an LNG loading control system with lightning protection and anti-static monitoring functions, which can monitor the induced lightning current of the LNG loading skid, the static electricity charge of the workers before loading and unloading operations, and the impedance of the grid where the loading skid is located. When a monitoring value exceeds the respective preset threshold value, the loading and unloading pipeline is automatically closed to prevent the static electricity discharge caused by lightning from igniting methane that may exist in the working environment.

[0071] Figure 2 A flowchart of the steps of an LNG loading control method with a lightning static electricity monitoring function according to an embodiment of the present invention is shown.

[0072] like Figure 2 As shown, in step S201, the pipeline between the tank car 14 and the loading skid 3 is opened or closed by the switch device installed between the ball valve at the tank car end and the ball valve at the tail end of the loading and unloading arm of the loading skid, so as to start and stop the liquefied hydrocarbon loading operation. Specifically, the switch device includes a liquid phase arm cut-off valve 8 and a gas phase recovery arm cut-off valve 9. The liquid phase arm cut-off valve 8 is installed between the liquid phase arm side ball valve 5 at the tail end of the liquid phase arm of the loading skid 3 and the lower liquid inlet ball valve 11 of the liquefied hydrocarbon inlet of the tank car, and is used to open or cut off the pipeline between the liquid phase arm of the loading skid and the liquefied hydrocarbon inlet of the tank car. The gas phase recovery arm cut-off valve 9 is installed between the gas recovery arm side ball valve 6 at the tail end of the gas recovery arm of the loading skid 3 and the gas outlet valve 13 of the gasified hydrocarbon outlet of the tank car, and is used to open or cut off the pipeline between the gas recovery arm of the loading skid and the gasified hydrocarbon outlet of the tank car.

[0073] like Figure 2As shown, in step S202, the lightning induced current of the loading skid 3, the human body electrostatic charge carried by the loading workers, and the ground grid resistance value of the loading skid 3 connected to the ground grid are monitored by the monitoring device. Specifically, the monitoring device includes a lightning current monitor 2, a human body electrostatic monitor 7, and a ground grid resistance monitor 1. The lightning current monitor 2 is installed on the loading skid 3, and is used to monitor the lightning induced current flowing through the loading skid 3 when the loading shed where the loading skid 3 is located is struck by lightning, wherein the lightning current monitor 2 uses a Rogowski coil lightning current sensor. The human body electrostatic monitor 7 is used to monitor the human body electrostatic charge carried by the loading workers before the liquefied hydrocarbon loading operation, wherein the human body electrostatic monitor 7 uses a contact electrostatic sensor. The ground grid resistance monitor 1 is used to monitor the ground grid resistance value of the ground grid connected to the loading skid 3, wherein the ground grid resistance monitor 1 uses a resistance sensor, and the monitoring frequency is once a day.

[0074] like Figure 2 As shown, in step S203, when any one of the lightning induced current, the electrostatic charge of the human body, and the ground grid resistance value exceeds the preset threshold value, the switch device is controlled by the control device 4 to close the pipeline between the tank car 14 and the loading skid 3. Specifically, the control device 4 is connected to the ground grid resistance monitor 1, the lightning current monitor 2, and the human body static electricity monitor 7 through the shielded cables 401-403 with insulating sheaths, respectively, to receive the lightning induced current, the electrostatic charge of the human body, and the ground grid resistance value. When any one of the lightning induced current, the electrostatic charge of the human body, and the ground grid resistance value exceeds the preset threshold value, the control device 4 sends out an alarm signal to remind the operator that there is danger at this time, and sends out a closing command to close the liquid phase arm cut-off valve 8 and the gas phase recovery arm cut-off valve 9 to close the pipeline between the tank car 14 and the loading skid 3.

[0075] The present invention creatively monitors the lightning induced current of the loading skid 3 before or during the liquefied hydrocarbon loading operation, the resistance value of the grid where the loading skid 3 is located, and the body charge of personnel before the LNG loading and unloading operation through a monitoring device, and when the data exceeds a preset threshold, controls the switch device to cut off the pipeline between the tank truck 14 and the loading skid 3, thereby preventing the liquid hydrocarbon loading operation from causing an explosion accident due to spark discharge, and ensuring the safety of on-site personnel and equipment.

[0076] Figure 3 A flowchart of the steps of an LNG loading control method with a lightning static electricity monitoring function according to another embodiment of the present invention is shown.

[0077] like Figure 3As shown, in step a, it is determined whether the lightning induced current of the loading skid 3 exceeds the preset threshold value. If the determination result is no, the process proceeds to step b, and if the determination result is yes, the process proceeds to step e. Specifically, when the loading shed where the loading skid 3 is located is struck by lightning, the lightning induced current flowing through the loading skid 3 is monitored by the lightning current monitor 2, and the lightning induced current is transmitted to the control device 4 through the shielded cable 402 with an insulating sheath, and the control device 4 determines whether the lightning induced current of the loading skid 3 exceeds the preset threshold value.

[0078] like Figure 3 As shown, in step b, it is determined whether the electrostatic charge of the human body carried by the loading operator before the liquefied hydrocarbon loading operation exceeds the preset threshold value. If the determination result is no, the process proceeds to step c, and if the determination result is yes, the process proceeds to step e. Specifically, the electrostatic charge of the human body carried by the loading operator before the liquefied hydrocarbon loading operation is monitored by the human body electrostatic monitor 7, and the electrostatic charge of the human body is transmitted to the control device 4 through the shielded cable 403 with an insulating sheath. The control device 4 determines whether the electrostatic charge of the human body carried by the loading operator before the liquefied hydrocarbon loading operation exceeds the preset threshold value.

[0079] like Figure 3 As shown, in step c, it is determined whether the ground grid resistance value of the ground grid connected to the loading skid 3 exceeds the preset threshold value. If the determination result is no, the process proceeds to step d, and if the determination result is yes, the process proceeds to step e. Specifically, the ground grid resistance value of the ground grid connected to the loading skid 3 is monitored by the ground grid resistance monitor 1, and the ground grid resistance value is transmitted to the control device 4 through the shielded cable 401 with an insulating sheath. The control device 4 determines whether the ground grid resistance value of the ground grid connected to the loading skid 3 exceeds the preset threshold value.

[0080] like Figure 3 As shown, in step d, the switch device is turned on, and the loading operator can carry out the liquefied hydrocarbon loading operation. Specifically, if any of the lightning induced current, the electrostatic charge of the human body, and the ground grid resistance value does not exceed the preset threshold value, the control device 4 issues an opening command to open the liquid phase arm cut-off valve 8 and the gas phase recovery arm cut-off valve 9, and conduct the pipeline between the tank truck 14 and the loading skid 3, and the operator can carry out the LNG loading operation.

[0081] like Figure 3 As shown, in step e, an alarm is issued, and a closing command is issued to close the switch device, cut off the pipeline between the tank truck 14 and the loading skid 3, and the loading operator cannot perform liquefied hydrocarbon loading operations. Specifically, if any one of the lightning induced current, the static electricity charge of the human body, and the ground grid resistance value exceeds the preset threshold, the control device 4 issues an alarm and generates a closing command after a preset time to close the liquid phase arm cut-off valve 8 and the gas recovery arm cut-off valve 9, close the pipeline between the tank truck 14 and the loading skid 3, and the operator cannot perform LNG loading operations.

[0082] The present invention creatively monitors the lightning induced current of the loading skid 3 before or during the liquefied hydrocarbon loading operation, the resistance value of the grid where the loading skid 3 is located, and the body charge of personnel before the LNG loading and unloading operation through a monitoring device, and when the data exceeds a preset threshold, controls the switch device to cut off the pipeline between the tank truck 14 and the loading skid 3, thereby preventing the liquid hydrocarbon loading operation from causing an explosion accident due to spark discharge, and ensuring the safety of on-site personnel and equipment.

[0083] The LNG loading control system with a lightning static electricity monitoring function provided by the present invention can also be used in conjunction with a computer-readable storage medium, on which a computer program is stored, and the computer program is executed to run an LNG loading control method with a lightning static electricity monitoring function. The computer program can run computer instructions, and the computer instructions include computer program codes, which can be in source code form, object code form, executable file or some intermediate form, etc.

[0084] Computer-readable storage media may include: any entity or device that can carry computer program code, recording media, USB flash drives, mobile hard disks, magnetic disks, optical disks, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signals, telecommunication signals, and software distribution media, etc.

[0085] It should be noted that the content contained in computer-readable storage media can be appropriately increased or decreased based on the requirements of legislation and patent practices in the jurisdiction. For example, in some jurisdictions, based on legislation and patent practices, computer-readable storage media do not include electrical carrier signals and telecommunications signals.

[0086] Figure 4 A flowchart of the steps of a method for monitoring and controlling the lightning induced current, ground grid resistance, and human body electrostatic charge of a loading skid in a liquefied hydrocarbon loading area according to an embodiment of the present invention is shown.

[0087] The LNG loading control system with a lightning static monitoring function composed of a liquid phase arm shut-off valve 8, a gas recovery arm shut-off valve 9, a lightning current monitor 2, a ground grid resistance monitor 1, a human body static monitoring device 7, and a control device 4 is used as an example to explain the LNG loading control process with a lightning static monitoring function for a liquefied hydrocarbon loading area provided by the present invention. Figure 4 shown.

[0088] like Figure 4As shown, the lightning induced current of the loading skid 3, the ground grid resistance value of the loading skid 3, and the human body static electricity charge of the operator before the LNG loading and unloading operation are respectively monitored in real time by the lightning current monitor 2, the ground grid resistance value monitor 1, and the human body static electricity monitor 7, and the data of the lightning induced current, the ground grid resistance value, and the human body charge are sent to the control device 4 in real time. If the lightning induced current is detected to be lower than or equal to the preset current value (preset threshold), the control device 4 does not act to keep the liquid phase arm cut-off valve 8 and the gas recovery arm cut-off valve 9 open, and continue the liquefied hydrocarbon loading operation. If the lightning induced current is detected to be greater than the preset current value, the control device 4 immediately controls the liquid phase arm cut-off valve 8 and the gas recovery arm cut-off valve 9 to disconnect, so as to disconnect the liquid phase arm and gas recovery arm pipelines between the tank car 14 and the loading skid 3, so as to stop the liquefied hydrocarbon loading operation. At the same time, the control device 4 turns on the sound and light alarm to remind the operator that the liquid hydrocarbon loading operation is not allowed to continue. The above-mentioned lightning monitoring process can prevent the potential difference between the tank truck and the loading skid from causing spark discharge and igniting volatile liquefied hydrocarbons when lightning strikes, thereby ensuring the safety of the loading operation.

[0089] like Figure 4 As shown, the lightning induced current of the loading skid 3, the ground grid resistance value of the loading skid 3, and the human body electrostatic charge of the operator before the LNG loading and unloading operation are respectively monitored in real time by the lightning current monitor 2, the ground grid resistance value monitor 1, and the human body electrostatic charge monitor 7, and the data of the lightning induced current, the ground grid resistance value, and the human body charge are sent to the control device 4 in real time. If the ground grid resistance value is monitored to be lower than or equal to the preset resistance value (preset threshold), the control device 4 does not act to keep the liquid phase arm cut-off valve 8 and the gas recovery arm cut-off valve 9 open, and continue the liquefied hydrocarbon loading operation. If the ground grid resistance value is monitored to be greater than the preset resistance value, the control device 4 immediately controls the liquid phase arm cut-off valve 8 and the gas recovery arm cut-off valve 9 to disconnect, so as to disconnect the liquid phase arm and gas recovery arm pipelines between the tank car 14 and the loading skid 3, so as to stop the liquefied hydrocarbon loading operation. At the same time, the control device 4 turns on the sound and light alarm to remind the operator that the liquid hydrocarbon loading operation is not allowed to continue. The above-mentioned ground grid resistance value monitoring process can ensure the safety of the loading operation.

[0090] like Figure 4As shown, the lightning induced current of the loading skid 3, the ground grid resistance value of the loading skid 3, and the electrostatic charge of the human body of the operator before the LNG loading and unloading operation are respectively monitored in real time by the lightning current monitor 2, the ground grid resistance value monitor 1, and the human body electrostatic charge of the operator before the LNG loading and unloading operation, and the data of the lightning induced current, the ground grid resistance value, and the human body charge are sent to the control device 4 in real time. If it is monitored that the electrostatic charge of the human body is lower than or equal to the preset charge value (preset threshold), the control device 4 does not act to keep the liquid phase arm cut-off valve 8 and the gas recovery arm cut-off valve 9 open, and continue the liquefied hydrocarbon loading operation. If it is monitored that the electrostatic charge of the human body is greater than the preset charge value, the control device 4 immediately controls the liquid phase arm cut-off valve 8 and the gas recovery arm cut-off valve 9 to disconnect, so as to disconnect the liquid phase arm and gas recovery arm pipelines between the tank car 14 and the loading skid 3, so as to stop the liquefied hydrocarbon loading operation. At the same time, the control device 4 turns on the sound and light alarm to remind the operator that the liquid hydrocarbon loading operation is not allowed to continue. The above-mentioned ground grid resistance value monitoring process can ensure the safety of the operator.

[0091] The present invention creatively monitors the lightning induced current of the loading skid 3 before or during the liquefied hydrocarbon loading operation, the resistance value of the grid where the loading skid 3 is located, and the body charge of personnel before the LNG loading and unloading operation through a monitoring device, and when the data exceeds a preset threshold, controls the switch device to cut off the pipeline between the tank truck 14 and the loading skid 3, thereby preventing the liquid hydrocarbon loading operation from causing an explosion accident due to spark discharge, and ensuring the safety of on-site personnel and equipment.

[0092] The specific details and benefits of the LNG loading control method with lightning static electricity monitoring function for the liquefied hydrocarbon loading area provided by the present invention can be found in the above description of the LNG loading control system with lightning static electricity monitoring function for the liquefied hydrocarbon loading area, which will not be repeated here.

[0093] In summary, the present invention provides an LNG loading control system with a lightning static electricity monitoring function. Compared with the prior art, the present invention has the following advantages: the present invention can monitor the lightning induced current of the loading skid, the static electricity charge of the workers before loading and unloading operations, and the ground grid resistance value of the loading skid. When a certain monitoring value exceeds a preset threshold, the loading and unloading pipeline is automatically closed to prevent the methane that may exist in the working environment from being ignited by lightning static electricity discharge, which can effectively prevent explosion accidents caused by liquefied hydrocarbon leakage and can be widely used in the field of LNG loading and unloading.

[0094] It should be understood that the embodiments disclosed in the present invention are not limited to the specific structures, processing steps or materials disclosed herein, but should be extended to equivalent substitutions of these features understood by ordinary technicians in the relevant field. It should also be understood that the terms used herein are only used for the purpose of describing specific embodiments and are not meant to be limiting.

[0095] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two; the orientations or positional relationships indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0096] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0097] Certain terms are used throughout this application document to indicate specific system components. As those skilled in the art will recognize, different names can usually be used to indicate the same components, so this application document is not intended to distinguish those components that are only different in name but not in function. In this application document, the terms "comprise", "include" and "have" are used in an open form, and therefore should be interpreted as meaning "including but not limited to...". In addition, the terms "substantially", "substantially" or "approximately" that may be used in this article relate to the tolerances of the corresponding terms accepted by the industry. The term "coupling" as may be used in this article includes direct coupling and indirect coupling via other components, elements, circuits, or modules, wherein for indirect coupling, the components, elements, circuits, or modules between them do not change the information of the signal but can adjust its current level, voltage level, and / or power level. Inferred coupling (for example, one of the elements is coupled to another element by inference) includes direct and indirect coupling between two elements in the same way as "coupling".

[0098] The "one embodiment" or "embodiment" mentioned in the specification means that the specific features, structures or characteristics described in conjunction with the embodiment are included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment" or "embodiment" appearing in various places throughout the specification do not necessarily refer to the same embodiment.

[0099] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

[0100] Although the embodiments disclosed in the present invention are as above, the contents described are only embodiments adopted for facilitating the understanding of the present invention and are not intended to limit the present invention. Any technician in the technical field to which the present invention belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present invention, but the patent protection scope of the present invention shall still be subject to the scope defined in the attached claims.

Claims

1. An LNG loading control system with lightning static monitoring function, It is characterized in that The system comprises: A switch device, which is installed between the ball valve at the tank truck end and the ball valve at the tail end of the loading arm of the loading skid, is used to open or close the pipeline between the tank truck and the loading skid to start and stop the liquefied hydrocarbon loading operation; A monitoring device is used to monitor the lightning induced current of the loading skid, the static electricity of the loading workers, and the grounding resistance value of the loading skid connected to the grounding grid; The control device is used to control the switch device to close the pipeline between the tank truck and the loading skid when any one of the lightning induced current, the human body static charge, and the ground grid resistance value exceeds a preset threshold.

2. The LNG loading control system with lightning static monitoring function as claimed in claim 1, It is characterized in that The switch device comprises: The liquid phase arm shut-off valve is installed between the liquid phase arm side ball valve at the tail end of the loading skid liquid phase arm and the lower liquid inlet ball valve of the tank truck liquefied hydrocarbon inlet, and is used to open or cut off the pipeline between the loading skid liquid phase arm and the tank truck liquefied hydrocarbon inlet.

3. An LNG loading control system with a lightning static monitoring function as claimed in claim 1 or 2, It is characterized in that The switch device comprises: The gas recovery arm shut-off valve is installed between the gas recovery arm side ball valve at the tail end of the gas recovery arm of the loading skid and the gas outlet valve of the tank truck gasified hydrocarbon outlet, and is used to open or cut off the pipeline between the gas recovery arm of the loading skid and the gasified hydrocarbon outlet of the tank truck.

4. An LNG loading control system with a lightning static monitoring function as claimed in any one of claims 1 to 3, It is characterized in that The monitoring device comprises: A lightning current monitor is installed on a loading skid and is used to monitor the lightning induced current flowing through the loading skid when the loading shed where the loading skid is located is struck by lightning. The lightning current monitor uses a Rogowski coil lightning current sensor.

5. An LNG loading control system with a lightning static monitoring function as claimed in any one of claims 1 to 4, It is characterized in that The monitoring device comprises: A human body static electricity monitor is used to monitor the static electricity charge on the human body of the loading operator before the liquefied hydrocarbon loading operation, wherein the human body static electricity monitor adopts a contact type static electricity sensor.

6. An LNG loading control system with a lightning static monitoring function as claimed in any one of claims 1 to 5, It is characterized in that The monitoring device comprises: The ground grid resistance monitor is used to monitor the ground grid resistance value of the ground grid connected to the loading skid, wherein the ground grid resistance monitor adopts a resistance sensor and the monitoring frequency is once a day.

7. An LNG loading control system with a lightning static electricity monitoring function as claimed in any one of claims 1 to 6, It is characterized in that The control device is connected to the switch device and the monitoring device via a shielded cable with an insulating sheath.

8. An LNG loading control system with a lightning static electricity monitoring function as claimed in any one of claims 1 to 7, It is characterized in that The control device comprises: The setting module supports respectively setting preset thresholds of the lightning induced current, the human body static electricity charge, and the ground grid resistance value.

9. An LNG loading control system with a lightning static electricity monitoring function as claimed in any one of claims 1 to 8, It is characterized in that The control device comprises: The alarm module is used to generate an alarm prompt when any one of the lightning induced current, the human body static charge, and the ground grid resistance value exceeds the preset threshold.

10. An LNG loading control system with a lightning static electricity monitoring function according to any one of claims 1 to 9, It is characterized in that The control device comprises: The instruction module is used to generate a closing instruction to close the switch device and cut off the pipeline between the tank truck and the loading skid when any one of the lightning induced current, the human body static charge, and the ground grid resistance value exceeds the preset threshold.

11. A LNG loading control method with lightning static monitoring function, It is characterized in that Executed by the system according to any one of claims 1 to 10, the method comprises the following steps: The pipeline between the tank truck and the loading skid is opened or closed by the switch device installed between the ball valve at the end of the tank truck and the ball valve at the tail end of the loading arm of the loading skid to start or stop the liquefied hydrocarbon loading operation; The monitoring device is used to monitor the lightning induced current of the loading skid, the static electricity of the human body carried by the loading operator, and the grounding resistance value of the grounding grid connecting the loading skid; When any one of the lightning induced current, the electrostatic charge of the human body, and the ground grid resistance value exceeds a preset threshold, the control device controls the switch device to close the pipeline between the tank truck and the loading skid.

12. A LNG loading control method with lightning static monitoring function as claimed in claim 11, It is characterized in that The method comprises the following steps: Step a, judging whether the lightning induced current of the loading skid exceeds a preset threshold value, if the judgment result is no, proceeding to step b, if the judgment result is yes, proceeding to step e; Step b, judging whether the electrostatic charge of the human body carried by the loading operator before the liquefied hydrocarbon loading operation exceeds a preset threshold value, if the judgment result is no, proceeding to step c, if the judgment result is yes, proceeding to step e; Step c, judging whether the ground network resistance value of the ground network connected by the loading skid exceeds a preset threshold value, if the judgment result is no, proceeding to step d, if the judgment result is yes, proceeding to step e; Step d, turning on the switch device, so that the loading operator can carry out the liquefied hydrocarbon loading operation; Step e: issuing an alarm and a closing command to close the switch device, cut off the pipeline between the tank truck and the loading skid, and the loading operator cannot carry out the liquefied hydrocarbon loading operation.

13. A storage medium, It is characterized in that It contains a series of instructions for executing the method steps as claimed in any one of claims 11-12.

Citation Information

Patent Citations

  • Lightning protection environment online monitoring alarm network system

    CN104134320A

  • Intelligent safety electric instrument linkage management and control system of gas station and application method thereof

    CN110658764A

  • Electrostatic monitoring system and electrostatic monitoring method for liquefied hydrocarbon vehicle-loading area

    CN111156410A

  • Access control system for personnel safety in chemical explosion-related sites

    CN113041493A

  • Interlocking control system of intelligent loading and unloading vehicle for hazardous chemical substances

    CN115231506A