Data processing method and device, electronic equipment and storage medium
By introducing multi-authority object task generation, data processing and result reporting modules into the data management system, the problems of convenience and low efficiency of traditional data processing methods are solved, and efficient processing of employee data management is achieved.
Patent Information
- Application Number
- CN202410999293.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-10-15
AI Technical Summary
Traditional data processing methods are less convenient and less efficient, especially when managing large amounts of employee data, it is difficult to efficiently select and manage employee data.
By introducing multi-authority objects, task generation, data processing and result reporting modules into the data management system, the generation of target tasks, data query and real-time updates are realized, and the convenience and efficiency of data processing between multi-authority objects are improved.
It improves the efficiency and convenience of employee data management, realizes efficient data processing between multi-authority objects, and avoids the tediousness and inefficiency of manual operations in traditional methods.
Smart Images

Figure CN118779332A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer application technology, and in particular to a data processing method, device, electronic equipment and storage medium. Background Art
[0002] With the continuous development of social economy, various types of enterprises are also growing, the number of employees in enterprises is also increasing, and the work content of employees is becoming more multidimensional. Therefore, it is becoming more and more difficult to manage the work data of employees within the enterprise. For example, how to select employees who can work on new projects from a large number of employee data centers is a difficult task.
[0003] Traditionally, a large amount of employee data is usually recorded in Excel spreadsheets, and operations such as adding, deleting, modifying and checking are manually performed based on the Excel spreadsheets to achieve centralized management of employee data. For example, the data in the Excel spreadsheets is manually analyzed, and employees who can work on new projects are selected, and then the selected employee data is manually added to the new Excel spreadsheet to obtain the processing results of the work task. Obviously, the traditional data processing method is less convenient and less efficient. Summary of the invention
[0004] The present invention provides a data processing method, device, electronic device and storage medium to solve the problems of poor convenience and low efficiency of traditional data processing methods.
[0005] According to one aspect of the present invention, a data processing method is provided, wherein the method comprises:
[0006] In response to the task generation operation of the first rights object, a target task is generated, and the target task is sent to the second rights object so that the second rights object determines the target task;
[0007] In response to the data processing operation of the second permission object, determining a data processing result, wherein the data processing operation includes querying a target database for target data required for the target task, and the data in the target database is updated in real time based on the data update operation of the third permission object;
[0008] In response to the result reporting operation of the second permission object on the data processing result, the data processing result is sent to the first permission object, so that the first permission object determines the data processing result corresponding to the target task.
[0009] According to another aspect of the present invention, there is provided a data processing device, wherein the device comprises:
[0010] a task generation module, configured to generate a target task in response to a task generation operation of the first permission object, and send the target task to the second permission object so that the second permission object determines the target task;
[0011] a data processing module, configured to determine a data processing result in response to a data processing operation of the second permission object, wherein the data processing operation includes querying a target database for target data required for the target task, and the data in the target database is updated in real time based on a data update operation of the third permission object;
[0012] The result reporting module is configured to send the data processing result to the first permission object in response to the result reporting operation of the second permission object on the data processing result, so that the first permission object determines the data processing result corresponding to the target task.
[0013] According to another aspect of the present invention, there is provided an electronic device, the electronic device comprising:
[0014] at least one processor; and
[0015] a memory communicatively connected to the at least one processor; wherein,
[0016] The memory stores a computer program that can be executed by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can perform the data processing method described in any embodiment of the present invention.
[0017] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the data processing method described in any embodiment of the present invention when executed.
[0018] The technical solution of the embodiment of the present invention generates a target task in response to a task generation operation of a first permission object, and sends the target task to a second permission object so that the second permission object determines the target task; determines a data processing result in response to a data processing operation of the second permission object, wherein the data processing operation includes querying a target database for target data required for the target task, and the data in the target database is updated in real time based on a data update operation of a third permission object; sends the data processing result to the first permission object in response to a result reporting operation of the second permission object for the data processing result, so that the first permission object determines the data processing result corresponding to the target task. The present invention improves the convenience and efficiency of data processing between multiple permission objects based on the developed data management system.
[0019] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0021] Figure 1 is a flow chart of a data processing method provided according to Embodiment 1 of the present invention;
[0022] Figure 2 is a flow chart of a data processing method provided according to Embodiment 2 of the present invention;
[0023] Figure 3 An overall system architecture diagram of data processing provided by an embodiment of the present invention;
[0024] Figure 4 is a structural schematic diagram of a data processing device provided according to Embodiment 3 of the present invention;
[0025] Figure 5 It is a structural schematic diagram of an electronic device for implementing the data processing method of an embodiment of the present invention. DETAILED DESCRIPTION
[0026] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0027] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0028] The present invention relates to a data management system for managing a large amount of object data. The database management system can implement the data processing method of the present invention. Among them, the data management system of the present invention can set a variety of permission accounts. The permissions of each permission account are different, and the operations that can be performed on the system are also different. The system function module of the data management system of the present invention can be configured in the operating system of devices such as servers, desktop computers and laptops, for example, Windows devices. The data management system of the present invention has a built-in complete permission architecture, including: a series of system conventional modules such as menus, roles, users, dictionaries, parameters, monitoring and code generation, and at the same time, provides multi-terminal adaptation, for example, all mainstream devices such as computers, tablets and mobile phones, and provides a variety of different styles of skins.
[0029] Embodiment 1
[0030] Figure 1 A flowchart of a data processing method is provided for the first embodiment of the present invention. This embodiment is applicable to the case where data processing is performed based on a data management system. The method can be executed by a data processing device. The data processing device can be implemented in the form of hardware and / or software. The data processing device can be configured in a computer. Figure 1 As shown, the method includes:
[0031] S110: In response to the task generation operation of the first rights object, generate a target task, and send the target task to the second rights object, so that the second rights object determines the target task.
[0032] In the embodiment of the present invention, four permission objects are included, and the permission objects can be understood as objects for logging into different permission accounts. In the embodiment of the present invention, the operation interfaces displayed for different permission objects can be different, and the operations that different permission objects can perform on the data management system can also be different.
[0033] Among them, the first permission object is a permission object for logging into the data management system. The first permission object can perform the task generation operation in the data management system. The task generation operation can be understood as an operation for setting a task. In an embodiment of the present invention, the task generation operation can be preset according to scenario requirements and is not specifically limited here. Optionally, the task generation operation can be a selection operation for a displayed task selection item, or a task input operation for a displayed task input box.
[0034] The target task can be understood as the task set by the task generation operation. In an embodiment of the present invention, the target task can be a task set by the first permission object for other permission objects. Other permission objects include at least one of the second permission object, the third permission object, and the fourth permission object. For example, a task of querying the object data required for the target project is set for the second permission object; a task of maintaining the object data operation data is set for the third permission object; a task of reviewing the object data operation data is set for the fourth permission object, etc.
[0035] The second permission object can be understood as a permission object for logging into the data management system. The second permission object can execute the data processing operation in the data management system. The data processing operation can be related to the target task.
[0036] For example, the target task is to search for 10 target objects that are assigned to a computer project and require that the target objects' performance is greater than 50. Accordingly, the data processing operation may be an operation of searching for the target objects.
[0037] Alternatively, the target task is sent to the second permission object, and is to find 5 target objects that operate a certain mechanical project, or belong to the second operation department; correspondingly, the data processing operation may be an operation of finding the above target object;
[0038] Alternatively, the target task is to send to a plurality of the third permission objects, and add a work year plan. Correspondingly, the data update operation may be to add the above-mentioned work year plan, etc.
[0039] S120. Determine a data processing result in response to a data processing operation of the second permission object, wherein the data processing operation includes querying a target database for target data required for the target task, and the data in the target database is updated in real time based on a data update operation of a third permission object.
[0040] The data processing operation can be understood as an operation for processing data. In an embodiment of the present invention, the data processing operation can be preset according to the scene requirements and is not specifically limited here. Optionally, the data processing operation can be an operation for adding, deleting, modifying, and querying data.
[0041] The data processing result may be understood as a result determined based on the data processing operation.
[0042] The target database can be understood as a database of a data management system.
[0043] The target data may be understood as the data obtained by the query. Optionally, the target data includes a plurality of target objects that meet the conditions and object data corresponding to each of the target objects.
[0044] The third permission object can be understood as a permission object for logging into the data management system. The third permission object can perform the data update operation in the data management system.
[0045] The data updating operation may be understood as an operation of updating data.
[0046] Optionally, determining a data processing result in response to the data processing operation of the second rights object includes:
[0047] In response to an input operation of the second permission object on at least one displayed target condition item, determining at least one target query condition, wherein the target condition item includes at least one of a category condition item, a score condition item, a department condition item, a position condition item, and a performance condition item;
[0048] In response to a query trigger operation, determining and displaying the target data in the target database that meets the target query condition;
[0049] In response to the sort selection operation, a target sorting mode is determined, and the target data is displayed based on the target sorting mode.
[0050] Among them, the target condition item can be understood as a condition item displayed on the operation interface. Optionally, the target condition item may include at least one of a category condition item, a score condition item, a department condition item, a position condition item, and a performance condition item. Among them, the category condition item can be used to input the condition of the job category, for example, the machinery category, then specifically, query the target data of the machinery category. The score condition item can be used to input the condition of the job score, for example, the score threshold, then specifically, query the target data of the job score exceeding the score threshold, etc.
[0051] The input operation can be understood as an operation of inputting conditions. In the embodiment of the present invention, the input operation can be a selection operation for a preset option, or an operation for inputting conditions in a text box.
[0052] The target query condition can be understood as all conditions determined based on the input operation. In the embodiment of the present invention, the target query condition can be empty, one or more.
[0053] The query trigger operation can be understood as a starting operation for performing a data query based on the target query condition, for example, triggering a query button.
[0054] The sorting selection operation can be understood as an operation of selecting a sorting method for data. Optionally, the sorting selection operation may include an operation of selecting a sorting basis object and an operation of selecting a sorting method, wherein the sorting basis object may include category, points, department, position or performance; and the sorting method may include ascending or descending order.
[0055] The target sorting method may be determined based on the selected sorting basis object and sorting method.
[0056] Specifically, a target sorting method is determined, and the target data is displayed on an operation interface of the second permission object based on the target sorting method.
[0057] S130: In response to the result reporting operation of the second permission object on the data processing result, send the data processing result to the first permission object, so that the first permission object determines the data processing result corresponding to the target task.
[0058] The result reporting operation may be understood as an operation of reporting the data processing result to the first permission object.
[0059] Optionally, the result reporting operation includes a format selection operation and a reporting triggering operation, and the sending of the data processing result to the first permission object includes:
[0060] determining a target format in response to a format selection operation, wherein the target format includes a bar graph and / or a data table;
[0061] In response to a reporting trigger operation, the data processing result is sent to the first rights object in the target format.
[0062] The format selection operation can be understood as an operation of selecting a reporting format for data. The format selection operation can be an operation of selecting a preset format option, or an operation of inputting a reporting format into a text box.
[0063] The target format can be understood as a reporting format of a target selected based on the formula. Optionally, the target format can include a bar graph and / or a data table.
[0064] The reporting trigger operation can be understood as a trigger operation for reporting the data processing result, for example, triggering a reporting button.
[0065] Specifically, the data processing result is sent to the first permission object in the target format, and the data processing result is displayed on the operation interface of the first permission object in the target format.
[0066] The technical solution of the embodiment of the present invention generates a target task in response to a task generation operation of a first permission object, and sends the target task to a second permission object so that the second permission object determines the target task; determines a data processing result in response to a data processing operation of the second permission object, wherein the data processing operation includes querying a target database for target data required for the target task, and the data in the target database is updated in real time based on a data update operation of a third permission object; sends the data processing result to the first permission object in response to a result reporting operation of the second permission object for the data processing result, so that the first permission object determines the data processing result corresponding to the target task. The present invention improves the convenience and efficiency of data processing between multiple permission objects based on the developed data management system.
[0067] Embodiment 2
[0068] Figure 2 This is a flow chart of a data processing method provided in Embodiment 2 of the present invention. This embodiment adds the data processing result determined in response to the data processing operation of the second permission object described in the above embodiment. Figure 2 As shown, the method includes:
[0069] S210: In response to the data update operations of the plurality of third rights objects, update the data in the target database in real time.
[0070] Optionally, the target database includes multiple storage objects and job data corresponding to each storage object, and each of the third permission objects is used to update the job data of one storage object in real time.
[0071] The storage object may be understood as an object stored in the target database. The operation data may be understood as the operation record of the storage object. Optionally, the operation data includes at least one of the operation category, operation points, operation department, operation position and operation performance.
[0072] For example, the storage object may be an employee, and correspondingly, the job data may include employee basic information and work records; the job category may be the category of the employee's major, and exemplarily, the job category may be computer, mechanical, or electrical, etc.
[0073] Optionally, updating the data in the target database in real time includes:
[0074] determining target update data, and sending the target update data to a fourth rights object, so that the fourth rights object determines whether the target update data meets a data update condition;
[0075] If so, the data in the target database is updated in real time based on the target update data.
[0076] The target update data may be understood as the operation data updated by the data update operation. The target update data may be one or more items, which are not specifically limited here.
[0077] The fourth permission object can be understood as a permission object for logging into the data management system. The fourth permission can be used to perform data review operations in the data management system. The data review operation can be understood as an operation to determine whether the target update data meets the data update conditions. The data update conditions can be determined subjectively by the fourth permission object and are not specifically limited here.
[0078] In the embodiment of the present invention, a fourth permission object can audit data of a target data category.
[0079] Optionally, before the data update operation in response to the plurality of third rights objects, the method further includes:
[0080] In response to the data entry operation of the second permission object, target entry data is determined, wherein the target entry data includes an entry object and operation data of the entry object, and the operation data includes at least one of an operation category, an operation score, an operation department, an operation position, and an operation performance;
[0081] The target entry data is stored in the target database, an object link of the target entry data is generated, and the object link is displayed under the target directory.
[0082] The data entry operation is an operation for entering data. Specifically, the data entry button is triggered to display the data entry template, and the entry object and the corresponding operation category, operation points, operation department, operation position and operation performance, etc. are input into the data entry template. The data entry template may include necessary entry items and / or non-necessary entry items.
[0083] The target input data may be understood as the data input by the data input operation.
[0084] The object link can be understood as a link of query object data. In the embodiment of the present invention, a corresponding object link can be generated based on an entry object and the operation data of the entry object.
[0085] Specifically, after saving multiple target input data; for the first permission object, the second permission object, the third permission object and the fourth permission object; in the operation interface, the job data of the object corresponding to the object link can be directly viewed based on the object link, wherein the job data of an object can be queried through an object link.
[0086] The target directory may be understood as a directory for classifying and displaying the object links.
[0087] Optionally, displaying the object link in the target directory includes:
[0088] Extracting key data from the target input data, and determining a target data category of the target input data based on the key data;
[0089] The object link is displayed under a subdirectory corresponding to the target data category, wherein the target directory includes a plurality of subdirectories, and one subdirectory is used to store the target input data of one target data category.
[0090] The key data may be understood as data used to classify the data category of the target input data. Optionally, the key data may be the job category in the target input data, or other job data except the job category.
[0091] The target data category can be understood as the category of the target input data. Exemplarily, the target data category can include computer category, mechanical category, or electrical category.
[0092] S220: Generate a target task in response to the task generation operation of the first rights object, and send the target task to the second rights object so that the second rights object determines the target task.
[0093] S230: Determine a data processing result in response to the data processing operation of the second rights object.
[0094] S240: In response to the result reporting operation of the second permission object on the data processing result, send the data processing result to the first permission object, so that the first permission object determines the data processing result corresponding to the target task.
[0095] The technical solution of the embodiment of the present invention is to update the data in the target database in real time by responding to the data update operation of multiple third permission objects; wherein the target database includes multiple storage objects and the operation data corresponding to each storage object, and each third permission object is used to update the operation data of one storage object in real time. The present invention can realize the real-time update of a single piece of data based on each third permission object, avoiding the drawback of the large workload of traditional data management and update through one or a few objects, and improving the convenience of data update and management.
[0096] Figure 3 The overall system architecture diagram of a data processing provided by an embodiment of the present invention is shown in FIG. Figure 3 As shown, the overall system architecture of the data processing can achieve the following functions:
[0097] 1. Data entry function: The basic information of various personnel is collected by default to build an employee information database.
[0098] The work data of each employee will be classified according to the categories learned, and employees of each professional category will be centrally managed to achieve independent management functions for each type of employee. For example, for mechanical employees, functions such as input, modification, deletion and display of employee information are open; for electrical employees, functions such as sorting, threshold query and performance entry are open.
[0099] For employee information entry, a location for key information is reserved in the database. This location is set in the form of key-value, where key is the type of key information, such as system number id, user number user_id, user authority number role_id, personnel name username, etc., and value is a wildcard. Key information can be necessary entry information. Through the login page, log in to the permission account to achieve different permissions. For some templates, add interfaces, some interfaces can call local services of the operating system, and some interfaces can call network services.
[0100] 2. Rights management function. The data management system provides functions such as user management, rights management, and system management for the second rights object. The second rights object may be a system administrator.
[0101] 3. Log management function. It records the log information of each user logging into the system, operating function modules, and exiting the system. It is mainly used to analyze and monitor the system operation status, monitor the system data operation history, etc.
[0102] 4. Classification management of employee information. Independent management is performed for each employee of each major. The corresponding points, performance, projects, positions, classifications and other work data can be added, deleted, modified and checked.
[0103] 5. Data display function. Enter the target query conditions for the preset condition items, and the system will automatically extract and display the list of related employees; if there is no employee data that meets the target query conditions, the displayed data in the list will be empty.
[0104] 6. Chart display function: Extract and summarize employee data that meets the target query conditions in the database, and intuitively display data comparison information items in the form of legends.
[0105] The information display of the present invention extracts the key information of the corresponding data items in the database and replaces the default wildcards in the template based on the key-value relationship, thereby generating and displaying the required information.
[0106] 7. Points management function. Review and maintain the updated data of employees, for example, review whether the updated points data of employees meet the standards; similarly, the work data updated by employees such as performance or projects can also be reviewed, which will not be elaborated here.
[0107] 8. Employee data management. For the work data of employees in this system, such as professional categories, score bars, departments, positions, and performance, you can perform management operations such as adding, deleting, modifying, and checking.
[0108] 9. Multiple permission account login function. The data management system of the present invention can set multiple permission accounts. Each permission account has different permissions and can perform different operations on the system.
[0109] 10. Security monitoring function. The data management system of the present invention is equipped with a tool for testing system security, which can regularly upgrade and update the system, and can check security issues such as system logs, security holes, and security policies to ensure the stability and security of the system.
[0110] 11. Data backup function. Regularly back up employee data and ensure the integrity and availability of the backup data. In the event of data loss or damage, data can be quickly restored to reduce losses.
[0111] The present invention changes the traditional static data collection and management mode, introduces a dynamic management mechanism, realizes the real-time update of employee data, and builds an efficient information sharing platform, so that each department and each talent pool can quickly obtain the required talent information and improve work efficiency.
[0112] The present invention realizes real-time analysis of talent data from multiple dimensions, such as major studied, work projects, and specialties, and provides a more comprehensive and in-depth display of talent information, which is conducive to operating users to have a more comprehensive understanding of the characteristics and advantages of talents.
[0113] Compared with the traditional data management method of displaying talent information in the form of Excel tables, which is cumbersome and inefficient, the data management system of the present invention introduces visual form technology and adopts a simple and clear interface design, allowing users to edit, query and export forms based on the interface, thereby improving the work efficiency of employee data management.
[0114] Embodiment 3
[0115] Figure 4 This is a schematic diagram of the structure of a data processing device provided in Embodiment 3 of the present invention. Figure 4 As shown, the device includes: a task generating module 310 , a data processing module 320 and a result reporting module 330 .
[0116] Among them, the task generation module 310 is used to generate a target task in response to the task generation operation of the first permission object, and send the target task to the second permission object so that the second permission object determines the target task; the data processing module 320 is used to determine the data processing result in response to the data processing operation of the second permission object, wherein the data processing operation includes querying the target data required for the target task in the target database, and the data in the target database is updated in real time based on the data update operation of the third permission object; the result reporting module 330 is used to send the data processing result to the first permission object in response to the result reporting operation of the second permission object on the data processing result, so that the first permission object determines the data processing result corresponding to the target task.
[0117] The technical solution of the embodiment of the present invention generates a target task in response to a task generation operation of a first permission object, and sends the target task to a second permission object so that the second permission object determines the target task; determines a data processing result in response to a data processing operation of the second permission object, wherein the data processing operation includes querying a target database for target data required for the target task, and the data in the target database is updated in real time based on a data update operation of a third permission object; sends the data processing result to the first permission object in response to a result reporting operation of the second permission object for the data processing result, so that the first permission object determines the data processing result corresponding to the target task. The present invention improves the convenience and efficiency of data processing between multiple permission objects based on the developed data management system.
[0118] Optionally, the data processing device further comprises: a data updating module, configured to update the data in the target database in real time in response to the data updating operations of the plurality of third rights objects;
[0119] The target database includes a plurality of storage objects and operation data corresponding to each storage object, and each of the third permission objects is used to update the operation data of one storage object in real time.
[0120] Optional data update module, specifically used for:
[0121] determining target update data, and sending the target update data to a fourth rights object, so that the fourth rights object determines whether the target update data meets a data update condition;
[0122] If so, the data in the target database is updated in real time based on the target update data.
[0123] Optionally, the data processing device further includes: a data entry module and a storage and display module;
[0124] The data entry module is used to determine target entry data in response to the data entry operation of the second permission object before the data update operation in response to the plurality of third permission objects, wherein the target entry data includes an entry object and operation data of the entry object, and the operation data includes at least one of an operation category, an operation score, an operation department, an operation position, and an operation performance;
[0125] The storage and display module is used to store the target entry data in the target database, generate an object link for the target entry data, and display the object link under the target directory.
[0126] Optionally, the storage display module is specifically used for:
[0127] Extracting key data from the target input data, and determining the target data category of the target input data based on the key data, wherein the key data includes a job category;
[0128] The object link is displayed under a subdirectory corresponding to the target data category, wherein the target directory includes a plurality of subdirectories, and one subdirectory is used to store the target input data of one target data category.
[0129] Optionally, the data processing module includes: a condition input unit, a data query unit and a sorting display unit;
[0130] The condition input unit is used to determine at least one target query condition in response to an input operation of the second permission object on at least one displayed target condition item, wherein the target condition item includes at least one of a category condition item, a score condition item, a department condition item, a position condition item, and a performance condition item;
[0131] The data query unit is used to determine and display the target data in the target database that meets the target query condition in response to the query trigger operation;
[0132] The sorting display unit is used to determine a target sorting method in response to a sorting selection operation, and display the target data based on the target sorting method.
[0133] Optionally, the result reporting module 330 is specifically used to:
[0134] determining a target format in response to the format selection operation, wherein the target format includes a bar graph and / or a data table;
[0135] In response to the reporting triggering operation, the data processing result is sent to the first rights object in the target format.
[0136] The data processing device provided in the embodiment of the present invention can execute the data processing method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0137] Embodiment 4
[0138] Figure 5A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0139] like Figure 5 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0140] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0141] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 performs the various methods and processes described above, such as a data processing method.
[0142] In some embodiments, the data processing method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the data processing method described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to perform the data processing method in any other appropriate manner (e.g., by means of firmware).
[0143] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0144] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0145] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0146] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0147] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user terminal or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0148] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0149] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0150] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A data processing method, characterized in that: include: In response to the task generation operation of the first rights object, a target task is generated, and the target task is sent to the second rights object so that the second rights object determines the target task; In response to the data processing operation of the second permission object, determining a data processing result, wherein the data processing operation includes querying a target database for target data required for the target task, and the data in the target database is updated in real time based on the data update operation of the third permission object; In response to the result reporting operation of the second permission object on the data processing result, the data processing result is sent to the first permission object, so that the first permission object determines the data processing result corresponding to the target task.
2. The method according to claim 1, characterized in that Also includes: In response to the data update operations of the plurality of third rights objects, updating the data in the target database in real time; The target database includes a plurality of storage objects and operation data corresponding to each storage object, and each of the third permission objects is used to update the operation data of one storage object in real time.
3. The method according to claim 2, characterized in that The real-time updating of the data in the target database includes: determining target update data, and sending the target update data to a fourth rights object, so that the fourth rights object determines whether the target update data meets a data update condition; If so, the data in the target database is updated in real time based on the target update data.
4. The method according to claim 2, characterized in that: Before the data update operation in response to the plurality of third rights objects, the method further includes: In response to the data entry operation of the second permission object, target entry data is determined, wherein the target entry data includes an entry object and operation data of the entry object, and the operation data includes at least one of an operation category, an operation score, an operation department, an operation position, and an operation performance; The target entry data is stored in the target database, an object link of the target entry data is generated, and the object link is displayed under the target directory.
5. The method according to claim 4, characterized in that The displaying of the object link under the target directory includes: Extracting key data from the target input data, and determining a target data category of the target input data based on the key data; The object link is displayed under a subdirectory corresponding to the target data category, wherein the target directory includes a plurality of subdirectories, and one subdirectory is used to store the target input data of one target data category.
6. The method according to claim 1, characterized in that The step of determining a data processing result in response to the data processing operation of the second rights object includes: In response to an input operation of the second permission object on at least one displayed target condition item, determining at least one target query condition, wherein the target condition item includes at least one of a category condition item, a score condition item, a department condition item, a position condition item, and a performance condition item; In response to a query trigger operation, determining and displaying the target data in the target database that meets the target query condition; In response to the sort selection operation, a target sorting mode is determined, and the target data is displayed based on the target sorting mode.
7. The method according to claim 1, characterized in that The result reporting operation includes a format selection operation and a reporting triggering operation, and the sending of the data processing result to the first rights object includes: determining a target format in response to a format selection operation, wherein the target format includes a bar graph and / or a data table; In response to a reporting trigger operation, the data processing result is sent to the first rights object in the target format.
8. A data processing device, characterized in that: include: a task generation module, configured to generate a target task in response to a task generation operation of the first permission object, and send the target task to the second permission object so that the second permission object determines the target task; a data processing module, configured to determine a data processing result in response to a data processing operation of the second permission object, wherein the data processing operation includes querying a target database for target data required for the target task, and the data in the target database is updated in real time based on a data update operation of the third permission object; The result reporting module is configured to send the data processing result to the first permission object in response to the result reporting operation of the second permission object on the data processing result, so that the first permission object determines the data processing result corresponding to the target task.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can perform the data processing method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the data processing method according to any one of claims 1 to 7 when executed.