Method for determining water and sand regulation storage capacity of sandy river reservoir

By analyzing the controlled flow and sedimentation conditions of the reservoir, and using the sediment erosion and sedimentation calculation model, the water and sediment regulation storage capacity of the sandy river reservoir is determined, which solves the problem of not clearly determining the water and sediment regulation storage capacity in the existing technology, and realizes the stage of reservoir design. Reasonable configuration and river sedimentation reduction effect.

CN118780207APending Publication Date: 2024-10-15YELLOW RIVER ENG CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411001581.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing technology does not clearly provide methods and processes for determining the water and sediment regulation storage capacity of sandy river reservoirs, which makes it difficult to rationally allocate water and sediment regulation storage capacity during the design stage of the reservoir, affecting the comprehensive benefits of the reservoir.

Method used

By collecting reservoir engineering design data and measured water and sediment data, we analyze the flow rate, control duration and water volume, formulate water and sediment regulation storage capacity comparison plans, and use the reservoir-river sediment erosion and sedimentation calculation model to calculate the storage capacity and sedimentation amount of each plan. , Comprehensive selection of water and sediment regulation storage capacity with low siltation loss and siltation reduction protection objects with small siltation volume.

Benefits of technology

A concise, reliable, and easy-to-operate method for determining the water and sediment regulation storage capacity of sandy river reservoirs is provided to guide the design of the reservoir and rationally configure the water and sediment regulation storage capacity to ensure the comprehensive benefits of the reservoir and the river siltation reduction effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780207A_ABST
    Figure CN118780207A_ABST
Patent Text Reader

Abstract

The invention discloses a method for determining the water and sand regulation capacity of a reservoir of a Cooheavily river, and the method comprises the steps: collecting reservoir engineering design data, actual measurement and design water and sand data, analyzing the regulation and control flow, regulation and control duration or regulation and control water quantity of a reservoir siltation reduction object, drawing up a water and sand regulation capacity comparison and selection scheme, and employing a reservoir-river sediment erosion and siltation calculation model to determine the water and sand regulation capacity of the reservoir. And comprehensively comparing and selecting the recommended water and sand transfer storage capacity. According to the method, the blank that there is no clear determination method for the water and sand transfer storage capacity in existing specifications and standards is filled up, needed data are generally collected in engineering design, the needed model tools have mature research theoretical basis and practice basis in China, the steps are simple and clear, the result is reliable, operation is easy, and the method is suitable for large-scale popularization and application. The method has the characteristics of simple steps, reliable result and easiness in operation, and is a method which is easily mastered and used by grassroots science and technology workers and engineering designers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of sediment technology for water conservancy projects, and in particular to a method for determining the water and sediment regulating storage capacity of a reservoir in a river with high sediment content. Background Art

[0002] As a means of coordinating the relationship between river water and sediment and reducing river siltation, water and sediment regulation has undergone long-term exploration and practice on sandy rivers represented by the Yellow River, and has achieved fruitful results. It can be widely used in the management of general sandy rivers. In the reservoir design stage, in order to fully utilize the siltation reduction benefits of the reservoir, a certain amount of exclusive storage capacity for water and sediment regulation will be allocated. In the current specifications and technical standards, a principled explanation is given for the determination of the scale of water and sediment regulation storage capacity of reservoirs, but the method and process for determining the water and sediment regulation storage capacity are not clearly given. Given that water and sediment regulation is an effective means for reservoirs on sandy rivers to maintain effective storage capacity and facilitate siltation reduction in the river channel below the dam, it is necessary to clarify the method for determining the water and sediment regulation storage capacity, guide the reservoir to reasonably allocate the water and sediment regulation storage capacity during the design stage, and fully utilize the comprehensive benefits of the reservoir. Summary of the invention

[0003] The present invention aims to provide a method for determining the water and sediment regulating storage capacity of a reservoir on a sediment-laden river, so as to make up for the problem that the water and sediment regulating storage capacity cannot be quantitatively determined.

[0004] To achieve the above object, the present invention adopts the following technical solutions: The method for determining the water and sediment regulating storage capacity of a reservoir in a sediment-laden river according to the present invention comprises the following steps: S1, collect engineering design data, measured and designed water and sediment data of reservoirs on sediment-rich rivers; S2, analyze and clarify the control flow, control duration, control water volume and control timing that are beneficial to the reduction of siltation of the reservoir protection objects; S3, formulate a reservoir water and sediment regulation storage capacity ratio selection scheme; determine the upper limit water level of water and sediment regulation corresponding to each proposed reservoir water and sediment regulation storage capacity ratio selection scheme according to the reservoir dead water level and storage capacity curve; S4, using the reservoir-river sediment scouring and deposition calculation model, calculate the reservoir storage capacity and the sedimentation amount of the reservoir sediment reduction protection object corresponding to each proposed reservoir water and sediment regulation storage capacity selection scheme; S5. Comprehensively select the water-sediment regulation storage capacity with small siltation loss in the reservoir and small siltation amount in the reservoir silt reduction protection object as the recommended water-sediment regulation storage capacity.

[0005] Furthermore, in step S1, the engineering design data include dead water level and original reservoir capacity curve; the measured and designed water and sediment data include measured flow, sediment content, sediment transport rate and river scouring and siltation, and designed water and sediment data of reservoir inflow of the reservoir silt reduction protection object.

[0006] Furthermore, step S2 includes analyzing the response of sediment scouring and siltation changes to different flow levels, different flow level durations or flood volumes, and water volumes at different times based on the engineering design data, measured and designed water and sediment data of the sediment-laden river reservoirs, and clarifying the regulated flow, regulated duration, regulated water volume, and regulated timing that are beneficial to reducing siltation in the reservoir protection objects.

[0007] Furthermore, the reservoir water and sediment regulation storage capacity selection scheme proposed in step S3 is obtained by fluctuating a certain value based on the estimated reservoir water and sediment regulation storage capacity calculated according to the control flow, control duration, and control water volume.

[0008] Furthermore, step S5 compares the reservoir-river sediment accumulation in each proposed reservoir water and sediment regulation storage capacity selection scheme; when the difference in reservoir sedimentation is no more than a preset threshold, the scheme with the least sedimentation for the silt reduction protection object is used as the recommended water and sediment regulation storage capacity scheme.

[0009] The advantage of the present invention is that, based on the previous reservoir design and application, a method for determining the water and sediment regulation capacity of reservoirs in sediment-laden rivers with universal applicability is proposed. The method has the characteristics of simple steps, reliable results and easy operation. It is a method that is easy for grassroots scientific and technological workers and engineering designers to master and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a flow chart of the method for determining the water and sediment regulation storage capacity of a reservoir on a sediment-laden river according to the present invention.

[0011] Figure 2 It is a bar graph for analyzing the flow rate regulation of the reservoir silt reduction protection object in the method described in the present invention.

[0012] Figure 3 It is a curve chart for analyzing the duration of regulation of reservoir silt reduction protection objects in the method of the present invention. DETAILED DESCRIPTION

[0013] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0014] like Figure 1 As shown, the method for determining the water and sediment regulating storage capacity of a reservoir in a sediment-rich river according to the present invention comprises the following specific implementation steps: S1, collect engineering design data, measured and designed water and sediment data of reservoirs on sediment-rich rivers.

[0015] A river with high sediment content refers to a river with an average sediment content of more than 10kg / m³ over many years. The engineering design data collected for reservoirs with high sediment content include the dead water level of the reservoir and the reservoir capacity curve. The dead water level is generally used as the lower limit of the water and sediment regulation capacity. The measured and designed water and sediment data collected for reservoirs with high sediment content include the measured flow, sediment content, sediment transport rate, river scouring and silting, and reservoir inflow design data of the reservoir silt reduction protection object. The measured water and sediment data are mainly used to clarify the regulation requirements required for the reservoir silt reduction protection object. The designed water and sediment data are mainly used for the comparison and calculation of water and sediment regulation capacity schemes.

[0016] S2. Based on the engineering design data, measured and designed water and sediment data of reservoirs on sediment-laden rivers, analyze the response of sediment scouring and siltation changes to different flow levels, different flow level durations or flood volumes, and water volumes at different times. Analyze and clarify the control flow, control duration, control water volume, and control timing that are beneficial to reducing siltation of reservoir protection objects.

[0017] Specifically, the flow and sediment content of the reservoir silt reduction protection objects are divided into several levels according to their sizes, and the scouring and silting efficiency of each flow level under each sediment content level is counted (the scouring and silting efficiency is the scouring and silting amount / water volume of each group), and then a bar chart of different sediment content levels, different flow levels and scouring and silting efficiency is drawn to obtain the flow level with the minimum scouring and silting efficiency value that is compatible with all sediment content levels as the recommended regulated flow; further statistics are made on the duration of each flood for the regulated flow, and the duration and scouring and silting efficiency points are combined in a graph, and the recommended regulation duration is obtained in combination with the inflection point; based on the ten-day scale, the total amount of sediment in each ten-day period is analyzed, and the few ten-day periods with the largest sediment volume (generally a maximum of five ten-day periods) are taken as the regulation opportunities.

[0018] S3, formulate a plan for selecting the storage capacity ratio of reservoirs for water and sediment regulation. According to the control flow, control duration, and control water volume that are beneficial to the desilting of the protected objects of the reservoir in step S2, the water and sediment control storage capacity required by the reservoir can be estimated. The water volume is obtained by multiplying the control flow and the control duration. After deducting the possible inflow of water during the control period, the water and sediment control storage capacity required by the reservoir is obtained. If the analysis results in the control water volume, the possible inflow of water during the control period is directly deducted to obtain the water and sediment control storage capacity. According to the estimated water and sediment control storage capacity, a certain value is fluctuated up and down to obtain several comparison options.

[0019] According to the dead water level and storage capacity curve of the reservoir, the upper limit water level of water and sediment regulation is determined according to the proposed water and sediment regulation storage capacity selection scheme. Before the reservoir reaches sediment erosion and sedimentation balance, the upper limit water level of water and sediment regulation is the real-time storage capacity corresponding to the dead water level plus the water level corresponding to the water and sediment regulation storage capacity. After the reservoir sediment erosion and sedimentation balance, the upper limit water level of water and sediment regulation is the designed flood limit water level of the reservoir.

[0020] S4, using the reservoir-river sediment scouring and deposition calculation model, calculate the reservoir capacity and the siltation amount of the reservoir siltation protection object corresponding to each proposed reservoir water and sediment regulation storage capacity ratio selection scheme.

[0021] The reservoir-river channel sediment scouring and silting calculation model refers to a model that can carry out reservoir sediment scouring and silting calculations and dam channel sediment scouring and silting calculations. The reservoir sediment scouring and silting calculation model includes both empirical models based on empirical formulas of reservoir backwater sediment discharge and open discharge sediment discharge laws, and hydrodynamic models based on hydrodynamic principles. The empirical model can be directly constructed with reference to the engineering sediment design manual, etc. The hydrodynamic model is generally universal and can be used after the parameters are calibrated and verified. For the river channel sediment scouring and silting calculation model, there are also empirical models based on empirical fitting sediment transport formulas, and hydrodynamic models based on hydrodynamic principles. In the present invention, both empirical models based on empirical statistics and hydrodynamic models based on hydrodynamic principles can be used. In specific cases, designers can flexibly choose according to the information and model conditions at their disposal.

[0022] S5. Comprehensively select the water-sediment regulation storage capacity with small siltation loss and small siltation amount of the reservoir siltation reduction protection object as the recommended water-sediment regulation storage capacity.

[0023] Here, we mainly compare the reservoir-river sediment scouring and siltation conditions of the reservoir and river channel calculated in step 4. When the reservoir sedimentation amounts are not much different (the difference in reservoir sedimentation amounts in various schemes is not greater than the preset threshold), the scheme with the smallest sedimentation amount for the silt reduction protection object is generally used as the recommended water and sediment regulation storage capacity scheme.

[0024] Based on the existing engineering sediment design theory and the design and dispatching experience of built reservoirs, the present invention proposes a method for determining the water and sediment regulating storage capacity of a reservoir in a sediment-laden river. By collecting reservoir engineering design data, measured and designed water and sediment data, analyzing the regulated flow, regulation duration or regulated water volume of the reservoir silt reduction object, formulating a water and sediment regulating storage capacity comparison plan, and using a reservoir-river sediment scouring and silting calculation model, a comprehensive comparison and recommendation of the water and sediment regulating storage capacity is made. The present invention fills the gap in the existing specifications and standards that there is no clear method for determining the water and sediment regulating storage capacity. The required data has generally been collected in engineering design, and the required model tools have a mature research theoretical basis and practical basis in China. The steps are concise, the results are reliable, and it is easy to operate. It has the characteristics of concise steps, reliable results, and easy operation. It is a method that is easy for grassroots scientific and technological workers and engineering designers to master and use.

Claims

1. A method for determining the water and sediment regulation storage capacity of a reservoir on a sediment-laden river, characterized in that: The following steps are involved: S1, collect engineering design data, measured and designed water and sediment data of reservoirs on sediment-rich rivers; S2, analyze and clarify the control flow, control duration, control water volume and control timing that are beneficial to the reduction of siltation of the reservoir protection objects; S3, formulate a reservoir water and sediment regulation storage capacity ratio selection scheme; determine the upper limit water level of water and sediment regulation corresponding to each proposed reservoir water and sediment regulation storage capacity ratio selection scheme according to the reservoir dead water level and storage capacity curve; S4, using the reservoir-river sediment scouring and deposition calculation model, calculate the reservoir storage capacity and the sedimentation amount of the reservoir sediment reduction protection object corresponding to each proposed reservoir water and sediment regulation storage capacity selection scheme; S5. Comprehensively select the water-sediment regulation storage capacity with small siltation loss in the reservoir and small siltation amount in the reservoir silt reduction protection object as the recommended water-sediment regulation storage capacity.

2. The method for determining the water and sediment regulating storage capacity of a reservoir in a sediment-laden river according to claim 1, characterized in that: In step S1, the engineering design data include dead water level and original reservoir capacity curve; the measured and designed water and sediment data include the measured flow, sediment content, sediment transport rate and river scouring and silting, and reservoir inflow design data of the reservoir silt reduction protection object.

3. The method for determining the water and sediment regulating storage capacity of a reservoir in a sediment-laden river according to claim 1, characterized in that: Step S2 includes analyzing the response of sediment scouring and siltation changes to different flow levels, flood volumes at different flow levels or times, and water volumes at different times based on the engineering design data, measured and designed water and sediment data of sediment-laden river reservoirs, and clarifying the regulated flow, regulated duration, regulated water volume, and regulated timing that are beneficial to reducing siltation in reservoir protection objects.

4. The method for determining the water and sediment regulating storage capacity of a reservoir in a sediment-laden river according to claim 1, characterized in that: The reservoir water and sediment regulation storage capacity selection scheme proposed in step S3 is obtained by fluctuating a certain value based on the estimated reservoir water and sediment regulation storage capacity according to the regulated flow, regulation duration, and regulated water volume.

5. The method for determining the water and sediment regulating storage capacity of a reservoir on a sediment-laden river according to claim 1, characterized in that: Step S5 compares the reservoir-river sediment accumulation in each proposed reservoir water and sediment regulation storage capacity selection scheme; when the difference in reservoir sedimentation is no more than a preset threshold, the scheme with the least sedimentation for the silt reduction protection object is used as the recommended water and sediment regulation storage capacity scheme.