Mixed time domain tree search method and device for multi-satellite traversal rendezvous task planning

By decomposing the multi-satellite ergodic rendezvous mission planning problem into outer rendezvous sequence and transfer time planning and inner orbit transfer trajectory planning, timeline branching and gradient method optimization are introduced to solve the problem of high solution complexity in traditional methods and achieve high efficiency. Search for the optimal rendezvous sequence and time for a multi-star traversal rendezvous mission.

CN118780459AActive Publication Date: 2024-10-15NAT UNIV OF DEFENSE TECH
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411287093.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-10-15
Estimated Expiration
2044-09-13

AI Technical Summary

Technical Problem

It is difficult to efficiently search for the optimal rendezvous sequence and time for a multi-satellite traversal rendezvous mission with the existing technology, especially when the orbit transfer aircraft needs to traverse multiple space targets. The traditional method has many local optima, is sensitive to initial values, and has high solution complexity. problem.

Method used

The multi-satellite ergodic rendezvous mission planning problem is decomposed into the outer rendezvous sequence and transfer time planning problem and the inner end-to-end orbit transfer trajectory planning problem. Timeline branches are introduced, and redundancy is carried out by constructing a hybrid time domain solution tree and defining a branch evaluation function. Co-tailoring uses the gradient method to optimize the time variable and decompose it into independent orbit transfer trajectory planning problems to solve the optimal solution.

Benefits of technology

It effectively reduces the solution complexity, improves the efficiency of searching for optimal solutions for multi-star traversal rendezvous tasks, avoids redundant calculations, obtains continuous optimal time variables and optimal rendezvous sequences, and significantly improves the efficiency and accuracy of the algorithm. sex.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780459A_ABST
    Figure CN118780459A_ABST
Patent Text Reader

Abstract

The invention relates to a mixed time domain tree search method and device for multi-star traversal rendezvous task planning. The method comprises the steps that a multi-star traversal rendezvous task planning problem is decomposed into an outer-layer rendezvous sequence and time planning problem and an inner-layer transfer trajectory planning problem; dispersing a time domain into uniformly distributed time points, so as to convert an outer layer optimization problem into a pure combination optimization problem; a timeline branch is introduced on the basis of a traditional tree search sequence branch, a mixed time domain solution tree of a discretized outer layer problem is constructed, an evaluation function of the branch is defined, and a relatively inferior branch is cut based on an evaluation value, so that redundant calculation is avoided; based on an optimal branch in the mixed time domain solution tree, time is accurately optimized through a gradient method to obtain a continuous optimal time variable, an original problem is decomposed into a plurality of independent inner-layer orbit transfer trajectory planning problems, and optimal end-to-end transfer trajectories are solved respectively. According to the method, algorithm hyper-parameters are customized for specific problems, and the optimal scheme of the multi-satellite traversal rendezvous task can be efficiently solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of aerospace technology, and in particular to a hybrid time-domain tree search method and device for multi-satellite traversal rendezvous mission planning. Background Art

[0002] The multi-satellite traversal rendezvous mission planning problem is a typical time-varying traveling salesman problem, such as Figure 1 As shown in Figure 1, the traveling salesman is an orbital transfer vehicle (OTV), which needs to traverse the intersection within a given mission time. n The OTV is a space-based multi-objective aircraft that is used to detect and intercept space objects. The OTV is a space-based multi-objective aircraft that is used to detect and intercept ...

[0003] There are three traditional solutions. The first one constructs it as a nonlinear programming problem, taking the absolute time of intersection with each target as the design variable, and solving it through gradient optimization. There are many local optima and it is sensitive to the initial value, making it difficult to effectively obtain the optimal solution. The second one constructs it as a mixed integer optimization problem, using global optimization algorithms such as genetic algorithms to simultaneously optimize discrete access sequence variables and continuous transfer time variables. The increase in variable dimensions also increases the difficulty of solving. The third one uses a tree search method to traverse feasible intersection sequences, and uses a local algorithm to accurately optimize the time variable for each sequence. The coupling of the two algorithms results in an extremely high complexity of the solution. At present, there is still a need to develop a method that can simultaneously and efficiently search for the optimal intersection sequence and time. Summary of the invention

[0004] Based on this, it is necessary to provide a hybrid time-domain tree search method and device for multi-satellite traversal rendezvous mission planning in response to the above technical problems.

[0005] A hybrid time-domain tree search method for multi-satellite traversal rendezvous mission planning, the method comprising: The multi-satellite traversal rendezvous mission planning problem is decomposed into the outer rendezvous sequence and transfer time planning problem and the inner end-to-end orbit transfer trajectory planning problem, and a mathematical model of the two-level planning problem is constructed.

[0006] The time domain is discretized into uniformly distributed time points, and the outer layer rendezvous sequence and transfer time planning problem is converted into a discretized outer layer problem; the time domain is determined according to the start and end times of the multi-satellite traversal rendezvous mission.

[0007] On the basis of traditional tree search sequence branches, timeline branches are introduced. According to the initial orbital states of the orbit transfer spacecraft and multiple target stars to be rendezvoused, a hybrid time domain solution tree of the discretized outer problem is constructed based on sequence branches and timeline branches.

[0008] The evaluation function of the branch is defined, and the hybrid time-domain solution tree is redundantly pruned according to the evaluation value of the branch to obtain the optimal branch of the hybrid time-domain solution tree.

[0009] According to the optimal branch, the gradient method is used to accurately optimize the time and obtain the continuous optimal time variable.

[0010] According to the optimal rendezvous sequence and continuous optimal time variables obtained in the outer layer, the original problem is decomposed into multiple independent inner layer end-to-end orbit transfer trajectory planning problems, and the optimal end-to-end transfer trajectory is solved respectively; the optimal rendezvous sequence obtained in the outer layer is the rendezvous sequence corresponding to the optimal branch of the hybrid time domain solution tree.

[0011] A hybrid time-domain tree search device for multi-satellite traversal rendezvous mission planning, the device comprising: The two-layer planning problem model building module is used to decompose the multi-satellite traversal rendezvous mission planning problem into an outer-layer rendezvous sequence and transfer time planning problem and an inner-layer end-to-end orbit transfer trajectory planning problem, and to build a mathematical model of the two-layer planning problem.

[0012] The discretized outer problem conversion module is used to discretize the time domain into uniformly distributed time points and convert the outer rendezvous sequence and transfer time planning problem into a discretized outer problem; the time domain is determined according to the start and end times of the multi-satellite traversal rendezvous mission.

[0013] A hybrid time domain solution tree determination module for the discretized outer problem is used to introduce timeline branches on the basis of traditional tree search sequence branches, and to construct a hybrid time domain solution tree for the discretized outer problem based on sequence branches and timeline branches according to the initial orbital states of the orbit transfer spacecraft and multiple target stars to be rendezvoused.

[0014] The optimal branch determination module of the hybrid time domain solution tree is used to define the evaluation function of the branch, perform redundant pruning on the hybrid time domain solution tree according to the evaluation value of the branch, and obtain the optimal branch of the hybrid time domain solution tree.

[0015] The optimal time variable determination module is used to accurately optimize the time according to the optimal branch using the gradient method to obtain the continuous optimal time variable.

[0016] The inner layer end-to-end transfer trajectory determination module is used to decompose the original problem into multiple independent inner layer end-to-end orbit transfer trajectory planning problems according to the optimal rendezvous sequence and continuous optimal time variables obtained in the outer layer, and solve the optimal end-to-end transfer trajectory respectively; the optimal rendezvous sequence obtained in the outer layer is the rendezvous sequence corresponding to the optimal branch of the hybrid time domain solution tree.

[0017] The above-mentioned hybrid time-domain tree search method and device for multi-satellite traversal rendezvous mission planning include decomposing the multi-satellite traversal rendezvous mission planning problem into an outer rendezvous sequence and time planning problem and an inner transfer trajectory planning problem; discretizing the time domain into evenly distributed time points, thereby converting the outer optimization problem originally having discrete-continuous mixed characteristics into a pure combinatorial optimization problem; introducing timeline branches on the basis of traditional tree search sequence branches, constructing a hybrid time-domain solution tree of the discretized outer problem and defining the evaluation function of the branch, and pruning the inferior branches based on the evaluation value to avoid redundant calculations; based on the optimal branch in the hybrid time-domain solution tree, accurately optimizing the time through the gradient method to obtain the continuous optimal time variable, decomposing the original problem into multiple independent inner orbit transfer trajectory planning problems, and solving the optimal end-to-end transfer trajectory respectively. This method can efficiently solve the optimal solution for the multi-satellite traversal rendezvous mission by customizing the algorithm hyperparameters for specific problems. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the multi-star traversal rendezvous mission; Figure 2 A schematic flow chart of a hybrid time-domain tree search method for multi-satellite traversal rendezvous mission planning in one embodiment; Figure 3 is an overall flow chart of a hybrid time-domain tree search method in another embodiment; Figure 4 A schematic diagram of inner and outer layer decomposition of a multi-satellite traversal rendezvous mission planning problem in another embodiment; Figure 5 A schematic diagram of a discretized time domain in another embodiment; Figure 6 A schematic diagram of a hybrid time-domain solution tree in another embodiment; Figure 7: This is an analysis diagram of the impact of hyperparameters on the performance of the hybrid time-domain tree search algorithm in another embodiment, wherein (a) is the analysis of the impact of discrete time steps on the performance of the method, (b) is the analysis of the impact of maximum transfer fuel on the performance of the method, (c) is the analysis of the impact of maximum transfer duration on the performance of the method, (d) is the analysis of the impact of transfer duration weight coefficient on the performance of the method, (e) is the analysis of the impact of sequence branch boundary discount coefficient on the performance of the method, (f) is the analysis of the impact of timeline branch boundary discount coefficient on the performance of the method, (g) is the analysis of the impact of the upper limit of the number of sequence branches on the performance of the method, and (h) is the analysis of the impact of the upper limit of the number of timeline branches on the performance of the method; Figure 8 A comparison diagram of the results of a hybrid time-domain tree search algorithm and a traditional tree search algorithm in another embodiment; Fig. 9 is an index comparison diagram of a discrete time variable and a continuous time variable in another embodiment; Fig.10 is a deviation comparison diagram of a discrete time variable and a continuous time variable in another embodiment; Fig.11 A result statistical diagram of a discrete time variable and a continuous time variable in another embodiment; Fig.12 A comparison diagram of the results of the hybrid time-domain tree search algorithm in another embodiment and the currently most advanced method; Fig.13 The present invention is a structural block diagram of a hybrid time-domain tree search device for multi-satellite traversal rendezvous mission planning in one embodiment. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0020] In one embodiment, Figure 2 As shown, a hybrid time-domain tree search method for multi-satellite traversal rendezvous mission planning is provided, and the method comprises the following steps: Step 100: Decompose the multi-satellite traversal rendezvous mission planning problem into an outer layer rendezvous sequence and transfer time planning problem and an inner layer end-to-end orbit transfer trajectory planning problem, and construct a mathematical model of the two-layer planning problem.

[0021] Step 102: discretize the time domain into uniformly distributed time points, and convert the outer layer rendezvous sequence and transfer time planning problem into a discretized outer layer problem; the time domain is determined according to the start and end times of the multi-satellite traversal rendezvous mission.

[0022] Step 104: Based on the sequence branch of the traditional tree search, a timeline branch is introduced, and according to the initial orbital states of the orbit transfer spacecraft and the multiple target stars to be rendezvoused, a hybrid time domain solution tree of the discretized outer problem is constructed based on the sequence branch and the timeline branch.

[0023] Step 106: define the evaluation function of the branch, perform redundant pruning on the hybrid time-domain solution tree according to the evaluation value of the branch, and obtain the optimal branch of the hybrid time-domain solution tree.

[0024] Specifically, an evaluation function of the branch is defined, based on which the inferior branches are pruned, thereby improving the efficiency of the algorithm in exploring potential branches in the solution tree and avoiding redundant calculations.

[0025] Step 108: According to the optimal branch, the gradient method is used to accurately optimize the time to obtain a continuous optimal time variable.

[0026] Step 110: According to the optimal intersection sequence and continuous optimal time variables obtained in the outer layer, the original problem is decomposed into multiple independent inner layer end-to-end orbit transfer trajectory planning problems, and the optimal end-to-end transfer trajectory is solved respectively; the optimal intersection sequence obtained in the outer layer is the intersection sequence corresponding to the optimal branch of the hybrid time domain solution tree.

[0027] The detailed process of the hybrid time-domain tree search algorithm is shown in the attached Figure 3 shown.

[0028] The complete pseudo code of the hybrid time-domain tree search algorithm is as follows. Algorithm 1 is the main process of the algorithm, and its input is and The initial orbital state of the target star to be rendezvoused and , the output is the optimal intersection sequence and time points of the discretized outer layer problem . represents a sequence branch, which includes the intersection sequence of formula (7) , Alternative target status mark ( Initialized to 0, when When the target star has been rendezvoused, ), branch value and the timeline branch to which it belongs The pruning strategy in lines 11 to 15 and lines 20 to 21 in Algorithm 1 is only an embodiment and can be replaced by other strategies.

[0029] Algorithm 1 Hybrid Time Domain Tree Search enter: and The initial orbital state of the target star to be rendezvoused and ; Output: The optimal intersection sequence and time points of the discretized outer problem ; 1: With The initial state initializes a sequence branch The root node of 2: Command of , and add it to the sequence branch set ; 3: (deep direction exploration); 4: Define a new set of sequence branches ; 5: : 6: : 7: : 8: Define a new sequence branch ; 9: Use Algorithm 2 to move the target star Add to ; 10: : 11: Will Add to ; 12: else do: 13: Use replace The branch with the worst median ; 14: end if; 15: end if; 16: end for; 17: end for; 18: Calculate pruning boundaries ; 19: Cut off Median exist Branches outside ; 20: ; 21: end for; twenty two: Median The best branch ;

[0030] In the above-mentioned hybrid time-domain tree search method for multi-satellite traversal rendezvous mission planning, the method includes decomposing the multi-satellite traversal rendezvous mission planning problem into an outer rendezvous sequence and time planning problem and an inner transfer trajectory planning problem; discretizing the time domain into uniformly distributed time points, thereby converting the outer optimization problem originally with discrete-continuous mixed characteristics into a pure combinatorial optimization problem; introducing timeline branches on the basis of traditional tree search sequence branches, constructing a hybrid time-domain solution tree of the discretized outer problem and defining the evaluation function of the branch, and pruning the inferior branches based on the evaluation value to avoid redundant calculations; based on the optimal branch in the hybrid time-domain solution tree, accurately optimizing the time through the gradient method, obtaining the continuous optimal time variable, decomposing the original problem into multiple independent inner orbit transfer trajectory planning problems, and solving the optimal end-to-end transfer trajectory respectively. This method can efficiently solve the optimal solution for the multi-satellite traversal rendezvous mission by customizing the algorithm hyperparameters for specific problems.

[0031] In one embodiment, the mathematical model of the two-layer planning problem in step 100 includes a mathematical model of an inner-layer end-to-end orbit transfer trajectory planning problem and a mathematical model of an outer-layer rendezvous sequence and transfer time planning problem; wherein the objective function of the inner-layer end-to-end orbit transfer trajectory planning problem is: (1) (2) The constraints of the mathematical model for the inner layer end-to-end orbit transfer trajectory planning problem include: (3) (4) (5) in, It is from the starting point Transfer to target point fuel consumption, The orbital transfer vehicle is at the starting point Quality, and are the departure and arrival times of this transfer, and are the numbers of the departure and arrival stars, is the maximum thrust amplitude constant, is the thrust vector, is the normalized thrust magnitude variable, is the thrust direction unit vector variable, is the maximum transfer fuel consumption, and are the minimum transfer time and the maximum transfer time respectively. and are the terminal position and velocity of the orbit transfer vehicle, and are the terminal position and velocity of the space target, respectively. and are the maximum terminal position error and velocity error respectively.

[0032] The objective function of the outer rendezvous sequence and transfer time planning problem is a function of the transfer fuel or a function of the transfer time: (6) (7) The constraints of the mathematical model of the outer layer rendezvous sequence and transfer time planning problem are: (8) (9) (10) (11) in, is the minimum value of the function for transferring fuel, is the function of the transferred fuel, is the minimum value of the function of transfer time, is the function of the transfer duration of each segment, and Respectively Segment transfer fuel consumption and transfer duration, ,in is the number of space modules, It is The number of the rendezvous space module, , Represents the intersection number, For the The moment of intersection of a space target, It is Segment transfer duration, , and are the minimum and maximum transfer durations, respectively. are the start and end times of the task, respectively. yes Arrive at The moment of the target star, .

[0033] Specifically, the level of the problem is divided as shown in the attached Figure 4 shown.

[0034] The inner problem is a nonlinear trajectory optimization problem. The design variables are the maneuvers of the orbital transfer vehicle (OTV) over time as shown in formula (2). The objective function of the inner problem is to minimize fuel consumption. The objective function of the inner problem is shown in formula (2).

[0035] The orbital transfer fuel depends only on the initial mass of the OTV, and the departure and arrival orbits and times. It can also be defined as the objective function. There is usually a conflict between transfer fuel and duration and a trade-off is required. The constraints considered in the inner problem include the maximum transfer fuel constraint of formula (3): , the minimum and maximum transfer time constraints of formula (4) and , and the intersection condition of formula (5).

[0036] The outer problem is a time-varying traveling salesman problem, and the design variable is the time when the OTV arrives at each target star: (12) in, OTV has reached The moment of the target star, are the start and end time of the task respectively. In order to avoid the mixing of discrete combination solution space and continuous time domain solution space, the design variables are decomposed into two parts: (13) (14) in, Represents the intersection number, It is The number of the rendezvous target star, It is Segment transfer time. The conversion relationship between the design variables shown in formula (6) and the design variables shown in formulas (7) and (8) is: (15) The objective function of the outer problem is to transfer fuel in each stage or transfer duration The objective function of the outer problem is shown in formula (6) and formula (7).

[0037] The constraints of the outer problem include the order constraints of formula (8) and formula (9), and the upper limit constraint of fuel consumption of formula (10). and the task time upper limit constraint of formula (11).

[0038] Take the multi-asteroid mining problem of a space orbit design competition as an example. The problem details and data can be found on the website https: / / gtoc12.tsinghua.edu.cn / competition / . The mission objective function of this example is: (16) in, For the The amount of minerals collected from an asteroid is defined as 10 kg of minerals mined per year of mining: (17) in, is the time when OTV rendezvouses the asteroid and recovers the minerals (the variable for solving the problem), is the moment when the miner starts working (a constant is given for the problem). This embodiment uses the examples from the top three results of the competition as test examples, namely, the Jet Propulsion Laboratory of a certain country, the Beijing Institute of Technology and the Chinese Academy of Sciences (BIT-CAS-DFH) and the OptimiCS of a certain country, which contain 35, 30 and 29 multi-satellite rendezvous mission planning problems respectively, for a total of 94 examples.

[0039] In the outer layer optimization problem, we use the literature (1) (Zhu, YH, and Luo, YZ, “Fast Evaluation of Low-Thrust Transfers via Multilayer Perceptions.” Journal of Guidance, Control, and Dynamics , Vol. 42, No. 1, 2019, pp. 2627–2637.) The proposed method estimates the end-to-end orbit transfer fuel consumption value.

[0040] In the inner layer optimization problem, the paper (2) (Jiang, FH, Baoyin, HX, and Li, JF, “Practical Techniques for Low-Thrust Trajectory Optimization with Homotopic Approach.” Journal of Guidance, Control, and Dynamics , Vol. 35, No.1, 2012, pp. 245–258.) The method described here accurately optimizes the end-to-end transfer trajectory.

[0041] In one embodiment, step 102 includes: discretizing the time domain of the task into Evenly distributed time points; the time points are: (18) in, is a discrete interval, are the start and end times of the task, respectively. An integer greater than 0.

[0042] The outer layer rendezvous sequence and transfer time planning problem is transformed into Space targets are arranged without duplication at a point in time The pure combinatorial optimization problem at time points is the discretized outer layer problem; is the number of space targets.

[0043] Specifically, the time domain is discretized into uniformly distributed time points, thereby transforming the original outer optimization problem with discrete-continuous mixed characteristics into a pure combinatorial optimization problem, as shown in the attached figure. Figure 5 As shown in Figure 2. By discretizing time, the complete solution space of the outer optimization problem can be described and the spatial complexity can be quantified. The task timeline is discretized into uniformly distributed time points, the discrete interval is The original problem is transformed into The target stars are arranged without duplication. Time point In The space complexity of this problem is .

[0044] In one embodiment, step 104 includes: initializing a root node of a sequence branch S with the initial orbital state of the orbital transfer vehicle; for the current space target, if there is at least one pair of departure time and arrival time that satisfy all transfer constraints to the next space target, the sequence branch will be extended to the next space target; at each extension depth, each sequence branch contains multiple timeline branches, and for each end time point, only the optimal timeline with the lowest total transfer fuel consumption is retained; at each layer of branch width expansion, when the number of sequence branches is greater than a preset sequence branch number threshold, redundant inferior sequence branches are pruned; when the number of timeline branches contained in a sequence branch is greater than a preset timeline branch number threshold, redundant inferior timeline branches are pruned; and so on, nestedly extending feasible sequence branches and timeline branches; after completing the expansion of all possible sequences and arrival times, a hybrid time domain solution tree of the discretized outer problem is obtained.

[0045] Specifically, timeline branches are introduced on the basis of traditional tree search sequence branches. Each sequence branch contains multiple timeline branches, and a timeline branch represents the specific intersection time with each target under the intersection sequence. Based on sequence branches and timeline branches, a hybrid time domain solution tree of the discretized outer problem is constructed, such as Figure 6 As shown in Figure 2.2, due to the natural precession drift of the orbital plane and the natural revolution of the phase in the plane, which usually changes slowly and monotonically with time, for any pair of departure and arrival satellites, there may be no or few windows that meet the transfer constraints during the entire mission period. Figure 5 The permutation and combination solution space in is transformed into Figure 6 If the solution tree only contains accessible transfer branches, most of the redundant parts of the solution space that do not need to be explored will be naturally excluded.

[0046] The root node of the tree starts from the orbital state of OTV at the initial moment of the mission, and expands feasible sequence branches and timeline branches in a nested formula. If you reach the next target If there is at least one pair of departure time and arrival time that satisfies all transition constraints, then the sequence branch can be extended to the next target. . At each expansion depth, each sequence branch contains multiple timeline branches. For each end time point, only the optimal timeline with the lowest total transfer fuel consumption is retained. Because the subsequent expansion has nothing to do with the past time, it is only related to the current end time. After completing the expansion of all possible sequences and arrival times, the optimal solution must exist in the obtained branch. If the problem has strict transfer constraints and few feasible transfers, an exhaustive search can be performed. Otherwise, a pruning strategy is needed to reduce the time complexity. A reasonable pruning strategy can improve both the efficiency and convergence of the algorithm.

[0047] In one embodiment, for the current space target, if there is at least one pair of departure time and arrival time to the next space target that satisfies all transfer constraints, the sequence branch will be extended to the next space target, including: the access sequence of the sequence branch S c The final target is the starting star , will reach the star Add to sequence branch S to define a new set of timeline branches ; For a timeline branch T of a sequence branch S, the timeline branch Terminal time point Departure time , branching by timeline Current total fuel consumption is the current total fuel consumption; calculate the first arrival time If the calculated transfer fuel consumption or transfer duration does not meet the preset conditions, the transfer fuel consumption at the next arrival time is calculated; is the number of steps, is a discrete interval, and They are the minimum and maximum values ​​of the transfer duration respectively; if the calculated transfer fuel consumption or transfer duration meets the preset conditions, a new timeline branch is defined , and update; calculate the new timeline branch The evaluation value; if the timeline branch set There are timeline branches in With the new timeline branch have the same end time point, then when the timeline branches The evaluation value is greater than the new timeline branch When the evaluation value is , a new timeline branch is used Replace timeline branch collection Timeline branches in ; If the number of timeline branches of the sequence branch is less than the preset threshold, the new timeline branch Add to timeline branch collection Otherwise, use a new timeline branch Replace timeline branch collection The timeline branch with the worst evaluation value ; Continue to iterate the next timeline branch until all timeline branches of the sequence branch are executed; calculate the pruning boundary of the timeline branch T and delete the new timeline branch set The evaluation value of the sequence branch in the timeline branch outside the pruning boundary; use the timeline branch set Replace the timeline branch set in the sequence branch S , achieving the expansion of a new space target to a sequence branch.

[0048] Specifically, expand a new goal based on a sequence branch S The pseudo code of the algorithm (Algorithm 2) is as follows, which expands a new goal based on a sequence branch S It is the basic operation of hybrid time domain tree search. A timeline branch The transfer time including formula (14) , total transfer fuel consumption Total task duration and branch value The pruning strategy in lines 21 to 25 and 29 to 30 in Algorithm 2 is only an embodiment and can be replaced by other strategies.

[0049] Algorithm 2: The operation of expanding a new target star to a sequence branch; Input: an existing sequence branch S and a target star to be expanded ; Output: The target star New sequence branch obtained by extending to S ; 1: Take the C-terminal target of the access sequence of sequence branch S as the starting point ; 2: Will reach the star Add to the sequence branch S, let ; 3: Define a new set of timeline branches ; 4: : 5: Branching by timeline Terminal time point Departure time ; 6: Branching by timeline Current total fuel consumption is the current total fuel consumption; 7: (The step length is ) do: 8: Calculate arrival time ; 9: Calculate the transfer fuel using the estimation model in reference (1) ; 10: or : 11: Go to the next step of row 7 ; 12: end if; 13: Define a new timeline branch ; 14: Use and renew ; 15: Computing timeline branches Value ; 16: if and Have the same end time point; 17: if do: 18: Use replace In ; 19: end if; 20: else if do: 21: Will Add to ; 22: else do: 23: Use replace Median Worst timeline branch ; 24: end if; 25: end for; 26: end for; 27: Calculate pruning boundaries ; 28: Delete Median At the border Other timeline branches ; 29: Replace S with a new timeline branch ,make ; 30: return ;

[0050] After completing the expansion of all feasible branches, take the sequence branch with the best value As a task plan.

[0051] Some hyperparameters have a significant impact on the performance of the algorithm for solving a specific class of problems, including four parts: 1) The time step of the discretized outer problem 2) Transfer fuel and time constraints and 3) Weight factor to balance fuel and time and , and 4) a pruning factor that limits the overall time complexity of the algorithm and , Maximum number of branches and , as shown in Table 1.

[0052] Table 1 Hyperparameters of the hybrid time-domain tree search algorithm

[0053] This embodiment tests the performance of the hybrid time-domain tree search algorithm under different parameter configurations by adjusting only one parameter and fixing other parameters. The fixed values ​​and value ranges of the parameters are given in Table 1. Figure 7 The following is an analysis of the impact of hyperparameters on the performance of the hybrid time-domain tree search algorithm. (a) is the analysis of the impact of discrete time steps on the performance of this method, (b) is the analysis of the impact of maximum transfer fuel on the performance of this method, (c) is the analysis of the impact of maximum transfer duration on the performance of this method, (d) is the analysis of the impact of transfer duration weight coefficient on the performance of this method, (e) is the analysis of the impact of sequence branch boundary discount coefficient on the performance of this method, (f) is the analysis of the impact of timeline branch boundary discount coefficient on the performance of this method, (g) is the analysis of the impact of the upper limit of the number of sequence branches on the performance of this method, and (h) is the analysis of the impact of the upper limit of the number of timeline branches on the performance of this method. From the curves of the average calculation time and the objective function value of solving 94 test cases under different parameter configurations, it can be seen that for each parameter, there is an intermediate value that makes the algorithm both efficient and optimal. The average calculation time of all tests is less than 5s. This result shows the efficiency of the proposed hybrid time-domain tree search algorithm and confirms that configuring appropriate parameters for specific problems can achieve both algorithm efficiency and optimal results. Subsequent tests will use the parameter values ​​in Table 1.

[0054] The core innovation of this application is to introduce timeline branches based on the traditional tree search algorithm. In order to verify the role of timeline branches in obtaining better sequences, the results of the hybrid time-domain tree search algorithm and the traditional tree search algorithm are compared, such as Figure 8 In order to ensure that the time variables corresponding to these sequences are fully optimized and thus ensure fairness in sequence comparison, the Differential Evolution (DE) algorithm is used to accurately optimize the time variables based on fixed sequences. Figure 8 The results show that after the introduction of timeline branches, 70 out of 94 tasks obtained better sequences. For the other 20 tasks, although no better sequences were obtained, the objective function values ​​increased significantly. This shows that the introduction of timeline branches can not only obtain better intersection sequences, but also obtain better time variables, and can achieve the optimality of both sequences and time variables at the same time.

[0055] In one embodiment, the evaluation function of the definition branch is: (19) in, is the evaluation function of the timeline branch, is the total transfer fuel consumption, is the total transfer time, and They are and The weight coefficient of .

[0056] According to the evaluation function of the timeline branch, the evaluation value of the sequence branch is calculated as: (20) in, is the evaluation value of the sequence branch.

[0057] In one embodiment, redundant pruning of the hybrid time-domain solution tree is performed according to the evaluation value of the branch to obtain the optimal branch of the hybrid time-domain solution tree, including: defining the boundary value of the sequence branch and the boundary value of the timeline branch as: (twenty one) (twenty two) in, , are the minimum and maximum boundary values ​​of the evaluation values ​​of the sequence branches, respectively. , are the minimum and maximum boundary values ​​of the evaluation values ​​of the timeline branches, is the evaluation value of the sequence branch, is the evaluation function of the timeline branch, and are the boundary discount coefficients for sequence branches and timeline branches respectively.

[0058] The evaluation values ​​of the sequence branches and the evaluation values ​​of the timeline branches are compared with the boundary values ​​of the sequence branches and the boundary values ​​of the timeline branches respectively, and the branches outside the boundary of the sequence branches and the boundary of the timeline branches are trimmed.

[0059] Specifically, based on the total transfer fuel and time Evaluation timeline branch: (twenty three) Weighted sum is a simple and effective evaluation method, so the evaluation function of the branch is shown in formula (19). and The value of depends mainly on the mobility of the OTV, the task constraints and the specific definition of the objective function. The evaluation value of a sequence branch is the optimal value of the evaluation value of the timeline branch it contains. The calculation expression is shown in formula (20).

[0060] By comparing the branch values, redundant branches are pruned to avoid exponential growth in search complexity. The first pruning formula is to define the boundary values ​​of the sequence branches separately. and the boundary values ​​of the timeline branches , thereby filtering out low-quality branches: (twenty one) (twenty two) In the embodiment, a simple and effective boundary function as shown in formula (21) and formula (22) is used. All branches with evaluation values ​​outside the boundary are pruned.

[0061] In addition, the embodiment limits the width of each layer of expansion branches. When the number of sequence branches is greater than the preset sequence branch number threshold ( ), the redundant inferior sequence branches will be pruned; when the number of timeline branches contained in a sequence branch is greater than the preset timeline branch number threshold ( ), the redundant inferior timeline branches will be pruned.

[0062] In one embodiment, the sequence branch includes a junction sequence c , Alternative space target status mark , the evaluation value of the sequence branch and the timeline branch to which it belongs .

[0063] In one embodiment, the timeline branch includes the transfer duration , total transfer fuel consumption Total task duration and the evaluation value of the timeline branch .

[0064] In a specific embodiment, step 108: based on the optimal branch in the hybrid time domain solution tree, accurately optimize the time by using a gradient method to obtain a continuous optimal time variable.

[0065] In this embodiment, the Sequential Quadratic Programing (SQP) algorithm is used to accurately optimize the time and compare the discrete time solution obtained by the hybrid time-domain tree search algorithm. J 0. Continuous-time solution of SQP with exact convergence J SQP and DE global optimization exact time solution J DE ,like Fig. 9 As shown. It can be seen that J 0 and J SQP Very close, most deviations are less than 1.5kg, and the smallest deviation is only 0.0014kg. J SQP and J DE They are almost identical, which indicates that the hybrid time-domain tree search algorithm can locate a set of discrete time variables that are close to the optimal result and the exploration of the time domain is very sufficient and accurate.

[0066] In the embodiment, the discrete time variable obtained by the hybrid time domain tree search is compared with the continuous time variable obtained by SQP, such as Fig.10 As shown, 98.21% of the results have a deviation of less than 15 days (the mission cycle is 2000 days). Fig.11 The statistics of all time variables are given, among which the discrete time variables are located near the final converged continuous time variables, and the average time deviation of most tasks is less than 10 days. This result shows that the discretization of time does not cause significant errors, but makes the exploration of the time domain more thorough.

[0067] Step 110: Based on the optimal rendezvous sequence obtained in the outer layer and the precisely optimized rendezvous time, the original problem is decomposed into multiple independent inner-layer orbit transfer trajectory planning problems, and the optimal end-to-end transfer trajectory is solved respectively; the optimal rendezvous sequence obtained in the outer layer is the rendezvous sequence corresponding to the optimal branch of the hybrid time domain solution tree.

[0068] The objective function value of the final solution J STTS Final results with the top three teams in the competition J GTOC For comparison, Fig.12 As shown. In 25 of the 94 test cases, sequences different from the competition results were obtained, while in the other 69 cases, sequences exactly the same as the competition results were obtained. The indicators of all sequences different from the competition results are better than the competition results. Tables 2 to 4 give the details of the sequences different from the competition results, and the differences in the sequences are marked with gray background color. n D is the total count of differences. The minimum improvement in the index of a single task is 2.30 kg (0.304%), the maximum is 30.49 kg (5.39%), and the average is 9.53 kg (1.44%). 44% of the sequences that are different from the competition results have an improvement of 10 kg. This result fully proves the optimality of the method in this application in sequence search.

[0069] Table 2 Comparison with the results of a Jet Propulsion Laboratory

[0070] Table 3 Comparison with the results of the joint team of Beijing Institute of Technology and Chinese Academy of Sciences

[0071] Table 4 Comparison with the results of OptimiCS of a certain country

[0072] It should be understood that although Figure 2The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 2 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.

[0073] In one embodiment, Fig.13 As shown, a hybrid time domain tree search device for multi-satellite traversal rendezvous mission planning is provided, comprising: a two-layer planning problem model building module, a discretized outer layer problem conversion module, a hybrid time domain solution tree determination module for the discretized outer layer problem, an optimal branch determination module for the hybrid time domain solution tree, an optimal time variable determination module, and an inner layer end-to-end transfer trajectory determination module, wherein: The two-layer planning problem model building module is used to decompose the multi-satellite traversal rendezvous mission planning problem into an outer-layer rendezvous sequence and transfer time planning problem and an inner-layer end-to-end orbit transfer trajectory planning problem, and to build a mathematical model of the two-layer planning problem.

[0074] The discretized outer problem conversion module is used to discretize the time domain into uniformly distributed time points and convert the outer rendezvous sequence and transfer time planning problem into a discretized outer problem; the time domain is determined according to the start and end times of the multi-satellite traversal rendezvous mission.

[0075] A hybrid time domain solution tree determination module for the discretized outer problem is used to introduce timeline branches on the basis of traditional tree search sequence branches, and to construct a hybrid time domain solution tree for the discretized outer problem based on sequence branches and timeline branches according to the initial orbital states of the orbit transfer spacecraft and multiple target stars to be rendezvoused.

[0076] The optimal branch determination module of the hybrid time domain solution tree is used to define the evaluation function of the branch, perform redundant pruning on the hybrid time domain solution tree according to the evaluation value of the branch, and obtain the optimal branch of the hybrid time domain solution tree.

[0077] The optimal time variable determination module is used to accurately optimize the time according to the optimal branch using the gradient method to obtain the continuous optimal time variable.

[0078] The inner layer end-to-end transfer trajectory determination module is used to decompose the original problem into multiple independent inner layer end-to-end orbit transfer trajectory planning problems according to the optimal rendezvous sequence and continuous optimal time variables obtained in the outer layer, and solve the optimal end-to-end transfer trajectory respectively; the optimal rendezvous sequence obtained in the outer layer is the rendezvous sequence corresponding to the optimal branch of the hybrid time domain solution tree.

[0079] In one embodiment, the mathematical model of the two-layer planning problem in the two-layer planning problem model construction module includes a mathematical model of the inner layer end-to-end orbit transfer trajectory planning problem and a mathematical model of the outer layer rendezvous sequence and transfer time planning problem; wherein the mathematical model of the inner layer end-to-end orbit transfer trajectory planning problem is shown in formulas (1) to (5). The mathematical model of the outer layer rendezvous sequence and transfer time planning problem is shown in formulas (6) to (11).

[0080] In one embodiment, the discretization outer problem conversion module is further used to discretize the time domain of the task into uniformly distributed time points; the time points are shown in formula (18); the outer layer rendezvous sequence and transfer time planning problem are converted into Space targets are arranged without duplication of the time points The pure combinatorial optimization problem at time points is the discretized outer layer problem; is the number of space targets.

[0081] In one embodiment, the hybrid time-domain solution tree determination module of the discretized outer problem is further used to initialize the root node of a sequence branch S with the initial orbital state of the orbit transfer spacecraft; for the current space target, if there is at least one pair of departure time and arrival time to the next space target that satisfies all transfer constraints, the sequence branch will be extended to the next space target; at each extension depth, each sequence branch may contain multiple timeline branches, and for each end time point, only the branch with the lowest total transfer fuel consumption ( )'s optimal timeline; expand the width of the branch at each layer, when the number of sequence branches is greater than the preset sequence branch number threshold, then cut the redundant inferior sequence branches; when the number of timeline branches contained in a sequence branch is greater than the preset timeline branch number threshold, then cut the redundant inferior timeline branches; and so on, nested expansion of feasible sequence branches and timeline branches; after completing the expansion of all possible sequences and arrival times, the hybrid time domain solution tree of the discretized outer problem is obtained.

[0082] In one embodiment, the hybrid time-domain solution tree determination module for the discretized outer layer problem is also used to access the sequence of the sequence branch S. c The final target is the starting star , will reach the star Add to sequence branch S to define a new set of timeline branches ; For a timeline branch of sequence branch S , branching by timeline Terminal time point Departure time , branching by timeline Current total fuel consumption is the current total fuel consumption; calculate the first arrival time If the calculated transfer fuel consumption or transfer duration does not meet the preset conditions, the transfer fuel consumption at the next arrival time is calculated; is the number of steps, is a discrete interval, and They are the minimum and maximum values ​​of the transfer duration respectively; if the calculated transfer fuel consumption or transfer duration meets the preset conditions, a new timeline branch is defined , and update; calculate the new timeline branch The evaluation value of; if the timeline branch set There are timeline branches in With the new timeline branch have the same end time point, then when the timeline branches The evaluation value is greater than the new timeline branch When the evaluation value is , a new timeline branch is used Replace timeline branch collection Timeline branches in ; If the number of timeline branches of the sequence branch is less than the preset threshold, the new timeline branch Add to timeline branch collection Otherwise, use a new timeline branch Replace timeline branch collection The timeline branch with the worst evaluation value ; Continue to iterate the next timeline branch until all timeline branches of the sequence branch are executed; calculate the pruning boundary of the timeline branch T and delete the new timeline branch set The evaluation value of the sequence branch in the timeline branch outside the pruning boundary; use the timeline branch set Replace the timeline branch set in the sequence branch S , achieving the expansion of a new space target to a sequence branch.

[0083] In one embodiment, the optimal branch determination module of the hybrid time domain solution tree is also used to define the evaluation function of the branch as shown in formula (19); according to the evaluation function of the timeline branch, the evaluation value of the sequence branch is calculated using formula (20).

[0084] In one of the embodiments, the optimal branch determination module of the hybrid time domain solution tree is also used to define the boundary value of the sequence branch and the boundary value of the timeline branch as shown in formula (21) and formula (22); the evaluation value of the sequence branch and the evaluation value of the timeline branch are compared with the boundary value of the sequence branch and the boundary value of the timeline branch respectively, and the branches outside the boundary of the sequence branch and the boundary of the timeline branch are trimmed.

[0085] In one embodiment, the sequence branches in the hybrid time-domain solution tree determination module of the discretized outer layer problem include intersection sequences c , Alternative space target status mark , the evaluation value of the sequence branch and the timeline branch to which it belongs .

[0086] In one embodiment, the hybrid time domain solution tree determination module of the discretized outer layer problem includes a timeline branch including a transfer time length Δ t , total transfer fuel consumption Total task duration and the evaluation value of the timeline branch .

[0087] For the specific definition of the hybrid time-domain tree search device for multi-satellite traversal rendezvous mission planning, please refer to the definition of the hybrid time-domain tree search method for multi-satellite traversal rendezvous mission planning above, which will not be repeated here. Each module in the above-mentioned hybrid time-domain tree search device for multi-satellite traversal rendezvous mission planning can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0088] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0089] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A hybrid time-domain tree search method for multi-satellite traversal rendezvous mission planning, characterized in that: The method comprises: The multi-satellite traversal rendezvous mission planning problem is decomposed into the outer layer rendezvous sequence and transfer time planning problem and the inner layer end-to-end orbit transfer trajectory planning problem, and a mathematical model of the two-layer planning problem is constructed. The time domain is discretized into uniformly distributed time points, and the outer layer rendezvous sequence and transfer time planning problem is converted into a discretized outer layer problem; the time domain is determined according to the start and end times of the multi-satellite traversal rendezvous mission; On the basis of the traditional tree search sequence branch, a timeline branch is introduced, and according to the initial orbital states of the orbit transfer spacecraft and the multiple target stars to be rendezvoused, a hybrid time domain solution tree of the discretized outer layer problem is constructed based on the sequence branch and the timeline branch; Defining an evaluation function of a branch, performing redundant pruning on the hybrid time-domain solution tree according to the evaluation value of the branch, and obtaining an optimal branch of the hybrid time-domain solution tree; According to the optimal branch, the time is accurately optimized using the gradient method to obtain a continuous optimal time variable; According to the optimal rendezvous sequence and continuous optimal time variables obtained in the outer layer, the original problem is decomposed into multiple independent inner layer end-to-end orbit transfer trajectory planning problems, and the optimal end-to-end transfer trajectory is solved respectively; the optimal rendezvous sequence obtained in the outer layer is the rendezvous sequence corresponding to the optimal branch of the hybrid time domain solution tree.

2. The method according to claim 1, characterized in that The mathematical model of the two-layer planning problem includes a mathematical model of an inner-layer end-to-end orbit transfer trajectory planning problem and a mathematical model of an outer-layer rendezvous sequence and transfer time planning problem; Among them, the objective function of the inner end-to-end track transfer trajectory planning problem is: ; ; The constraints of the mathematical model for the inner layer end-to-end orbit transfer trajectory planning problem include: ; ; ; in, It is from the starting point Transfer to target point fuel consumption, The orbital transfer vehicle is at the departure point Quality, and are the departure and arrival times of this transfer, and are the numbers of the departure and arrival stars, is the maximum thrust amplitude constant, is the thrust vector, is the normalized thrust magnitude variable, is the thrust direction unit vector variable, is the maximum transfer fuel consumption, and are the minimum transfer time and the maximum transfer time respectively. and are the terminal position and velocity of the orbit transfer vehicle, and are the terminal position and velocity of the space target, respectively. and are the maximum terminal position error and velocity error respectively; The objective function of the outer layer rendezvous sequence and transfer time planning problem is a function of the transfer fuel or a function of the transfer duration: ; ; The constraints of the mathematical model of the outer layer rendezvous sequence and transfer time planning problem are: ; ; ; ; in, is the minimum value of the function for transferring fuel, is the function of the transferred fuel, is the minimum value of the function of transfer time, is the function of the transfer duration of each segment, and Respectively Segment transfer fuel consumption and transfer duration, ,in is the number of space modules, It is The number of the rendezvous space module, , Represents the intersection number, For the j The moment of intersection of a space target, It is i Segment transfer duration, , and are the minimum and maximum transfer durations, respectively. are the start and end times of the task, respectively. OTV has reached The moment of the target star, .

3. The method according to claim 1, characterized in that: Discretize the time domain into uniformly distributed time points, and convert the outer layer intersection sequence and transfer time planning problem into a discretized outer layer problem, including: Discretize the time domain of the task into Evenly distributed time points; the time points are: ; in, is a discrete interval, , are the start and end times of the task, respectively. is an integer greater than 0; The outer layer rendezvous sequence and transfer time planning problem is converted into n Space targets are arranged without duplication of the time points n The pure combinatorial optimization problem at time points is the discretized outer layer problem; n is the number of space targets.

4. The method according to claim 1, characterized in that: On the basis of the traditional tree search sequence branch, a timeline branch is introduced, and according to the initial orbital states of the orbit transfer spacecraft and the multiple target stars to be rendezvoused, a hybrid time domain solution tree of the discretized outer layer problem is constructed based on the sequence branch and the timeline branch, including: Initialize a root node of a sequence branch S with the initial orbital state of the orbit transfer vehicle; For the current space target, if there is at least one pair of departure time and arrival time to the next space target that satisfies all transfer constraints, the sequence branch will be extended to the next space target; At each expansion depth, each sequence branch contains multiple timeline branches, and for each end time point, only the optimal timeline with the lowest total transfer fuel consumption is retained; Expand the width of the branch at each layer. When the number of sequence branches is greater than the preset sequence branch number threshold, the redundant inferior sequence branches are pruned; when the number of timeline branches contained in a sequence branch is greater than the preset timeline branch number threshold, the redundant inferior timeline branches are pruned; And so on, the feasible sequence branches and timeline branches are nestedly expanded; after completing the expansion of all possible sequences and arrival times, the mixed time domain solution tree of the discretized outer problem is obtained.

5. The method according to claim 4, characterized in that For the current space target, if there is at least one pair of departure time and arrival time to the next space target that satisfies all transfer constraints, the sequence branch will be extended to the next space target, including: The access sequence of the sequence branch S c The final target is the starting star , will reach the star Add to sequence branch S to define a new set of timeline branches ; For a timeline branch of a sequence branch S , branching by timeline Terminal time point Departure time , branching by timeline The current total fuel consumption is the current total fuel consumption; Calculate the first arrival time If the calculated transfer fuel consumption or transfer duration does not meet the preset conditions, the transfer fuel consumption at the next arrival time is calculated; , is the number of steps, is a discrete interval, and are the minimum and maximum values ​​of the transfer duration respectively; If the calculated transfer fuel consumption or transfer duration meets the preset conditions, a new timeline branch is defined , and update; calculate the new timeline branch The evaluation value of If the timeline branch set There are timeline branches in With the new timeline branch have the same end time point, then when the timeline branches The evaluation value is greater than the new timeline branch When the evaluation value is , a new timeline branch is used Replace timeline branch collection Timeline branches in ; If the number of timeline branches of a sequence branch is less than the preset threshold, the new timeline branch Add to timeline branch collection middle; Otherwise, branch with a new timeline Replace timeline branch collection The timeline branch with the worst evaluation value ; Continue iterating the next timeline branch until all timeline branches of the sequence branch are executed; Computing timeline branches The pruning boundary of the timeline is deleted, and the new timeline branch set is deleted. The evaluation value of the sequence branch in is the timeline branch outside the pruning boundary; Branching collections with timelines Replace the timeline branch set in the sequence branch S , achieving the expansion of a new space target to a sequence branch.

6. The method according to claim 1, characterized in that The evaluation function of the definition branch is: ; in, is the evaluation function of the timeline branch, is the total transfer fuel consumption, is the total transfer time, and They are and The weight coefficient of According to the evaluation function of the timeline branch, the evaluation value of the sequence branch is calculated as: ; in, is the evaluation value of the sequence branch.

7. The method according to claim 1, characterized in that The hybrid time-domain solution tree is redundancy pruned according to the evaluation value of the branch to obtain the optimal branch of the hybrid time-domain solution tree, including: The boundary values ​​of sequence branches and timeline branches are defined as follows: ; ; in, , are the minimum and maximum boundary values ​​of the evaluation values ​​of the sequence branches, respectively. , are the minimum and maximum boundary values ​​of the evaluation values ​​of the timeline branches, is the evaluation value of the sequence branch, is the evaluation function of the timeline branch, and are the boundary discount coefficients for sequence branches and timeline branches respectively; The evaluation values ​​of the sequence branches and the evaluation values ​​of the timeline branches are compared with the boundary values ​​of the sequence branches and the boundary values ​​of the timeline branches respectively, and the branches outside the boundary of the sequence branches and the boundary of the timeline branches are trimmed.

8. The method according to claim 1, characterized in that The sequence branch includes an intersection sequence, a candidate space target state mark, an evaluation value of the sequence branch and a corresponding timeline branch.

9. The method according to claim 1, characterized in that: The timeline branch includes transfer duration, total transfer fuel consumption, total task duration and an evaluation value of the timeline branch.

10. A hybrid time-domain tree search device for multi-satellite traversal rendezvous mission planning, characterized in that: The device comprises: A two-layer planning problem model building module is used to decompose the multi-satellite traversal rendezvous mission planning problem into an outer layer rendezvous sequence and transfer time planning problem and an inner layer end-to-end orbit transfer trajectory planning problem, and to build a mathematical model for the two-layer planning problem; A discretized outer layer problem conversion module is used to discretize the time domain into uniformly distributed time points, and convert the outer layer rendezvous sequence and transfer time planning problem into a discretized outer layer problem; the time domain is determined according to the start and end times of the multi-satellite traversal rendezvous mission; A hybrid time-domain solution tree determination module for the discretized outer layer problem is used to introduce a timeline branch on the basis of a traditional tree search sequence branch, and to construct a hybrid time-domain solution tree for the discretized outer layer problem based on the sequence branch and the timeline branch according to the initial orbital states of the orbit transfer spacecraft and the multiple target stars to be rendezvoused; An optimal branch determination module of a hybrid time-domain solution tree, used to define an evaluation function of a branch, perform redundant pruning on the hybrid time-domain solution tree according to the evaluation value of the branch, and obtain the optimal branch of the hybrid time-domain solution tree; An optimal time variable determination module, used to accurately optimize the time according to the optimal branch using a gradient method to obtain a continuous optimal time variable; The inner layer end-to-end transfer trajectory determination module is used to decompose the original problem into multiple independent inner layer end-to-end orbit transfer trajectory planning problems according to the optimal rendezvous sequence and continuous optimal time variables obtained in the outer layer, and solve the optimal end-to-end transfer trajectory respectively; the optimal rendezvous sequence obtained in the outer layer is the rendezvous sequence corresponding to the optimal branch of the hybrid time domain solution tree.

Citation Information

Patent Citations

  • Planning method and device for space debris clearing task

    CN110991712A

  • Near-earth minor planet rendezvous task orbit optimization method based on hybrid power

    CN112016187A

  • Heterogeneous multi-unmanned aerial vehicle cooperative task allocation method based on Monte Carlo tree search architecture under time sequence constraint

    CN115494873A

  • Two-stage path planning optimization method based on SP model

    CN116579511A

  • Multi-celestial body leveraging sequence rapid evaluation method based on leveraging state feasible region

    CN117454602A