Hydrogen leakage risk prevention and control method and device and hydrogen leakage risk prevention and control system
By establishing a risk matrix and using the entropy weight method to evaluate hydrogen leakage risks, the problem of inaccurate hydrogen leakage risk levels is solved, a more accurate risk assessment and reasonable prevention and control strategies are achieved, and the probability and impact of hydrogen leakage risks are reduced.
Patent Information
- Application Number
- CN202410771504.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-10-15
AI Technical Summary
The hydrogen leakage risk level in the existing technology is inaccurate, resulting in unreasonable risk prevention and control strategies, and a lack of universal, simple, efficient and objective risk analysis methods.
By obtaining information on hydrogen leakage risk events, a risk matrix is established, and the entropy weight method is used to determine the weight of hydrogen leakage risk indicators, calculate risk scores and levels, and formulate corresponding risk prevention and control strategies.
It achieves more accurate risk level assessment, reasonable resource allocation and risk prevention and control strategies, reducing the probability and impact of hydrogen leakage risks.
Smart Images

Figure CN118780595A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of risk prevention and control technology, and in particular to a hydrogen leakage risk prevention and control method, device, computer-readable storage medium, computer program product and hydrogen leakage risk prevention and control system. Background Art
[0002] In recent years, the research and application of hydrogen fuel emergency power supply vehicle related technologies have continued to deepen, but due to the special nature of hydrogen being highly flammable and explosive, hydrogen fuel emergency power supply vehicles may have the risk of hydrogen leakage during use, and even cause fires and explosions, which seriously threaten the safety of life and property. Therefore, the risk analysis of hydrogen leakage is of great significance in reducing hydrogen safety risks and ensuring the safe application of technology.
[0003] The current hydrogen leakage risk analysis and methods are mainly aimed at single equipment or systems in fixed scenarios. There is a lack of research on overall risk analysis in multiple application scenarios. Although there are various risk analysis and comprehensive evaluation methods and their effectiveness has been verified, some of these methods are highly targeted, have a narrow application range, and lack universality, while some methods are complex in structure and cumbersome to implement. At the same time, some methods also face the problem of strong subjective evaluation factors. Therefore, a universal, simple, efficient and more objective risk analysis method needs to be studied.
[0004] With regard to the current hydrogen fuel emergency power supply vehicles, there are problems such as incomplete hydrogen leakage risk events, unclear risk sources, and incomplete risk assessment methods. Summary of the invention
[0005] The main purpose of the present application is to provide a hydrogen leakage risk prevention and control method, device, computer-readable storage medium, computer program product and hydrogen leakage risk prevention and control system, so as to at least solve the problem of inaccurate hydrogen leakage risk level in the prior art leading to unreasonable risk prevention and control strategy.
[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for preventing and controlling the risk of hydrogen leakage is provided, comprising: obtaining a plurality of risk event information, wherein the risk event information is information about a hydrogen leakage risk event occurring in hydrogen-related equipment; establishing a risk matrix according to the plurality of risk event information, wherein the number of rows of the risk matrix is the number of the risk event information, the number of columns of the risk matrix is the number of hydrogen leakage risk indicators, the hydrogen leakage risk indicators at least include the possibility and severity of occurrence, and the element a of the risk matrix is ijThe invention provides a score for the jth hydrogen leakage risk indicator corresponding to the ith risk event information; an entropy weight method is used to determine the weight of the hydrogen leakage risk indicator; a risk score for each risk event information is calculated according to the risk matrix and the weight of the hydrogen leakage risk indicator; a risk level for each risk event information is determined according to the risk score of each risk event information; and a corresponding risk prevention and control strategy is formulated according to the risk level of each risk event information.
[0007] Optionally, multiple risk event information are obtained, including: classifying risk events according to hydrogen leakage occurrence scenarios and risk categories to obtain multiple groups of risk events; determining multiple risk event information based on the multiple groups of risk events, the risk event information including the probability of occurrence of the risk event and the impact of the occurrence, and one risk event information corresponds to a group of risk events.
[0008] Optionally, a risk matrix is established based on multiple risk event information, including: scoring the possibility of occurrence of the risk event information according to the probability of occurrence of the risk event corresponding to each risk event information, to obtain multiple first scores; scoring the severity of the risk event information according to the impact of the occurrence of the risk event corresponding to each risk event information, to obtain multiple second scores; and constructing the risk matrix based on multiple first scores and multiple second scores.
[0009] Optionally, the entropy weight method is used to determine the weight of the hydrogen leakage risk index, including: for the element a of the risk matrix ij Perform normalization processing to obtain multiple normalized scores f ij , the normalized score f ij is the normalized score of the jth hydrogen leakage risk index corresponding to the i-th risk event information; Calculate the entropy value H of each hydrogen leakage risk index j , the entropy value H j is the entropy value of the jth hydrogen leakage risk indicator; Calculate the weight of each hydrogen leakage risk index use Calculate the weight index of each hydrogen leakage risk indicator is the entropy value H not equal to 1 j The mean of Weights of the hydrogen leakage risk indicators Optimize and obtain the weight w of each hydrogen leakage risk indicator rm,j , where r is a constant.
[0010] Optionally, the risk score of each risk event information is calculated according to the risk matrix and the weight of the hydrogen leakage risk index, including: using Calculate the risk score S of each risk event information i , the risk score S i is the risk score of the i-th risk event information.
[0011] Optionally, the risk level of each risk event information is determined according to the risk score of each risk event information, including: when the risk score is less than or equal to a first threshold, determining that the risk level of the corresponding risk event information is an acceptable risk; when the risk score is greater than the first threshold and less than or equal to a second threshold, determining that the risk level of the corresponding risk event information is a low risk; when the risk score is greater than the second threshold and less than or equal to a third threshold, determining that the risk level of the corresponding risk event information is a medium risk; when the risk score is greater than the third threshold and less than or equal to a fourth threshold, determining that the risk level of the corresponding risk event information is a high risk; when the risk score is greater than the fourth threshold, determining that the risk level of the corresponding risk event information is an unacceptable risk.
[0012] According to another aspect of the present application, a hydrogen leakage risk prevention and control device is provided, comprising: an acquisition unit, used to acquire a plurality of risk event information, wherein the risk event information is information about a hydrogen leakage risk event occurring in hydrogen-related equipment; an establishment unit, used to establish a risk matrix according to the plurality of risk event information, wherein the number of rows of the risk matrix is the number of the risk event information, the number of columns of the risk matrix is the number of hydrogen leakage risk indicators, the hydrogen leakage risk indicators at least include the possibility and severity of occurrence, and the element a of the risk matrix is ij The score of the jth hydrogen leakage risk indicator corresponding to the ith risk event information; a first determination unit, used to determine the weight of the hydrogen leakage risk indicator by adopting the entropy weight method; a calculation unit, used to calculate the risk score of each risk event information according to the risk matrix and the weight of the hydrogen leakage risk indicator; a second determination unit, used to determine the risk level of each risk event information according to the risk score of each risk event information; a generation unit, used to formulate a corresponding risk prevention and control strategy according to the risk level of each risk event information.
[0013] According to another aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute any one of the methods described.
[0014] According to another aspect of the present application, a computer program product is provided, comprising a computer program, wherein when the computer program is executed by a processor, any one of the methods described above is implemented.
[0015] According to another aspect of the present application, a hydrogen leakage risk prevention and control system is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of the methods described.
[0016] By applying the technical solution of the present application, in the above-mentioned method for preventing and controlling the risk of hydrogen leakage, the method scores each hydrogen leakage risk indicator corresponding to each risk event information, thereby establishing a risk matrix, and adopts the entropy weight method to determine the weight of the above-mentioned hydrogen leakage risk indicator. The risk score of each risk event information can be calculated by the risk matrix and the weight of the hydrogen leakage risk indicator, and then the risk level of the risk event information is determined, that is, according to the risk level of the risk event information, a corresponding risk prevention and control strategy is formulated and resources are reasonably allocated to reduce the probability of risk occurrence and reduce the impact of risk events, thereby solving the problem of unreasonable risk prevention and control strategies caused by inaccurate hydrogen leakage risk levels in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A hardware structure block diagram of a mobile terminal for executing a method for preventing and controlling hydrogen leakage risks provided in an embodiment of the present application is shown;
[0018] Figure 2 A schematic flow chart of a method for preventing and controlling hydrogen leakage risk provided in accordance with an embodiment of the present application is shown;
[0019] Figure 3 A risk level diagram provided according to an embodiment of the present application is shown;
[0020] Figure 4 A structural block diagram of a hydrogen leakage risk prevention and control device provided according to an embodiment of the present application is shown.
[0021] The above drawings include the following reference numerals:
[0022] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION
[0023] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0024] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0025] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0026] As introduced in the background technology, inaccurate hydrogen leakage risk levels in the prior art lead to unreasonable risk prevention and control strategies. To solve this technical problem, the embodiments of the present application provide a hydrogen leakage risk prevention and control method, device, computer-readable storage medium, computer program product and hydrogen leakage risk prevention and control system.
[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0028] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a method for preventing and controlling hydrogen leakage risk according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1Different configurations shown.
[0029] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the display method of device information in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above-mentioned network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The above-mentioned specific examples of the network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0030] In this embodiment, a method for preventing and controlling the risk of hydrogen leakage running on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.
[0031] Figure 2 : is a flow chart of a method for preventing and controlling the risk of hydrogen leakage according to an embodiment of the present application. Figure 2 As shown, the method comprises the following steps:
[0032] Step S201, obtaining a plurality of risk event information, wherein the risk event information is information about a hydrogen leakage risk event occurring in hydrogen-related equipment;
[0033] Step S202: establish a risk matrix based on the risk event information. The number of rows in the risk matrix is the number of risk event information. The number of columns in the risk matrix is the number of hydrogen leakage risk indicators. The hydrogen leakage risk indicators at least include the possibility and severity of occurrence. The element a of the risk matrix is ijis the score of the j-th hydrogen leakage risk indicator corresponding to the i-th risk event information;
[0034] Step S203, using entropy weight method to determine the weight of the above hydrogen leakage risk index;
[0035] Step S204, calculating the risk score of each of the risk event information according to the risk matrix and the weight of the hydrogen leakage risk index;
[0036] Step S205, determining the risk level of each of the risk event information according to the risk score of each of the risk event information;
[0037] Step S206: formulate corresponding risk prevention and control strategies according to the risk level of each of the above risk event information.
[0038] In the above-mentioned method for preventing and controlling the risk of hydrogen leakage, the method scores each hydrogen leakage risk indicator corresponding to each risk event information to establish a risk matrix, and adopts the entropy weight method to determine the weight of the above-mentioned hydrogen leakage risk indicator. The risk score of each risk event information can be calculated by the risk matrix and the weight of the hydrogen leakage risk indicator, and then the risk level of the risk event information is determined, that is, according to the risk level of the risk event information, a corresponding risk prevention and control strategy is formulated and resources are reasonably allocated to reduce the probability of risk occurrence and reduce the impact of risk events. This solves the problem of unreasonable risk prevention and control strategies caused by inaccurate hydrogen leakage risk levels in the prior art.
[0039] For ease of reference, in an optional implementation, the above step S201 includes:
[0040] Step S2011, classifying risk events according to hydrogen leakage occurrence scenarios and risk categories to obtain multiple groups of the above risk events;
[0041] Step S2012, determining a plurality of risk event information according to the plurality of risk event groups, wherein the risk event information includes the probability of occurrence of the risk event and the impact of occurrence, and one risk event information corresponds to a group of risk events.
[0042] In the above implementation mode, a large amount of existing literature and databases are consulted, hydrogen leakage risk events of hydrogen-related equipment are sorted out, and risk events are screened and sorted according to the vehicle configuration of the hydrogen fuel emergency power supply vehicle and expert opinions to obtain a hydrogen leakage risk event library belonging to the hydrogen fuel emergency power supply vehicle. Finally, the events of the established multi-scenario hydrogen leakage risk event library of the hydrogen fuel emergency power supply vehicle are further summarized and sorted, and the occurrence scenarios and risk categories of the risk events are summarized. Based on this, risk description is carried out in combination with database literature data and expert opinions, the establishment of the risk system is completed, and risk event information is stored.
[0043] For the convenience of calculation, in an optional implementation, the above step S202 includes:
[0044] Step S2021, scoring the likelihood of occurrence of the risk event information according to the probability of occurrence of the risk event corresponding to each of the risk event information, to obtain a plurality of first scores;
[0045] Step S2022, scoring the severity of the risk event information according to the impact of the risk event corresponding to each of the risk event information to obtain a plurality of second scores;
[0046] Step S2023: construct the risk matrix according to the plurality of first scores and the plurality of second scores.
[0047] In the above implementation, the probability of occurrence of the risk event information is scored according to the probability of occurrence of the risk event corresponding to each of the risk event information, and multiple first scores are obtained. For example, if it rarely occurs and the probability of occurrence is less than 0.0001%, the first score is 1; if it rarely occurs and the probability of occurrence is greater than or equal to 0.0001% and less than 0.001%, the first score is 2; if it sometimes occurs and the probability of occurrence is greater than or equal to 0.001% and less than 0.01%, the first score is 3; if it occurs relatively frequently and the probability of occurrence is greater than or equal to 0.01% and less than 0.01%, the first score is 4; If the probability of occurrence is less than or equal to 0.1%, the first score is 4. If it occurs relatively frequently and the probability of occurrence is greater than 0.1%, the first score is 5. The severity of the above risk event information is scored according to the impact of the risk event corresponding to each of the above risk event information, and multiple second scores are obtained. For example, if the severity is negligible, that is, the risk will hardly cause loss of life and property, and will basically not cause social attention. If the warning is delayed or invalid, it will probably not cause any consequences. The second score is 1. If the severity is small, that is, the risk may cause the emergency power supply vehicle to malfunction, which may cause greater risk potential. If the risk is medium, the risk will cause the emergency power supply vehicle to malfunction, and there is a risk of hydrogen leakage. There is a possibility of more serious disasters, but it is still within the controllable range. The early warning function and human intervention can fully control the relevant risks. If the early warning is delayed or failed, it may lead to serious consequences. The second score is 3. If the severity is severe, the risk will cause very strong harm or have the potential to cause the greatest harm. It may cause partial leakage of hydrogen. If it encounters an open flame, it may cause a small-scale explosion or fire, causing casualties or major damage, which will attract the attention of relevant media and consumers. If the early warning is delayed or failed, it will lead to a major safety accident. The second score is 4. If the severity is very severe, the risk will lead to a large amount of hydrogen leakage, which is very likely to cause explosions and fires, and the explosion range is large, causing casualties or major damage, which will attract the attention of relevant media and consumers. If the early warning is delayed or failed, it will lead to a major safety accident, the second score is 5. The original data of the risk score can be organized into a matrix form and expressed by the following formula (1): To facilitate calculation, the matrix A RM The number of rows m represents the number of risk events, and the number of columns n represents the number of indicators in the risk matrix, which is generally 2, corresponding to the risk severity and possibility of occurrence of the risk matrix.
[0048] In order to determine a suitable weight, in an optional implementation, the above step S203 includes:
[0049] Step S2031, for the element a of the risk matrix ijPerform normalization processing to obtain multiple normalized scores f ij , the above normalized score f ij is the normalized score of the j-th hydrogen leakage risk indicator corresponding to the i-th risk event information;
[0050] Step S2032, using Calculate the entropy value H of each of the above hydrogen leakage risk indicators j , the above entropy value H j is the entropy value of the jth hydrogen leakage risk indicator mentioned above;
[0051] Step S2033, using Calculate the weights of the above hydrogen leakage risk indicators use Calculate the weight index of each of the above hydrogen leakage risk indicators is the above entropy value H not equal to 1 j The mean of
[0052] Step S2034, using Weights of the above hydrogen leakage risk indicators Optimize and obtain the weight w of each of the above hydrogen leakage risk indicators rm, j, where r is a constant.
[0053] In the above implementation, when the traditional entropy weight method is used for calculation, when all entropy values approach 1, the weight gap will be over-magnified, the weighting will be unreasonable, and the smaller the index gap, the larger the weight. Calculate the weight after improving the entropy value. In the formula, the r index is preferably 35 based on experience. Even when all entropy values approach 1, the weight gap will not be excessively magnified.
[0054] In order to achieve risk level classification, in an optional implementation, the above step S204 includes:
[0055] Step S2041, using Calculate the risk score S of each of the above risk event information i , the above risk score S i is the risk score of the i-th risk event information mentioned above.
[0056] In the above implementation mode, after the weighting by the improved entropy weight method is completed, according to the formula Calculate the risk score of the risk event and classify the risk according to the level of the score in the risk matrix.
[0057] In order to achieve precise risk control, in an optional implementation, the above step S205 includes:
[0058] Step S2051: when the risk score Si is less than or equal to the first threshold, determining that the risk level of the corresponding risk event information is an acceptable risk;
[0059] Step S2052: when the risk score Si is greater than the first threshold and less than or equal to the second threshold, determining that the risk level of the corresponding risk event information is low risk;
[0060] Step S2053: when the risk score Si is greater than the second threshold and less than or equal to the third threshold, determining that the risk level of the corresponding risk event information is medium risk;
[0061] Step S2054: when the risk score Si is greater than the third threshold and less than or equal to the fourth threshold, determining that the risk level of the corresponding risk event information is high risk;
[0062] Step S2055: When the risk score Si is greater than the fourth threshold, determine that the risk level of the corresponding risk event information is an unacceptable risk.
[0063] In the above implementation mode, the above threshold is illustrated by example. When the risk score Si is less than or equal to 3, the risk level of the corresponding risk event information is determined to be an acceptable risk, that is, it is acceptable, and the existing management procedures are executed to keep the existing measures effective to prevent the risk from further escalating. When the risk score Si is greater than 3 and less than or equal to 6, the risk level of the corresponding risk event information is determined to be a low risk, that is, the risk has the possibility of further aggravation, but generally will not cause harm quickly, and the risk can be eliminated through prevention and control measures. When the risk score Si is greater than 6 and less than or equal to 10, the risk level of the corresponding risk event information is determined to be a medium risk, that is, it is tolerable in a safe environment, but the risk can be further reduced, and regulatory measures need to be set. When the risk score Si is greater than 10 and less than or equal to 16, the risk level of the corresponding risk event information is determined to be a high risk, that is, it is intolerable, and there is a high possibility that a major disaster will occur and evolve into an unacceptable risk, and high-quality regulatory measures need to be set. When the risk score Si is greater than 16, the risk level of the corresponding risk event information is determined to be an unacceptable risk, that is, it is unacceptable, and prevention and control measures need to be taken immediately to prevent and eliminate the risk.
[0064] It should be noted that a risk level diagram can also be constructed based on the first score of the likelihood of occurrence and the second score of the risk severity, such as Figure 3 As shown, the corresponding risk level can be queried according to the first score and the second score, for example, acceptable risk I, low risk II, medium risk III, high risk IV and unacceptable risk V.
[0065] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0066] The embodiment of the present application also provides a device for preventing and controlling the risk of hydrogen leakage. It should be noted that the device for preventing and controlling the risk of hydrogen leakage in the embodiment of the present application can be used to execute the method for preventing and controlling the risk of hydrogen leakage provided in the embodiment of the present application. The device is used to implement the above-mentioned embodiments and preferred embodiments, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.
[0067] The following is an introduction to the hydrogen leakage risk prevention and control device provided in the embodiments of the present application.
[0068] Figure 4 is a structural block diagram of a device for preventing and controlling the risk of hydrogen leakage according to an embodiment of the present application. Figure 4 As shown, the device comprises:
[0069] An acquisition unit 10 is used to acquire a plurality of risk event information, wherein the risk event information is information about a hydrogen leakage risk event occurring in hydrogen-related equipment;
[0070] An establishing unit 20 is used to establish a risk matrix according to the above-mentioned risk event information, wherein the number of rows of the above-mentioned risk matrix is the number of the above-mentioned risk event information, the number of columns of the above-mentioned risk matrix is the number of hydrogen leakage risk indicators, and the above-mentioned hydrogen leakage risk indicators at least include the possibility and severity of occurrence, and the element aij of the above-mentioned risk matrix is the score of the j-th above-mentioned hydrogen leakage risk indicator corresponding to the i-th above-mentioned risk event information;
[0071] A first determining unit 30 is used to determine the weight of the above hydrogen leakage risk index by using an entropy weight method;
[0072] A calculation unit 40, configured to calculate a risk score of each of the risk event information according to the risk matrix and the weight of the hydrogen leakage risk index;
[0073] A second determining unit 50 is used to determine the risk level of each of the risk event information according to the risk score of each of the risk event information;
[0074] The generating unit 60 is used to formulate corresponding risk prevention and control strategies according to the risk level of each of the above risk event information.
[0075] In the above-mentioned hydrogen leakage risk prevention and control device, the device scores each hydrogen leakage risk indicator corresponding to each risk event information, thereby establishing a risk matrix, and adopts the entropy weight method to determine the weight of the above-mentioned hydrogen leakage risk indicator, so as to calculate the risk score of each risk event information through the risk matrix and the weight of the hydrogen leakage risk indicator, and then determine the risk level of the risk event information, that is, formulate corresponding risk prevention and control strategies and reasonably allocate resources according to the risk level of the risk event information, reduce the probability of risk occurrence and reduce the impact of risk events, and solve the problem of unreasonable risk prevention and control strategies caused by inaccurate hydrogen leakage risk levels in the prior art.
[0076] For easy reference, in an optional implementation, the acquisition unit includes:
[0077] A classification module is used to classify risk events according to hydrogen leakage occurrence scenarios and risk categories to obtain multiple groups of the above risk events;
[0078] The first determination module is used to determine a plurality of risk event information according to a plurality of groups of risk events, wherein the risk event information includes the probability of occurrence of the risk event and the impact of occurrence, and one risk event information corresponds to a group of risk events.
[0079] In the above implementation mode, a large amount of existing literature and databases are consulted, hydrogen leakage risk events of hydrogen-related equipment are sorted out, and risk events are screened and sorted according to the vehicle configuration of the hydrogen fuel emergency power supply vehicle and expert opinions to obtain a hydrogen leakage risk event library belonging to the hydrogen fuel emergency power supply vehicle. Finally, the events of the established multi-scenario hydrogen leakage risk event library of the hydrogen fuel emergency power supply vehicle are further summarized and sorted, and the occurrence scenarios and risk categories of the risk events are summarized. Based on this, risk description is carried out in combination with database literature data and expert opinions, the establishment of the risk system is completed, and risk event information is stored.
[0080] To facilitate calculation, in an optional implementation, the establishment unit includes:
[0081] A first scoring module is used to score the probability of occurrence of the risk event information according to the probability of occurrence of the risk event corresponding to each of the risk event information, to obtain multiple first scores;
[0082] A second scoring module scores the severity of the risk event information according to the impact of the risk event corresponding to each of the risk event information to obtain a plurality of second scores;
[0083] A construction module is used to construct the risk matrix according to the plurality of the first scores and the plurality of the second scores.
[0084] In the above implementation, the probability of occurrence of the risk event information is scored according to the probability of occurrence of the risk event corresponding to each of the risk event information, and multiple first scores are obtained. For example, if it rarely occurs and the probability of occurrence is less than 0.0001%, the first score is 1; if it rarely occurs and the probability of occurrence is greater than or equal to 0.0001% and less than 0.001%, the first score is 2; if it sometimes occurs and the probability of occurrence is greater than or equal to 0.001% and less than 0.01%, the first score is 3; if it occurs relatively frequently and the probability of occurrence is greater than or equal to 0.01% and less than 0.01%, the first score is 4; If the probability of occurrence is less than or equal to 0.1%, the first score is 4. If it occurs relatively frequently and the probability of occurrence is greater than 0.1%, the first score is 5. The severity of the above risk event information is scored according to the impact of the risk event corresponding to each of the above risk event information, and multiple second scores are obtained. For example, if the severity is negligible, that is, the risk will hardly cause loss of life and property, and will basically not cause social attention. If the warning is delayed or invalid, it will probably not cause any consequences. The second score is 1. If the severity is small, that is, the risk may cause the emergency power supply vehicle to malfunction, which may cause greater risk potential. If the risk is medium, the risk will cause the emergency power supply vehicle to malfunction, and there is a risk of hydrogen leakage. There is a possibility of more serious disasters, but it is still within the controllable range. The early warning function and human intervention can fully control the relevant risks. If the early warning is delayed or failed, it may lead to serious consequences. The second score is 3. If the severity is severe, the risk will cause very strong harm or have the potential to cause the greatest harm. It may cause partial leakage of hydrogen. If it encounters an open flame, it may cause a small-scale explosion or fire, causing casualties or major damage, which will attract the attention of relevant media and consumers. If the early warning is delayed or failed, it will lead to a major safety accident. The second score is 4. If the severity is very severe, the risk will lead to a large amount of hydrogen leakage, which is very likely to cause explosions and fires, and the explosion range is large, causing casualties or major damage, which will attract the attention of relevant media and consumers. If the early warning is delayed or failed, it will lead to a major safety accident, the second score is 5. The original data of the risk score can be organized into a matrix form and expressed by the following formula (1): To facilitate calculation, the matrix A RM The number of rows m represents the number of risk events, and the number of columns n represents the number of indicators in the risk matrix, which is generally 2, corresponding to the risk severity and possibility of occurrence of the risk matrix.
[0085] In order to determine a suitable weight, in an optional implementation manner, the first determining unit includes:
[0086] A processing module is used to process the element a of the above risk matrix ijPerform normalization processing to obtain multiple normalized scores f ij , the above normalized score f ij is the normalized score of the j-th hydrogen leakage risk indicator corresponding to the i-th risk event information;
[0087] The first computing module is used to Calculate the entropy value H of each of the above hydrogen leakage risk indicators j , the above entropy value H j is the entropy value of the jth hydrogen leakage risk indicator mentioned above;
[0088] The second computing module is used to Calculate the weight of each of the above hydrogen leakage risk indicators use Calculate the weight index of each of the above hydrogen leakage risk indicators is the above entropy value H not equal to 1 j The mean of
[0089] The third computing module is used to Weights of the above hydrogen leakage risk indicators Optimize and obtain the weight w of each of the above hydrogen leakage risk indicators rm, j, where r is a constant.
[0090] In the above implementation, when the traditional entropy weight method is used for calculation, when all entropy values approach 1, the weight gap will be over-magnified, the weighting will be unreasonable, and the smaller the index gap, the larger the weight. Calculate the weight after improving the entropy value. In the formula, the r index is preferably 35 based on experience. Even when all entropy values approach 1, the weight gap will not be excessively magnified.
[0091] In order to achieve risk level classification, in an optional implementation, the calculation unit includes:
[0092] The third computing module is used to Calculate the risk score S of each of the above risk event information i , the above risk score S i is the risk score of the i-th risk event information mentioned above.
[0093] In the above implementation mode, after the weighting by the improved entropy weight method is completed, according to the formula Calculate the risk score of the risk event and classify the risk according to the level of the score in the risk matrix.
[0094] In order to achieve fine-grained risk prevention and control, in an optional implementation manner, the second determination unit includes:
[0095] A second determination module is used to determine that the risk level of the corresponding risk event information is an acceptable risk when the risk score Si is less than or equal to the first threshold;
[0096] A third determination module is used to determine that the risk level of the corresponding risk event information is low risk when the risk score Si is greater than the first threshold and less than or equal to the second threshold;
[0097] A fourth determination module, configured to determine that the risk level of the corresponding risk event information is medium risk when the risk score Si is greater than the second threshold and less than or equal to the third threshold;
[0098] A fifth determination module, configured to determine that the risk level of the corresponding risk event information is high risk when the risk score Si is greater than the third threshold and less than or equal to the fourth threshold;
[0099] The sixth determination module is used to determine that the risk level of the corresponding risk event information is an unacceptable risk when the risk score Si is greater than the fourth threshold.
[0100] In the above implementation mode, the above threshold is illustrated by example. When the risk score Si is less than or equal to 3, the risk level of the corresponding risk event information is determined to be an acceptable risk, that is, it is acceptable, and the existing management procedures are executed to keep the existing measures effective to prevent the risk from further escalating. When the risk score Si is greater than 3 and less than or equal to 6, the risk level of the corresponding risk event information is determined to be a low risk, that is, the risk has the possibility of further aggravation, but generally will not cause harm quickly, and the risk can be eliminated through prevention and control measures. When the risk score Si is greater than 6 and less than or equal to 10, the risk level of the corresponding risk event information is determined to be a medium risk, that is, it is tolerable in a safe environment, but the risk can be further reduced, and regulatory measures need to be set. When the risk score Si is greater than 10 and less than or equal to 16, the risk level of the corresponding risk event information is determined to be a high risk, that is, it is intolerable, and there is a high possibility that a major disaster will occur and evolve into an unacceptable risk, and high-quality regulatory measures need to be set. When the risk score Si is greater than 16, the risk level of the corresponding risk event information is determined to be an unacceptable risk, that is, it is unacceptable, and prevention and control measures need to be taken immediately to prevent and eliminate the risk.
[0101] It should be noted that a risk level diagram can also be constructed based on the first score of the likelihood of occurrence and the second score of the risk severity, such as Figure 3 As shown, the corresponding risk level can be queried according to the first score and the second score, for example, acceptable risk I, low risk II, medium risk III, high risk IV and unacceptable risk V.
[0102] The above-mentioned hydrogen leakage risk prevention and control device includes a processor and a memory, and the above-mentioned acquisition unit, establishment unit, first determination unit, calculation unit, second determination unit and generation unit are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize the corresponding functions. The above-mentioned modules are all located in the same processor; or, the above-mentioned modules are located in different processors in any combination.
[0103] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and the problem of inaccurate hydrogen leakage risk level leading to unreasonable risk prevention and control strategy in the prior art can be solved by adjusting kernel parameters.
[0104] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.
[0105] An embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method for preventing and controlling the risk of hydrogen leakage.
[0106] Specifically, the prevention and control methods of hydrogen leakage risks include:
[0107] Step S201, obtaining a plurality of risk event information, wherein the risk event information is information about a hydrogen leakage risk event occurring in hydrogen-related equipment;
[0108] Step S202: establish a risk matrix based on the risk event information. The number of rows in the risk matrix is the number of risk event information. The number of columns in the risk matrix is the number of hydrogen leakage risk indicators. The hydrogen leakage risk indicators at least include the possibility and severity of occurrence. The element a of the risk matrix is ij is the score of the j-th hydrogen leakage risk indicator corresponding to the i-th risk event information;
[0109] Step S203, using entropy weight method to determine the weight of the above hydrogen leakage risk index;
[0110] Step S204, calculating the risk score of each of the risk event information according to the risk matrix and the weight of the hydrogen leakage risk index;
[0111] Step S205, determining the risk level of each of the risk event information according to the risk score of each of the risk event information;
[0112] Step S206: formulate corresponding risk prevention and control strategies according to the risk level of each of the above risk event information.
[0113] An embodiment of the present invention provides a processor, and the processor is used to run a program, wherein the method for preventing and controlling the risk of hydrogen leakage is executed when the program is running.
[0114] Specifically, the prevention and control methods of hydrogen leakage risks include:
[0115] Step S201, obtaining a plurality of risk event information, wherein the risk event information is information about a hydrogen leakage risk event occurring in hydrogen-related equipment;
[0116] Step S202: establish a risk matrix based on the risk event information. The number of rows in the risk matrix is the number of risk event information. The number of columns in the risk matrix is the number of hydrogen leakage risk indicators. The hydrogen leakage risk indicators at least include the possibility and severity of occurrence. The element a of the risk matrix is ij is the score of the j-th hydrogen leakage risk indicator corresponding to the i-th risk event information;
[0117] Step S203, using entropy weight method to determine the weight of the above hydrogen leakage risk index;
[0118] Step S204, calculating the risk score of each of the risk event information according to the risk matrix and the weight of the hydrogen leakage risk index;
[0119] Step S205, determining the risk level of each of the risk event information according to the risk score of each of the risk event information;
[0120] Step S206: formulate corresponding risk prevention and control strategies according to the risk level of each of the above risk event information.
[0121] An embodiment of the present invention provides a hydrogen leakage risk prevention and control system, which includes a processor, a memory, and a program stored in the memory and executable on the processor. When the processor executes the program, at least the following steps are implemented:
[0122] Step S201, obtaining a plurality of risk event information, wherein the risk event information is information about a hydrogen leakage risk event occurring in hydrogen-related equipment;
[0123] Step S202: establish a risk matrix based on the risk event information. The number of rows in the risk matrix is the number of risk event information. The number of columns in the risk matrix is the number of hydrogen leakage risk indicators. The hydrogen leakage risk indicators at least include the possibility and severity of occurrence. The element a of the risk matrix is ij is the score of the j-th hydrogen leakage risk indicator corresponding to the i-th risk event information;
[0124] Step S203, using entropy weight method to determine the weight of the above hydrogen leakage risk index;
[0125] Step S204, calculating the risk score of each of the risk event information according to the risk matrix and the weight of the hydrogen leakage risk index;
[0126] Step S205, determining the risk level of each of the risk event information according to the risk score of each of the risk event information;
[0127] Step S206: formulate corresponding risk prevention and control strategies according to the risk level of each of the above risk event information.
[0128] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program for initializing at least the following method steps:
[0129] Step S201, obtaining a plurality of risk event information, wherein the risk event information is information about a hydrogen leakage risk event occurring in hydrogen-related equipment;
[0130] Step S202: establish a risk matrix based on the risk event information. The number of rows in the risk matrix is the number of risk event information. The number of columns in the risk matrix is the number of hydrogen leakage risk indicators. The hydrogen leakage risk indicators at least include the possibility and severity of occurrence. The element a of the risk matrix is ij is the score of the j-th hydrogen leakage risk indicator corresponding to the i-th risk event information;
[0131] Step S203, using entropy weight method to determine the weight of the above hydrogen leakage risk index;
[0132] Step S204, calculating the risk score of each of the risk event information according to the risk matrix and the weight of the hydrogen leakage risk index;
[0133] Step S205, determining the risk level of each of the risk event information according to the risk score of each of the risk event information;
[0134] Step S206: formulate corresponding risk prevention and control strategies according to the risk level of each of the above risk event information.
[0135] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0136] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0137] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0138] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0139] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0140] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0141] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0142] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0143] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0144] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:
[0145] 1) In the hydrogen leakage risk prevention and control method of the present application, the method scores each hydrogen leakage risk indicator corresponding to each risk event information to establish a risk matrix, and uses the entropy weight method to determine the weight of the above hydrogen leakage risk indicator. The risk score of each risk event information can be calculated by the risk matrix and the weight of the hydrogen leakage risk indicator, and then the risk level of the risk event information is determined, that is, according to the risk level of the risk event information, a corresponding risk prevention and control strategy is formulated and resources are reasonably allocated to reduce the probability of risk occurrence and reduce the impact of risk events. This solves the problem of unreasonable risk prevention and control strategies caused by inaccurate hydrogen leakage risk levels in the prior art.
[0146] 2) In the hydrogen leakage risk prevention and control device of the present application, the device scores each hydrogen leakage risk indicator corresponding to each risk event information to establish a risk matrix, and uses the entropy weight method to determine the weight of the above hydrogen leakage risk indicator. The risk score of each risk event information can be calculated by the risk matrix and the weight of the hydrogen leakage risk indicator, and then the risk level of the risk event information is determined. That is, according to the risk level of the risk event information, corresponding risk prevention and control strategies and reasonable allocation of resources are formulated to reduce the probability of risk occurrence and reduce the impact of risk events. This solves the problem of unreasonable risk prevention and control strategies caused by inaccurate hydrogen leakage risk levels in the prior art.
[0147] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for preventing and controlling hydrogen leakage risk, characterized in that: include: Acquire multiple risk event information, wherein the risk event information is information about hydrogen leakage risk events occurring in hydrogen-related equipment; A risk matrix is established based on the risk event information. The number of rows in the risk matrix is the number of risk event information. The number of columns in the risk matrix is the number of hydrogen leakage risk indicators. The hydrogen leakage risk indicators at least include the possibility and severity of occurrence. The element a of the risk matrix is ij is the score of the jth hydrogen leakage risk indicator corresponding to the i-th risk event information; The entropy weight method is used to determine the weight of the hydrogen leakage risk index; Calculating a risk score for each of the risk event information according to the risk matrix and the weight of the hydrogen leakage risk index; Determine the risk level of each risk event information according to the risk score of each risk event information; Formulate corresponding risk prevention and control strategies based on the risk level of each risk event information.
2. The method according to claim 1, characterized in that Obtain multiple risk event information, including: Classifying risk events according to hydrogen leakage occurrence scenarios and risk categories to obtain multiple groups of risk events; A plurality of risk event information are determined based on the plurality of groups of risk events, wherein the risk event information includes the probability of occurrence of the risk event and the impact of the occurrence, and one piece of risk event information corresponds to a group of risk events.
3. The method according to claim 2, characterized in that A risk matrix is established based on the risk event information, including: Scoring the likelihood of occurrence of the risk event information according to the probability of occurrence of the risk event corresponding to each of the risk event information to obtain a plurality of first scores; Scoring the severity of the risk event information according to the impact of the risk event corresponding to each of the risk event information to obtain a plurality of second scores; The risk matrix is constructed according to a plurality of the first scores and a plurality of the second scores.
4. The method according to claim 1, characterized in that: The entropy weight method is used to determine the weight of the hydrogen leakage risk index, including: For the element a of the risk matrix ij Perform normalization processing to obtain multiple normalized scores f ij , the normalized score f ij is the normalized score of the jth hydrogen leakage risk indicator corresponding to the i-th risk event information; use Calculate the entropy value H of each hydrogen leakage risk index j , the entropy value H j is the entropy value of the j-th hydrogen leakage risk indicator; use Calculate the weight of each hydrogen leakage risk index use Calculate the weight index of each hydrogen leakage risk indicator is the entropy value H not equal to 1 j The mean of use Weights of the hydrogen leakage risk indicators Optimize and obtain the weight w of each hydrogen leakage risk indicator rm, j, where r is a constant.
5. The method according to claim 1, characterized in that Calculating the risk score of each risk event information according to the risk matrix and the weight of the hydrogen leakage risk index includes: use Calculate the risk score S of each risk event information i , the risk score S i is the risk score of the i-th risk event information.
6. The method according to any one of claims 1 to 5, characterized in that Determining the risk level of each of the risk event information according to the risk score of each of the risk event information includes: When the risk score is less than or equal to the first threshold, determining that the risk level of the corresponding risk event information is an acceptable risk; When the risk score is greater than the first threshold and less than or equal to the second threshold, determining that the risk level of the corresponding risk event information is low risk; When the risk score is greater than the second threshold and less than or equal to the third threshold, determining that the risk level of the corresponding risk event information is medium risk; When the risk score is greater than the third threshold and less than or equal to the fourth threshold, determining that the risk level of the corresponding risk event information is high risk; When the risk score is greater than the fourth threshold, it is determined that the risk level of the corresponding risk event information is an unacceptable risk.
7. A device for preventing and controlling hydrogen leakage risk, characterized in that: include: An acquisition unit, used to acquire a plurality of risk event information, wherein the risk event information is information about a hydrogen leakage risk event of hydrogen-related equipment; A establishing unit is used to establish a risk matrix according to the plurality of risk event information, wherein the number of rows of the risk matrix is the number of risk event information, the number of columns of the risk matrix is the number of hydrogen leakage risk indicators, the hydrogen leakage risk indicators at least include the possibility and severity of occurrence, and the element a of the risk matrix is ij is the score of the jth hydrogen leakage risk indicator corresponding to the i-th risk event information; A first determining unit, configured to determine a weight of the hydrogen leakage risk index by adopting an entropy weight method; A calculation unit, used for calculating the risk score of each risk event information according to the risk matrix and the weight of the hydrogen leakage risk index; A second determining unit is used to determine the risk level of each of the risk event information according to the risk score of each of the risk event information; The generating unit is used to formulate corresponding risk prevention and control strategies according to the risk level of each risk event information.
8. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method according to any one of claims 1 to 6.
9. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.
10. A hydrogen leakage risk prevention and control system, characterized in that: include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of claims 1 to 6.