Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

452results about How to "Reduce casualties" patented technology

Fire-fighting data processing method and intelligent fire-fighting platform

The invention relates to the technical field of intelligent fire fighting, in particular to a fire fighting data processing method and an intelligent fire fighting platform. The method comprises the following steps: acquiring fire-fighting supervision data; performing fire abnormal feature analysis based on the fire-fighting supervision data to generate fire abnormal feature data; according to the fire anomaly feature data, performing simulated fire anomaly spatio-temporal evolution analysis of the fire-fighting supervision area to generate simulated fire anomaly spatio-temporal evolution data; performing time-space node evaluation processing of a fire risk index on the simulated fire abnormal time-space evolution data to generate a fire risk time-space evaluation index; based on the fire risk space-time evaluation index, multi-agent collaborative fire-fighting intelligent control parameter analysis is carried out, and multi-agent collaborative fire-fighting intelligent control parameters are generated; and executing multi-agent cooperative fire-fighting intelligent control operation according to the cooperative multi-agent fire-fighting intelligent control parameters. According to the invention, by analyzing the evolution trend of fire-fighting fires, accurate fire-fighting measures are realized by multi-agent cooperative fire-fighting control.
Owner:HUNAN JUNTE INTELLIGENT TECH CO LTD

Smart park safety management method and system based on data analysis

The invention discloses a smart park safety management method and system based on data analysis, and relates to the technical field of safety managements.During operation of the system, sensors are installed at key positions in an industrial park, various safety related data are collected in real time, and a first data set, a second data set and a third data set are obtained; data are transmitted to a central system through a wireless network or a wired network, the collected data are stored and preliminarily processed, an industrial park safety management index Gygl is obtained through calculation according to historical data and real-time data, the Gygl is compared with a preset standard threshold value M and a preset standard threshold value N, the safety risk of the industrial park is evaluated, and the safety risk of the industrial park is evaluated. According to the method, various safety indexes are monitored in real time, abnormal conditions are identified, real-time early warning is provided, various safety data and safety conditions of the industrial park are displayed in real time through a visualization technology, a chart and an instrument panel, a safety management report is generated, and a regular safety report is generated.
Owner:BEIJING JIABI TECHNOLOGY CO LTD

Digital twinborn model and method for coal mine disaster scene based on multi-modal data

The invention provides a digital twinborn model and method for a coal mine disaster scene based on multi-modal data. The method comprises the following steps: acquiring original data in a mine; performing cleaning, normalization and de-noising preprocessing on the original data; fusing different types of preprocessed original data by using a data fusion algorithm, and constructing a comprehensive digital twinborn model; establishing a virtual mirror image of the mine by using a digital twinning technology, and mapping the mine in the real world into a digital twinning model; real-time mapping and simulation analysis are carried out based on the established digital twinborn model, and the disaster development trend is predicted by monitoring the internal environment and the equipment state of the mine; and according to a model analysis result, optimizing prevention and control measures of coal mine disasters, establishing a real-time monitoring and early warning system of the disasters, and taking measures in time when abnormal conditions are found. The system comprises a data acquisition module, a model construction module and a model analysis module. The pertinence and effectiveness of coal mine disaster prevention and control can be improved.
Owner:YUHENG POWER STATION OF SHAANXI HUADIAN YUHENG COAL POWER CO LTD +2

Geological disaster early warning device based on seismic waveform recognition

The invention relates to the technical field of earthquake monitoring, in particular to a geological disaster early warning device based on earthquake waveform recognition, which comprises an earthquake data receiving module, an earthquake wave type analysis module, a disaster mode recognition module, an early warning signal construction module, a risk judgment module and an early warning information issuing module. According to the invention, through identifying and analyzing the seismic waveform data, the characteristics of the earthquake and the type of the caused disaster, such as landslide, rock collapse, debris flow, ground fissure, surface collapse and the like, are rapidly judged, and through comprehensively evaluating the emergency and the influence range of the earthquake event, the targeted early warning information is generated and issued in time. The geological disaster response speed and efficiency can be remarkably improved, earthquake monitoring is not limited to recording of earthquake activities, disaster risks can be evaluated in real time, more accurate disaster prediction and early warning can be provided, for areas where geological disasters frequently occur, the early warning accuracy and timeliness can be remarkably improved, casualties and property losses can be reduced, and the economic benefit is improved. And the method has extremely high practical value and social significance.
Owner:KUNMING UNIV OF SCI & TECH

Method and system for artificial intelligence identification, study and judgment of fire alarm

The invention belongs to the technical field of fire detection, and discloses a method and a system for artificial intelligence identification, research and judgment of fire alarm, and the method comprises the following steps: carrying out the framing of input video data, converting a video stream into continuous image frames frame by frame, carrying out the timestamp marking of each frame of image, and obtaining a framed image; according to the method, flames are positioned by analyzing red and orange tones of the images, early signs of a fire can be more accurately captured by analyzing flame shapes and diffusion behaviors, the area change rate of flames and smoke in continuous frames can be analyzed, the dynamic change of flame diffusion speed and smoke coverage can be beneficially understood, and the method is suitable for popularization and application. The fire hazard early warning is more timely and accurate, the fire hazard risk level is evaluated according to the flame dynamic model, and the system is allowed to adjust the sensitivity and threshold of the early warning signal according to the real-time data, so that the fire hazard early warning scheme is more targeted and effective, faster response can be provided at the initial stage of the fire hazard, and casualties and property loss are greatly reduced.
Owner:WEIFANG PING AN FIRE ENG CO LTD

Distributed optical fiber monitoring system for rock mass change state monitoring

The invention discloses a distributed optical fiber monitoring system for monitoring a rock mass change state, relates to the field of monitoring equipment, is applied to an underground cavity and can monitor axial and radial fracture signals of the underground cavity at the same time so as to facilitate three-dimensional positioning of a seismic source at a fracture occurrence position. The distributed optical fiber monitoring system comprises a first optical fiber and a second optical fiber. The first optical fibers are arranged on the cavern wall in the axial direction of the underground cavern and can monitor fracture signals distributed in the axial direction of the underground cavern; the second optical fiber is mainly composed of a peripheral side optical fiber section and a reversing transition section, and the peripheral side optical fiber section is used for being arranged on the cavern wall along the cross section contour of the cavern wall and can monitor fracture signals distributed in the radial direction of the underground cavern. Therefore, the distributed optical fiber monitoring system can simultaneously monitor the axial and radial fracture signals of the underground cavern, realizes the space monitoring of the underground cavern, and facilitates the more accurate three-dimensional positioning of a seismic source at the fracture occurrence position.
Owner:SICHUAN UNIV

Improved semantic segmentation network construction method and system for bridge road crack recognition

The invention belongs to the technical field of bridge and road crack recognition, and discloses an improved semantic segmentation network construction method and system for bridge and road crack recognition. According to the method, a convolution block, a down-sampling layer and an up-sampling layer in a UNet network are improved, a novel space-channel attention mechanism is introduced, jump connection and a U-shaped structure in the UNet network are reserved, an improved semantic segmentation network is constructed, and crack recognition is carried out. According to the invention, a highly-specific crack semantic segmentation network model with stronger generalization ability and higher precision is designed, on CRACK500, SDNET2018 and CFD public data sets, IoU is 73.3%, F1 reaches 82.6% and is far higher than that of other models, and the method is suitable for detecting cracks on bridge body structures such as road surfaces and bridge towers of bridges.
Owner:SHANDONG UNIV OF SCI & TECH

Coal mine major disaster risk prevention and control system and method based on artificial intelligence

The invention relates to the technical field of coal mine safety, in particular to a coal mine major disaster risk prevention and control system and method based on artificial intelligence, and the system comprises a data collection module, a data transmission module, a data processing module, a disaster prediction module, a decision support module and a user interaction module. The data transmission module transmits collected environment data to a ground control center, the data processing module ensures the accuracy and consistency of data through data preprocessing, data fusion and anomaly detection, the disaster prediction module predicts potential disasters and generates a risk assessment report, and the decision support module determines the risk assessment report according to the prediction result. According to the system, multiple intelligent technologies are integrated, comprehensive prevention and control of major disasters of the coal mine are achieved, and the safety management level of the coal mine is improved.
Owner:云鼎科技股份有限公司

Complex stratum TBM tunneling parameter real-time prediction method

ActiveCN119513494Areduce wearReduce equipment failure rateMachine learningModel selectionMachine
The invention relates to the technical field of tunneling parameter prediction, in particular to a complex stratum TBM tunneling parameter real-time prediction method. According to the technical scheme, the method comprises the steps of data collection and preprocessing, model selection and training, model prediction and evaluation, and result application and feedback. According to the data collection and preprocessing, operation parameters are collected in real time through various sensors on TBM equipment, wherein the operation parameters comprise the cutterhead rotating speed, the penetration degree, the thrust, the torque, the total thrust, the gripper shoe pressure, the propelling speed, the current and the power. Real-time prediction of the TBM tunneling parameters of the complex stratum is achieved by fusing the machine learning algorithm, the tunneling parameters can be optimized in real time, and the construction efficiency is improved; the tunneling process is stabilized to guarantee the engineering quality; tool abrasion is reduced, energy consumption is reduced, and the construction cost is reduced; equipment faults and accidents are prevented, and construction safety is guaranteed; and construction technology innovation can be promoted, intelligent construction management is achieved, the comprehensive benefits of TBM construction are comprehensively improved, and efficient, safe and intelligent development of tunnel (roadway) engineering is promoted.
Owner:HUAINAN MINING IND GRP +2

5G communication data transmission management system

The invention discloses a 5G communication data transmission management system, which relates to the technical field of communication data transmission and comprises a real-time resource monitoring module, an intelligent evaluation module, a feature extraction module, a transmission process division module, a normal transmission management module and an overload transmission regulation and control module, through a deployed network monitoring tool and performance monitoring software, the resource occupation condition in the video monitoring data transmission process is monitored in real time. According to the invention, the system intelligently evaluates the resource occupation condition through real-time monitoring and a machine learning model, and dynamically regulates and controls the resources, reduces the delay, accelerates the analysis speed and guarantees the emergency response in the case of high load by using the queue expansion index, the link fluctuation index and the queue theory model. Through transmission process division, efficient management in a normal stage and dynamic optimization in an overload stage are realized, timely response and resource release are ensured, waste is avoided, and the stability and efficiency of the system under various loads are improved.
Owner:NANJING ZHIGAN SPECTRUM INFORMATION TECH CO LTD

Indoor fire hazard flashover risk prediction method based on flame form and remote sensing data

An indoor fire hazard flashover risk prediction method based on a flame form and remote sensing data comprises the following steps: using fire hazard simulation software to simulate fire hazard data, and constructing a fire hazard data set; ignition is conducted, an indoor fire flame image is obtained through a high-definition camera, and the obtained image is processed; outputting the real-time heat release rate HRR of a fire point from the processed image through a residual network Resnet model; a methane laser remote sensing detector is used for monitoring and acquiring methane gas concentration data of an indoor flue gas layer at a specific height in real time; and building a fire hazard flashover risk prediction model based on the fire source heat release rate and the methane gas concentration, and predicting the flashover risk in advance. According to the invention, accurate identification and prediction of the flashover risk of the fire in the early stage of fire development are realized, and an early warning signal is sent when the fire is about to enter the flashover stage, so that casualties and property loss caused by the fire are reduced.
Owner:SHENZHEN RESEARCH INSTITUTE OF CHINA UNIVERSITY OF MINING & TECHNOLOGY

Disaster response intelligent command system and control method thereof

The invention discloses a disaster response intelligent command system and a control method thereof, and relates to the field of emergency processing, and the system comprises an environment information collection module which is used for obtaining the environment information of a target area; the disaster early warning module is used for acquiring the environment information and generating disaster early warning information based on the environment information; the intelligent decision module is used for acquiring the environment information and generating an emergency response instruction and a resource management instruction based on the environment information; the emergency response module is used for acquiring the emergency response instruction and generating an emergency response scheme based on the emergency response instruction; the resource management module is used for acquiring the resource management instruction and generating a resource management scheme based on the resource management instruction; and the manual information collection module is used for carrying out intelligent interaction with the fed-back personnel and obtaining manual information, and the manual information is used for correcting the emergency response instruction and the resource management instruction.
Owner:SICHUAN YINLIHUA APPL TECH CO LTD

Fire early warning method and system based on multi-source information fusion and medium

The invention discloses a fire early warning method and system based on multi-source information fusion and a medium. The method comprises single vehicle model training, model deployment, fire risk assessment, BIM modeling display and abnormal information notification. According to the fire early warning method and system based on multi-source information fusion and the medium, deep fusion and model training are carried out on the image, positioning and temperature information of the vehicle, the vehicle temperature fault mode can be rapidly and accurately recognized, the accuracy of fire early warning is improved, multi-source information is obtained in real time, and when the vehicle has an overtemperature phenomenon, the fire early warning efficiency is improved. A worker can quickly locate the vehicle and nearby the vehicle, measures can be taken for the overtemperature vehicle in time, fire disasters are prevented or the fire disaster damage degree is reduced, and powerful support is provided for fire prevention and control work. A bridge fire risk map is displayed on a display device or a user terminal by establishing a bridge BIM model, a command department, workers and drivers can quickly grasp information such as a disaster site, a fire reason, a disaster situation degree and a vehicle density degree of a current bridge fire through the bridge fire risk map, and the environment adaptability of the system is high; according to the invention, the fire risk can be evaluated in different environments, the decision-making efficiency of a command department is improved, a worker can quickly arrive at a rescue site to carry out fire extinguishing and rescue work, and a driver in a low-risk area can quickly evacuate from a bridge or assist the worker in personnel evacuation. And casualties and economic losses caused by fire disasters can be reduced as much as possible.
Owner:广东交科检测有限公司 +4

Marine traffic accident severity prediction method based on feature engineering

The invention provides a maritime traffic accident severity prediction method based on feature engineering, and the method comprises the steps: constructing a maritime accident risk influence factor data set according to risk influence factors and accident severity in historical data, and carrying out the preprocessing of the data; coupling the influence factors through a feature fusion algorithm, and mining association rules; carrying out data balance analysis by using an SVM-SMOTE oversampling method, and balancing the sample proportion of serious accidents and non-serious accidents; the original influence factors are trained by using multiple machine learning models, and key influence factor subsets are screened out by calculating the importance degrees of the influence factors; and S4, evaluating an optimal model in the machine learning model through a UAR evaluation index, and predicting the severity of the marine traffic accident by using the optimal model and combining the key influence factor subset in the S4. By reasonably matching the combination of the prediction model and the oversampling method, the model performance is remarkably improved, and a comprehensive and profound insight is provided for predicting the severity of the marine accident.
Owner:DALIAN MARITIME UNIVERSITY

New energy vehicle power battery protection and flame retardation system and method

The invention relates to a new energy vehicle power battery protection flame-retardant system and method, and belongs to the technical field of new energy vehicle protection. The system comprises a controller, a power source, an unfolding device and sensors, the power source, the unfolding device and the sensors are electrically connected with the controller, the unfolding device comprises a gas generator and flame-retardant cloth, and the sensors comprise a temperature sensor arranged on a vehicle power battery, a smoke sensor and collision sensors arranged on a vehicle body and the power battery; and the unfolding device is arranged corresponding to a power battery of the vehicle. The invention has the following beneficial effects: when the vehicle power battery burns due to high temperature or accident collision, flames, high temperature and a large amount of smoke generated by burning are isolated, the escape time of passengers is prolonged, the medical cost caused by casualties is reduced, and the economic loss is effectively reduced; and meanwhile, by reducing the number of casualties in traffic accidents, the overall safety level of the society is improved, and the social stability is maintained.
Owner:BEIJING VOCATIONAL COLLEGE OF TRANSPORTATION

Mountain torrent disaster monitoring data source fusion processing method and system based on deep learning

The invention belongs to the technical field of mountain torrent disaster monitoring, and discloses a mountain torrent disaster monitoring data source fusion processing method and system based on deep learning. The method comprises the steps of multi-source rainfall data collection, multi-source data fusion and fusion processing of multiple monitoring data sources, including data integration, data alignment, data fusion algorithm and other operations, and through fusion processing of the multiple monitoring data sources, a high-precision rainfall monitoring result is obtained. Analyzing rainfall data, and predicting the probability and range of mountain torrent disasters possibly occurring in the future according to an analysis result; and releasing mountain torrent early warning information. Based on a multi-source data fusion technology, the rainfall condition can be monitored more accurately, and the accuracy and reliability of early warning are improved. Early warning information is sent out 2 hours in advance, enough time can be provided for relevant mountain torrent defense departments to take countermeasures, and casualties and property losses are reduced.
Owner:青海省水旱灾害防御服务中心(省水利厅农村水电技术服务中心)(青海省黄河干流防洪工程建设局) +3

Coal mine water flowing fractured zone observation method, device and system and storage medium

The invention discloses a coal mine water flowing fractured zone observation method, device and system and a storage medium, and belongs to the technical field of coal mine safety monitoring and early warning. The method comprises the following steps: constructing an initialized transparent geologic model; acquiring historical fracture electrification method data; the initialized transparent geologic model is used for processing historical fracture electrification method data so as to construct a roof water flowing fractured zone virtual mirror image; processing the virtual mirror image of the roof water flowing fractured zone by using a numerical simulation algorithm to obtain simulation monitoring data; obtaining monitoring difference data according to the simulation monitoring data and the electrical method data characteristics corresponding to the early warning threshold; optimizing the initialized transparent geologic model according to the monitoring difference data to obtain a target geologic model; acquiring fracture electrification method data through a drilling electrical method technology; inputting the fracture electrification method data into the target geologic model to obtain monitoring data; judging whether the monitoring data exceed an early warning threshold value or not; and if yes, triggering an early warning mechanism.
Owner:CETC BIGDATA RES INST CO LTD

Landslide geological disaster early warning pushing method and system

The invention discloses a landslide geological disaster early warning pushing method and system, and relates to the technical field of emergency response, and the method comprises the steps: introducing a time dimension to generate an early warning pushing coefficient Awarning based on a landslide influence range Aimpact and a comprehensive risk score Rreg, and carrying out the dynamic adjustment through analyzing the change of a risk along with the time, thereby achieving the early warning pushing of a landslide geological disaster. And comparing with a preset first push threshold value F1 and a preset second push threshold value F2, and timely transmitting the risk condition of the landslide influence area. When the early warning pushing coefficient Awarning exceeds a first pushing threshold value F1, an emergency early warning mechanism is triggered immediately, first landslide information is pushed, and related personnel are informed to take necessary safety measures; and when the early warning push coefficient Awarning is between the first push threshold F1 and the second push threshold F2, second landslide information is pushed, residents are reminded to make precaution preparations, and the dynamic evaluation mechanism ensures that the early warning information can quickly and accurately reflect risk changes.
Owner:KUNMING PUXING ENVIRONMENTAL PROTECTION TECHNOLOGY CO LTD

Comprehensive pipe gallery monitoring and early warning analysis method based on multimode sensing fusion reasoning

The invention discloses a comprehensive pipe gallery monitoring and early warning analysis method based on multimode sensing fusion reasoning, relates to the technical field of comprehensive pipe gallery monitoring and early warning, and solves the technical problem that in the prior art, only the risk at the current moment is processed, the potential chain reaction of the risk is ignored, and the risk is spread. According to the method, risk event evolution chains are constructed through development nodes of risk events, and a comprehensive pipe gallery risk evolution network is constructed according to overlapped nodes and index description sets of the risk event evolution chains; the early warning state score of the comprehensive pipe gallery is analyzed; analyzing an early warning consequence score of the comprehensive pipe gallery according to the consequence score of the risk event corresponding to the alarm node; based on the early warning state score and the early warning consequence score, the early warning grade of the comprehensive pipe gallery is analyzed; according to the invention, through the comprehensive pipe gallery risk evolution network, potential risk chain reactions are predicted in advance, and early warning is carried out in time.
Owner:HEFEI ZEZHONG CITY INTELLIGENT TECH CO LTD

Multi-dimensional fire safety management system

The invention relates to the technical field of fire safety, in particular to a multi-dimensional fire safety management system which comprises an environment monitoring module, a data analysis module, a real-time video monitoring module, an intelligent decision module and a self-adaptive evacuation navigation module. The data analysis module processes and analyzes the collected environmental data, the real-time video monitoring module monitors the internal situation of the building by adopting a high-resolution camera, the intelligent decision-making module generates a fire coping strategy, and the self-adaptive evacuation navigation module dynamically generates and updates a safe evacuation route in the building. The self-adaptive evacuation navigation module is introduced, so that a safe evacuation route in the building can be dynamically generated and updated in real time. The system can adjust the evacuation route according to the current environmental condition by analyzing the fire behavior development and the personnel distribution condition in the building in real time, thereby effectively preventing the personnel from entering a high-risk area by mistake, and ensuring that the personnel can be quickly and orderly guided to a safe area in an emergency.
Owner:QINGDAO TONGREN BUILDING FIRE PROTECTION CO LTD

Flood inundation area prediction method based on land survey data

The invention discloses a flood inundation area prediction method based on land survey data, and relates to the technical field of flood inundation area prediction.The method comprises the steps that when a dam breach risk coefficient of a target dam is not smaller than a preset dam breach risk coefficient, a plurality of preliminary inundation sub-areas are simulated according to flood water flow; obtaining a first flood water storage capacity of each preliminary submerging sub-region; taking the current vegetation density, underground water level height and soil permeability coefficient of each preliminary submerging sub-region as a data set, and clustering the data set to determine a water storage capacity influence index of each preliminary submerging sub-region; the second flood storage capacity is obtained according to the water storage capacity influence index and the first flood storage capacity, and the final flood inundation area is determined according to the second flood storage capacity, so that the flood inundation area in the future period can be predicted, the flood control plan and the emergency plan are normal, flood can be effectively prevented and evacuated before the flood comes, and the flood inundation efficiency is improved. And casualties and property loss are reduced.
Owner:TECH CENT FOR SOIL AGRI & RURAL ECOLOGY & ENVIRONMENT MINIST OF ECOLOGY & ENVIRONMENT

Power catwalk and remote control under-pressure operation system

The invention relates to the technical field of oil and gas drilling and production equipment, in particular to a power catwalk and a remote control snubbing operation system.The power catwalk comprises a main body base, a transportation track is installed on the main body base, a pipe rack is installed on at least one side of the main body base, the transportation track is used for transporting pipe columns, and the pipe rack is hinged to the main body base; the pipe rack can swing up and down around a hinge point with the main body base; the conveying rails are arranged at intervals, a pipe outlet assembly is arranged between every two adjacent conveying rails and comprises a first base, the first base is provided with a fixed plate and a movable plate, the fixed plate is fixedly connected with the first base and used for bearing pipe columns, and the movable plate turns over towards the pipe arranging frame. And the moving plate is used for pushing the pipe columns in the conveying rail into the pipe arranging frame on one side of the main body base. The power catwalk pipe column in-and-out transportation track does not need manual carrying or intervention, the possibility of personnel casualty accidents is reduced, the efficiency of pipe column in-and-out transportation track is remarkably improved, and the operation time is shortened.
Owner:CHENGDU LUFTHANSA PETROLEUM TECH CO LTD

Improved white whale optimized BiLSTM-Attention loess landslide displacement prediction method and system

The invention belongs to the technical field of landslide prediction, and discloses a BiLSTM-Attention loess landslide displacement prediction method and system based on an improved whale algorithm, and the method comprises the steps: decomposing the accumulated displacement of a landslide into trend term displacement and periodic term displacement through an exponential smoothing method, and dividing a training set and a test set; the method comprises the following steps: establishing a BiLSTM-Attention network model, designing a multi-strategy enhanced white whale algorithm based on a fuzzy set, optimizing hyper-parameters in the BiLSTM-Attention model by using FBWO, and realizing adaptive optimization of four hyper-parameters, namely a hidden layer node number, an initial learning rate, a maximum number of iterations and a regularization coefficient, in the BiLSTM-Attention network. And finally, an FBWO-BiLSTM-Attention landslide displacement prediction model is obtained and is used for predicting the displacement of a periodic term. Inputting the trend term displacement data into a partial least square regression model to obtain predicted trend term displacement; inputting the periodic term displacement data into the FBWO-BiLSTM-Attention prediction model to obtain a predicted value of the periodic term displacement; and adding the predicted trend term displacement and periodic term displacement to obtain a final landslide accumulated displacement prediction result.
Owner:NORTHWEST UNIV

Traffic accident early warning method and system based on neural network algorithm

The invention discloses a traffic accident early warning method and system based on a neural network algorithm, and relates to the field of traffic accident prediction.The method comprises the steps that traffic monitoring data including vehicle behavior data and traffic flow data are obtained and preprocessed, and corresponding traffic accident labels are configured; utilizing diffusion process and reverse process mechanisms to extract potential feature representation in the traffic monitoring data, and correcting the potential feature representation in combination with environmental influence; constructing a risk assessment model based on a neural network, and performing training and optimization; acquiring real-time traffic monitoring data, generating corrected real-time potential feature representation, and inputting the corrected real-time potential feature representation into the trained risk assessment model to obtain a traffic accident risk assessment value; and comparing the traffic accident risk assessment value with an early warning threshold value, and when the risk assessment value exceeds a preset threshold value, generating a traffic accident early warning signal. The problem that the model prediction generalization ability is insufficient is solved.
Owner:LANZHOU JIAOTONG UNIV +1

Disaster relief plan generation method and device based on disaster characteristics

The invention relates to the technical field of emergency rescue and disaster relief plan auxiliary recommendation, in particular to a disaster relief plan generation method and device based on disaster characteristics. According to the plan recommendation model, current disaster information is matched with a self-defined plan and a historical disaster plan to obtain a first matching probability and a second matching probability, and a recommendation result is obtained according to the first matching probability and the second matching probability; according to the disaster relief plan recommendation method and the disaster relief plan recommendation system, different types of disaster characteristics are quickly and accurately identified by combining a plan recommendation algorithm, and the personalized disaster relief plan is recommended and generated according to the disaster characteristics, so that the disaster response efficiency and effect can be remarkably improved, and the disaster relief plan recommendation method and the disaster relief plan recommendation system are high in practicability. And economic loss and casualties caused by disasters are reduced.
Owner:709TH RESEARCH INSTITUTE CHINA STATE SHIPBUILDING CORP LTD

Novel anti-slide pile and intelligent regional landslide monitoring management method and system

The invention discloses a novel anti-slide pile and an intelligent regional landslide monitoring and management method and system, relates to the technical field of landslide monitoring, combines the functions of real-time monitoring, early warning and prediction, structural stability evaluation, maintenance scheme analysis and the like, is beneficial to improving the scientificity, accuracy and efficiency of landslide control, reduces the geological disaster risk, and improves the safety of landslide management. Meanwhile, by combining elements such as the inclined piles in front of the piles, the anchor cables and the water guide pipes, the structure not only improves the stability of the slide-resistant piles, but also can effectively control deformation and drainage of landslides, so that geological disaster risks are reduced, casualties and economic losses are reduced, and the structure is composed of the slide-resistant piles, the anchor cables, the inclined piles in front of the piles, the water guide pipes and the drainage pipes; the anti-slide pile is a hollow pile, the anchor cable and the inclined pile in front of the pile are constructed in the hollow pile, the hollow pile part is filled with concrete after the anchor cable and the inclined pile are constructed, and the concept that the anchor cable cannot be constructed in a traditional embedded anti-slide pile is changed.
Owner:GUIZHOU UNIV +3

Cloud video processing method based on truck driving recorder

The invention relates to the technical field of video processing, and discloses a cloud video processing method based on a truck driving recorder, which comprises the steps of video data uploading, video feature extraction, video feature analysis and warning signal display. Through complex calculation and analysis models, the fatigue degree of the driver can be accurately evaluated, and the accuracy and reliability of driving analysis are improved; multiple factors such as the continuous driving duration of the driver, the eye closing rate of different time periods, the eye closing judgment factor and the abnormal driving coefficient are comprehensively considered, the state of the driver is comprehensively evaluated, and the limitation of single-index evaluation is avoided; the warning signal is visually displayed to related personnel, so that the related personnel can quickly take measures, such as reminding a driver of having a rest or performing other interventions, and the safety of the driver and road traffic is guaranteed.
Owner:SHENZHEN LIUXIN TECH CO LTD

H2S leakage diffusion range prediction method and system

The invention belongs to the technical field of gas diffusion safety engineering, and relates to a H2S leakage diffusion range prediction method and system, and the method comprises the steps: arranging a plurality of different sensors in a predicted leakage region; calculating predicted concentration values of different sensors according to weather information and H2S mass fraction of a predicted leakage region; a target function is set according to the predicted concentration values of different sensors, and the leakage point position and the gas mass release speed are obtained; and according to the unsteady instantaneous point source puff superposition model, simulating the leakage point position and the gas mass release velocity diffusion to obtain the H2S leakage diffusion range. The system comprises a setting module, a calculation module, an acquisition module and a diffusion simulation module. According to the method and the system, the problems of small monitoring range, high possibility of missing report, insufficient H2S early warning capability and the like of the existing point type sensor are effectively solved; and the leakage source information is inversed by using the linear sensor information, so that the prediction precision can be further improved.
Owner:CHINA NAT PETROLEUM CORP +1

Mine micro-seismic event time sequence prediction method based on KF-LSTM-BO network

The invention relates to a mine micro-seismic event time sequence prediction method, in particular to a mine micro-seismic event time sequence prediction method based on a KF-LSTM-BO network, and the method comprises the following steps: firstly, performing logarithm processing on time-space intensity data to enhance autocorrelation; meanwhile, in order to reduce the influence of accidental high-strength micro-seismic events on the data and reduce the difference between the data, a maximum and minimum value normalization method is adopted for normalization. In order to enhance the prediction effect of the irregular data, a KF filter is adopted to carry out de-noising reprocessing on the processed data. In consideration of inconvenience of manual parameter adjustment and high degree of dependence on deep learning knowledge, Bayesian optimization is introduced to perform hyper-parameter automatic adjustment and optimization on the KF-LSTM. According to the invention, the monitoring data can be acquired in real time for prediction, the safety of mining operation is improved, the production safety is ensured, and casualties are reduced at the same time.
Owner:SHENYANG INSTITUTE OF CHEMICAL TECHNOLOGY

Coal dust influence suppression method for coal mine gas laser detection and detection device

The invention discloses a coal dust influence suppression method for coal mine gas laser detection and a detection device, and the method comprises the steps: extracting gas in a coal mine goaf through a gas pump and a beam tube of the coal mine gas laser detection device, and detecting a characteristic absorption spectrum of the gas in the goaf by adopting a TDLAS technology; correcting a second harmonic signal and a peak value in the characteristic absorption spectrum by considering the attenuation influence of the coal dust in the goaf gas on the second harmonic signal of the laser penetrating through the goaf gas; and obtaining the accurate concentration value of each component gas in the goaf gas by using the corrected second harmonic signal peak value. According to the invention, the influence of coal dust on gas concentration detection can be greatly reduced, the sensitivity of gas detection is improved, and good detection effect and precision can be achieved.
Owner:CCTEG CHINA COAL RES INST