The present application relates to the technical field of oil and gas development, and discloses a
workover device and method based on homogeneous well killing fluid, wherein the
workover method of the
workover device based on homogeneous well killing fluid comprises the following steps: preparing homogeneous well killing fluid, preparing spacer fluid, carrying out circulating well killing, carrying out oil
pipe lifting operation after successful well killing, then carrying out well passing operation and oil
pipe lowering operation, ensuring that the oil
pipe is not damaged, and then using well washing fluid to carry out reverse circulation well washing, if the bottom hole plug cannot be discharged, using well killing fluid to carry out
drill grinding treatment until the well washing is qualified, connecting water
injection well process pipeline, carrying out test injection operation, confirming that the well head is not punctured and not leaked, and then the workover is successful; the present application can completely remove the bottom hole plug, ensure the smoothness of the
wellbore, improve the workover quality and efficiency, and solve the problem that under the condition of high
injection pressure of the water
injection well, the construction efficiency is affected by factors such as formation leakage, test pressure sleeve breaking and the like before carrying out conventional string checking, plugging sidetracking and other downhole operations.