Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

473results about How to "Reduce property damage" patented technology

Fire-fighting data processing method and intelligent fire-fighting platform

The invention relates to the technical field of intelligent fire fighting, in particular to a fire fighting data processing method and an intelligent fire fighting platform. The method comprises the following steps: acquiring fire-fighting supervision data; performing fire abnormal feature analysis based on the fire-fighting supervision data to generate fire abnormal feature data; according to the fire anomaly feature data, performing simulated fire anomaly spatio-temporal evolution analysis of the fire-fighting supervision area to generate simulated fire anomaly spatio-temporal evolution data; performing time-space node evaluation processing of a fire risk index on the simulated fire abnormal time-space evolution data to generate a fire risk time-space evaluation index; based on the fire risk space-time evaluation index, multi-agent collaborative fire-fighting intelligent control parameter analysis is carried out, and multi-agent collaborative fire-fighting intelligent control parameters are generated; and executing multi-agent cooperative fire-fighting intelligent control operation according to the cooperative multi-agent fire-fighting intelligent control parameters. According to the invention, by analyzing the evolution trend of fire-fighting fires, accurate fire-fighting measures are realized by multi-agent cooperative fire-fighting control.
Owner:HUNAN JUNTE INTELLIGENT TECH CO LTD

Smart park safety management method and system based on data analysis

The invention discloses a smart park safety management method and system based on data analysis, and relates to the technical field of safety managements.During operation of the system, sensors are installed at key positions in an industrial park, various safety related data are collected in real time, and a first data set, a second data set and a third data set are obtained; data are transmitted to a central system through a wireless network or a wired network, the collected data are stored and preliminarily processed, an industrial park safety management index Gygl is obtained through calculation according to historical data and real-time data, the Gygl is compared with a preset standard threshold value M and a preset standard threshold value N, the safety risk of the industrial park is evaluated, and the safety risk of the industrial park is evaluated. According to the method, various safety indexes are monitored in real time, abnormal conditions are identified, real-time early warning is provided, various safety data and safety conditions of the industrial park are displayed in real time through a visualization technology, a chart and an instrument panel, a safety management report is generated, and a regular safety report is generated.
Owner:BEIJING JIABI TECHNOLOGY CO LTD

Geological disaster early warning device based on seismic waveform recognition

The invention relates to the technical field of earthquake monitoring, in particular to a geological disaster early warning device based on earthquake waveform recognition, which comprises an earthquake data receiving module, an earthquake wave type analysis module, a disaster mode recognition module, an early warning signal construction module, a risk judgment module and an early warning information issuing module. According to the invention, through identifying and analyzing the seismic waveform data, the characteristics of the earthquake and the type of the caused disaster, such as landslide, rock collapse, debris flow, ground fissure, surface collapse and the like, are rapidly judged, and through comprehensively evaluating the emergency and the influence range of the earthquake event, the targeted early warning information is generated and issued in time. The geological disaster response speed and efficiency can be remarkably improved, earthquake monitoring is not limited to recording of earthquake activities, disaster risks can be evaluated in real time, more accurate disaster prediction and early warning can be provided, for areas where geological disasters frequently occur, the early warning accuracy and timeliness can be remarkably improved, casualties and property losses can be reduced, and the economic benefit is improved. And the method has extremely high practical value and social significance.
Owner:KUNMING UNIV OF SCI & TECH

Method and system for artificial intelligence identification, study and judgment of fire alarm

The invention belongs to the technical field of fire detection, and discloses a method and a system for artificial intelligence identification, research and judgment of fire alarm, and the method comprises the following steps: carrying out the framing of input video data, converting a video stream into continuous image frames frame by frame, carrying out the timestamp marking of each frame of image, and obtaining a framed image; according to the method, flames are positioned by analyzing red and orange tones of the images, early signs of a fire can be more accurately captured by analyzing flame shapes and diffusion behaviors, the area change rate of flames and smoke in continuous frames can be analyzed, the dynamic change of flame diffusion speed and smoke coverage can be beneficially understood, and the method is suitable for popularization and application. The fire hazard early warning is more timely and accurate, the fire hazard risk level is evaluated according to the flame dynamic model, and the system is allowed to adjust the sensitivity and threshold of the early warning signal according to the real-time data, so that the fire hazard early warning scheme is more targeted and effective, faster response can be provided at the initial stage of the fire hazard, and casualties and property loss are greatly reduced.
Owner:WEIFANG PING AN FIRE ENG CO LTD

Distributed optical fiber monitoring system for rock mass change state monitoring

The invention discloses a distributed optical fiber monitoring system for monitoring a rock mass change state, relates to the field of monitoring equipment, is applied to an underground cavity and can monitor axial and radial fracture signals of the underground cavity at the same time so as to facilitate three-dimensional positioning of a seismic source at a fracture occurrence position. The distributed optical fiber monitoring system comprises a first optical fiber and a second optical fiber. The first optical fibers are arranged on the cavern wall in the axial direction of the underground cavern and can monitor fracture signals distributed in the axial direction of the underground cavern; the second optical fiber is mainly composed of a peripheral side optical fiber section and a reversing transition section, and the peripheral side optical fiber section is used for being arranged on the cavern wall along the cross section contour of the cavern wall and can monitor fracture signals distributed in the radial direction of the underground cavern. Therefore, the distributed optical fiber monitoring system can simultaneously monitor the axial and radial fracture signals of the underground cavern, realizes the space monitoring of the underground cavern, and facilitates the more accurate three-dimensional positioning of a seismic source at the fracture occurrence position.
Owner:SICHUAN UNIV

Automobile information safety fuzzy test method and system based on large model

The invention belongs to the technical field of automobile information safety fuzzy testing, discloses an automobile information safety fuzzy testing method based on a large model, and develops optimization application research of LLMs in an automobile software fuzzy testing scene by utilizing the advantages of an artificial intelligence technology in the aspects of data processing, natural language interaction, generalization ability and the like. The concealment and effectiveness of the test set generated by the fuzz test are optimized, and the fuzz test process efficiency is improved. Through the implementation of the invention, related key technologies are applied to the fuzz test of the automobile, and other related products and enterprises in China are radiated by writing technical standards, so that the fuzz test system can be used as an application demonstration and sample plate of the fuzz test of the intelligent driving automobile. According to market analysis, fuzzy test calculation is carried out on 100 thousand automobiles every year according to the method, and the data safety and the system safety are improved.
Owner:BEIJING INST OF TECH

Fire environment emergency evacuation system of railway tunnel emergency rescue station

The invention provides a fire environment emergency evacuation system of a railway tunnel emergency rescue station. The fire environment emergency evacuation system comprises subsystems and a central system. The subsystem comprises a data acquisition module which monitors data of various disaster-causing factors in an area where the subsystem is located in real time; the data analysis module is used for judging the danger degree of the region through threshold comparison by using a parallel computing judgment algorithm of time filtering; the alarm module is used for giving an alarm and indicating a safe evacuation direction according to the danger degree; and the central system is used for summarizing the data of all the subsystems, dynamically dividing a safe evacuation area in a preset two-dimensional grid map, and calculating an optimal evacuation path from each grid to the safe area based on an improved D * algorithm combined with a railway tunnel fire special environment so as to avoid a dangerous area. And finally, obtaining an optimal evacuation path combined with the real-time change of the fire environment. According to the embodiment, the safety guarantee capability of the railway tunnel can be remarkably improved, and the method has important significance in promoting sustainable and healthy development of railway traffic.
Owner:CENT SOUTH UNIV +3

Coal mine major disaster risk prevention and control system and method based on artificial intelligence

The invention relates to the technical field of coal mine safety, in particular to a coal mine major disaster risk prevention and control system and method based on artificial intelligence, and the system comprises a data collection module, a data transmission module, a data processing module, a disaster prediction module, a decision support module and a user interaction module. The data transmission module transmits collected environment data to a ground control center, the data processing module ensures the accuracy and consistency of data through data preprocessing, data fusion and anomaly detection, the disaster prediction module predicts potential disasters and generates a risk assessment report, and the decision support module determines the risk assessment report according to the prediction result. According to the system, multiple intelligent technologies are integrated, comprehensive prevention and control of major disasters of the coal mine are achieved, and the safety management level of the coal mine is improved.
Owner:云鼎科技股份有限公司

Intelligent electric meter power load analysis system and method

The invention relates to the technical field of power load analysis, and discloses an intelligent ammeter power load analysis system and method, and the method comprises the steps: obtaining the current overall power consumption of a user, judging whether the power consumption of the user is abnormal or not, forming abnormal analysis data, and carrying out the corresponding abnormal prompt for the user according to the abnormal analysis data. According to the intelligent electric meter power load analysis system and method, whether the electric equipment is abnormal or not is judged according to the power utilization data collected by the electric meter, the abnormal reason of the electric equipment is judged according to the power utilization data, and a user is timely notified to carry out adjustment according to the abnormal reason of the electric equipment; therefore, the service life of the electric equipment is prevented from being shortened due to the fact that the use condition of the electric equipment cannot be adjusted in time, the equipment is prevented from being damaged due to the fact that equipment abnormity cannot be perceived in time, the service life of the equipment is prolonged, property loss of a user is reduced, fire catching of the electric equipment is reduced, and personal injury to personnel due to fire disasters is avoided.
Owner:BEIJING BONA ELECTRIC CO LTD

Indoor fire hazard flashover risk prediction method based on flame form and remote sensing data

An indoor fire hazard flashover risk prediction method based on a flame form and remote sensing data comprises the following steps: using fire hazard simulation software to simulate fire hazard data, and constructing a fire hazard data set; ignition is conducted, an indoor fire flame image is obtained through a high-definition camera, and the obtained image is processed; outputting the real-time heat release rate HRR of a fire point from the processed image through a residual network Resnet model; a methane laser remote sensing detector is used for monitoring and acquiring methane gas concentration data of an indoor flue gas layer at a specific height in real time; and building a fire hazard flashover risk prediction model based on the fire source heat release rate and the methane gas concentration, and predicting the flashover risk in advance. According to the invention, accurate identification and prediction of the flashover risk of the fire in the early stage of fire development are realized, and an early warning signal is sent when the fire is about to enter the flashover stage, so that casualties and property loss caused by the fire are reduced.
Owner:SHENZHEN RESEARCH INSTITUTE OF CHINA UNIVERSITY OF MINING & TECHNOLOGY

Marine traffic accident severity prediction method based on feature engineering

The invention provides a maritime traffic accident severity prediction method based on feature engineering, and the method comprises the steps: constructing a maritime accident risk influence factor data set according to risk influence factors and accident severity in historical data, and carrying out the preprocessing of the data; coupling the influence factors through a feature fusion algorithm, and mining association rules; carrying out data balance analysis by using an SVM-SMOTE oversampling method, and balancing the sample proportion of serious accidents and non-serious accidents; the original influence factors are trained by using multiple machine learning models, and key influence factor subsets are screened out by calculating the importance degrees of the influence factors; and S4, evaluating an optimal model in the machine learning model through a UAR evaluation index, and predicting the severity of the marine traffic accident by using the optimal model and combining the key influence factor subset in the S4. By reasonably matching the combination of the prediction model and the oversampling method, the model performance is remarkably improved, and a comprehensive and profound insight is provided for predicting the severity of the marine accident.
Owner:DALIAN MARITIME UNIVERSITY

Mountain torrent disaster monitoring data source fusion processing method and system based on deep learning

The invention belongs to the technical field of mountain torrent disaster monitoring, and discloses a mountain torrent disaster monitoring data source fusion processing method and system based on deep learning. The method comprises the steps of multi-source rainfall data collection, multi-source data fusion and fusion processing of multiple monitoring data sources, including data integration, data alignment, data fusion algorithm and other operations, and through fusion processing of the multiple monitoring data sources, a high-precision rainfall monitoring result is obtained. Analyzing rainfall data, and predicting the probability and range of mountain torrent disasters possibly occurring in the future according to an analysis result; and releasing mountain torrent early warning information. Based on a multi-source data fusion technology, the rainfall condition can be monitored more accurately, and the accuracy and reliability of early warning are improved. Early warning information is sent out 2 hours in advance, enough time can be provided for relevant mountain torrent defense departments to take countermeasures, and casualties and property losses are reduced.
Owner:青海省水旱灾害防御服务中心(省水利厅农村水电技术服务中心)(青海省黄河干流防洪工程建设局) +3

Artificial intelligence comprehensive fire extinguishing system of electric vehicle charging station

The invention discloses an artificial intelligence comprehensive fire extinguishing system for an electric vehicle charging station, belongs to the technical field of intelligent fire extinguishing, and can monitor the temperature, smoke, voltage and charging conditions of the charging station in real time and intelligently judge fire risks by adopting an artificial intelligence technology, so that the intelligent level of the fire extinguishing system is improved, and the fire monitoring accuracy is improved. And the mechanical arm fire extinguishing module and the intelligent vehicle moving module are arranged, so that property loss caused by fire disasters can be effectively reduced.
Owner:BEIJING UNIVERSAL FUTURE TECH CO LTD

Battery car storage battery charging cabinet with automatic fire extinguishing device

The utility model discloses a battery car storage battery charging cabinet with an automatic fire extinguishing device, which comprises a cabinet body, a plurality of battery cabins are longitudinally arranged on two sides in the cabinet body, a battery falling channel is formed between two rows of battery cabins, and an isolation cabin communicated with the battery falling channel is arranged at the bottom of the cabinet body. A hot aerosol fire extinguishing device is installed at the top end in the isolation bin, a charging socket and a separation mechanism are installed on the inner wall of the battery bin, a smoke sensing alarm is installed at the top end in the battery bin, an electric control unit is installed at the bottom end in the battery bin, and a discharging opening communicated with a battery falling channel is formed in one side of the battery bin. According to the storage battery automatic fire extinguishing device, the storage battery which is spontaneously combusted can be isolated and automatically extinguished, the influence of the fire behavior on other storage batteries is reduced, and potential safety hazards and property loss are reduced.
Owner:WEIFANG SONGCHEN CHUANGZHI 3D TECH CO LTD

Landslide geological disaster early warning pushing method and system

The invention discloses a landslide geological disaster early warning pushing method and system, and relates to the technical field of emergency response, and the method comprises the steps: introducing a time dimension to generate an early warning pushing coefficient Awarning based on a landslide influence range Aimpact and a comprehensive risk score Rreg, and carrying out the dynamic adjustment through analyzing the change of a risk along with the time, thereby achieving the early warning pushing of a landslide geological disaster. And comparing with a preset first push threshold value F1 and a preset second push threshold value F2, and timely transmitting the risk condition of the landslide influence area. When the early warning pushing coefficient Awarning exceeds a first pushing threshold value F1, an emergency early warning mechanism is triggered immediately, first landslide information is pushed, and related personnel are informed to take necessary safety measures; and when the early warning push coefficient Awarning is between the first push threshold F1 and the second push threshold F2, second landslide information is pushed, residents are reminded to make precaution preparations, and the dynamic evaluation mechanism ensures that the early warning information can quickly and accurately reflect risk changes.
Owner:KUNMING PUXING ENVIRONMENTAL PROTECTION TECHNOLOGY CO LTD

Multi-dimensional fire safety management system

The invention relates to the technical field of fire safety, in particular to a multi-dimensional fire safety management system which comprises an environment monitoring module, a data analysis module, a real-time video monitoring module, an intelligent decision module and a self-adaptive evacuation navigation module. The data analysis module processes and analyzes the collected environmental data, the real-time video monitoring module monitors the internal situation of the building by adopting a high-resolution camera, the intelligent decision-making module generates a fire coping strategy, and the self-adaptive evacuation navigation module dynamically generates and updates a safe evacuation route in the building. The self-adaptive evacuation navigation module is introduced, so that a safe evacuation route in the building can be dynamically generated and updated in real time. The system can adjust the evacuation route according to the current environmental condition by analyzing the fire behavior development and the personnel distribution condition in the building in real time, thereby effectively preventing the personnel from entering a high-risk area by mistake, and ensuring that the personnel can be quickly and orderly guided to a safe area in an emergency.
Owner:QINGDAO TONGREN BUILDING FIRE PROTECTION CO LTD

Flood inundation area prediction method based on land survey data

The invention discloses a flood inundation area prediction method based on land survey data, and relates to the technical field of flood inundation area prediction.The method comprises the steps that when a dam breach risk coefficient of a target dam is not smaller than a preset dam breach risk coefficient, a plurality of preliminary inundation sub-areas are simulated according to flood water flow; obtaining a first flood water storage capacity of each preliminary submerging sub-region; taking the current vegetation density, underground water level height and soil permeability coefficient of each preliminary submerging sub-region as a data set, and clustering the data set to determine a water storage capacity influence index of each preliminary submerging sub-region; the second flood storage capacity is obtained according to the water storage capacity influence index and the first flood storage capacity, and the final flood inundation area is determined according to the second flood storage capacity, so that the flood inundation area in the future period can be predicted, the flood control plan and the emergency plan are normal, flood can be effectively prevented and evacuated before the flood comes, and the flood inundation efficiency is improved. And casualties and property loss are reduced.
Owner:TECH CENT FOR SOIL AGRI & RURAL ECOLOGY & ENVIRONMENT MINIST OF ECOLOGY & ENVIRONMENT

Traffic accident early warning method and system based on neural network algorithm

The invention discloses a traffic accident early warning method and system based on a neural network algorithm, and relates to the field of traffic accident prediction.The method comprises the steps that traffic monitoring data including vehicle behavior data and traffic flow data are obtained and preprocessed, and corresponding traffic accident labels are configured; utilizing diffusion process and reverse process mechanisms to extract potential feature representation in the traffic monitoring data, and correcting the potential feature representation in combination with environmental influence; constructing a risk assessment model based on a neural network, and performing training and optimization; acquiring real-time traffic monitoring data, generating corrected real-time potential feature representation, and inputting the corrected real-time potential feature representation into the trained risk assessment model to obtain a traffic accident risk assessment value; and comparing the traffic accident risk assessment value with an early warning threshold value, and when the risk assessment value exceeds a preset threshold value, generating a traffic accident early warning signal. The problem that the model prediction generalization ability is insufficient is solved.
Owner:LANZHOU JIAOTONG UNIV +1

Emulsion pump station frequency conversion control system and application method thereof

PendingCN119572472AImprove liquid supply efficiencyreduce consumptionMining devicesPump controlAutomatic controlSystem pressure
The invention relates to the technical field of electro-hydraulic control, and discloses an emulsion pump station frequency conversion control system which comprises an emulsion pump station, a pump station initialization subsystem, a fault detection subsystem, a pressure sensor, a controller, a frequency conversion device, an emulsion pump station switching subsystem, an emulsion pressure setting subsystem and an emulsion main pipeline. The invention further provides an application method of the emulsion pump station frequency conversion control system. The application method comprises the following steps that S1, a program is initialized; the emulsion supply efficiency of the fully mechanized coal mining face of the coal mine can be improved, the liquid supply pressure can be stabilized, the power consumption in the liquid supply system can be reduced, the service life of frequency conversion control system equipment of the emulsion pump station can be prolonged, automatic control of the emulsion pump station can be realized, the labor cost can be reduced, and the working efficiency and reliability can be improved; unnecessary property loss is reduced, and important technical guarantee is provided for efficient and safe production of the coal industry and stable development of the coal industry.
Owner:WUXI WEISHUN COAL MINE MASCH CO LTD

Novel anti-slide pile and intelligent regional landslide monitoring management method and system

The invention discloses a novel anti-slide pile and an intelligent regional landslide monitoring and management method and system, relates to the technical field of landslide monitoring, combines the functions of real-time monitoring, early warning and prediction, structural stability evaluation, maintenance scheme analysis and the like, is beneficial to improving the scientificity, accuracy and efficiency of landslide control, reduces the geological disaster risk, and improves the safety of landslide management. Meanwhile, by combining elements such as the inclined piles in front of the piles, the anchor cables and the water guide pipes, the structure not only improves the stability of the slide-resistant piles, but also can effectively control deformation and drainage of landslides, so that geological disaster risks are reduced, casualties and economic losses are reduced, and the structure is composed of the slide-resistant piles, the anchor cables, the inclined piles in front of the piles, the water guide pipes and the drainage pipes; the anti-slide pile is a hollow pile, the anchor cable and the inclined pile in front of the pile are constructed in the hollow pile, the hollow pile part is filled with concrete after the anchor cable and the inclined pile are constructed, and the concept that the anchor cable cannot be constructed in a traditional embedded anti-slide pile is changed.
Owner:GUIZHOU UNIV +3

Ocean satellite communication remote multi-level collaborative linkage method and system

The invention provides an ocean satellite communication and remote guide multi-level collaborative linkage method and system. The method provided by the invention comprises the following steps: a service application system instantly sends a remote guide satellite resource demand to a remote guide satellite resource scheduling system and a data processing system based on a service demand; the conduction remote satellite resource scheduling system and the data processing system instantly call target satellite resources from an operator conduction remote satellite resource system according to the conduction remote satellite resource demand, and transmit monitoring data to the conduction remote satellite resource scheduling system and the data processing system based on the target satellite resources; the remote satellite resource scheduling system and the data processing system are conducted to fuse the monitoring data to obtain fusion information, and the fusion information is transmitted to the service application system; and the business application system instantly controls and manages activities based on the fusion information. According to the method and the system provided by the invention, on-demand instant comprehensive scheduling of various satellite resources is realized based on mutual cooperation of multiple levels, and the comprehensive application capability of the satellite for communicating with the remote ground is improved.
Owner:DONGHAI LAB

Cloud video processing method based on truck driving recorder

The invention relates to the technical field of video processing, and discloses a cloud video processing method based on a truck driving recorder, which comprises the steps of video data uploading, video feature extraction, video feature analysis and warning signal display. Through complex calculation and analysis models, the fatigue degree of the driver can be accurately evaluated, and the accuracy and reliability of driving analysis are improved; multiple factors such as the continuous driving duration of the driver, the eye closing rate of different time periods, the eye closing judgment factor and the abnormal driving coefficient are comprehensively considered, the state of the driver is comprehensively evaluated, and the limitation of single-index evaluation is avoided; the warning signal is visually displayed to related personnel, so that the related personnel can quickly take measures, such as reminding a driver of having a rest or performing other interventions, and the safety of the driver and road traffic is guaranteed.
Owner:SHENZHEN LIUXIN TECH CO LTD

Power construction risk intelligent early warning method and device based on multi-dimensional information fusion

The invention provides an electric power construction risk intelligent early warning method and device based on multi-dimensional information fusion, and relates to the technical field of electric power construction risk intelligent early warning. Monitoring environment change information, equipment operation state information and safety distance information of the power construction site; determining a first early warning result based on the environment change information and a first judgment rule; determining a second early warning result based on the equipment operation state information and a second judgment rule; determining a third early warning result based on the safety distance information and a third judgment rule; and based on the first early warning result, the second early warning result and the third early warning result, determining a power construction risk level. Therefore, potential safety hazards are found by monitoring the environment change, the equipment operation state and the safety distance in real time, so that the occurrence of construction accidents is reduced. Therefore, the life safety of constructors can be protected, and the property loss can be reduced.
Owner:GUANGZHOU ANDIAN MEASUREMENT & CONTROL TECH CO LTD

Home safety supervision system based on artificial intelligence

The invention relates to the technical field of home safety, and discloses a home safety supervision system based on artificial intelligence, and the system comprises an equipment connection module which is used for establishing data connection between a plurality of intelligent household appliances and a preset terminal to obtain a plurality of monitoring units; the monitoring module is used for setting a plurality of same data transmission windows in a monitoring time period, alternately sending a preset code to the intelligent household electrical appliance through a preset terminal in the data transmission windows, and obtaining transmission feedback of the preset code; the test module is used for adding P-wave interference to the monitoring unit in a preset test time period to obtain feature transmission feedback of a preset code; the correction module is used for performing space-time analysis on the transmission feedback of the preset code to obtain a space-time analysis result, and correcting the transmission feedback of the preset code according to the space-time analysis result to obtain standard feedback; and the judgment module is used for fitting the standard feedback and the feature transmission feedback to obtain a fitting result.
Owner:FUZHOU CHENGHE ELECTRONIC TECHNOLOGY CO LTD

Vehicle-mounted CT system

The invention relates to the technical field of vehicle-mounted CT, and particularly discloses a vehicle-mounted CT system which comprises a vehicle-mounted CT host and further comprises a multi-stage buffer mechanism installed at the bottom of the CT host, the multi-stage buffer mechanism comprises a base installed in a carriage, a non-contact buffer part is arranged on the base, a contact buffer part is arranged between the non-contact buffer part and the CT host, and the non-contact buffer part is connected with the CT host. The CT host is fixed by the non-contact buffer part and the contact buffer part when a vehicle runs normally, the non-contact buffer part and the contact buffer part are both used for buffering energy consumption step by step during emergency braking, the response time of the non-contact buffer part lags behind or is synchronous with the response time of the contact buffer part, and an acceleration sensor connected with the control panel is arranged on the base. And the control panel controls the non-contact buffer part and the contact buffer part to act. Under the condition that a vehicle is braked suddenly, multi-stage buffering can be generated on the CT host, and the CT host is effectively protected.
Owner:SICHUAN XUANGUANG LIYING MEDICAL TECH CO LTD

Coal dust influence suppression method for coal mine gas laser detection and detection device

The invention discloses a coal dust influence suppression method for coal mine gas laser detection and a detection device, and the method comprises the steps: extracting gas in a coal mine goaf through a gas pump and a beam tube of the coal mine gas laser detection device, and detecting a characteristic absorption spectrum of the gas in the goaf by adopting a TDLAS technology; correcting a second harmonic signal and a peak value in the characteristic absorption spectrum by considering the attenuation influence of the coal dust in the goaf gas on the second harmonic signal of the laser penetrating through the goaf gas; and obtaining the accurate concentration value of each component gas in the goaf gas by using the corrected second harmonic signal peak value. According to the invention, the influence of coal dust on gas concentration detection can be greatly reduced, the sensitivity of gas detection is improved, and good detection effect and precision can be achieved.
Owner:CCTEG CHINA COAL RES INST

Fuel gas use monitoring management system and method

The invention discloses a fuel gas use monitoring management system and method, and belongs to the technical field of fuel gas use monitoring, the system comprises an AI monitor used for monitoring the fuel gas use state, the AI monitor is in communication connection with a linkage control system, and the linkage control system is used for controlling fuel gas on-off and monitoring fuel gas leakage; the system further comprises a supervision user client and a database, the supervision user client communicates with the AI monitor, and the database is used for storing monitoring and analysis data in the AI monitor so that the supervision user client can analyze and call the monitoring and analysis data. The linkage control system further comprises a user client which communicates with the AI monitor and is used for self-inspection of the linkage control system. The method is used for solving the problem of standardizing gas use and management in the gas use process.
Owner:詹建荣

High and steep slope geological disaster monitoring method and system based on multi-source data fusion

PendingCN121963394AEffectively predict instability risksHigh precisionAlarmsDisaster monitoringLandslide
The invention relates to the technical field of slope disaster monitoring, in particular to a high and steep slope geological disaster monitoring method and system based on multi-source data fusion. The method comprises the following steps: tracking surface deformation through PS-InSAR time sequence analysis and atmospheric phase correction to obtain surface deformation characteristics; identifying the apparent diseases of the slope, and extracting spatial and temporal distribution characteristics of the apparent diseases of the slope; analyzing spatio-temporal evolution characteristics under geologic structure constraints by utilizing slope rock mass structure characteristics and the earth surface deformation characteristics; according to underground water level dynamic and potential sliding surface weakening features and the slope apparent disease spatial and temporal distribution features, extracting disaster-causing key factor features after cooperative correction; and combining the disaster-causing key factor characteristics, the true three-dimensional geological environment background characteristics and the spatio-temporal evolution characteristics to analyze the comprehensive early warning grade and the potential instability mode of the landslide. Scientific support is provided for high and steep slope geological disaster prevention and control, and engineering construction and operation safety can be guaranteed.
Owner:JIANGXI PROVINCIAL EXPRESSWAY INVESTMENT GRP CO LTD +3

Automobile engine fault positioning method based on data analysis

The invention discloses an automobile engine fault positioning method based on data analysis, and belongs to the technical field of automobile fault detection, and the method comprises the steps: 1, drawing up normal operation data intervals of all monitoring items of an engine under different environment condition values; 2, judging whether the operation data of each monitoring item under the environment condition value is normal or not according to the acquired operation data information; 3, when the operation data of the monitoring project is abnormal, generating a corresponding fault alarm, and determining the danger level of the fault; and 4, when the operation data of the monitoring items are normal, predicting whether each monitoring item has a potential fault risk or not. According to the method, when the engine does not have a fault, whether each monitoring item has a potential fault risk or not is predicted according to the historical accumulation condition of the operation data of each monitoring item position, so that a user can be timely reminded to perform corresponding inspection and maintenance on the corresponding position, and the occurrence of the fault is avoided.
Owner:OBDSPACE TECH CO LTD

Fire-fighting processing method, electronic device, storage medium and program product

The invention discloses a fire-fighting processing method, an electronic device, a storage medium and a program product. The method is applied to the energy storage device, the energy storage device comprises an energy storage cabinet body, at least one battery pack is arranged in the energy storage cabinet body, and the method comprises the steps of obtaining first state information and second state information, the first state information is obtained based on predetermined environmental parameters in a space defined by the interior of an energy storage cabinet and the exterior of the battery pack, and the second state information is obtained based on predetermined environmental parameters of the internal space of the battery pack; generating a first system-level fire-fighting instruction according to the first state information, wherein the first system-level fire-fighting instruction is used for instructing the energy storage device to carry out fire fighting on the interior of the energy storage cabinet body; and according to the second state information, generating a battery pack level fire-fighting instruction corresponding to a target level in a plurality of preset battery pack fire-fighting levels, wherein the battery pack level fire-fighting instruction is used for instructing the energy storage device to carry out fire fighting on the interior of the battery pack.
Owner:BYD AUTO IND CO LTD