Urban planning comparison and selection method, system and equipment and storage medium
By obtaining urban data and generating a sunshine simulation model, using the comparison model trained by the historical review team scoring data, and calculating the comparison score by combining the first scoring data and the second scoring data, the accuracy of the urban planning comparison and selection methods in the existing technology is solved. Lower questions, achieving higher accuracy and objectivity in comparison and selection.
Patent Information
- Application Number
- CN202410899089.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-10-15
AI Technical Summary
The existing urban planning comparison and selection method has low accuracy in project plan comparison and selection due to the subjective factors of multiple people scoring and the lack of supervision mechanism.
By obtaining city data and generating a sunshine simulation model, using a comparison model trained based on historical review team scoring data, the comparison score is calculated by combining the first scoring data and the second scoring data, reducing the interference of subjective factors and improving accuracy.
It improves the accuracy and objectivity of project plan comparison and selection, and reduces the impact of subjective bias of the review team.
Smart Images

Figure CN118780668A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of city evaluation, and in particular to a city planning comparison method, a city planning comparison system, a city planning comparison device and a storage medium. Background Art
[0002] Before determining a construction project, it is necessary to compare and select project plans. As the requirements for project plans in cities continue to increase, a review team including different professional and technical personnel is needed to evaluate project plans. The review team generally includes urban designers, structural engineers, environmental assessment experts, cost accountants, customers, planning experts, and legal advisors. At present, the general review and selection method is to calculate the average score of each item based on the scoring of multiple people. This review and selection method has subjective factors of the judges and lacks an effective supervision mechanism, resulting in low accuracy in the comparison of project plans.
[0003] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention
[0004] The main purpose of the present invention is to provide an urban planning comparison method, aiming to improve the accuracy of comparison of project plans.
[0005] To achieve the above object, the present invention provides a city planning comparison and selection method, which comprises the following steps:
[0006] Acquire city data of the city to be compared, wherein the city data includes original city data and city analysis data of the city to be compared, wherein the city analysis data is obtained by analyzing the city data;
[0007] Sending the city data to the review team, and receiving first scoring data returned by the review team;
[0008] Input the city data into a comparison model and output second scoring data, wherein the comparison model is generated by training based on the historical scoring data of the review team, and the historical scoring data is the scoring data of the city by the review team before the current moment;
[0009] The comparison score of the city to be compared is determined according to the first scoring data and the second scoring data.
[0010] Optionally, the city analysis data includes sunshine analysis data, and the step of obtaining the city data of the city to be compared includes:
[0011] Acquire the original city data, wherein the original city data includes: geographic location data, sun altitude angle data, city orientation data, city height data, and city building spacing data;
[0012] Generate a sunshine simulation model of the city to be compared according to the geographical location data, the solar altitude angle data, the city orientation data, the city height data and the city building spacing data;
[0013] The sunshine analysis data is calculated according to a sunshine simulation model.
[0014] Optionally, the step of determining the comparison score of the to-be-compared city according to the first score data and the second score data includes:
[0015] Determine the scoring deviation of each assessor for the city to be compared according to the first scoring data and the second scoring data;
[0016] Determine third scoring data in the first scoring data according to the scoring deviation and the scoring deviation interval, the third scoring data being the first scoring data corresponding to the scoring deviation in the scoring deviation interval;
[0017] The comparison score is determined according to the third score data.
[0018] Optionally, the step of determining the scoring deviation of each assessor on the to-be-compared city according to the first scoring data and the second scoring data comprises:
[0019] Dividing the first scoring data according to the judges of the review team to obtain first sub-scoring data corresponding to different judges;
[0020] Determine a plurality of second sub-scoring data according to the identifier corresponding to the second scoring data, wherein the second sub-scoring data correspond to different assessors;
[0021] The score deviation is calculated based on the first sub-score data and the second sub-score data corresponding to the same judge.
[0022] Optionally, before the step of inputting the city data into the comparison model and outputting the second scoring data, the method further includes:
[0023] Classifying the historical scoring data according to the scorers of the review team to obtain a plurality of historical first scoring data corresponding to different scorers;
[0024] Determine the input feature type of the neural network input layer according to the historical city data, determine the output feature type of the neural network output layer according to the historical first scoring data,
[0025] The comparison model is determined based on the historical city data, the historical first scoring data and the neural network.
[0026] Optionally, the step of determining the comparison model based on the historical city data, the historical first scoring data and the neural network includes:
[0027] Using the historical city data as input data of a neural network input layer, and using the historical first scoring data as output data of a neural network output layer;
[0028] The input data and the output data are used as a data set, and the data set is divided into a training set and a test set;
[0029] Training the neural network according to the training set to obtain a neural network to be tested;
[0030] The neural network to be tested is tested according to the test set, and according to the test result, the step of adjusting the parameters of the neural network and returning to execute the step of training the neural network according to the training set is selected, or the neural network to be tested is used as the comparison model.
[0031] Optionally, after the step of determining the comparison score of the to-be-compared city according to the first scoring data and the second scoring data, the method further includes:
[0032] When there are cities that have not been scored, the comparison scores corresponding to the cities to be compared are recorded, and the cities to be compared are updated according to the cities that have not been scored, and the step of obtaining the city data of the cities to be compared is returned to execute;
[0033] When there is no city that has not been rated, the comparison result is determined based on the multiple comparison scores.
[0034] In addition, to achieve the above-mentioned purpose, the present invention also provides an urban planning comparison and selection system, the urban planning comparison and selection system comprising:
[0035] An acquisition module, used for acquiring city data of a city to be compared, wherein the city data includes original city data and city analysis data of the city to be compared, wherein the city analysis data is obtained by analyzing the city data;
[0036] A communication module, used for sending the city data to the review team and receiving the first scoring data returned by the review team;
[0037] An analysis module, used for inputting the city data into a comparison model and outputting second scoring data, wherein the comparison model is generated by training based on the historical scoring data of the review team, and the historical scoring data is the scoring data of the review team on the city before the current moment;
[0038] A calculation module is used to determine the comparison score of the city to be compared based on the first scoring data and the second scoring data.
[0039] In addition, to achieve the above-mentioned purpose, the present invention also provides an urban planning comparison and selection device, which includes: a memory, a processor, and an urban planning comparison and selection program stored in the memory and executable on the processor, and the urban planning comparison and selection program is configured to implement the steps of any of the above-mentioned urban planning comparison and selection methods.
[0040] In addition, to achieve the above-mentioned purpose, the present invention also provides a storage medium, on which a city planning comparison program is stored, and when the city planning comparison program is executed by a processor, the steps of any of the above-mentioned city planning comparison methods are implemented.
[0041] The present invention proposes a city planning comparison method, which obtains first scoring data and second scoring data through two processing methods based on the city data of the city to be compared. Since the comparison model used by the second scoring data is generated based on historical scoring data, the obtained second scoring data is objective data and is less affected by other factors, so it has higher accuracy. Furthermore, the comparison score of the city to be compared is calculated by the first scoring data and the second scoring data, which can improve the accuracy of the comparison of project plans. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 It is a structural diagram of an urban planning comparison and selection device in a hardware operating environment involved in an embodiment of the present invention;
[0043] Figure 2 It is a flow chart of the first embodiment of the urban planning comparison method of the present invention;
[0044] Figure 3 It is a flow chart of the second embodiment of the urban planning comparison method of the present invention;
[0045] Figure 4 It is a flow chart of a third embodiment of the urban planning comparison method of the present invention;
[0046] Figure 5 This is a schematic diagram of the specific steps of step S41 of the urban planning comparison method of the present invention;
[0047] Figure 6 It is a flow chart of a fourth embodiment of the urban planning comparison method of the present invention;
[0048] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0049] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0050] Reference Figure 1 , Figure 1 It is a schematic diagram of the structure of the urban planning comparison equipment of the hardware operating environment involved in the embodiment of the present invention.
[0051] like Figure 1 As shown, the urban planning comparison and selection device may include: a processor 1001, such as a central processing unit (CPU), a communication bus 1002, an interactive device 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components, and can also communicate with external devices. The interactive device 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional interactive device 1003 may also be connected to the communication bus through a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a wireless fidelity (WIreless-FIdelity, WI-FI) interface). The memory 1005 may be a high-speed random access memory (Random Access Memory, RAM) memory, or a stable non-volatile memory (Non-Volatile Memory, NVM), such as a disk memory. The memory 1005 may also be a storage device independent of the aforementioned processor 1001.
[0052] Those skilled in the art will understand that Figure 1 The structure shown in the figure does not constitute a limitation of the urban planning comparison and selection equipment, and may include more or fewer components than shown in the figure, or a combination of certain components, or a different arrangement of components.
[0053] like Figure 1 As shown, the memory 1005 as a storage medium may include an operating system, a data storage module, a network communication module, a user interface module and an urban planning comparison and selection program.
[0054] exist Figure 1 In the urban planning comparison device shown, the network interface 1004 is mainly used for data communication with other devices; the interactive device 1003 is mainly used for data interaction with users; the processor 1001 and the memory 1005 in the urban planning comparison device of the present invention can be set in the urban planning comparison device, and the urban planning comparison device calls the urban planning comparison program stored in the memory 1005 through the processor 1001, and executes the urban planning comparison method provided by the embodiment of the present invention.
[0055] The embodiment of the present invention provides a method for comparing and selecting urban planning, referring to Figure 2 , Figure 2 This is a flow chart of a first embodiment of a city planning comparison and selection method of the present invention. In this embodiment, the city planning comparison and selection method includes:
[0056] Step S1, obtaining city data of a city to be compared, wherein the city data includes original city data and city analysis data of the city to be compared, wherein the city analysis data is obtained by analyzing the city data;
[0057] Before the city selection, different city plans will be received, and the city plan includes the original city data of the city, and the original city data includes: city size data, city material data, city structure data and city economic data.
[0058] Urban dimension data include: the total length, width, height of the city, as well as the height and area of each floor; urban material data include: the types, specifications, quantities of various materials used; urban result data include: the structural form, force system, component size, etc. of urban objects. In addition, other city-related data can also be included, such as geographic location data, solar altitude angle data, city orientation data, and city building spacing data. Urban analysis data refers to the data obtained by analyzing the city, specifically including the data in the analysis process and the result data obtained by the analysis. It should be noted that due to different comparisons, the required analysis items are not the same. For example: sunshine analysis, environment and sustainability analysis, etc.
[0059] Step S2, sending the city data to the review team, and receiving first scoring data returned by the review team;
[0060] It should be noted that in the process of city selection, there are generally selection criteria, but these selection criteria are often not specific enough. At the same time, professional personnel are needed to analyze and score. Different city plans have different design concepts and ideas, and the differences in various indicators may be large. In addition, the people in different evaluation dimensions in the review team will have different personal subjective factors. This leads to insufficient disclosure in the selection process. The city data is sent to the review team so that the review team analyzes and scores the city data to obtain the first scoring data, and the first scoring data is returned. The first scoring data is received through the communication interface, and the first scoring data includes the scores of each specific project and the scores of each judge.
[0061] Step S3, inputting the city data into a comparison model and outputting second scoring data, wherein the comparison model is generated by training based on the historical scoring data of the review team, and the historical scoring data is the scoring data of the city by the review team before the current moment;
[0062] The comparison model here includes an input layer, an intermediate layer, and an output layer. Specifically, after the city data is standardized, the standardized city data is input into the comparison model. The city data is transmitted to the intermediate layer through the input layer, and the output data of the output layer is determined through the intermediate layer, thereby obtaining the second scoring data.
[0063] Step S4, determining the comparison score of the city to be compared according to the first scoring data and the second scoring data.
[0064] In this embodiment, optionally, the accuracy of the first scoring data is verified by the second scoring data. When there is data in the first scoring data whose deviation value from the second scoring data is greater than the deviation threshold, the first scoring data is reviewed again, or the first scoring data corresponding to the deviation value greater than the deviation threshold is excluded from the calculation of the comparison score. The comparison score is calculated based on the first scoring data according to the comparison score formula. The comparison score formula can be that different first sub-scoring data in the first scoring data correspond to different weights. Optionally, the comparison score is calculated based on the first scoring data and the second scoring data.
[0065] In this embodiment, the first scoring data and the second scoring data are obtained by two processing methods based on the urban data of the city to be compared. Since the comparison model used for the second scoring data is generated based on the historical scoring data, the obtained second scoring data is objective data and is less affected by other factors, thus having higher accuracy. Furthermore, the comparison scores of the cities to be compared are calculated by using the first scoring data and the second scoring data, which can improve the accuracy of the comparison of project plans.
[0066] Further, based on the first embodiment, a second embodiment of the urban planning comparison method of the present invention is proposed. In this embodiment, referring to Figure 3 The city analysis data includes sunshine analysis data, and the step of obtaining the city data of the city to be compared includes:
[0067] Step S11, obtaining the original city data, the original city data including: geographical location data, sun altitude angle data, city orientation data, city height data and city building spacing data;
[0068] The original city data here can be obtained from a database that stores the original city data. The geographical location data includes longitude and latitude coordinates, altitude, topographic features, etc. The longitude and latitude coordinates will affect the direction of sunshine. The solar altitude angle data affects the sunshine time and sunshine intensity on the surface of the city to be compared.
[0069] Step S12, generating a sunshine simulation model of the city to be compared according to the solar altitude angle data, the city orientation data, the city height data and the city building spacing data;
[0070] An accurate virtual city model is established based on city height data, city orientation data, city building spacing data, and geographic location data. A virtual sun is set as a light source in the virtual city model based on the geographic location data and solar altitude angle data, and a ray tracing algorithm is used to simulate the propagation of light, thereby generating a sunlight simulation model.
[0071] Step S13, calculating the sunshine analysis data according to the sunshine simulation model.
[0072] It should be noted that the light source should dynamically change according to the actual situation, simulate the complete sunshine process, and determine the sunshine analysis data of each space in the city under the complete sunshine condition. The sunshine analysis data here include sunshine time and sunshine intensity. In this embodiment, the sunshine analysis data is a simulation based on a physical model and does not contain subjective factors. The sunshine analysis data here specifically refers to the sunshine time and sunshine intensity of each subspace of the city to be compared and the regional type identification of each subspace. The regional type identification here can be an office, a toilet, an activity room, a conference room, and an open-air balcony. For the sunshine time and sunshine intensity calculated without subjective factors, there is no need for the review team to analyze, and when different regional types have corresponding sunshine time and sunshine intensity designs, this requires the review of the review team. In the technical solution of this embodiment, through steps S11 to S13, and step S2, the analysis process that does not require subjective judgment and the scoring process that requires subjective judgment are separated, thereby reducing the number of steps affected by subjective factors. In other embodiments, the city analysis data includes wind environment analysis data, and a simulation model of the wind environment is constructed through the original city data to determine the wind speed and direction of each subspace of the city to be compared, as well as the corresponding area type, urban architectural style, etc. Thus, the wind environment analysis data is determined according to the wind speed and direction of each subspace, the corresponding area type, and the urban architectural style, and the urban architectural style will affect the wind direction and wind volume.
[0073] In this embodiment, a sunshine simulation model of the city to be compared is generated by using geographic location data, solar altitude angle data, orientation data of each building in the city, height data of buildings in the city, and urban building spacing data, so that sunshine analysis data can be obtained accurately and objectively, thereby providing accurate and analyzable data for the subsequent first scoring data and second scoring data, thereby improving the accuracy of the comparison scoring.
[0074] Further, based on any of the above embodiments, a third embodiment of the urban planning comparison method of the present invention is proposed. In this embodiment, if Figure 4 As shown, the step of determining the comparison score of the to-be-compared city according to the first score data and the second score data includes:
[0075] Step S41, determining the scoring deviation of each assessor for the city to be compared according to the first scoring data and the second scoring data;
[0076] The first scoring data includes multiple scoring items, each scoring item includes at least one judge participating in the scoring, and the scoring items of the second scoring data correspond to the first scoring data, and also include second sub-scoring data of different judges. The root mean square error of the first sub-scoring data and the corresponding second sub-scoring data of the same judge is calculated. For example, the first sub-scoring data corresponding to the first judge includes: the first sub-economic score, the first sub-sunlight analysis score, the first sub-wind environment analysis score, and the first sub-environmental analysis score, etc. The second sub-scoring data includes: the second sub-economic score, the second sub-sunlight analysis score, the second sub-wind environment analysis score, and the second sub-environmental analysis score corresponding to the first judge, etc. The scoring deviation is calculated by the root mean square difference formula.
[0077] Step S42, determining third scoring data in the first scoring data according to the scoring deviation and the scoring deviation interval, wherein the third scoring data is the first scoring data corresponding to the scoring deviation in the scoring deviation interval;
[0078] When the score deviation is within the score deviation interval, it is determined that the first sub-score corresponding to the first evaluator passes the second score data verification, and the first sub-score corresponding to the first evaluator is used as the third sub-score data; when the score deviation is within the score deviation interval, it is determined that the first sub-score corresponding to the first evaluator does not pass the second score data verification. In this embodiment, it is determined whether all the evaluators in the review team pass the second score data verification, obtain multiple third sub-score data, and use the multiple third sub-score data as the third score data.
[0079] Step S43: determining the comparison score according to the third scoring data.
[0080] The comparison score is calculated based on the third score data and the comparison score.
[0081] In this embodiment, by calculating the score deviation and determining whether the data of each evaluator can be used as the third score data through the score deviation interval, the accuracy of screening abnormal scores or non-normal scores is improved compared to the truncated mean method, thereby improving the accuracy of project scheme comparison.
[0082] For further reference, Figure 5 , step S41 may further include the following steps:
[0083] Step S411, dividing the first scoring data according to the judges of the review team to obtain first sub-scoring data corresponding to different judges;
[0084] Determine the judge corresponding to each of the first sub-scoring data according to the identifier of the first scoring data. Thus, the first sub-scoring data corresponding to different judges are obtained.
[0085] Step S412, determining a plurality of second sub-scoring data according to the identifier corresponding to the second scoring data, wherein the second sub-scoring data correspond to different assessors;
[0086] It should be noted that the second scoring data is obtained by the output of the comparison model. Optionally, the second scoring data corresponds to the first scoring data one by one. It should be noted that since the comparison model is trained and generated based on the historical scoring data of the review team, the historical scoring data includes the scoring of the judges, and the output second scoring data is actually a prediction of the scores of multiple judges.
[0087] Step S413, calculating the scoring deviation according to the first sub-scoring data and the second sub-scoring data corresponding to the same judge.
[0088] The correlation coefficient between the first sub-scoring data and the second sub-scoring data is calculated as the scoring deviation, and the corresponding step S42 is replaced by step S402.
[0089] Step S402 is as follows: when the correlation coefficient is positive, it is determined that the first sub-score corresponding to the first judge has passed the second score data verification, and the first sub-score corresponding to the first judge is used as the third sub-score data; when the correlation coefficient is negative, it is determined that the first sub-score corresponding to the first judge has not passed the second score data verification. It is determined whether all the judges in the review team have passed the second score data verification, and multiple third sub-score data are obtained, and the multiple third sub-score data are used as the third score data.
[0090] In this embodiment, the first scoring data is divided according to the judges of the review team to obtain first sub-scoring data corresponding to different judges, and multiple second sub-scoring data are determined according to the identifiers corresponding to the second scoring data, and the second sub-scoring data correspond to different judges. The scoring deviation is calculated based on the first sub-scoring data and the second sub-scoring data corresponding to the same judge, thereby improving the accuracy of the comparison of project plans.
[0091] Further, based on any of the above embodiments, a fourth embodiment of the urban planning comparison method of the present invention is proposed. In this embodiment, reference is made to Figure 6 , before the step of inputting the city data into the comparison model and outputting the second scoring data, it also includes:
[0092] Step S301, classifying the historical scoring data according to the scorers of the review team to obtain a plurality of historical first scoring data corresponding to different scorers respectively;
[0093] Step S302, determining the input feature type of the neural network input layer according to the historical city data, and determining the output feature type of the neural network output layer according to the historical first scoring data,
[0094] Step S303, determining the comparison model based on the historical city data, the historical first scoring data and the neural network.
[0095] It should be noted that the execution order of step S301, step S302, and step S303 and step S1 and step S2 is not limited. Step S301, step S302, and step S303 can be executed in advance to determine the judges of the review team. Of course, steps S1 and S2 can also be executed first to determine the judges of the review and obtain the historical data corresponding to the judges. Thereby ensuring that the comparison model corresponds to the judges. The output feature type is the score of different projects and different judges of the city to be compared. Preferably, the formula of the activation function of the neural network here is:
[0096] f(x)=max(0.01X,X)
[0097] X is the input data, i.e., the historical city data, and f(x) is the output data, i.e., the historical first scoring data. The activation function of this embodiment allows negative gradients to pass through, the purpose of which is that there is scoring abnormal point noise in the historical first scoring data during the training process, which leads to oscillations during the training process, and allowing negative gradients to pass through can reduce the oscillations during the training process and accelerate the convergence of the model. The neural network is optimized using an adaptive moment estimation algorithm, and the mean square error is selected as the loss function. In other embodiments, all scores can be manually analyzed, abnormal scores can be filtered, and other activation functions can be used.
[0098] In this embodiment, the historical scoring data is classified by the scorers of the review team to obtain multiple historical first scoring data corresponding to different scorers, and the input feature type of the neural network input layer is determined according to the historical city data, and the output feature type of the neural network output layer is determined according to the historical first scoring data. The data type of the input and output data of the model can be determined more standardly and accurately, thereby improving the accuracy of the comparison model.
[0099] Furthermore, the step of determining the comparison model based on the historical city data, the historical first scoring data and the neural network includes:
[0100] Using the historical city data as input data of a neural network input layer, and using the historical first scoring data as output data of a neural network output layer;
[0101] The input data and the output data are used as a data set, and the data set is divided into a training set and a test set;
[0102] Training the neural network according to the training set to obtain a neural network to be tested;
[0103] The neural network to be tested is tested according to the test set, and according to the test result, the step of adjusting the parameters of the neural network and returning to execute the step of training the neural network according to the training set is selected, or the neural network to be tested is used as the comparison model.
[0104] Both the training set and the test set include input data and output data, and the input data and the output data correspond to each other. In this embodiment, a model index can be set, and a test set can be used for testing. When the model index is reached, the neural network to be tested is used as the comparison model. When the model index is reached, the step of adjusting the parameters of the neural network and returning to the step of training the neural network according to the training set is selected. The model index here can be accuracy. In other embodiments, multiple alternative models can be generated first, and the comparison model can be determined among the multiple alternative models. There is at least one difference in learning rate, number of iterations, and batch size between the alternative models.
[0105] In this embodiment, by taking input data and output data as a data set, and dividing the data set into a training set and a test set; training the neural network according to the training set to obtain a neural network to be tested; and testing the neural network to be tested according to the test set, a comparison model that meets the requirements can be obtained, thereby improving the accuracy of scheme comparison.
[0106] Further, based on any of the above embodiments, a fifth embodiment of the urban planning comparison method of the present invention is proposed. In this embodiment, after the step of determining the comparison score of the to-be-compared city according to the first scoring data and the second scoring data, the method further includes:
[0107] When there are cities that have not been scored, the comparison scores corresponding to the cities to be compared are recorded, and the cities to be compared are updated according to the cities that have not been scored, and the step of obtaining the city data of the cities to be compared is returned to execute;
[0108] When there is no city that has not been rated, the comparison result is determined based on the multiple comparison scores.
[0109] The project plan of the city with the highest comparison score will be selected as the selected city.
[0110] In this embodiment, determining the comparison score corresponding to each city to be compared in the same manner can improve the standardization of the comparison process.
[0111] Further, based on any of the above embodiments, a sixth embodiment of the urban planning comparison method of the present invention is proposed. In this embodiment
[0112] Before the step of inputting the city data into the comparison model and outputting the second scoring data, the step further includes:
[0113] The selection model is determined according to a multi-objective optimization algorithm, wherein the multi-objective optimization algorithm includes simulated annealing. In other embodiments, other multi-objective optimization algorithms may be used, such as genetic algorithms, particle swarm optimization algorithms, and multi-objective ant colony optimization algorithms. In this embodiment, simulated annealing is used as an example.
[0114] In this embodiment, specifically, target indicators that require multi-objective optimization are determined, and the optimization indicators here can be economic score variance, sunshine analysis score variance, wind environment analysis score variance, environmental analysis score variance, greening rate score variance, etc.
[0115] In the simulated annealing algorithm, different temperature layers are set for different target indicators. Each temperature layer is set with a corresponding target indicator calculation method. In addition, different temperature layers have different probabilities of using a comparison model with a worse target indicator as the comparison model in the iteration process. In addition, the weights of each target indicator need to be dynamically adjusted in the simulated annealing algorithm.
[0116] In this embodiment, the original comparison model is trained based on the historical scoring data of different proportions of different judges. The data of the same test set is used for testing. The test data in the test set here needs to be similar to obtain the corresponding original test scoring results, and the corresponding historical scoring data is randomly selected in the neighborhood of for training the new comparison model, and the data of the same test set is used for testing to obtain the corresponding new test scoring results, and the selection is made between the original test scoring results and the new test scoring results. The selection method here is to calculate the corresponding target indicator in the temperature layer for selection. Lower the temperature and return to execute the step of randomly selecting the corresponding historical scoring data in the neighborhood of for training the new comparison model. When the obtained comparison model meets the conditions, the simulated annealing algorithm is stopped. In this embodiment, a comparison model that meets the requirements of economic score, sunshine analysis score, wind environment analysis score, environmental analysis score and greening rate score can be appropriately selected through a multi-objective optimization algorithm. Since the output result of the comparison model will affect the comparison score of the city to be compared, determining the comparison model through a multi-objective optimization algorithm can enable the city to be compared that best meets the multi-objective optimization results to obtain a higher score, thereby realizing multi-objective comparison and scoring of the cities to be compared.
[0117] In addition, an embodiment of the present invention further provides an urban planning comparison and selection system, the urban planning comparison and selection system comprising:
[0118] An acquisition module, used for acquiring city data of a city to be compared, wherein the city data includes original city data and city analysis data of the city to be compared, wherein the city analysis data is obtained by analyzing the city data;
[0119] A communication module, used for sending the city data to the review team and receiving the first scoring data returned by the review team;
[0120] An analysis module, used for inputting the city data into a comparison model and outputting second scoring data, wherein the comparison model is generated by training based on the historical scoring data of the review team, and the historical scoring data is the scoring data of the review team on the city before the current moment;
[0121] A calculation module is used to determine the comparison score of the city to be compared based on the first scoring data and the second scoring data.
[0122] In addition, an embodiment of the present invention also proposes an urban planning comparison device, which includes: a memory, a processor, and an urban planning comparison program stored in the memory and executable on the processor, wherein the urban planning comparison program is configured to implement the steps of any of the above-mentioned embodiments of the urban planning comparison method.
[0123] In addition, an embodiment of the present invention further proposes a storage medium, on which a city planning comparison program is stored. When the city planning comparison program is executed by a processor, the embodiment steps of any of the above-mentioned city planning comparison methods are implemented.
[0124] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.
[0125] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0126] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) as described above, and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0127] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A method for comparing and selecting urban planning, characterized in that: The urban planning comparison and selection method comprises the following steps: Acquire city data of the city to be compared, wherein the city data includes original city data and city analysis data of the city to be compared, wherein the city analysis data is obtained by analyzing the city data; Sending the city data to the review team, and receiving first scoring data returned by the review team; Input the city data into a comparison model and output second scoring data, wherein the comparison model is generated by training based on the historical scoring data of the review team, and the historical scoring data is the scoring data of the city by the review team before the current moment; The comparison score of the city to be compared is determined according to the first scoring data and the second scoring data.
2. The urban planning comparison method according to claim 1, characterized in that: The city analysis data includes sunshine analysis data, and the step of obtaining the city data of the city to be compared includes: Acquire the original city data, wherein the original city data includes: geographic location data, sun altitude angle data, city orientation data, city height data, and city building spacing data; Generate a sunshine simulation model of the city to be compared according to the geographical location data, the solar altitude angle data, the city orientation data, the city height data and the city building spacing data; The sunshine analysis data is calculated according to a sunshine simulation model.
3. The urban planning comparison method according to claim 1, characterized in that: The step of determining the comparison score of the to-be-compared city according to the first score data and the second score data comprises: Determine the scoring deviation of each assessor for the city to be compared according to the first scoring data and the second scoring data; Determine third scoring data in the first scoring data according to the scoring deviation and the scoring deviation interval, the third scoring data being the first scoring data corresponding to the scoring deviation in the scoring deviation interval; The comparison score is determined according to the third score data.
4. The urban planning comparison method according to claim 3, characterized in that: The step of determining the scoring deviation of each assessor for the city to be compared according to the first scoring data and the second scoring data comprises: Dividing the first scoring data according to the judges of the review team to obtain first sub-scoring data corresponding to different judges; Determine a plurality of second sub-scoring data according to the identifier corresponding to the second scoring data, wherein the second sub-scoring data correspond to different assessors; The score deviation is calculated based on the first sub-score data and the second sub-score data corresponding to the same judge.
5. The urban planning comparison method according to claim 1, characterized in that: Before the step of inputting the city data into the comparison model and outputting the second scoring data, the method further includes: Classifying the historical scoring data according to the scorers of the review team to obtain a plurality of historical first scoring data corresponding to different scorers respectively; Determine the input feature type of the neural network input layer according to the historical city data, determine the output feature type of the neural network output layer according to the historical first scoring data, The comparison model is determined based on the historical city data, the historical first scoring data and the neural network.
6. The urban planning comparison method according to claim 5, characterized in that: The step of determining the comparison model based on the historical city data, the historical first scoring data and the neural network comprises: Using the historical city data as input data of a neural network input layer, and using the historical first scoring data as output data of a neural network output layer; The input data and the output data are used as a data set, and the data set is divided into a training set and a test set; Training the neural network according to the training set to obtain a neural network to be tested; The neural network to be tested is tested according to the test set, and according to the test result, the step of adjusting the parameters of the neural network and returning to execute the step of training the neural network according to the training set is selected, or the neural network to be tested is used as the comparison model.
7. The urban planning comparison method according to claim 1, characterized in that: Before the step of inputting the city data into the comparison model and outputting the second scoring data, the step further includes: The comparison model is determined according to a multi-objective optimization algorithm, which is a simulated annealing algorithm. The target indicators of the multi-objective optimization algorithm include: at least one of the economic score variance, the sunshine analysis score variance, the wind environment analysis score variance, the environmental analysis score variance and the greening rate score variance.
8. An urban planning comparison and selection system, characterized in that: The urban planning comparison and selection system comprises: An acquisition module, used for acquiring city data of a city to be compared, wherein the city data includes original city data and city analysis data of the city to be compared, wherein the city analysis data is obtained by analyzing the city data; A communication module, used for sending the city data to the review team and receiving the first scoring data returned by the review team; An analysis module, used for inputting the city data into a comparison model and outputting second scoring data, wherein the comparison model is generated by training based on the historical scoring data of the review team, and the historical scoring data is the scoring data of the review team on the city before the current moment; A calculation module is used to determine the comparison score of the city to be compared based on the first scoring data and the second scoring data.
9. An urban planning comparison and selection device, characterized in that: The urban planning comparison and selection device comprises: a memory, a processor and an urban planning comparison and selection program stored in the memory and executable on the processor, wherein the urban planning comparison and selection program is configured to implement the steps of the urban planning comparison and selection method as described in any one of claims 1 to 7.
10. A storage medium, characterized in that: The storage medium stores an urban planning comparison program, and when the urban planning comparison program is executed by the processor, the steps of the urban planning comparison method according to any one of claims 1 to 7 are implemented.