Power distribution network operation state management system and method for photovoltaic power generation

By calculating the node's load-to-distance ratio and the load-to-distance equal importance ratio, the power transmission between the photovoltaic power generation system and the distribution network node is optimized, and the problem of power transmission anomalies and losses when the photovoltaic power generation system is connected to the distribution network is solved. Resource saving and power transmission stability are achieved.

CN118783418APending Publication Date: 2024-10-15TAIZHOU KAITAI POWER DESIGN CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410782294.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

When the photovoltaic power generation system is connected to the distribution network, the integration point is inappropriate or the input power changes greatly, resulting in abnormal power transmission. At the same time, multi-node access increases power loss and the complexity of distribution network route design.

Method used

By obtaining the voltage and load of historical connected nodes, calculate the node's load-distance ratio and load-distance equally important ratio, select reasonable nodes for power transmission, monitor and adjust during the transmission process, and dynamically add or replace nodes to Optimize power distribution.

Benefits of technology

It avoids abnormal power transmission due to insufficient location or load of a single node, reduces power loss, and optimizes the number of node connections to reduce resource waste and complexity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118783418A_ABST
    Figure CN118783418A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power distribution networks, in particular to a power distribution network operation state management system and method for photovoltaic power generation, and the management method comprises the following steps: obtaining a reasonable node distribution number in a power distribution network according to the number of connection times of each node and a photovoltaic power generation system and a distributed voltage value; reading the electric load capacity of all nodes connected with the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, and generating the load-distance degree proportion of each node; calculating to obtain a load-distance equal importance degree ratio of the nodes; in the power transmission process, a plurality of nodes are monitored, and when the transmission voltage of the photovoltaic power generation system is abnormally increased, secondary distribution is carried out according to the remaining loadable capacity of the plurality of nodes; and when the plurality of nodes are abnormal, extracting the nodes with the same number as the abnormal nodes from the remaining nodes according to the selection priority as new nodes to be connected with the photovoltaic power generation system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power distribution networks, and in particular to a power distribution network operation status management system and method for photovoltaic power generation. Background Art

[0002] A distribution network refers to a power grid that receives electricity from a transmission grid or a regional power plant and distributes it locally or step by step according to voltage to various types of users through distribution facilities. It plays an important role in distributing electricity in the power grid. When photovoltaic power generation is connected to a distribution network, it is usually directly connected to the distribution network for power transmission. There are two types of access: 1. A fixed access point is set in advance, and the photovoltaic power generation system is connected to the access point for power transmission. This type of access may cause power transmission abnormalities due to an inappropriate access point or a large fluctuation in the input power of the photovoltaic power generation system. 2. The photovoltaic power generation system is simultaneously connected to multiple node locations of the distribution network. This type of access reduces the load pressure on a single node, but due to the increase in the number of node locations connected, the power transmission loss will increase exponentially, and it also increases the complexity of the distribution network route design. Summary of the invention

[0003] The object of the present invention is to provide a distribution network operation status management system and method for photovoltaic power generation, so as to solve the problems raised in the above background technology.

[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for managing the operating status of a distribution network for photovoltaic power generation, the management method comprising the following steps:

[0005] Step S100: Obtain each node in the distribution network that is historically connected to the photovoltaic power generation system and the output voltage of the historical photovoltaic power generation system; obtain a reasonable number of node allocations in the distribution network according to the number of connections between each node and the photovoltaic power generation system and the allocated voltage value, and connect any node that meets the reasonable number of node allocations to the photovoltaic power generation system;

[0006] Step S200: reading the power load of all nodes connected to the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, obtaining the actual distance loss and the actual load of each node according to the historical power distribution times of each node, and generating the load-distance degree ratio of each node; calculating the load-distance equal importance degree ratio of the node according to the average distance and the average power load of all nodes connected to the photovoltaic power generation system; by comparing the size relationship between the load-distance degree ratio of each node and the load-distance equal importance degree ratio, selecting a number of nodes, and having the photovoltaic power generation system distribute voltage to the said number of nodes and perform power transmission;

[0007] Step S300: During the power transmission process, several nodes are monitored; when the transmission voltage of the photovoltaic power generation system increases abnormally, secondary distribution is performed according to the remaining load capacity of several nodes; if the remaining load capacity of a node is less than the allocated transmission voltage, a new node is added as a power transmission object;

[0008] Step S400: When several nodes are abnormal, the selection priority of the remaining nodes is generated according to the power load of the remaining nodes in the distribution network and the distance between them and the photovoltaic power generation system, and the nodes with the same number as the abnormal nodes are extracted from the remaining nodes according to the selection priority as new nodes to be connected to the photovoltaic power generation system.

[0009] Furthermore, the step S100 includes the following steps:

[0010] Step S101: Count the number of times each node has been historically connected to the photovoltaic power generation system and the voltage value allocated each time, where the number of connections of the i-th node is n. i , the voltage value of the i-th node assigned for the jth time is V ij ;

[0011] Step S102: Read the output voltage value of each photovoltaic power generation system in history, select the first m voltage values ​​of all output voltage values ​​sorted from large to small to calculate the average voltage value According to the formula:

[0012]

[0013] Among them, r is the number of nodes connected to the photovoltaic power generation system in the distribution network, and the average voltage value of the node distribution is calculated Selecting several nodes in the distribution network to connect to the photovoltaic power generation system does not mean that the more nodes are connected, the better. The more nodes are connected, the more complex the circuit of the distribution network will be, which will increase the waste of resources. Therefore, it is necessary to set the upper limit of the number of connected nodes so that the average voltage value of the node distribution can be obtained. More precise;

[0014] Step S103: Set the reasonable node allocation number to N, according to the formula: The reasonable node allocation number N of the distribution network is calculated, and any N nodes in the distribution network are connected to the photovoltaic power generation system, and the power of the photovoltaic power generation system is transmitted to the distribution network through the N nodes.

[0015] Furthermore, the step S200 includes the following steps:

[0016] Step S201: Set the power load of the pth node among the N nodes to F p, the distance between the pth node and the photovoltaic power generation system is L p ; Sort the N nodes according to the power load from high to low to generate a load set A F =[a1,a2,…,a p ,…,a N}, sort the N nodes from far to near according to the distance to generate a distance set B L ={b1,b2,…,b p ,…,b N}, calculate the average power load of N nodes The average distance of N nodes

[0017] Step S202: Real-time acquisition of the input voltage of the photovoltaic power generation system as V act , select load set A F The first q nodes in Extract the q nodes in the distance set B L The corresponding node in determines whether the q nodes belong to the set When the q nodes are in the distance set B L The corresponding nodes in all belong to set B L ′, the photovoltaic power generation system distributes power to the q nodes;

[0018] Among multiple nodes, the power load of the node is given priority. The more power load, the more fault tolerance. Therefore, the nodes with the largest power load are selected first.

[0019] Step S203: Set the historical power allocation times of the pth node among the N nodes to j p , then the actual distance loss of the pth node is obtained in, is the average distance of N nodes, g is the transmission loss per unit distance, and the actual load of the pth node is obtained in, is the average power load of each node, h is the load loss of a single power transmission; according to the formula:

[0020]

[0021] Calculate the node load-distance equal importance ratio ε; when there is a node among the q nodes that does not belong to the set B L ', set the L The node of ′ is a p , node a p In the distance set B L The corresponding node in is bp′ , according to the formula: Calculate node a p The load-distance ratio ε p ; When ε p >ε, then according to node a p With node b N-q+1 The distance difference between them is used to calculate the node a p The same load difference when , then exclude node a p , reselect a new node;

[0022] Step S204: When selecting a new node, select load set A F The q+1th node a q+1 , determine whether If it is not satisfied, then keep node a q+1 While continuing to load set A F Continue to select new nodes to satisfy When satisfied , then repeat step S203 until no more nodes are excluded;

[0023] After selecting several nodes with the largest power load, the distance between the node and the photovoltaic power generation system is judged. Generally, the closer the distance, the smaller the loss. The optimal choice is the node with the larger power load and the closer distance. However, this is not inevitable. Therefore, it is necessary to choose between power load and distance loss. The load-distance equal importance ratio ε of the node is set to form a balance between power load and distance loss to a certain extent. When the load-distance ratio ε of a node is p If the load-distance equal importance ratio ε is exceeded, it means that the load of the node has a greater impact than the distance loss. Therefore, the load should be given priority to the node, and the impact of the distance loss should be ignored to a certain extent. This can effectively reduce the loss and make the selection of nodes more scientific.

[0024] Step S205: According to the proportional relationship between the actual power load values ​​of each node retained, the input voltage V act To distribute, according to the formula:

[0025]

[0026] Among them, F total The actual power load of all nodes retained is the total value, and the voltage value V assigned to the pth node is calculated. p ;

[0027] Select a suitable number of nodes from multiple nodes for power transmission, calculate the load loss and line loss of the nodes by the number of times they have participated in power transmission in history, and focus on different losses for different nodes based on the ratio between the two, so as to minimize the loss and save resources in the end.

[0028] Furthermore, the step S300 includes the following steps:

[0029] Step S301: When the photovoltaic power generation system transmits power to the remaining nodes, the nodes are monitored and the voltage value V assigned to the pth node is set. p , calculate the remaining load capacity V of the pth node p ′=F p ×(1-j p %)-V p , where F p ×(1-j p %) is the actual load capacity of the pth node;

[0030] Step S302: When the transmission voltage of the photovoltaic power generation system increases, the increased transmission voltage is set to ΔV, and the increased transmission voltage ΔV is distributed according to the remaining load capacity of several nodes according to the formula:

[0031]

[0032] Where r is the number of nodes that remain; the voltage value V that redistributes the increased transmission voltage to the pth node is calculated. add(p) ;

[0033] Step S303: When there is a voltage value V reallocated to the pth node add(p) Greater than the remaining load capacity V of the pth node p ′, the remaining voltage cannot be distributed. Then, among the N nodes, except for the remaining nodes, all nodes whose actual load values ​​are greater than the remaining voltage that cannot be allocated are screened out, and a node with the shortest distance is extracted, which will not be able to allocate the remaining voltage V s Transmit to the node with the shortest distance.

[0034] Furthermore, the step S400 includes the following steps:

[0035] Step S401: When there are several nodes among the N nodes that are abnormal, the power load of the remaining nodes in the distribution network and the distance between the remaining nodes and the photovoltaic power generation system are obtained according to the formula:

[0036]

[0037] Among them, F k is the power load of the kth node among the remaining nodes, L k is the distance between the kth node and the photovoltaic power generation system among the remaining nodes, j k The number of times the kth node has been historically allocated electricity; the selection priority τ of the kth node is calculated k ;

[0038] Step S402: sort the remaining nodes from high to low according to the selection priority, remove several abnormal nodes from the N nodes, and extract the remaining nodes with the same number as the removed nodes as new nodes to connect to the photovoltaic power generation system.

[0039] In order to better implement the above method, a distribution network operation status management system is also proposed, which includes a node connection module, a node selection module, a transmission voltage abnormality processing module and a node abnormality processing module;

[0040] The node connection module is used to obtain each node in the distribution network that is historically connected to the photovoltaic power generation system and the output voltage of the historical photovoltaic power generation system; according to the number of connections between each node and the photovoltaic power generation system and the allocated voltage value, a reasonable number of node allocations in the distribution network is obtained, and any node that meets the reasonable number of node allocations is connected to the photovoltaic power generation system;

[0041] The node selection module is used to read the power load of all nodes connected to the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, obtain the actual distance loss and actual load of each node according to the historical power distribution times of each node, and generate the load-distance degree ratio of each node; calculate the load-distance equal importance degree ratio of the node according to the average distance and average power load of all nodes connected to the photovoltaic power generation system; and select a number of nodes by comparing the size relationship between the load-distance degree ratio of each node and the load-distance equal importance degree ratio, and distribute voltage to the several nodes by the photovoltaic power generation system and perform power transmission;

[0042] The transmission voltage abnormality processing module is used to monitor several nodes during the power transmission process; when the transmission voltage of the photovoltaic power generation system increases abnormally, secondary distribution is performed according to the remaining load capacity of several nodes; if the remaining load capacity of a node is less than the allocated transmission voltage, a new node is added as a power transmission object;

[0043] The node abnormality processing module is used to generate selection priorities of the remaining nodes according to the power load of the remaining nodes in the distribution network and the distance between the remaining nodes and the photovoltaic power generation system when several nodes are abnormal, and extract the same number of nodes as the nodes with abnormalities from the remaining nodes according to the selection priorities as new nodes to be connected to the photovoltaic power generation system;

[0044] Furthermore, the node selection module includes a load-distance ratio generation unit and a node screening unit;

[0045] The load-distance ratio generation unit is used to read the power load of all nodes connected to the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, obtain the actual distance loss and the actual load of each node according to the historical power distribution times of each node, and generate the load-distance ratio of each node; the node screening unit is used to calculate the load-distance importance ratio of the node according to the average distance and the average power load of all nodes connected to the photovoltaic power generation system; by comparing the size relationship between the load-distance ratio of each node and the load-distance importance ratio, select a number of nodes, and the photovoltaic power generation system distributes voltage to the several nodes and transmits power;

[0046] Furthermore, the transmission voltage abnormality processing module includes a power secondary distribution unit and a node adding unit;

[0047] The power secondary distribution unit is used to monitor several nodes during power transmission; when the transmission voltage of the photovoltaic power generation system increases abnormally, secondary distribution is performed according to the remaining load capacity of several nodes; the node adding unit is used to add a new node as a power transmission object if the remaining load capacity of a node is less than the allocated transmission voltage;

[0048] Further, the node exception processing module includes a priority selection unit and a node replacement unit;

[0049] The selection priority unit is used to generate the selection priority of the remaining nodes according to the power load of the remaining nodes in the distribution network and the distance between them and the photovoltaic power generation system when several nodes are abnormal; the node replacement unit is used to extract the same number of nodes as the nodes with abnormalities from the remaining nodes according to the selection priority as new nodes to be connected to the photovoltaic power generation system.

[0050] Compared with the prior art, the present invention has the following beneficial effects: (1) the present invention connects the photovoltaic power generation system with multiple nodes of the distribution network, which can avoid the problem of abnormal power transmission caused by inappropriate location or insufficient load of a single node; (2) while ensuring the connection between the photovoltaic power generation system and multiple nodes of the distribution network, the present invention ensures that the number of nodes connected during transmission is minimized as much as possible, thereby reducing excessive power loss caused by too many connected nodes; (3) the present invention selects a suitable number of nodes from multiple nodes for power transmission, calculates the load loss and line loss of the nodes by the number of historical times participating in power transmission, and focuses on different losses for different nodes according to the ratio between the two, so that the loss can be minimized and resources can be saved. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0052] Figure 1 A schematic diagram of the steps of a method for managing the operating status of a distribution network for photovoltaic power generation;

[0053] Figure 2 The present invention is a structural diagram of a distribution network operation status management system for photovoltaic power generation. DETAILED DESCRIPTION

[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0055] See also Figure 1 to Figure 2 The present invention provides a technical solution: a method for managing the operating status of a distribution network for photovoltaic power generation, the management method comprising the following steps:

[0056] Step S100: Obtain each node in the distribution network that is historically connected to the photovoltaic power generation system and the output voltage of the historical photovoltaic power generation system; obtain a reasonable number of node allocations in the distribution network according to the number of connections between each node and the photovoltaic power generation system and the allocated voltage value, and connect any node that meets the reasonable number of node allocations to the photovoltaic power generation system;

[0057] Wherein, the step S100 includes the following steps:

[0058] Step S101: Count the number of times each node has been historically connected to the photovoltaic power generation system and the voltage value allocated each time, where the number of connections of the i-th node is n. i , the voltage value of the i-th node assigned for the jth time is V ij ;

[0059] Step S102: Read the output voltage value of each photovoltaic power generation system in history, select the first m voltage values ​​of all output voltage values ​​sorted from large to small to calculate the average voltage value According to the formula:

[0060]

[0061] Among them, r is the number of nodes connected to the photovoltaic power generation system in the distribution network, and the average voltage value of the node distribution is calculated

[0062] Step S103: Set the reasonable node allocation number to N, according to the formula: The reasonable node allocation number N of the distribution network is calculated, and any N nodes in the distribution network are connected to the photovoltaic power generation system, and the power of the photovoltaic power generation system is transmitted to the distribution network through the N nodes.

[0063] Step S200: reading the power load of all nodes connected to the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, obtaining the actual distance loss and the actual load of each node according to the historical power distribution times of each node, and generating the load-distance degree ratio of each node; calculating the load-distance equal importance degree ratio of the node according to the average distance and the average power load of all nodes connected to the photovoltaic power generation system; by comparing the size relationship between the load-distance degree ratio of each node and the load-distance equal importance degree ratio, selecting a number of nodes, and having the photovoltaic power generation system distribute voltage to the said number of nodes and perform power transmission;

[0064] Wherein, the step S200 includes the following steps:

[0065] Step S201: Set the power load of the pth node among the N nodes to F p , the distance between the pth node and the photovoltaic power generation system is L p ; Sort the N nodes according to the power load from high to low to generate a load set A F =

[0066] {a1,a2,…,a p ,…,a N}, sort the N nodes from far to near according to the distance to generate a distance set B L =

[0067] {b1,b2,…,b p ,…,b N}, calculate the average power load of N nodes The average distance of N nodes

[0068] Step S202: Real-time acquisition of the input voltage of the photovoltaic power generation system as V act , select load set A F The first q nodes in Extract the q nodes in the distance set B L The corresponding node in determines whether the q nodes belong to set B L ′={b N-q+1 ,…,b N-1 ,b N}, when the q nodes are in the distance set B L The corresponding nodes in all belong to set B L ′, the photovoltaic power generation system distributes power to the q nodes;

[0069] Step S203: Set the historical power allocation times of the pth node among the N nodes to j p , then the actual distance loss of the pth node is obtained in, is the average distance of N nodes, g is the transmission loss per unit distance, and the actual load of the pth node is obtained in, is the average power load of each node, h is the load loss of a single power transmission; according to the formula:

[0070]

[0071] Calculate the node load-distance equal importance ratio ε; when there is a node among the q nodes that does not belong to the set B L ', set the L The node of ′ is a p , node a p In the distance set B L The corresponding node in is b p′ , according to the formula: Calculate node a p The load-distance ratio ε p ; When ε p >ε, then according to node a p With node b N-q+1 The distance difference between them is used to calculate the node a p The same load difference when

[0072] , then exclude node a p , reselect a new node;

[0073] Step S204: When selecting a new node, select load set A F The q+1th node a q+1 , determine whether If it is not satisfied, then keep node a q+1 While continuing to load set A F Continue to select new nodes to satisfy When satisfied , then repeat step S203 until no more nodes are excluded;

[0074] Step S205: According to the proportional relationship between the actual power load values ​​of each node retained, the input voltage V act To distribute, according to the formula:

[0075]

[0076] Among them, F total The actual power load of all nodes retained is the total value, and the voltage value V assigned to the pth node is calculated. p .

[0077] Step S300: During the power transmission process, several nodes are monitored; when the transmission voltage of the photovoltaic power generation system increases abnormally, secondary distribution is performed according to the remaining load capacity of several nodes; if the remaining load capacity of a node is less than the allocated transmission voltage, a new node is added as a power transmission object;

[0078] Wherein, the step S300 includes the following steps:

[0079] Step S301: When the photovoltaic power generation system transmits power to the remaining nodes, the nodes are monitored and the voltage value V assigned to the pth node is set. p , calculate the remaining load capacity V of the pth node p ′=F p ×(1-j p %)-V p , where F p ×(1-j p %) is the actual load capacity of the pth node;

[0080] Step S302: When the transmission voltage of the photovoltaic power generation system increases, the increased transmission voltage is set to ΔV, and the increased transmission voltage ΔV is distributed according to the remaining load capacity of several nodes according to the formula:

[0081]

[0082] Where r is the number of nodes that remain; the voltage value V that redistributes the increased transmission voltage to the pth node is calculated. add(p) ;

[0083] Step S303: When there is a voltage value V reallocated to the pth node add(p) Greater than the remaining load capacity V of the pth node p ′, the remaining voltage cannot be distributed. Then, among the N nodes, except for the remaining nodes, all nodes whose actual load values ​​are greater than the remaining voltage that cannot be allocated are screened out, and a node with the shortest distance is extracted, which will not be able to allocate the remaining voltage V s Transmit to the node with the shortest distance.

[0084] Step S400: When several nodes are abnormal, the selection priority of the remaining nodes is generated according to the power load of the remaining nodes in the distribution network and the distance between them and the photovoltaic power generation system, and the nodes with the same number as the abnormal nodes are extracted from the remaining nodes according to the selection priority as new nodes to be connected to the photovoltaic power generation system.

[0085] Wherein, the step S400 includes the following steps:

[0086] Step S401: When there are several nodes among the N nodes that are abnormal, the power load of the remaining nodes in the distribution network and the distance between the remaining nodes and the photovoltaic power generation system are obtained according to the formula:

[0087]

[0088] Among them, F k is the power load of the kth node among the remaining nodes, L k is the distance between the kth node and the photovoltaic power generation system among the remaining nodes, j k The number of times the kth node has been historically allocated electricity; the selection priority τ of the kth node is calculated k ;

[0089] Step S402: sort the remaining nodes from high to low according to the selection priority, remove several abnormal nodes from the N nodes, and extract the remaining nodes with the same number as the removed nodes as new nodes to connect to the photovoltaic power generation system.

[0090] A distribution network operation status management system for photovoltaic power generation, the management system comprising a node connection module, a node selection module, a transmission voltage abnormality processing module and a node abnormality processing module;

[0091] The node connection module is used to obtain each node in the distribution network that is historically connected to the photovoltaic power generation system and the output voltage of the historical photovoltaic power generation system; according to the number of connections between each node and the photovoltaic power generation system and the allocated voltage value, a reasonable number of node allocations in the distribution network is obtained, and any node that meets the reasonable number of node allocations is connected to the photovoltaic power generation system;

[0092] The node selection module is used to read the power load of all nodes connected to the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, obtain the actual distance loss and actual load of each node according to the historical power distribution times of each node, and generate the load-distance degree ratio of each node; calculate the load-distance equal importance degree ratio of the node according to the average distance and average power load of all nodes connected to the photovoltaic power generation system; and select a number of nodes by comparing the size relationship between the load-distance degree ratio of each node and the load-distance equal importance degree ratio, and distribute voltage to the several nodes by the photovoltaic power generation system and perform power transmission;

[0093] The transmission voltage abnormality processing module is used to monitor several nodes during the power transmission process; when the transmission voltage of the photovoltaic power generation system increases abnormally, secondary distribution is performed according to the remaining load capacity of several nodes; if the remaining load capacity of a node is less than the allocated transmission voltage, a new node is added as a power transmission object;

[0094] The node abnormality processing module is used to generate selection priorities of the remaining nodes according to the power load of the remaining nodes in the distribution network and the distance between the remaining nodes and the photovoltaic power generation system when several nodes are abnormal, and extract the same number of nodes as the nodes with abnormalities from the remaining nodes according to the selection priorities as new nodes to be connected to the photovoltaic power generation system;

[0095] Wherein, the node selection module includes a load-distance ratio generation unit and a node screening unit;

[0096] The load-distance ratio generation unit is used to read the power load of all nodes connected to the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, obtain the actual distance loss and the actual load of each node according to the historical power distribution times of each node, and generate the load-distance ratio of each node; the node screening unit is used to calculate the load-distance importance ratio of the node according to the average distance and the average power load of all nodes connected to the photovoltaic power generation system; by comparing the size relationship between the load-distance ratio of each node and the load-distance importance ratio, select a number of nodes, and the photovoltaic power generation system distributes voltage to the several nodes and transmits power;

[0097] Wherein, the transmission voltage abnormality processing module includes a power secondary distribution unit and a node adding unit;

[0098] The power secondary distribution unit is used to monitor several nodes during power transmission; when the transmission voltage of the photovoltaic power generation system increases abnormally, secondary distribution is performed according to the remaining load capacity of several nodes; the node adding unit is used to add a new node as a power transmission object if the remaining load capacity of a node is less than the allocated transmission voltage;

[0099] Wherein, the node exception processing module includes a priority selection unit and a node replacement unit;

[0100] The selection priority unit is used to generate the selection priority of the remaining nodes according to the power load of the remaining nodes in the distribution network and the distance between them and the photovoltaic power generation system when several nodes are abnormal; the node replacement unit is used to extract the same number of nodes as the nodes with abnormalities from the remaining nodes according to the selection priority as new nodes to be connected to the photovoltaic power generation system.

[0101] Count the number of connections to the photovoltaic power generation system for each node and the voltage value allocated each time. The first node is connected three times, the voltage value allocated for the first time is 100V, the voltage allocated for the second time is 90V, and the voltage allocated for the third time is 110V. The second node is connected twice, the voltage allocated for the first time is 200V, and the voltage allocated for the second time is 220V. Read the output voltage value of each photovoltaic power generation system in history, select the two largest voltage values ​​among all the output voltage values ​​to calculate the average voltage value. According to the formula:

[0102]

[0103] The reasonable node allocation number of the distribution network is obtained as N=ceil(250 / 145)=2, that is, two nodes in the distribution network are connected to the photovoltaic power generation system, and the power of the photovoltaic power generation system is transmitted to the distribution network through the two nodes.

[0104] Set the power load value of the first node of the two nodes to F1 = 50V, the distance between the node and the photovoltaic power generation system to L1 = 1m, the power load value of the second node to F2 = 100V, the distance between the node and the photovoltaic power generation system to L2 = 0.5m, and obtain the input voltage of the photovoltaic power generation system in real time as V act =30V, select the second node as the transmission object.

[0105] When the voltage of the photovoltaic power generation system abnormally increases by 80V, the load value of the second node can no longer be met, and the first node is called to jointly transmit power; when the first node is abnormal, the selection priority of the remaining nodes is generated according to the power load of the remaining nodes in the distribution network and the distance between them and the photovoltaic power generation system; a node with the highest priority is selected to replace the first node.

[0106] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0107] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for managing the operating status of a distribution network for photovoltaic power generation, characterized in that: The management method comprises the following steps: Step S100: Obtain each node in the distribution network that is historically connected to the photovoltaic power generation system and the output voltage of the historical photovoltaic power generation system; obtain a reasonable number of node allocations in the distribution network according to the number of connections between each node and the photovoltaic power generation system and the allocated voltage value, and connect any node that meets the reasonable number of node allocations to the photovoltaic power generation system; Step S200: reading the power load of all nodes connected to the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, obtaining the actual distance loss and the actual load of each node according to the historical power distribution times of each node, and generating the load-distance degree ratio of each node; calculating the load-distance equal importance degree ratio of the node according to the average distance and the average power load of all nodes connected to the photovoltaic power generation system; by comparing the size relationship between the load-distance degree ratio of each node and the load-distance equal importance degree ratio, selecting a number of nodes, and having the photovoltaic power generation system distribute voltage to the said number of nodes and perform power transmission; Step S300: During the power transmission process, several nodes are monitored; when the transmission voltage of the photovoltaic power generation system increases abnormally, secondary distribution is performed according to the remaining load capacity of several nodes; if the remaining load capacity of a node is less than the allocated transmission voltage, a new node is added as a power transmission object; Step S400: When several nodes are abnormal, the selection priority of the remaining nodes is generated according to the power load of the remaining nodes in the distribution network and the distance between them and the photovoltaic power generation system, and the nodes with the same number as the abnormal nodes are extracted from the remaining nodes according to the selection priority as new nodes to be connected to the photovoltaic power generation system.

2. A method for managing the operating status of a distribution network for photovoltaic power generation according to claim 1, characterized in that: The step S100 includes the following steps: Step S101: Count the number of times each node has been historically connected to the photovoltaic power generation system and the voltage value allocated each time, where the number of connections of the i-th node is n. i , the voltage value of the i-th node assigned for the jth time is V ij ; Step S102: Read the output voltage value of each photovoltaic power generation system in history, select the first m voltage values ​​of all output voltage values ​​sorted from large to small to calculate the average voltage value According to the formula: Among them, r is the number of nodes connected to the photovoltaic power generation system in the distribution network, and the average voltage value of the node distribution is calculated Step S103: Set the reasonable node allocation number to N, according to the formula: The reasonable node allocation number N of the distribution network is calculated, and any N nodes in the distribution network are connected to the photovoltaic power generation system, and the power of the photovoltaic power generation system is transmitted to the distribution network through the N nodes.

3. A method for managing the operating status of a distribution network for photovoltaic power generation according to claim 2, characterized in that: The step S200 includes the following steps: Step S201: Set the power load of the pth node among the N nodes to F p , the distance between the pth node and the photovoltaic power generation system is L p ; Sort the N nodes according to the power load from high to low to generate a load set A F ={a1,a2,…,a p ,…,a N }, sort the N nodes from far to near according to the distance to generate a distance set B L ={b1,b2,…,b p ,…,b N }, calculate the average power load of N nodes The average distance of N nodes Step S202: Real-time acquisition of the input voltage of the photovoltaic power generation system as V act , select load set A F The first q nodes in Extract the q nodes in the distance set B L The corresponding node in determines whether the q nodes belong to set B L ′={b N-q+1 ,…,b N-1 ,b N }, when the q nodes are in the distance set B L The corresponding nodes in all belong to set B L ′, the photovoltaic power generation system distributes power to the q nodes; Step S203: Set the historical power allocation times of the pth node among the N nodes to j L , then the actual distance loss of the pth node is obtained in, is the average distance of N nodes, g is the transmission loss per unit distance, and the actual load of the pth node is obtained in, is the average power load of each node, h is the load loss of a single power transmission; according to the formula: Calculate the node load-distance equal importance ratio ε; when there is a node among the q nodes that does not belong to the set B L ', set the L The node of ′ is a p , node a p In the distance set B L The corresponding node in is b p′ , according to the formula: Calculate node a p The load-distance ratio ε p ; When ε p >ε, then according to node a p With node b N-q+1 The distance difference between them is used to calculate the node a p The same load difference when , then exclude node a p , reselect a new node; Step S204: When selecting a new node, select load set A F The q+1th node a q+1 , determine whether If it is not satisfied, then keep node a q+1 While continuing to load set A F Continue to select new nodes to satisfy When satisfied , then repeat step S203 until no more nodes are excluded; Step S205: According to the proportional relationship between the actual power load values ​​of each node retained, the input voltage V act To distribute, according to the formula: Among them, F total The actual power load of all nodes retained is the total value, and the voltage value V assigned to the pth node is calculated. p .

4. A method for managing the operating status of a distribution network for photovoltaic power generation according to claim 3, characterized in that: The step S300 includes the following steps: Step S301: When the photovoltaic power generation system transmits power to the remaining nodes, the nodes are monitored and the voltage value V assigned to the pth node is set. p , calculate the remaining load capacity V of the pth node p ′=F p ×(1-j p %0-V p , where F p ×(1-j p %) is the actual load capacity of the pth node; Step S302: When the transmission voltage of the photovoltaic power generation system increases, the increased transmission voltage is set to ΔV, and the increased transmission voltage ΔV is distributed according to the remaining load capacity of several nodes according to the formula: Where r is the number of nodes that remain; the voltage value V that redistributes the increased transmission voltage to the pth node is calculated. add(p) ; Step S303: When there is a voltage value V reallocated to the pth node add(p) Greater than the remaining load capacity V of the pth node p ′, the remaining voltage cannot be distributed. Then, except for the remaining nodes among the N nodes, all nodes whose actual load values ​​are greater than the remaining voltage that cannot be allocated are screened out, and a node with the shortest distance is extracted, which will not be able to allocate the remaining voltage V s Transmit to the node with the shortest distance.

5. A method for managing the operating status of a distribution network for photovoltaic power generation according to claim 4, characterized in that: The step S400 includes the following steps: Step S401: When some of the N nodes are abnormal, the power load of the remaining nodes in the distribution network and the distance between the remaining nodes and the photovoltaic power generation system are obtained according to the formula: Among them, F k is the power load of the kth node among the remaining nodes, L k is the distance between the kth node and the photovoltaic power generation system among the remaining nodes, j k The number of times the kth node has been historically allocated electricity; the selection priority τ of the kth node is calculated k ; Step S402: sort the remaining nodes from high to low according to the selection priority, remove several abnormal nodes from the N nodes, and extract the remaining nodes with the same number as the removed nodes as new nodes to connect to the photovoltaic power generation system.

6. A distribution network operation status management system applied to a distribution network operation status management method for photovoltaic power generation according to any one of claims 1 to 5, characterized in that: The management system includes a node connection module, a node selection module, a transmission voltage abnormality processing module and a node abnormality processing module; The node connection module is used to obtain each node in the distribution network that is historically connected to the photovoltaic power generation system and the output voltage of the historical photovoltaic power generation system; according to the number of connections between each node and the photovoltaic power generation system and the allocated voltage value, a reasonable number of node allocations in the distribution network is obtained, and any node that meets the reasonable number of node allocations is connected to the photovoltaic power generation system; The node selection module is used to read the power load of all nodes connected to the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, obtain the actual distance loss and actual load of each node according to the historical power distribution times of each node, and generate the load-distance degree ratio of each node; calculate the load-distance equal importance degree ratio of the node according to the average distance and average power load of all nodes connected to the photovoltaic power generation system; and select a number of nodes by comparing the size relationship between the load-distance degree ratio of each node and the load-distance equal importance degree ratio, and distribute voltage to the several nodes by the photovoltaic power generation system and perform power transmission; The transmission voltage abnormality processing module is used to monitor several nodes during the power transmission process; when the transmission voltage of the photovoltaic power generation system increases abnormally, secondary distribution is performed according to the remaining load capacity of several nodes; if the remaining load capacity of a node is less than the allocated transmission voltage, a new node is added as a power transmission object; The node abnormality processing module is used to generate the selection priority of the remaining nodes according to the power load of the remaining nodes in the distribution network and the distance between them and the photovoltaic power generation system when several nodes are abnormal, and extract the same number of nodes as the nodes with abnormalities from the remaining nodes according to the selection priority as new nodes to be connected to the photovoltaic power generation system.

7. The distribution network operation status management system according to claim 6, characterized in that: The node selection module includes a load-distance ratio generation unit and a node screening unit; The load-distance degree ratio generating unit is used to read the power load of all nodes connected to the photovoltaic power generation system and the distance between the nodes and the photovoltaic power generation system, obtain the actual distance loss and the actual load of each node according to the historical power distribution times of each node, and generate the load-distance degree ratio of each node; the node screening unit is used to calculate the load-distance equal importance ratio of the node according to the average distance and the average power load of all nodes connected to the photovoltaic power generation system; by comparing the size relationship between the load-distance degree ratio of each node and the load-distance equal importance ratio, a number of nodes are selected, and the photovoltaic power generation system distributes voltage to the several nodes and transmits power.

8. The distribution network operation status management system according to claim 6, characterized in that: The transmission voltage abnormality processing module includes a power secondary distribution unit and a node adding unit; The power secondary distribution unit is used to monitor several nodes during the power transmission process; when the transmission voltage of the photovoltaic power generation system increases abnormally, secondary distribution is performed according to the remaining load capacity of several nodes; the node adding unit is used to add a new node as a power transmission object if the remaining load capacity of a node is less than the allocated transmission voltage.

9. The distribution network operation status management system according to claim 6, characterized in that: The node exception processing module includes a priority selection unit and a node replacement unit; The selection priority unit is used to generate the selection priority of the remaining nodes according to the power load of the remaining nodes in the distribution network and the distance between them and the photovoltaic power generation system when several nodes are abnormal; the node replacement unit is used to extract the same number of nodes as the nodes with abnormalities from the remaining nodes according to the selection priority as new nodes to be connected to the photovoltaic power generation system.