Vertical constant pressure load loading device suitable for wind power foundation model experiment and implementation method

By using the vertical constant pressure load loading device designed with roller pulleys and counterweights in the wind power foundation model experiment, the problem of vertical load instability provided by the hydraulic jack was solved, achieving high precision and high quality of the experiment, and reducing the cost cost.

CN118794718AActive Publication Date: 2024-10-18TIANJIN UNIV
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410979244.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-10-18
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

In structural static experiments, the vertical load provided by existing hydraulic jacks is unstable and easy to fluctuate, affecting the accuracy of experimental results. The main factors include the displacement and plastic deformation of the specimen, and the internal pressure relief of the hydraulic system.

Method used

A vertical constant pressure load loading device suitable for wind power foundation model experiments is designed. It uses a roller pulley set and a counterweight to apply a constant vertical load by adjusting the mass of the weight combination to ensure the stability of the load.

Benefits of technology

It significantly improves the accuracy and reliability of structural static experiments, ensures the stability of vertical loads, improves experimental accuracy and quality, reduces experimental costs, and improves resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118794718A_ABST
    Figure CN118794718A_ABST
Patent Text Reader

Abstract

The invention discloses a vertical constant-pressure load loading device suitable for a wind power foundation model experiment and an implementation method. The vertical constant-pressure load loading device comprises a model soil box body, the model soil tank box body is filled with model soil; an experimental model is arranged right above the model soil; the left side and the right side of the model soil box body are respectively provided with two stand columns. A supporting frame is arranged at the tops of the four stand columns; the transverse middle position of the support frame vertically penetrates through the loading tower drum; the bottom of the loading tower drum is connected with the experimental model; the top of the loading tower drum is fixedly connected with the bottom of the tower drum top cover plate; the front side and the rear side of the bottom of the tower drum top cover plate are respectively connected with one pulley group; the two pulley blocks are rotationally and symmetrically distributed; and each pulley group is connected with one weight combination through a steel wire rope. According to the invention, the roller skating group is creatively utilized, so that the loading precision and quality of the vertical load of the wind power foundation model experiment can be greatly improved, and the stability of the vertical load in the experiment process is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of wind power foundation model experiments, and in particular to a vertical constant pressure load loading device suitable for wind power foundation model experiments and an implementation method thereof. Background Art

[0002] At present, the loading method adopted by most laboratories is: during the experiment, firstly, a vertical load (i.e., vertical direction) is provided by an ordinary hydraulic jack, and then, a horizontal hydraulic jack is used to provide horizontal and moment loads. Most structural laboratories usually use ordinary hydraulic jacks for loading when conducting structural static experimental research, and rollers, pulleys, or linear guides are used to move between the jack and the vertical reaction device. However, due to the influence of the horizontal load of the model and the vertical deformation of the specimen itself, these measures cannot guarantee the stability of the vertical load during the experiment. The vertical load is prone to fluctuations, and the maximum amplitude of the vertical load can even reach more than 50% of the set value, which seriously affects the accuracy of the experimental results.

[0003] The main factors that lead to the instability of the vertical load provided by the hydraulic jack in the structural static test include: first, when the specimen is subjected to horizontal reciprocating displacement, the top elevation will fluctuate to a certain extent; second, the specimen undergoes vertical plastic deformation or damage, resulting in a reduction in its height; third, the hydraulic system may experience a slight internal pressure release during the experiment, which in turn affects the pressure stability of the jack.

[0004] For scaled model experiments, even a small deviation will have a great impact on the stress state of the prototype structure fed back by the experimental results, and experimental errors need to be eliminated as much as possible.

[0005] Therefore, there is an urgent need to develop a technology that can improve and optimize conventional load-applying devices, independently control vertical (i.e., vertical direction) loads in experiments, ensure the stability of vertical loads during experiments, and thus improve experimental accuracy and quality. Summary of the invention

[0006] The purpose of the present invention is to provide a vertical constant pressure load loading device and an implementation method suitable for wind power foundation model experiments in view of the technical defects existing in the prior art.

[0007] To this end, the present invention provides a vertical constant pressure load loading device suitable for wind power foundation model experiments, which includes a hollow model soil trough box with an open top;

[0008] The model soil tank box is filled with model soil;

[0009] Just above the model soil, an experimental model is set;

[0010] Two vertically distributed columns are arranged on the left and right sides of the model soil trough box;

[0011] A support frame is provided on the top of the four columns;

[0012] A vertically distributed loading tower is vertically penetrated through the horizontal middle position of the support frame;

[0013] The bottom of the loading tower is connected to the experimental model;

[0014] The top of the loading tower is fixedly connected to the bottom center of the horizontally distributed tower top cover plate;

[0015] The front and rear sides of the bottom of the tower top cover are respectively connected to a roller pulley set;

[0016] The two pulley blocks are rotationally symmetrically distributed;

[0017] Each roller pulley group is connected to a weight combination through a steel wire rope;

[0018] Two weight combinations are respectively located on the left and right sides of the model soil trough box;

[0019] Each weight combination includes a plurality of weights which are spaced apart from top to bottom.

[0020] In addition, the present invention also provides an implementation method of the vertical constant pressure load loading device suitable for wind power foundation model experiment as described above, which comprises the following steps:

[0021] Step S1, making an experimental model: preparing an experimental model corresponding to the wind power foundation structure according to a preset scale ratio;

[0022] Step S2, model soil installation: the model soil is filled in the model soil tank box with an opening at the top, and the top surface of the model soil is a plane;

[0023] Step S3, installation of the loading support device: fixing and connecting the four columns and the support frame;

[0024] Step S4, installation of the experimental model and the loading tower: a loading tower is arranged above the model soil according to the experimental model and in the support frame, and the experimental model 1 is connected to the loading tower by anchor bolts;

[0025] Step S5, installation of load loading device: arranging two pulley blocks and matching weight combinations and steel wire ropes on both sides of the experimental module;

[0026] Step S6, vertical load application: by adjusting the mass of the weight combination, the magnitude of the load applied to the experimental model is adjusted, and finally a vertical constant pressure load of corresponding magnitude is provided to the experimental model.

[0027] It can be seen from the technical solution provided by the present invention above that, compared with the prior art, the present invention provides a vertical constant pressure load loading device and implementation method suitable for wind power foundation model experiments. The present invention aims to solve the technical problem of unstable vertical load faced during the loading process of wind power foundation model experiments. The present invention is scientifically designed and innovatively utilizes roller pulleys. It is quick and convenient to assemble, safe and reliable, and can greatly improve the loading accuracy and quality of the vertical load in the wind power foundation model experiment, ensure the stability of the vertical load during the experiment, and thus improve the experimental accuracy and quality, which has great practical significance.

[0028] In the present invention, a constant pressure loading structure is designed based on the roller pulley group, thereby meeting the purpose of constant applied vertical load and improving the accuracy and quality of the model experiment.

[0029] The present invention utilizes roller pulleys and counterweights to effectively apply a vertical constant load, which can significantly improve the accuracy and reliability of structural static experiments, and provides an efficient and stable loading method for indoor scaled structural experiments. In addition, the device of the present invention is easy to disassemble and can be reused, which reduces the experimental cost and improves the utilization rate of resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 A three-dimensional schematic diagram of a vertical constant pressure load loading device suitable for wind power foundation model experiments provided by the present invention Figure 1 ;

[0031] Figure 2 A schematic diagram of the front structure of a vertical constant pressure load loading device suitable for wind power foundation model experiments provided by the present invention Figure 1 , the figure omits the pulley block and the matching wire rope at the rear side;

[0032] Figure 3 A schematic diagram of the front structure of a vertical constant pressure load loading device suitable for wind power foundation model experiments provided by the present invention Figure 2 , this figure omits the pulley block and the matching wire rope located at the front side;

[0033] Figure 4 A left side view of a vertical constant pressure load loading device suitable for wind power foundation model experiments provided by the present invention;

[0034] Figure 5 A structural stereogram of a pulley block provided in a vertical constant pressure load loading device suitable for a wind power foundation model experiment provided by the present invention;

[0035] Figure 6 A three-dimensional schematic diagram of a vertical constant pressure load loading device suitable for wind power foundation model experiments provided by the present invention Figure 2;

[0036] In the figure, 1 is the experimental model (i.e., the specimen), 2 is the square steel column, 3 is the double-jointed channel steel, 4 is the roller pulley set, and 5 is the steel wire rope;

[0037] 6 is a weight, 7 is a model soil, 70 is a model soil tank box, 8 is a loading tower, 9 is an anchor bolt connection section, and 10 is a tower top cover plate;

[0038] 3-2 is the front crossbeam, 3-1 is the rear crossbeam; 3-4 is the left supporting beam, and 3-3 is the right supporting beam. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0041] In the description of this patent, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense, for example, it can be fixedly connected or set, or it can be detachably connected or set, or connected or set in one piece. For ordinary technicians in this field, the specific meanings of the above terms in this patent can be understood according to specific circumstances.

[0042] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0043] See also Figures 1 to 6, the present invention provides a vertical constant pressure load loading device suitable for wind power foundation model experiments, including a hollow model soil trough box 70 with an open top;

[0044] The model soil tank box 70 is filled with model soil 7;

[0045] Directly above the model soil 7, an experimental model 1 (i.e., a test piece, i.e., a scaled model of a wind power foundation structure) is arranged;

[0046] Two vertically symmetrical columns 2 are respectively provided on the left and right sides of the model soil trough box 70;

[0047] A support frame 3 is provided on the top of the four columns 2;

[0048] A vertically distributed loading tower 8 vertically penetrates through the horizontal middle position of the support frame 3;

[0049] The bottom of the loading tower 8 is connected to the experimental model 1 (i.e., the specimen);

[0050] The top of the loading tower 8 is fixedly connected to the bottom center of the horizontally distributed tower top cover plate 10;

[0051] The front and rear sides of the bottom of the tower top cover plate 10 are respectively connected to a roller pulley set 4;

[0052] Each roller pulley set 4 is connected to a weight assembly through a steel wire rope 5;

[0053] Two weight assemblies are respectively located on the left and right sides of the model soil trough box 70;

[0054] Each weight combination includes a plurality of weights 6 which are spaced apart from top to bottom;

[0055] In the present invention, in specific implementation, the model soil trough box 70 is preferably a cubic box with an upper opening, which is mainly used to simulate soil in a laboratory.

[0056] The model soil trough box 70 is filled with model soil 7, and the top of the model soil 7 is flat, which is used to simulate the soil foundation structure in a real wind farm and conduct relevant experimental research. The model soil can be used to simulate the mechanical properties of the soil, the bearing characteristics of the foundation, etc., and the interaction between the soil and the foundation structure can be better understood.

[0057] In the present invention, the experimental model 1 is a scaled model of a wind power foundation structure, and the experiment mainly performs stress analysis on it by loading, and it is generally a steel or concrete circular expansion structure.

[0058] It should be noted that the experimental model 1 is a scaled-down model for simulating and studying the foundation structure of a wind turbine generator set. The experimental model 1 is made by reducing the size of a real wind turbine foundation so as to be tested and studied in a laboratory or experimental site, wherein the scale ratio (i.e., the scale ratio between the model and the real object) of the experimental model 1 (i.e., the scaled model) is generally 1:10 to 1:100.

[0059] In the present invention, in a specific implementation, the column 2 is a square steel column.

[0060] It should be noted that the column 2 is fixed to the floor of the laboratory by anchor bolts, and is mainly used to support the upper loading device, and is preferably a steel structure.

[0061] In the present invention, in specific implementation, the support frame 3 is a double-jointed channel steel structure;

[0062] It should be noted that the support frame 3 is connected to the top of the column 2 by welding, and is used to support the upper loading device, preferably a steel structure. The column 2 and the support frame 3 are the fixed structure of the constant pressure load loading device of the present invention, which can provide good loading stability for the device.

[0063] In specific implementation, the support frame 3 includes a left support beam 3-4 and a right support beam 3-3 distributed longitudinally;

[0064] The left support beam 3-4 and the right support beam 3-3 are symmetrically distributed;

[0065] A front crossbeam 3-2 and a rear crossbeam 3-1 distributed laterally are fixedly arranged (e.g., welded) on the top of the left support beam 3-4 and the right support beam 3-3;

[0066] The front cross beam 3-2 and the rear cross beam 3-1 are symmetrically distributed front to back;

[0067] There is a longitudinal gap between the front cross beam 3-2 and the rear cross beam 3-1;

[0068] The loading tower 8 vertically penetrates through the longitudinal gap.

[0069] In specific implementation, the top surfaces of the front crossbeam 3-2 and the rear crossbeam 3-1 are located on the same horizontal plane;

[0070] The top surfaces of the left support beam 3 - 4 and the right support beam 3 - 3 are located on the same horizontal plane.

[0071] In the present invention, in a specific implementation, the steel wire rope 5 passes around a plurality of fixed pulleys in the roller pulley group 4 in sequence, one end of the steel wire rope 5 is fixedly connected to the fixed buckle 4 - 1 in the roller pulley group 4 , and the other end is connected to a weight combination.

[0072] It should be noted that, in the present invention, there are two steel wire ropes 5, which are respectively arranged rotationally symmetrically along the loading device and are mainly used for applying loads.

[0073] In the present invention, in a specific implementation, the two pulley blocks 4 are rotationally symmetrically distributed.

[0074] In the present invention, in specific implementation, the two pulley blocks 4 are parallel to each other.

[0075] In the present invention, in a specific implementation, each pulley block 4 includes a first fixed pulley 4-2, a third fixed pulley 4-4, a fifth fixed pulley 4-6 and a seventh fixed pulley 4-8 installed at the bottom of the tower top cover plate 10, and a second fixed pulley 4-3, a fourth fixed pulley 4-5, a sixth fixed pulley 4-7, an eighth fixed pulley 4-9 and a ninth fixed pulley 4-10 installed on the front cross beam 3-2 or the rear cross beam 3-1;

[0076] The steel wire rope 5 passes over the first fixed pulley 4-2, the second fixed pulley 4-3, the third fixed pulley 4-4, the fourth fixed pulley 4-5, the fifth fixed pulley 4-6, the sixth fixed pulley 4-7, the seventh fixed pulley 4-8 and the eighth fixed pulley 4-9 in sequence;

[0077] One end of the steel wire rope 5 is fixedly connected to the fixed buckle 4-1, and the other end of the steel wire rope 5 is connected to a weight combination after passing around the ninth fixed pulley 4-10;

[0078] The fixing buckle 4-1 is fixed to the support frame 3 (specifically, fixed to the front crossbeam 3-2 or the rear crossbeam 3-1) by screws;

[0079] Among them, the center points of the second fixed pulley 4-3, the fourth fixed pulley 4-5, the sixth fixed pulley 4-7, the eighth fixed pulley 4-9 and the ninth fixed pulley 4-10 are located on the same horizontal straight line;

[0080] The center points of the first fixed pulley 4-2, the third fixed pulley 4-4, the fifth fixed pulley 4-6 and the seventh fixed pulley 4-8 are located on the same horizontal straight line;

[0081] The ninth fixed pulley 4-10 is arranged at the right end of the front cross beam 3-2 or the left end of the rear cross beam 3-1;

[0082] The first fixed pulley 4-2, the second fixed pulley 4-3, the third fixed pulley 4-4, the fourth fixed pulley 4-5, the fifth fixed pulley 4-6, the sixth fixed pulley 4-7, the seventh fixed pulley 4-8, the eighth fixed pulley 4-9 and the ninth fixed pulley 4-10 are located on the same vertical plane;

[0083] The second fixed pulley 4-3 is located directly below the middle position of the gap between the first fixed pulley 4-2 and the third fixed pulley 4-4;

[0084] The fourth fixed pulley 4-5 is located directly below the middle position of the gap between the third fixed pulley 4-4 and the fifth fixed pulley 4-6;

[0085] The sixth fixed pulley 4-7 is located directly below the middle position of the gap between the fifth fixed pulley 4-6 and the seventh fixed pulley 4-8;

[0086] Wherein, for each fixed pulley located at the top, the steel wire rope between it and the adjacent fixed pulley located at the bottom is distributed vertically.

[0087] It should be noted that the two pulley blocks 4 have exactly the same shape and structure, but are distributed in different directions.

[0088] It should be noted that, for the present invention, two steel wire ropes 5 are respectively connected to the bottom of the tower top cover plate 10 to apply a vertical load (i.e., a vertical load), thereby applying twice the vertical load to the experimental model 1 (i.e., a scaled model) connected to the tower top cover plate 10.

[0089] See also Figure 1 As shown, when each weight combination includes four weights 6 that are spaced apart from top to bottom, the device of the present invention can apply a stable and reliable vertical load (ie 8P1) to the experimental model 1.

[0090] It should be noted that the weight of a single weight 6 is G1, then P1 = N*G1, where N is the number of weights on one side. Figure 1 N is shown as 4; where P1 is a plurality of weights located on one side ( Figure 1 4 weights are shown) The total pulling force provided by weight 6;

[0091] Due to the pulley block 4 located on one side, through the eight fixed pulleys it includes (specifically the first fixed pulley 4-2, the third fixed pulley 4-4, the fifth fixed pulley 4-6 and the seventh fixed pulley 4-8, the second fixed pulley 4-3, the fourth fixed pulley 4-5, the sixth fixed pulley 4-7 and the eighth fixed pulley 4-9), a load of 8P1 can be applied to the top of the experimental model 1, that is, the single-side load of the experimental model 1 is 8P1, then, the pulley block 4 on both sides can apply a total of 16P1 vertical load to the scale model (i.e., the experimental model 1). The present invention can ensure the constancy of the applied vertical load while meeting the vertical load required for the experiment.

[0092] In specific implementation, since the vertical load on the scaled model (i.e., experimental model 1) is equal to 16P1, then, for experimental needs, after determining the size of the vertical load that needs to be applied to the experimental model 1, the total tension P1 of the unilateral weights can be further determined. Since P1=N*G1, the number N of weights that need to be suspended in the unilateral direction of the device of the present invention can be determined.

[0093] It should be noted that the ninth fixed pulley 4-10 is a load diverting connection section between the pulley block 4 and the weight combination. The present invention can change the direction of load transfer and superimpose loads by connecting different pulleys. The load in the pulley block 4 can be transferred through multiple pulleys, so that the required applied force is superimposed on the scaled model, which can greatly improve the accuracy and reliability of the experiment.

[0094] In a specific implementation, the steel wire rope 5 is generally a stainless steel wire rope with 7×7 strands, a diameter of 3 to 6 mm, and a length of 2 to 5 m.

[0095] In the present invention, in a specific implementation, the weights of the two weight combinations are equal, and the two weight combinations are rotationally symmetrically distributed.

[0096] It should be noted that, for the present invention, the weight 6 is a component with hooks installed at the center of the top and bottom, mainly for applying vertical load in the loading device. The weight 6 can be customized according to the experimental requirements, and hooks for connection need to be reserved at the top and bottom of the weight.

[0097] In the present invention, in specific implementation, the bottom of the loading tower 8 is fixedly connected to the top of the experimental model 1 (i.e., the specimen) through the anchor bolt connection section 9;

[0098] Anchor bolt connection section 9, including an upper anchor plate and a lower anchor plate;

[0099] The annular upper anchor plate is fixedly arranged at the bottom of the loading tower 8 (it can be integrally formed or fixed by welding);

[0100] The annular lower anchor plate is fixedly arranged at the top center of the experimental model 1 (it can be integrally formed or fixed by welding);

[0101] The upper anchor plate and the lower anchor plate are fixedly connected by a plurality of anchor bolts.

[0102] In a specific implementation, a plurality of first through holes are distributed at equal intervals along the circumferential direction on the upper anchor plate;

[0103] The lower anchor plate is provided with a second through hole at a position corresponding to each first through hole;

[0104] Each anchor bolt vertically passes through the first through hole and the second through hole on the lower anchor plate from top to bottom, and the portion of its upper end protruding from the upper anchor plate is threadedly fixedly connected with a pair of first nuts (such as steel nuts), and the portion of its lower end protruding from the lower anchor plate is threadedly fixedly connected with a pair of second nuts (such as steel nuts).

[0105] It should be noted that, in the present invention, the anchor bolt connection section 9, as a connection structure for connecting the experimental model 1 and the loading tower 8, is preferably a steel structure.

[0106] In the present invention, the loading tower 8 is a structure used to apply external loads in the wind power foundation model experiment. The load loading end in the experiment is connected to the experimental model 1 through the anchor connection section 9. The loading tower 8 is preferably a steel structure.

[0107] The loading tower 8 is usually designed in a scaled-down manner according to the actual tower size of the wind turbine generator set, mainly by applying vertical loads and horizontal loads at the loading tower so that the foundation bears the scaled-down vertical loads, horizontal loads and bending moment loads.

[0108] In the present invention, in a specific implementation, the tower top cover plate 10 is rectangular in shape, and is a steel cover plate with a length of 0.2 to 0.5 m, a width of 0.2 to 0.4 m, and a thickness of 2 to 5 mm. According to the experimental load requirements, installation holes for the pulley block are reserved at the tower top cover plate 10, mainly serving as a structure for connecting the loading tower 8 and the pulley block 4.

[0109] Based on the vertical constant pressure load loading device suitable for wind power foundation model experiment provided by the present invention, the present invention also provides an experimental implementation method of the vertical constant pressure load loading device suitable for wind power foundation model experiment, comprising the following steps:

[0110] Step S1, making an experimental model 1: preparing an experimental model 1 corresponding to the wind power foundation structure according to a preset scale ratio;

[0111] First, according to the experimental design requirements, the scale ratio calculation of the wind power foundation prototype design drawings was carried out, and the scale ratio of the experimental model 1 (i.e., the scaled model) was selected to be 1:10 to 1:100;

[0112] Secondly, determine the basic dimensions of the experimental model 1 and complete the dimension drawing of the experimental model 1;

[0113] Finally, the experimental model 1 is processed. The material of the experimental model is not limited to steel or concrete. The specific experimental material can be selected according to the requirements of the specific experimental plan.

[0114] Step S2, installing the model soil 7: the model soil 7 is filled inside the model soil tank box 70 with an opening at the top, and the top surface of the model soil 7 is a flat surface;

[0115] It should be noted that, for the present invention, according to the size of the experimental model 1, a model soil trough box 70 of corresponding size is selected and the model soil trough box 70 is fixedly installed on the laboratory floor by bolts or welding. After the installation is stable, the soil is backfilled in layers according to the experimental design requirements.

[0116] Step S3, installation of the loading support device: fixing and connecting the four columns 2 and the support frame 3 to form a basic support frame;

[0117] It should be noted that, in specific implementation, the column 2 and the support frame 3 are manufactured according to the requirements of the experimental plan and the on-site conditions of the laboratory. During the installation process, the column 2 is first fixed to the laboratory floor by bolts or welding, and then the column 2 and the support frame 3 are connected as a whole by welding to ensure stability during the experimental loading process.

[0118] Step S4, installation of the experimental model 1 and the loading tower 8: Install the experimental model 1 and the loading tower 8 on the model soil 7 according to the support frame.

[0119] 3, a loading tower 8 is provided, and the experimental model 1 is connected to the loading tower 8 by anchor bolts;

[0120] First, the experimental model 1 is placed on the model soil 7 in the model soil tank box 70;

[0121] Then, the experimental model 1 is connected to the loading tower 8 by anchor bolts through the anchor bolt connection section 9 to ensure the connection stability between the experimental model 1 and the loading tower 8 .

[0122] Step S5, installation of the load loading device: two pulley blocks and matching weight combinations and steel wire ropes 5 are arranged on both sides of the experimental module 1;

[0123] In specific implementation, the vertical load borne by the model is determined according to the scale ratio, thereby determining the number of fixed pulleys in the pulley block 4, and the pulley block 4 is connected with a steel wire rope 5. The vertical constant pressure loading system of the pulley block is arranged on both sides of the experimental model 1 using a rotationally symmetrical system, and is distributed in a rotationally symmetrical manner on both sides of the experimental model 1 to prevent bias pressure from being generated during the experiment.

[0124] For step S5, during the installation process, firstly, the fixed buckle and the fixed pulley are installed to the corresponding positions according to the experimental design requirements. Then, one end of the steel wire rope 5 is fixed to the fixed buckle 4-1; then, the steel wire rope 5 is passed through each fixed pulley along the pulley block; finally, according to the vertical load requirements of the model experiment, multiple (for example, four) weights 6 are hung on the other end of the steel wire rope 5.

[0125] Step S6, vertical load application: by adjusting the mass of the weight combination, the magnitude of the load applied to the experimental model 1 is adjusted, and finally a vertical constant pressure load of a corresponding magnitude is provided to the experimental model 1.

[0126] In specific implementation, according to the calculated load, a corresponding number of weights 6 are added to adjust the mass of the weight combination. When the total pulling force of the weights on one side is P1 (specifically equal to 4G1, G1 is the weight of a single weight, and 4 is the number of weights on one side), a pulley block 4 on one side can apply a load of 8P1 on the top of the model, and the pulley blocks on both sides apply a total load of 16P1, which meets the vertical load required for the experiment while ensuring the constancy of the applied vertical load.

[0127] It should be noted that the constant pressure load loading device provided by the present invention can not only be applied to the experiment of the above-mentioned experimental model 1 which is a circular extended foundation structure model, but the experimental model 1 can also be other types of wind power foundation structure modules. The technical solution of the present invention is also applicable to other types of wind power foundation structure model experiments.

[0128] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A vertical constant pressure load loading device suitable for wind power foundation model experiments, It is characterized in that It comprises a hollow model soil trough box (70) with an open top; The interior of the model soil trough box (70) is filled with model soil (7); Directly above the model soil (7), an experimental model (1) is arranged; Two vertically distributed upright posts (2) are respectively arranged on the left and right sides of the model soil trough box (70); A support frame (3) is provided on the top of the four columns (2); A vertically distributed loading tower (8) vertically penetrates through the middle of the horizontal direction of the support frame (3); The bottom of the loading tower (8) is connected to the experimental model (1); The top of the loading tower (8) is fixedly connected to the bottom center of the horizontally distributed tower top cover plate (10); The front and rear sides of the bottom of the tower top cover plate (10) are respectively connected to a roller pulley set (4); The two pulley blocks (4) are rotationally symmetrically distributed; Each roller pulley group (4) is connected to a weight combination via a steel wire rope (5); Two weight assemblies are respectively located on the left and right sides of the model soil trough box (70); Each weight combination comprises a plurality of weights (6) which are spaced apart from each other in sequence from top to bottom.

2. The vertical constant pressure load loading device suitable for wind power foundation model experiment as claimed in claim 1, It is characterized in that The model soil trough box (70) is a cubic box with an upper opening.

3. The vertical constant pressure load loading device suitable for wind power foundation model experiment according to claim 1, It is characterized in that The support frame (3) comprises a left support beam (3-4) and a right support beam (3-3) which are longitudinally distributed; The left support beam (3-4) and the right support beam (3-3) are symmetrically distributed. A front crossbeam (3-2) and a rear crossbeam (3-1) distributed laterally are fixedly arranged on the top of the left support beam (3-4) and the right support beam (3-3); The front cross beam (3-2) and the rear cross beam (3-1) are symmetrically distributed front and rear; There is a longitudinal gap between the front cross beam (3-2) and the rear cross beam (3-1); The loading tower (8) vertically penetrates through the longitudinal gap.

4. The vertical constant pressure load loading device suitable for wind power foundation model experiment as claimed in claim 3, It is characterized in that The top surfaces of the front cross beam (3-2) and the rear cross beam (3-1) are located on the same horizontal plane; The top surfaces of the left supporting beam (3-4) and the right supporting beam (3-3) are located on the same horizontal plane.

5. The vertical constant pressure load loading device suitable for wind power foundation model experiment according to claim 1, It is characterized in that The steel wire rope (5) is passed around a plurality of fixed pulleys in the roller pulley group (4) in sequence, one end of the steel wire rope is fixedly connected to a fixed buckle (4-1) in the roller pulley group (4), and the other end is connected to a weight combination.

6. The vertical constant pressure load loading device suitable for wind power foundation model experiment according to claim 1, It is characterized in that The two pulley blocks (4) are parallel to each other.

7. The vertical constant pressure load loading device suitable for wind power foundation model experiment according to claim 1, It is characterized in that Each pulley block (4) comprises a first fixed pulley (4-2), a third fixed pulley (4-4), a fifth fixed pulley (4-6) and a seventh fixed pulley (4-8) installed at the bottom of the tower top cover plate (10), and a second fixed pulley (4-3), a fourth fixed pulley (4-5), a sixth fixed pulley (4-7), an eighth fixed pulley (4-9) and a ninth fixed pulley (4-10) installed on the front cross beam (3-2) or the rear cross beam (3-1); The steel wire rope (5) is passed around the first fixed pulley (4-2), the second fixed pulley (4-3), the third fixed pulley (4-4), the fourth fixed pulley (4-5), the fifth fixed pulley (4-6), the sixth fixed pulley (4-7), the seventh fixed pulley (4-8) and the eighth fixed pulley (4-9) in sequence; One end of the steel wire rope (5) is fixedly connected to the fixed buckle (4-1), and the other end of the steel wire rope (5) is connected to a weight combination after passing around the ninth fixed pulley (4-10); The fixing buckle (4-1) is fixed to the support frame (3) by means of screws; The center points of the second fixed pulley (4-3), the fourth fixed pulley (4-5), the sixth fixed pulley (4-7), the eighth fixed pulley (4-9) and the ninth fixed pulley (4-10) are located on the same horizontal straight line; The center points of the first fixed pulley (4-2), the third fixed pulley (4-4), the fifth fixed pulley (4-6) and the seventh fixed pulley (4-8) are located on the same horizontal straight line; A ninth fixed pulley (4-10) is arranged at the right end of the front cross beam (3-2) or the left end of the rear cross beam (3-1); The first fixed pulley (4-2), the second fixed pulley (4-3), the third fixed pulley (4-4), the fourth fixed pulley (4-5), the fifth fixed pulley (4-6), the sixth fixed pulley (4-7), the seventh fixed pulley (4-8), the eighth fixed pulley (4-9) and the ninth fixed pulley (4-10) are located on the same vertical plane; The second fixed pulley (4-3) is located directly below the middle position of the gap between the first fixed pulley (4-2) and the third fixed pulley (4-4); The fourth fixed pulley (4-5) is located directly below the middle position of the gap between the third fixed pulley (4-4) and the fifth fixed pulley (4-6); The sixth fixed pulley (4-7) is located directly below the middle position of the gap between the fifth fixed pulley (4-6) and the seventh fixed pulley (4-8); Wherein, for each fixed pulley located at the top, the steel wire rope between it and the adjacent fixed pulley located at the bottom is distributed vertically.

8. The vertical constant pressure load loading device suitable for wind power foundation model experiment according to claim 1, It is characterized in that The weights of the two weight combinations are equal, and the two weight combinations are rotationally symmetrically distributed.

9. The vertical constant pressure load loading device suitable for wind power foundation model experiment according to claim 1, It is characterized in that The bottom of the loading tower (8) is fixedly connected to the top of the test model (1) via an anchor bolt connection section (9); An anchor bolt connection section (9), comprising an upper anchor plate and a lower anchor plate; An annular upper anchor plate is fixedly arranged at the bottom of the loading tower (8); A circular lower anchor plate is fixedly arranged at the top center of the experimental model (1); The upper anchor plate and the lower anchor plate are fixedly connected by multiple anchor bolts; Wherein, a plurality of first through holes are distributed on the upper anchor plate at equal intervals along the circumferential direction; The lower anchor plate is provided with a second through hole at a position corresponding to each first through hole; Each anchor bolt vertically passes through the first through hole and the second through hole on the lower anchor plate from top to bottom, and the portion of its upper end protruding from the upper anchor plate is threadedly fixedly connected with a pair of first nuts, and the portion of its lower end protruding from the lower anchor plate is threadedly fixedly connected with a pair of second nuts.

10. An implementation method of a vertical constant pressure load loading device suitable for wind power foundation model experiment according to any one of claims 1 to 9, It is characterized in that The following steps are involved: Step S1, making an experimental model (1): preparing an experimental model (1) corresponding to the wind power foundation structure according to a preset scale ratio; Step S2, model soil (7) installation: the model soil (7) is filled inside the model soil trough box (70) with an opening at the top, and the top surface of the model soil (7) is a plane; Step S3, installation of the loading support device: fixing and connecting the four columns (2) and the support frame (3); Step S4, installation of the experimental model (1) and the loading tower (8): installing the loading tower (8) on the model soil (7) according to the experimental model (1) and in the support frame (3), and connecting the experimental model (1) and the loading tower (8) by anchor bolts; Step S5, installation of the load loading device: arranging two pulley blocks and matching weight assemblies and steel wire ropes (5) on both sides of the experimental module (1); Step S6, vertical load application: by adjusting the mass of the weight combination, the magnitude of the load applied to the experimental model (1) is adjusted, and finally a vertical constant pressure load of a corresponding magnitude is provided to the experimental model (1).

Citation Information

Patent Citations

  • Device for loading self-balancing gravity load

    CN103983465A

  • Pile foundation model loading device under cyclic load

    CN111851608A

  • Gravitational load test apparatus

    CN201716239U

  • Intelligent test system and method for traffic load engineering detection of road construction

    US20230073710A1