Intelligent electric meter upgrading analysis management method
By collecting and transmitting data on smart meters in real time, and using the cloud management platform to perform historical analysis and upgrade strategy generation, it solves the problem that traditional management methods cannot meet the performance optimization needs, realizes scientific upgrades and management of smart meters, and improves its performance. efficiency and reliability.
Patent Information
- Application Number
- CN202410771734.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-15
- Publication Date
- 2024-10-18
AI Technical Summary
Traditional smart meter management methods cannot meet the needs of managers and administrators for more functions and performance optimization of smart meters, and cannot effectively evaluate and improve their performance and stability.
By loading the data acquisition module and communication module on the smart meter, the meter information is collected and transmitted to the cloud management platform in real time, historical information analysis is performed, equipment upgrade analysis strategies are generated, including software and hardware upgrade decisions, and the functions and performance of the smart meter are optimized.
It realizes the scientific upgrade decision-making of smart meters, improves its efficiency, reliability and management level, ensures reasonable and effective upgrades, and promotes the rational utilization and sustainable development of energy.
Smart Images

Figure CN118796231A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field related to smart electric meters, and in particular to a smart electric meter upgrade analysis and management method. Background Art
[0002] As an energy metering device that can acquire, transmit and manage electricity consumption information in real time, smart meters play an important role in the field of energy management. However, with the growth of energy demand and changes in energy supply, higher requirements are placed on the performance and stability of smart meters.
[0003] Traditional smart meter management methods often only focus on basic energy metering functions. Although they can monitor and record energy consumption, they still have some limitations and cannot meet the needs of managers and administrators for more functions and performance optimization of smart meters. Therefore, it is necessary to provide a smart meter upgrade analysis management method to solve the above technical problems. Summary of the invention
[0004] The present invention provides a smart meter upgrade analysis management method, which solves the problem that the needs of managers and administrators for more functions and performance optimization of smart meters cannot be met.
[0005] In order to solve the above technical problems, the present invention provides a smart meter upgrade analysis and management method, which is applied to the smart meter and includes the following steps:
[0006] Step 1: A data acquisition module is loaded on the smart meter to collect meter information in real time and transmit the meter information to the cloud management platform through the communication module;
[0007] Step 2: receiving meter information on the cloud management platform, wherein the meter information includes supply function information, attribute information, environment information and operation information; storing the meter information to generate historical meter information, further comprising the following steps:
[0008] S1: When the manager updates the function requirement information of the location of the smart meter to the cloud management platform, the cloud management platform extracts the supply function information of the location of the smart meter and matches the supply function information with the function requirement information. If any function in the supply function information cannot meet the function in the function requirement information, the unsatisfied function is marked as a missing function, and a device upgrade analysis strategy is generated;
[0009] S2: Perform fluency analysis on the historical meter information of the smart meter, extract the response time of the smart meter in the set time zone before the current moment, where the response time can be obtained by sending different instructions or requests from the cloud management platform to the smart meter, recording the time when the smart meter receives different instructions or requests, and calculating the time difference between the time and the execution completion time of different instructions or requests to obtain the response time of the smart meter; set the time zone to N, mark the moment in the time zone as i in chronological order, mark the response time corresponding to the moment as Ri, and mark the average of the response time of all moments as R; calculate the response time corresponding to all moments in the time zone, and use the formula To obtain the smoothness value R1 of the smart meter in the time zone; extract a set number of time zones from the time series in reverse chronological order, the set number is represented as M, and the time zones corresponding to the number are marked as m in chronological order, and the smoothness values of the time zones corresponding to the number are marked as mR, and the smoothness values of all time zones are averaged and marked as Calculate the smoothness value of all time zones using the formula To obtain the smooth change rate R2;
[0010] Extract the environmental information and operation information of the smart meter in the set time zone before the current moment; set the normal thresholds of the corresponding parameters in the environmental information and operation information, mark the parameters that are not within the corresponding normal thresholds as abnormal parameters, mark the total number of abnormal parameters in the environmental information as K, and number the abnormal parameters as j, and mark the numerical value of the numbered abnormal parameter in the environmental information as jH; calculate all abnormal parameters in the set time zone, and use the formula To obtain the environmental impact coefficient R3 of the smart meter; where ijb represents the weight correction factor corresponding to the abnormal parameter numbered j at the i-th moment;
[0011] S3: normalize and calculate the environmental impact coefficient, the smoothness change rate, and the smoothness value to obtain the performance fluctuation value of the smart meter;
[0012] S4: setting a normal threshold value of the performance fluctuation value, comparing the performance fluctuation value with the normal threshold value, and generating a device upgrade analysis strategy if the performance fluctuation value is not within the corresponding normal threshold value;
[0013] Step 3: When generating the device upgrade analysis strategy, perform device upgrade analysis on the smart meter to obtain device analysis results, including software upgrade and hardware upgrade results; the specific analysis of the device upgrade analysis is as follows:
[0014] S21: Based on the missing functions of the smart meter, determine the content and version of the software that the smart meter needs to upgrade and mark it as preliminary upgrade information; send the preliminary upgrade information and information acquisition instructions to the developer team, and the developer team estimates the development time and development cost of the preliminary upgrade information; calculate the estimated development time and development cost to obtain the development value;
[0015] S22: Obtain the attribute information of the smart meter, obtain the subsequent version of the smart meter through the communication protocol according to the attribute information and mark it as an updated meter. If there is no subsequent version, obtain the replacement version of the smart meter and mark it as an updated meter; match the supply function information of the updated meter with the function in the function requirement information, and sort the updated meters with successfully matched functions according to the version update sequence to generate a hardware candidate list; compare and evaluate the performance of the updated meters in the hardware candidate list with the smart meter in turn to obtain the performance improvement rate of the corresponding new generation; obtain the price of the updated meter; send the attribute information and information acquisition instructions of the smart meter and the updated meter to the meter disassembly and assembly team, and the meter disassembly and assembly team will feedback the estimated disassembly and assembly time and disassembly and assembly cost of the smart meter and the updated meter; normalize the performance improvement rate, price, estimated disassembly and assembly time, and disassembly and assembly cost of the updated meter to obtain the value of the updated meter;
[0016] Arrange the values of all updated meters in order of magnitude to generate an updated meter list, and select the updated meter with the largest value as the prepared upgraded meter;
[0017] S23: normalizing the development value of the prepared upgrade information, the performance fluctuation value of the smart meter and the performance value of the prepared upgrade meter to obtain an upgrade decision value of the smart meter; setting an upgrade threshold group of the smart meter, the upgrade threshold group including a software upgrade threshold and a hardware upgrade threshold; comparing the upgrade decision value of the smart meter with the value range of its upgrade threshold group, if the upgrade decision value is within the software upgrade threshold, generating a software upgrade result, if the upgrade decision value is within the hardware upgrade threshold, generating a hardware upgrade result;
[0018] S24: recording the estimated development time and development cost of the smart meter preparation upgrade information, the smoothness value of the smart meter, the smoothness change rate, the value of the updated meter and its corresponding parameters, the equipment analysis results, and the updated meter list as the meter update impact information;
[0019] Step 4: The cloud management platform sends the meter update impact information to the manager's smart terminal; the manager selects the device analysis results of the smart meter and feeds them back to the cloud management platform to perform corresponding operations and upgrade the smart meter.
[0020] Preferably, the data acquisition module includes a plurality of sensors and a sensor acquisition unit for acquiring operation information of the smart meter, the sensors are all installed in an inner cavity provided inside the smart meter, and the sensor acquisition unit is used for acquiring environmental information of the sensors.
[0021] Preferably, the device analysis result of the selected smart meter is fed back to the cloud management platform to perform corresponding operations, specifically as follows:
[0022] When the device analysis result is selected as the software upgrade result, the developer team will carry out software upgrade development work based on the preliminary upgrade information, including writing code, testing and verifying the improved functions; after the software upgrade development work is completed, the software is tested and accepted, and the software that meets the standards is used as the software upgrade version, and the software upgrade version is sent to the smart meter for software upgrade operation; the software upgrade operation includes remote upgrade or on-site operation;
[0023] When the selected device analysis result is a hardware upgrade result, the updated meters selected by the management personnel are obtained and marked as selected upgraded meters. The supply function information and price of the selected upgraded meters are extracted, and a procurement plan is formulated in consultation with suppliers. The meter disassembly and assembly team dismantles the old version of the smart meters and installs the selected upgraded meters. After the selected upgraded meters are installed, their performance is evaluated and verified, and the attribute information of the meter at the location is uploaded for update. The attribute information includes its model, function, performance, and price.
[0024] Preferably, when generating the updated electric meter list, the electric meters to be upgraded in the updated electric meter list are marked, and unique information is added to the options of the electric meters to be upgraded, wherein the unique information includes personalization, value addition, and visualization effect.
[0025] Preferably, the communication module is used for data transmission and communication with the cloud management platform, and includes a wireless communication module, a wired communication module, and a mobile communication module.
[0026] Compared with the related art, the smart meter upgrade analysis and management method provided by the present invention has the following beneficial effects:
[0027] 1. The present invention analyzes the historical meter information of the smart meter to obtain the fluency, environmental impact coefficient and fluency change rate, so as to accurately evaluate the performance fluctuation of the smart meter and generate an equipment upgrade analysis strategy; or match the function requirement information uploaded by the manager with the supply function information of the smart meter at the location, if any function in the supply function information cannot meet the function in the function requirement information, generate an equipment upgrade analysis strategy; through this strategy, the manager can locate the specific functions that need to be upgraded in software or hardware, realize the scientific and optimized decision-making of smart meter upgrade, and ensure the rationality and effectiveness of the upgrade.
[0028] 2. The present invention obtains information on the impact of meter updates through intelligent analysis on the cloud management platform, assists management personnel in making decisions, and improves the scientificity and accuracy of smart meter updates and upgrades.
[0029] In summary, the present invention analyzes smart meters for upgrades, improves functions, optimizes upgrade management of smart meters, provides real-time monitoring and remote management, and supports auxiliary decision making, thereby effectively improving the efficiency, reliability and management level of smart meters, and promoting sustainable energy development and rational use of energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 A principle block diagram of a smart meter upgrade analysis and management method provided by the present invention. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] The terms used in this disclosure are for the purpose of describing specific embodiments only and are not intended to limit the disclosure. The singular forms "a", "a type" and "the" used in this disclosure and the appended claims are also intended to include plural forms unless the context clearly indicates otherwise. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.
[0033] It should be understood that although the terms first, second, third, etc. may be used in the present disclosure to describe various information, such information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present disclosure, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".
[0034] Please refer to Figure 1 A smart meter upgrade analysis and management method, applied to smart meters, includes the following steps:
[0035] Step 1: A data acquisition module is loaded on the smart meter to collect meter information in real time and transmit the meter information to the cloud management platform through the communication module;
[0036] Step 2: receiving meter information on the cloud management platform, wherein the meter information includes supply function information, attribute information, environment information and operation information; storing the meter information to generate historical meter information, further comprising the following steps:
[0037] S1: When the manager updates the function requirement information of the location of the smart meter to the cloud management platform, the cloud management platform extracts the supply function information of the location of the smart meter. The supply function information refers to the functions that the smart meter can provide, and the function requirement information refers to the functions required by the smart meter at the location, and matches the supply function information with the function requirement information. If any function in the supply function information cannot meet the function in the function requirement information, the unsatisfied function is marked as a missing function, and a device upgrade analysis strategy is generated;
[0038] S2: Perform fluency analysis on the historical meter information of the smart meter, and extract the response time of the smart meter in the set time zone before the current moment. The response time can be obtained by sending different instructions or requests from the cloud management platform to the smart meter, recording the time when the smart meter receives different instructions or requests, and calculating the time difference between the time and the execution completion time of different instructions or requests to obtain the response time of the smart meter; set the time zone to N, mark the time in the time zone as i in chronological order, mark the response time corresponding to the time as Ri, and mark the average of the response time of all times as Calculate the response time corresponding to all moments in the time zone using the formula To obtain the smoothness value R1 of the smart meter in the time zone; extract a set number of time zones from the time series in reverse chronological order, the set number is represented as M, and the time zones corresponding to the number are marked as m in chronological order, and the smoothness values of the time zones corresponding to the number are marked as mR, and the smoothness values of all time zones are averaged and marked as Calculate the smoothness value of all time zones using the formula To obtain the smooth change rate R2;
[0039] Extract the environmental information and operation information of the smart meter in the set time zone before the current moment; set the normal thresholds of the corresponding parameters in the environmental information and operation information, mark the parameters that are not within the corresponding normal thresholds as abnormal parameters, mark the total number of abnormal parameters in the environmental information as K, and number the abnormal parameters as j, and mark the numerical value of the numbered abnormal parameter in the environmental information as jH; calculate all abnormal parameters in the set time zone, and use the formula To obtain the environmental impact coefficient R3 of the smart meter; where ijb represents the weight correction factor corresponding to the abnormal parameter numbered j at the i-th moment;
[0040] S3: Normalize the environmental impact coefficient, the smoothness change rate, and the smoothness value, and use the formula R=R3×a3 / (R1×a1+R2×a2) to obtain the performance fluctuation value R of the smart meter; where a1, a2, and a3 represent the weight ratio coefficients corresponding to the environmental impact coefficient, the smoothness change rate, and the smoothness value, respectively;
[0041] S4: setting a normal threshold value of the performance fluctuation value, comparing the performance fluctuation value with the normal threshold value, and generating a device upgrade analysis strategy if the performance fluctuation value is not within the corresponding normal threshold value;
[0042] Step 3: When generating the device upgrade analysis strategy, perform device upgrade analysis on the smart meter to obtain device analysis results, including software upgrade and hardware upgrade results; the specific analysis of the device upgrade analysis is as follows:
[0043] S21: Based on the missing functions of the smart meter, determine the content and version of the software upgrade required for the smart meter and mark it as preliminary upgrade information; send the preliminary upgrade information and information acquisition instructions to the developer team, and the developer team will calculate the estimated development time and development cost of the preliminary upgrade information and mark them as T1 and T2 respectively; calculate the estimated development time and development cost, and use the formula T=T1×t1+T2×t2 to obtain the development value T; where t1 and t2 represent the weight ratio coefficients corresponding to the estimated development time and development cost respectively;
[0044] S22: Acquire the attribute information of the smart meter, obtain the subsequent version of the smart meter through the communication protocol according to the attribute information and mark it as an updated meter; if there is no subsequent version, obtain the replacement version of the smart meter and mark it as an updated meter; match the supply function information of the updated meter with the function in the function requirement information, sort the updated meters with successfully matched functions according to the version update order to generate a hardware candidate list; perform performance comparison and evaluation on the updated meters in the hardware candidate list and the smart meter in turn, obtain the performance improvement rate of the corresponding new generation and mark it as G 1; performance comparison and evaluation is an existing mature technology, which is a common method for comparing the performance of different technologies or products. Experiments and indicators are used to evaluate their differences, which will not be repeated here; obtain the price of the updated meter and mark it as G2; send the attribute information and information acquisition instructions of the smart meter and the updated meter to the meter disassembly and assembly team, and the meter disassembly and assembly team will feedback the estimated disassembly and assembly time and disassembly and assembly costs of the smart meter and the updated meter and mark them as G3 and G4 respectively; normalize the performance increase and decrease rate, price, estimated disassembly and assembly time, and disassembly and assembly costs of the updated meter, and use the formula The performance value G of the updated electric meter is obtained; wherein g1, g2, g3, and g4 represent the weight factors corresponding to the performance increase / decrease rate, price, estimated installation / disassembly time, and installation / disassembly cost, respectively;
[0045] Arrange the values of all updated meters in order of magnitude to generate an updated meter list, and select the updated meter with the largest value as the prepared upgraded meter;
[0046] S23: normalize the development value of the prepared upgrade information, the performance fluctuation value of the smart meter and the quality value of the prepared upgrade meter, and use the formula GTR=T×γ1+R×γ2+G×γ3 to obtain the upgrade decision value GTR of the smart meter; wherein γ1, γ2, and γ3 represent the weight factors corresponding to the development value, the performance fluctuation value, and the quality value respectively; set the upgrade threshold group of the smart meter, and the upgrade threshold group includes the software upgrade threshold and the hardware upgrade threshold; compare the upgrade decision value of the smart meter with the value range of its upgrade threshold group, and if the upgrade decision value is within the software upgrade threshold, generate a software upgrade result, and if the upgrade decision value is within the hardware upgrade threshold, generate a hardware upgrade result;
[0047] S24: recording the estimated development time and development cost of the smart meter preparation upgrade information, the smoothness value of the smart meter, the smoothness change rate, the value of the updated meter and its corresponding parameters, the equipment analysis results, and the updated meter list as the meter update impact information;
[0048] Step 4: The cloud management platform sends the meter update impact information to the manager's smart terminal; the manager selects the device analysis results of the smart meter and feeds them back to the cloud management platform to perform corresponding operations and upgrade the smart meter.
[0049] In the present application, the data acquisition module includes a plurality of sensors and a sensor acquisition unit for acquiring operation information of the smart meter. The sensors are installed in an inner cavity provided inside the smart meter. The sensor acquisition unit is used to acquire environmental information of the sensors.
[0050] It should be noted that operating information such as power consumption, current, voltage, temperature, power, power quality, etc., and environmental information including temperature, humidity, light intensity, vibration frequency, electromagnetic interference, etc. are examples of operating information and environmental information. The specific parameters need to be set in combination with the parameters of the objects that the smart meter actually needs to collect.
[0051] In this application, the device analysis results of the selected smart meter are fed back to the cloud management platform to perform corresponding operations, as follows:
[0052] When the device analysis result is selected as the software upgrade result, the developer team will carry out software upgrade development work based on the preliminary upgrade information, including writing code, testing and verifying the improved functions; after the software upgrade development work is completed, the software is tested and accepted, and the software that meets the standards is used as the software upgrade version, and the software upgrade version is sent to the smart meter for software upgrade operation; the software upgrade operation includes remote upgrade or on-site operation;
[0053] When the selected device analysis result is a hardware upgrade result, the updated meters selected by the management personnel are obtained and marked as selected upgraded meters. The supply function information and price of the selected upgraded meters are extracted, and a procurement plan is formulated in consultation with suppliers. The meter disassembly and assembly team dismantles the old version of the smart meters and installs the selected upgraded meters. After the selected upgraded meters are installed, their performance is evaluated and verified, and the attribute information of the meter at the location is uploaded for update. The attribute information includes its model, function, performance, and price.
[0054] It should be noted that the remote upgrade or on-site operation in the software upgrade operation are both existing mature technologies. Remote upgrade refers to transmitting the software upgrade version to the smart meter through a network connection, and then performing the upgrade operation on the smart meter. On-site operation means that the technicians personally go to the location of the meter and perform the upgrade operation on site, which will not be elaborated here.
[0055] In the present application, when generating an updated meter list, the meters to be upgraded in the updated meter list are marked, and unique information is added to the options of the meters to be upgraded, and the unique information includes personalization, value addition, and visualization effects.
[0056] It should be noted that personalization, value-added, and visualization effects are all existing mature technologies that are used to highlight the advantages and characteristics of the options and will not be elaborated here.
[0057] In the present application, the communication module is used for data transmission and communication with the cloud management platform, including a wireless communication module, a wired communication module, and a mobile communication module.
[0058] It should be noted that the wireless communication module utilizes wireless LAN, Bluetooth, Zigbee, and Z-Wave technologies wirelessly, the wired communication module utilizes Ethernet, RS485, and RS232 through physical connection, and the mobile communication module utilizes mobile network (for example, 2G, 3G, 4G, and 5G) technology. The communication module uses the above technologies to achieve communication connection between the cloud management platform and the smart meter.
[0059] The working principle of a smart meter upgrade analysis and management method provided by the present invention is as follows:
[0060] When the present invention is used, for example, the management personnel need to update the function requirement information of the smart meter in a certain area according to the relevant notification of the local power supply unit or other special factors. Therefore, the management personnel upload the function requirement information to the cloud management platform, and the cloud management platform matches the function requirement information with the supply function information of the smart meter. If any function in the supply function information cannot meet the function in the function requirement information, the unsatisfied function is marked as a missing function, and an equipment upgrade analysis strategy is generated; at the same time, the data acquisition module on the smart meter uploads the meter information to the cloud management platform in real time, and the cloud management platform performs a fluency analysis on the historical meter information to obtain the performance fluctuation value of the smart meter; if the performance fluctuation value is not within the corresponding normal threshold, an equipment upgrade analysis strategy is generated; when generating the equipment upgrade analysis strategy, an equipment upgrade analysis is performed on the smart meter to obtain the meter update impact information;
[0061] The cloud management platform sends the meter update impact information to the manager's smart terminal; the manager selects the device analysis results of the smart meter based on the meter update impact information and feeds them back to the cloud management platform to perform corresponding operations; when the selected device analysis result is the software upgrade result, the developer team performs software upgrade development work based on the preliminary upgrade information, including writing code, testing and verifying the improved functions; after the software upgrade development work is completed, the software is tested and accepted, and the software that meets the standards is used as the software upgrade version, and the software upgrade version is sent to the smart meter for software upgrade operations; software upgrade operations include remote upgrades or on-site operations;
[0062] When the selected device analysis result is a hardware upgrade result, the updated meters selected by the management personnel are obtained and marked as selected upgraded meters. The supply function information and prices of the selected upgraded meters are extracted, and a procurement plan is formulated in consultation with suppliers. The meter disassembly and installation team dismantles the old version of the smart meters and installs the selected upgraded meters. After the selected upgraded meters are installed, their performance is evaluated and verified, and the attribute information of the meters at the location is uploaded for update. According to the above steps, the upgrade of smart meters in a certain area is completed.
[0063] Those skilled in the art will readily appreciate other embodiments of the present invention after considering the specification and practicing the invention disclosed herein. This application is intended to cover any variations, uses or adaptations of the present invention that follow the general principles of the present invention and include common knowledge or customary techniques in the art that are not disclosed in this disclosure. The specification and examples are to be considered exemplary only, and the true scope and spirit of the present invention are indicated by the following claims.
[0064] It should be understood that the present invention is not limited to the exact construction that has been described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.
Claims
1. A smart meter upgrade analysis and management method, applied to smart meters, characterized in that: The following steps are involved: Step 1: A data acquisition module is loaded on the smart meter to collect meter information in real time and transmit the meter information to the cloud management platform through the communication module; Step 2: receiving meter information on the cloud management platform, wherein the meter information includes supply function information, attribute information, environment information and operation information; storing the meter information to generate historical meter information, further comprising the following steps: S1: When the manager updates the function requirement information of the location of the smart meter to the cloud management platform, the cloud management platform extracts the supply function information of the location of the smart meter and matches the supply function information with the function requirement information. If any function in the supply function information cannot meet the function in the function requirement information, the unsatisfied function is marked as a missing function, and a device upgrade analysis strategy is generated; S2: Perform fluency analysis on the historical meter information of the smart meter, and extract the response time of the smart meter in the set time zone before the current moment. The response time can be obtained by sending different instructions or requests from the cloud management platform to the smart meter, recording the time when the smart meter receives different instructions or requests, and calculating the time difference between the time and the execution completion time of different instructions or requests to obtain the response time of the smart meter; set the time zone to N, mark the time in the time zone as i in chronological order, mark the response time corresponding to the time as Ri, and mark the average of the response time of all times as Calculate the response time corresponding to all moments in the time zone using the formula To obtain the smoothness value R1 of the smart meter in the time zone; extract a set number of time zones from the time series in reverse chronological order, the set number is represented as M, and the time zones corresponding to the number are marked as m in chronological order, and the smoothness values of the time zones corresponding to the number are marked as mR, and the smoothness values of all time zones are averaged and marked as Calculate the smoothness value of all time zones using the formula To obtain the smooth change rate R2; Extract the environmental information and operation information of the smart meter in the set time zone before the current moment; set the normal thresholds of the corresponding parameters in the environmental information and operation information, mark the parameters that are not within the corresponding normal thresholds as abnormal parameters, mark the total number of abnormal parameters in the environmental information as K, and number the abnormal parameters as j, and mark the values of the numbered abnormal parameters in the environmental information as jH; calculate all the abnormal parameters in the set time zone, and use the formula To obtain the environmental impact coefficient R3 of the smart meter; where ijb represents the weight correction factor corresponding to the abnormal parameter numbered j at the i-th moment; S3: Normalize the environmental impact coefficient, the smoothness change rate, and the smoothness value, and use the formula R=R3×a3 / (R1×a1+R2×a2) to obtain the performance fluctuation value R of the smart meter; where a1, a2, and a3 represent the weight ratio coefficients corresponding to the environmental impact coefficient, the smoothness change rate, and the smoothness value, respectively; S4: setting a normal threshold value of the performance fluctuation value, comparing the performance fluctuation value with the normal threshold value, and generating a device upgrade analysis strategy if the performance fluctuation value is not within the corresponding normal threshold value; Step 3: When generating the device upgrade analysis strategy, perform device upgrade analysis on the smart meter to obtain device analysis results, which include software upgrade and hardware upgrade results; Step 4: The cloud management platform sends the meter update impact information to the manager's smart terminal; the manager selects the device analysis results of the smart meter and feeds them back to the cloud management platform to perform corresponding operations and upgrade the smart meter.
2. A smart meter upgrade analysis and management method according to claim 1, characterized in that: The data acquisition module includes a plurality of sensors and a sensor acquisition unit for acquiring operation information of the smart meter. The sensors are installed in an inner cavity provided inside the smart meter. The sensor acquisition unit is used for acquiring environmental information of the sensors.
3. A smart meter upgrade analysis and management method according to claim 2, characterized in that: The equipment upgrade analysis is specifically analyzed as follows: S21: Based on the missing functions of the smart meter, determine the content and version of the software upgrade required for the smart meter and mark it as preliminary upgrade information; send the preliminary upgrade information and information acquisition instructions to the developer team, and the developer team will calculate the estimated development time and development cost of the preliminary upgrade information and mark them as T1 and T2 respectively; calculate the estimated development time and development cost, and use the formula T=T1×t1+T2×t2 to obtain the development value T; where t1 and t2 represent the weight ratio coefficients corresponding to the estimated development time and development cost respectively; S22: Obtain the attribute information of the smart meter, obtain the subsequent version of the smart meter through the communication protocol according to the attribute information and mark it as an updated meter. If there is no subsequent version, obtain the replacement version of the smart meter and mark it as an updated meter; match the supply function information of the updated meter with the function in the function requirement information, and sort the updated meters with successfully matched functions according to the version update order to generate a hardware candidate list; compare and evaluate the performance of the updated meters in the hardware candidate list with the smart meter in turn, and obtain the performance improvement rate of the corresponding new generation and mark it as G1; obtain the price of the updated meter and mark it as G2; send the attribute information and information acquisition instructions of the smart meter and the updated meter to the meter disassembly and assembly team, and the meter disassembly and assembly team will feedback the estimated disassembly and assembly time and disassembly and assembly cost of the smart meter and the updated meter and mark them as G3 and G4 respectively; normalize the performance improvement rate, price, estimated disassembly and assembly time and disassembly and assembly cost of the updated meter, and use the formula The performance value G of the updated electric meter is obtained; wherein g1, g2, g3, and g4 represent the weight factors corresponding to the performance increase / decrease rate, price, estimated installation / disassembly time, and installation / disassembly cost, respectively; Arrange the values of all updated meters in order of magnitude to generate an updated meter list, and select the updated meter with the largest value as the prepared upgraded meter; S23: normalize the development value of the prepared upgrade information, the performance fluctuation value of the smart meter and the quality value of the prepared upgrade meter, and use the formula GTR=T×γ1+R×γ2+G×γ3 to obtain the upgrade decision value GTR of the smart meter; wherein γ1, γ2, and γ3 represent the weight factors corresponding to the development value, the performance fluctuation value, and the quality value respectively; set the upgrade threshold group of the smart meter, and the upgrade threshold group includes the software upgrade threshold and the hardware upgrade threshold; compare the upgrade decision value of the smart meter with the value range of its upgrade threshold group, and if the upgrade decision value is within the software upgrade threshold, generate a software upgrade result, and if the upgrade decision value is within the hardware upgrade threshold, generate a hardware upgrade result; S24: Record the estimated development time, development cost, and fluency value, fluency change rate, and value of updating the smart meter and its corresponding parameters, equipment analysis results, and updated meter list of the smart meter preparation upgrade information, and summarize them as meter update impact information.
4. A smart meter upgrade analysis and management method according to claim 3, characterized in that: The device analysis results of the selected smart meter are fed back to the cloud management platform to perform corresponding operations, as follows: When the device analysis results are selected as software upgrade results, the developer team will carry out software upgrade development work based on the preliminary upgrade information, including writing code, testing and verifying improved functions; After the software upgrade development work is completed, the software is tested and accepted, and the software that meets the standards is used as the software upgrade version, which is sent to the smart meter for software upgrade operations; Software upgrade operations include remote upgrades or on-site operations; When the selected device analysis result is a hardware upgrade result, the updated meters selected by the management personnel are obtained and marked as selected upgraded meters. The supply function information and price of the selected upgraded meters are extracted, and a procurement plan is formulated in consultation with suppliers. The meter disassembly and assembly team dismantles the old version of the smart meters and installs the selected upgraded meters. After the selected upgraded meters are installed, their performance is evaluated and verified, and the attribute information of the meter at the location is uploaded for update. The attribute information includes its model, function, performance, and price.
5. A smart meter upgrade analysis and management method according to claim 4, characterized in that: When generating an updated meter list, the meters to be upgraded in the updated meter list are marked, and unique information is added to the options of the meters to be upgraded. The unique information includes personalization, value addition, and visualization effects.
6. A smart meter upgrade analysis and management method according to claim 5, characterized in that: The communication module is used for data transmission and communication with the cloud management platform, and includes a wireless communication module, a wired communication module, and a mobile communication module.
