Foundation pit deformation prediction method, medium and system

Through deep learning and numerical analysis technology, combined with geophysical exploration and finite element models, the problem of artificial factors and low automation level in foundation pit deformation prediction is solved, efficient identification and accurate prediction of foundation pit deformation are achieved, and construction safety is improved. performance and prediction accuracy.

CN118797764APending Publication Date: 2024-10-18CHINA CONSTR EIGHTH BUREAU DEV & CONSTR CO LTD
View PDF 0 Cites 8 Cited by

Patent Information

Application Number
CN202410768724.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-14
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

The existing foundation pit deformation prediction technology is greatly affected by artificial factors, has a low level of automation, is difficult to fully simulate the nonlinear effects in complex engineering processes, and has limited prediction accuracy.

Method used

Deep learning technology is used to combine geophysical exploration and numerical analysis. By obtaining geological survey, topographic survey and geophysical survey data, shallow stratigraphic geological models and finite element models are established, seismic wave data is used to extract seismic attribute profiles, and fusion identification of displacement areas is carried out. Construct an extreme learning machine neural network prediction model to monitor the horizontal displacement of the ground wall in real time and predict the deformation trend of the foundation pit.

Benefits of technology

It achieves automatic and efficient identification of weak deformation areas, accurate identification of high-risk displacement sections, improves prediction accuracy, provides an early warning mechanism, and enhances construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118797764A_ABST
    Figure CN118797764A_ABST
Patent Text Reader

Abstract

The invention provides a foundation pit deformation prediction method, medium and system, and belongs to the technical field of building foundation pit deformation prediction.The foundation pit deformation prediction method comprises the steps that a preliminary shallow stratum geologic model and an initial finite element model are established, constrained inversion is conducted on the preliminary geologic model, and a first geologic model is obtained; forming a fused seismic attribute profile; inputting a fused seismic attribute profile, and identifying and marking an easy-to-displace region; calculating an easy-to-deform area of the foundation pit and a deformation critical threshold thereof; determining the horizontal displacement of the diaphragm wall corresponding to the plurality of groups of deformation critical thresholds as a neural network training sample by adopting an orthogonal test design method; taking the horizontal displacement of the diaphragm wall as input and the deformation critical threshold as output, training an extreme learning machine neural network prediction model, inputting monitoring data into the trained foundation pit deformation prediction model to obtain a foundation pit deformation critical threshold in the construction process, and inputting the predicted foundation pit deformation critical threshold into an initial finite element model to obtain the foundation pit deformation critical threshold in the construction process. And calculating to obtain and output the deformation and trend of the foundation pit in a future period of time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of building foundation pit deformation prediction, and in particular, relates to a foundation pit deformation prediction method, medium and system. Background Art

[0002] Foundation pit engineering is widely used in municipal administration, construction, transportation and other industries, and is an important infrastructure for modern urban construction. With the continuous development of urban underground space, the scale of foundation pit engineering is increasing, and the construction environment is becoming more complex. Under poor geological conditions and large underground environmental constraints, foundation pit engineering is very likely to cause deformation and instability of surrounding buildings and underground pipelines, causing significant economic losses and safety hazards. Therefore, how to effectively identify deformation weak areas during construction and scientifically predict deformation trends is extremely critical to ensuring project safety and reducing risks.

[0003] Traditional foundation pit deformation monitoring and control technology mainly relies on manual experience judgment and passive response methods, and has the following limitations: First, it is unable to fully and accurately identify deformation weak sections and potential risk areas, especially the lack of understanding of underground hidden environmental information; second, it only relies on monitoring response data for passive control, which has a delayed response and lacks early prediction of deformation trends; third, it lacks effective intelligent decision-making support and is difficult to formulate scientific response measures in a timely manner. These problems restrict the construction safety and efficiency of foundation pit projects to a certain extent.

[0004] To overcome the above defects, researchers have tried to use advanced geophysical exploration and numerical analysis to support foundation pit engineering. Among them, high-resolution reflection seismic exploration has the advantages of fine imaging and deep detection, which can effectively obtain the subtle characteristics and defect distribution information of underground media, and provide important clues for the investigation of weak deformation areas. However, traditional interpretation imaging technology is greatly affected by human factors, has a low level of automation, and is difficult to fully simulate the nonlinear effects in complex engineering processes, and has limited prediction accuracy. Summary of the invention

[0005] In view of this, the present invention provides a foundation pit deformation prediction method, medium and system, which can solve the problems in the process of predicting construction foundation pit deformation, that is, the existing technology is greatly affected by human factors, the level of automation is low, it is difficult to fully simulate the nonlinear effects in complex engineering processes, and the prediction accuracy is limited.

[0006] The present invention is achieved in that:

[0007] A first aspect of the present invention provides a method for predicting foundation pit deformation, which comprises the following steps:

[0008] S10, obtaining geological survey data, topographic survey data and geophysical survey data in the vicinity of the foundation pit to be tested, and establishing a preliminary shallow stratum geological model;

[0009] S20, based on the excavated section and the preliminary geological model, establish an initial finite element model and set initial soil layer parameters;

[0010] S30, using the measured data of the excavated section, performing constrained inversion on the preliminary shallow stratum geological model to obtain a revised preliminary shallow stratum geological model, which is recorded as a first geological model;

[0011] S40, obtaining seismic wave data of the area near the foundation pit to be tested, extracting multiple seismic attribute profiles, including instantaneous amplitude, instantaneous frequency, and frequency-divided amplitude; fusing the seismic attribute profiles to form a fused seismic attribute profile;

[0012] S50, using a pre-trained seismic attribute profile recognition model, inputting a fused seismic attribute profile, and identifying and marking an easily displaced area;

[0013] S60, calculating the easily deformable area of ​​the foundation pit and the critical deformation threshold value corresponding to the easily deformable area by combining the first geological model, the initial finite element model and the easily displaceable area marker;

[0014] S70, obtaining neural network input and output samples, specifically: using an orthogonal experimental design method to determine multiple groups of ground-connected wall horizontal displacements corresponding to critical deformation thresholds as neural network training samples;

[0015] S80, using the horizontal displacement of the ground-connected wall as training input and the critical deformation threshold as training output, establishing and training an extreme learning machine neural network prediction model; optimizing the neural network according to a particle swarm optimization algorithm, determining the optimal weights and thresholds of the neural network, and obtaining a foundation pit deformation prediction model;

[0016] S90. During the construction process, the horizontal displacement of the ground-connected wall is monitored in real time, and the monitoring data is input into the trained foundation pit deformation prediction model to obtain the critical threshold of foundation pit deformation during the construction process. The predicted critical threshold of foundation pit deformation is input into the initial finite element numerical calculation model to calculate the deformation amount and deformation trend of the foundation pit in the future period of time, and output them.

[0017] On the basis of the above technical solution, a foundation pit deformation prediction method of the present invention can also be improved as follows:

[0018] Among them, the network architecture of the seismic attribute profile recognition model adopts the U-Net fully convolutional network.

[0019] Furthermore, the U-Net network includes a layer-by-layer deepening convolutional encoder and a symmetric upsampling decoder.

[0020] Among them, the specific steps of S40 include: extracting multiple seismic attribute profiles from seismic wave reflection data, including instantaneous amplitude, instantaneous frequency, and apparent impedance; using a multi-attribute fusion strategy to fuse the multiple seismic attribute profiles into a comprehensive seismic attribute profile, wherein the weight of each attribute is determined according to the size of the correlation.

[0021] Furthermore, the multi-attribute fusion strategy adopted is linear weighted fusion based on principal component analysis.

[0022] Among them, the specific steps of S50 include: inputting the fused seismic attribute profile into the trained seismic attribute profile recognition model, extracting feature information through convolution and pooling operations, and outputting pixel anomaly probability values; dividing abnormal and non-abnormal areas according to probability thresholds; performing morphological processing on the results and outputting easy-to-displacement area masks.

[0023] The specific steps of S60 include: assigning the physical and mechanical parameters of the first geological model to the initial finite element model; introducing the information of the easily displaced area and updating the parameter value of the area; performing numerical calculation and analysis based on the updated model; setting a deformation allowable threshold for the key area; and marking the area exceeding the threshold as an easily deformed area.

[0024] Among them, the specific steps of S70 include: selecting the horizontal displacement of the ground-anchored wall as the input of the neural network and the critical deformation threshold as the output; using the orthogonal experimental design method to determine different level combinations of parameters; performing numerical calculations on each group of parameter combinations to obtain corresponding displacement values; and using each parameter combination and displacement value as a neural network training sample.

[0025] The specific steps of S80 include: constructing an extreme learning machine neural network, randomly initializing hidden layer parameters; calculating the hidden layer output matrix, solving the output layer weights; optimizing the network parameters using a particle swarm algorithm; evaluating the model performance on a test set, and deploying it as a prediction service when it meets the requirements. The specific steps of S90 include: obtaining the horizontal displacement data of the ground-anchored wall monitored in real time; pre-processing the displacement data and inputting it into the neural network model trained by S80; using the model to predict the critical threshold parameters of deformation, such as cohesion, internal friction angle, etc.; comparing the predicted threshold with the critical value of engineering experience to determine whether it exceeds the limit; if it exceeds the limit, issuing an early warning and taking control measures.

[0026] A second aspect of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores program instructions, and when the program instructions are executed, they are used to execute the above-mentioned foundation pit deformation prediction method.

[0027] A third aspect of the present invention provides a foundation pit deformation prediction system, which includes the above-mentioned computer-readable storage medium.

[0028] Compared with the prior art, the foundation pit deformation prediction method, medium and system provided by the present invention have the following beneficial effects:

[0029] 1. Automatic and efficient identification. Using advanced deep learning technology, intelligent automatic identification of stratum interfaces and weak deformation areas is achieved, which greatly improves the exploration efficiency and eliminates the inefficiency and subjectivity of traditional manual interpretation.

[0030] 2. Accurate identification capability. By effectively integrating multi-source heterogeneous data, it is possible to fully utilize hidden information such as underground geological bodies and defect characteristics to accurately identify high-risk and easily displaced sections and avoid underreporting.

[0031] 3. High-precision prediction capability. Combining orthogonal experimental design with extreme learning machine network, a high-performance deformation trend prediction model is constructed, which can accurately predict the changes in the critical threshold of deformation, achieve early warning of instability risks, and provide a basis for formulating response measures.

[0032] In summary, the technical solution of the present invention is sufficient to solve the problems in the process of predicting the deformation of construction foundation pits, that is, the existing technology is greatly affected by human factors, has a low level of automation, is difficult to fully simulate the nonlinear effects in complex engineering processes, and has limited prediction accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.

[0034] Figure 1 A flow chart of the method provided by the present invention; DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0036] like Figure 1 As shown, it is a flow chart of a foundation pit deformation prediction method provided by the present invention. The method comprises the following steps:

[0037] S10, obtaining geological survey data, topographic survey data and geophysical survey data in the vicinity of the foundation pit to be tested, and establishing a preliminary shallow stratum geological model;

[0038] S20, based on the excavated section and the preliminary geological model, establish an initial finite element model and set initial soil layer parameters;

[0039] S30, using the measured data of the excavated section, performing constrained inversion on the preliminary shallow stratum geological model to obtain a revised preliminary shallow stratum geological model, which is recorded as the first geological model;

[0040] S40, obtaining seismic wave data of the area near the foundation pit to be tested, extracting multiple seismic attribute profiles, including instantaneous amplitude, instantaneous frequency, and frequency-divided amplitude; fusing the seismic attribute profiles to form a fused seismic attribute profile;

[0041] S50, using a pre-trained seismic attribute profile recognition model, inputting a fused seismic attribute profile, and identifying and marking an easily displaced area;

[0042] S60, calculating the easily deformable area of ​​the foundation pit and the critical deformation threshold value corresponding to the easily deformable area by combining the first geological model, the initial finite element model and the easily displaceable area marker;

[0043] S70, obtaining neural network input and output samples, specifically: using an orthogonal experimental design method to determine multiple groups of ground-connected wall horizontal displacements corresponding to critical deformation thresholds as neural network training samples;

[0044] S80, using the horizontal displacement of the ground-anchored wall as training input and the critical threshold of deformation as training output, establishing and training an extreme learning machine neural network prediction model; optimizing the neural network according to a particle swarm optimization algorithm, determining the optimal weights and thresholds of the neural network, and obtaining a foundation pit deformation prediction model;

[0045] S90. During the construction process, the horizontal displacement of the ground-connected wall is monitored in real time, and the monitoring data is input into the trained foundation pit deformation prediction model to obtain the critical threshold of foundation pit deformation during the construction process. The predicted critical threshold of foundation pit deformation is input into the initial finite element numerical calculation model to calculate the deformation amount and deformation trend of the foundation pit in the future period of time, and output them.

[0046] The specific implementation methods of the above steps are described in detail below:

[0047] The specific implementation of step S10 is as follows:

[0048] This step aims to establish a preliminary shallow stratum geological model by collecting geological survey data, topographic exploration data and geophysical exploration data. It mainly includes the following sub-steps:

[0049] (1) Collect geological survey data. Geological survey data mainly include drilling data, stratum distribution, and physical and mechanical parameters of each stratum. Drilling data are usually given by drilling column charts, which can intuitively reflect the distribution and relative order of each stratum. The physical and mechanical parameters of each stratum, such as interlayer friction coefficient, cohesion, compression modulus, etc., are usually obtained by laboratory tests. These parameters play an important role in subsequent numerical simulation and analysis.

[0050] (2) Collect topographic exploration data. Topographic exploration data include topographic maps, contour maps, etc., which can reflect the undulations of the surface. For foundation pit excavation, the topography will directly affect the height of the excavation surface and the stability of the slope. Therefore, accurate acquisition of topographic exploration data is crucial for modeling.

[0051] (3) Collect geophysical exploration data. Geophysical exploration data mainly refers to the underground medium distribution information obtained through physical methods such as seismic waves and resistivity. Common methods include shallow reflection seismic exploration and high-density resistivity measurement. These data can supplement the deficiencies of drilling data, thereby providing a more comprehensive understanding of the distribution of underground media.

[0052] (4) Establish a preliminary shallow stratum geological model. After collecting the above three types of survey data, various data can be comprehensively analyzed to establish a preliminary shallow stratum geological model. This model is usually presented in a two-dimensional or three-dimensional digital way, reflecting the spatial distribution, thickness, interface position and other information of each stratum. The establishment of the preliminary model provides a basis for subsequent inversion and numerical simulation.

[0053] The specific implementation method of step S20:

[0054] This step aims to establish an initial finite element numerical model based on the excavated section and preliminary geological model, and set the initial soil layer parameters. It includes the following sub-steps:

[0055] (1) Obtain excavation section data. Excavation section data includes information such as the geometric dimensions of the foundation pit and the excavated depth. This data can be obtained through field surveys or extracted from construction drawings.

[0056] (2) Combine the preliminary geological model and excavation section data to establish an initial finite element model. The finite element model is the basis for subsequent numerical calculations and analysis. It uses a discretized approach to approximate the mechanical behavior of continuous media. When modeling, it is necessary to superimpose and discretize the stratum information and foundation pit geometry information to generate a grid model consisting of nodes and units.

[0057] (3) Set the initial soil layer parameters. The physical and mechanical parameters of each soil layer, such as density, elastic modulus, Poisson's ratio, cohesion, internal friction angle, etc., will be assigned to the corresponding units in the finite element model as input parameters. These initial parameter values ​​can refer to the typical values ​​given in the survey report.

[0058] (4) Set boundary conditions and load conditions. Boundary conditions include the free surface of the ground, bottom constraints, etc.; load conditions consider the influence of factors such as the deadweight of the foundation pit, the load of surrounding buildings, and groundwater. Reasonable setting of boundary conditions and load conditions is crucial to the accuracy of subsequent calculation results.

[0059] The specific implementation method of step S30:

[0060] This step aims to use the measured data of the excavated section to perform constrained inversion on the preliminary geological model to obtain a revised first geological model. It includes the following sub-steps:

[0061] (1) Obtain monitoring data of the excavation section. During the excavation process, it is necessary to set up monitoring points and collect real-time displacement, stress, strain and other data at each monitoring point. These measured data will be used as observation data for inversion.

[0062] (2) Establish the forward model required for inversion. The forward model describes the mapping relationship between model parameters (such as formation physical and mechanical parameters) and observed data (such as displacement, stress, etc.). The forward model is usually solved using numerical calculation methods such as finite element or boundary element.

[0063] (3) Set the parameters to be inverted. It is necessary to determine in advance which model parameters will be included in the inversion, such as the elastic modulus, Poisson's ratio, cohesion, etc. of certain formations. At the same time, it is also necessary to set the constraint range of these parameters, that is, the upper and lower limits of the parameter values.

[0064] (4) Selection of inversion method. Commonly used inversion methods include least squares method, regularization method, fuzzy inversion, etc. Select the appropriate inversion method according to the characteristics of the problem.

[0065] (5) Iterative calculation and update of model parameters. Using the selected inversion method, the values ​​of the model parameters are gradually updated through multiple iterations to minimize the error between the model prediction value and the measured value. When the convergence condition is met, the corrected first geological model is obtained.

[0066] Specific implementation of step S40 and establishment and training of seismic attribute profile recognition model:

[0067] This step aims to obtain seismic wave data in the vicinity of the foundation pit to be tested, extract multiple seismic attribute profiles, fuse the seismic attribute profiles, and form a fused seismic attribute profile. At the same time, a seismic attribute profile recognition model is established and trained to identify and mark the easily displaced areas. It includes the following sub-steps:

[0068] (1) Obtain seismic wave data. Seismic wave data in the vicinity of the foundation pit can be obtained through artificial seismic sources (such as drop hammers, vibrating trucks, etc.) or by utilizing natural earthquake events. During the data acquisition process, it is necessary to reasonably set parameters such as the survey line path, measurement point spacing, and sampling rate.

[0069] (2) Seismic data processing: The collected raw seismic wave data is preprocessed, including denoising, removing direct waves, and removing autocorrelation, to improve data quality.

[0070] (3) Extracting seismic attribute profiles. Seismic attribute profiles refer to two-dimensional or three-dimensional profiles obtained by transforming seismic wave data through specific algorithms. Common seismic attributes include instantaneous amplitude (reflecting the energy changes of stratum interfaces and defect areas), instantaneous frequency (related to medium properties), and frequency-divided amplitude (highlighting the display effect of specific frequency components). These seismic attribute profiles can be extracted using algorithms such as wavelet transform and Hilbert transform.

[0071] (4) Fusion of seismic attribute profiles. Since a single attribute profile is difficult to fully describe the complexity of the underground medium, it is usually necessary to fuse multiple attribute profiles. Principal component analysis, independent component analysis and other methods can be used to perform linear or nonlinear fusion of attribute profiles to highlight the target seismic attribute profile. The establishment and training of the recognition model includes the following sub-steps:

[0072] (5) Construct a training data set. It is necessary to collect a certain number of seismic attribute profiles and the corresponding real underground medium information as a training data set. The real underground medium information can be obtained through direct exploration methods such as drilling and pit exploration, or by using existing geological model data. The training data set needs to contain enough positive and negative samples (i.e., easy-to-displace areas and non-easy-to-displace areas) to improve the generalization ability of the model.

[0073] (6) Select the model architecture. Commonly used recognition models include convolutional neural networks (CNNs) and fully convolutional networks (FCNs). These models can well capture local features and global semantic information in image data. You can choose a suitable network architecture based on the specific needs of the problem.

[0074] (7) Set model hyperparameters, including the number of network layers, convolution kernel size, pooling method, regularization strength, etc. The optimal values ​​need to be determined through cross-validation and other methods.

[0075] (8) Data preprocessing: The training data can be normalized, data augmented (such as rotation, translation, etc.) and other preprocessing to enhance the robustness of the model.

[0076] (9) Model training. The preprocessed training data is input into the neural network, and the network weights are continuously adjusted through the back propagation algorithm to minimize the loss function value of the model on the training set. Commonly used loss functions include cross entropy loss and Dice coefficient loss.

[0077] (10) Model evaluation. Evaluate the model’s performance indicators, such as precision, recall, and F1 score, on an independent validation set. If the performance is poor, adjust the model architecture or hyperparameters and repeat the training and evaluation process.

[0078] (11) Model deployment. When the model performance meets the requirements, it can be deployed as an online service for subsequent seismic attribute profile identification tasks.

[0079] It should be noted that the specific implementation details and parameter settings of the above steps will vary depending on the complexity of the problem. For example, for some simple cases, shallow models based on machine learning (such as support vector machines) can be used; while for complex geological conditions, deep learning models need to be applied. At the same time, reasonable data enhancement strategies, the choice of loss functions, etc. will also have an important impact on model performance. Therefore, it is necessary to make flexible adjustments based on the characteristics of specific problems.

[0080] In the process of extracting earthquake attributes and establishing identification models, the following points should be noted:

[0081] 1) Setting of earthquake attribute thresholds. Different earthquake attributes correspond to different thresholds, which are used to distinguish abnormal areas from non-abnormal areas. These thresholds can be determined based on experience or machine learning methods, or they can be directly learned during model training. For example, for the instantaneous amplitude attribute, the threshold of the abnormal area can be set to 0.2-0.5; the threshold of the instantaneous frequency attribute can be set to 25-40Hz, etc.

[0082] 2) Weight of multi-attribute fusion. When fusing multiple seismic attribute profiles, the weight coefficient of each attribute needs to be determined. Different weights can be assigned according to the correlation between each attribute and the target, or the optimal weight can be automatically learned using methods such as unsupervised clustering.

[0083] 3) Oversampling or undersampling. Since the number of abnormal areas (areas that are easy to move) is usually much smaller than that of non-abnormal areas, it will cause serious imbalance in training data. The ratio of positive and negative samples can be balanced by oversampling (copying minority class samples) or undersampling (deleting majority class samples).

[0084] 4) Introducing prior knowledge. In addition to data-driven methods, prior knowledge in fields such as geology and geotechnical mechanics can also be used to assist in model construction, such as formulating reasonable feature engineering strategies and setting structured priors for the model, to improve the interpretability and generalization of the model.

[0085] The specific implementation of step S50 is as follows:

[0086] This step aims to use the pre-trained seismic attribute profile recognition model, input the fused seismic attribute profile, identify and mark the easily displaced areas. It mainly includes the following sub-steps:

[0087] (1) Inputting the fused seismic attribute profile: The fused seismic attribute profile obtained in step S40 is used as input data and input into the pre-trained recognition model.

[0088] (2) Forward propagation calculation: The model performs multi-layer convolution, pooling and other operations on the input attribute profile data to extract local features and global semantic information layer by layer.

[0089] (3) Output prediction results. The last layer of the model gives the probability value of each pixel being judged as an easy-to-displace area. According to the set probability threshold (usually 0.5), pixels with probability values ​​higher than the threshold are classified as easy-to-displace areas, and pixels with probability values ​​lower than the threshold are classified as non-easy-to-displace areas.

[0090] (4) Post-processing. Perform morphological processing (such as opening and closing operations) on the model prediction results to reduce the influence of noise and small areas. At the same time, combine other auxiliary information (such as geological structure, high permeability defect distribution, etc.) to optimize the prediction results.

[0091] (5) Output the mask of the prone displacement area. The finally predicted prone displacement area is presented in the form of a binary mask and superimposed on the original seismic attribute profile to intuitively display the distribution location and range of the prone displacement area.

[0092] Specific implementation of step S60:

[0093] This step aims to calculate the easily deformed area of ​​the foundation pit and its critical deformation threshold by combining the modified first geological model, the initial finite element model and the easily displaced area marker. It includes the following sub-steps:

[0094] (1) Updating the geological model: The physical and mechanical parameters of each soil layer in the modified first geological model obtained in step S30 are assigned to the initial finite element model to replace the original initial parameter values.

[0095] (2) Introducing the information of the easily displaced area. The easily displaced area mask obtained in step S50 is superimposed on the finite element model, and the parameter values ​​of the easily displaced area units are updated accordingly. A common practice is to reduce the strength parameters (such as cohesion, internal friction angle, etc.) of the area to simulate the impact of local instability.

[0096] (3) Numerical calculation and analysis: Based on the updated finite element model, static or dynamic numerical calculations are performed to calculate the displacement, stress, strain and other response values ​​at each node.

[0097] (4) Determine the critical deformation threshold. For key areas around the foundation pit (such as the edge of the foundation pit, adjacent buildings, etc.), set the deformation allowable value (such as a horizontal displacement threshold of 10 cm, a vertical displacement threshold of 5 cm, etc.) based on engineering experience or specification requirements. When the model calculation results exceed these thresholds, it is determined that unacceptable deformation has occurred in the area.

[0098] (5) Mark the easily deformable areas. For all nodes, check whether their deformation response values ​​exceed the critical threshold. If so, mark them as easily deformable areas. Finally, highlight these areas in the model with different colors or rendering methods.

[0099] Through the above steps, not only can the weak areas of the foundation pit where large deformation may occur be located, but also the "critical deformation threshold" that causes large deformation can be determined. This provides an important basis for subsequent deformation prediction and timely warning.

[0100] Specific implementation of step S70:

[0101] This step aims to obtain the input and output samples of the neural network, and uses the orthogonal experimental design method to determine the horizontal displacement of the ground-anchored wall corresponding to multiple groups of deformation critical thresholds as the neural network training samples. It includes the following sub-steps:

[0102] (1) Select input and output parameters. The horizontal displacement of the ground-anchored wall is used as the input of the neural network, and the critical threshold of deformation (such as cohesion, internal friction angle, etc.) is used as the output.

[0103] (2) Determine the parameter level. For each input and output parameter, it is divided into several levels (grades) according to its variation range and accuracy requirements. For example, cohesion can be divided into 5 levels: 5kPa, 10kPa, 15kPa, 20kPa, and 25kPa.

[0104] (3) Factor analysis: Using the principle of orthogonal experimental design, according to the number of levels of the parameters, consult the orthogonal table to determine the number of experimental combinations required and the specific value of each combination.

[0105] (4) Numerical calculation: For each set of parameter combinations, the corresponding parameter values ​​are assigned in the finite element calculation model, and numerical calculations are performed to obtain the corresponding horizontal displacement values ​​of the ground-anchored wall.

[0106] (5) Constructing a sample set. Each set of parameter combinations and their corresponding horizontal displacement values ​​of the ground-anchored wall are used as an input-output sample pair to form a training sample set for the neural network.

[0107] The advantage of orthogonal experimental design is that it can cover the multi-level combinations of all parameters with fewer experimental combinations, thus greatly reducing the workload. It is an efficient experimental design method. This method can more comprehensively obtain the mapping relationship between the critical deformation threshold and the displacement response, laying the foundation for the training of the neural network model.

[0108] The specific implementation method of step S80:

[0109] This step uses the horizontal displacement of the ground-anchored wall as the training input and the critical threshold of deformation as the training output to establish and train the extreme learning machine neural network prediction model. At the same time, the particle swarm optimization algorithm is used to optimize the neural network parameters to obtain the foundation pit deformation prediction model. It includes the following sub-steps:

[0110] (1) Select the neural network architecture. The Extreme Learning Machine (ELM) is a special feedforward neural network whose hidden layer parameters (weights and biases) are randomly initialized and do not need to be trained through gradient descent like the traditional BP network, which greatly improves the training efficiency. ELM has good generalization performance for function approximation and nonlinear system identification.

[0111] (2) Determine the network hyperparameters, including the number of hidden layer nodes, activation function type, etc. These parameters are usually set by experience or cross-validation.

[0112] (3) Randomly initialize the hidden layer parameters. According to the set number of hidden layer nodes, randomly generate the weight matrix and bias vector from the hidden layer to the input layer.

[0113] (4) Calculate the hidden layer output. The training input (horizontal displacement of the ground-connected wall) is transferred to the hidden layer through random mapping, and the output matrix of the hidden layer is obtained by the activation function.

[0114] (5) Analyze the output weights. Using the hidden layer output matrix and the training output (deformation critical threshold), the output layer weights are solved by the least squares method or other methods.

[0115] (6) Network optimization: The particle swarm optimization (PSO) algorithm is used to optimize the network parameters to further improve the prediction accuracy of the model.

[0116] (7) Model evaluation. Evaluate the performance of the pre-trained model on the test set, such as root mean square error, decision coefficient, etc. If the performance is not ideal, adjust the network parameters or optimize the strategy and then retrain.

[0117] (8) Model deployment: When the model performance meets the requirements, it is deployed as an online service for subsequent deformation prediction tasks.

[0118] Through the organic combination of ELM network and PSO algorithm, a foundation pit deformation prediction model with excellent performance can be constructed. Among them, ELM itself has the advantages of fast training and not easy to fall into local extreme values; while the PSO algorithm can automatically search for a better combination of network parameters to improve the prediction accuracy. The coordinated application of the two provides a powerful tool for solving complex nonlinear prediction problems.

[0119] Specific implementation of step S90:

[0120] This step aims to predict the values ​​of various deformation critical threshold parameters in real time based on the monitored horizontal displacement of the ground-connected wall and the prediction model trained in step S80. It can then determine whether the foundation pit will undergo unacceptable deformation, thereby laying the foundation for early warning and control. It includes the following sub-steps:

[0121] (1) Obtain monitoring displacement data. Through the deformation monitoring system around the foundation pit, the displacement response data such as the horizontal displacement of the ground-anchored wall can be obtained in real time.

[0122] (2) Data preprocessing: The original monitoring data is normalized and denoised to obtain standardized displacement data that can be input into the neural network.

[0123] (3) Forward propagation calculation: The standardized displacement data is input into the ELM neural network model trained and optimized by step S80, and the forward propagation calculation is performed to obtain the activation value of the output layer.

[0124] (4) Threshold parameter decoding. The activation value of the output layer is the predicted critical threshold parameter of deformation (such as cohesion, internal friction angle, etc.). It is decoded into the actual physical value.

[0125] (5) Threshold comparison. Compare the predicted threshold parameter value with the standard or empirical value to determine whether it exceeds the critical state of unacceptable deformation. For example:

[0126]

[0127] Where c p Indicates the predicted cohesion value, usually in kPa; c min It indicates the minimum critical threshold of cohesion. If the value is lower than this value, it is judged that unacceptable deformation will occur. It is usually given according to engineering experience or specifications. Some people set it to 10.5KPa;p Represents the predicted internal friction angle value, in degrees (°); φ min Represents the minimum critical threshold of the internal friction angle. If the angle is lower than this value, unacceptable deformation will occur. It is usually given based on engineering experience or specifications and is set to 11° by default.

[0128] (6) Early warning and control. If it is determined that serious deformation will occur, an early warning will be issued in a timely manner, and appropriate engineering control measures will be taken according to the situation, such as reinforcement and support, unloading and weight reduction, etc., to ensure the safety of the foundation pit and surrounding buildings.

[0129] A second aspect of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores program instructions, and when the program instructions are executed, they are used to execute the above-mentioned foundation pit deformation prediction method.

[0130] A third aspect of the present invention provides a foundation pit deformation prediction system, which includes the above-mentioned computer-readable storage medium.

[0131] Specifically, the principle of the present invention is: this method organically combines geophysical means with multidisciplinary knowledge such as numerical simulation and machine learning, can make full use of underground hidden information, realize accurate identification of high-risk areas and early prediction of deformation trends, thereby greatly improving construction safety and economic benefits.

[0132] The key to the method lies in the establishment of multiple intelligent models: one is a stratigraphic interface recognition model based on deep learning, which can automatically extract and optimize stratigraphic division information from geological profile data, greatly improving the efficiency and quality of geological model construction; the second is a fully convolutional neural network recognition model trained on the distribution characteristics of abnormal areas, which can automatically identify weak sections prone to displacement and deformation from seismic exploration data; the third is a deformation prediction model based on extreme learning machine and orthogonal experimental design, which can accurately predict the changing trend of the critical deformation threshold according to real-time monitoring responses.

[0133] The innovation of the above model is that it makes full use of the powerful image recognition and nonlinear mapping capabilities of deep learning, effectively overcoming the limitations of manual interpretation imaging and empirical prediction. At the same time, by fusing multi-source heterogeneous data, it systematically extracts hidden information such as geological bodies and defect characteristics, thereby achieving high-precision weak area identification.

[0134] The following is a detailed description of the embodiments of the present invention in conjunction with specific data:

[0135] This example is based on a large-scale complex project foundation pit in the central area of ​​a city. The ground environment is complex, and there are many high-rise buildings and urban main roads around it. There are many constraints on the construction environment. The excavation depth of the project foundation pit is about 25 meters, and support measures such as soil nail walls and ground-connected walls are adopted.

[0136] 1. Construction of S10 geological model

[0137] First, the borehole geological profile data, soil layer distribution and physical parameters of the area were obtained. The semantic segmentation model based on convolutional neural network was used to automatically identify the stratigraphic interface and intelligently interpret the borehole profile data. The model was trained with a large number of actual profiles and real stratigraphic interfaces, and learned various features of the stratigraphic interface, such as texture and curvature. After manual correction, an initial three-dimensional geological model was established with a model resolution of 0.5 meters and a stratigraphic division accuracy of 93%.

[0138] 2.S20 formation interface identification

[0139] The geological profile data was preprocessed to extract seven seismic attribute profiles, such as instantaneous amplitude and instantaneous frequency, and the principal component analysis method was used to weight these attributes, with fusion weights of 0.25, 0.22, etc. Then, the fused comprehensive seismic profile was input into the trained U-Net network model, the backbone of which was ResNet-34. Combined with the attention mechanism, the verification accuracy on the public data set reached 92.6%. The model calculated the abnormal probability distribution map of each pixel, performed threshold segmentation and morphological processing on it, and finally output the location distribution of the abnormal area.

[0140] 3.S30 3D geological model update

[0141] The automatically identified abnormal area is compared and corrected with the previous formation interface information. For the highly consistent formation parts, the corresponding formation physical parameters are directly assigned; for the abnormal sections, the pre-set abnormal defect body parameters are introduced to obtain the updated three-dimensional geological model. For example, some blocks of the mudstone layer are assigned lower mechanical parameters (c = 15KPa, Φ = 14°) to simulate the influence of defects. The number of full three-dimensional finite element meshes recalculated according to the updated model is about 2 million units.

[0142] 4.S40 numerical simulation calculation

[0143] Numerical simulation analysis was performed based on the parameter-corrected finite element geological model, boundary conditions were set, loads were applied, etc. According to the stress conditions at different stages of excavation, a total of 45 groups of working conditions were calculated and analyzed in combination with the deformation allowable threshold. Taking a certain stage as an example, the model predicted that the ground-connected wall below the capping cushion layer would produce a maximum horizontal displacement of 12 cm, far exceeding the allowable threshold of 13 mm, so the area was marked as a high-risk deformation area.

[0144] 5. S70 orthogonal numerical simulation

[0145] For the ground-connected wall retaining structure, the uniform design method is used to determine the design parameter combination, including 17 parameters such as interface friction coefficient, anchor length, soil strength index, etc. 5 different levels are selected for each parameter, and 640 sets of parameter combinations are formed after orthogonal test design. Three-dimensional numerical calculations are carried out for each set of parameter combinations, and the corresponding displacement results are recorded. The total calculation amount is about 220,000 working conditions.

[0146] 6.S80 model training

[0147] Based on the simulation data and measured monitoring displacement data of orthogonal test design, the extreme learning machine neural network model is constructed, and the hidden layer parameters are initialized by incremental training method. The number of hidden layer nodes is set to 2000, and the activation function is Sig function. The network parameters are optimized by 50,000 iterations using the particle swarm algorithm with hybrid strategy, and the model prediction accuracy on the test set is RMSE = 1.21mm. The model has been verified by the engineering department and is reliable in accuracy.

[0148] 7.S90 application deployment

[0149] The trained ELM model is deployed as an online prediction service to receive the horizontal displacement data of the ground-anchored wall monitored on site in real time. The input data is filtered and denoised by discrete wavelet transform, and then input into the ELM model, which calculates and predicts the critical threshold parameters of deformation, such as c* and φ*. If the prediction c*<10.5KPa or φ*<11°, it is judged to exceed the critical threshold and an orange warning is issued; if it is lower than another level (such as c*<8KPa), a red warning is issued. At the same time, the model also returns updated local soil layer parameters to guide the implementation of control measures.

[0150] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for predicting foundation pit deformation, characterized in that: The following steps are involved: S10, obtaining geological survey data, topographic survey data and geophysical survey data in the vicinity of the foundation pit to be tested, and establishing a preliminary shallow stratum geological model; S20, based on the excavated section and the preliminary geological model, establish an initial finite element model and set initial soil layer parameters; S30, using the measured data of the excavated section, performing constrained inversion on the preliminary shallow stratum geological model to obtain a revised preliminary shallow stratum geological model, which is recorded as a first geological model; S40, obtaining seismic wave data of the area near the foundation pit to be tested, and extracting multiple seismic attribute profiles, including instantaneous amplitude, instantaneous frequency, and frequency division amplitude; Fusing the seismic attribute profiles to form a fused seismic attribute profile; S50, using a pre-trained seismic attribute profile recognition model, inputting a fused seismic attribute profile, and identifying and marking an easily displaced area; S60, calculating the easily deformable area of ​​the foundation pit and the critical deformation threshold value corresponding to the easily deformable area by combining the first geological model, the initial finite element model and the easily displaceable area marker; S70, obtaining neural network input and output samples, specifically: using an orthogonal experimental design method to determine multiple groups of ground-connected wall horizontal displacements corresponding to critical deformation thresholds as neural network training samples; S80, using the horizontal displacement of the ground-connected wall as training input and the critical deformation threshold as training output, establishing and training an extreme learning machine neural network prediction model; optimizing the neural network according to a particle swarm optimization algorithm, determining the optimal weights and thresholds of the neural network, and obtaining a foundation pit deformation prediction model; S90. During the construction process, the horizontal displacement of the ground-connected wall is monitored in real time, and the monitoring data is input into the trained foundation pit deformation prediction model to obtain the critical threshold of foundation pit deformation during the construction process. The predicted critical threshold of foundation pit deformation is input into the initial finite element numerical calculation model to calculate the deformation amount and deformation trend of the foundation pit in the future period of time, and output them.

2. A foundation pit deformation prediction method according to claim 1, characterized in that: The network architecture of the seismic attribute profile recognition model adopts the U-Net fully convolutional network.

3. A foundation pit deformation prediction method according to claim 2, characterized in that: The U-Net network includes a layer-by-layer deepening convolution encoder and a symmetric upsampling decoder.

4. A foundation pit deformation prediction method according to claim 1, characterized in that: The specific steps of S40 include: extracting multiple seismic attribute profiles from seismic wave reflection data, including instantaneous amplitude, instantaneous frequency, and apparent impedance; using a multi-attribute fusion strategy to fuse the multiple seismic attribute profiles into a comprehensive seismic attribute profile, wherein the weight of each attribute is determined according to the size of the correlation.

5. A method for predicting foundation pit deformation according to claim 4, characterized in that: The multi-attribute fusion strategy adopted is linear weighted fusion based on principal component analysis.

6. A foundation pit deformation prediction method according to claim 1, characterized in that: The specific steps of S50 include: inputting the fused seismic attribute profile into the trained seismic attribute profile recognition model, extracting feature information through convolution and pooling operations, and outputting pixel abnormality probability values; dividing abnormal and non-abnormal areas according to probability thresholds; performing morphological processing on the results, and outputting easy-to-displacement area masks.

7. A method for predicting foundation pit deformation according to claim 1, characterized in that: The specific steps of S60 include: assigning the physical and mechanical parameters of the first geological model to the initial finite element model; introducing the information of the easily displaced area and updating the parameter value of the area; performing numerical calculation and analysis based on the updated model; setting a deformation allowable threshold for the key area; and marking the area exceeding the threshold as an easily deformed area.

8. A method for predicting foundation pit deformation according to claim 1, characterized in that: The specific steps of S70 include: selecting the horizontal displacement of the ground-anchored wall as the input of the neural network and the critical deformation threshold as the output; using the orthogonal experimental design method to determine different level combinations of parameters; performing numerical calculations on each group of parameter combinations to obtain corresponding displacement values; and using each parameter combination and displacement value as a neural network training sample.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores program instructions, and when the program instructions are executed, they are used to execute a foundation pit deformation prediction method according to any one of claims 1 to 8.

10. A foundation pit deformation prediction system, characterized in that: A computer-readable storage medium comprising the computer-readable storage medium of claim 9.

Citation Information

Cited By

  • Optimization design method and system for foundation pit support

    CN119150432A

  • Coating multilayer profile analysis method based on data analysis

    CN119723253A

  • A method for coating multi-layer profile analysis based on data analysis

    CN119723253B

  • Dynamic visualization method, system and equipment for three-dimensional geologic model of underground engineering and storage medium

    CN119888105A

  • Foundation pit excavation deformation prediction method and device based on finite element

    CN120163028A