V-type valley debris flow parameter calculation method and terminal equipment

By combining Manning's formula and the principles of fluid mechanics, the angle is iteratively adjusted to improve the accuracy of parameter calculations of V-shaped valley debris flow, which solves the problem of insufficient accuracy of traditional methods and improves the accuracy and safety of calculation results.

CN118798075AInactive Publication Date: 2024-10-18CHINA GEOLOGICAL SURVEY XIAN MINERAL RESOURCES SURVEY CENT
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410793326.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-19
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional methods have insufficient accuracy when calculating parameters such as flow velocity, deepest mud level, and flood width of V-shaped valley debris flows, resulting in poor disaster prevention and reduction effects and affecting the safety of residents.

Method used

Obtain V-shaped valley topographic data through surveying and mapping devices, construct a standard section, and combine Manning's formula with fluid mechanics formulas to simplify the calculation formula and use the included angle as the independent variable. Iteratively adjust the preset angle to improve the accuracy of the deepest mud level and section area. Calculation accuracy.

Benefits of technology

It improves the accuracy and reliability of debris flow parameter calculation, ensures that the difference between calculation results and actual values ​​is within the allowable range, and enhances the effectiveness of disaster prevention and reduction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798075A_ABST
    Figure CN118798075A_ABST
Patent Text Reader

Abstract

The invention discloses a V-shaped valley debris flow parameter calculation method and terminal equipment, and relates to the field of debris flow disaster prevention and control. The method comprises the following steps: drawing extension lines with included angles of a preset left angle and a preset right angle on two sides of a vertical direction by taking a lowest point as a starting point; inputting the preset left angle and the preset right angle into a preset deepest mud position calculation formula to obtain a first deepest mud position; the areas of the first left sectional area and the first right sectional area are calculated, and whether the error rates between the first left sectional area and the sectional area and between the first right sectional area and the sectional area are larger than a preset error rate or not is judged; if the error rate is greater than the preset error rate, adjusting the angle value of the preset left angle and / or the preset right angle; and judging whether the adjusted area of the second left sectional area and / or the second right sectional area is greater than a preset error rate, and if so, continuing to adjust until the error rate is less than the preset error rate. By implementing the technical scheme provided by the invention, the effect of improving the V-shaped valley debris flow parameter calculation precision is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of debris flow disaster prevention and control, and specifically to a method and terminal device for calculating parameters of a V-shaped valley debris flow. Background Art

[0002] Due to the complex and changeable terrain of mountainous areas, especially the existence of "V"-shaped valleys, it is extremely difficult to calculate key parameters such as the velocity, deepest mud level, and flood width of debris flows. Traditional calculation methods have obvious limitations when dealing with such complex terrains, and often cannot accurately reflect the true movement characteristics of debris flows, resulting in inaccurate prediction results. This not only affects the effectiveness of disaster prevention and mitigation work, but also poses potential risks to the safety of local residents.

[0003] Therefore, there is an urgent need for a method that can improve the calculation accuracy of debris flow parameters in “V”-shaped valleys. Summary of the invention

[0004] The present application provides a method and terminal device for calculating parameters of a V-shaped valley debris flow, which can improve the calculation accuracy of the parameters of a V-shaped valley debris flow.

[0005] In a first aspect, the present application provides a method for calculating the parameters of a V-shaped valley debris flow, comprising: constructing a standard section based on the V-shaped valley terrain data obtained by a surveying and mapping device, and determining the lowest point of the standard section; taking the lowest point as the starting point, drawing an extension line on both sides of the lowest point with a preset left angle and a preset right angle with respect to the vertical direction; inputting the preset left angle and the preset right angle into a preset deepest mud level calculation formula to obtain a first deepest mud level, wherein the preset deepest mud level calculation formula is a function with the angle between the lowest point and both sides of the vertical direction as an independent variable; calculating the areas of a first left section area and a first right section area based on the first deepest mud level, and determining a first left error rate between the first left section area and the actual left section area, and a first right section area and the actual right section area. whether the first right error rate between the first left error rate and / or the first right error rate is respectively greater than the preset error rate; if the first left error rate and / or the first right error rate is greater than the preset error rate, adjust the angle value of the preset left angle and / or the preset right angle according to the first left error rate and / or the first right error rate; calculate the area of ​​the second left cross-sectional area and / or the second right cross-sectional area based on the adjusted angle value of the preset left angle and / or the preset right angle, and judge whether the second left error rate between the second left cross-sectional area and the actual left cross-sectional area, and / or the second right error rate between the first right cross-sectional area and the actual right cross-sectional area is greater than the preset error rate; if greater than, continue to adjust the adjusted preset left angle and / or preset right angle until the second left error rate, and / or the second right error rate are respectively less than the preset error rate.

[0006] By adopting the above technical scheme, a triangle with a preset angle to the deepest mud level is drawn on the obtained standard section, and then the Manning formula is simplified into a calculation formula about the angle to and the deepest mud level. The deepest mud level and cross-sectional area are calculated based on the preset angle, and the difference between the calculated value and the actual value is effectively judged. The preset angle is iteratively adjusted until the difference is within the allowable range, so as to obtain the cross-sectional area and deepest mud level with high accuracy, thereby improving the accuracy and reliability of debris flow parameter calculation.

[0007] Optionally, before inputting the preset left angle and the preset right angle into the preset deepest mud level calculation formula to obtain the first deepest mud level, the method further includes: combining the Manning formula and the fluid mechanics formula to obtain an initial calculation formula: Based on the cross-sectional area calculation formula and the wetted perimeter calculation formula, the initial calculation formula is simplified to the preset deepest mud level calculation formula: Among them, H is the deepest mud level, Q is the peak flow of debris flow, V is the cross-sectional flow velocity, n is the river roughness, I is the longitudinal slope, A is the cross-sectional area, C is the wet perimeter, α i is the angle with the right side of the vertical direction, α j It is the angle with the left side of the vertical direction.

[0008] By adopting the above technical solution and combining the actual surveying and mapping data of the V-shaped valley terrain with the principles of fluid mechanics, the Manning formula is simplified to obtain the values ​​of the deepest mud levels corresponding to different angles, so that the deepest mud level can be calculated more accurately.

[0009] Optionally, based on the cross-sectional area calculation formula and the wet perimeter calculation formula, the initial calculation formula is simplified to the preset deepest mud level calculation formula, including: according to the triangle calculation formula, the cross-sectional area calculation formula and the wet perimeter calculation formula, the cross-sectional area calculation formula and the wet perimeter calculation formula are simplified to function calculation formulas with the angle between the lowest point and both sides of the vertical direction as independent variables: A = 0.5 × H 2 ×(tanα i +tanα j ),

[0010] By adopting the above technical solution, by expressing the cross-sectional area and wet perimeter as functions related to the angles on both sides of the deepest mud level, the influence of angle changes on the deepest mud level H of the debris flow can be directly reflected, thereby improving the rapid assessment of the debris flow area.

[0011] Optionally, the cross-sectional area calculation formula and the wet perimeter length calculation formula are simplified into function calculation formulas with the angle between the lowest point and both sides of the vertical direction as independent variables, including: setting the right horizontal line of the debris flow section corresponding to the deepest mud level to H×tanαi , the left horizontal line is set to H×tanα j ; The cross-sectional area calculation formula and wetted perimeter length calculation formula are obtained from the right horizontal line and the left horizontal line.

[0012] By adopting the above technical solution, the right horizontal line and the left horizontal line of the debris flow section are respectively set to expressions related to the deepest mud level and the angle according to trigonometric functions, so that the calculated cross-sectional area and wet perimeter length calculation standards can be consistent with the calculation standards of the preset deepest mud level calculation formula, thereby improving the accuracy of the calculated deepest mud level.

[0013] Optionally, before determining whether a first left error rate between the first left cross-sectional area and the actual left cross-sectional area, and a first right error rate between the first right cross-sectional area and the actual right cross-sectional area are respectively greater than preset error rates, the method also includes: acquiring measured data, and drawing a model proportional to the V-shaped valley based on the measured data; and calculating the actual left cross-sectional area and the actual right cross-sectional area corresponding to the actual deepest mud position based on the proportional model.

[0014] By adopting the above technical solution, by calculating the actual left cross-sectional area and the actual right cross-sectional area corresponding to the actual deepest mud level, it can be ensured that whether the judged area error rate is greater than the preset error rate is based on accurate and reliable data, which helps to improve the accuracy and reliability of the judgment results.

[0015] Optionally, if the first left error rate and / or the first right error rate is greater than the preset error rate, the angle value of the preset left angle and / or the preset right angle is adjusted according to the first left error rate and / or the first right error rate, including: if the first left error rate and / or the first right error rate is greater than the preset error rate, determining whether the preset left angle and / or the preset right angle is greater than the dichotomy error rate; if it is greater than the dichotomy error rate, adjusting the angle value of the preset left angle and / or the preset right angle by dichotomy.

[0016] By adopting the above technical solution, by judging whether it is greater than the binary search error rate, and accordingly using the binary search method to adjust the preset left angle and / or the preset right angle, the search range can be effectively narrowed, and the optimal angle that meets the conditions can be quickly found, thereby improving the efficiency of debris flow parameter calculation.

[0017] Optionally, if the first left error rate and / or the first right error rate is greater than the preset error rate, then after determining whether the first left error rate and / or the first right error rate is greater than the dichotomy error rate, the method also includes: if the preset left angle and / or the preset right angle is less than the dichotomy error rate, then adjusting the angle value of the preset left angle and / or the preset right angle by a preset adjustment angle.

[0018] By adopting the above technical solution, by introducing a preset adjustment angle and combining it with the dichotomy method, not only the calculation accuracy is improved, but also the preset adjustment angle is used for fine-tuning when the error rate is small, which improves the calculation efficiency and achieves a balance between calculation speed and accuracy.

[0019] In a second aspect of the present application, a terminal device is provided, including: an acquisition module 601, which is used to construct a standard section based on V-shaped valley terrain data acquired by a surveying and mapping device, and determine the lowest point of the standard section; a drawing module 602, which is used to take the lowest point as the starting point and draw an extension line on both sides of the lowest point with a preset left angle and a preset right angle with respect to the vertical direction; a calculation module 603, which is used to input the preset left angle and the preset right angle into a preset deepest mud level calculation formula to obtain a first deepest mud level, wherein the preset deepest mud level calculation formula is a function with the angle between the lowest point and both sides of the vertical direction as an independent variable; a first judgment module 604, which is used to calculate the areas of a first left cross-sectional area and a first right cross-sectional area based on the first deepest mud level, and judge the first left error rate between the first left cross-sectional area and the actual left cross-sectional area, and the first right cross-sectional area and the actual Whether the first right error rate between the right cross-sectional areas is respectively greater than the preset error rate; an adjustment module 605 is used to adjust the angle value of the preset left angle and / or the preset right angle according to the first left error rate and / or the first right error rate if the first left error rate and / or the first right error rate is greater than the preset error rate; a second judgment module 606 is used to calculate the area of ​​the second left cross-sectional area and / or the second right cross-sectional area based on the adjusted angle value of the preset left angle and / or the preset right angle, and judge whether the second left error rate between the second left cross-sectional area and the actual left cross-sectional area, and / or the second right error rate between the first right cross-sectional area and the actual right cross-sectional area is greater than the preset error rate, if greater, continue to adjust the adjusted preset left angle and / or preset right angle until the second left error rate, and / or the second right error rate are respectively less than the preset error rate.

[0020] In a third aspect of the present application, an electronic device is provided, comprising a processor (701), a memory (705), a user interface (703) and a network interface (704), wherein the memory (705) is used to store instructions, the user interface (703) and the network interface (704) are used to communicate with other devices, and the processor (701) is used to execute the instructions stored in the memory (705) so that the electronic device (700) executes any method as in the first aspect.

[0021] In a fourth aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores instructions, and when the instructions are executed, the method steps of any one of the first aspects are executed.

[0022] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. By simplifying the Manning formula into a calculation formula for the angle to the deepest mud level, calculating the deepest mud level and cross-sectional area based on the preset angle, and then comparing the cross-sectional area with the actual area, the difference between the calculated value and the actual value can be effectively judged.

[0023] 2. By iteratively adjusting the preset angle until the difference between the cross-sectional area and the actual area is within the allowable range, the cross-sectional area and the deepest mud level with high accuracy can be obtained, thereby improving the accuracy and reliability of debris flow parameter calculation. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a calculation flow chart of V-shaped valley debris flow parameters provided in an embodiment of the present application.

[0025] Figure 2 It is a schematic diagram of the initial angle section disclosed in the embodiment of the present application.

[0026] Figure 3 It is a schematic cross-sectional view after the first iteration of adjusting the initial angle disclosed in the embodiment of the present application.

[0027] Figure 4 It is a cross-sectional schematic diagram after the second iteration adjustment of the initial angle disclosed in the embodiment of the present application.

[0028] Figure 5 It is a schematic cross-sectional view after the third iteration of adjusting the initial angle disclosed in the embodiment of the present application.

[0029] Figure 6 It is a structural diagram of a terminal device disclosed in an embodiment of the present application.

[0030] Figure 7 It is a structural schematic diagram of an electronic device disclosed in an embodiment of the present application. DETAILED DESCRIPTION

[0031] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0032] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.

[0033] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0034] The following, combined Figure 1 A method for calculating parameters of a V-shaped valley debris flow provided in an embodiment of the present application is described in detail.

[0035] Step S101: construct a standard section based on the V-shaped valley terrain data obtained by the surveying and mapping device, and determine the lowest point of the standard section.

[0036] Surveying and mapping equipment is used to refer to equipment that can identify cross-sectional contours, such as total stations, GPS navigators, and remote sensing instruments.

[0037] The lowest point is the lowest point corresponding to the deepest mud level in the standard section. Figure 2 Point O is shown.

[0038] Step S102: Taking the lowest point as the starting point, draw an extension line on both sides of the lowest point, each of which has an angle with the vertical direction of a preset left angle and a preset right angle.

[0039] The vertical direction can be understood as a direction parallel to the deepest mud level. In the embodiment of the present application, the vertical direction refers to a direction that is co-located with and parallel to the deepest mud level. Optionally, the angle values ​​of the preset left angle and the preset right angle can be the same or different, and the present application does not make specific limitations on this.

[0040] like Figure 2 In the example shown, point O is the lowest point, and OP is the vertical direction starting from the lowest point, that is, the deepest mud position. The preset right angle is α1, the preset left angle is α2, and an extension line OM` with an angle of α1 and an extension line ON` with an angle of α2 are drawn from point O as the starting point.

[0041] Step S103: Input the preset left angle and the preset right angle into the preset deepest mud level calculation formula to obtain the first deepest mud level. The preset deepest mud level calculation formula is a function with the angle between the lowest point and both sides of the vertical direction as the independent variable.

[0042] In an optional implementation, before inputting the preset left angle and the preset right angle into the preset deepest mud level calculation formula to obtain the first deepest mud level, the method further includes: combining the Manning formula and the fluid mechanics formula to obtain an initial calculation formula: Based on the cross-sectional area calculation formula and the wetted perimeter calculation formula, the initial calculation formula is simplified to the preset deepest mud level calculation formula: Among them, H is the deepest mud level, Q is the peak flow of debris flow, V is the cross-sectional flow velocity, n is the river roughness, I is the longitudinal slope, A is the cross-sectional area, C is the wet perimeter, α i is the angle with the right side of the vertical direction, α j It is the angle with the left side of the vertical direction.

[0043] For example, the preset left angle and the preset right angle are 45°, Q = 100m^3 / s, n = 0.025, I = 5‰, and the known conditions are substituted into the preset deepest mud level calculation formula to obtain Therefore, the value of the deepest mud level when the preset left angle and the preset right angle are 45 degrees respectively can be obtained.

[0044] In this embodiment, the Manning formula is simplified by combining the actual surveying and mapping data of the V-shaped valley terrain with the principles of fluid mechanics to obtain the values ​​of the deepest mud level corresponding to different angles, so that the deepest mud level can be calculated more accurately.

[0045] The fluid mechanics formula is used to replace the calculation formula for the cross-sectional area and the wet perimeter in the Manning formula. In the embodiment of the present application, based on the cross-sectional area calculation formula and the wet perimeter calculation formula, the initial calculation formula is simplified to the preset deepest mud level calculation formula, including: according to the triangle calculation formula, the cross-sectional area calculation formula and the wet perimeter calculation formula, the cross-sectional area calculation formula and the wet perimeter calculation formula are simplified to function calculation formulas with the angle between the lowest point and both sides of the vertical direction as independent variables: A = 0.5 × H 2 ×(tanα i +tanα j ),

[0046] In the embodiment of the present application, the standard section is divided into two right triangles by the deepest mud level, and therefore, the calculation formula for the standard section area can be set to the sum of the areas of the two triangles.

[0047] In an optional implementation, the cross-sectional area calculation formula and the wetted perimeter calculation formula are simplified into function calculation formulas with the angle between the lowest point and both sides of the vertical direction as independent variables, including: setting the right horizontal line of the debris flow section corresponding to the deepest mud level to H×tanα i , the left horizontal line is set to H×tanα j; The cross-sectional area calculation formula and wetted perimeter length calculation formula are obtained from the right horizontal line and the left horizontal line.

[0048] Based on trigonometric functions, we can obtain the horizontal line H×tanα on the right side. i , the left horizontal line H×tanα j , combined with the above cross-sectional area calculation formula, we can get A = 0.5 × H 2 ×(tanα i +tanα j ). In this embodiment, the right horizontal line and the left horizontal line of the debris flow section are respectively set to expressions related to the deepest mud level and the angle according to trigonometric functions, so that the calculated cross-sectional area and wet perimeter length calculation standards can be consistent with the calculation standards of the preset deepest mud level calculation formula, thereby improving the accuracy of the calculated deepest mud level.

[0049] In another optional embodiment, the average angle α is taken as (α i +α j ) / 2, A=H 2 ×tanα,

[0050] Combined with the above example, the wetted perimeter length C = ON + OM, then according to trigonometric function, we can get In this embodiment, by expressing the cross-sectional area and wet perimeter as functions related to the angles on both sides of the deepest mud level, the effect of angle changes on the deepest mud level H of the debris flow can be directly reflected, thereby improving the rapid assessment of the debris flow area.

[0051] Optionally, the cross section can be divided into N equally proportioned triangles, and the cross-sectional area calculation formula and the wetted perimeter length calculation formula can be simplified to function calculation formulas with the angle between the lowest point and both sides of the vertical direction as independent variables: C=k×A x , where K is a proportional factor whose value depends on the geometry, roughness and other physical properties of the specific channel or section; the value of P is different in different types of channels or sections, e.g., for a rectangular channel, P is close to 1, while for a very irregular section, P may deviate from 1.

[0052] Optionally, the angle values ​​of the preset left angle and the preset right angle may be the same or different, and this application does not make any specific limitation on this.

[0053] Step S104: Calculate the areas of the first left cross-sectional area and the first right cross-sectional area based on the first deepest mud level, and determine whether the first left error rate between the first left cross-sectional area and the actual left cross-sectional area, and the first right error rate between the first right cross-sectional area and the actual right cross-sectional area are respectively greater than the preset error rates.

[0054] The preset error rate is used to determine whether the error rate between the estimated area of ​​the valley contour and the actual area of ​​the valley is within the expected error rate range. It should be understood that the error between the estimated area and the actual area can be positive or negative. In the embodiment of the present application, the calculated preset error rates are all set to positive values. For example, the preset error rate is set to S ′ = estimated area / actual area, where the estimated area is the area of ​​the estimated valley contour, such as the first left section area and the first right section area, and the actual area is the actual area of ​​the valley. When calculating the actual left section area and the actual right section area, the AREA command in CAD can be used to measure the actual area corresponding to the deepest mud level H.

[0055] In an optional embodiment, before determining whether a first left error rate between the first left cross-sectional area and the actual left cross-sectional area, and a first right error rate between the first right cross-sectional area and the actual right cross-sectional area are respectively greater than preset error rates, the method further includes: acquiring measured data, and drawing a model proportional to the V-shaped valley based on the measured data; and calculating the actual left cross-sectional area and the actual right cross-sectional area corresponding to the actual deepest mud position based on the proportional model.

[0056] In this embodiment, by calculating the actual left cross-sectional area and the actual right cross-sectional area corresponding to the actual deepest mud level, it can be ensured that whether the judged area error rate is greater than the preset error rate is based on accurate and reliable data, which helps to improve the accuracy and reliability of the judgment results.

[0057] like Figure 2 As shown in the figure, the lowest point of the standard section constructed according to the terrain data of the V-shaped valley is set as point O, the vertical projection point of point O on the debris flow surface is set as point P, and the intersection points of the debris flow and the two sides of the V-shaped valley are points M and N respectively. The actual left section area is S PON , the actual right side cross-sectional area is S POM Combined with the above example, after inputting the preset left angle and the preset right angle into the preset deepest mud level calculation formula, the first left cross-sectional area S is obtained. PON` The area is: 0.5×H 2 ×tanα1, the first right cross-sectional area S POM` The area is: 0.5×H 2 ×tanα2. Thus, the first left error rate is The first right error rate is Again and will be respectively with S ′ Compare and judge and Step S105: If the first left error rate and / or the first right error rate are greater than the preset error rate, adjust the angle value of the preset left angle and / or the preset right angle according to the first left error rate and / or the first right error rate.

[0058] In an optional embodiment, if the first left error rate and / or the first right error rate is greater than the preset error rate, the angle value of the preset left angle and / or the preset right angle is adjusted according to the first left error rate and / or the first right error rate, including: if the first left error rate and / or the first right error rate is greater than the preset error rate, determining whether the preset left angle and / or the preset right angle is greater than the dichotomy error rate; if it is greater than the dichotomy error rate, adjusting the angle value of the preset left angle and / or the preset right angle by dichotomy.

[0059] Combined with the above example, if the actual left cross-sectional area is S PON The actual right side cross-sectional area is S POM They are 40 square meters and 45 square meters respectively. 20 square meters, 25 square meters, which is greater than the preset error rate of 10%, then determine whether the preset left angle and the preset right angle are greater than the binary error rate. If the preset left angle and the preset right angle are greater than the binary error rate, the binary strategy is adopted to adjust the values ​​of α1 and α2. Specifically, the values ​​of α1 and α2 are 45°, respectively, and the binary error rate is 20%, then the values ​​of α1 and α2 are adjusted to 67.5° respectively through binary method.

[0060] In this embodiment, by determining whether it is greater than the binary search error rate and accordingly using the binary search method to adjust the preset left angle and / or the preset right angle, the search range can be effectively narrowed and the optimal angle that meets the conditions can be quickly found, thereby improving the efficiency of debris flow parameter calculation.

[0061] In another optional embodiment, if the first left error rate and / or the first right error rate is greater than the preset error rate, it is determined whether the first left error rate and / or the first right error rate is greater than the dichotomy error rate, wherein the dichotomy error rate is the area error rate (such as 10%); if it is greater than the dichotomy error rate, the angle value of the preset left angle and / or the preset right angle is adjusted by dichotomy.

[0062] Optionally, if the first left error rate and / or the first right error rate is greater than the preset error rate, then after determining whether the first left error rate and / or the first right error rate is greater than the dichotomy error rate, the method also includes: if the preset left angle and / or the preset right angle is less than the dichotomy error rate, then adjusting the angle value of the preset left angle and / or the preset right angle by a preset adjustment angle.

[0063] The preset adjustment angle is a preset angle value, which is used to fine-tune the preset left angle and / or the preset right angle when it is determined that the preset left angle and / or the preset right angle is less than the dichotomy error rate.

[0064] In this embodiment, by introducing a preset adjustment angle and combining it with the dichotomy method, not only the calculation accuracy is improved, but also the preset adjustment angle is used for fine-tuning when the error rate is small, thereby improving the calculation efficiency and achieving a balance between calculation speed and accuracy.

[0065] Step S106: Calculate the area of ​​the second left cross-sectional area and / or the second right cross-sectional area based on the angle value of the adjusted preset left angle and / or preset right angle, and determine whether the second left error rate between the second left cross-sectional area and the actual left cross-sectional area, and / or the second right error rate between the first right cross-sectional area and the actual right cross-sectional area is greater than the preset error rate; if so, continue to adjust the adjusted preset left angle and / or preset right angle until the second left error rate and / or the second right error rate are respectively less than the preset error rate.

[0066] Combined with the above example, the actual left cross-sectional area is S PON The actual right side cross-sectional area is S POM They are 40 square meters and 45 square meters respectively, with a preset error rate of 10%. and The values ​​of α1 and α2 are respectively greater than the preset error rate, and the values ​​of α1 and α2 are 45°, respectively. The error rate of the binary method is 20%. The values ​​of α1 and α2 are adjusted to 67.5° respectively through the binary method. Then, the corresponding value of 67.5° is calculated by the preset deepest mud level calculation formula and the cross-sectional area calculation formula. and They are 27 square meters and 30 square meters respectively. and The corresponding second left error rate and second right error rate are 13 square meters and 15 square meters respectively, that is, the second left error rate and the second right error rate are greater than the preset error rate, then the adjusted preset left angle and preset right angle need to be further adjusted, and it is judged again whether the adjusted preset left angle and preset right angle are greater than the binary error rate. If the judgment result is less than the binary error rate, the adjusted preset left angle and preset right angle are further adjusted according to the preset adjustment angle. The corresponding preset left angle after adjustment is The error rate between the value and the actual left cross-sectional area is less than the preset error rate. The preset left angle corresponds to If the error rate between the value of and the actual right cross-sectional area is greater than the preset error rate, continue to adjust the preset right angle on the right side, and calculate the corresponding like If the error rate is still greater than the preset error rate, continue to adjust the preset right angle until the second right error rate is less than the preset error rate. Figure 3 , Figure 4 , Figure 5 The iterative adjustment process shown is not described in detail in this application.

[0067] The method for calculating the parameters of a V-shaped valley debris flow provided in an embodiment of the present application is to obtain a standard section and draw a triangle with a preset angle to the deepest mud level on the standard section, then simplify the Manning formula into a calculation formula for the angle to and the deepest mud level, calculate the deepest mud level and the cross-sectional area based on the preset angle, effectively judge the difference between the calculated value and the actual value, and iteratively adjust the preset angle until the difference is within the allowable range, so as to obtain the cross-sectional area and the deepest mud level with high accuracy, thereby improving the accuracy and reliability of the calculation of debris flow parameters.

[0068] The above is an example of a method for calculating debris flow parameters using a lowest point in a river section. If there are multiple V-shaped valleys in the river section, the debris flow parameters corresponding to other V-shaped valleys can be calculated using the above calculation method, and this application will not go into details.

[0069] It is understandable that the terminal device is required to achieve Figure 2 The functions described include hardware and / or software modules that perform the corresponding functions. In combination with the steps of each example described in the embodiments disclosed herein, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application in combination with the embodiments, but such implementation should not be considered to be beyond the scope of the present application.

[0070] In this embodiment, the terminal device can be divided into functional modules according to the above method example. For example, different functional modules can be divided according to different functions, or two or more functions can be integrated into one processing module. The above integrated modules can be implemented in the form of hardware. It should be noted that the division of modules in this embodiment is schematic and is only a logical function division. There may be other division methods in actual implementation.

[0071] In the case of dividing each functional module into corresponding functional modules, Figure 6 A possible schematic diagram of a terminal device 600 involved in the above embodiment is shown, and the terminal device 600 includes: an acquisition module 601, which is used to construct a standard section based on the V-shaped valley terrain data acquired by the surveying and mapping device, and determine the lowest point of the standard section; a drawing module 602, which is used to take the lowest point as the starting point and draw an extension line on both sides of the lowest point with a preset left angle and a preset right angle with respect to the vertical direction; a calculation module 603, which is used to input the preset left angle and the preset right angle into a preset deepest mud level calculation formula to obtain a first deepest mud level, and the preset deepest mud level calculation formula is a function with the angle between the lowest point and both sides of the vertical direction as an independent variable; a first judgment module 604, which is used to calculate the areas of the first left section area and the first right section area based on the first deepest mud level, and judge the first left error rate between the first left section area and the actual left section area, and Whether the first right error rate between the first right cross-sectional area and the actual right cross-sectional area is respectively greater than the preset error rate; an adjustment module 605 is used to adjust the angle value of the preset left angle and / or the preset right angle according to the first left error rate and / or the first right error rate if the first left error rate and / or the first right error rate are greater than the preset error rate; a second judgment module 606 is used to calculate the area of ​​the second left cross-sectional area and / or the second right cross-sectional area based on the adjusted angle value of the preset left angle and / or the preset right angle, and judge whether the second left error rate between the second left cross-sectional area and the actual left cross-sectional area, and / or the second right error rate between the first right cross-sectional area and the actual right cross-sectional area are greater than the preset error rate, and if greater, continue to adjust the adjusted preset left angle and / or preset right angle until the second left error rate and / or the second right error rate are respectively less than the preset error rate.

[0072] In an optional implementation of the embodiment of the present application, the calculation module 603 is further used to combine the Manning formula and the fluid mechanics formula to obtain an initial calculation formula: Based on the cross-sectional area calculation formula and the wetted perimeter calculation formula, the initial calculation formula is simplified to the preset deepest mud level calculation formula: Among them, H is the deepest mud level, Q is the peak flow of debris flow, V is the cross-sectional flow velocity, n is the river roughness, I is the longitudinal slope, A is the cross-sectional area, C is the wet perimeter, α i is the angle with the right side of the vertical direction, α j It is the angle with the left side of the vertical direction.

[0073] In an optional implementation of the embodiment of the present application, the calculation module 603 is further used to simplify the cross-sectional area calculation formula and the wetted perimeter length calculation formula into function calculation formulas with the angle between the lowest point and both sides of the vertical direction as independent variables according to the triangle calculation formula, the cross-sectional area calculation formula and the wetted perimeter length calculation formula: A = 0.5 × H 2 ×(tanα i +tanαj ),

[0074] In an optional implementation of the embodiment of the present application, the calculation module 603 is further used to set the right horizontal line of the debris flow section corresponding to the deepest mud level to H×tanα i , the left horizontal line is set to H×tanα j ; The cross-sectional area calculation formula and wetted perimeter length calculation formula are obtained from the right horizontal line and the left horizontal line.

[0075] In an optional implementation of the embodiment of the present application, the first judgment module 604 is also used to obtain measured data, draw a model proportional to the V-shaped valley based on the measured data; and calculate the actual left cross-sectional area and the actual right cross-sectional area corresponding to the actual deepest mud position based on the proportional model.

[0076] In an optional implementation method of the embodiment of the present application, the adjustment module 605 is also used to determine whether the preset left angle and / or the preset right angle is greater than the binary error rate if the first left error rate and / or the first right error rate is greater than the preset error rate; if it is greater than the binary error rate, the angle value of the preset left angle and / or the preset right angle is adjusted by binary search.

[0077] In an optional implementation of the embodiment of the present application, the adjustment module 605 is also used to adjust the angle value of the preset left angle and / or the preset right angle by a preset adjustment angle if the preset left angle and / or the preset right angle is less than the dichotomy error rate.

[0078] The present application also discloses an electronic device. Figure 7 , Figure 7 The electronic device 700 may include: at least one processor 701 , at least one network interface 704 , a user interface 703 , a memory 705 , and at least one communication bus 702 .

[0079] The communication bus 702 is used to realize the connection and communication between these components.

[0080] The user interface 703 may include a display screen (Display) and a camera (Camera), and the optional user interface 703 may also include a standard wired interface and a wireless interface.

[0081] The network interface 704 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0082] Among them, the processor 701 may include one or more processing cores. The processor 701 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 705, and calling data stored in the memory 705. Optionally, the processor 701 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 701 can integrate one or more combinations of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application programs; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 701, and it can be implemented separately through a chip.

[0083] Among them, the memory 705 may include a random access memory (Random Access Memory, RAM) and may also include a read-only memory (Read-Only Memory). Optionally, the memory 705 includes a non-transitory computer-readable storage medium. The memory 705 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 705 may include a program storage area and a data storage area, wherein the program storage area may store instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc.; the data storage area may store data involved in the above-mentioned various method embodiments, etc. The memory 705 may also be optionally at least one storage device located away from the aforementioned processor 701. Refer to Figure 7 The memory 705 as a computer storage medium may include an operating system, a network communication module, a user interface module and an application program for a method for calculating parameters of a V-shaped valley debris flow.

[0084] exist Figure 7In the electronic device 700 shown, the user interface 703 is mainly used to provide an input interface for the user and obtain the data input by the user; and the processor 701 can be used to call the application program storing a method for calculating the parameters of a V-type valley debris flow in the memory 705, and when executed by one or more processors 701, the electronic device 700 executes one or more of the methods described in the above embodiments. It should be noted that for the aforementioned method embodiments, for the sake of simple description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0085] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0086] In the several embodiments provided in this application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0087] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0088] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0089] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.

[0090] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, those skilled in the art will easily think of other embodiments of the present disclosure.

[0091] This application is intended to cover any variation, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the art that are not disclosed in the present application. The description and examples are to be regarded as exemplary only, and the scope and spirit of the present application are defined by the claims.

Claims

1. A method for calculating the parameters of V-shaped valley debris flow. It is characterized in that include: Constructing a standard section based on V-shaped valley terrain data acquired by a surveying and mapping device, and determining the lowest point of the standard section; Taking the lowest point as the starting point, draw an extension line on both sides of the lowest point, with the angles with the vertical direction being a preset left angle and a preset right angle respectively; Inputting the preset left angle and the preset right angle into a preset deepest mud level calculation formula to obtain a first deepest mud level, wherein the preset deepest mud level calculation formula is a function with the angles between the lowest point and both sides of the vertical direction as independent variables; Calculating the areas of a first left cross-sectional area and a first right cross-sectional area based on the first deepest mud level, and determining whether a first left error rate between the first left cross-sectional area and an actual left cross-sectional area, and a first right error rate between the first right cross-sectional area and an actual right cross-sectional area are respectively greater than a preset error rate; If the first left error rate and / or the first right error rate is greater than the preset error rate, adjusting the angle value of the preset left angle and / or the preset right angle according to the first left error rate and / or the first right error rate; Calculate the area of ​​the second left cross-sectional area and / or the second right cross-sectional area based on the angle value of the adjusted preset left angle and / or the preset right angle, and determine whether the second left error rate between the second left cross-sectional area and the actual left cross-sectional area, and / or the second right error rate between the first right cross-sectional area and the actual right cross-sectional area is greater than the preset error rate; if so, continue to adjust the adjusted preset left angle and / or the preset right angle until the second left error rate and / or the second right error rate are respectively less than the preset error rates.

2. The method according to claim 1, It is characterized in that Before inputting the preset left angle and the preset right angle into a preset deepest mud level calculation formula to obtain a first deepest mud level, the method further includes: Combining the Manning formula and the fluid mechanics formula, we get the initial calculation formula: Based on the cross-sectional area calculation formula and the wetted perimeter calculation formula, the initial calculation formula is simplified to the calculation formula of the preset deepest mud level: Among them, H is the deepest mud level, Q is the peak flow of debris flow, V is the cross-sectional flow velocity, n is the river roughness, I is the longitudinal slope, A is the cross-sectional area, C is the wet perimeter, α i is the angle with the right side of the vertical direction, α j It is the angle with the left side of the vertical direction.

3. The method according to claim 2, It is characterized in that Based on the cross-sectional area calculation formula and the wetted perimeter calculation formula, the initial calculation formula is simplified into the preset deepest mud level calculation formula, including: According to the triangle calculation formula, the cross-sectional area calculation formula and the wetted perimeter length calculation formula, the cross-sectional area calculation formula and the wetted perimeter length calculation formula are simplified into function calculation formulas with the angle between the lowest point and both sides of the vertical direction as independent variables: A=0.5×H′×(tanαi+tanaj) 4. The method according to claim 3, It is characterized in that The cross-sectional area calculation formula and the wet perimeter calculation formula are simplified into function calculation formulas with the angles between the lowest point and both sides of the vertical direction as independent variables, including: setting the right horizontal line of the debris flow section corresponding to the deepest mud level to H×tanαi, and setting the left horizontal line to H×tanαj; The cross-sectional area calculation formula and the wet perimeter length calculation formula are derived from the right horizontal line and the left horizontal line.

5. The method according to claim 1, It is characterized in that Before determining whether a first left error rate between the first left cross-sectional area and the actual left cross-sectional area, and a first right error rate between the first right cross-sectional area and the actual right cross-sectional area are respectively greater than a preset error rate, the method further includes: Acquire measured data, and draw a model proportional to the V-shaped valley according to the measured data; The actual left cross-sectional area and the actual right cross-sectional area corresponding to the actual deepest mud level are calculated according to the proportional model.

6. The method according to claim 1, It is characterized in that If the first left error rate and / or the first right error rate is greater than the preset error rate, adjusting the angle value of the preset left angle and / or the preset right angle according to the first left error rate and / or the first right error rate includes: If the first left error rate and / or the first right error rate is greater than the preset error rate, determining whether the preset left angle and / or the preset right angle is greater than a dichotomy difference; If it is greater than the dichotomy error rate, the angle value of the preset left angle and / or the preset right angle is adjusted by dichotomy.

7. The method according to claim 6, It is characterized in that After determining whether the preset left angle and / or the preset right angle is greater than the dichotomy error rate if the first left error rate and / or the first right error rate is greater than the preset error rate, the method further includes: If the preset left angle and / or the preset right angle is smaller than the dichotomy error rate, the angle value of the preset left angle and / or the preset right angle is adjusted by a preset adjustment angle.

8. A terminal device, It is characterized in that The terminal device comprises: An acquisition module, used to construct a standard section based on the V-shaped valley terrain data acquired by the surveying and mapping device, and determine the lowest point of the standard section; A drawing module, used for drawing an extension line with a preset left angle and a preset right angle with respect to the vertical direction on both sides of the lowest point, starting from the lowest point; A calculation module, used for inputting the preset left angle and the preset right angle into a preset deepest mud level calculation formula to obtain a first deepest mud level, wherein the preset deepest mud level calculation formula is a function with the angle between the lowest point and both sides of the vertical direction as an independent variable; a first judgment module, configured to calculate the areas of a first left cross-sectional area and a first right cross-sectional area based on the first deepest mud level, and to judge whether a first left error rate between the first left cross-sectional area and an actual left cross-sectional area, and a first right error rate between the first right cross-sectional area and an actual right cross-sectional area are respectively greater than a preset error rate; an adjustment module, configured to adjust the angle value of the preset left angle and / or the preset right angle according to the first left error rate and / or the first right error rate if the first left error rate and / or the first right error rate is greater than the preset error rate; A second judgment module is used to calculate the area of ​​a second left cross-sectional area and / or a second right cross-sectional area based on the angle value of the adjusted preset left angle and / or the preset right angle, and to judge whether a second left error rate between the second left cross-sectional area and the actual left cross-sectional area, and / or a second right error rate between the first right cross-sectional area and the actual right cross-sectional area is greater than the preset error rate; if so, continue to adjust the adjusted preset left angle and / or the preset right angle until the second left error rate and / or the second right error rate are respectively less than the preset error rate.

9. An electronic device, It is characterized in that The electronic device (700) comprises a processor (701), a memory (705), a user interface (703) and a network interface (704), wherein the memory (705) is used to store instructions, the user interface (703) and the network interface (704) are used to communicate with other devices, and the processor (701) is used to execute the instructions stored in the memory (705) so that the electronic device (700) executes the method according to any one of claims 1 to 7.

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores instructions, and when the instructions are executed, the method steps according to any one of claims 1 to 7 are performed.

Citation Information

Patent Citations

  • Novel dynamic numerical debris flow simulation analysis method and system

    CN107506566A

  • Analyzing method and device for debris flow velocity field of natural channel irregular fracture surface

    CN108411844A

  • Method and system for early warning mountain flood debris flow based on steep slope convergence and cross section flow calculation

    CN109345777A

  • Debris flow evolution prediction method based on wave breaking principle

    CN116384266A

  • AU2021105412A4