Property service work order distribution method and system based on semantic analysis and medium

By building prefabricated work order tags in the property management system and using semantic analysis models to automatically match and assign work orders, it solves the problem of low efficiency and problem escalation caused by misunderstanding during the work order dispatch process, and achieves rapid response and efficient resolution. Improved customer satisfaction.

CN118798558APending Publication Date: 2024-10-18SHENZHEN LONGGUANGYUNZHONG INTELLIGENT TECH CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410891745.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

In the existing property management system, there are misunderstandings in the work order dispatch process that cause work orders to flow to the wrong department, resulting in low efficiency, escalation of problems, and increased losses.

Method used

By building pre-made work order labels in the property management system and using the semantic analysis model to output labels, work orders are automatically matched and assigned to corresponding handlers to ensure rapid response and resolution of problems.

Benefits of technology

It effectively improves customer satisfaction, avoids escalation of the situation and aggravation of losses, and improves the efficiency and accuracy of work order processing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118798558A_ABST
    Figure CN118798558A_ABST
Patent Text Reader

Abstract

The invention provides a property service work order distribution method and system based on semantic analysis and a medium, and the method comprises the steps: constructing prefabricated work order labels based on a property management system, carrying out the analysis processing of the prefabricated work order labels, obtaining a processing emergency degree, carrying out the classification of the prefabricated work order labels based on the processing emergency degree, and carrying out the classification of the prefabricated work order labels. Inputting the question submitted by the owner into a semantic model, outputting the meaning of the question based on the semantic model, and matching a processing label based on the meaning of the question; matching the processed label with multiple categories of labels to obtain a matching degree, and judging whether the matching degree is greater than or equal to a set matching degree threshold value or not; if yes, allocating the processing work orders to different processing personnel based on the types of the processing work orders; if yes, establishing a new prefabricated work order label based on the processing label; labels are output through a semantic analysis model, automatic distribution is completed according to the labels, problems submitted by owners are responded and solved more quickly, the customer satisfaction is effectively improved, and event upgrading and loss aggravation are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of property management, and in particular to a method, system and medium for distributing property service work orders based on semantic analysis. Background Art

[0002] The current community APP, mini-programs, and official accounts provide channels for owners to provide feedback. When owners encounter problems, they can enter the problem in text and submit it to the backend. The backend will automatically generate a work order. After seeing the work order, the property manager will manually determine which person should follow up and handle it.

[0003] Prior art A method and system for intelligent dispatching and following orders based on big data, and a storage medium. First, the work order to be dispatched is obtained, then the work order to be dispatched is semantically analyzed to obtain the semantic understanding features of the work order, and then the type label of the undertaking unit is determined based on the semantic understanding features of the work order. In this way, the intervention of staff can be avoided, the process of dispatching and following orders can be automated, and work efficiency and customer satisfaction can be improved.

[0004] However, in the existing technology, personnel are unable to check the dispatch in time, and the deviation in understanding the problem causes the work order to flow to the wrong department. The overall process is inefficient and may lead to the escalation of the problem and increase the loss. In response to the above problems, effective technical solutions are urgently needed. Summary of the invention

[0005] The purpose of the embodiments of the present invention is to provide a property service work order distribution method, system and medium based on semantic analysis. According to the feedback content, labels are output through the semantic analysis model, and automatic distribution is completed according to the labels. Problems submitted by owners are responded to and solved more quickly, which effectively improves customer satisfaction and avoids escalation of the situation and increased losses.

[0006] The embodiment of the present invention also provides a method for distributing property service work orders based on semantic analysis, including:

[0007] Construct prefabrication work order labels based on the property management system, analyze and process the prefabrication work order labels to obtain the processing urgency, and classify the prefabrication work order labels based on the processing urgency to obtain multiple categories of labels;

[0008] Obtain the questions submitted by the owner, input the questions submitted by the owner into the semantic model, output the meaning of the questions based on the semantic model, and match the processing labels based on the meaning of the questions;

[0009] Matching the processed label with labels of multiple categories to obtain a matching degree, and determining whether the matching degree is greater than or equal to a set matching degree threshold;

[0010] If it is greater than or equal to, a processing work order is generated, the type of the processing work order is analyzed, and the processing work order is assigned to different processing personnel based on the type of the processing work order;

[0011] If it is less, a new prefabricated work order tag is created based on the processing tag.

[0012] Optionally, in the method for distributing property service work orders based on semantic analysis described in an embodiment of the present invention, a prefabricated work order label is constructed based on the property management system, and the prefabricated work order label is analyzed and processed to obtain the processing urgency, which specifically includes:

[0013] Inputting prefabricated work order tags on the management webpage of the property management system, wherein the prefabricated work order tags include garbage cleaning, illegal parking in the parking lot, lighting replacement and line inspection;

[0014] Analyze the issues that need to be addressed for each prefabricated work order label based on the prefabricated work order label, and analyze the consequences of the issues that need to be addressed;

[0015] The prefabricated work order tags are divided into emergency situations according to the impact consequences, and the processing urgency corresponding to each prefabricated work order tag is generated.

[0016] Optionally, in the method for distributing property service work orders based on semantic analysis described in an embodiment of the present invention, prefabricated work order labels are classified based on processing urgency to obtain multiple categories of labels, specifically including:

[0017] Perform urgency analysis on the prefabricated workpiece labels, and classify the urgency into levels to obtain multiple processing labels;

[0018] Analyze and process urgency based on prefabricated work order tags;

[0019] Matching the processing urgency with a set emergency interval, where the set emergency interval includes a first interval, a second interval, and a third interval;

[0020] If the processing urgency is in the first range, the prefabricated work order label is determined to be normal;

[0021] If the processing urgency is in the second range, the prefabricated work order tag is determined to be urgent;

[0022] If the processing urgency is in the third interval, the prefabricated work order label is determined to be very urgent;

[0023] If the processing urgency is in two different intervals, the upper and lower limits of the first interval, the second interval or the third interval are adjusted.

[0024] Optionally, in the method for issuing property service work orders based on semantic analysis described in an embodiment of the present invention, obtaining a question submitted by an owner, inputting the question submitted by the owner into a semantic model, outputting the meaning of the question based on the semantic model, and matching and processing tags based on the meaning of the question specifically include:

[0025] Obtain questions submitted by owners, perform voice analysis, grammatical segmentation, and extract core words from the questions submitted by owners;

[0026] Input the questions submitted by the owner into the semantic model, and analyze the meaning or implications of the questions submitted by the owner based on voice analysis, grammatical segmentation, and extraction of core words in the questions;

[0027] Matching pre-made work order tags in the property management system based on the meaning or implications of the owner-submitted issue;

[0028] Match the processing tags according to the prefabricated work order tags.

[0029] Optionally, in the method for distributing property service work orders based on semantic analysis described in an embodiment of the present invention, if it is greater than or equal to, a processing work order is generated, the type of the processing work order is analyzed, and the work order is assigned to different processing personnel based on the type of the processing work order, specifically including:

[0030] Match the processing tag with tags of multiple categories. If the matching degree is greater than the set matching degree threshold, a processing work order is automatically generated based on the processing tag.

[0031] Analyze the types of work orders based on the tag categories;

[0032] Based on the type of work order to be processed, corresponding types of processing personnel are assigned, including cleaning, security or electrician.

[0033] Optionally, in the method for distributing property service work orders based on semantic analysis described in an embodiment of the present invention, if is less than , a new prefabricated work order tag is created based on the processing tag, specifically including:

[0034] Matching the processing tag with tags of multiple categories, if the matching degree is less than a first matching degree threshold, analyzing the work order problem of the processing tag and the meaning of the tag based on the processing tag to create a new prefabricated work order tag;

[0035] Update the new prefabrication work order label to the property management system's management webpage;

[0036] If the matching degree is greater than the first matching degree threshold and less than the second matching degree threshold, then analyzing the similarity between the meaning of the processing tag and the existing prefabricated work order tag categories in the current management webpage based on the processing tag;

[0037] Based on the similarity, the processing tag is assigned to the prefabricated work order tag category whose similarity is greater than the set similarity threshold.

[0038] In a second aspect, an embodiment of the present invention provides a property service work order dispatching system based on semantic analysis, the system comprising: a memory and a processor, the memory comprising a program of a property service work order dispatching method based on semantic analysis, and the program of the property service work order dispatching method based on semantic analysis is executed by the processor to implement the following steps:

[0039] Construct prefabrication work order labels based on the property management system, analyze and process the prefabrication work order labels to obtain the processing urgency, and classify the prefabrication work order labels based on the processing urgency to obtain multiple categories of labels;

[0040] Obtain the questions submitted by the owner, input the questions submitted by the owner into the semantic model, output the meaning of the questions based on the semantic model, and match the processing labels based on the meaning of the questions;

[0041] Matching the processed label with labels of multiple categories to obtain a matching degree, and determining whether the matching degree is greater than or equal to a set matching degree threshold;

[0042] If it is greater than or equal to, a processing work order is generated, the type of the processing work order is analyzed, and the processing work order is assigned to different processing personnel based on the type of the processing work order;

[0043] If it is less, a new prefabricated work order tag is created based on the processing tag.

[0044] Optionally, in the property service work order dispatching system based on semantic analysis described in the embodiment of the present invention, a prefabricated work order label is constructed based on the property management system, and the prefabricated work order label is analyzed and processed to obtain the processing urgency, which specifically includes:

[0045] Inputting prefabricated work order tags on the management webpage of the property management system, wherein the prefabricated work order tags include garbage cleaning, illegal parking in the parking lot, lighting replacement and line inspection;

[0046] Analyze the issues that need to be addressed for each prefabricated work order label based on the prefabricated work order label, and analyze the consequences of the issues that need to be addressed;

[0047] The prefabricated work order tags are divided into emergency situations according to the impact consequences, and the processing urgency corresponding to each prefabricated work order tag is generated.

[0048] Optionally, in the property service work order dispatching system based on semantic analysis described in the embodiment of the present invention, the prefabricated work order labels are classified based on the processing urgency to obtain multiple categories of labels, specifically including:

[0049] Perform urgency analysis on the prefabricated workpiece labels, and classify the urgency into levels to obtain multiple processing labels;

[0050] Analyze and process urgency based on prefabricated work order tags;

[0051] Matching the processing urgency with a set emergency interval, where the set emergency interval includes a first interval, a second interval, and a third interval;

[0052] If the processing urgency is in the first range, the prefabricated work order label is determined to be normal;

[0053] If the processing urgency is in the second range, the prefabricated work order tag is determined to be urgent;

[0054] If the processing urgency is in the third interval, the prefabricated work order label is determined to be very urgent;

[0055] If the processing urgency is in two different intervals, the upper and lower limits of the first interval, the second interval or the third interval are adjusted.

[0056] In the third aspect, an embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium includes a property service work order dispatching method program based on semantic analysis. When the property service work order dispatching method program based on semantic analysis is executed by a processor, the steps of the property service work order dispatching method based on semantic analysis as described in any one of the above items are implemented.

[0057] As can be seen from the above, an embodiment of the present invention provides a method, system and medium for distributing property service work orders based on semantic analysis. Prefabricated work order labels are constructed based on the property management system, and the prefabricated work order labels are analyzed and processed to obtain the processing urgency. The prefabricated work order labels are classified based on the processing urgency to obtain labels of multiple categories; the owner submits the problem, and the owner submits the problem into a semantic model, and the problem meaning is output based on the semantic model, and the processing label is matched based on the problem meaning; the processing label is matched with labels of multiple categories to obtain a matching degree, and it is determined whether the matching degree is greater than or equal to a set matching degree threshold; if it is greater than or equal to, a processing work order is generated, the type of processing work order is analyzed, and it is assigned to different processing personnel based on the type of processing work order; if it is less than, a new prefabricated work order label is established based on the processing label; according to the feedback content, the label is output through the semantic analysis model, and automatic distribution is completed according to the label, so that the owner's submitted problems can be responded to and solved more quickly, which effectively improves customer satisfaction, avoids escalation of the situation, and aggravates losses. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments of the present invention are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0059] Figure 1 A flowchart of a method for distributing property service work orders based on semantic analysis provided in an embodiment of the present invention;

[0060] Figure 2 A flowchart of processing urgency analysis of a property service work order dispatching method based on semantic analysis provided in an embodiment of the present invention;

[0061] Figure 3 A flow chart of a label classification method for a property service work order dispatching method based on semantic analysis provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0062] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents the selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present invention.

[0063] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0064] Please refer to Figure 1 , Figure 1 The flowchart of a method for distributing a property service work order based on semantic analysis in some embodiments of the present invention. The method for distributing a property service work order based on semantic analysis is used in a terminal device, and the method for distributing a property service work order based on semantic analysis includes the following steps:

[0065] S101, constructing a prefabrication work order label based on the property management system, analyzing and processing the prefabrication work order label to obtain a processing urgency, and classifying the prefabrication work order label based on the processing urgency to obtain labels of multiple categories;

[0066] S102, obtaining the question submitted by the owner, inputting the question submitted by the owner into a semantic model, outputting the meaning of the question based on the semantic model, and matching and processing tags based on the meaning of the question;

[0067] S103, matching the processed tag with tags of multiple categories to obtain a matching degree, and determining whether the matching degree is greater than or equal to a set matching degree threshold;

[0068] S104, if it is greater than or equal to, then generate a processing work order, analyze the type of the processing work order, and assign it to different processing personnel based on the type of the processing work order;

[0069] S105: If it is less than, create a new prefabricated work order tag based on the processing tag.

[0070] It should be noted that by inputting the prefabricated work order label into the property management system, the semantics of the problem submitted by the owner is analyzed through the semantic model to match the processing label with the prefabricated work order label, thereby generating a matching processing work order, improving processing efficiency and property management quality.

[0071] Please refer to Figure 2 , Figure 2 The flowchart of the processing urgency analysis of a property service work order dispatching method based on semantic analysis in some embodiments of the present invention is as follows. According to an embodiment of the present invention, a prefabricated work order label is constructed based on a property management system, and the prefabricated work order label is analyzed and processed to obtain the processing urgency, which specifically includes:

[0072] S201, inputting prefabricated work order tags on the management webpage of the property management system, where the prefabricated work order tags include garbage cleaning, illegal parking in the parking lot, lighting replacement and line inspection;

[0073] S202, analyzing the problems that need to be solved for each prefabricated work order label according to the prefabricated work order label, and analyzing the impact and consequences of the problems that need to be solved;

[0074] S203, classifying the prefabricated work order labels into emergency situations according to the impact consequences, and generating a processing urgency corresponding to each prefabricated work order label.

[0075] It should be noted that the processing urgency of the prefabricated work order tag is generated by analyzing the problems that need to be processed by the prefabricated work order tag of the management webpage and classifying the emergency situations by analyzing the impact of the problems.

[0076] Please refer to Figure 3 , Figure 3 The flowchart is a label classification method of a property service work order distribution method based on semantic analysis in some embodiments of the present invention. According to an embodiment of the present invention, the prefabricated work order labels are classified based on the processing urgency to obtain multiple categories of labels, specifically including:

[0077] S301, analyzing the urgency of the prefabricated workpiece labels, and classifying the urgency into levels to obtain a plurality of processing labels;

[0078] S302, analyzing and processing urgency based on prefabricated work order labels;

[0079] S303, matching the processing urgency with a set emergency interval, where the set emergency interval includes a first interval, a second interval, and a third interval;

[0080] S304, if the processing urgency is in the first range, the prefabricated work order label is determined to be normal, if the processing urgency is in the second range, the prefabricated work order label is determined to be urgent, and if the processing urgency is in the third range, the prefabricated work order label is determined to be very urgent;

[0081] S305: If the processing urgency is in two different intervals, the upper and lower limits of the first interval, the second interval or the third interval are adjusted.

[0082] It should be noted that different emergency processing levels establish different urgency labels, thereby matching different prefabricated work order labels, establishing different work orders and assigning them to different processing personnel to improve processing efficiency.

[0083] According to an embodiment of the present invention, obtaining a question submitted by an owner, inputting the question submitted by the owner into a semantic model, outputting the meaning of the question based on the semantic model, and matching and processing tags based on the meaning of the question specifically include:

[0084] Obtain questions submitted by owners, perform voice analysis, grammatical segmentation, and extract core words from the questions submitted by owners;

[0085] Input the questions submitted by the owner into the semantic model, and analyze the meaning or implications of the questions submitted by the owner based on voice analysis, grammatical segmentation, and extraction of core words in the questions;

[0086] Matching pre-made work order tags in the property management system based on the meaning or implications of the owner-submitted issue;

[0087] Match the processing tags according to the prefabricated work order tags.

[0088] It should be noted that the semantic model is used to perform semantic analysis on the issues submitted by the owner to obtain the meaning and implications of the issues that the business needs to deal with, thereby matching the prefabricated work order labels.

[0089] Specifically, natural language processing is performed based on the issues submitted by the owner. Natural language processing includes word segmentation, part-of-speech tagging, syntactic analysis, etc. The confidence level corresponding to the issue submitted by the owner and the prefabricated work order label is output through a language model such as RNN. The urgency of the issue submitted by the business is analyzed by analyzing the confidence level. For example, when the confidence level is 0.65, the urgency of the issue submitted by the owner is determined to be general; when the confidence level is 0.7, the urgency of the issue submitted by the owner is determined to be urgent; and when the confidence level is 0.9, the urgency of the issue submitted by the owner is determined to be very urgent.

[0090] According to an embodiment of the present invention, if it is greater than or equal to, a processing work order is generated, the type of the processing work order is analyzed, and the processing work order is assigned to different processing personnel based on the type of the processing work order, specifically including:

[0091] Match the processing tag with tags of multiple categories. If the matching degree is greater than the set matching degree threshold, a processing work order is automatically generated based on the processing tag.

[0092] Analyze the types of work orders based on the tag categories;

[0093] Based on the type of work order to be processed, corresponding types of processing personnel are assigned, including cleaning, security or electrician.

[0094] It should be noted that by analyzing the matching degree between the processing tag and the tag category, a processing work order is established, and then the type of the work order is analyzed and assigned to the corresponding processing personnel to improve processing efficiency.

[0095] According to an embodiment of the present invention, if less than, a new prefabricated work order tag is created based on the processing tag, specifically including:

[0096] Matching the processing tag with tags of multiple categories, if the matching degree is less than a first matching degree threshold, analyzing the work order problem of the processing tag and the meaning of the tag based on the processing tag to create a new prefabricated work order tag;

[0097] Update the new prefabrication work order label to the property management system's management webpage;

[0098] If the matching degree is greater than the first matching degree threshold and less than the second matching degree threshold, then analyzing the similarity between the meaning of the processing tag and the existing prefabricated work order tag categories in the current management webpage based on the processing tag;

[0099] Based on the similarity, the processing tag is assigned to the prefabricated work order tag category whose similarity is greater than the set similarity threshold.

[0100] It should be noted that by analyzing the owner's problem, it is determined whether the prefabricated work order label meets the processing effect of the owner's problem, so as to establish a new prefabricated work order label or assign the work order problem to a similar prefabricated work order label based on the matching degree and processing effect, thereby improving the processing efficiency of the owner's problem.

[0101] According to an embodiment of the present invention, the method further includes: marking the historical feedback issues with prefabricated work order labels;

[0102] Input the labeled data into the open source text classification model for training. After training, deploy the model to the server and obtain the API interface.

[0103] After the owner submits the question, it is first judged by the semantic model, and the model outputs the label: After the owner submits the text question through the APP channel, the text is transmitted to the model through the API for judgment, and the model outputs the label corresponding to the text;

[0104] The backend automatically generates work orders and automatically dispatches them to the processing personnel based on the tags;

[0105] It should be noted that the problems reported in history are marked with prefabricated work order labels. For example, the green belt at the elevator entrance of Building A is not cleaned well enough and often emits a foul smell, which is disgusting, so it is marked as garbage cleaning and urgent. For example, the entrance and exit of the underground garage in Building B smells so bad, so please check it out quickly, and mark it as garbage cleaning and urgent. The mapping relationship between labels and handlers is configured in the background in advance. After the work order is automatically generated, it is automatically distributed to the APP account of the handler (such as cleaner A) according to labels such as garbage cleaning.

[0106] In a second aspect, an embodiment of the present invention provides a property service work order dispatching system based on semantic analysis, the system comprising: a memory and a processor, the memory comprising a program of a property service work order dispatching method based on semantic analysis, and when the program of the property service work order dispatching method based on semantic analysis is executed by the processor, the following steps are implemented:

[0107] Construct prefabrication work order labels based on the property management system, analyze and process the prefabrication work order labels to obtain the processing urgency, and classify the prefabrication work order labels based on the processing urgency to obtain multiple categories of labels;

[0108] Obtain the questions submitted by the owner, input the questions submitted by the owner into the semantic model, output the meaning of the questions based on the semantic model, and match the processing labels based on the meaning of the questions;

[0109] Matching the processed label with labels of multiple categories to obtain a matching degree, and determining whether the matching degree is greater than or equal to a set matching degree threshold;

[0110] If it is greater than or equal to, a processing work order is generated, the type of the processing work order is analyzed, and the processing work order is assigned to different processing personnel based on the type of the processing work order;

[0111] If it is less, a new prefabricated work order tag is created based on the processing tag.

[0112] It should be noted that by inputting the prefabricated work order label into the property management system, the semantics of the problem submitted by the owner is analyzed through the semantic model to match the processing label with the prefabricated work order label, thereby generating a matching processing work order, improving processing efficiency and property management quality.

[0113] According to an embodiment of the present invention, a prefabricated work order label is constructed based on a property management system, and the prefabricated work order label is analyzed and processed to obtain the processing urgency, which specifically includes:

[0114] Input prefabricated work order tags on the management webpage of the property management system. The prefabricated work order tags include garbage cleaning, illegal parking in the parking lot, lighting replacement and line inspection;

[0115] Analyze the issues that need to be addressed for each prefabricated work order label based on the prefabricated work order label, and analyze the consequences of the issues that need to be addressed;

[0116] The prefabricated work order tags are divided into emergency situations according to the impact consequences, and the processing urgency corresponding to each prefabricated work order tag is generated.

[0117] It should be noted that the processing urgency of the prefabricated work order tag is generated by analyzing the problems that need to be processed by the prefabricated work order tag of the management webpage and classifying the emergency situations by analyzing the impact of the problems.

[0118] According to an embodiment of the present invention, the prefabricated work order labels are classified based on the processing urgency to obtain multiple categories of labels, specifically including:

[0119] Perform urgency analysis on the prefabricated workpiece labels, and classify the urgency into levels to obtain multiple processing labels;

[0120] Analyze and process urgency based on prefabricated work order tags;

[0121] Matching the processing urgency with a set emergency interval, where the set emergency interval includes a first interval, a second interval, and a third interval;

[0122] If the processing urgency is in the first range, the prefabricated work order label is determined to be normal;

[0123] If the processing urgency is in the second range, the prefabricated work order tag is determined to be urgent;

[0124] If the processing urgency is in the third interval, the prefabricated work order label is determined to be very urgent;

[0125] If the processing urgency is in two different intervals, the upper and lower limits of the first interval, the second interval or the third interval are adjusted.

[0126] It should be noted that different emergency processing levels establish different urgency labels, thereby matching different prefabricated work order labels, establishing different work orders and assigning them to different processing personnel to improve processing efficiency.

[0127] According to an embodiment of the present invention, obtaining a question submitted by an owner, inputting the question submitted by the owner into a semantic model, outputting the meaning of the question based on the semantic model, and matching and processing tags based on the meaning of the question specifically include:

[0128] Obtain questions submitted by owners, perform voice analysis, grammatical segmentation, and extract core words from the questions submitted by owners;

[0129] Input the questions submitted by the owner into the semantic model, and analyze the meaning or implications of the questions submitted by the owner based on voice analysis, grammatical segmentation, and extraction of core words in the questions;

[0130] Matching pre-made work order tags in the property management system based on the meaning or implications of the owner-submitted issue;

[0131] Match the processing tags according to the prefabricated work order tags.

[0132] It should be noted that the semantic model is used to perform semantic analysis on the issues submitted by the owner to obtain the meaning and implications of the issues that the business needs to deal with, thereby matching the prefabricated work order labels.

[0133] Specifically, natural language processing is performed based on the issues submitted by the owner. Natural language processing includes word segmentation, part-of-speech tagging, syntactic analysis, etc. The confidence level corresponding to the issue submitted by the owner and the prefabricated work order label is output through a language model such as RNN. The urgency of the issue submitted by the business is analyzed by analyzing the confidence level. For example, when the confidence level is 0.65, the urgency of the issue submitted by the owner is determined to be general; when the confidence level is 0.7, the urgency of the issue submitted by the owner is determined to be urgent; and when the confidence level is 0.9, the urgency of the issue submitted by the owner is determined to be very urgent.

[0134] According to an embodiment of the present invention, if it is greater than or equal to, a processing work order is generated, the type of the processing work order is analyzed, and the processing work order is assigned to different processing personnel based on the type of the processing work order, specifically including:

[0135] Match the processing tag with tags of multiple categories. If the matching degree is greater than the set matching degree threshold, a processing work order is automatically generated based on the processing tag.

[0136] Analyze the types of work orders based on the tag categories;

[0137] Based on the type of work order to be processed, corresponding types of processing personnel are assigned, including cleaning, security or electrician.

[0138] It should be noted that by analyzing the matching degree between the processing tag and the tag category, a processing work order is established, and then the type of the work order is analyzed and assigned to the corresponding processing personnel to improve processing efficiency.

[0139] According to an embodiment of the present invention, if less than, a new prefabricated work order tag is created based on the processing tag, specifically including:

[0140] Matching the processing tag with tags of multiple categories, if the matching degree is less than a first matching degree threshold, analyzing the work order problem of the processing tag and the meaning of the tag based on the processing tag to create a new prefabricated work order tag;

[0141] Update the new prefabrication work order label to the property management system's management webpage;

[0142] If the matching degree is greater than the first matching degree threshold and less than the second matching degree threshold, then analyzing the similarity between the meaning of the processing tag and the existing prefabricated work order tag categories in the current management webpage based on the processing tag;

[0143] Based on the similarity, the processing tag is assigned to the prefabricated work order tag category whose similarity is greater than the set similarity threshold.

[0144] It should be noted that by analyzing the owner's problem, it is determined whether the prefabricated work order label meets the processing effect of the owner's problem, so as to establish a new prefabricated work order label or assign the work order problem to a similar prefabricated work order label based on the matching degree and processing effect, thereby improving the processing efficiency of the owner's problem.

[0145] According to an embodiment of the present invention, the method further includes: marking the historical feedback issues with prefabricated work order labels;

[0146] Input the labeled data into the open source text classification model for training. After training, deploy the model to the server and obtain the API interface.

[0147] After the owner submits the question, it is first judged by the semantic model, and the model outputs the label: After the owner submits the text question through the APP channel, the text is transmitted to the model through the API for judgment, and the model outputs the label corresponding to the text;

[0148] The backend automatically generates work orders and automatically dispatches them to the processing personnel based on the tags;

[0149] It should be noted that the problems reported in history are marked with prefabricated work order labels. For example, the green belt at the elevator entrance of Building A is not cleaned well enough and often emits a foul smell, which is disgusting, so it is marked as garbage cleaning and urgent. For example, the entrance and exit of the underground garage in Building B smells so bad, so please check it out quickly, and mark it as garbage cleaning and urgent. The mapping relationship between labels and handlers is configured in the background in advance. After the work order is automatically generated, it is automatically distributed to the APP account of the handler (such as cleaner A) according to labels such as garbage cleaning.

[0150] The third aspect of the present invention provides a computer-readable storage medium, which includes a property service work order dispatching method program based on semantic analysis. When the property service work order dispatching method program based on semantic analysis is executed by a processor, the steps of the property service work order dispatching method based on semantic analysis as described above are implemented.

[0151] The present invention discloses a property service work order distribution method, system and medium based on semantic analysis. Prefabricated work order labels are constructed based on a property management system, and the prefabricated work order labels are analyzed and processed to obtain processing urgency, and the prefabricated work order labels are classified based on the processing urgency to obtain labels of multiple categories; the owner submits the problem, inputs the owner submits the problem into a semantic model, outputs the problem meaning based on the semantic model, and matches the processing label based on the problem meaning; the processing label is matched with labels of multiple categories to obtain a matching degree, and it is determined whether the matching degree is greater than or equal to a set matching degree threshold; if it is greater than or equal to, a processing work order is generated, the type of the processing work order is analyzed, and the work order is assigned to different processing personnel based on the type of the processing work order; if it is less than, a new prefabricated work order label is established based on the processing label; according to the feedback content, the label is output through the semantic analysis model, and automatic distribution is completed according to the label, so that the owner submits the problem and is responded to and solved more quickly, which effectively improves customer satisfaction, avoids escalation of the situation, and aggravates losses.

[0152] In the several embodiments provided by the present invention, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are only schematic. For example, the division of units is only a logical function division. There may be other division methods in actual implementation, such as: multiple units or components can be combined, or can be integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the components shown or discussed can be through some interfaces, and the indirect coupling or communication connection of devices or units can be electrical, mechanical or other forms.

[0153] The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units; they may be located in one place or distributed on multiple network units; some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0154] In addition, all functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may be separately used as a unit, or two or more units may be integrated into one unit; the above-mentioned integrated units may be implemented in the form of hardware or in the form of hardware plus software functional units.

[0155] Those skilled in the art can understand that all or part of the steps of implementing the above method embodiments can be completed by hardware related to program instructions, and the aforementioned program can be stored in a readable storage medium. When the program is executed, it executes the steps of the above method embodiments; and the aforementioned storage medium includes: mobile storage devices, read-only memories (ROM, Read-Only Memory), random access memories (RAM, Random Access Memory), disks or optical disks, and other media that can store program codes.

[0156] Alternatively, if the above-mentioned integrated unit of the present invention is implemented in the form of a software function module and sold or used as an independent product, it can also be stored in a readable storage medium. Based on this understanding, the technical solution of the embodiment of the present invention can be essentially or partly reflected in the form of a software product that contributes to the prior art. The software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute all or part of the methods described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as mobile storage devices, ROM, RAM, magnetic disks or optical disks.

Claims

1. A method for distributing property service work orders based on semantic analysis. It is characterized in that include: Construct prefabrication work order labels based on the property management system, analyze and process the prefabrication work order labels to obtain the processing urgency, and classify the prefabrication work order labels based on the processing urgency to obtain multiple categories of labels; Obtain the questions submitted by the owner, input the questions submitted by the owner into the semantic model, output the meaning of the questions based on the semantic model, and match the processing labels based on the meaning of the questions; Matching the processed label with labels of multiple categories to obtain a matching degree, and determining whether the matching degree is greater than or equal to a set matching degree threshold; If it is greater than or equal to, a processing work order is generated, the type of the processing work order is analyzed, and the processing work order is assigned to different processing personnel based on the type of the processing work order; If it is less, a new prefabricated work order tag is created based on the processing tag.

2. According to the method for distributing property service work orders based on semantic analysis according to claim 1, It is characterized in that Based on the property management system, prefabrication work order labels are constructed, and the prefabrication work order labels are analyzed and processed to obtain the processing urgency, including: Inputting prefabricated work order tags on the management webpage of the property management system, wherein the prefabricated work order tags include garbage cleaning, illegal parking in the parking lot, lighting replacement and line inspection; Analyze the issues that need to be addressed for each prefabricated work order label based on the prefabricated work order label, and analyze the consequences of the issues that need to be addressed; The prefabricated work order tags are divided into emergency situations according to the impact consequences, and the processing urgency corresponding to each prefabricated work order tag is generated.

3. According to the method for distributing property service work orders based on semantic analysis according to claim 2, It is characterized in that The prefabricated work order labels are classified based on the processing urgency to obtain multiple categories of labels, including: Perform urgency analysis on the prefabricated workpiece labels, and classify the urgency into levels to obtain multiple processing labels; Analyze and process urgency based on prefabricated work order tags; Matching the processing urgency with a set emergency interval, where the set emergency interval includes a first interval, a second interval, and a third interval; If the processing urgency is in the first range, the prefabricated work order label is determined to be normal; If the processing urgency is in the second range, the prefabricated work order tag is determined to be urgent; If the processing urgency is in the third interval, the prefabricated work order label is determined to be very urgent; If the processing urgency is in two different intervals, the upper and lower limits of the first interval, the second interval or the third interval are adjusted.

4. According to the method for distributing property service work orders based on semantic analysis according to claim 3, It is characterized in that Obtain the questions submitted by the owner, input the questions submitted by the owner into the semantic model, output the meaning of the questions based on the semantic model, and match and process the labels based on the meaning of the questions, including: Obtain questions submitted by owners, perform voice analysis, grammatical segmentation, and extract core words from the questions submitted by owners; Input the questions submitted by the owner into the semantic model, and analyze the meaning or implications of the questions submitted by the owner based on voice analysis, grammatical segmentation, and extraction of core words in the questions; Matching pre-made work order tags in the property management system based on the meaning or implications of the owner-submitted issue; Match the processing tag according to the pre-made work order tag.

5. According to the method for distributing property service work orders based on semantic analysis according to claim 4, It is characterized in that If it is greater than or equal to, a processing work order is generated, the type of processing work order is analyzed, and different processing personnel are assigned based on the type of processing work order, including: Match the processing tag with tags of multiple categories. If the matching degree is greater than the set matching degree threshold, a processing work order is automatically generated based on the processing tag. Analyze the types of work orders based on the tag categories; Based on the type of work order to be processed, corresponding types of processing personnel are assigned, including cleaning, security or electrician.

6. According to the method for distributing property service work orders based on semantic analysis according to claim 5, It is characterized in that If it is less than, a new prefabricated work order tag is created based on the processing tag, including: Matching the processing tag with tags of multiple categories, if the matching degree is less than a first matching degree threshold, analyzing the work order problem of the processing tag and the meaning of the tag based on the processing tag to create a new prefabricated work order tag; Update the new prefabrication work order label to the property management system's management webpage; If the matching degree is greater than the first matching degree threshold and less than the second matching degree threshold, then analyzing the similarity between the meaning of the processing tag and the existing prefabricated work order tag categories in the current management webpage based on the processing tag; Based on the similarity, the processing tag is assigned to the prefabricated work order tag category whose similarity is greater than the set similarity threshold.

7. A property service work order distribution system based on semantic analysis, It is characterized in that The system includes: a memory and a processor, wherein the memory includes a program of a method for distributing property service work orders based on semantic analysis, and when the program of the method for distributing property service work orders based on semantic analysis is executed by the processor, the following steps are implemented: Construct prefabrication work order labels based on the property management system, analyze and process the prefabrication work order labels to obtain the processing urgency, and classify the prefabrication work order labels based on the processing urgency to obtain multiple categories of labels; Obtain the questions submitted by the owner, input the questions submitted by the owner into the semantic model, output the meaning of the questions based on the semantic model, and match the processing labels based on the meaning of the questions; Matching the processed label with labels of multiple categories to obtain a matching degree, and determining whether the matching degree is greater than or equal to a set matching degree threshold; If it is greater than or equal to, a processing work order is generated, the type of the processing work order is analyzed, and the processing work order is assigned to different processing personnel based on the type of the processing work order; If it is less, a new prefabricated work order tag is created based on the processing tag.

8. According to the property service work order distribution system based on semantic analysis according to claim 7, It is characterized in that Based on the property management system, prefabrication work order labels are constructed, and the prefabrication work order labels are analyzed and processed to obtain the processing urgency, including: Inputting prefabricated work order tags on the management webpage of the property management system, wherein the prefabricated work order tags include garbage cleaning, illegal parking in the parking lot, lighting replacement and line inspection; Analyze the issues that need to be addressed for each prefabricated work order label based on the prefabricated work order label, and analyze the consequences of the issues that need to be addressed; The prefabricated work order tags are divided into emergency situations according to the impact consequences, and the processing urgency corresponding to each prefabricated work order tag is generated.

9. According to the property service work order distribution system based on semantic analysis according to claim 8, It is characterized in that The prefabricated work order labels are classified based on the processing urgency to obtain multiple categories of labels, including: Perform urgency analysis on the prefabricated workpiece labels, and classify the urgency into levels to obtain multiple processing labels; Analyze and process urgency based on prefabricated work order tags; Matching the processing urgency with a set emergency interval, where the set emergency interval includes a first interval, a second interval, and a third interval; If the processing urgency is in the first range, the prefabricated work order label is determined to be normal; If the processing urgency is in the second range, the prefabricated work order tag is determined to be urgent; If the processing urgency is in the third interval, the prefabricated work order label is determined to be very urgent; If the processing urgency is in two different intervals, the upper and lower limits of the first interval, the second interval or the third interval are adjusted.

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium includes a property service work order dispatching method program based on semantic analysis. When the property service work order dispatching method program based on semantic analysis is executed by a processor, the steps of the property service work order dispatching method based on semantic analysis as described in any one of claims 1 to 6 are implemented.

Citation Information

Cited By

  • Work order management method and device based on AI analysis, equipment and storage medium

    CN120106438A

  • Work order management methods, devices, equipment, and storage media based on AI analysis

    CN120106438B

  • Business work order processing method and system and electronic equipment

    CN121616054A