Electric power inspection scheduling method and system based on artificial intelligence
Through the power inspection and dispatching method based on artificial intelligence, the inspection intervals and regional divisions are dynamically adjusted, which solves the problem of low response efficiency in traditional power inspection and dispatching, improves the safety and stability of the power system, and reduces the risk of failure.
Patent Information
- Application Number
- CN202411290744.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In complex geographical structures and expanded power inspection areas, traditional power line inspection schedules are random and difficult to respond to sudden failures efficiently, resulting in low maintenance efficiency. Especially when the load is at different periods, the inspection routes and When the area remains unchanged, the failure probability is high.
Adopt an artificial intelligence-based power inspection dispatching method to obtain parameter data of power equipment by establishing an artificial intelligence dispatch model, conduct fault prediction analysis, dynamically adjust inspection interval thresholds, predict maintenance nodes, optimize inspection routes and area divisions, and ensure Frequent inspections during high-risk periods.
It improves the safety and stability of the power system, reduces the risk of accidents, and improves the ability to efficiently maintain power equipment by dynamically adjusting inspection intervals and regional divisions.
Smart Images

Figure CN118798607A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data exchange, and in particular to an artificial intelligence-based electric power inspection and dispatching method and system. Background Art
[0002] Power lines are the main framework of the power grid. Their operation requires safety and reliability. Therefore, the inspection and maintenance of transmission lines have become the basic work to ensure reliable power supply of the power grid. At present, the inspection of power lines is generally issued by the person in charge of the power supply area. The dispatch of inspection vehicles is based on years of work experience and has a strong randomness. In the context of the complex geographical structure of the power grid and the increasing expansion of the inspection area, it is often difficult to achieve efficient response. The load of power equipment is different at different times. If the inspection route and area remain unchanged, when the probability of power equipment failure is high, the inspection team responsible for the area will not be efficient in repairing sudden failures. Therefore, an artificial intelligence-based power inspection scheduling method and system are proposed. Summary of the invention
[0003] The purpose of the present invention is to provide an artificial intelligence-based power inspection and dispatching method and system to solve the problems raised in the above-mentioned background technology.
[0004] In order to solve the above technical problems, one of the purposes of the present invention is to provide an artificial intelligence-based power inspection and dispatching method, comprising the following steps: S1. Establish an artificial intelligence dispatching model to obtain the inspection area that the power inspection team is responsible for, and extract parameter data of power equipment in the inspection area; S2. Perform operational fault prediction analysis on power equipment based on historical parameter data, and adjust the power equipment in the inspection area from normal to risk in the corresponding period according to the prediction analysis results; S3, setting each power equipment as a maintenance point, and then making a time prediction based on the inspection route of the power inspection team to obtain the predicted maintenance node when the power inspection team arrives at the maintenance point; S4, set the inspection interval threshold, and then dynamically adjust the inspection interval threshold according to the risk status set in S2, and then the prediction maintenance node corresponding to the power equipment combines the inspection interval threshold to perform time detection. When the interval time between two adjacent prediction maintenance nodes is greater than the inspection interval threshold, inspection scheduling is performed through S5; S5. Obtain the abnormal inspection area that needs inspection scheduling, and then divide the normal power equipment in the abnormal inspection area into adjacent inspection areas for inspection time compression detection, so as to update the time detection result of S4.
[0005] As a further improvement of the present technical solution, S1 is connected to the power inspection system and then establishes an artificial intelligence scheduling model. The artificial intelligence scheduling model sends information to the power inspection team in the power inspection system and collects the inspection routes uploaded by the power inspection team.
[0006] As a further improvement of the technical solution, S1 obtains the list of power inspection teams in the power inspection system, obtains the inspection area that each power inspection team is responsible for, and then extracts the parameter data uploaded by each power device.
[0007] As a further improvement of the technical solution, the steps of S2 are as follows: S2.1. Extract the historical parameter data uploaded by the power equipment, and then predict the power consumption trend of the power equipment based on the historical parameter data to obtain the power consumption peak value corresponding to different time periods of the power equipment; S2.2. Analyze the operational risk level of power equipment by combining its performance with the peak power consumption. Set a risk peak for each power equipment. When the peak power consumption exceeds the risk peak, the power equipment is judged to be adjusted from a normal state to a risky state. The higher the value exceeding the risk threshold, the greater the risk factor.
[0008] As a further improvement of the technical solution, the steps of S3 are as follows: S3.1. Set up maintenance points according to the location of each power equipment in the inspection area; S3.2. Extract the inspection route uploaded by the power inspection team, and extract the real-time location of the power inspection team at the same time. Then, predict the arrival time of the maintenance point based on the real-time location of the power inspection team and the inspection route, and obtain the predicted maintenance node when the power inspection team arrives at each maintenance point.
[0009] As a further improvement of the technical solution, the step of S4 is as follows: S4.1, set the inspection interval threshold, and then dynamically adjust it according to the risk factor obtained in S2.2. The higher the risk factor, the shorter the inspection interval threshold; S4.2. Combine the predicted maintenance nodes to detect the inspection interval of each maintenance point, obtain the inspection interval between the predicted maintenance nodes corresponding to the maintenance point in different time periods, and then compare the inspection interval with the inspection interval threshold corresponding to the maintenance point. When the inspection interval is less than the inspection interval threshold, continue monitoring. Conversely, when the inspection interval is greater than the inspection interval threshold, mark the inspection area to which the maintenance point belongs as an abnormal inspection area and send it to S5.
[0010] As a further improvement of the technical solution, the step of S5 is as follows: S5.1, receiving the abnormal inspection area sent by S4.2, and then extracting the adjacent inspection areas of the abnormal inspection area; S5.2. Divide the normal power equipment in the inspection area into adjacent inspection areas, expand the adjacent inspection areas, and update the inspection routes and inspection intervals. When the adjacent inspection areas after the update are not marked as abnormal, continue to divide the normal power equipment into the adjacent inspection areas until the inspection interval corresponding to the abnormal inspection area meets the requirements of S4.2, and remove the abnormal inspection area mark.
[0011] As a further improvement of the present technical solution, when dividing normal power equipment into adjacent inspection areas, S5.2 gives priority to dividing the normal power equipment closest to the adjacent inspection area.
[0012] The second object of the present invention is to provide an artificial intelligence-based power inspection and dispatching system, including any one of the artificial intelligence-based power inspection and dispatching methods described above, including a model building unit, an operation prediction unit, and a region division unit; The model building unit is used to build an artificial intelligence dispatching model and simultaneously obtain parameters of the power inspection team, the inspection area, and the power equipment; The operation prediction unit is used to perform operation fault prediction analysis on the power equipment, complete the risk adjustment of the power equipment, and then the power inspection team corresponds to the prediction maintenance node of each power equipment; The area division unit is used to set the inspection interval threshold, and perform time detection in combination with the predicted maintenance node, and divide the abnormal inspection area into areas according to the detection results, so that the abnormal inspection area eliminates the abnormal mark.
[0013] Compared with the prior art, the present invention has the following beneficial effects: by comparing the interval time of predicted maintenance nodes in different time periods, the interval time of each maintenance point is obtained, which is convenient for planning subsequent power inspection and scheduling, and then by dividing the normal power equipment into adjacent inspection areas in the abnormal inspection area, the interval time of the maintenance points in the abnormal inspection area is adjusted, so that when the power equipment is at high risk, it can be frequently inspected, thereby improving the safety and stability of the power system and reducing the risk of accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is the overall flow chart of the present invention; Figure 2 A flowchart of obtaining the peak power consumption of power equipment at different time periods according to the present invention; Figure 3 A flowchart for obtaining a predicted maintenance section for the power inspection team to arrive at each maintenance point for the present invention; Figure 4A flowchart of marking the inspection area to which the maintenance point belongs as an abnormal inspection area in the present invention; Figure 5 The structural principle diagram of the unit for model building of the present invention.
[0015] The meaning of each number in the figure is: 10. Model building unit; 20. Operation prediction unit; 30. Area division unit. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] like Figure 1-Figure 5 As shown, one of the purposes of the present invention is to provide an artificial intelligence-based power inspection and dispatching method, comprising the following steps: S1. Establish an artificial intelligence dispatching model to obtain the inspection area that the power inspection team is responsible for, and extract parameter data of power equipment in the inspection area; S1 is connected to the power inspection system and then establishes an artificial intelligence dispatching model. The artificial intelligence dispatching model sends information to the power inspection team in the power inspection system and collects the inspection routes uploaded by the power inspection team. The specific working steps are as follows: System integration: Connect sensor data, equipment information, and historical data to the system, define data transmission protocols and interface standards to ensure seamless data integration, and establish an API (application programming interface) for AI (artificial intelligence) models to allow the system to exchange and call data with the model; Establishment of artificial intelligence dispatching model: Collect data from power equipment and inspection records, and then establish an artificial intelligence dispatching model to complete the operations of all steps S1 to S5, including scheduling production plans, updating inspection routes, etc.; Inspection route collection and feedback: The inspection team uses mobile devices or GPS devices to record the inspection route, and uploads the inspection route data to the central database through the system. At the same time, the system tracks the inspection progress and route in real time, and sends the data fed back by the inspection team to the artificial intelligence scheduling model for data supplement.
[0018] S1 obtains the list of power inspection teams in the power inspection system, obtains the inspection area that each power inspection team is responsible for, and then extracts the parameter data uploaded by each power device. The specific working steps are as follows: Obtain inspection team: Obtain inspection team information from the database or through API (application programming interface) query, and obtain the inspection area information of each inspection team; Extracting power equipment parameter data: Extracting power equipment parameter data from the equipment data source database / API (application programming interface) and filtering by time range; Data integration: Associate the inspection team with the inspection area and equipment parameter data to integrate the information.
[0019] S2. Perform operational fault prediction analysis on power equipment based on historical parameter data, and adjust the power equipment in the inspection area from normal to risk in the corresponding period according to the prediction analysis results; The steps of S2 are as follows: S2.1. Extract the historical parameter data uploaded by the power equipment, and then predict the power consumption trend of the power equipment based on the historical parameter data to obtain the power consumption peak value corresponding to different time periods of the power equipment; Extract the historical power consumption data of power equipment, including power consumption, timestamp and other parameters. The formula is as follows:
[0020] Among them, y is the power consumption of the power equipment, x is the time characteristic, β0 is the intercept term, β1 is the regression coefficient of the time characteristic, and ε is the error term, which represents the deviation between the predicted value and the actual value; To predict the peak electricity consumption during a specific time period, use the trained linear regression model to make predictions:
[0021] in, is the target value that we want to predict. We use historical data to fit a linear regression model and estimate β0 and β1. It is a future time point. The prediction results are analyzed to find the maximum value of electricity consumption as the peak power consumption.
[0022] S2.2. Analyze the operational risk level of power equipment by combining the performance of power equipment with the peak power consumption. Set a risk peak for each power equipment. When the peak power consumption exceeds the risk peak, the power equipment is determined to be adjusted from a normal state to a risk state. The higher the value exceeding the risk threshold, the greater the risk factor. The specific working steps are as follows: Set the risk peak value P risk , usually based on the maximum load capacity of the equipment or historical data, records the peak power consumption P in the current time period actual ; If P actual >P risk , then calculate the risk coefficient R:
[0023] This formula calculates the proportion of excess risk peaks. The risk coefficient R reflects the degree of excess, with higher values indicating greater risk. Set a risk threshold R threshold , when the risk factor R exceeds R threshold The device status is adjusted to risk status.
[0024] S3, setting each power equipment as a maintenance point, and then making a time prediction based on the inspection route of the power inspection team to obtain the predicted maintenance node when the power inspection team arrives at the maintenance point; The steps for S3 are as follows: S3.1. Set up maintenance points according to the location of each power equipment in the inspection area; S3.2, extract the inspection route uploaded by the power inspection team, and extract the real-time location of the power inspection team at the same time, then predict the arrival time of the maintenance point based on the real-time location of the power inspection team and the inspection route, and obtain the predicted maintenance node when the power inspection team arrives at each maintenance point. The specific work steps are as follows: Data collection: the specific location latitude and longitude or other coordinates of each power equipment, the route or path information planned by the inspection team, and the current location of the inspection team; Calculate the distance from the current location to the maintenance point: Use the geographic coordinates of longitude and latitude to calculate the distance from the current location to each maintenance point. The Haversine formula can be used to calculate the spherical distance. Obtain the speed of the inspection team: You can calculate the average speed from the inspection team's historical data or monitor the speed in real time to obtain the distance from the current location to the inspection point; Calculate the estimated arrival time: Use speed and distance to calculate the arrival time. Assuming the speed of the inspection team is vkm / h and the distance from the current location to the inspection point is dkm, the estimated arrival time T is:
[0025] Where the speed is not constant, use real-time speed or a predictive model to adjust the calculation.
[0026] S4, set the inspection interval threshold, and then dynamically adjust the inspection interval threshold according to the risk status set in S2, and then the prediction maintenance node corresponding to the power equipment combines the inspection interval threshold to perform time detection. When the interval time between two adjacent prediction maintenance nodes is greater than the inspection interval threshold, inspection scheduling is performed through S5; The steps of S4 are as follows: S4.1, set the inspection interval threshold, and then dynamically adjust it according to the risk factor obtained in S2.2. The higher the risk factor, the shorter the inspection interval threshold. The specific working steps are as follows: Define inspection interval threshold: set the initial inspection interval threshold, that is, the inspection time interval under normal circumstances; Obtain risk factor: Calculate the risk factor of each maintenance point through monitoring data or analysis models. The risk factor can be based on equipment conditions, environmental factors, historical fault records, etc. Establish a relationship model between risk factor and inspection interval: define the relationship between risk factor and inspection interval threshold. The higher the risk factor, the shorter the inspection interval. Calculate dynamic inspection interval: adjust inspection interval threshold according to current risk factor; Update inspection plan: Update the inspection plan based on the calculated inspection interval and arrange more frequent inspections. The formula is as follows:
[0027] Among them, I adjusted It is the inspection interval threshold adjusted according to the risk factor, I0 is the initial inspection interval threshold, k is the adjustment coefficient, which controls the influence of the risk factor on the inspection interval. It can be set according to the actual situation. For example, k can be a constant less than 1, such as 0.5, and R is the risk factor, which ranges from [0,1].
[0028] S4.2, combine the predicted maintenance node to detect the inspection interval of each maintenance point, obtain the inspection interval between the predicted maintenance nodes corresponding to the maintenance point in different time periods, and then compare the inspection interval with the inspection interval threshold corresponding to the maintenance point. When the inspection interval is less than the inspection interval threshold, the monitoring is continued. On the contrary, when the inspection interval is greater than the inspection interval threshold, the inspection area to which the maintenance point belongs is marked as an abnormal inspection area and sent to S5. The formula is as follows: Interval time = current predicted maintenance node - next predicted maintenance node; Among them, the current predicted maintenance node and the next predicted maintenance node are the same maintenance point, but the time periods are different.
[0029] If the interval time is less than the inspection interval threshold, monitoring will continue; If the interval time is greater than the inspection interval threshold, the inspection area to which the maintenance point belongs is marked as an abnormal inspection area.
[0030] S5. Obtain the abnormal inspection area that needs inspection scheduling, and then divide the normal power equipment in the abnormal inspection area into adjacent inspection areas for inspection time compression detection, so as to update the time detection result of S4.
[0031] The steps of S5 are as follows: S5.1, receiving the abnormal inspection area sent by S4.2, and then extracting the adjacent inspection areas of the abnormal inspection area; S5.2, divide the normal power equipment in the inspection area into adjacent inspection areas, expand the adjacent inspection areas, and update the inspection routes and inspection intervals. When the adjacent inspection areas after the update are not marked as abnormal, continue to divide the normal power equipment into adjacent inspection areas until the inspection intervals corresponding to the abnormal inspection areas meet the requirements of S4.2, and eliminate the abnormal inspection area marks. The specific working steps are as follows: Receive and mark abnormal inspection areas: receive marking data of abnormal inspection areas; Extract adjacent inspection areas: Determine the inspection areas adjacent to the abnormal inspection area. This can be achieved by defining the geographic location or data structure of the adjacent areas. Divide normal power equipment into adjacent inspection areas: extract normal power equipment from abnormal inspection areas and distribute them to adjacent inspection areas; Expand adjacent inspection areas: Expanding the scope of adjacent inspection areas can be achieved by increasing the boundaries of the inspection area or covering more equipment; Update inspection routes and inspection intervals: Update inspection routes and inspection intervals based on new inspection area divisions, taking into account newly added equipment and areas; Check whether the adjacent inspection area is marked as abnormal: Evaluate whether the updated adjacent inspection area is still marked as abnormal. If not, proceed to the next step; otherwise, repeat the adjustment process; Continue to divide normal power equipment: If the adjacent area is not marked as abnormal, continue to divide the normal power equipment from the abnormal area to the adjacent area until the inspection interval of the abnormal area meets the normal requirements; Eliminate abnormal marks: Once the inspection interval of the abnormal inspection area meets the normal requirements, eliminate the abnormal mark; Assume that each inspection area A i The inspection interval is T i , where T i is the average inspection interval of all power equipment in the area. For each adjacent inspection area A j , new interval time T j It can be calculated by the following formula:
[0032] Among them, M is the inspection interval time, M k It is area A j The inspection interval of the kth device in |A j | is area A j The number of devices; Update inspection routes based on new area divisions. Calculate the total length or time of each inspection route and ensure that the specified inspection frequency is met.
[0033] For each inspection area A i , the inspection interval is T i Should meet the normal value range [T min ,T max ]:
[0034] If T i If it exceeds the range, the inspection area division needs to be adjusted.
[0035] S5.2 When dividing normal power equipment into adjacent inspection areas, priority shall be given to dividing the normal power equipment closest to the adjacent inspection area.
[0036] The second object of the present invention is to provide an artificial intelligence-based power inspection and dispatching system, including any one of the artificial intelligence-based power inspection and dispatching methods described above, including a model building unit 10, an operation prediction unit 20, and a region division unit 30; The model building unit 10 is used to build an artificial intelligence dispatching model and simultaneously obtain the parameters of the power inspection team, the inspection area, and the power equipment; The operation prediction unit 20 is used to perform operation fault prediction analysis on the power equipment, complete the risk adjustment of the power equipment, and then the power inspection team corresponds to the prediction maintenance node of each power equipment; The area division unit 30 is used to set the inspection interval threshold, and perform time detection in combination with the predicted maintenance node, and divide the abnormal inspection area into regions according to the detection result, so that the abnormal inspection area eliminates the abnormal mark.
[0037] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. An artificial intelligence-based power inspection and dispatching method, characterized in that: The steps include: S1. Establish an artificial intelligence dispatching model to obtain the inspection area that the power inspection team is responsible for, and extract parameter data of power equipment in the inspection area; S2. Perform operational fault prediction analysis on power equipment based on historical parameter data, and adjust the power equipment in the inspection area from normal to risk in the corresponding period according to the prediction analysis results; S3, setting each power equipment as a maintenance point, and then making a time prediction based on the inspection route of the power inspection team to obtain the predicted maintenance node when the power inspection team arrives at the maintenance point; S4, set the inspection interval threshold, and then dynamically adjust the inspection interval threshold according to the risk status set in S2, and then the prediction maintenance node corresponding to the power equipment combines the inspection interval threshold to perform time detection. When the interval time between two adjacent prediction maintenance nodes is greater than the inspection interval threshold, inspection scheduling is performed through S5; S5. Obtain the abnormal inspection area that needs inspection scheduling, and then divide the normal power equipment in the abnormal inspection area into adjacent inspection areas for inspection time compression detection, so as to update the time detection result of S4.
2. The power inspection and dispatching method based on artificial intelligence according to claim 1 is characterized by: The S1 is connected to the power inspection system and then establishes an artificial intelligence scheduling model. The artificial intelligence scheduling model sends information to the power inspection team in the power inspection system and collects the inspection routes uploaded by the power inspection team.
3. The power inspection and dispatching method based on artificial intelligence according to claim 1 is characterized in that: The S1 obtains the list of power inspection teams in the power inspection system, obtains the inspection area that each power inspection team is responsible for, and then extracts the parameter data uploaded by each power device.
4. The power inspection and dispatching method based on artificial intelligence according to claim 1 is characterized in that: The steps of S2 are as follows: S2.
1. Extract the historical parameter data uploaded by the power equipment, and then predict the power consumption trend of the power equipment based on the historical parameter data to obtain the power consumption peak value corresponding to different time periods of the power equipment; S2.
2. Analyze the operational risk level of power equipment by combining its performance with the peak power consumption. Set a risk peak for each power equipment. When the peak power consumption exceeds the risk peak, the power equipment is judged to be adjusted from a normal state to a risky state. The higher the value exceeding the risk threshold, the greater the risk factor.
5. The power inspection and dispatching method based on artificial intelligence according to claim 1 is characterized by: The steps of S3 are as follows: S3.
1. Set up maintenance points according to the location of each power equipment in the inspection area; S3.
2. Extract the inspection route uploaded by the power inspection team, and extract the real-time location of the power inspection team at the same time. Then, predict the arrival time of the maintenance point based on the real-time location of the power inspection team and the inspection route, and obtain the predicted maintenance node when the power inspection team arrives at each maintenance point.
6. The power inspection and dispatching method based on artificial intelligence according to claim 1 is characterized by: The steps of S4 are as follows: S4.1, set the inspection interval threshold, and then dynamically adjust it according to the risk factor obtained in S2.
2. The higher the risk factor, the shorter the inspection interval threshold; S4.
2. Combine the predicted maintenance nodes to detect the inspection interval of each maintenance point, obtain the inspection interval between the predicted maintenance nodes corresponding to the maintenance point in different time periods, and then compare the inspection interval with the inspection interval threshold corresponding to the maintenance point. When the inspection interval is less than the inspection interval threshold, continue monitoring. Conversely, when the inspection interval is greater than the inspection interval threshold, mark the inspection area to which the maintenance point belongs as an abnormal inspection area and send it to S5.
7. The power inspection and dispatching method based on artificial intelligence according to claim 1 is characterized by: The steps of S5 are as follows: S5.1, receiving the abnormal inspection area sent by S4.2, and then extracting the adjacent inspection areas of the abnormal inspection area; S5.
2. Divide the normal power equipment in the inspection area into adjacent inspection areas, expand the adjacent inspection areas, and update the inspection routes and inspection intervals. When the adjacent inspection areas after the update are not marked as abnormal, continue to divide the normal power equipment into the adjacent inspection areas until the inspection interval corresponding to the abnormal inspection area meets the requirements of S4.2, and remove the abnormal inspection area mark.
8. The power inspection and dispatching method based on artificial intelligence according to claim 7 is characterized by: When dividing the normal power equipment into adjacent inspection areas, S5.2 gives priority to dividing the normal power equipment closest to the adjacent inspection area.
9. A method for realizing an artificial intelligence-based power inspection and dispatching system, comprising an artificial intelligence-based power inspection and dispatching method according to any one of claims 1 to 8, characterized in that: It includes a model building unit (10), an operation prediction unit (20) and a region division unit (30); The model building unit (10) is used to build an artificial intelligence dispatching model and simultaneously obtain parameters of the power inspection team, the inspection area, and the power equipment; The operation prediction unit (20) is used to perform operation fault prediction analysis on the power equipment, complete risk adjustment for the power equipment, and then the power inspection team corresponds to the prediction maintenance node of each power equipment; The area division unit (30) is used to set an inspection interval threshold, and to perform time detection in combination with a predicted maintenance node, and to divide the abnormal inspection area into areas according to the detection result, so that the abnormal inspection area eliminates the abnormal mark.
Citation Information
Patent Citations
Method and system of planning automatic inspection path of intelligent device
CN110009761A
High-voltage cable inspection period optimization method based on risk assessment
CN110400001A
Intelligent factory inspection method and system
CN111885495A
Power plant equipment intelligent inspection method and system based on cloud side-end cooperation
CN117014472A
Intelligent comprehensive monitoring system for transformer substation
CN117674427A
Cited By
Industrial production intelligent inspection method and system, electronic equipment and medium
CN119090454A