Machine room deployment method and device, equipment, storage medium and computer program product

By pre-designing a standardized base model in the data center, the problem of low delivery efficiency of the data center when there is a sudden demand for computing resources is solved, rapid response and agile delivery in intelligent computing scenarios are achieved, and the efficiency of the liquid-cooled data center is improved. Construction project efficiency.

CN118802518AActive Publication Date: 2024-10-18CHINA MOBILE GROUP DESIGN INST +1

Patent Information

Application Number
CN202410714245.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-10-18
Estimated Expiration
2044-06-04

AI Technical Summary

Technical Problem

When faced with sudden large-scale computing resource demand, existing data centers have low delivery efficiency and are unable to provide sufficient racks and supporting resources in a timely manner, resulting in construction project delays and high resource uncertainty.

Method used

By pre-designing a standardized base model, calculating the number of network devices and racks based on the physical design units and parameters of the data center in the computer room, building a standardized base model, and deploying the computer room according to computing resource requirements, achieving proactive and rapid resource response deliver.

Benefits of technology

It has significantly improved the delivery efficiency of liquid-cooled data center computing resource projects, shortened the construction cycle, achieved rapid response and agile delivery to computing resource requirements in intelligent computing scenarios, and reduced manual output and design phase time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118802518A_ABST
    Figure CN118802518A_ABST
Patent Text Reader

Abstract

The invention discloses a machine room deployment method, apparatus and device, a storage medium and a computer program product. The method comprises the steps of obtaining machine room data center basic physical design unit POD networking information and machine room parameters; according to the POD networking information and the machine room parameters, the number of network devices, the number of servers and the number of target connected cabinets of a rack are calculated, and a minimum base construction unit is constructed; according to the port proportion of the network equipment and the minimum construction unit of the base, calculating the number of servers which can be borne by the base and the number of racks which are pre-occupied by the base, and constructing a standardized base model; and deploying the machine room according to computing power resource construction requirements and the standardized base model. According to the method, the active response of the standardized base model to the resource demand is designed in advance, so that the delivery efficiency of a liquid cooling data center computing power resource project construction project can be effectively improved, and quick response and agile delivery of the computing power resource demand in an intelligent computing scene are realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computer technology, and in particular to a computer room deployment method, device, equipment, storage medium and computer program product. Background Art

[0002] With the accelerated innovation of technologies such as artificial intelligence and big data, and the increasing integration of the digital economy into the real economy, my country has entered the era of intelligence and is actively promoting the construction and development of intelligent computing centers. As the infrastructure for computing power, the number of data centers and racks has experienced explosive growth, resulting in a sharp increase in the power consumption of data centers. At the same time, with the increasing demand for single-point computing power, the power consumption of a single computing server is dozens of times that of a traditional server, reaching 1,000 to 10,000 W. In order to reduce the energy consumption of data centers and help my country's dual carbon goals, the existing data center air cooling efficiency can no longer meet the heat dissipation and energy consumption requirements. The data center computer room needs to adapt to the industry's mainstream liquid cooling technology. Liquid cooling can greatly improve the heat dissipation efficiency and reduce the energy consumption of data centers by replacing traditional air cooling with coolant and server heat exchange.

[0003] With the development of intelligent computing and the large-scale application of liquid-cooled computer rooms, the demand for computing resources and liquid-cooled rack construction is growing, and the delivery timeliness requirements are higher. The efficiency of conventional cyclical and progressive construction project delivery can no longer effectively match the actual needs of the rapid development of computing power. In the existing liquid-cooled data center computing resource delivery process, after receiving the large-scale construction demand for computing power, it relies heavily on manual sorting and verification to see whether the computer room supporting resources corresponding to the resource demand are met. Since many demands are large-scale and sudden, the computer room provider cannot effectively guarantee the actual number of available racks in a timely manner, resulting in insufficient racks and supporting resource reserves to meet sudden resource demands. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a computer room deployment method, device, equipment, storage medium and computer program product, which can effectively improve the delivery efficiency of liquid-cooled data center computing power resource project construction projects by pre-designing a standardized base model to actively respond to resource needs, and achieve rapid response and agile delivery of computing power resource needs in intelligent computing scenarios.

[0005] In order to achieve the above object, an embodiment of the present invention provides a computer room deployment method, including:

[0006] Obtain the basic physical design unit POD networking information and room parameters of the computer room data center;

[0007] According to the POD networking information and the equipment room parameters, the number of network devices, the number of servers, and the target number of connected cabinets of the rack are calculated, and the minimum construction unit of the base is constructed;

[0008] According to the port ratio of the network equipment and the minimum construction unit of the base, the number of servers that the base can carry and the number of racks occupied by the base are calculated, and a standardized base model is constructed;

[0009] The computer room is deployed according to the computing resource construction requirements and the standardized base model.

[0010] As an improvement of the above solution, the network device includes an access switch and an aggregation switch, and the number of network devices, the number of servers, and the target number of connected cabinets of the rack are calculated according to the POD networking information and the computer room parameters, and the minimum construction unit of the base is constructed, including:

[0011] Calculate the number of servers that a single rack can carry according to the POD networking information, the access switch parameters, the rack parameters, and the server parameters;

[0012] Calculate the number of access switches and the target number of connected cabinets of the rack according to the port ratio of the access switches and the port ratio of the servers;

[0013] The minimum construction unit of the base is constructed according to the number of servers that a single rack can carry, the number of access switches, and the target number of connected cabinets of the rack.

[0014] As an improvement of the above solution, the calculation of the number of servers that a single rack can carry according to the POD networking information, the access switch parameters, the rack parameters and the server parameters includes:

[0015] Calculate the number of servers that can be accessed by a single access switch according to the POD networking information and the port ratio of the access switch;

[0016] Calculate the number of servers that a single rack can carry under power conditions according to the rated power of the rack, the rated power of the access switch, and the rated power of the server;

[0017] Calculate the number of servers that a single rack can carry under space conditions based on the available U number of the rack, the U number of the access switch, and the U number occupied by a single server;

[0018] The number of servers that a single rack can carry is determined based on the number of servers that a single access switch can access, the number of servers that a single rack can carry under power conditions, and the number of servers that a single rack can carry under space conditions.

[0019] As an improvement of the above solution, the number of servers that the base can carry and the number of racks occupied by the base are calculated according to the port ratio of the network device and the minimum construction unit of the base, and a standardized base model is constructed, including:

[0020] According to the port ratio of the aggregation switch and the minimum construction unit of the base, the number of the minimum construction units of the base that can be carried by the base and the number of racks occupied by the base are calculated;

[0021] Calculate the number of servers that the base can carry according to the number of minimum construction units of the base and the number of servers that a single rack can carry;

[0022] A standardized base model is constructed according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can bear, the number of racks occupied by the base, and the number of servers that the base can bear.

[0023] As an improvement of the above solution, the standardized base model is constructed according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can bear, the number of racks occupied by the base, and the number of servers that the base can bear, including:

[0024] Constructing a base model according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can carry, the number of racks occupied by the base, and the number of servers that the base can carry;

[0025] Determine whether the number of servers that the base can support meets the requirements of the computer room and business;

[0026] If it is in compliance, the standardized base model is formed; if it is not in compliance, the number of the aggregation switches is adjusted, and the base size is recalculated and adjusted.

[0027] As an improvement of the above solution, the deployment of the computer room according to the computing resource construction requirements and the standardized base model includes:

[0028] The standardized base model is synchronized to the computer room provider side to pre-occupy the rack and transform the supporting resources of the computer room, and the network equipment is pre-installed and wired simultaneously;

[0029] According to the computing power resource construction requirements, the network equipment and the server are installed and wired according to the standardized base model.

[0030] As an improvement of the above solution, the method further includes:

[0031] If the proportion of racks used by the base exceeds the preset threshold, the capacity expansion mechanism is triggered to supplement the occupied rack resources to a complete base.

[0032] The embodiment of the present invention further provides a computer room deployment device, including:

[0033] The data acquisition module is used to obtain the POD networking information and room parameters of the basic physical design unit of the computer room data center;

[0034] A unit construction module, used to calculate the number of network devices, the number of servers and the target number of connected cabinets of the rack according to the POD networking information and the computer room parameters, and to construct a minimum construction unit of the base;

[0035] A model building module, used to calculate the number of servers that the base can carry and the number of racks occupied by the base according to the port ratio of the network device and the minimum construction unit of the base, and to build a standardized base model;

[0036] The computer room deployment module is used to deploy the computer room according to the computing resource construction requirements and the standardized base model.

[0037] An embodiment of the present invention further provides a terminal device, comprising a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein the processor implements any of the above-mentioned computer room deployment methods when executing the computer program.

[0038] An embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium includes a stored computer program, wherein when the computer program is executed, the device where the computer-readable storage medium is located is controlled to execute any one of the above-mentioned computer room deployment methods.

[0039] An embodiment of the present invention further provides a computer program product, which includes a computer program or a computer instruction. When the computer program or the computer instruction is executed by a processor, any of the above-mentioned computer room deployment methods is implemented.

[0040] Compared with the prior art, the beneficial effects of a computer room deployment method, device, equipment, storage medium and computer program product provided by the embodiments of the present invention are: by obtaining the POD networking information of the basic physical design unit of the computer room data center and the computer room parameters; according to the POD networking information and the computer room parameters, the number of network devices, the number of servers and the target number of connected cabinets of the rack are calculated, and the minimum construction unit of the base is constructed; according to the port ratio of the network device and the minimum construction unit of the base, the number of servers that the base can carry and the number of racks occupied by the base are calculated, and a standardized base model is constructed; according to the computing power resource construction requirements and the standardized base model, the computer room is deployed. The embodiments of the present invention play a huge role in the design, supply and delivery stages of the liquid cooling data center construction project in the intelligent computing scenario by pre-designing the standardized base model to actively respond to resource requirements, which can effectively improve the delivery efficiency of the liquid cooling data center computing power resource project construction project, and achieve rapid response and agile delivery to computing power resource requirements in the intelligent computing scenario. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a flow chart of a preferred embodiment of a method for deploying a computer room provided by the present invention;

[0042] Figure 2 It is a schematic diagram comparing the full-process construction cycle of a computer room deployment method provided by the present invention with a traditional method;

[0043] Figure 3 It is a schematic diagram of POD networking in a computer room in a computer room deployment method provided by the present invention;

[0044] Figure 4 It is a structural schematic diagram of the smallest construction unit of a base in a computer room deployment method provided by the present invention;

[0045] Figure 5 It is a structural schematic diagram of a standardized base model in a computer room deployment method provided by the present invention;

[0046] Figure 6 It is a structural schematic diagram of a standardized base model after delivery in a computer room deployment method provided by the present invention;

[0047] Figure 7 It is a structural schematic diagram of a preferred embodiment of a computer room deployment device provided by the present invention;

[0048] Figure 8 It is a structural schematic diagram of a preferred embodiment of a terminal device provided by the present invention. DETAILED DESCRIPTION

[0049] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] See also Figure 1 , Figure 1 The figure is a flow chart of a preferred embodiment of a computer room deployment method provided by the present invention. The computer room deployment method comprises:

[0051] S1, obtain the basic physical design unit POD networking information and room parameters of the computer room data center;

[0052] S2, according to the POD networking information and the equipment room parameters, calculate the number of network devices, the number of servers and the target number of connected cabinets of the rack, and construct the minimum construction unit of the base;

[0053] S3, according to the port ratio of the network device and the minimum construction unit of the base, calculate the number of servers that the base can carry and the number of racks occupied by the base, and build a standardized base model;

[0054] S4: Deploy the computer room according to the computing resource construction requirements and the standardized base model.

[0055] For details, please refer to Figure 2 , Figure 2 This is a schematic diagram comparing the full-process construction cycle of a computer room deployment method provided by the present invention with the traditional method. Intelligent computing data centers usually carry self-developed training and large-granular computing power requirements, and deploy large-scale computing power, usually more than 10,000 card clusters, which belongs to the ultra-large-scale new computing power infrastructure of intensive construction. The large-scale and sudden demand for computing power resources brings many challenges to the current traditional data center project construction in the design, supply, delivery and other links. Specifically, there are the following problems:

[0056] (1) MO manual output stage: After receiving the demand for large-scale computing power construction, it relies heavily on manual preliminary surveys to sort out and verify whether the corresponding computer room supporting resources of the resource demand are met (the number of racks and ODF transmissions required for this resource expansion, etc.). Since many demands are large-scale and sudden, the computer room provider cannot effectively guarantee the actual number of available racks in a timely manner, resulting in insufficient racks and supporting resource reserves to meet sudden resource demands. For example: involving the transformation of racks and ODF (Optical Distribution Frame) transmission, the overall transformation work takes a long time and cannot be effectively controlled. The average time for the transformation to be usable is usually more than 1.5 months. The high risk coefficient of uncertainty in the computer room supporting facilities seriously affects the start time of the construction project plan.

[0057] (2) Design phase: After receiving the information on the available computer rooms and racks manually output by the MO, it is necessary to prepare the construction project plan, plan the use of computer room racks, output product server and network equipment configuration and networking, output network optimization construction plan, computer room supporting and optical cable transmission construction plan, etc. This is a passive response design method to sudden resource demands, which is not only slow but also inefficient.

[0058] (3) Supply stage: It is difficult to match servers and liquid-cooled racks. The current standardization of liquid-cooled racks, liquid-cooled servers, and liquid-cooling technology is relatively weak. There are no substantive binding standards in the industry for the connection between servers and liquid-cooled cabinet pipelines, and there is a lack of compatibility. During the supply stage, it is necessary to connect servers and liquid-cooled racks, and the transformation and matching cycle is relatively long.

[0059] (4) Delivery: In the hardware equipment installation phase, large-scale computing resources need to be quickly installed and wired in a short period of time. This is a very tedious and time-consuming task. Network equipment such as aggregation switches and access switches (TOR) need to be installed and wired, and cables in the rack and cables from the aggregation switch to the rack cabinets need to be laid. This seriously affects the efficiency of hardware equipment, which in turn slows down the progress of software equipment and affects the entire resource delivery period.

[0060] The entire process of resource construction for traditional data center projects, from demand to manual output of MO, takes more than 9 months of construction time through design-supply-delivery. The present invention proposes a design method for a standardized base for liquid-cooled computer rooms (Base: a modular infrastructure solution that matches computing power resource requirements, including computer rooms, racks, network equipment, integrated wiring, etc.) that precedes resource delivery in intelligent computing scenarios. The MO manual output capability is pre-positioned before the sudden demand for computing power resources arrives, and forward-looking planning forms a standardized base and pre-occupies it, effectively shortening the design-supply-delivery time, that is, the DSD construction cycle, and greatly improving the delivery efficiency of the entire process of liquid-cooled data center computing power resource project construction projects in intelligent computing scenarios.

[0061] The embodiment of the present invention obtains the network information of the computer room POD (point of delivery, the basic physical design unit of the data center) and the parameters of the computer room. Figure 3 , Figure 3 This is a schematic diagram of the POD networking in a computer room deployment method provided by the present invention. The types of POD hardware equipment in the liquid cooling computer room of a cloud data center mainly include servers and various network devices. The network devices mainly include access switches and aggregation switches. The access switches include business access switches, storage access switches, management access switches, and IPMI access switches. The aggregation switches include business aggregation switches and management aggregation switches. Servers and access switches, access switches, and aggregation switches form a combination through certain connection relationships and quantity ratios. Figure 3 As shown in the figure, the ratio of the number of access switches and servers is usually determined by the number of available ports of the access switch / the number of unilateral uplink ports of the server, and the ratio of the number of aggregation switches and access switches is determined by the number of available ports of the aggregation switch / the number of unilateral uplink ports of the access switch. According to the POD networking information and the parameters of the computer room, the number of network devices, the number of servers, and the target number of cabinets in the rack are calculated, and the minimum construction unit of the base is constructed. According to the port ratio of the network equipment and the minimum construction unit of the base, the number of servers that the base can carry and the number of racks occupied by the base are calculated, and a standardized base model is constructed. After receiving the computing power resource construction requirements, according to the computing power resource construction requirements and the standardized base model, the number of racks occupied by the base and the supporting resources of the computer room are quickly confirmed, the resource demand and supply are matched, and the remaining rack installation and wiring are quickly completed with the minimum construction unit of the base as the minimum unit, and the computer room is deployed, thereby realizing agile delivery of resources.

[0062] The embodiments of the present invention play a huge role in the design, supply and delivery stages of liquid-cooled data center construction projects in intelligent computing scenarios by pre-designing a standardized base model to proactively respond to resource demands. It can effectively improve the delivery efficiency of liquid-cooled data center computing resource project construction projects and achieve rapid response and agile delivery of computing resource demands in intelligent computing scenarios.

[0063] In another preferred embodiment, the network device includes an access switch and an aggregation switch, and S2 calculates the number of network devices, the number of servers, and the target number of connected cabinets of the rack according to the POD networking information and the computer room parameters, and constructs a minimum construction unit of the base, including:

[0064] S201, calculating the number of servers that a single rack can carry according to the POD networking information, the access switch parameters, the rack parameters, and the server parameters;

[0065] S202, calculating the number of access switches and the target number of connected cabinets of a rack according to the port ratio of the access switches and the port ratio of the servers;

[0066] S203: construct a minimum construction unit of a base according to the number of servers that a single rack can carry, the number of access switches, and the target number of connected cabinets of the rack.

[0067] Specifically, in the embodiment of the present invention, the network device includes an access switch and an aggregation switch. The number of servers that a single rack can carry is calculated based on POD networking information, access switch parameters, rack parameters, and server parameters. The number of access switches and the target number of connected cabinets of the rack are calculated based on the port ratio of the access switch and the port ratio of the server. Usually, the service access switch, storage access switch, and management access switch of the data center use box-type devices, with 40 downstream ports on a single switch, and are deployed in pairs. Therefore, a pair of service access switches / storage access switches / management access switches can access up to 20 servers. The IPMI access switch has 40 downstream ports and can access up to 40 servers. At the same time, for the convenience of deployment, the business access switch, storage access switch, management access switch and IPMI access switch are deployed in the same cabinet as the server, and the optimal cabinet connection mode for computing resources under the liquid cooling rack is determined to be two cabinets, that is, the target number of cabinets is 2, then the number of access switches installed in the minimum construction unit Brick of the base = 2*business access switch + 2*storage access switch + 2*management access switch + IPMI access switch, the number of servers = 2*Min(Min(BP1, SP2, MP1, IP), SNp, SNu). In summary, the minimum construction unit Brick model of the base is obtained, such as Figure 4 As shown, Figure 4The diagram is a structural diagram of the smallest construction unit of a base in a computer room deployment method provided by the present invention. The gray cables in the diagram are cabinet cables and inter-cabinet cables that have been reserved according to the networking.

[0068] In another preferred embodiment, the step S201, calculating the number of servers that a single rack can carry according to the POD networking information, the access switch parameters, the rack parameters, and the server parameters, includes:

[0069] S2011, calculating the number of servers that can be accessed by a single access switch according to the POD networking information and the port ratio of the access switch;

[0070] S2012, calculating the number of servers that a single rack can carry under power conditions according to the rated power of the rack, the rated power of the access switch, and the rated power of the server;

[0071] S2013, calculating the number of servers that a single rack can carry under space conditions according to the available U number of the rack, the U number of the access switch, and the U number occupied by a single server;

[0072] S2014: Determine the number of servers that a single rack can carry according to the number of servers that a single access switch can access, the number of servers that a single rack can carry under power conditions, and the number of servers that a single rack can carry under space conditions.

[0073] Specifically, the embodiment of the present invention calculates the number of servers that can be accessed by a single access switch according to the POD networking information and the port ratio of the access switch. Exemplarily, the number of product servers that can be accessed by a single service access switch / storage access switch / management access switch / IPMI access switch is, since the port ratio BP1=BP2 And SP1=SP2 And MP1=MP2, the number of servers that can be accessed by a single access switch=Min(BP1, SP2, MP1, IP). Among them, BP represents the ratio of the service access switch to the product server connection port, SP represents the ratio of the storage access switch to the product server connection port, MP represents the ratio of the management access switch to the product server connection port, and IP represents the ratio of the IPMI access switch to the product server connection port.

[0074] According to the rated power of the rack, the rated power of the access switch and the rated power of the server, calculate the number of servers that a single rack can carry under power conditions. Exemplarily, the number of product servers that a single rack can carry due to power, that is, the number of servers SNp = (rack rated power - service access switch rated power - storage access switch rated power - management access switch rated power - IPMI access switch rated power) / server rated power:

[0075]

[0076] Among them, SNp indicates the number of product servers that can be carried by a single rack power, Rp indicates the single rack power, Sp indicates the server power, BSWp indicates the business access switch power, SSWp indicates the storage access switch power, MSWp indicates the management access switch power, and IPMISWp indicates the IPMI access switch power.

[0077] According to the available U number of the rack, the U number of the access switch and the U number occupied by a single server, calculate the number of servers that a single rack can carry under space conditions. For example, the number of product servers that can be installed in a single rack due to space, that is, the number of servers SNu = (the number of available U numbers of the rack - the number of U numbers of the service access switch - the number of U numbers of the storage access switch - the number of U numbers of the management access switch - the number of U numbers of the IPMI access switch) / the number of U numbers occupied by a single server:

[0078]

[0079] Among them, SNu indicates the number of product servers that can be carried by a single rack space, Ru indicates the number of U of available space in a single rack, Su indicates the number of U of space occupied by the server, BSWu indicates the number of U of space occupied by the service access switch, SSWu indicates the number of U of space occupied by the storage access switch, MSWu indicates the number of U of space occupied by the management access switch, and IPMISWu indicates the number of U of space occupied by the IPMI access switch.

[0080] According to the number of servers Min(BP1, SP2, MP1, IP) that a single access switch can access, the number of servers SNp that a single rack can carry under power conditions, and the number of servers SNu that a single rack can carry under space conditions, determine the number of servers that a single rack can carry = Min(Min(BP1, SP2, MP1, IP), SNp, SNu).

[0081] In another preferred embodiment, the S3, according to the port ratio of the network device and the minimum construction unit of the base, calculates the number of servers that the base can carry and the number of racks occupied by the base, and constructs a standardized base model, including:

[0082] S301, calculating the number of the minimum construction units of the base that can be carried by the base and the number of racks occupied by the base according to the port ratio of the aggregation switch and the minimum construction unit of the base;

[0083] S302, calculating the number of servers that the base can carry according to the number of minimum construction units of the base and the number of servers that a single rack can carry;

[0084] S303: construct a standardized base model according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can bear, the number of racks occupied by the base, and the number of servers that the base can bear.

[0085] Specifically, the embodiment of the present invention calculates the number of minimum construction units that the base can bear and the number of racks occupied by the base based on the POD networking information, according to the port ratio of the aggregation switch and the minimum construction unit of the base. Exemplarily, the number of access switches that can be connected to the service aggregation switch is the number of available ports of the aggregation switch / the number of single-sided uplink ports of the access switch, that is, BCP1=BCP2=SCP1=SCP2. Among them, BCP represents the ratio of the connection ports between the service aggregation switch and the service access switch, and SCP represents the ratio of the connection ports between the service aggregation switch and the storage access switch. Combined with Figure 4 The smallest construction unit of the base is Brick. The number of Bricks contained in a base is in, Indicates the number of Bricks, the smallest construction unit of the base. 2 indicates the number of service aggregation Bricks and management aggregation Bricks. The number of Bricks that can be connected to the management aggregation switch (usually a frame-type device) Need to meet In summary, the number of racks contained in a base is Among them, 4 means that the management aggregation Brick and the business aggregation Brick require two additional Bricks, totaling 4 management switch racks; MCP represents the ratio of the connection ports of the management aggregation switch to the management access switch, and ICP represents the ratio of the connection ports of the management aggregation switch to the IPMI access switch. According to the number of minimum construction units of the base and the number of servers that a single rack can carry, calculate the number of servers that the base can carry. For example, the number of product servers that a base can carry can also be calculated: According to the minimum construction unit of the base, the number of minimum construction units of the base that the base can carry, the number of racks occupied by the base, and the number of servers that the base can carry, a standardized base model is constructed, such as Figure 5 As shown, Figure 5 It is a structural diagram of a standardized base model in a computer room deployment method provided by the present invention. The yellow cables in the figure are the cabinet cables from the reserved service aggregation Brick to the empty cabinet Brick according to the networking, the blue cables are the cabinet cables from the reserved management aggregation Brick to the empty cabinet Brick, and the gray cables are the connections within the Brick cabinet and between cabinets.

[0086] In another preferred embodiment, the S303, constructing a standardized base model according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can carry, the number of racks occupied by the base, and the number of servers that the base can carry, includes:

[0087] S3031, constructing a base model according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can carry, the number of racks occupied by the base, and the number of servers that the base can carry;

[0088] S3032, judging whether the number of servers that the base can carry meets the requirements of the computer room and business;

[0089] S3033, if it is in compliance, forming the standardized base model; if it is not in compliance, adjusting the number of the aggregation switches and recalculating and adjusting the base size.

[0090] Specifically, the embodiment of the present invention constructs a base model according to the minimum construction unit of the base, the number of minimum construction units of the base that the base can bear, the number of racks occupied by the base, and the number of servers that the base can bear. According to the number of servers that the base can bear, it is judged whether it meets the computer room conditions and actual business needs. If it meets the requirements, a standardized base model is formed and the base planning is executed; if it does not meet the requirements, the number of business aggregation switches and management aggregation switches is increased or reduced, and the base size is recalculated and adjusted.

[0091] In another preferred embodiment, the step S4 deploys the computer room according to the computing resource construction requirements and the standardized base model, including:

[0092] S401, synchronizing the standardized base model to the computer room provider, pre-occupying the rack and transforming the supporting resources of the computer room, and simultaneously pre-installing and wiring the network equipment;

[0093] S402: According to the computing resource construction requirements, the network equipment and the server are installed and wired according to the standardized base model.

[0094] Specifically, after the standardized base model is pre-built in the embodiment of the present invention, the standardized base model is synchronized to the computer room provider side, and the number of racks occupied by a base is obtained according to the calculation method described above based on the actual computer room conditions, and planning and pre-occupancy are performed. In addition to the starting components, the business aggregation switch, management aggregation switch, and various access switches are pre-installed in accordance with the networking method, and the network and wiring of the rack are delivered synchronously to achieve plug-in delivery of subsequent server resources. The base planning requirements are synchronized to the computer room provider side, and the rack and ODF are transformed in advance to ensure the pre-occupancy of rack resources and complete the pre-delivery of base aggregation and access resources. In this way, after receiving the computing power resource construction requirements, the servers that match the requirements are directly installed on the shelves according to the Brick minimum unit in the hard collection stage, and the power interface and the server to access switch connection are connected on site, such as Figure 6 As shown, Figure 6 It is a structural schematic diagram after the standardized base model is delivered in a computer room deployment method provided by the present invention, thereby realizing rapid resource delivery.

[0095] As a preferred embodiment, the method further comprises:

[0096] If the proportion of racks used by the base exceeds the preset threshold, the capacity expansion mechanism is triggered to supplement the occupied rack resources to a complete base.

[0097] Specifically, when the computer room deployment method provided by the embodiment of the present invention is actually applied, the base planning and pre-occupancy are started before the sudden computing power resource demand arrives to determine whether a new base is needed. If a new base is needed, a new standardized base model is created according to the above method, and resource planning and pre-occupancy are performed. If a new base is not needed, and the proportion of racks used by the base exceeds the preset threshold, the capacity expansion mechanism is triggered to supplement the pre-occupied rack resources to a complete base. Exemplarily, whether the number of racks pre-occupied by the base is within 60% of the safety waterline (threshold = number of racks used by the base / number of racks pre-occupied by a complete base, this threshold can be set according to actual business needs), if it exceeds the waterline, the capacity expansion mechanism is triggered to supplement the rack resources to a complete base. If it is below the safety waterline, the resource demand can be directly matched, and delivery is performed with Brick as the minimum delivery unit.

[0098] The embodiment of the present invention forms a standardized base model based on the computer room information design before the large-scale and sudden computing power resource demand arrives, and the computer room provider side synchronously plans, pre-occupies and transforms the computer room supporting resources. After the computing power resource construction demand arrives, the whole process link responds quickly, and the overall time is 5 months. Compared with the traditional passive response construction method to resource demand, the base design method before resource delivery improves the construction project delivery efficiency by nearly 50%. Figure 2This design method plays a huge role in the design, supply and delivery stages of liquid-cooled data center construction projects in intelligent computing scenarios, effectively improving the delivery efficiency of the entire construction process and achieving agile delivery of computing resource requirements. The specific stages are as follows:

[0099] (1) MO manual output: Before resource demand arrives, MO manual output capabilities are pre-positioned and standardized computing bases are planned for pre-occupancy, which greatly reduces the manual sorting time and uncertainty of supporting resources in the computer room after sudden demand arrives, and enables supporting resources such as computer room racks to quickly respond to and match sudden computing power demand, ensuring that computer room racks are available and applicable.

[0100] (2) Design stage: The pre-occupied base has planned the use of the computer room rack (such as Figure 6 The resource deployment shown in the figure, the equipment is put on the shelf in advance, etc.), according to the base planning, the efficiency of HLD (High-Level Design) and LLD (Low-Level Design) in the design stage can be significantly improved.

[0101] (3) Supply stage: After the liquid cooling room is planned, the entire liquid cooling server cabinet is packaged and delivered, with minimal implementation complexity and high compatibility, effectively shortening the construction project cycle and effectively improving delivery quality.

[0102] (4) Delivery stage: The integrated wiring of the computer room and network equipment such as aggregation switches and access switches are installed in advance according to the network topology before the design stage. The cables from the aggregation switch to the rack and the cabinets in the rack have been laid out in advance according to the pre-installed racks. After the server equipment arrives, it is directly installed in the rack quickly and the server is connected to the access switch in the cabinet. Compared with the traditional method of installing and wiring the network equipment and servers after they arrive, the embodiments of the present invention can greatly improve the delivery efficiency and realize rapid installation of equipment and agile delivery.

[0103] Correspondingly, the present invention also provides a computer room deployment device, which can implement all processes of the computer room deployment method in the above embodiment.

[0104] See also Figure 7 , Figure 7 1 is a schematic diagram of a preferred embodiment of a computer room deployment device provided by the present invention. The computer room deployment device comprises:

[0105] Data acquisition module 701, used to obtain POD networking information and room parameters of the basic physical design unit of the computer room data center;

[0106] The unit construction module 702 is used to calculate the number of network devices, the number of servers and the target number of connected cabinets of the rack according to the POD networking information and the equipment room parameters, and to construct a minimum construction unit of the base;

[0107] The model building module 703 is used to calculate the number of servers that the base can carry and the number of racks occupied by the base according to the port ratio of the network device and the minimum construction unit of the base, and to build a standardized base model;

[0108] The computer room deployment module 704 is used to deploy the computer room according to the computing resource construction requirements and the standardized base model.

[0109] Preferably, the network device includes an access switch and an aggregation switch, and the unit construction module 702 includes:

[0110] The first calculation unit 7021 is used to calculate the number of servers that can be carried by a single rack according to the POD networking information, the access switch parameters, the rack parameters and the server parameters;

[0111] A second calculation unit 7022 is configured to calculate the number of access switches and the target number of connected cabinets of a rack according to the port ratio of the access switches and the port ratio of the servers;

[0112] The base construction unit 7023 is used to construct a minimum construction unit of the base according to the number of servers that a single rack can carry, the number of access switches, and the target number of connected cabinets of the rack.

[0113] Preferably, the first calculation unit 7021 is specifically used for:

[0114] Calculate the number of servers that can be accessed by a single access switch according to the POD networking information and the port ratio of the access switch;

[0115] Calculate the number of servers that a single rack can carry under power conditions according to the rated power of the rack, the rated power of the access switch, and the rated power of the server;

[0116] Calculate the number of servers that a single rack can carry under space conditions based on the available U number of the rack, the U number of the access switch, and the U number occupied by a single server;

[0117] The number of servers that a single rack can carry is determined based on the number of servers that a single access switch can access, the number of servers that a single rack can carry under power conditions, and the number of servers that a single rack can carry under space conditions.

[0118] Preferably, the model building module 703 includes:

[0119] The third calculation unit 7031 is used to calculate the number of the minimum construction units of the base that can be carried by the base and the number of racks occupied by the base according to the port ratio of the aggregation switch and the minimum construction unit of the base;

[0120] The fourth calculation unit 7032 is used to calculate the number of servers that the base can carry according to the number of the minimum construction units of the base and the number of servers that a single rack can carry;

[0121] The model building unit 7033 is used to build a standardized base model according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can bear, the number of racks occupied by the base, and the number of servers that the base can bear.

[0122] Preferably, the model building unit 7033 is specifically used for:

[0123] Constructing a base model according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can carry, the number of racks occupied by the base, and the number of servers that the base can carry;

[0124] Determine whether the number of servers that the base can support meets the requirements of the computer room and business;

[0125] If it is in compliance, the standardized base model is formed; if it is not in compliance, the number of the aggregation switches is adjusted, and the base size is recalculated and adjusted.

[0126] Preferably, the computer room deployment module 704 includes:

[0127] The model synchronization unit 7041 is used to synchronize the standardized base model to the computer room provider side, perform rack pre-occupancy and transformation of computer room supporting resources, and simultaneously perform pre-installation and wiring of the network equipment;

[0128] The rack installation and wiring unit 7042 is used to install and wire the network equipment and the server according to the computing resource construction requirements and the standardized base model.

[0129] Preferably, the device is also used for:

[0130] If the proportion of racks used by the base exceeds the preset threshold, the capacity expansion mechanism is triggered to supplement the occupied rack resources to a complete base.

[0131] In the specific implementation, the working principle, control process and technical effect achieved by the computer room deployment device provided in the embodiment of the present invention are the same as those of the computer room deployment method in the above embodiment, and will not be repeated here.

[0132] See also Figure 8 , Figure 8 801 is a schematic diagram of a preferred embodiment of a terminal device provided by the present invention. The terminal device includes a processor 801, a memory 802, and a computer program stored in the memory 802 and configured to be executed by the processor 801. When the processor 801 executes the computer program, the computer room deployment method described in any of the above embodiments is implemented.

[0133] Preferably, the computer program can be divided into one or more modules / units (such as computer program 1, computer program 2, ...), and the one or more modules / units are stored in the memory 802 and executed by the processor 801 to complete the present invention. The one or more modules / units can be a series of computer program instruction segments that can complete specific functions, and the instruction segments are used to describe the execution process of the computer program in the terminal device.

[0134] The processor 801 can be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor can be a microprocessor, or the processor 801 can be any conventional processor. The processor 801 is the control center of the terminal device, and various parts of the terminal device are connected using various interfaces and lines.

[0135] The memory 802 mainly includes a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function, etc., and the data storage area can store related data, etc. In addition, the memory 802 can be a high-speed random access memory, or a non-volatile memory, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, and a flash card (Flash Card), etc., or the memory 802 can also be other volatile solid-state storage devices.

[0136] It should be noted that the above terminal device may include, but is not limited to, a processor and a memory. Those skilled in the art will understand that Figure 8The structural diagram is only an example of the above-mentioned terminal device and does not constitute a limitation of the above-mentioned terminal device. It may include more or less components than shown in the figure, or combine certain components, or different components.

[0137] An embodiment of the present invention further provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the computer room deployment method described in any of the above embodiments.

[0138] An embodiment of the present invention further provides a computer program product, which includes a computer program or a computer instruction. When the computer program or the computer instruction is executed by a processor, the computer room deployment method described in any of the above embodiments is implemented.

[0139] The embodiment of the present invention provides a method, device, equipment, storage medium and computer program product for deploying a computer room, by obtaining the POD networking information of the basic physical design unit of the computer room data center and the parameters of the computer room; according to the POD networking information and the parameters of the computer room, the number of network devices, the number of servers and the target number of connected cabinets of the rack are calculated, and the minimum construction unit of the base is constructed; according to the port ratio of the network device and the minimum construction unit of the base, the number of servers that the base can carry and the number of racks occupied by the base are calculated, and a standardized base model is constructed; according to the computing power resource construction requirements and the standardized base model, the computer room is deployed. The embodiment of the present invention plays a huge role in the design, supply and delivery stages of the liquid cooling data center construction project in the intelligent computing scenario by pre-designing the standardized base model to actively respond to resource requirements, which can effectively improve the delivery efficiency of the construction project of the computing power resource project of the liquid cooling data center, and realize rapid response and agile delivery to the computing power resource requirements in the intelligent computing scenario.

[0140] It should be noted that the system embodiment described above is merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the drawings of the system embodiment provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.

[0141] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A method for deploying a computer room, characterized in that: include: Obtain the basic physical design unit POD networking information and room parameters of the computer room data center; Calculate the number of network devices, the number of servers, and the target number of connected cabinets for the rack based on the POD networking information and the computer room parameters, and construct the minimum construction unit of the base; According to the port ratio of the network equipment and the minimum construction unit of the base, the number of servers that the base can carry and the number of racks occupied by the base are calculated, and a standardized base model is constructed; The computer room is deployed according to the computing power resource construction requirements and the standardized base model.

2. The computer room deployment method according to claim 1, wherein: The network equipment includes access switches and aggregation switches. Then, according to the POD networking information and the computer room parameters, the number of network devices, the number of servers, and the target number of connected cabinets of the rack are calculated, and the minimum construction unit of the base is constructed, including: Calculate the number of servers that a single rack can support based on the POD networking information, the access switch parameters, the rack parameters, and the server parameters; Calculate the number of access switches and the target number of connected cabinets in the rack based on the port ratio of the access switches and the port ratio of the servers; The minimum construction unit of the base is constructed according to the number of servers that a single rack can carry, the number of access switches, and the target number of connected cabinets of the rack.

3. The computer room deployment method according to claim 2, wherein: The calculating the number of servers that a single rack can carry according to the POD networking information, the access switch parameters, the rack parameters, and the server parameters includes: Calculate the number of servers that can be connected to a single access switch based on the POD networking information and the port ratio of the access switch; Calculate the number of servers that a single rack can support under power conditions based on the rated power of the rack, the rated power of the access switch, and the rated power of the server; Calculate the number of servers that a single rack can support based on the available U number of the rack, the U number of the access switch, and the U number occupied by a single server. The number of servers that a single rack can carry is determined based on the number of servers that a single access switch can access, the number of servers that a single rack can carry under power conditions, and the number of servers that a single rack can carry under space conditions.

4. The computer room deployment method according to claim 2, wherein: The calculation of the number of servers that the base can carry and the number of racks occupied by the base based on the port ratio of the network equipment and the minimum construction unit of the base, and the construction of a standardized base model, includes: Calculate the number of the minimum construction units of the base that the base can carry and the number of racks occupied by the base according to the port ratio of the aggregation switch and the minimum construction unit of the base; Calculate the number of servers that the base can support based on the number of minimum construction units of the base and the number of servers that a single rack can support; A standardized base model is constructed according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can bear, the number of racks occupied by the base, and the number of servers that the base can bear.

5. The computer room deployment method according to claim 4, characterized in that: The step of constructing a standardized base model according to the minimum base construction unit, the number of the minimum base construction units that the base can bear, the number of racks occupied by the base, and the number of servers that the base can bear includes: Constructing a base model according to the minimum construction unit of the base, the number of the minimum construction units of the base that the base can bear, the number of racks occupied by the base, and the number of servers that the base can bear; Determine whether the base meets the requirements of the computer room and business based on the number of servers it can support. If they are consistent, the standardized base model is formed; if they are not consistent, the number of aggregation switches is adjusted, and the base size is recalculated and adjusted.

6. The computer room deployment method according to claim 1, wherein: The deployment of the computer room according to the computing resource construction requirements and the standardized base model includes: Synchronize the standardized base model to the computer room provider to pre-occupy the racks and transform the supporting resources of the computer room, and simultaneously pre-install and wire the network equipment; According to the computing power resource construction requirements, the network equipment and the server are installed and wired according to the standardized base model.

7. The computer room deployment method according to claim 6, wherein: The method further comprises: If the proportion of racks used by the base exceeds the preset threshold, the capacity expansion mechanism is triggered to replenish the occupied rack resources to a complete base.

8. A computer room deployment device, characterized in that: include: The data acquisition module is used to obtain the POD networking information and room parameters of the basic physical design unit of the computer room data center; A unit construction module is used to calculate the number of network devices, the number of servers, and the target number of connected cabinets of the rack based on the POD networking information and the computer room parameters, and to construct the minimum construction unit of the base; A model building module is used to calculate the number of servers that the base can carry and the number of racks occupied by the base based on the port ratio of the network equipment and the minimum construction unit of the base, and to build a standardized base model; The computer room deployment module is used to deploy the computer room according to the computing resource construction requirements and the standardized base model.

9. A terminal device, characterized in that: The computer room deployment method comprises a processor and a memory, wherein the memory stores a computer program and the computer program is configured to be executed by the processor, and when the processor executes the computer program, the computer room deployment method according to any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium, characterized in that The computer-readable storage medium stores a computer program, wherein when the device where the computer-readable storage medium is located executes the computer program, the computer room deployment method according to any one of claims 1 to 7 is implemented.

11. A computer program product, characterized in that The computer program product includes a computer program or computer instructions, and when the computer program or the computer instructions are executed by a processor, the computer room deployment method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Micro-module data center and resource management method

    CN107680004A

  • Method and system for pushing new rack into operational mode in data center

    CN112448842A

  • Switch resource intelligent allocation and deployment method and device

    CN113949637A

  • Data center resource pool construction method and related equipment

    CN114143190A

  • Machine room deployment method and device, electronic equipment and storage medium

    CN117473594A

Cited By

  • Data center, method, electronic device, storage medium and program product

    CN118365054A