Demister flushing control system and method thereof

Through real-time monitoring and dynamic adjustment of the parameters of water pumps and valves, the demister flushing control system is optimized, which solves the problems of resource waste and response delay in the existing technology, improves the efficiency and safety of the flushing process, and reduces the risk of failure.

CN118808201APending Publication Date: 2024-10-22FUJIAN HONGSHAN THERMOELECTRICITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410817936.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

The existing demister flushing control system lacks the ability to dynamically adjust microscopic parameters during the flushing process, resulting in resource waste, high energy consumption, response delays and operational errors. It is difficult to identify and handle abnormal situations, affecting the long-term operating efficiency and safety of power equipment. sex.

Method used

A demister flushing control system is designed to realize real-time monitoring and dynamic monitoring of water pumps and valves through the startup configuration module, parameter adjustment module, valve sequence control module, washing cycle execution module, monitoring status analysis module and operation strategy adjustment module. Adjust and optimize flushing parameters and control strategies, and identify and handle abnormal operations.

Benefits of technology

It improves the efficiency and accuracy of the flushing process, reduces energy consumption and resource waste, enhances automation, quickly identifies and handles abnormalities, reduces the risk of equipment failure and maintenance costs, and ensures the stability and reliability of power equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118808201A_ABST
    Figure CN118808201A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of electric power control, in particular to a demister flushing control system and method, and the system comprises a start configuration module, a parameter adjustment module, a valve sequence control module, a washing circulation execution module, a monitoring state analysis module and an operation strategy adjustment module. According to the invention, the power and flow velocity of the water pump are automatically adjusted, the flushing time and frequency are accurately controlled, the use of water resources is optimized, the energy consumption is reduced, dynamic adjustment of flushing parameters is driven by real-time data, the flushing efficiency and the operation precision are improved, errors and delay are reduced, the flushing automation degree of the demister is enhanced, and manual intervention is reduced through automatic valve operation; the response speed and precision are improved, the abnormity is carefully monitored and timely identified, the maintenance team is enabled to respond quickly, the equipment fault and safety risk are reduced, the dynamic mechanism improves the stability and reliability of flushing control, the efficient maintenance of the power equipment is ensured, and the extra cost and downtime are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power control, and in particular to a defogger flushing control system and method thereof. Background Art

[0002] The field of power control technology involves control technologies for all aspects of the power system, from power generation, transmission, distribution to power consumption, including power stability control, voltage and frequency regulation, load management, fault detection and response, etc. Automated control can improve system efficiency and safety, reduce manual operation errors, and increase response speed. Power control technology not only supports the construction of smart grids, real-time power monitoring, high-voltage direct current (HVDC) and alternating current (AC) control, but also optimizes power distribution and use, and enhances grid stability and power quality.

[0003] Among them, the defogger flushing control system is an automation system in power equipment and high-voltage facilities. It is mainly used to remove water vapor, mist and pollutants on the equipment by controlling the flushing procedure to maintain the cleanliness and insulation performance of power transmission lines and related equipment. The main purpose of this system is to reduce manual intervention by automatically controlling the flushing cycle and intensity, improve power transmission efficiency and equipment operation safety. The defogger flushing control system can automatically adjust flushing parameters such as time, water volume and area, effectively remove moisture and dirt on the surface of power equipment, prevent power accidents caused by reduced insulation performance, maintain power stability and improve power supply reliability.

[0004] Existing power control technology lacks the ability to dynamically adjust microscopic parameters during the flushing process in the application of defogger flushing control systems. Static control strategies lead to waste of resources, such as excessive water use and unnecessary energy consumption, while also reducing the flushing effect, affecting the long-term operating efficiency and safety of power equipment. In terms of valve operation, reliance on manual inspection or basic automation procedures increases operational complexity, and the lack of a high-precision real-time feedback mechanism leads to response delays and operational errors. This lack of precise control makes it difficult to quickly and accurately identify and handle problems, especially when abnormal conditions occur, increasing the risk of equipment failure and maintenance costs. Traditional systems are not comprehensive and timely in fault analysis and impact assessment, and lack dynamic recording and analysis of the impact of faulty valves and maintenance measures, which limits the timeliness and effectiveness of optimization measures, making the system less responsive to emergencies and unable to maximize the maintenance of power transmission and equipment stability. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings in the prior art and to propose a defogger flushing control system and method thereof.

[0006] In order to achieve the above object, the present invention adopts the following technical solution: a defogger flushing control system comprises:

[0007] The startup configuration module selects the defogger flushing water pump, performs water pump inspection and status assessment, records the model and time before startup, activates the startup sequence, monitors the startup pressure and flow, and obtains the water pump startup status record;

[0008] The parameter adjustment module records the flushing time and number of times based on the water pump startup status record, calculates the energy consumption and total time, adjusts the water pump power and flow rate, records the estimated flushing time, and obtains the flushing adjustment record;

[0009] The valve sequence control module performs a defogger valve sequence check and operation based on the flushing adjustment record, records the operation time and feedback, and obtains valve operation feedback details;

[0010] The washing cycle execution module determines the start and end time of washing based on the valve operation feedback details, compares the number of rinses with the set value, records the time and status of each wash, and obtains a washing cycle record;

[0011] The monitoring status analysis module performs abnormal valve operation inspection based on the washing cycle record, including delay and early closing, analyzes abnormal time and cause, and obtains abnormal operation analysis results;

[0012] The operation strategy adjustment module adjusts the flushing process and valve control strategy based on the abnormal operation analysis results, analyzes the impact of the faulty valve, records the optimization measures and adjustment process, and obtains the strategy optimization results.

[0013] As a further solution of the present invention, the water pump startup status record includes the water pump model before startup, the recorded startup time, the monitored pressure feedback, and the monitored flow feedback; the flushing adjustment record includes the adjusted flushing time, the adjusted number of flushing times, the calculated total energy consumption, the calculated total time, the adjusted water pump power, the adjusted flow rate, and the expected next flushing time; the valve operation feedback details include the start and end time of the valve operation, feedback information during the operation, the error state when the operation fails, and the cause of the failure when the operation fails; the washing cycle record includes the start and end time of the washing, the number of completed flushing times, and the time record of the end of the washing; the abnormal operation analysis results include the identified faulty defogger valve, the time when the fault occurred, the duration of the fault, and the affected range; the strategy optimization results include the adjusted water pump operating parameters, the adjusted defogger valve control strategy, and the proposed optimization measures.

[0014] As a further solution of the present invention, the startup configuration module includes:

[0015] Select the water pump submodule to select the defogger flushing water pump, check the historical operation data, determine whether the water pump is in standby state, activate the water pump start sequence, synchronously update the operation log, record the current state of the water pump and the start sequence activity, and obtain the water pump activation status result;

[0016] The state detection submodule evaluates the running state and start-up readiness of the water pump based on the water pump activation state result, records the model of the water pump and the timestamp before start-up, checks the integrity and consistency of the water pump start-up sequence, collects start-up readiness information, and obtains start-up readiness details;

[0017] Based on the startup preparation details, the recording and monitoring submodule monitors key parameters in the water pump startup process, including pressure and flow, records multiple parameters of the startup process, analyzes parameter feedback, records the time when the startup is completed, and obtains the water pump startup status record.

[0018] As a further solution of the present invention, the parameter adjustment module includes:

[0019] The input verification submodule receives the input of flushing time and number based on the water pump startup status record, uses historical data if the user does not provide new settings, performs format verification and logic range check on the input time and number, records the user's input history, and generates verified input data;

[0020] The energy consumption calculation submodule uses the verified input data to calculate the total energy consumption of this flushing, uses the historical energy consumption data and the current input data to adjust the power and flow rate parameters of the water pump, estimates the energy consumption in the future time period according to the prediction model, and calculates the energy consumption and adjustment parameters;

[0021] The adjustment record submodule estimates the expected time of the next flushing through the energy consumption and adjustment parameters, updates the prediction model according to the current state and environmental factors, synchronizes the defogger flushing state and user configuration to the database, and constructs the flushing adjustment record.

[0022] As a further solution of the present invention, the valve sequence control module includes:

[0023] The valve status check submodule checks the initial status of the defogger valve based on the flushing adjustment record, performs startup status and fault code reading on the defogger valve, starts a timer to record the operation start time, records the error status and fault cause of the defogger valve with abnormal status, and obtains valve status details;

[0024] The valve operation control submodule performs the opening and closing operations of the defogger valve based on the valve status details, records the start operation time of the defogger valve, monitors and records the response and feedback status of the defogger valve during the operation, and generates a valve control result record;

[0025] The operation result recording submodule analyzes the operation result of the defogger valve based on the valve control result record, records the end time of the defogger valve operation, marks the time point of successful operation, records the error status and cause of the failed defogger valve operation, and obtains valve operation feedback details.

[0026] As a further solution of the present invention, the washing cycle execution module includes:

[0027] The start and end determination submodule identifies and records the start and end time points of washing based on the valve operation feedback details, compares the number of washing times with the number of times preset by the user, and updates the washing status and time if the current number of times does not reach the preset value; if it does, records the end status and terminates the cycle, and generates a washing status update;

[0028] The washing monitoring submodule adopts the washing status update, records the start and end time of washing one by one, monitors the duration of each washing cycle, updates the washing status record, and obtains the details of the washing process;

[0029] The cycle record submodule calculates the total time of the washing cycle through the washing process details, counts the washing time periods, finds the average efficiency, and constructs a washing cycle record.

[0030] As a further solution of the present invention, the monitoring status analysis module includes:

[0031] The abnormal operation detection submodule analyzes the opening and closing time of the defogger valve one by one based on the washing cycle record, identifies events that are inconsistent with the predetermined operation plan, including delayed opening and early closing of the defogger valve, and records the abnormal time point and valve identification, analyzes the abnormal operation data, identifies the operation error and fault signal, and obtains the abnormal operation details of the defogger valve;

[0032] The fault analysis submodule analyzes the occurrence time and duration of the abnormal operation based on the abnormal operation details of the defogger valve, compares the operation log and feedback, records the occurrence time and duration of the fault, iteratively evaluates the fault data, and generates fault time and cause analysis results;

[0033] The fault impact assessment submodule is based on the fault time and cause analysis results, applies the time series analysis method, calculates the fault duration and evaluates the impact on the washing cycle and performance, analyzes the operational changes and response strategies of the defogger during the fault, organizes the details of the fault impact, evaluates the impact of the fault on operational efficiency, and obtains abnormal operation analysis results.

[0034] As a further solution of the present invention, the formula of the time series analysis method is as follows:

[0035]

[0036] Among them, X t is the value of the time series at time t, c is the constant term in the model, p is the order of the autoregressive model, φ i is the autoregressive coefficient, α i is the periodic adjustment coefficient of the i-th autoregressive coefficient, ω is the base frequency of periodic adjustment, q is the order of the moving average model, θ j is the moving average coefficient, β j is the periodic adjustment coefficient of the jth moving average coefficient, γ is the nonlinear adjustment coefficient of the error term, and ε t is the error term at time t.

[0037] As a further solution of the present invention, the operation strategy adjustment module includes:

[0038] Based on the abnormal operation analysis results, the operation sequence evaluation submodule gradually evaluates the performance of the links in the flushing process, records the execution time and operation status of the key links, analyzes the response performance of the links under abnormal conditions, identifies the key problem points that lead to low efficiency, and performs risk assessment and impact analysis to obtain the operation process efficiency analysis results;

[0039] The parameter adjustment submodule uses the results of the operation process efficiency analysis to adjust the operating parameters of the water pump, including flow rate and pressure settings, and simultaneously fine-tune the opening and closing control strategy of the defogger valve to match differentiated operation requirements, record the reasons and steps for parameter adjustment, and generate a parameter configuration optimization log;

[0040] The optimization measures submodule analyzes the adjusted parameters through the parameter configuration optimization log, including the response and impact of the faulty defogger valve, proposes optimization measures based on real-time operation feedback, records the implementation steps of the measures and the expected optimization effects, and constructs strategy optimization results.

[0041] A defogger flushing control method is implemented based on the defogger flushing control system, comprising the following steps:

[0042] S1: Select the defogger flushing water pump, record the water pump model, mark the current time as the time point before starting, activate the water pump start sequence, monitor the water pump start pressure in real time through the pressure sensor, and generate the water pump start status record;

[0043] S2: Based on the water pump startup status record, receiving the flushing time and number of times set by the user, estimating and recording the time required for the flushing process, and generating a flushing adjustment record;

[0044] S3: using the flushing adjustment record, checking the defogger valve sequence, sequentially controlling the opening and closing of the valves, and recording the operation time and feedback to generate valve operation feedback details;

[0045] S4: based on the valve operation feedback details, determining the start and end time of the washing process, comparing the real-time flushing number with the flushing number set by the user, recording and analyzing the duration and completion of each washing, and generating a washing cycle record;

[0046] S5: Based on the washing cycle record, analyze the data in the record, check whether there is any abnormal valve operation, analyze the time point and potential cause of the abnormality, adjust the flushing process and valve control strategy, iterate the optimization measures and adjustment process, and generate a strategy optimization result.

[0047] Compared with the prior art, the advantages and positive effects of the present invention are:

[0048] In the present invention, by finely controlling the flushing time and number of times, and automatically adjusting the water pump power and flow rate, optimizing the use of water resources and reducing energy consumption, adjusting the flushing parameters according to real-time data, ensuring the efficiency and accuracy of the flushing process, improving the operation response speed and accuracy, reducing operation errors and delays, and enhancing the automation of the defogger flushing control. Automated valve sequence inspection and operation reduce the need for manual intervention, improve the response speed and accuracy of the operation, and reduce operation errors and delays. Detailed monitoring helps to timely identify and analyze the time and cause of abnormal operation, so that the maintenance team can take measures quickly to reduce potential equipment failures or safety risks. Analyze the impact of faulty valves and optimize the record of measures to improve the adaptability of the overall flushing process and valve control strategy. This dynamic adjustment mechanism improves the stability and reliability of defogger flushing control and ensures that the maintenance of power equipment is more efficient and targeted. Real-time data-driven decision-making improves power transmission efficiency and the safety of equipment operation, while reducing additional costs and downtime caused by improper maintenance. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Figure 1 is a system flow chart of the present invention;

[0050] Figure 2 It is a schematic diagram of the system framework of the present invention;

[0051] Figure 3 It is a flowchart of the startup configuration module of the present invention;

[0052] Figure 4 It is a flow chart of the parameter adjustment module of the present invention;

[0053] Figure 5 It is a flow chart of the valve sequence control module of the present invention;

[0054] Figure 6 It is a flow chart of the washing cycle execution module of the present invention;

[0055] Figure 7 It is a flow chart of the monitoring status analysis module of the present invention;

[0056] Figure 8 This is a flow chart of the operation strategy adjustment module of the present invention;

[0057] Fig. 9 It is a schematic diagram of the method steps of the present invention. DETAILED DESCRIPTION

[0058] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0059] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0060] Embodiment 1

[0061] See also Figure 1 to Figure 2 The present invention provides a technical solution: a defogger flushing control system comprising:

[0062] The startup configuration module selects the defogger flushing pump, checks the pump status and startup readiness, records the pump model and time before startup, activates the pump startup sequence, monitors the pressure and flow feedback during startup, records the startup operation completion time, and obtains the pump startup status record;

[0063] The parameter adjustment module receives the input of flushing time and number based on the water pump startup status record. If the user does not enter new settings, the historical data is used to verify the validity and logical consistency of the input data, calculate the total energy consumption and time of this flushing, adjust the water pump power and flow rate according to the energy consumption forecast, and record the estimated time of the next flushing to obtain the flushing adjustment record;

[0064] The valve sequence control module checks and operates the defogger valve according to the flushing adjustment record sequence, starts the timer to record the operation time, sequentially controls the defogger valve and records the operation feedback. If the defogger valve operation is successful, the operation end time is recorded. If the operation fails, the error state and the cause of the failure are recorded, the defogger valve sequence operation is ended and the operation completion time is recorded, and the valve operation feedback details are obtained;

[0065] The washing cycle execution module uses the valve operation feedback details to determine the start and end of each wash, compares the number of rinses with the number set by the user, continues washing if the preset number is not reached, records the time and monitors the status of each wash, and ends the wash and records the end time if the preset number is reached, to obtain a washing cycle record;

[0066] The monitoring status analysis module analyzes the washing cycle records, checks whether there are abnormalities in the defogger valve operation, including delay and early closing, analyzes the time and cause of abnormal operation, marks and records the faulty defogger valve and the time of the fault, analyzes the fault duration and impact range, and obtains the abnormal operation analysis results;

[0067] The operation strategy adjustment module evaluates the flushing process according to the abnormal operation analysis results, adjusts the operating parameters of the water pump and the control strategy of the defogger valve according to the fault analysis, analyzes the impact of the adjusted operation process on the faulty defogger valve, proposes optimization measures and records the adjustment process to obtain the strategy optimization results.

[0068] The water pump startup status record includes the water pump model before startup, the recorded startup time, the monitored pressure feedback, and the monitored flow feedback. The flushing adjustment record includes the adjusted flushing time, the adjusted number of flushing times, the calculated total energy consumption, the calculated total time, the adjusted water pump power, the adjusted flow rate, and the expected next flushing time. The valve operation feedback details include the valve operation start and end time, feedback information during operation, error status when the operation fails, and the cause of the failure when the operation fails. The washing cycle record includes the start and end time of washing, the number of completed flushing times, and the time record of the end of washing. The abnormal operation analysis results include the identified faulty defogger valve, the time when the fault occurred, the duration of the fault, and the affected scope. The strategy optimization results include the adjusted water pump operating parameters, the adjusted defogger valve control strategy, and the proposed optimization measures.

[0069] Specifically, if Figure 2 , 3 As shown, the startup configuration module includes:

[0070] Select the water pump submodule to select the defogger flushing water pump, check the historical operation data, determine whether the water pump is in standby state, activate the water pump start sequence, synchronously update the operation log, record the current state of the water pump and the start sequence activity, and obtain the execution process of the water pump activation state result as follows;

[0071] When selecting the defogger flushing pump, the historical operation data should be checked first according to the guidelines of Case 1, which involves obtaining the operation records in the past month from the data storage, including the timestamps of each start and stop, the flow and pressure values ​​during operation, and using statistical calculation methods (based on the average daily operation time and frequency in the last month) to calculate the average operation efficiency and reliability indicators of the pump. By comparing the indicators with the set standard thresholds (the set thresholds are the average daily operation time of not less than 3 hours and the failure frequency of less than 5%), it is determined whether the pump is in the standby state. If the pump meets the standby state requirements, the start sequence is executed. The activation of the start sequence involves sending a start command to the control system and synchronously updating the operation log to record the current status of the pump and the start sequence activity. The sending of the start command and the log update are processed by the field programmable gate array (FPGA) control system to ensure the immediate transmission and execution of the command and obtain the pump activation status result.

[0072] The state detection submodule evaluates the running state and start-up readiness of the water pump based on the water pump activation state result, records the water pump model and the timestamp before start-up, checks the integrity and consistency of the water pump start-up sequence, collects the start-up readiness information, and obtains the execution process of the start-up readiness details as follows;

[0073] The status detection submodule evaluates the operating status and start-up readiness of the water pump based on the water pump activation status results. First, the water pump model and the timestamp before starting are recorded. The timestamp is recorded using the Network Time Protocol (NTP) synchronization to ensure the accuracy of the time. The integrity and consistency of the water pump start sequence are checked, including verifying whether the reception and execution status of the start command are consistent with the predetermined start procedure. Collecting start-up preparation information includes checking the readiness of the water pump, confirming the system response through sensor input data, and outputting start-up preparation details.

[0074] The recording and monitoring submodule monitors the key parameters of the water pump startup process, including pressure and flow, based on the startup preparation details, records multiple parameters of the startup process, analyzes parameter feedback, records the time of startup completion, and obtains the execution process of the water pump startup status record as follows;

[0075] The recording and monitoring submodule monitors the key parameters of the pump startup process based on the startup preparation details. Key parameters include the pressure and flow of the pump, which are monitored in real time by sensors installed at the outlet and inlet of the pump. Record multiple parameters of the startup process. The parameter recording device uses a high-precision digital recorder that can accurately record data changes per second. Through real-time analysis of parameter data, evaluate whether the performance of the pump meets the design standards, analyze parameter feedback, and use a prediction model based on historical data to compare the current parameters with the predicted values ​​to adjust the operation settings of the pump. Record the time when the startup is completed, synchronize it through NTP to ensure its accuracy, and generate a record of the pump startup status.

[0076] Specifically, if Figure 2 , 4 As shown, the parameter adjustment module includes:

[0077] The input verification submodule receives the input of flushing time and number based on the pump startup status record. If the user does not provide new settings, the historical data is used to perform format verification and logic range check on the input time and number, record the user's input history, and generate the verified input data. The execution process is as follows;

[0078] The input verification submodule first receives the input of flushing time and number. If the user does not provide a new setting, the historical data is automatically used. This step includes checking whether the format of the input data conforms to the standard time format and whether the flushing number is within a reasonable numerical range (e.g., 1 to 100 times). The format check and logic range check are implemented through a series of conditional statements. If the data is abnormal, the user is reminded to re-enter. The module records the user's input history, which involves storing the data entered by each user in the database for tracking and backtracking. The module generates verified input data.

[0079] The energy consumption calculation submodule uses the verified input data to calculate the total energy consumption of this flushing, uses the historical energy consumption data and current input data to adjust the power and flow rate parameters of the water pump, and estimates the energy consumption in the future time period based on the prediction model. The execution process of energy consumption and adjustment parameters is as follows;

[0080] The energy consumption calculation submodule uses the validated input data to calculate the total energy consumption for this flush, including obtaining the historical energy consumption data of the water pump from the database and combining it with the current input data (number of flushes and time). By adjusting the power and flow rate parameters of the water pump, a prediction model is used to estimate the energy consumption in the future time period. This prediction model is based on linear regression analysis and predicts future energy consumption based on past data points. The adjustment parameters are as follows: E t =E h ×(1+r×Δt), where E tis the predicted total energy consumption, E h is the historical average energy consumption, r is the adjustment coefficient set according to past change trends, and Δt is the increase in time compared to the last flushing time.

[0081] The adjustment record submodule estimates the expected time of the next flushing through energy consumption and adjustment parameters, updates the prediction model according to the current status and environmental factors, synchronizes the defogger flushing status and user configuration to the database, and constructs the execution process of the flushing adjustment record as follows;

[0082] The adjustment record submodule estimates the expected time for the next flushing by energy consumption and adjustment parameters. The estimation process takes into account the current state and environmental factors (such as seasonal temperature changes and water quality differences), and updates the prediction model to adapt to the changes. The process of updating the prediction model involves collecting the latest environmental and operational data and retraining the model to improve its accuracy. The operation of synchronizing the defogger flushing status and user configuration to the database ensures that all relevant settings and status information are up to date, and builds the flushing adjustment record. The record building process uses the following formula to calibrate the adjustment effect: Among them, T n is the estimated time for the next flush, T o is the originally planned flushing time, ΔE is the change in energy consumption caused by environmental factors, and E t is the estimated total energy consumption.

[0083] Specifically, if Figure 2 , 5 As shown, the valve sequence control module includes:

[0084] The valve status check submodule checks the initial status of the defogger valve based on the flushing adjustment record, reads the startup status and fault code of the defogger valve, starts the timer to record the start time of the operation, and records the error status and fault cause of the defogger valve with abnormal status. The execution process of obtaining the valve status details is as follows;

[0085] The valve status check submodule first checks the initial status of the defogger valve based on the flushing adjustment record, which involves reading the valve's most recent operation record, including the time and status code of the last operation. The defogger valve startup status and fault code are read from the control system through the interface, and the following formula is used to evaluate the valve's health: Among them, S v Represents the health status score of the valve, C i is the severity level W of the i-th fault code iis the weight coefficient corresponding to the fault code, n is the number of fault codes detected, and the timer is started to record the start time of the operation. The operation ensures the accurate recording of time and provides a time benchmark for subsequent operations. The error state and fault cause of the defogger valve in abnormal state are automatically identified and recorded by an integrated fault diagnosis system, so as to obtain the valve state details.

[0086] The valve operation control submodule performs the opening and closing operations of the defogger valve based on the valve status details, records the start operation time of the defogger valve, monitors and records the response and feedback status of the defogger valve during the operation, and generates the execution flow of the valve control result record as follows;

[0087] The valve operation control submodule performs the opening and closing operations of the defogger valve based on the valve status details. At the beginning of the operation, the start time of the defogger valve is recorded, and this time is marked by the previously started timer. During the valve operation process, the response and feedback status of the valve are monitored and recorded. The data is collected in real time through sensors to generate valve control result records. The valve control result record uses the following formula to evaluate the operation effect: Among them, R v represents the average response score of valve operation, R j is the response score of the jth operation and m is the number of operations.

[0088] The operation result recording submodule analyzes the operation results of the defogger valve based on the valve control result record, records the end time of the defogger valve operation, marks the time point of successful operation, records the error state and cause of the failed defogger valve operation, and obtains the execution process of the valve operation feedback details as follows;

[0089] The operation result recording submodule analyzes the operation results of the defogger valve based on the valve control result record. The end time of the operation is recorded and the time point of successful operation is marked. The time is ensured to be accurate through the synchronized system clock. The error state and cause of the valve operation failure are automatically detected and recorded by the fault diagnosis module to obtain the valve operation feedback details, using the following formula: Among them, F v Indicates the success rate of the operation, E k represents the error index when the kth operation fails, and p is the total number of operations.

[0090] Specifically, if Figure 2 , 6 As shown, the washing cycle execution module includes:

[0091] The start and end judgment submodule identifies and records the start and end time points of washing based on the valve operation feedback details, compares the number of washes with the number of washes preset by the user, and updates the washing status and time if the current number of washes does not reach the preset value. If it does, the end status is recorded and the cycle is terminated. The execution flow of generating the washing status update is as follows;

[0092] The start and end judgment submodule identifies and records the start and end time points of washing based on the valve operation feedback details. The module first obtains the number of washes from the valve operation feedback and compares it with the number preset by the user. If the current number does not reach the preset value, the module will update the washing status and time; if the preset number has been reached or exceeded, the end status is recorded and the cycle is terminated. The time point records in the process use timestamps to ensure accuracy, generate washing status updates, and use the following formula to score the status: Among them, S w represents the washing status score, n is the current number of washes, n p It is the preset number of washes.

[0093] The washing monitoring submodule adopts the washing status update, records the start and end time of washing one by one, monitors the duration of each washing cycle, updates the washing status record, and obtains the execution flow of the washing process details as follows;

[0094] The washing monitoring submodule uses washing status updates to record the start and end time of each washing cycle and monitor the duration of each washing cycle. It continuously monitors sensor inputs such as water flow and pressure to ensure that each washing cycle is under control. The washing status record includes the duration of each washing cycle and related environmental parameters such as temperature and chemical concentration to obtain details of the washing process. The efficiency of each washing cycle is calculated by the following formula: Among them, E c is the efficiency of the wash cycle, T active is the total time of the actual washing activity, T total It is the total time from the start to the end of the wash.

[0095] The cycle record submodule calculates the total time of the washing cycle through the washing process details, counts the washing time periods, and finds the average efficiency. The execution process of constructing the washing cycle record is as follows;

[0096] The cycle record submodule calculates the total time of the washing cycle and counts the washing period through the washing process details. This module summarizes the data of all washing cycles, calculates the average efficiency, and constructs the washing cycle record. The calculation of the average efficiency uses the following formula: Among them, E a Represents the average efficiency, E ciis the efficiency of the ith washing cycle, and k is the total number of washing cycles.

[0097] Specifically, if Figure 2 , 7 As shown, the monitoring status analysis module includes:

[0098] The abnormal operation detection submodule analyzes the opening and closing time of the defogger valve one by one based on the washing cycle record, identifies events that are inconsistent with the scheduled operation plan, including delayed opening and early closing of the defogger valve, and records the abnormal time point and valve identification, analyzes the abnormal operation data, identifies the operation error and fault signal, and obtains the detailed results of the abnormal operation of the defogger valve. The execution process is as follows;

[0099] The abnormal operation detection submodule analyzes the washing cycle records and checks the opening and closing time of the defogger valve one by one. This module identifies events that are inconsistent with the scheduled operation plan, such as delayed opening and premature closing of the defogger valve. The identification of abnormal events depends on the comparative analysis with the valve operation plan, and the abnormal time point is identified by the following formula: ΔT op =|T act -T sched |, where ΔT o p represents the time deviation of the operation, T a ct is the actual operation time, T s ched is the scheduled operation time. The abnormal time point and valve identification are recorded, and the abnormal operation data is deeply analyzed to identify the operation error and fault signal, and generate the abnormal operation details of the defogger valve.

[0100] The fault analysis submodule analyzes the occurrence time and duration of abnormal operation based on the abnormal operation details of the defogger valve, compares the operation log and feedback, records the time of the fault and its continuous impact, iteratively evaluates the fault data, and generates the execution process of the fault time and cause analysis results as follows;

[0101] The fault analysis submodule conducts in-depth fault analysis based on the abnormal operation details of the defogger valve. This module analyzes the occurrence time and duration of the abnormal operation and compares it with the operation log and feedback information. The time and duration of the fault are calculated using the following formula: f =T end -T start , where D f is the duration of the fault, T start and T end The timestamps of the start and end of the fault are respectively. The fault time and cause analysis results are generated by iteratively evaluating the collected fault data.

[0102] The fault impact assessment submodule is based on the fault time and cause analysis results, applies the time series analysis method, calculates the fault duration and evaluates the impact on the washing cycle and performance, analyzes the operation changes and response strategies of the defogger during the fault, organizes the details of the fault impact, evaluates the impact of the fault on the operating efficiency, and obtains the abnormal operation analysis results. The execution process is as follows;

[0103] The fault impact assessment submodule calculates the duration of the fault and evaluates its impact on the washing cycle and performance based on the fault time and cause analysis results. This module analyzes the operational changes and response strategies of the defogger during the fault, and organizes the details of the fault impact to obtain abnormal operation analysis results, providing key information for maintenance and improved operations.

[0104] The formula for the time series analysis method is as follows:

[0105]

[0106] Among them, X t is the value of the time series at time t, c is the constant term in the model, p is the order of the autoregressive model, φ i is the autoregressive coefficient, α i is the periodic adjustment coefficient of the i-th autoregressive coefficient, ω is the base frequency of periodic adjustment, q is the order of the moving average model, θ j is the moving average coefficient, β j is the periodic adjustment coefficient of the jth moving average coefficient, γ is the nonlinear adjustment coefficient of the error term, and ε t is the error term at time t.

[0107] The execution process is as follows:

[0108] Compute the autoregressive part, where each coefficient φ i Adjusted to φ i +α i sin(2πωt) is used to introduce periodic factors and calculate the moving average part, where each coefficient θ j is adjusted to θ j +β j cos(2πωt) to introduce periodic factors, adding To introduce the nonlinear effect of the error term, combine all parts to get the time series X t The whole process is to select a suitable data set for model training to estimate the original parameters c, φ i ,θ j , using the periodic least squares method to determine α i , β j ,ω, by adding the square term Cross-validation is used to determine the optimal γ, and finally all parameters are determined to minimize the prediction error.

[0109] Specifically, if Figure 2 , 8 As shown, the operation strategy adjustment module includes:

[0110] Based on the abnormal operation analysis results, the operation sequence evaluation submodule gradually evaluates the performance of the links in the flushing process, records the execution time and operation status of the key links, analyzes the response performance of the links under abnormal conditions, identifies the key problem points that lead to low efficiency, and conducts risk assessment and impact analysis. The execution process of obtaining the operation process efficiency analysis results is as follows;

[0111] The operation sequence evaluation submodule evaluates the performance of each link in the flushing process based on the abnormal operation analysis results. This module records the execution time and operation status of key links and uses the data recording system to track the performance of each link. The response performance of the link under abnormal conditions is analyzed by the following formula: Among them, P eff Indicates the performance efficiency of the link, T norm is the expected execution time of the link under normal conditions, T act is the actual execution time. This formula helps identify key problem points that lead to inefficiency under abnormal conditions, and conducts risk assessment and impact analysis. The module obtains the results of the operation process efficiency analysis, providing a basis for further adjustments and improvements.

[0112] The parameter adjustment submodule uses the results of the operation process efficiency analysis to adjust the operating parameters of the water pump, including flow rate and pressure settings, and simultaneously fine-tune the opening and closing control strategy of the defogger valve to match differentiated operation requirements, record the reasons and steps for parameter adjustment, and generate the execution process of the parameter configuration optimization log as follows;

[0113] The parameter adjustment submodule uses the results of the operation process efficiency analysis to adjust the operating parameters of the water pump, including the flow rate and pressure settings. This module simultaneously fine-tunes the opening and closing control strategy of the defogger valve to match the differentiated operation requirements. During the parameter adjustment process, the reasons and steps for parameter adjustment are recorded, and the operation management system is used to record and track the changes. The modified parameter configuration is optimized by the following formula: ΔP = P new -P old , where ΔP represents the difference in parameter adjustment, P new is the new parameter value, P old is the original parameter value. The generated parameter configuration optimization log records the effect of each adjustment and the expected improvement in detail.

[0114] The optimization measures submodule analyzes the adjusted parameters through parameter configuration optimization logs, including the response and impact of the faulty defogger valve, proposes optimization measures based on real-time operational feedback, records the implementation steps of the measures and the expected optimization effects, and constructs the execution process of the strategy optimization results as follows;

[0115] The optimization measures submodule analyzes the adjusted parameters through parameter configuration optimization logs. This module includes the response and impact assessment of faulty defogger valves. Based on real-time operational feedback, optimization measures are proposed, and the implementation steps of the measures and the expected optimization results are recorded. The effect of the optimization measures is evaluated by the following formula: Among them, O eff Represents the proportional gain of the optimization effect, E post is the optimized efficiency, E pre is the efficiency before optimization. The constructed strategy optimization result record contains the specific impact of the optimization measures on system performance.

[0116] Specifically, if Fig. 9 As shown, a defogger flushing control method is performed based on the defogger flushing control system, comprising the following steps:

[0117] S1: Select the defogger flushing water pump, record the water pump model, and mark the current time as the time point before starting, activate the water pump start sequence, monitor the starting pressure of the water pump in real time through the pressure sensor, and measure the flow data through the flow meter to generate the water pump start status record;

[0118] S2: Based on the water pump startup status record, receive the flushing time and number of times set by the user, calculate the energy consumption and expected total running time of the water pump according to the status record, dynamically adjust the power parameters and flow rate parameters of the water pump according to the energy consumption and total time, estimate and record the time required for the flushing process, and generate a flushing adjustment record;

[0119] S3: Use the flushing adjustment record to check the defogger valve sequence, sequentially control the opening and closing of the valve, and record the operation time and feedback, including valve opening response time and closing stability analysis, and generate valve operation feedback details;

[0120] S4: Based on the valve operation feedback details, determine the start and end time of the washing process, compare the real-time flushing number with the flushing number set by the user, record and analyze the duration and completion of each wash, and generate a washing cycle record;

[0121] S5: Based on the washing cycle records, analyze the data in the records to check whether there are abnormal valve operations, including delays and premature closing, and analyze the time points and potential causes of the abnormalities, adjust the flushing process and valve control strategy, iterate the optimization measures and adjustment process, and generate strategy optimization results.

[0122] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A demister flushing control system, characterized in that: The system comprises: The startup configuration module selects the demister flushing pump, performs pump inspection and status assessment, records the model and time before startup, activates the startup sequence, monitors startup pressure and flow, and obtains a record of the pump startup status; The parameter adjustment module records the flushing time and number of times based on the water pump startup status record, calculates the energy consumption and total time, adjusts the water pump power and flow rate, records the estimated flushing time, and obtains a flushing adjustment record; The valve sequence control module performs a defogger valve sequence check and operation based on the flushing adjustment record, records the operation time and feedback, and obtains valve operation feedback details; The washing cycle execution module determines the start and end time of washing based on the valve operation feedback details, compares the number of flushes with the set value, records the time and status of each wash, and obtains a washing cycle record; The monitoring status analysis module performs valve operation abnormality inspection based on the washing cycle record, including delay and early closing, analyzes the abnormal time and cause, and obtains abnormal operation analysis results; The operation strategy adjustment module adjusts the flushing process and valve control strategy based on the abnormal operation analysis results, analyzes the impact of the faulty valve, records the optimization measures and adjustment process, and obtains the strategy optimization results.

2. The demister flushing control system according to claim 1, characterized in that: The water pump startup status record includes the water pump model before startup, the recorded startup time, the monitored pressure feedback, and the monitored flow feedback. The flushing adjustment record includes the adjusted flushing time, the adjusted number of flushing times, the calculated total energy consumption, the calculated total time, the adjusted water pump power, the adjusted flow rate, and the expected next flushing time. The valve operation feedback details include the valve operation start and end time, feedback information during operation, the error status when the operation fails, and the cause of the fault when the operation fails. The washing cycle record includes the start and end time of washing, the number of completed flushing times, and the time record of the end of washing. The abnormal operation analysis result includes the identified faulty defogger valve, the time when the fault occurred, the duration of the fault, and the affected range. The strategy optimization result includes the adjusted water pump operating parameters, the adjusted defogger valve control strategy, and the proposed optimization measures.

3. The demister flushing control system according to claim 1, characterized in that: The startup configuration module includes: Select the water pump submodule to select the defogger flushing water pump, check the historical operation data, determine whether the water pump is in the standby state, activate the water pump start sequence, and synchronously update the operation log to record the current status of the water pump and the start sequence activity, and obtain the water pump activation status result; The status detection submodule evaluates the operating status and start-up readiness of the water pump based on the water pump activation status result, records the water pump model and the timestamp before start-up, checks the integrity and consistency of the water pump start-up sequence, collects start-up preparation information, and obtains start-up preparation details; Based on the startup preparation details, the recording and monitoring submodule monitors key parameters during the water pump startup process, including pressure and flow, records multiple parameters of the startup process, analyzes parameter feedback, records the time when the startup is completed, and obtains a water pump startup status record.

4. The demister flushing control system according to claim 1, characterized in that: The parameter adjustment module includes: The input verification submodule receives the input of flushing time and number based on the water pump startup status record, uses historical data if the user does not provide new settings, performs format verification and logical range check on the input time and number, records the user's input history, and generates verified input data; The energy consumption calculation submodule uses the verified input data to calculate the total energy consumption of this flushing, uses the historical energy consumption data and the current input data to adjust the power and flow rate parameters of the water pump, and estimates the energy consumption in the future time period according to the prediction model to calculate the energy consumption and adjust the parameters; The adjustment record submodule estimates the expected time of the next flushing through the energy consumption and adjustment parameters, updates the prediction model according to the current state and environmental factors, synchronizes the defogger flushing state and user configuration to the database, and constructs the flushing adjustment record.

5. The demister flushing control system according to claim 1, characterized in that: The valve sequence control module includes: The valve status check submodule checks the initial status of the defogger valve based on the flushing adjustment record, reads the startup status and fault code of the defogger valve, starts a timer to record the operation start time, records the error status and fault cause of the defogger valve with abnormal status, and obtains valve status details; The valve operation control submodule performs opening and closing operations of the demister valve based on the valve status details, records the start time of the demister valve operation, monitors and records the response and feedback status of the demister valve during the operation, and generates a valve control result record; The operation result recording submodule analyzes the operation results of the defogger valve based on the valve control result record, records the end time of the defogger valve operation, marks the time point of successful operation, records the error status and cause of the failed defogger valve operation, and obtains valve operation feedback details.

6. The demister flushing control system according to claim 1, characterized in that: The washing cycle execution module includes: The start and end determination submodule identifies and records the start and end time points of the wash cycle based on the valve operation feedback details, compares the number of wash cycles with the number of wash cycles preset by the user, and updates the wash status and time if the current number of wash cycles does not reach the preset value; if the current number of wash cycles reaches the preset value, records the end status and terminates the cycle, and generates a wash status update; The washing monitoring submodule adopts the washing status update, records the start and end time of washing one by one, monitors the duration of each washing cycle, updates the washing status record, and obtains the washing process details; The cycle record submodule calculates the total time of the washing cycle through the washing process details, counts the washing time periods, calculates the average efficiency, and constructs a washing cycle record.

7. The demister flushing control system according to claim 1, characterized in that: The monitoring status analysis module includes: The abnormal operation detection submodule analyzes the opening and closing time of the defogger valve one by one based on the washing cycle record, identifies events that are inconsistent with the predetermined operation plan, including delayed opening and premature closing of the defogger valve, records the abnormal time point and valve identification, analyzes the abnormal operation data, identifies operation errors and fault signals, and obtains detailed results of the abnormal operation of the defogger valve; The fault analysis submodule analyzes the occurrence time and duration of the abnormal operation based on the detailed results of the abnormal operation of the defogger valve, compares the operation log and feedback, records the time and duration of the fault, iteratively evaluates the fault data, and generates fault time and cause analysis results; Based on the fault time and cause analysis results, the fault impact assessment submodule applies a time series analysis method to calculate the fault duration and evaluate the impact on the washing cycle and performance. It also analyzes the operational changes and response strategies of the defogger during the fault period, organizes the details of the fault impact, evaluates the impact of the fault on operational efficiency, and obtains abnormal operation analysis results.

8. The demister flushing control system according to claim 1, characterized in that: The formula of the time series analysis method is as follows: Among them, X t is the value of the time series at time t, c is the constant term in the model, p is the order of the autoregressive model, φ i is the autoregressive coefficient, α i is the periodic adjustment coefficient of the i-th autoregressive coefficient, ω is the base frequency of periodic adjustment, q is the order of the moving average model, θ j is the moving average coefficient, β j is the periodic adjustment coefficient of the jth moving average coefficient, γ is the nonlinear adjustment coefficient of the error term, ε t is the error term at time t.

9. The demister flushing control system according to claim 1, characterized in that: The operation strategy adjustment module includes: Based on the abnormal operation analysis results, the operation sequence evaluation submodule gradually evaluates the performance of each link in the flushing process, records the execution time and operation status of key links, analyzes the response performance of each link under abnormal conditions, identifies key problem points that lead to inefficiency, and conducts risk assessment and impact analysis to obtain the operation process efficiency analysis results; The parameter adjustment submodule uses the results of the operation process efficiency analysis to adjust the operating parameters of the water pump, including flow rate and pressure settings, and simultaneously fine-tune the opening and closing control strategy of the demister valve to match differentiated operation requirements. It also records the reasons and steps for parameter adjustments and generates a parameter configuration optimization log. The optimization measures submodule analyzes the adjusted parameters through the parameter configuration optimization log, including the response and impact of the faulty defogger valve, proposes optimization measures based on real-time operation feedback, records the implementation steps of the measures and the expected optimization effects, and constructs strategy optimization results.

10. A demister flushing control method, characterized in that: The demister flushing control system according to any one of claims 1 to 9 comprises the following steps: Select the defogger flushing pump, record the pump model, mark the current time as the time point before startup, activate the pump startup sequence, monitor the pump startup pressure in real time through the pressure sensor, and generate a pump startup status record; Based on the water pump startup status record, receiving the flushing time and number of times set by the user, estimating and recording the time required for the flushing process, and generating a flushing adjustment record; Using the flushing adjustment record, check the defogger valve sequence, sequentially control the opening and closing of the valves, record the operation time and feedback, and generate valve operation feedback details; Based on the valve operation feedback details, determine the start and end time of the washing process, compare the real-time number of flushes with the number of flushes set by the user, record and analyze the duration and completion status of each wash, and generate a washing cycle record; Based on the washing cycle record, the data in the record is analyzed to check whether there is any abnormal valve operation, and the time point and potential cause of the abnormality are analyzed, the flushing process and valve control strategy are adjusted, the optimization measures and adjustment process are iterated, and the strategy optimization results are generated.