Rapid generation method of one-key sequence control test signal sequence for substation operation ticket acceptance
By editing interval information and generating test signal sequences, the problem of low efficiency in editing test signal sequences during substation live-line acceptance testing is solved, and efficient test signal generation is achieved, which is suitable for one-click sequential control systems in substations.
Patent Information
- Application Number
- CN202411168587.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-29
AI Technical Summary
During the uninterrupted power supply acceptance phase, the low efficiency of editing the substation test signal sequence leads to incomplete testing and potential safety hazards.
By editing the interval information, primary and secondary equipment are processed separately to generate interval test signal sequences, which are then combined to generate operation ticket test signal sequences, reducing manual intervention and error correction.
It improves the efficiency of editing test signal sequences, conforms to the habits of operation and maintenance personnel, and is suitable for combined operation ticket testing of equipment such as main transformers and busbars in operating substations, significantly improving efficiency.
Smart Images

Figure CN119051265A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of substations, and in particular to a method for quickly generating a one-key sequential control test signal sequence for acceptance of a substation operation ticket. Background Art
[0002] One-button sequential control technology is an intelligent control technology for substation switching operations. It can realize automated control with few or no personnel on duty, thereby reducing the risk of human error and ensuring the safe and stable operation of the power grid. At present, the acceptance modes of the one-button sequential control function of substations are mainly divided into power outage acceptance mode and non-power outage acceptance mode. The power outage acceptance mode depends on the actual primary and secondary equipment in the substation and needs to be carried out under power outage conditions. The power outage of the substation is carried out step by step according to the voltage level and busbar in a planned manner, and the overall time is very long. The non-power outage acceptance mode adopts simulation testing technology, using special software or devices to simulate the behavior of primary and secondary equipment in the substation. It can be carried out without affecting the power supply, so it has been more and more widely used.
[0003] The basic principle of the non-power-off acceptance mode is to use special software or devices to send and receive test signal sequences containing three remote (telecommunication, telemetry, and remote control) information, provide telecommunication and telemetry data for the one-button sequential control system to be tested, and execute the remote control commands issued by it to verify whether the functions and performance of the one-button sequential control system to be tested are correct. Due to the large number of one-button sequential control operation tickets, especially when the operation tickets involve both primary and secondary equipment, the work of editing the test signal sequence will take up a lot of time.
[0004] The conventional test signal sequence editing method is to manually select signals one by one from the substation monitoring system configuration file for each operation ticket. A typical 500kV substation has more than 500 operation tickets, and editing the test signal sequence will take a lot of time. Moreover, when an error occurs, the test signal sequences of all operation tickets in the same interval must be modified.
[0005] In the prior art, the invention patent with the patent publication number CN101594004A discloses an intelligent control method for a substation automation system, which replaces the manual operation of the operation ticket with computer intelligence, and controls and operates the equipment through intelligence. Various operations in the substation operation are pre-edited into intelligent operation tickets and downloaded to the execution server: for pure intra-interval operations, they are downloaded to the interval layer intelligent device. For cross-interval operations, they are downloaded to a special intelligent operation server. When the substation is in operation, if such operations are required, the execution command is sent to the execution server through the background monitoring interface or the dispatching end by remote control. The execution server automatically completes a series of switching operations, among which the error prevention of various operations is also handled by the execution server according to the pre-edited rules, and the entire switching operation is realized with "one-click operation". The comparative document is aimed at the functions of the substation automation system, and the switching operations that were previously performed manually are entered into the computer and controlled for execution.
[0006] The existing invention patent with publication number CN110674282A discloses a method for intelligently drafting one-key sequential control operation tickets based on an expert knowledge rule base, and proposes a method for automatically creating one-key sequential control operation tickets by identifying the relevant information of primary and secondary equipment involved in the one-key sequential control operation task and performing standardized processing, comparing the source equipment state and the target equipment state before and after the operation based on the equipment state, and seeking the difference items, obtaining the corresponding operation ticket sequence through the intelligent drafting expert knowledge rule base, and combining the anti-mistake locking logic. This prior art is aimed at the drafting of operation tickets.
[0007] In this technical field, the entire process of one-key sequential control of substations includes three steps: (1) the operation and maintenance personnel prepare and review the operation ticket; (2) the monitoring manufacturer configures the operation ticket on the one-key sequential control host; (3) the operation and maintenance personnel verify whether the configuration of the monitoring manufacturer is correct, and accept the operation ticket. The invention patent with publication number CN110674282A is about the first step, called the operation ticket drafting.
[0008] Secondly, the step 1 of the intelligent drafting method of one-key sequential control operation ticket based on the expert knowledge rule base is to standardize the naming of the information in the station, so that the corresponding information can be automatically obtained according to the information name and definition in the following steps 2 and 6. The focus is on the definition of the original information, which is more suitable for new substations. The standardized processing of its information will help to carry out work in the later stage. For the centralized control system, a large number of substations that have undergone one-key sequential control transformation are operating stations, and their information names have long been defined. There is no need to standardize the information for the so-called automatic association. The amount of information in the entire station is very large, and one-key sequential control will only use a small part of it. If the whole station is processed in an informationized and standardized manner, it will waste a lot of time and delay the operation of the substation in operation.
[0009] On February 1, 2024, Sheng Haihua published "Research and Application of One-key Sequential Control System Mirror Debugging Technology Based on Expert Knowledge Base" in "Power System Protection and Control", and in the introduction of 0, it was disclosed that "In the implementation of the one-key sequential control project of substation, there is still a lack of effective on-site testing and acceptance means, and it relies heavily on on-site manual power outages. At the same time, frequent primary equipment operation has a great impact on the service life of the equipment, and it is labor-intensive, labor-intensive, low-efficiency, and narrowly applicable. Due to the difficulty in flexibly simulating the status of primary equipment and actual signals, it is difficult to set non-compliant conditions item by item for testing the sequential control operation logic for situations that do not meet the operating conditions. As a result, the test is incomplete, there is a greater risk of missed tests, and there are greater safety hazards in subsequent applications", that is, the technical problem solved by the one-key sequential control system mirror debugging technology based on the expert knowledge base is to achieve non-power outage test acceptance and test safety issues, and there is no improvement on the problem of low editing efficiency of the test signal sequence.
[0010] In 2.3, typical sequential control tickets are automatically generated. The one-click sequential control operation ticket library in the platform is compiled by voltage level and interval classification, including single interval operation tickets and combination tickets. The combination ticket is composed of each interval operation ticket according to the error prevention requirements. It is not appropriate in this field. The error prevention requirements are summarized according to the operating procedures to prevent operators from violating the operating procedures due to lack of experience, poor condition, etc., rather than the other way around. The error prevention requirements are first established and then the operation is specified. Take the bus switching operation as an example. Bus switching refers to the substation (switch station) with double bus connection mode. The operation of switching part or all of the intervals on one set of buses to another set of buses for operation or hot standby. During the switching operation, attention should be paid to the balanced switching of power supply and load. Generally, a power interval is switched first, followed by a load interval, to prevent the bus tie circuit breaker from passing a large current and causing an unexpected failure. Therefore, when making a combination ticket for bus switching, the operation order of the intervals is determined by the current (which interval is the load and which interval is the power supply) at the time, and is not affected by error prevention.
[0011] And in the automatic generation of 2.2 logical rules, the platform generates interlocking logical rules based on the topological connection relationship of the main wiring diagram, that is, it is divided according to the actual lines, main transformers, busbars, etc. This requires higher professional requirements for operators, and the operation steps are also two more steps. For example, in Table 2 disclosed in the article, among all the operation ticket expressions exemplified, the sequential control operation ticket has only two steps, and once the interval type (line) is modified, the operation ticket basically needs to be reconfigured, and the configuration of the operation ticket is inflexible and inefficient. Summary of the invention
[0012] The technical problem to be solved by the present invention is to solve the problem of low editing efficiency of test signal sequences when testing test equipment in a substation during the non-power outage acceptance stage.
[0013] In order to solve the above technical problems, the present invention provides the following technical solutions: A method for quickly generating a one-key sequential control test signal sequence for substation operation ticket acceptance includes the following steps: S1, edit the interval information, and divide the interval type of the interval information into primary equipment and secondary equipment; S2, according to the switching operation, generating a corresponding interval test signal sequence from the interval information; S3, generating an operation ticket test signal sequence by combining multiple interval test signal sequences according to the operation ticket.
[0014] Advantages: The idea of the present invention is not to edit the test signal sequence directly for the operation ticket, but to first edit the interval information for the primary equipment and the secondary equipment, and then generate the test signal sequence from the interval information according to the specific switching operation, and combine the generated test signal sequences to finally generate the test signal sequence for the operation ticket. The rapid generation of the test signal sequence improves the editing efficiency of the test signal sequence.
[0015] In one embodiment of the present invention, in step S1, the primary equipment bay information includes: circuit breaker information, section I bus side switch information, section II bus side switch information, bay side switch information, and neutral point grounding switch information.
[0016] In one embodiment of the present invention, a device interval information has multiple device states, namely: cold standby state, I mother hot standby state, I mother running state, II mother hot standby state, II mother running state, and the device state test signal sequence of each interval information in the primary device interval information is obtained.
[0017] In one embodiment of the present invention, the interval operation steps of the primary equipment include: closing the circuit breaker, opening the circuit breaker, closing the knife switch and opening the gate; obtaining the circuit breaker operation step test signal sequence and the knife switch operation step test signal sequence.
[0018] In one embodiment of the present invention, in step S2, a primary equipment interval test signal sequence is obtained according to a primary equipment interval switching operation; wherein the primary equipment interval test signal sequence is sequentially composed of one primary equipment interval device state test signal sequence and multiple primary equipment interval operation step test signal sequences.
[0019] In one embodiment of the present invention, the secondary device interval information includes: a control object, a controlled signal, and a double confirmation signal, all of which contain address and value information, and the value indicates the state of the secondary device interval when it exits operation.
[0020] In one embodiment of the present invention, the device state of the secondary device interval information includes: an input state and an exit state; In one embodiment of the present invention, when in the input state, the secondary device interval device state test signal sequence is a controlled signal and a double confirmation signal that takes the inverse value according to the secondary device interval information. In the exit state, the secondary device interval device state test signal sequence is a controlled signal and a double confirmation signal that takes a positive value according to the secondary device interval information.
[0021] In one embodiment of the present invention, the interval switching operations of the secondary equipment are: switching from on to off, switching from off to on; each control object of the secondary equipment interval corresponds to an operation step, and a secondary equipment interval operation step test signal sequence is obtained.
[0022] In one embodiment of the present invention, in step S2, a secondary equipment interval test signal sequence is obtained according to the secondary equipment interval switching operation; wherein each secondary equipment interval test signal sequence is composed of one secondary equipment interval device state test signal sequence and multiple secondary equipment interval operation step test signal sequences in sequence.
[0023] In one embodiment of the present invention, generating an operation ticket test signal sequence comprises the following steps: S31: merging the device state test signal sequences of each interval, and when the same signal appears in multiple device state test signal sequences, only retaining the first one; S32: Combining the operation steps of each interval in sequence to test the signal sequence.
[0024] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention is applicable to the acceptance of operation tickets for in-service substations. Users only need to set the interval information and select the source device state and the target device state of the switching operation to automatically generate a one-key sequential control test signal sequence. There is no need to manually select and set the test signals one by one according to the details of the specific switching operation steps. This not only improves the editing efficiency of the test signal sequence, but is also more in line with the usage habits of substation operation and maintenance personnel. Even if an editing error is found, it is only necessary to modify the interval information and regenerate the test signal sequence.
[0025] Especially for the switching operations of main transformers, busbars and other equipment, which involve the testing of combined operation tickets for multiple primary and secondary equipment intervals, the final test signal sequence is automatically merged and combined based on the tested interval test signal sequence. There is no need to repeatedly adjust the order of a large number of test signals, and the efficiency improvement effect is more obvious.
[0026] The present invention defines a unified primary equipment type interval, and does not need to be divided according to actual lines, main transformers, buses, etc. as in the background technology. The present invention will automatically add and delete corresponding operation objects according to the interval parameters, for example, Figure 2In the embodiment, the low-voltage side primary equipment bay does not contain the II-section bus side switch, bay side switch, and neutral point grounding switch information, so no relevant information is generated in the equipment state test signal sequence. The signal sequence generated by the bay in the present invention is not directly arranged in bay order when combined, but follows professional operating procedures and has a certain order and signal merging logic. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 The present invention is a flowchart of a method for quickly generating a one-key sequential control test signal sequence for acceptance of a substation operation ticket according to an embodiment of the present invention.
[0028] Figure 2 This is a wiring diagram of a 220kV main transformer according to an embodiment of the present invention. DETAILED DESCRIPTION
[0029] In order to facilitate those skilled in the art to understand the technical solution of the present invention, the technical solution of the present invention is further described in conjunction with the accompanying drawings of the specification.
[0030] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0031] See also Figure 1 As shown, the present invention provides a method for quickly generating a one-key sequential control test signal sequence for substation operation ticket acceptance, comprising the following steps: S1, edit the interval information, and divide the interval types of the interval information into primary equipment and secondary equipment.
[0032] In one embodiment of the present invention, the primary equipment bay information includes: circuit breaker information, section I bus side switch information, section II bus side switch information, bay side switch information, and neutral point grounding switch information.
[0033] The circuit breaker information includes: control object, closed position, open position, current, voltage, and live indicator. Among them, the control object, closed position, and open position only contain address information. The current, voltage, and live indicator contain address and value information, and the value indicates the state of the primary equipment interval when it is operating normally.
[0034] The busbar section I side switch information, busbar section II side switch information, interval side switch information, and neutral point grounding switch information have the same structure, including: control object, main closed position, main open position, auxiliary closed position, auxiliary open position, and only address information.
[0035] The secondary device interval information includes: a control object, a controlled signal, and a double confirmation signal, all of which contain address and value information, and the value indicates the state of the secondary device interval when it exits operation.
[0036] S2, according to the switching operation, a corresponding interval test signal sequence is generated from the interval information.
[0037] In one embodiment of the present invention, a primary equipment interval has five equipment states, namely: cold standby state, I mother hot standby state, I mother operation state, II mother hot standby state, II mother operation state. The test signal sequences for different equipment states are shown in Table 1.
[0038] Table 1 Device state test signal sequence
[0039] There are four operating steps for primary equipment intervals, namely: closing the circuit breaker, opening the circuit breaker, closing the knife switch, and opening the knife switch.
[0040] Among them, the test signal sequence of the circuit breaker closing and circuit breaker opening operation steps is shown in Table 2.
[0041] Table 2 Circuit breaker operation test signal sequence
[0042] Among them, the test signal sequence of the closing and opening knife switch operation steps is shown in Table 3.
[0043] Table 3 Knife switch operation test signal sequence
[0044] In one embodiment of the present invention, the primary equipment interval has 16 switching operations, namely: cold standby to hot standby of mother I, hot standby of mother I to operation of mother I, cold standby to operation of mother I, operation of mother I to hot standby of mother I, hot standby of mother I to cold standby, operation of mother I to cold standby, cold standby to hot standby of mother II, hot standby of mother II to operation of mother II, cold standby to operation of mother II, operation of mother II to hot standby of mother II, hot standby of mother II to cold standby, operation of mother II to cold standby, hot standby of mother I to hot standby of mother II, operation of mother I to operation of mother II
[0045] Each type of primary equipment interval test signal sequence is composed of one primary equipment interval device state test signal sequence and multiple primary equipment interval operation step test signal sequences. Specifically, they are: (1) Convert from cold standby to hot standby on bus section I: In cold standby state, close the switch on bus section I and the switch on the interval side.
[0046] (2) Transition from I bus hot standby to I bus operation: When I bus is in hot standby state, close the neutral point grounding switch, close the circuit breaker, and open the neutral point grounding switch.
[0047] (3) Cold standby to I bus operation: In cold standby state, close the I section bus side switch, close the interval side switch, close the neutral point grounding switch, close the circuit breaker, and open the neutral point grounding switch.
[0048] (4) Switch from I bus operation to I bus hot standby: When I bus is in operation, close the neutral point grounding switch, open the circuit breaker, and open the neutral point grounding switch.
[0049] (5) Bus I hot standby to cold standby: Bus I is in hot standby state, the interval side switch is opened, and the bus section I side switch is opened.
[0050] (6) Bus I switching from operation to cold standby: When bus I is in operation, close the neutral point earthing switch, open the circuit breaker, open the neutral point earthing switch, open the interval side switch, and open the bus section I side switch.
[0051] (7) Convert cold standby to hot standby on bus II: In cold standby state, close the bus II side switch and the interval side switch.
[0052] (8) Switch from hot standby mode to operation mode: When the bus II is in hot standby mode, close the neutral point grounding switch, close the circuit breaker, and open the neutral point grounding switch.
[0053] (9) Cold standby to bus II operation: In cold standby state, close the bus II side switch, close the interval side switch, close the neutral point grounding switch, close the circuit breaker, and open the neutral point grounding switch.
[0054] (10) Switch from Ⅱ bus operation to Ⅱ bus hot standby: Ⅱ bus is in operation, close the neutral point grounding switch, open the circuit breaker, and open the neutral point grounding switch.
[0055] (11) Bus II hot standby switches to cold standby: Bus II is in hot standby state, the interval side switch is opened, and the bus II section side switch is opened.
[0056] (12) Bus II switching from operation to cold standby: Bus II is in operation, close the neutral point earthing switch, open the circuit breaker, open the neutral point earthing switch, open the interval side switch, and open the bus II side switch.
[0057] (13) Bus I hot standby to bus II hot standby: Bus I hot standby state, close the bus II side switch, open the bus I side switch; (14) Bus II hot standby to bus I hot standby: Bus II hot standby state, close the bus I side switch, open the bus II side switch.
[0058] (15) From bus I operation to bus II operation: When bus I is in operation, close the switch on bus II and open the switch on bus I.
[0059] (16) From bus II operation to bus I operation: When bus II is in operation, close the knife switch on the bus I side and open the knife switch on the bus II side.
[0060] In one embodiment of the present invention, the secondary device interval has two device states, namely: an input state and an exit state. In the input state, the test signal sequence is a controlled signal, and the double confirmation signal takes a negative value according to the secondary device interval information. In the exit state, the test signal sequence is a controlled signal, and the double confirmation signal takes a positive value according to the secondary device interval information.
[0061] The secondary equipment interval has two switching operations, namely: switching from on to off and switching from off to on. Each control object of the secondary equipment interval corresponds to an operation step, and its test signal sequence is shown in Table 4.
[0062] Table 4 Secondary equipment interval operation steps test signal sequence
[0063] In an embodiment of the present invention, each of the secondary device interval test signal sequences is composed of one secondary device interval device state test signal sequence and a plurality of secondary device interval operation step test signal sequences in sequence.
[0064] The corresponding interval test signal sequence is generated from the interval information according to the switching operation, and the one-button sequential control test of each interval can be completed.
[0065] S3, generating an operation ticket test signal sequence by combining multiple interval test signal sequences according to the operation ticket.
[0066] In one embodiment of the present invention, step S3 includes the following steps: S31: Merge the device state test signal sequences of each interval, and when the same signal appears in multiple intervals, only retain the first one.
[0067] In this embodiment, the equipment state test signal sequences of each interval are merged. Since the operation tickets of multiple intervals may involve the same signal when the operation tickets are combined, such as the operation tickets of each interval of the double busbar will involve the position signals of the bus tie switch and the knife switch, or the same interval contains multiple operation tickets, for example, when the internal bridge connection is expanded, the line interval is first changed from the cold standby state to the hot standby state, and then the main transformer high voltage side interval is changed from the cold standby state to the running state, and then the line interval is changed from the hot standby state to the running state. Therefore, when the same signal appears in multiple equipment state test signal sequences, the first equipment state test signal is used as the standard, and other repeated signals are automatically removed and only the first one is retained. The combination ticket is to combine multiple tickets together, each ticket has its own equipment state test signal sequence, which may contain some repeated signals, and which signals in the equipment state test signal sequence of each ticket are known. For example, a certain signal in the equipment state test signal sequence of the first operation ticket is closed, and a certain signal in the equipment state test signal sequence of the Nth operation ticket is divided, then the signal in the equipment state test signal sequence of the final combined ticket generated is closed.
[0068] S32: Combining the operation steps of each interval in sequence to test the signal sequence.
[0069] In this embodiment, each interval is combined in sequence in accordance with professional operating procedures. For the switching operation of main transformers, busbars and other equipment, which involves the test of the combined operation ticket of multiple primary and secondary equipment intervals, multiple interval test signal sequences are combined according to the operation ticket to generate an operation ticket test signal sequence. Specific embodiments See 1 and Figure 2 As shown in the figure, as a wiring diagram of a 220kV main transformer in an embodiment, the 220kV high voltage side of the main transformer adopts double busbar wiring, and the 35kV low voltage side adopts single busbar wiring.
[0071] For step S1: The primary equipment bay information on the high-voltage side includes: 2801 circuit breaker information, 28011 switch information on the bus section I side, 28012 switch information on the bus section II side, 28013 switch information on the bay side, and 28010 grounding switch information on the neutral point.
[0072] The primary equipment interval information on the low-voltage side includes: 301 circuit breaker information, 301 trolley information (equivalent to the knife switch on the busbar side of section I).
[0073] Among them, 28011, 28012, and 28013 are abbreviations for the numbers of the switches in the same interval on the primary wiring diagram. Only the numbers that are more than the circuit breaker numbers are marked. This is a common practice in the industry. Also, for the 301 trolley information, the trolley-type circuit breaker on the primary wiring diagram only marks the number of the circuit breaker (the rectangle in the middle), and does not mark the number of the trolley (the arrows on both sides of the rectangle). This is also a common practice in the industry.
[0074] The information of 2801 circuit breakers and 301 circuit breakers includes: control object, closed position, open position, current, voltage, and live indicator. Among them, the control object, closed position, and open position only contain address information; the current, voltage, and live indicator contain address and value information, and the value indicates the state of the primary equipment interval when it is operating normally.
[0075] The information of 28011 knife switch, 28012 knife switch, 28013 knife switch, 28010 knife switch and 301 trolley has the same structure, including: control object, main closing position, main opening position, auxiliary closing position and auxiliary opening position, and only contains address information.
[0076] The secondary equipment interval information on the high-voltage side includes the information of three soft pressure plates, namely, high backup protection, tripping the high-voltage side outlet, and starting the high-voltage side switch failure outlet soft pressure plate. Each soft pressure plate includes a control object, a controlled signal, and a double confirmation signal, all of which contain address and value information. The value is 0, indicating the state of the secondary equipment interval when it exits operation.
[0077] The secondary equipment interval information on the low-voltage side includes information on three soft pressure plates, namely, low backup protection, tripping the low-voltage side outlet, and starting the low-voltage side switch failure outlet soft pressure plate. Each soft pressure plate includes a control object, a controlled signal, and a double confirmation signal, all of which contain address and value information. A value of 0 indicates the state when the secondary equipment interval exits operation.
[0078] The addresses of the information described in step S1 are all obtained from the monitoring configuration file. How to parse the monitoring configuration file and obtain the address information is a common technical means in this field and will not be described in detail.
[0079] In one embodiment of the present invention, for step S2: The primary equipment interval on the high-voltage side has five equipment states, namely: cold standby state, I bus hot standby state, I bus operating state, II bus hot standby state, and II bus operating state.
[0080] The test signal sequence of the primary equipment state on the high-voltage side is shown in Table 5. Among them, the voltage and current use secondary values, the voltage uses the line voltage, the rated value is 100V, and the current rated value is 5A. Because the current threshold is 0.04 times the rated value, the current value takes 1.1 times the current threshold when there is current, and takes 0.9 times the current threshold when there is no current. Because the voltage threshold is 0.4 times the rated value and the no-voltage threshold is 0.15 times the rated value, the voltage threshold is 1.1 times the voltage threshold when there is voltage, and 0.9 times the no-voltage threshold when there is no voltage. The type of the live indicator is voltage indication, so it is closed when there is voltage and open when there is no voltage; if the type of the live indicator is no-voltage indication, it is just the opposite, open when there is voltage and closed when there is no voltage.
[0081] Table 5 High-voltage side primary equipment state test signal sequence
[0082] The low-voltage side primary equipment bay does not contain the busbar side switch, bay side switch, and neutral point grounding switch information, so no relevant information will be generated in the equipment state test signal sequence. The low-voltage side primary equipment state test signal sequence is shown in Table 6.
[0083] Table 6 Test signal sequence of primary equipment state on low voltage side
[0084] There are four operating steps for a primary equipment interval, namely: closing the circuit breaker, opening the circuit breaker, closing the knife switch (the trolley is also regarded as the knife switch), and opening the knife switch.
[0085] The test signal sequence for the circuit breaker closing and circuit breaker opening operation steps is shown in Table 7.
[0086] Table 7 Circuit breaker operation test signal sequence
[0087] The test signal sequence for the operation steps of closing the knife switch and opening the knife switch is shown in Table 8.
[0088] Table 8 Knife switch operation test signal sequence
[0089] The primary equipment interval on the high-voltage side has 16 switching operations, namely: cold standby to hot standby from mother Ⅰ, hot standby from mother Ⅰ to operation from mother Ⅰ, cold standby to operation from mother Ⅰ, operation from mother Ⅰ to hot standby from mother Ⅰ, hot standby from mother Ⅰ to cold standby, operation from mother Ⅰ to cold standby, cold standby to hot standby from mother Ⅱ, hot standby from mother Ⅱ to operation from mother Ⅱ, cold standby to operation from mother Ⅱ, operation from mother Ⅱ to hot standby from mother Ⅱ, hot standby from mother Ⅱ to cold standby, operation from mother Ⅱ to cold standby, hot standby from mother Ⅰ to hot standby from mother Ⅱ, operation from mother Ⅱ to operation from mother Ⅱ, hot standby from mother Ⅱ to cold standby, operation from mother Ⅱ to cold standby, hot standby from mother Ⅰ to hot standby from mother Ⅱ, operation from mother Ⅰ to operation from mother Ⅱ
[0090] Each high-voltage side primary equipment interval test signal sequence is composed of one primary equipment interval device state test signal sequence and multiple primary equipment interval operation step test signal sequences, which are: (1) Cold standby to I mother hot standby: cold standby state, close 28011 switch, close 28013 switch; (2) Switch from I bus hot standby to I bus operation: When I bus is in hot standby state, close the 28010 grounding switch, close the 2801 circuit breaker, and open the 28010 grounding switch; (3) Cold standby to I mother operation: cold standby state, close 28011 switch, close 28013 switch, close 28010 switch, close 2801 circuit breaker, open 28010 switch; (4) Switch from I bus operation to I bus hot standby: When I bus is in operation, close the 28010 switch, open the 2801 circuit breaker, and open the 28010 switch; (5) I mother hot standby to cold standby: I mother hot standby state, pull open 28013 switch, pull open 28011 switch; (6) I bus operation to cold standby: I bus operation state, close 28010 knife switch, open 2801 circuit breaker, open 28010 knife switch, open 28013 knife switch, open 28011 knife switch; (7) Cold standby to II mother hot standby: cold standby state, close 28012 switch, close 28013 switch; (8) Switch from Ⅱ bus hot standby to Ⅱ bus operation: Ⅱ bus hot standby state, close 28010 knife switch, close 2801 circuit breaker, open 28010 knife switch; (9) Cold standby to II mother operation: cold standby state, close 28012 knife switch, close 28013 knife switch, close 28010 knife switch, close 2801 circuit breaker, open 28010 knife switch; (10) Switch from bus II to hot standby: Bus II is in operation, close the 28010 switch, open the 2801 circuit breaker, and open the 28010 switch; (11) Ⅱ mother hot standby to cold standby: Ⅱ mother hot standby state, pull open 28013 knife switch, pull open 28012 knife switch; (12) Ⅱ bus operation to cold standby: Ⅱ bus operation state, close 28010 knife switch, open 2801 circuit breaker, open 28010 knife switch, open 28013 knife switch, open 28012 knife switch; (13) Switch from I mother hot standby to II mother hot standby: I mother hot standby state, close 28012 switch, open 28011 switch; (14) Switch from Ⅱ mother hot standby to Ⅰ mother hot standby: Ⅱ mother hot standby state, close 28011 switch, open 28012 switch; (15) Switch from I mother operation to II mother operation: In I mother operation state, close the 28012 knife switch and open the 28011 knife switch; (16) Switch from Ⅱ mother operation to Ⅰ mother operation: Ⅱ mother operation state, close 28011 knife switch, open 28012 knife switch.
[0091] There is no busbar switch on the secondary side of the primary equipment interval on the low-voltage side, and it has 6 switching operations, namely: cold standby to hot standby from bus Ⅰ, hot standby from bus Ⅰ to operation from bus Ⅰ, cold standby to operation from bus Ⅰ, operation from bus Ⅰ to hot standby from bus Ⅰ, hot standby from bus Ⅰ to cold standby, and operation from bus Ⅰ to cold standby.
[0092] Each low-voltage side primary equipment interval test signal sequence is composed of one primary equipment interval device state test signal sequence and multiple primary equipment interval operation step test signal sequences, which are: (1) From cold standby to I mother hot standby: in cold standby state, close the 301 trolley; (2) Switch from I bus hot standby to I bus operation: I bus hot standby state, close 301 circuit breaker; (3) Cold standby to I bus operation: cold standby state, close 301 switch, close 301 circuit breaker; (4) Switch from bus I to hot standby: When bus I is in operation, disconnect the 301 circuit breaker; (5) I mother hot standby to cold standby: I mother hot standby state, pull out 301 trolley; (6) Switching from I mother operation to cold standby: When I mother is in operation, open the 301 circuit breaker and the 301 trolley.
[0093] The secondary equipment interval has two equipment states: input state and exit state. In the input state, the test signal sequence is the controlled signal, and the double confirmation signal takes the negative value according to the secondary equipment interval information. In the exit state, the test signal sequence is the controlled signal, and the double confirmation signal takes the positive value according to the secondary equipment interval information. The secondary equipment states on the high and low voltage sides are shown in Table 9.
[0094] Table 9 Secondary equipment state test signal sequence
[0095] In one embodiment of the present invention, the secondary equipment bay has two switching operations, namely, exit protection and input protection. The high and low voltage side secondary equipment bay operation ticket is to perform input and exit operations on the three soft pressure plates, and its test signal sequence is shown in Table 10.
[0096] Table 10 High and low voltage side soft pressure plate operation steps test signal sequence
[0097] The high (low) voltage side secondary equipment interval test signal sequence consists of the high (low) voltage side equipment state test signal sequence and the high (low) voltage side soft pressure plate operation test signal sequence.
[0098] For the test of the main transformer's operation ticket from I bus operation to cold standby, the following interval test signal sequences need to be combined: low-voltage side I bus operation to I bus hot standby, high-voltage side I bus operation to I bus hot standby, low-voltage side input to output, high-voltage side input to output, low-voltage side I bus hot standby to cold standby, high-voltage side I bus hot standby to cold standby.
[0099] In one embodiment of the present invention, step S31 is first completed to merge the test signal sequences of the low-voltage side I mother running state, the high-voltage side I mother running state, the low-voltage side input state, the high-voltage side input state, the low-voltage side I mother hot standby state, and the high-voltage side I mother hot standby state. When the same signal appears in multiple device state test signal sequences, only the first one is retained; Then complete step S32, and sequentially combine the following steps to test the signal sequence: open the 301 circuit breaker, close the 28010 knife switch, open the 2801 circuit breaker, open the 28010 knife switch, exit the low backup protection, exit the low voltage side output, exit the low voltage side switch failure output, exit the high backup protection, exit the high voltage side output, exit the high voltage side switch failure output, open the 301 trolley, open the 28013 knife switch, and open the 28011 knife switch.
[0100] The present invention can provide test data for the one-button sequential control system without relying on the operating conditions in the power station during power outage simulation, and can comprehensively and quickly verify the functional logic of the one-button sequential control system, thereby improving the scope and speed of promotion and application of the one-button sequential control technology. The one-button sequential control test signal sequence generation method of the present invention only needs to set the interval information and select the source device state and the target device state of the switching operation to automatically generate the one-button sequential control test signal sequence, which not only improves the efficiency of editing the test signal sequence, but also is more in line with the usage habits of substation operation and maintenance personnel. In particular, for the switching operation of equipment such as main transformers and busbars, which involves the test of a combination of operation tickets for multiple primary and secondary equipment intervals, the final test signal sequence is automatically merged and combined based on the interval test signal sequence that has been tested, and the efficiency improvement effect is more obvious.
[0101] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-limiting from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any reference numerals in the claims should not be regarded as limiting the claims involved.
[0102] The above-described embodiments merely represent implementation methods of the invention. The protection scope of the present invention is not limited to the above-described embodiments. For those skilled in the art, several modifications and improvements may be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.
Claims
1. A method for quickly generating a one-key sequential control test signal sequence for substation operation ticket acceptance, characterized in that: The following steps are involved: S1, edit the interval information, and divide the interval type of the interval information into primary equipment and secondary equipment; S2, according to the switching operation, generating a corresponding interval test signal sequence from the interval information; S3, generating an operation ticket test signal sequence by combining multiple interval test signal sequences according to the operation ticket.
2. The one-key sequential control test signal sequence rapid generation method for substation operation ticket acceptance according to claim 1 is characterized in that: In step S1, the primary equipment bay information includes: circuit breaker information, section I busbar side switch information, section II busbar side switch information, bay side switch information, and neutral point grounding switch information.
3. The one-key sequential control test signal sequence rapid generation method for substation operation ticket acceptance according to claim 2 is characterized in that: The primary equipment interval information has multiple equipment states, namely: cold standby state, I mother hot standby state, I mother running state, II mother hot standby state, II mother running state. The equipment state test signal sequence of each interval information in the primary equipment interval information is obtained.
4. The one-key sequential control test signal sequence rapid generation method for substation operation ticket acceptance according to claim 2 is characterized in that: The interval operation steps of the primary equipment include: closing the circuit breaker, opening the circuit breaker, closing the knife switch and opening the gate; obtaining the circuit breaker operation step test signal sequence and the knife switch operation step test signal sequence.
5. The one-key sequential control test signal sequence rapid generation method for substation operation ticket acceptance according to claim 1 is characterized in that: In step S2, according to a primary equipment interval switching operation, a primary equipment interval test signal sequence is obtained; wherein the primary equipment interval test signal sequence is composed of one primary equipment interval device state test signal sequence and a plurality of primary equipment interval operation step test signal sequences in sequence.
6. The one-key sequential control test signal sequence rapid generation method for substation operation ticket acceptance according to claim 1 is characterized in that: The secondary device interval information includes: a control object, a controlled signal, and a double confirmation signal, all of which contain address and value information, and the value indicates the state of the secondary device interval when it exits operation.
7. The one-key sequential control test signal sequence rapid generation method for substation operation ticket acceptance according to claim 6 is characterized in that: The device states of the secondary device interval information include: input state and exit state; When in the input state, the secondary equipment interval equipment state test signal sequence is the controlled signal and the double confirmation signal takes the inverse value according to the secondary equipment interval information. In the exit state, the secondary device interval device state test signal sequence is a controlled signal and a double confirmation signal that takes a positive value according to the secondary device interval information.
8. The one-key sequential control test signal sequence rapid generation method for substation operation ticket acceptance according to claim 6 is characterized in that: The interval switching operations of the secondary equipment are: switching from on to off, switching from off to on; each control object of the secondary equipment interval corresponds to an operation step, and a test signal sequence of the secondary equipment interval operation steps is obtained.
9. The one-key sequential control test signal sequence rapid generation method for substation operation ticket acceptance according to claim 1 is characterized in that: In step S2, a secondary equipment interval test signal sequence is obtained according to the secondary equipment interval switching operation; wherein each secondary equipment interval test signal sequence is composed of one secondary equipment interval device state test signal sequence and a plurality of secondary equipment interval operation step test signal sequences in sequence.
10. The one-key sequential control test signal sequence rapid generation method for substation operation ticket acceptance according to claim 1, characterized in that: Generating an operation ticket test signal sequence includes the following steps: S31: merge the device state test signal sequences of each interval, and when the same signal appears in multiple intervals, only the first one is retained; S32: Combining the operation steps of each interval in sequence to test the signal sequence.
Citation Information
Cited By
One-key sequence control test signal sequence generation method
CN119358042A
A one-key sequence generation method for testing signals
CN119358042B