Oil field waste oil pipe lengthening repair process

Through heat treatment and friction welding technology, combined with heat treatment and friction stir welding, the problem of insufficient length of waste oil pipes after repair is solved, and the mechanical properties of the oil pipes are improved to meet API 5CT specifications.

CN118809084APending Publication Date: 2024-10-22MEIHEKOU HONGYE SEAMLESS STEEL PIPE CO LTD +1
View PDF 14 Cites 0 Cited by

Patent Information

Application Number
CN202410722111.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

Waste oil pipes in oil fields are often of insufficient length after repair, resulting in waste of resources and substandard mechanical properties, making them unable to meet the requirements of API 5CT specifications.

Method used

Heat treatment and friction welding technology are used to pre-treat and weld the welded end of the oil pipe, followed by heat treatment and friction stir welding to remove the welded convex ring and process the thread to improve the welding strength and density.

Benefits of technology

The effective connection of oil pipes is achieved, ensuring that the connected oil pipes have excellent mechanical properties, meet the requirements of API 5CT specifications, and solve the problem of short length of oil pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0004877481180000081
    Figure BDA0004877481180000081
  • Figure BDA0004877481180000091
    Figure BDA0004877481180000091
Patent Text Reader

Abstract

The invention discloses an oil field waste oil pipe lengthening repair process which comprises the steps that the length of a lengthening oil pipe is determined according to the user requirement and the length of a short oil pipe, and then the welding end of the short oil pipe and the welding end of the lengthening oil pipe are leveled out of the plane of a vertical oil pipe; the welding ends of the short oil pipe and the lengthened oil pipe are heated and cooled, and then the short oil pipe and the lengthened oil pipe are oppositely clamped on a friction welding machine to be welded; heating and cooling the welding part of the short oil pipe and the extended oil pipe, and removing convex rings on the inner and outer surfaces of a welded junction; the welded junction is welded again through friction stir welding; according to the oil field waste oil pipe extension repairing process, heating treatment and friction welding are sequentially carried out, plastic deformation and flowing of a welding material can be better promoted, the welding quality is improved, then heat treatment and friction stir welding are carried out on the welded material, and the welding quality is improved. The stress in the welding material can be reduced, the welding material is promoted to form a compact solid phase, and then the welding strength is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of resource utilization, and in particular to a process for lengthening and repairing waste oil pipes in oil fields. Background Art

[0002] Oil pipe is one of the main equipments in oil production. Generally speaking, 15kg of oil pipe is consumed for every 1m of drilling, accounting for about 25% of oil well pipes and 10% of the total steel used in the oil industry. During the use of oil pipes, the inner wall of the pipes and the threads of the joints will be scrapped due to corrosion and eccentric wear, resulting in no oil production in oil wells and no water injection in water wells. In addition to the oil pipes themselves, the losses also include high operating costs of well repair operations and affected oil field production. In serious cases, accidents such as well fluid leakage or pipe breakage may occur.

[0003] After the replaced waste oil pipes are repaired by means of cleaning, hot rolling and straightening, their technical indicators such as mechanical strength and hardness can meet the process requirements and can be recycled and reused. However, the length of the waste oil pipes in the oil field is generally short after repair, which does not meet the length requirements of users and is wasted, resulting in a huge waste and idleness of state-owned assets and resources.

[0004] In view of this, the present invention is proposed. Summary of the invention

[0005] The purpose of the present invention is to provide a process for lengthening and repairing waste oil pipes in oil fields, which can realize the connection of short-length oil pipes, and the connected oil pipes have excellent mechanical properties, can meet the requirements of API5CT standards, and solve the problem of short length of the repaired oil pipes.

[0006] In order to achieve the above-mentioned purpose of the present invention, the following technical solutions are particularly adopted:

[0007] The present invention provides a process for lengthening and repairing waste oil pipes in oil fields, and the process for lengthening and repairing waste oil pipes in oil fields comprises the following steps:

[0008] (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe;

[0009] (b) The welding ends of the short-length oil pipe and the extended oil pipe are heated and cooled, and then the short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding;

[0010] (c) The welding parts of the short-length oil pipe and the extended oil pipe are heated and cooled, and the convex rings on the inner and outer surfaces of the weld are removed;

[0011] (d) The weld is welded again using friction stir welding.

[0012] Preferably, in step (b), the heating treatment is heating to 800-900° C. under the protection of an inert gas and keeping the temperature for 20-40 minutes.

[0013] Preferably, in step (b), the control parameters of the friction welding machine are as follows: the rotation speed is 2000-2500 rpm, the pressure is 180-220 kN, and the holding time is 10-15 s.

[0014] Preferably, in step (c), the heating treatment is heating to 620-680° C. under the protection of an inert gas and keeping the temperature for 1-2 hours.

[0015] Preferably, in step (c), cooling is performed by using an inert gas to cool the mixture to room temperature.

[0016] Preferably, in step (c), removing the convex rings on the inner and outer surfaces of the weld includes:

[0017] The convex ring on the outer surface of the weld is turned flat using a lathe; the convex ring on the inner surface of the weld is removed using a three-tooth circular cutter.

[0018] Preferably, in step (d), the control parameters of the friction stir welding are as follows: the rotation speed is 2000-2200 rpm, the pressure is 2500-4000 N, and the compensation amount is 120-150 μm.

[0019] Preferably, in step (d), cooling is performed by using an inert gas to cool the mixture to room temperature.

[0020] Preferably, the step (d) further comprises: using a pipe thread lathe to process threads on both ends of the welded oil pipe.

[0021] Compared with the prior art, the beneficial effects of the present invention include at least:

[0022] The waste oil pipe extension and repair process of the present invention can better promote the plastic deformation and flow of welding materials and improve the welding quality by first heating the oil pipe and then performing friction welding. At the same time, the welded material is heat treated and stir friction welded, which can reduce the stress in the welding material and promote the welding material to form a dense solid phase, thereby improving the welding strength, realizing the connection of short-length oil pipes, so that the connected oil pipes have excellent mechanical properties, can meet the specification requirements of API 5CT, and solve the problem of short length of the repaired oil pipe. DETAILED DESCRIPTION

[0023] The following embodiments of the technical solution of the present invention are described in detail in conjunction with the embodiments. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and are therefore only used as examples, and cannot be used to limit the protection scope of the present invention.

[0024] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by those skilled in the art to which the present invention belongs.

[0025] An embodiment of the present invention provides a process for lengthening and repairing a waste oil pipe in an oil field, and the process for lengthening and repairing a waste oil pipe in an oil field comprises the following steps:

[0026] (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe;

[0027] (b) The welding ends of the short-length oil pipe and the extended oil pipe are heated and cooled, and then the short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding;

[0028] (c) The welding parts of the short-length oil pipe and the extended oil pipe are heated and cooled, and the convex rings on the inner and outer surfaces of the weld are removed;

[0029] (d) The weld is welded again using friction stir welding.

[0030] The waste oil pipe extension and repair process of the present invention can better promote the plastic deformation and flow of welding materials and improve the welding quality by first heating the oil pipe and then performing friction welding. At the same time, the welded material is heat treated and stir friction welded, which can reduce the stress in the welding material and promote the welding material to form a dense solid phase, thereby improving the welding strength, realizing the connection of short-length oil pipes, so that the connected oil pipes have excellent mechanical properties, can meet the specification requirements of API 5CT, and solve the problem of short length of the repaired oil pipe.

[0031] In one embodiment, in the step (b), the heating treatment is heating to 800-900° C. under the protection of an inert gas and keeping the temperature for 20-40 minutes.

[0032] By controlling the above-mentioned heating treatment parameters, the plastic deformation and flow of the welding material during the welding process can be better promoted, which is beneficial to improving the welding strength.

[0033] In one embodiment, in step (b), the control parameters of the friction welding machine are as follows: the rotation speed is 2000-2500 rpm, the pressure is 180-220 kN, and the holding time is 10-15 s.

[0034] By controlling the friction welding machine parameters, the mechanical strength of the oil pipe after welding can be improved.

[0035] In one embodiment, in the step (c), the heating treatment is heating to 620-680° C. under the protection of an inert gas and keeping the temperature for 1-2 hours.

[0036] The above-mentioned heating treatment can better improve the stress between materials, while improving the density of the materials, thereby improving the overall mechanical properties.

[0037] In one embodiment, in the step (c), cooling is performed by cooling to room temperature using an inert gas.

[0038] In one embodiment, in the step (c), removing the convex rings on the inner and outer surfaces of the weld includes:

[0039] The convex ring on the outer surface of the weld is turned flat using a lathe; the convex ring on the inner surface of the weld is removed using a three-tooth circular cutter.

[0040] In one embodiment, in the step (d), the control parameters of the friction stir welding are as follows: the rotation speed is 2000-2200 rpm, the pressure is 2500-4000 N, and the compensation amount is 120-150 μm.

[0041] In one embodiment, in the step (d), cooling is performed by cooling to room temperature using an inert gas.

[0042] In one embodiment, the step (d) further comprises: using a pipe threading lathe to process threads on both ends of the welded oil pipe.

[0043] The technical solution of the present invention is further described in detail below through specific embodiments.

[0044] Example 1

[0045] This embodiment is a process for repairing and splicing waste oil pipes in oil fields, and the process for repairing and splicing waste oil pipes in oil fields comprises the following steps:

[0046] (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe;

[0047] (b) The welding ends of the short-length oil pipe and the extended oil pipe are heated to 800° C. under the protection of inert gas and kept at this temperature for 40 minutes, and then cooled to room temperature by using inert gas. Then, the short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding. The control parameters of the friction welding machine are as follows: the speed is 2000 rpm, the pressure is 220 kN, and the pressure holding time is 10 seconds;

[0048] (c) The welding parts of the short-length oil pipe and the extended oil pipe are heated to 620°C under the protection of inert gas and kept at this temperature for 2 hours, and then cooled to room temperature using inert gas. The convex ring on the outer surface of the weld is then flattened using a lathe; the convex ring on the inner surface of the weld is removed using a three-tooth circular cutter;

[0049] (d) The weld is welded again by friction stir welding, and threads are processed on both ends of the welded oil pipe by a pipe thread lathe. The control parameters of the friction stir welding are as follows: the rotation speed is 2000 rpm, the pressure is 4000 N, and the compensation amount is 150 μm.

[0050] Example 2

[0051] This embodiment is a process for repairing and splicing waste oil pipes in oil fields, and the process for repairing and splicing waste oil pipes in oil fields comprises the following steps:

[0052] (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe;

[0053] (b) The welding ends of the short-length oil pipe and the extended oil pipe are heated to 900° C. under the protection of inert gas and kept at this temperature for 20 minutes, and then cooled to room temperature by using inert gas. Then, the short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding. The control parameters of the friction welding machine are as follows: the speed is 2500 rpm, the pressure is 180 kN, and the pressure holding time is 15 seconds.

[0054] (c) The welding parts of the short-length oil pipe and the extended oil pipe are heated to 680°C under the protection of inert gas and kept at this temperature for 1 hour, and then cooled to room temperature using inert gas. The convex ring on the outer surface of the weld is then flattened using a lathe; the convex ring on the inner surface of the weld is removed using a three-tooth circular cutter;

[0055] (d) The weld is welded again by friction stir welding, and threads are processed on both ends of the welded oil pipe by a pipe thread lathe. The control parameters of the friction stir welding are as follows: the rotation speed is 2200 rpm, the pressure is 2500 N, and the compensation amount is 120 μm.

[0056] Example 3

[0057] This embodiment is a process for repairing and splicing waste oil pipes in oil fields, and the process for repairing and splicing waste oil pipes in oil fields comprises the following steps:

[0058] (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe;

[0059] (b) The welding ends of the short-length oil pipe and the extended oil pipe are heated to 850° C. under the protection of inert gas and kept at this temperature for 30 minutes, and then cooled to room temperature by using inert gas. Then, the short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding. The control parameters of the friction welding machine are as follows: the speed is 2200 rpm, the pressure is 200 kN, and the pressure holding time is 12 seconds;

[0060] (c) The welding parts of the short-length oil pipe and the extended oil pipe are heated to 650°C under the protection of inert gas and kept at this temperature for 1.5 hours, cooled to room temperature with inert gas, and then the convex ring on the outer surface of the weld is flattened with a lathe; the convex ring on the inner surface of the weld is removed with a three-tooth circular cutter;

[0061] (d) The weld is welded again by friction stir welding, and threads are processed on both ends of the welded oil pipe by a pipe thread lathe. The control parameters of the friction stir welding are as follows: the rotation speed is 2100 rpm, the pressure is 3000 N, and the compensation amount is 130 μm.

[0062] Comparative Example 1

[0063] This comparative example is a process for lengthening and repairing waste oil pipes in oil fields, and the process for lengthening and repairing waste oil pipes in oil fields comprises the following steps:

[0064] (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe;

[0065] (b) The short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding, wherein the control parameters of the friction welding machine are as follows: the speed is 2200 rpm, the pressure is 200 kN, and the pressure holding time is 12 s;

[0066] (c) The welding parts of the short-length oil pipe and the extended oil pipe are heated to 650°C under the protection of inert gas and kept at this temperature for 1.5 hours, cooled to room temperature with inert gas, and then the convex ring on the outer surface of the weld is flattened with a lathe; the convex ring on the inner surface of the weld is removed with a three-tooth circular cutter;

[0067] (d) The weld is welded again by friction stir welding, and threads are processed on both ends of the welded oil pipe by a pipe thread lathe. The control parameters of the friction stir welding are as follows: the rotation speed is 2100 rpm, the pressure is 3000 N, and the compensation amount is 130 μm.

[0068] Comparative Example 2

[0069] This comparative example is a process for lengthening and repairing waste oil pipes in oil fields, and the process for lengthening and repairing waste oil pipes in oil fields comprises the following steps:

[0070] (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe;

[0071] (b) The welding ends of the short-length oil pipe and the extended oil pipe are heated to 850° C. under the protection of inert gas and kept at this temperature for 30 minutes, and then cooled to room temperature by using inert gas. Then, the short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding. The control parameters of the friction welding machine are as follows: the speed is 2200 rpm, the pressure is 200 kN, and the pressure holding time is 12 seconds;

[0072] (c) Use a lathe to flatten the convex ring on the outer surface of the weld; use a three-tooth circular cutter to remove the convex ring on the inner surface of the weld;

[0073] (d) The weld is welded again by friction stir welding, and threads are processed on both ends of the welded oil pipe by a pipe thread lathe. The control parameters of the friction stir welding are as follows: the rotation speed is 2100 rpm, the pressure is 3000 N, and the compensation amount is 130 μm.

[0074] Comparative Example 3

[0075] This comparative example is a process for lengthening and repairing waste oil pipes in oil fields, and the process for lengthening and repairing waste oil pipes in oil fields comprises the following steps:

[0076] (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe;

[0077] (b) The welding ends of the short-length oil pipe and the extended oil pipe are heated to 850° C. under the protection of inert gas and kept at this temperature for 30 minutes, and then cooled to room temperature by using inert gas. Then, the short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding. The control parameters of the friction welding machine are as follows: the speed is 1500 rpm, the pressure is 200 kN, and the pressure holding time is 15 s;

[0078] (c) The welding parts of the short-length oil pipe and the extended oil pipe are heated to 650°C under the protection of inert gas and kept at this temperature for 1.5 hours, cooled to room temperature with inert gas, and then the convex ring on the outer surface of the weld is flattened with a lathe; the convex ring on the inner surface of the weld is removed with a three-tooth circular cutter;

[0079] (d) The weld is welded again by friction stir welding, and threads are processed on both ends of the welded oil pipe by a pipe thread lathe. The control parameters of the friction stir welding are as follows: the rotation speed is 2100 rpm, the pressure is 3000 N, and the compensation amount is 130 μm.

[0080] Comparative Example 4

[0081] This comparative example is a process for lengthening and repairing waste oil pipes in oil fields, and the process for lengthening and repairing waste oil pipes in oil fields comprises the following steps:

[0082] (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe;

[0083] (b) The welding ends of the short-length oil pipe and the extended oil pipe are heated to 850° C. under the protection of inert gas and kept at this temperature for 30 minutes, and then cooled to room temperature by using inert gas. Then, the short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding. The control parameters of the friction welding machine are as follows: the speed is 2200 rpm, the pressure is 200 kN, and the pressure holding time is 12 seconds;

[0084] (c) The welding parts of the short-length oil pipe and the extended oil pipe are heated to 650°C under the protection of inert gas and kept at this temperature for 1.5 hours, cooled to room temperature with inert gas, and then the convex ring on the outer surface of the weld is flattened with a lathe; the convex ring on the inner surface of the weld is removed with a three-tooth circular cutter;

[0085] (d) The weld is welded again by friction stir welding, and threads are processed on both ends of the welded oil pipe by a pipe thread lathe. The control parameters of the friction stir welding are as follows: the rotation speed is 2500 rpm, the pressure is 2000 N, and the compensation amount is 130 μm.

[0086] Experimental example

[0087] Take the specification of ¢73.02mmX5.51mm, the length before connection is 8.8m, the length after connection is 9.3m, and the steel grade J55 (37Mn5) as an example for testing;

[0088] The repair process of Example 3 and Comparative Examples 1 to 4 was used for repair, and each method was repeated 20 times; the mechanical properties test of the repaired oil pipe was carried out;

[0089] The overall tensile test was carried out using a 250T hydraulic tensile machine. The average tensile strength of each group was calculated, and the fracture position was calculated as the number of welds. The test results are shown in Table 1:

[0090] Table 1

[0091]

[0092]

[0093] It can be seen from Table 1 that, compared with Comparative Examples 1 to 4, the oil pipe repaired in Example 3 of the present application has better mechanical strength.

[0094] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.

Claims

1. A process for lengthening and repairing waste oil pipes in oil fields, characterized in that: The steps include: (a) Determine the length of the extended oil pipe according to the user's requirements and the length of the short-length oil pipe, and then flatten the welding ends of the short-length oil pipe and the extended oil pipe to the plane perpendicular to the oil pipe; (b) The welding ends of the short-length oil pipe and the extended oil pipe are heated and cooled, and then the short-length oil pipe and the extended oil pipe are clamped relative to each other on a friction welding machine for welding; (c) The welding parts of the short-length oil pipe and the extended oil pipe are heated and cooled, and the convex rings on the inner and outer surfaces of the weld are removed; (d) The weld is welded again using friction stir welding.

2. The process for lengthening and repairing waste oil pipes in oil fields according to claim 1 is characterized in that: In the step (b), the heating treatment is heating to 800-900° C. under the protection of an inert gas and keeping the temperature for 20-40 minutes.

3. The process for lengthening and repairing waste oil pipes in oil fields according to claim 1 is characterized in that: In the step (b), the control parameters of the friction welding machine are as follows: the rotation speed is 2000-2500 rpm, the pressure is 180-220 kN, and the holding time is 10-15 s.

4. The process for lengthening and repairing waste oil pipes in oil fields according to claim 1 is characterized in that: In the step (c), the heating treatment is heating to 620-680° C. under the protection of an inert gas and keeping the temperature for 1-2 hours.

5. The process for lengthening and repairing waste oil pipes in oil fields according to claim 1 is characterized in that: In the step (c), cooling is performed by using an inert gas to cool the mixture to room temperature.

6. The process for lengthening and repairing waste oil pipes in oil fields according to claim 1 is characterized in that: In the step (c), removing the convex rings on the inner and outer surfaces of the weld includes: The convex ring on the outer surface of the weld is turned flat using a lathe; the convex ring on the inner surface of the weld is removed using a three-tooth circular cutter.

7. The process for lengthening and repairing waste oil pipes in oil fields according to claim 1 is characterized in that: In the step (d), the control parameters of the friction stir welding are as follows: the rotation speed is 2000-2200 rpm, the pressure is 2500-4000 N, and the compensation amount is 120-150 μm.

8. The process for lengthening and repairing waste oil pipes in oil fields according to claim 1 is characterized in that: In the step (d), cooling is performed by using an inert gas to cool the mixture to room temperature.

9. The process for lengthening and repairing waste oil pipes in oil fields according to claim 1, characterized in that: The step (d) also includes: using a pipe thread lathe to process threads on both ends of the welded oil pipe.

Citation Information

Patent Citations

  • Dissimilar metal connection method for copper-aluminum pipe

    CN102151974A

  • Waste and old oil well pipe performance recovery process

    CN102581542A

  • Remanufacturing method of polished rods of oil pumping units and polished rods of oil pumping units

    CN109759689A

  • Method for preparing multi-metal-based coating by compounding plasma cladding and friction stir welding on steel surface and prepared coating

    CN113512725A

  • Friction welding method for making short tie-in oil pipe

    CN1762637A