Filling material for waste oil and gas pipeline and preparation method and filling process thereof
By using filling materials composed of fly ash, Portland cement and other ingredients, the problem of high cost and poor environmental friendliness of waste oil and gas pipeline filling materials in the existing technology has been solved, and high-efficiency, low-cost long-distance filling has been achieved, and the efficiency has been improved. Cured strength and stability of filler materials.
Patent Information
- Application Number
- CN202310403924.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-17
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2043-04-17
AI Technical Summary
The filling materials used in the existing technology for abandoned oil and gas pipelines have high costs and poor environmental friendliness, are difficult to meet the needs of long-distance grouting, and have insufficient curing strength and stability, posing risks of environmental pollution.
Filling materials consisting of fly ash, Portland cement, modified PVA glue, retarder and expansion agent are used. After stirring evenly, a high-pressure pump is used for filling, thereby achieving long-distance grouting and permanent solidification.
It reduces the material cost, improves the fluidity and curing strength of the filling material, realizes long-distance filling, has good environmental friendliness and stability, high filling efficiency and low cost.
Abstract
Description
Technical Field
[0001] The invention relates to the field of petrochemical industry, and in particular to a filling material for abandoned oil and gas pipelines, a preparation method thereof and a filling process thereof. Background Art
[0002] During the 60 years of development of Shengli Oilfield, many oil and gas pipelines built and put into use in the early stage have entered a period of frequent pipeline accidents, with many corrosion and deformation problems. In the production process, they have also caused serious environmental pollution due to perforation many times, resulting in huge economic losses. Due to production adjustments, some pipelines are also in a state of suspension or idleness. Among them, there are oil pipelines and other pipelines laid in high-risk areas such as cultivated land, rivers, and around residential areas. At the same time, with the continuous expansion of urban scale, more buildings or factories have occupied underground pipelines or are close to pipelines, which greatly increases the difficulty of disposal, environmental pollution, and the risks of equipment, factory buildings, and personal safety caused by perforation and leakage of pipelines. With the advancement of the optimization of the ground system of old oilfields, more pipelines will be suspended and idle.
[0003] At present, environmental pollution caused by residual oil, gas and diversion effect in abandoned pipelines is an urgent problem to be solved. If it is not effectively handled, the hidden dangers of abandoned pipelines, such as leakage of waste gas and waste liquid, environmental pollution, land collapse and explosion, etc., which will cause environmental, property and personal safety, cannot be eliminated. Once an accident occurs, it will cause immeasurable economic losses to our production enterprises and seriously affect the corporate image.
[0004] The "Petroleum and Natural Gas Pipeline Protection Law of the People's Republic of China" states that "when a pipeline stops operating, is sealed or scrapped, the pipeline company shall take necessary safety protection measures and report to the department in charge of pipeline protection of the local people's government at or above the county level for record." The protection law puts forward relevant requirements for the safe disposal of abandoned pipelines in principle. When the service life of an oil and gas pipeline reaches the upper limit, or the benefits of continuing to transport oil and gas are far lower than the transportation cost and the pipeline has no other potential uses, the oil and gas pipeline needs to be scrapped.
[0005] The method of filling abandoned pipes with solid materials through grouting can solve the problems of pipe collapse and waste liquid pollution, and will become the development trend in the field of on-site disposal of abandoned pipes. At present, the pipe filling materials used for grouting include two categories: chemical slurry and cement slurry. The so-called chemical slurry is synthetic resin slurry, which is made of artificial synthetic resin as the main raw material and quickly forms a solid with a certain strength under the action of a curing agent. There are many types of synthetic resin slurries depending on the type of resin, such as urea-formaldehyde resin slurry, cyanide slurry, unsaturated resin slurry, etc. Among them, urea-formaldehyde resin is more widely used. Chemical slurry has the advantages of good stability, good fluidity, strong injectability, low viscosity, and easy control of gel time, but it has low strength, poor durability, high price, high cost, and even pollution to the surrounding environment. Therefore, grouting reinforcement projects are rarely used. Cement slurry is based on cement and is adjusted to cement slurry with water. Cement slurry has the advantages of high curing strength, but it has the disadvantages of difficult to adjust gel time and poor stability, which makes it difficult to meet the needs of long-distance grouting. Of course, various chemical additives can also be used to improve the properties of cement slurry. For example: the patent "A grouting filling device and method for abandoned oil and gas pipelines" with publication number CN104631462A provides a grouting filling device for abandoned oil and gas pipelines, the device comprising: a grouting machine, the grouting machine is connected to the grouting port at one end of the pipeline, used to inject the slurry into the pipeline from the grouting port, and push the slurry forward in the pipeline; a sedimentation separator, one end of the sedimentation separator is connected to the slurry outlet at the upper end of the other end of the pipeline through a conduit, used to ensure that the pipeline is filled with the slurry; a vacuum pump, the vacuum pump is connected to the other end of the sedimentation separator, and is used to provide a vacuum environment for the pipeline during grouting to reduce the resistance caused by the elevation difference of the pipeline. In the above scheme, the device also includes: a first valve, the first valve is arranged between the grouting ports of the grouting machine, and is used to control the switch state of the grouting port. In the above scheme, the grouting port is parallel to the axis of the pipeline, and is used to convert the pressure of the grouting machine into power; the sedimentation separator is parallel to the highest point of the pipeline. In the above scheme, the device also includes: an observation hole, which is arranged at the highest point of the pipeline, and is used to observe the filling state of the slurry in the pipeline; a second valve, one end of which is connected to the observation hole, and is used to control the air tightness of the pipeline. In the above scheme, the device also includes: a third valve; the third valve is arranged between the slurry outlet and the sedimentation separator, and is used to control the on and off state of the vacuum environment. In the above scheme, the device also includes: a foam ball, which is used to fill the pipeline when the elevation difference of the pipeline is not more than 1m, and assist the slurry to move forward. In the above scheme, the device also includes: a mask, which is arranged at one end of the pipeline, and is used to seal one end of the pipeline.The invention also provides a grouting filling method for waste gas oil and gas pipelines, the method comprising: using a grouting machine to inject slurry into the pipeline from a grouting port to push the slurry forward in the pipeline; using a vacuum pump to provide a vacuum environment for the pipeline to reduce the resistance caused by the elevation difference of the pipeline during grouting; using a sedimentation separator to determine that the pipeline is filled with the slurry. In the above scheme, the grouting port is parallel to the axis of the pipeline and is used to convert the pressure of the grouting machine into power. In the above scheme, when the elevation difference of the pipeline is not greater than 1m, a foam ball is used to fill the pipeline to assist the slurry in moving forward. Due to the improvement of the grouting filling device and method, the invention ensures the advantages of long-distance and large-diameter waste oil and gas pipeline grouting filling distance and high grouting filling rate, but due to the use of cement slurry, cement is the only main material, and the material cost is relatively high. Summary of the invention
[0006] In order to overcome the defects of the prior art, the present invention provides a filling material for abandoned oil and gas pipelines, a preparation method thereof and a filling process, and the technical scheme thereof is as follows: A filling material for abandoned oil and gas pipelines comprises the following components and their weight proportions: 80-100 parts of fly ash, 5-15 parts of cement, 120-150 parts of water, 0.1-1.5 parts of sodium hexametasilicate, 0.5-10 parts of modified PVA glue, 0.1-0.5 parts of retarder, and 5-15 parts of expansion agent.
[0007] The fly ash is the third-grade fly ash from a power plant, and its fineness is 45 μm square hole sieve residue ≤ 45%.
[0008] The cement is silicate cement, and its strength grade is ≥42.5.
[0009] The modified PVA glue solution is modified by: dissolving low molecular weight PVA in water, first adding 4-chlorobutyraldehyde thereto for polymerization to block part of hydroxyl groups; and then adding polyacrylamide thereto to obtain a polymer containing hydroxyl groups and amine groups.
[0010] The mass ratio of the PVA to 4-chlorobutyraldehyde is (100:28) to (100:32).
[0011] The mass ratio of the 4-chlorobutyraldehyde to the polyacrylamide is (100:2.1) to (100:2.5).
[0012] The retarder is a mixture of one or more of lignin sulfonate, sodium carboxymethyl cellulose and ferrous sulfate.
[0013] The expansion agent is a UEA expansion agent.
[0014] According to the above-mentioned method for preparing a filling material for abandoned oil and gas pipelines, the operating steps are: according to the mass parts of each component in the filling material, fly ash, cement, sodium hexametasilicate, modified PVA glue, retarder and expansion agent are placed in water, stirred evenly, and the filling material for abandoned oil and gas pipelines is obtained.
[0015] A filling process for an abandoned oil and gas pipeline, which uses the filling material prepared by the above method to fill the abandoned oil and gas pipeline; when the filling operation starts, the mixer is connected to the filling pump, and the filling pump and the reserved hole of the pipeline are connected with a special high-pressure filling pipe; the filling pump is turned on, and the conveying capacity of the filling pump is ensured by the mixer, and the filling capacity is controlled at 40 to 80 m 3 / h.
[0016] Compared with the prior art, the present invention mainly has the following beneficial technical effects: 1. The filling material provided by the present invention uses only a very low mass fraction of cement and a large amount of fly ash, so it has better environmental friendliness and lower cost.
[0017] 2. The filling material provided by the present invention has the advantages of high fluidity and long initial setting time, and can meet the needs of long-distance grouting, and is particularly suitable for long-distance oil and gas pipelines.
[0018] 3. After solidification, the filling material provided by the present invention has good strength and solidification rate, can achieve permanent solidification, and achieve good stability.
[0019] 4. The preparation method of the filling material provided by the present invention is simple and easy.
[0020] 5. The filling process provided by the present invention has strong operability and high filling efficiency. DETAILED DESCRIPTION
[0021] In order to make the technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below through examples, but the present invention is not limited to these examples.
[0022] In the embodiment, the fluidity and time loss of the filler slurry are determined by referring to the fluidity of cement paste in GB / T8077-2012 "Test method for homogeneity of concrete admixtures", and the fluidity of fly ash slurry is tested by changing the type and dosage of admixtures. The compressive strength test of fly ash slurry adopts a detachable triple mold, the inner cavity size of the mold is 40mm×40mm×160mm, and all test blocks are cured by standard.
[0023] Example 1: 85kg of fly ash, 15kg of cement, 120kg of water, 0.5kg of sodium hexametasilicate, 3kg of modified PVA glue, 0.1kg of lignin sulfonate retarder and 5kg of UEA expansion agent were stirred and mixed to obtain a filler. The 3-hour fluidity was 412mm, the 12-hour fluidity was 350mm, the stone rate was 98.5%, and the 28-day compressive strength was 3.80MPa.
[0024] Fly ash refers to the fine ash collected from the flue gas after coal combustion. It is the main solid waste discharged from coal-fired power plants. Its main components are SiO2 and Al2O3, and it also contains a small amount of Fe2O3, CaO, etc. In this embodiment, the fly ash uses the third-grade fly ash of the power plant, and its fineness is 45μm square hole sieve residue ≤45%.
[0025] The main mineral components of silicate cement are tricalcium silicate, dicalcium silicate, tricalcium aluminate, and tetracalcium aluminoferrite, and its strength grades are divided into six grades: 42.5, 42.5R, 52.5, 52.5R, 62.5, and 62.5R. In this embodiment, silicate cement is used, and its strength grade is ≥42.5. The actual strength grade of 42.5 can meet the requirements.
[0026] PVA is another name for polyvinyl alcohol, which has the chemical formula [C2H4O] n In this embodiment, the modification method of the modified PVA glue is: after dissolving low molecular weight PVA in water, 4-chlorobutyraldehyde is first added thereto for polymerization to block part of the hydroxyl groups; and polyacrylamide is then added thereto to obtain a polymer containing hydroxyl groups and amine groups. Among them, the mass ratio of PVA to 4-chlorobutyraldehyde is 100:30, and the mass ratio of 4-chlorobutyraldehyde to polyacrylamide is 1:2.3.
[0027] The present embodiment provides a method for preparing a filling material for abandoned oil and gas pipelines, and the operating steps are: according to the mass parts of each component in the filling material, fly ash, cement, sodium hexametasilicate, modified PVA glue, retarder and expansion agent are placed in water, stirred evenly, and the filling material for abandoned oil and gas pipelines is obtained.
[0028] The present embodiment provides a filling process for an abandoned oil and gas pipeline, which uses the filling material prepared by the above method to fill the abandoned oil and gas pipeline; at the beginning of the filling operation, the mixer is connected to the filling pump, and the filling pump and the reserved hole of the pipeline are connected with a special high-pressure filling pipe; the filling pump is turned on, and the conveying capacity of the filling pump is guaranteed by the mixer, and the filling capacity is controlled at 40 to 80 m 3 / h.
[0029] Example 2: 90kg of fly ash, 10kg of cement, 120kg of water, 0.5kg of sodium hexametasilicate, 5kg of modified PVA glue, 0.1kg of lignin sulfonate retarder and 5kg of UEA expansion agent were stirred and mixed to obtain a filler. The 3-hour fluidity was 430mm, the 12-hour fluidity was 385mm, the stone rate was 97.3%, and the 28-day compressive strength was 3.30MPa.
[0030] Fly ash refers to the fine ash collected from the flue gas after coal combustion. It is the main solid waste discharged from coal-fired power plants. Its main components are SiO2 and Al2O3, and it also contains a small amount of Fe2O3, CaO, etc. In this embodiment, the fly ash uses the third-grade fly ash of the power plant, and its fineness is 45μm square hole sieve residue ≤45%.
[0031] The main mineral components of silicate cement are tricalcium silicate, dicalcium silicate, tricalcium aluminate, and tetracalcium aluminoferrite, and its strength grades are divided into six grades: 42.5, 42.5R, 52.5, 52.5R, 62.5, and 62.5R. In this embodiment, silicate cement is used, and its strength grade is ≥42.5. The actual strength grade of 42.5 can meet the requirements.
[0032] PVA is another name for polyvinyl alcohol, which has the chemical formula [C2H4O] n In this embodiment, the modification method of the modified PVA glue is: after dissolving low molecular weight PVA in water, 4-chlorobutyraldehyde is first added thereto for polymerization to block part of the hydroxyl groups; and polyacrylamide is then added thereto to obtain a polymer containing hydroxyl groups and amine groups. Among them, the mass ratio of PVA to 4-chlorobutyraldehyde is 100:30, and the mass ratio of 4-chlorobutyraldehyde to polyacrylamide is 1:2.3.
[0033] The present embodiment provides a method for preparing a filling material for abandoned oil and gas pipelines, and the operating steps are: according to the mass parts of each component in the filling material, fly ash, cement, sodium hexametasilicate, modified PVA glue, retarder and expansion agent are placed in water, stirred evenly, and the filling material for abandoned oil and gas pipelines is obtained.
[0034] The present embodiment provides a filling process for an abandoned oil and gas pipeline, which uses the filling material prepared by the above method to fill the abandoned oil and gas pipeline; at the beginning of the filling operation, the mixer is connected to the filling pump, and the filling pump and the reserved hole of the pipeline are connected with a special high-pressure filling pipe; the filling pump is turned on, and the conveying capacity of the filling pump is guaranteed by the mixer, and the filling capacity is controlled at 40 to 80 m 3 / h.
[0035] Example 3: 100kg of fly ash, 5kg of cement, 150kg of water, 0.5kg of sodium hexametasilicate, 10kg of modified PVA glue, 0.2kg of lignin sulfonate retarder and 15kg of UEA expansion agent were stirred and mixed to obtain a filler. The 3-hour fluidity was 330mm, the 12-hour fluidity was 282mm, the stone rate was 96.7%, and the 28-day compressive strength was 2.11MPa.
[0036] Fly ash refers to the fine ash collected from the flue gas after coal combustion. It is the main solid waste discharged from coal-fired power plants. Its main components are SiO2 and Al2O3, and it also contains a small amount of Fe2O3, CaO, etc. In this embodiment, the fly ash uses the third-grade fly ash of the power plant, and its fineness is 45μm square hole sieve residue ≤45%.
[0037] The main mineral components of silicate cement are tricalcium silicate, dicalcium silicate, tricalcium aluminate, and tetracalcium aluminoferrite, and its strength grades are divided into six grades: 42.5, 42.5R, 52.5, 52.5R, 62.5, and 62.5R. In this embodiment, silicate cement is used, and its strength grade is ≥42.5. The actual strength grade of 42.5 can meet the requirements.
[0038] PVA is another name for polyvinyl alcohol, which has the chemical formula [C2H4O] n In this embodiment, the modification method of the modified PVA glue is: after dissolving low molecular weight PVA in water, 4-chlorobutyraldehyde is first added thereto for polymerization to block part of the hydroxyl groups; and polyacrylamide is then added thereto to obtain a polymer containing hydroxyl groups and amine groups. Among them, the mass ratio of PVA to 4-chlorobutyraldehyde is 100:30, and the mass ratio of 4-chlorobutyraldehyde to polyacrylamide is 1:2.3.
[0039] The present embodiment provides a method for preparing a filling material for abandoned oil and gas pipelines, and the operating steps are: according to the mass parts of each component in the filling material, fly ash, cement, sodium hexametasilicate, modified PVA glue, retarder and expansion agent are placed in water, stirred evenly, and the filling material for abandoned oil and gas pipelines is obtained.
[0040] The present embodiment provides a filling process for an abandoned oil and gas pipeline, which uses the filling material prepared by the above method to fill the abandoned oil and gas pipeline; at the beginning of the filling operation, the mixer is connected to the filling pump, and the filling pump and the reserved hole of the pipeline are connected with a special high-pressure filling pipe; the filling pump is turned on, and the conveying capacity of the filling pump is guaranteed by the mixer, and the filling capacity is controlled at 40 to 80 m 3 / h.
[0041] Application Example 1 The filler obtained in Example 1 is used to fill the abandoned pipeline of an oil production plant in Shengli Oilfield. The abandoned pipeline is a decommissioned external transmission pipeline, which is a 219×7.1 spiral seam submerged arc welded steel pipe with a length of 13.8 km. The filler is stirred and mixed, the mixer is connected to the filling pump, the filling pump and the reserved hole of the pipeline are connected with a special high-pressure filling pipe, the filling pump is turned on, and the conveying capacity of the filling pump is ensured by the mixer. The filling capacity is controlled at 40 to 80 m 3 / h, 3000km can be filled in one construction; after 28 days of testing, the filling meets the requirements of Q / SH1020 2769-2020 standard of Sinopec Shengli Petroleum Administration Co., Ltd.
Claims
1. A filling material for abandoned oil and gas pipelines, Features: The filling material comprises the following components and their weight parts: 80-100 parts of fly ash, 5-15 parts of cement, 120-150 parts of water, 0.1-1.5 parts of sodium hexametasilicate, 0.5-10 parts of modified PVA glue, 0.1-0.5 parts of retarder and 5-15 parts of expansion agent.
2. A filling material for abandoned oil and gas pipelines according to claim 1, Features: The fly ash is the third-grade fly ash from a power plant, and its fineness is 45 μm square hole sieve residue ≤ 45%.
3. A filling material for abandoned oil and gas pipelines according to claim 1, Features: The cement is silicate cement, and its strength grade is ≥42.
5.
4. A filling material for abandoned oil and gas pipelines according to claim 1, Features: The modified PVA glue solution is modified by: dissolving low molecular weight PVA in water, first adding 4-chlorobutyraldehyde thereto for polymerization to block part of hydroxyl groups; and then adding polyacrylamide thereto to obtain a polymer containing hydroxyl groups and amine groups.
5. A filling material for abandoned oil and gas pipelines according to claim 4, Features: The mass ratio of the PVA to 4-chlorobutyraldehyde is (100:28) to (100:32).
6. A filling material for abandoned oil and gas pipelines according to claim 4, Features: The mass ratio of the 4-chlorobutyraldehyde to the polyacrylamide is (100:2.1) to (100:2.5).
7. A filling material for abandoned oil and gas pipelines according to claim 1, Features: The retarder is a mixture of one or more of lignin sulfonate, sodium carboxymethyl cellulose and ferrous sulfate.
8. A filling material for abandoned oil and gas pipelines according to claim 1, Features: The expansion agent is a UEA expansion agent.
9. A method for preparing a filling material for abandoned oil and gas pipelines according to any one of claims 1 to 8, Features: The operation steps are: according to the mass parts of each component in the filling material, fly ash, cement, sodium hexametasilicate, modified PVA glue, retarder and expansion agent are placed in water, stirred evenly, and the filling material for abandoned oil and gas pipelines is obtained.
10. A filling process for abandoned oil and gas pipelines. Features: The abandoned oil and gas pipeline is filled with the filling material prepared in claim 9; when the filling operation starts, the mixer is connected to the filling pump, and the filling pump and the reserved hole of the pipeline are connected with a special high-pressure pipe for filling; the filling pump is turned on, and the conveying capacity of the filling pump is ensured by the mixer, and the filling capacity is controlled at 40 to 80 m 3 / h.
Citation Information
Patent Citations
Abandoned oil-gas pipeline grouting filling device and method
CN104631462A
High water filling material for filling of waste pipeline
CN105712738A
Front-mixing type high-pressure abrasive jet pipeline cutting device
CN113798999A
Manufacturing formula of recycled PVC (polyvinyl chloride) thermal insulation mortar with environment-friendly function
CN114315267A
Filling material for waste oil and gas pipeline and preparation method and grouting process thereof
CN114409324A