Steel bridge tower high-altitude rapid and accurate butt joint method based on machine vision

By installing support bases, targets and industrial cameras on steel bridge tower segments, machine vision technology is used to achieve rapid and accurate high-altitude docking of steel bridge towers, solving potential safety hazards caused by tall tower columns and narrow working spaces, and improving efficiency Construction efficiency and precision.

CN118814647AActive Publication Date: 2024-10-22CCCC SECOND HARBOR ENGINEERING CO LTD +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411297216.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-10-22
Estimated Expiration
2044-09-18

AI Technical Summary

Technical Problem

During the construction of steel structure bridge towers, the tower columns are tall and the on-site working space is narrow, making it difficult for tower crane operators to complete the precise docking of steel bridge tower segments, posing safety risks.

Method used

A fast and accurate high-altitude docking method for steel bridge towers based on machine vision is adopted. By installing support bases, targets, alignment poles and industrial cameras on steel bridge tower segments, data receiving modules, data processing modules and display modules are used to achieve alignment. The identification and plane position adjustment of position benchmarks and targets ensure the precise docking of steel bridge tower segments.

Benefits of technology

It achieves rapid and accurate docking of steel bridge tower segments, reduces the safety risks of high-altitude hoisting, improves operational efficiency and accuracy, and avoids information discrepancies caused by blind spots in the field of vision.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118814647A_ABST
    Figure CN118814647A_ABST
Patent Text Reader

Abstract

The invention discloses a steel bridge tower high-altitude rapid and accurate butt joint method based on machine vision, which comprises the following steps: manufacturing each steel bridge tower section in a matching manner, and respectively mounting a supporting base at the top opening and the bottom opening of each steel bridge tower section; a data receiving module, a data processing module and a display module are arranged in an operation room of the hoisting equipment; a target and an alignment mark post are installed on a supporting base of a top opening of the installed steel bridge tower section; an industrial camera is installed on a supporting base of a bottom opening of the to-be-installed steel bridge tower section; steel bridge tower sections to be installed are hoisted into the tower column installation range; receiving image data shot by each industrial camera, and identifying and marking a corresponding target; an operator observes the relative position of each alignment mark post and the corresponding target, adjusts the plane position of the to-be-installed steel bridge tower section, and then vertically lowers down the steel bridge tower section; and after the two steel bridge tower sections are in butt joint, temporary locking and subsequent connection are carried out. High-altitude rapid and accurate butt joint of the steel bridge tower can be achieved, and the safety risk is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of steel tower bridge construction, and more specifically, to a method for high-altitude rapid and precise docking of steel bridge towers based on machine vision. Background Art

[0002] With the construction of super-long span bridges, steel or composite structure bridge towers are widely used because of their higher bearing capacity, convenient construction methods and good economic benefits. Steel structure bridge towers are usually manufactured in segments of a certain height in the factory. Each segment is hoisted to the bridge tower position by large tower cranes and other lifting equipment on site for on-site assembly, and installed section by section until the entire 100-meter-high tower column is completed. The steel structure tower column segment is huge, and the operator of the tower crane and other lifting equipment can only hoist the steel bridge tower segment to the approximate range of the tower column through the visual window. If accurate docking is to be completed, there is a blind spot in the field of vision and remote guidance is required from the tower top commander. However, due to the narrow on-site working space of the towering tower column, there is a tendency for information gaps between the on-site commander and the driver operator, resulting in safety hazards. Therefore, there is an urgent need for a method for fast and accurate docking and installation of steel towers based on machine vision, which can enable the driver operator to independently and efficiently complete the accurate docking of the steel bridge tower segment. Summary of the invention

[0003] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.

[0004] In order to achieve these purposes and other advantages according to the present invention, a method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision is provided, comprising the following steps: S1. Match and manufacture each steel bridge tower segment, and install support bases at the intersection of the outer periphery of the top and bottom of each steel bridge tower segment and the cross center line of the steel bridge tower segment; according to the linear shape of the steel bridge tower, the two upper and lower corresponding support bases on the two adjacent steel bridge tower segments are arranged in the center; and a data receiving module, a data processing module and a display module are installed in the operating room of the lifting equipment; S2. Install targets and alignment poles on each supporting base at the top of the installed steel bridge tower segment in sequence, and the targets, alignment poles and corresponding supporting bases are all centered; install industrial cameras on each supporting base at the bottom of the steel bridge tower segment to be installed, and the industrial cameras are centered with the supporting bases; S3. Use lifting equipment to hoist the steel bridge tower segment to be installed into the tower column installation range; S4, first receiving the image data taken by each industrial camera through the data receiving module, then identifying the target corresponding to each industrial camera through the data processing module, and marking it in the display module; S5. The operator of the lifting equipment observes the relative positions of each alignment mark and the corresponding target through the display module, and adjusts the plane position of the steel bridge tower segment to be installed according to the relative position deviation between the two, until the center of each alignment mark reaches the center of the target in the image; and then vertically lowers the steel bridge tower segment to be installed; S6. After the two steel bridge tower segments are connected, they are temporarily locked and then connected. After the connection and installation are completed, the industrial cameras, targets and alignment poles are removed. S7. Repeat steps S2 to S6 to install the next steel bridge tower segment.

[0005] Preferably, step S1 also includes: when the steel bridge tower segments are matched and manufactured, targets, alignment poles and industrial cameras are temporarily installed on the corresponding supporting bases of the two steel bridge tower segments installed first, and the focal length of the industrial camera is adjusted and fixed so that when the two steel bridge tower segments are fully docked, the alignment pole in the industrial camera's field of view is located at the center of the target and is completely filled.

[0006] Preferably, the target is provided with a center circle and four satellite circles symmetrically arranged on the outer circumference of the center circle about the center of the center circle; the alignment pole includes a vertical pole and an alignment ball arranged on the top of the vertical pole, and the vertical pole, the alignment ball and the center circle are arranged in alignment; the radius of the alignment ball is smaller than the radius of the center circle.

[0007] Preferably, in step S4, identifying and marking the target corresponding to each industrial camera specifically includes the following steps: S41, grayscale processing is performed on the images within the visible range taken by each industrial camera, and circular contour lines are searched, and the center coordinates and radius (x1, y1, r1), (x2, y2, r2) ... (xn, yn, rn) of each identified circular contour are marked; S42, calculating the area of ​​each circular contour identified, if Si / Sj=k±0.02, i∈{1,n}, j∈{1,n} exists, then the circular contours corresponding to the determined areas Si and Sj are the suspected target satellite circle and the suspected target center circle, respectively, and k is the set area ratio of the satellite circle to the center circle; S43. Calculate the center distance Lij between each suspected target satellite circle and the suspected target center circle. If there are at least three Lij=L0, the suspected target satellite circle and the suspected target center circle satisfying Lij=L0 are determined to be the satellite circle and the center circle of the target, and are highlighted; where L0 is the set center distance between the satellite circle and the center circle.

[0008] Preferably, in step S5, during the process of vertically lowering the steel bridge tower segment to be installed, the display ratio of the alignment ball in the image taken by the industrial camera gradually increases, and when the center of the alignment ball is completely filled into the center circle, the plane positions and vertical positions of the two steel bridge tower segments have been docked.

[0009] Preferably, a plurality of wedge-shaped blocks are provided on the periphery of the top opening of the installed steel bridge tower segment to assist the steel bridge tower segment to be installed to accurately drop to the designed position.

[0010] Preferably, a wireless transmission module is provided in the industrial camera, and the wireless transmission module is used to transmit the image data captured by the industrial camera to the data receiving module.

[0011] The present invention has at least the following beneficial effects: The invention provides a method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision. The identification target and alignment pole are installed on the installed steel bridge tower segment, and the industrial camera is installed on the steel bridge tower segment to be installed. After the steel tower structure to be installed is hoisted, the operator of the lifting equipment hoists the steel bridge tower segment to be installed to the approximate range of the installed tower column through the visual window of the lifting equipment. Then the operator operates the target marked on the display module in the room, judges the relative relationship between the alignment pole and the target center, adjusts the plane position of the steel tower, and lowers the steel tower after completing the plane positioning, and then the temporary locking and connection of the steel bridge tower segment can be completed. The industrial camera, alignment pole and target can be quickly installed and disassembled for use, without the need for cumbersome procedures such as industrial camera calibration, and without the need to calculate complex spatial coordinates. It has strong operability and applicability, can solve the problems of visual field blind spots in the precise alignment process of large steel towers at high altitude, greatly reduces the safety risk of high-altitude hoisting, and realizes the precise and rapid positioning and installation of high-altitude steel bridge tower segments.

[0012] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the installation position of each support base described in the present invention; Figure 2 It is a structural schematic diagram of the industrial camera of the present invention; Figure 3 It is a schematic diagram of the structure of the target and the alignment pole of the present invention; Figure 4 It is the image observed by the operator in the display module when the steel bridge tower segment to be installed in the present invention is hoisted and lowered; DETAILED DESCRIPTION

[0014] The present invention is further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

[0015] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials are commercially available unless otherwise specified; in the description of the present invention, the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0016] like Figures 1 to 3 As shown, the present invention provides a method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision, comprising the following steps: S1. Match and manufacture each steel bridge tower segment, and install support bases 2 at the intersection of the outer periphery of the top and bottom of each steel bridge tower segment and the cross center line of the steel bridge tower segment; according to the linear shape of the steel bridge tower, the two upper and lower corresponding support bases 2 on the two adjacent steel bridge tower segments are arranged in the center; install a data receiving module, a data processing module and a display module in the operating room of the lifting equipment; S2. Install the target 7 and the alignment mark 5 on each support base 2 at the top of the installed steel bridge tower segment 6 in sequence, and the target 7, the alignment mark 5 and the corresponding support base 2 are all centered; install the industrial camera 3 on each support base 2 at the bottom of the steel bridge tower segment 1 to be installed, and the industrial camera 3 is centered with the support base 1; S3. Use lifting equipment to hoist the steel bridge tower segment 1 to be installed into the tower column installation range; S4, first receive the image data taken by each industrial camera 3 through the data receiving module, then identify the target 7 corresponding to each industrial camera 3 through the data processing module, and mark it in the display module; S5. The operator of the lifting equipment observes the relative positions of each alignment mark 5 and the corresponding target 7 through the display module, and adjusts the plane position of the steel bridge tower segment 1 to be installed according to the relative position deviation between the two, until the center of each alignment mark 5 reaches the center of the target 7 in the image; and then vertically lowers the steel bridge tower segment 1 to be installed; S6. After the two steel bridge tower segments are butt-jointed, they are temporarily locked and subsequently connected. After the connection and installation are completed, the industrial cameras 3, the targets 7 and the alignment poles 5 are removed. S7. Repeat steps S2 to S6 to install the next steel bridge tower segment.

[0017] In this technical solution, considering that the operator of the lifting equipment has a blind spot in vision and limited docking accuracy when lowering the steel bridge tower segment through the visual window in the operating room, the present invention installs the data receiving module, the data processing module and the display module in the operating room of the lifting equipment, and directly displays the data processing results to the operator through the display module. Preferably, the data receiving module can adopt a LoRa spread spectrum wireless data transmission module, the data processing module can adopt an MQTT edge computing gateway, and the display module is a display device connected to the data processing module. After the steel bridge tower segment 1 to be installed is lifted, the operator lifts the steel bridge tower segment 1 to be installed to the approximate range of the tower column installation through the visual window of the lifting equipment. Then the operator uses each industrial camera 3 to identify the corresponding target on the installed steel bridge tower segment 6, and adjusts the plane position of the steel bridge tower segment 1 to be installed by identifying the relative relationship between the alignment mark 5 and the center of the target 7. When the alignment mark 5 reaches the center of the target 7, the plane position of the steel bridge tower segment 1 to be installed is accurately positioned; after the plane positioning is completed, the steel tower is lowered, that is, the accurate lowering operation of the steel bridge tower segment 1 to be installed is completed, and then the temporary locking and connection of the steel bridge tower segment can be completed. The industrial camera 3, the alignment mark 5 and the target 7 can be quickly installed and disassembled for use, without the need for cumbersome procedures such as industrial camera calibration, and without the need to calculate complex spatial coordinates. It has strong operability and applicability, can solve the problems of blind spots in the precise alignment process of large high-altitude steel towers, and greatly reduce the safety risks of high-altitude hoisting.

[0018] In step S1, during the matching manufacturing process, the support base 2 is installed at the top and bottom of each steel bridge tower segment, and the two corresponding support bases 2 on the upper and lower steel bridge tower segments are vertically matched and installed according to the linear shape of the steel bridge tower. When the steel bridge tower segments are matched and manufactured, the target 7, the alignment mark 5 and the industrial camera 3 are temporarily installed on the corresponding support bases 2 on the first two steel bridge tower segments, and the focal length of the industrial camera 3 is adjusted and fixed, so that when the two steel bridge tower segments are fully connected, the alignment mark 5 in the perspective of the industrial camera 3 is located at the center of the target 7 and is completely filled. In the subsequent installation of the steel bridge tower segments, there is no need to adjust the focal length of each industrial camera 3.

[0019] Then, in step S2, the installation of the target 7, the alignment pole 5 and the industrial camera 3 on the installed steel bridge tower segment 6 and the steel bridge tower segment 1 to be installed is completed; Specifically, the target 7 is provided with a center circle 71 and four satellite circles 72 symmetrically arranged on the periphery of the center circle 71 about the center of the center circle 71; the alignment mark 5 includes a vertical rod 52 and an alignment ball 51 arranged on the top of the vertical rod 52, and the vertical rod 52, the alignment ball 51 and the center circle 71 are arranged in alignment; the radius of the alignment ball 51 is smaller than the radius of the center circle 71. The satellite circles 72 are used to assist the data processing module in identifying the center circle 71 from the image data taken by the industrial camera 3, and mark and display it, so as to facilitate the operator to judge the relative position of the alignment mark 5 and the corresponding center circle 71.

[0020] In step S3, the steel bridge tower segment 1 to be installed is hoisted into the tower column installation range by using lifting equipment; then the industrial cameras 3 are activated to identify the targets 7 and alignment poles 5 set on the installed steel bridge tower segment 6.

[0021] In step S4, identifying and marking the target corresponding to each industrial camera specifically includes the following steps: S41, grayscale processing is performed on the images within the visible range captured by each industrial camera 3, and circular contour lines are searched, and the center coordinates and radius (x1, y1, r1), (x2, y2, r2) ... (xn, yn, rn) of each identified circular contour are marked; S42, calculating the area of ​​each circular contour identified, if Si / Sj=k±0.02, i∈{1,n}, j∈{1,n} exists, then the circular contours corresponding to the determined areas Si and Sj are the suspected target satellite circle and the suspected target center circle, respectively, and k is the set area ratio of the satellite circle to the center circle; S43, calculate the center distance Lij between each suspected target satellite circle and the suspected target center circle. If there are at least three Lij=L0, the suspected target satellite circle and the suspected target center circle satisfying Lij=L0 are determined to be the satellite circle and the center circle of the target, and are highlighted; wherein L0 is the set center distance between the satellite circle and the center circle. Considering that the plane position of the steel bridge tower segment 1 to be installed is offset relative to the installed steel bridge tower segment 6, when the industrial camera 3 on the steel bridge tower segment 1 to be installed shoots downward, one of the four satellite circles 72 on the corresponding target 7 may be completely or partially blocked by the alignment ball 51, so it is set that if there are at least three Lij=L0, the suspected target satellite circle and the suspected target center circle satisfying Lij=L0 are determined to be the satellite circle and the center circle of the target; then they are marked and highlighted in the display module.

[0022] In step S5, the operator uses the center circle 71 marked in each target 7 in the display module as the target, observes the relative position of the corresponding alignment ball 51 and the center circle 71, operates the lifting equipment according to the position deviation displayed on the image, and adjusts the plane position of the steel bridge tower segment 1 to be installed until the center of each alignment ball 51 in the image reaches the center of the center circle 71, that is, it is considered that the plane position of the steel bridge tower segment 1 to be installed has reached the specified position. Figure 4 The present invention is an example of an image displayed on the display template after the image captured by each industrial camera 3 of the steel bridge tower segment 1 to be installed is roughly hoisted to the tower column installation range and processed in step S4. The operator can judge from the image that each alignment ball 51 is offset in the direction indicated by the arrow in the figure relative to the corresponding center circle 71, that is, at this time, the steel bridge tower segment 1 to be installed is offset as a whole in the direction indicated by the arrow in the figure relative to the installed steel bridge tower segment 6. The operator can use the lifting equipment to translate the steel bridge tower segment 1 to be installed in the direction opposite to the direction indicated by the arrow in the figure until the center of each alignment ball 51 in the image coincides with the center of the center circle 71.

[0023] Furthermore, in step S5, during the process of vertically lowering the steel bridge tower segment 1 to be installed, the display ratio of the alignment ball 51 in the image taken by the industrial camera gradually increases. When the center of the alignment ball 51 is completely filled into the center circle 71, the plane positions and vertical positions of the two steel bridge tower segments have been docked.

[0024] In another technical solution, a plurality of wedge-shaped blocks 4 are arranged around the top of the installed steel bridge tower segment 1 to assist the steel bridge tower segment 1 to be installed to accurately fall to the designed position. The wedge-shaped inclined surface of the wedge-shaped blocks 4 faces the inside of the steel bridge tower segment.

[0025] In another technical solution, a wireless transmission module is provided in the industrial camera 3, and the wireless transmission module is used to transmit the image data captured by the industrial camera 3 to the data receiving module. Each industrial camera 3 transmits data with the data receiving module through a wireless transmission mode.

[0026] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. A method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision, characterized in that: The following steps are involved: S1. Match and manufacture each steel bridge tower segment, and install support bases at the intersection of the outer periphery of the top and bottom of each steel bridge tower segment and the cross center line of the steel bridge tower segment; according to the linear shape of the steel bridge tower, the two upper and lower corresponding support bases on the two adjacent steel bridge tower segments are arranged in the center; and a data receiving module, a data processing module and a display module are installed in the operating room of the lifting equipment; S2. Install targets and alignment poles on each supporting base at the top of the installed steel bridge tower segment in sequence, and the targets, alignment poles and corresponding supporting bases are all centered; install industrial cameras on each supporting base at the bottom of the steel bridge tower segment to be installed, and the industrial cameras are centered with the supporting bases; S3. Use lifting equipment to hoist the steel bridge tower segment to be installed into the tower column installation range; S4, first receiving the image data taken by each industrial camera through the data receiving module, then identifying the target corresponding to each industrial camera through the data processing module, and marking it in the display module; S5. The operator of the lifting equipment observes the relative positions of each alignment mark and the corresponding target through the display module, and adjusts the plane position of the steel bridge tower segment to be installed according to the relative position deviation between the two, until the center of each alignment mark reaches the center of the target in the image; and then vertically lowers the steel bridge tower segment to be installed; S6. After the two steel bridge tower segments are connected, they are temporarily locked and then connected. After the connection and installation are completed, the industrial cameras, targets and alignment poles are removed. S7. Repeat steps S2 to S6 to install the next steel bridge tower segment.

2. The method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision as claimed in claim 1, characterized in that: Step S1 also includes: when the steel bridge tower segments are matched and manufactured, targets, alignment poles and industrial cameras are temporarily installed on the corresponding supporting bases of the two steel bridge tower segments installed first, and the focal length of the industrial camera is adjusted and fixed so that when the two steel bridge tower segments are fully docked, the alignment pole in the industrial camera's field of view is located at the center of the target and is completely filled.

3. The method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision as claimed in claim 1, characterized in that: The target is provided with a central circle and four satellite circles which are symmetrically arranged on the outer circumference of the central circle about the center of the central circle; the alignment pole comprises a vertical pole and an alignment ball arranged on the top of the vertical pole, and the vertical pole, the alignment ball and the central circle are arranged in alignment; the radius of the alignment ball is smaller than the radius of the central circle.

4. The method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision as claimed in claim 3 is characterized in that: In step S4, identifying and marking the target corresponding to each industrial camera specifically includes the following steps: S41, grayscale processing is performed on the images within the visible range taken by each industrial camera, and circular contour lines are searched, and the center coordinates and radius (x1, y1, r1), (x2, y2, r2) ... (xn, yn, rn) of each identified circular contour are marked; S42, calculating the area of ​​each circular contour identified, if Si / Sj=k±0.02, i∈{1,n}, j∈{1,n} exists, then the circular contours corresponding to the determined areas Si and Sj are the suspected target satellite circle and the suspected target center circle, respectively, and k is the set area ratio of the satellite circle to the center circle; S43. Calculate the center distance Lij between each suspected target satellite circle and the suspected target center circle. If there are at least three Lij=L0, the suspected target satellite circle and the suspected target center circle satisfying Lij=L0 are determined to be the satellite circle and the center circle of the target, and are highlighted; where L0 is the set center distance between the satellite circle and the center circle.

5. The method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision as claimed in claim 3 is characterized in that: In step S5, during the process of vertically lowering the steel bridge tower segment to be installed, the display ratio of the alignment ball in the image taken by the industrial camera gradually increases. When the center of the alignment ball is completely filled into the center circle, the plane positions and vertical positions of the two steel bridge tower segments have been docked.

6. The method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision as claimed in claim 1, characterized in that: A plurality of wedge-shaped blocks are arranged at the periphery of the top opening of the installed steel bridge tower segment to assist the steel bridge tower segment to be installed to accurately fall to the designed position.

7. The method for high-altitude rapid and accurate docking of steel bridge towers based on machine vision as claimed in claim 1, characterized in that: A wireless transmission module is provided in the industrial camera, and the wireless transmission module is used to transmit the image data captured by the industrial camera to the data receiving module.

Citation Information

Patent Citations

  • Steel tower section hoisting path guiding system and method for tower crane hoisting

    CN114524366A

  • Bridge tower section space relative attitude measurement and hoisting assembly method

    CN115108465A

  • Device and method for installing inclined steel bridge tower section by section

    CN116043717A

  • Ultrahigh bridge tower intelligent measurement and control method and system based on camera array

    CN118534809A

  • Device for rapidly stacking annealed steel coils

    CN201793675U