Intelligent scheduling simulation optimization method, device and equipment for four-way vehicle stereo garage and medium

By equating the tasks of the four-way shuttle car warehouse to a workshop scheduling problem and performing intelligent scheduling simulation optimization, the problem of low scheduling efficiency of the existing four-way shuttle car system is solved, more efficient task dispatching and path planning are achieved, and the cost is reduced Warehousing costs.

CN118822129AInactive Publication Date: 2024-10-22RIAMB (BEIJING) TECH DEV CO LTD

Patent Information

Application Number
CN202410574916.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-10
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The dispatching efficiency of the existing four-way shuttle system is low, which leads to increased storage costs while improving warehouse space utilization.

Method used

An intelligent scheduling simulation optimization method for four-way vehicle warehouses is proposed. By equating the tasks to be scheduled into processes in the workshop scheduling problem, and performing dispatch and path planning based on the preset intelligent scheduling model, a multi-vehicle obstacle avoidance strategy is used. Simulate the actual operating parameters of the equipment to optimize task dispatch and path planning.

Benefits of technology

It improves the task dispatch and path planning efficiency of the four-way vehicle warehouse, reduces warehousing costs, and improves the overall operational efficiency of the warehouse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118822129A_ABST
    Figure CN118822129A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field related to intelligent scheduling, in particular to an intelligent scheduling simulation optimization method, device and equipment for a four-way vehicle stereo garage and a medium. The method comprises the following steps: importing a task list to be scheduled and a current equipment state; enabling to-be-scheduled tasks in the task list to be equivalent to working procedures in a workshop scheduling problem, and carrying out the dispatching of each working procedure based on a preset intelligent scheduling model; performing simulation operation based on the dispatching result and the current equipment state to obtain a simulation result; wherein the simulation operation comprises the step of carrying out path planning on the trolleys for assigning tasks based on a multi-trolley obstacle avoidance strategy and actual operation parameters of equipment. And based on the simulation result and a preset intelligent scheduling model, the dispatching of each process is optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field related to intelligent scheduling, and specifically to an intelligent scheduling simulation optimization method, device, equipment and medium for a four-way vehicle garage. Background Art

[0002] The four-way shuttle system is a new type of automated high-rise warehouse, mainly composed of a four-way shuttle, guide rails, cargo elevators and shelves. The four-way shuttle can complete the movement in four directions: front, back, left and right, and the elevator can realize vertical movement in the up and down directions. The storage and retrieval of items is completed through the cooperation of the four-way shuttle and the elevator. It has high operating efficiency and can reduce storage costs while improving the utilization rate of warehouse space.

[0003] In the actual operation of the four-way shuttle system, it is necessary to schedule the four-way shuttle system. The existing scheduling strategy is inefficient. Summary of the invention

[0004] In view of this, the embodiments of the present application are directed to providing a method, device, equipment and medium for intelligent scheduling simulation optimization of a four-way vehicle garage.

[0005] The present application provides an intelligent scheduling simulation optimization method for a four-way vehicle stereoscopic garage, comprising:

[0006] Import the task list to be scheduled and the current equipment status;

[0007] The tasks to be scheduled in the task list are equivalent to the processes in the workshop scheduling problem, and the various processes are assigned based on a preset intelligent scheduling model;

[0008] Based on the assignment result and the current equipment status, a simulation operation is performed to obtain a simulation result; wherein the simulation operation includes: based on the multi-vehicle obstacle avoidance strategy and the actual operation parameters of the equipment, path planning is performed for the assigned task vehicle.

[0009] In some embodiments, the step of equating the to-be-scheduled tasks in the task list to processes in a workshop scheduling problem includes:

[0010] Split each task into 6 preset processes according to the most complex cross-layer situation;

[0011] The preset process includes:

[0012] Process 1: assign a four-way vehicle to the initial pickup process of the current task;

[0013] In process 2, if the starting position of the four-way vehicle assigned in process 1 is not at the cargo layer, a hoist is assigned for the process in which the four-way vehicle assigned in process 1 reaches the cargo layer.

[0014] Process 3: assign a four-way vehicle to the picking process in the cargo layer;

[0015] The four-way vehicle assigned in process 3 is the same as the four-way vehicle assigned in process 1;

[0016] Process 4, assigning a hoist to the process of getting the goods from the cargo layer to the target layer after picking up;

[0017] Process 5, assigning four-way vehicles to the process in which the goods in the target layer are transported to the target location;

[0018] In process 6, if the starting position of the four-way vehicle transporting the goods in process 5 is not at the target layer, a hoist is assigned to the process of the four-way vehicle transporting the goods in process 5.

[0019] In some embodiments, the preset intelligent scheduling model aims to minimize the maximum task completion time under preset constraints.

[0020] In some embodiments, the preset constraints include:

[0021] Each process can only be assigned to one device at a time;

[0022] One device can only process one process at a time;

[0023] Each process arrives after the system operation time;

[0024] The relationship between the processes under the same task;

[0025] The start time of each process under the same equipment is the sum of the start time of the previous process and the operation time;

[0026] The equipment numbers corresponding to process 1 and process 2 under the same task are the same.

[0027] In some embodiments, path planning for a task-assigned vehicle includes:

[0028] Path planning is performed with the goal of reducing the number of turns.

[0029] In some embodiments, the performing simulation operation includes: calculating the device operation time based on preset parameters;

[0030] The preset parameters include: the acceleration of the trolley in the X direction without load, the deceleration of the trolley in the X direction without load, the acceleration of the trolley in the Y direction without load, the deceleration of the trolley in the Y direction without load, the acceleration of the trolley in the X direction with load, the deceleration of the trolley in the X direction with load, the acceleration of the trolley in the Y direction with load, the deceleration of the trolley in the Y direction with load, the speed of the trolley in the X direction without load, the speed of the trolley in the Y direction with load, the switching time of the trolley in the XY directions without load, the switching time of the trolley in the XY directions with load, the switching time of the trolley in the YX direction without load, the switching time of the trolley in the YX direction with load, the acceleration of the hoist without load, the deceleration of the hoist without load, the acceleration of the hoist with load, the deceleration of the hoist with load, the speed of the hoist without load, and the speed of the hoist with load.

[0031] In some embodiments, the process and the equipment that performs the process are encoded based on a table;

[0032] The table includes a task number row and an equipment number row;

[0033] The task number row is used to fill in the number of each process; different process numbers are filled in different columns;

[0034] The equipment number row is used to fill in the number of the equipment that executes the process; the process number and the number of the equipment that executes the corresponding process are in the same column.

[0035] The present application also provides an intelligent scheduling simulation optimization device for a four-way vehicle stereoscopic garage, comprising:

[0036] Import module, used to import the task list to be scheduled and the current device status;

[0037] A dispatching module, used to equate the tasks to be scheduled in the task list to the processes in the workshop scheduling problem, and to dispatch each process based on a preset intelligent scheduling model;

[0038] The simulation module is used to perform simulation operation based on the dispatch results and the current equipment status to obtain simulation results; wherein, the simulation operation includes: path planning for the assigned vehicle based on the multi-vehicle obstacle avoidance strategy and the actual operating parameters of the equipment; and optimization of the dispatch of each process based on the simulation results and the preset intelligent scheduling model.

[0039] The present application also provides an electronic device, comprising:

[0040] A processor, and a memory for storing a program executable by the processor;

[0041] The processor is used to implement the above-mentioned intelligent scheduling simulation optimization method for the four-way vehicle stereoscopic garage by running the program in the memory.

[0042] The present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the processor executes the intelligent scheduling simulation optimization method for the four-way vehicle garage as described above.

[0043] The present application provides a method for intelligent scheduling simulation optimization of a four-way vehicle stereogram. First, a list of tasks to be scheduled and the current equipment status are imported; the tasks to be scheduled in the task list are equivalent to the processes in the workshop scheduling problem, and each process is assigned based on a preset intelligent scheduling model; based on the assignment result and the current equipment status, a simulation operation is performed to obtain a simulation result; wherein the simulation operation includes: based on the multi-vehicle obstacle avoidance strategy and the actual operating parameters of the equipment, path planning is performed for the assigned task vehicle. With such a setting, the scheme provided in the present application provides for intelligent scheduling simulation optimization of a four-way vehicle stereogram, so as to optimize the dispatch of tasks and path planning of the four-way vehicle stereogram, and improve the efficiency of the four-way vehicle stereogram. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] By describing the embodiments of the present application in more detail in conjunction with the accompanying drawings, the above and other purposes, features and advantages of the present application will become more apparent. The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the present application and do not constitute a limitation of the present application. In the accompanying drawings, the same reference numerals generally represent the same components or steps.

[0045] Figure 1 It is a flow chart of an intelligent scheduling simulation optimization method for a four-way vehicle garage provided by an embodiment of the present application.

[0046] Figure 2 It is a classification of vehicle and hoist related speed parameters provided by an embodiment of the present application.

[0047] Figure 3 An embodiment of the present application provides a four-way vehicle acceleration curve diagram.

[0048] Figure 4 This is a software testing solution provided by an embodiment of the present application.

[0049] Figure 5 This is a conflict type provided by an embodiment of the present application.

[0050] Figure 6 It is a structural schematic diagram of an intelligent scheduling simulation optimization device for a four-way vehicle garage provided by an embodiment of the present application.

[0051] Figure 7 It is a schematic diagram of the structure of an electronic device provided by an embodiment of the present application. DETAILED DESCRIPTION

[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] Application Overview

[0054] The four-way shuttle system is a new type of automated high-rise warehouse, mainly composed of a four-way shuttle, guide rails, cargo elevators and shelves. The four-way shuttle can complete the movement in four directions: front, back, left and right, and the elevator can realize vertical movement in the up and down directions. The storage and retrieval of items is completed through the cooperation of the four-way shuttle and the elevator. It has high operating efficiency and can reduce storage costs while improving the utilization rate of warehouse space.

[0055] At present, some scholars have conducted research on four-way vehicle path planning. The relevant business scenario types can be divided into single instructions, compound instructions; same-layer, cross-layer; single vehicle, multiple vehicles; whether it includes elevators, etc. The corresponding research direction is the combination of one or more of the above business scenarios, and the main research content focuses on the improvement of existing algorithms.

[0056] The present application provides a solution, which splits the most complex steps in the execution process of the warehousing and outbound tasks into equivalent processes in the workshop scheduling problem, establishes a mathematical model according to the idea of ​​solving the workshop scheduling problem, and uses heuristic algorithms to perform encoding, fitness calculation and other operations.

[0057] During the calculation process, it is necessary to calculate the time required to complete this task using the currently assigned equipment through path planning, and use this as the fitness value to perform evolutionary operations such as selection, crossover, and mutation to achieve the integration of task assignment and path planning. During the simulation optimization experiment, a variety of experimental factors are considered, and experiments are conducted under different combinations of factors to ensure the completeness of the experiment. From the perspective of whether there is a chain machine in front of each floor of the elevator, there are two types of on-site application scenarios: one is that there is no chain machine in front of each floor of the elevator, and the four-way vehicle must be loaded onto the elevator. The other is that there is a chain machine in front of each floor of the elevator, and the four-way vehicle and the cargo are on the elevator separately. The second type is targeted in the embodiment of this patent.

[0058] After introducing the basic principles of the present application, various non-limiting embodiments of the present application will be described in detail with reference to the accompanying drawings.

[0059] Exemplary Methods

[0060] Figure 1FIG. 1 is a flow chart of an intelligent dispatching simulation optimization method for a four-way vehicle stereoscopic garage provided by an embodiment of the present application. Figure 1 As shown, the method includes the following contents.

[0061] S101, importing the task list to be scheduled and the current device status;

[0062] S102, equating the tasks to be scheduled in the task list to the processes in the workshop scheduling problem, and assigning each process based on a preset intelligent scheduling model;

[0063] S103, based on the assignment result and the current equipment status, a simulation operation is performed to obtain a simulation result; wherein the simulation operation includes: based on the multi-vehicle obstacle avoidance strategy and the actual operation parameters of the equipment, a path planning is performed for the assigned vehicle.

[0064] Specifically, the operating time parameters and mathematical models of the four-way vehicle and the elevator involved in the simulation operation of the present application can be applied to most path planning algorithms, not limited to common algorithms such as A*.

[0065] S104, optimizing the dispatch of each process based on the simulation results and the preset intelligent scheduling model.

[0066] Specifically, the intelligent scheduling model can be a model built based on a genetic algorithm. In step 104, the time required for the currently assigned device to complete the task is calculated through path planning, and the time is used as the fitness value to perform evolutionary operations such as selection, crossover, and mutation to achieve task assignment. After the assignment, step S103 is re-executed. In this way, S103 and S104 are iteratively executed until the preset conditions are met, and the optimal dispatching strategy and path planning results are obtained. It should be noted that the coding proposed in this patent can be applied to most heuristic algorithms, not limited to common algorithms such as genetic algorithms.

[0067] With such a configuration, the solution provided in the present application optimizes the intelligent scheduling simulation of the four-way vehicle garage, so as to optimize the dispatching of tasks and the planning of paths of the four-way vehicle garage, and improve the efficiency of the four-way vehicle garage.

[0068] Furthermore, the step of equating the tasks to be scheduled in the task list to the processes in the workshop scheduling problem includes:

[0069] Split each task into 6 preset processes according to the most complex cross-layer situation;

[0070] The preset process includes:

[0071] Process 1: assign a four-way vehicle to the initial pickup process of the current task;

[0072] In process 2, if the starting position of the four-way vehicle assigned in process 1 is not at the cargo layer, a hoist is assigned for the process in which the four-way vehicle assigned in process 1 reaches the cargo layer.

[0073] Process 3: assign a four-way vehicle to the picking process in the cargo layer;

[0074] The four-way vehicle assigned in process 3 is the same as the four-way vehicle assigned in process 1;

[0075] Process 4, assigning a hoist to the process of getting the goods from the cargo layer to the target layer after picking up;

[0076] Process 5, assigning four-way vehicles to the process in which the goods in the target layer are transported to the target location;

[0077] In process 6, if the starting position of the four-way vehicle transporting the goods in process 5 is not at the target layer, a hoist is assigned to the process of the four-way vehicle transporting the goods in process 5.

[0078] Specifically, in the two task forms of warehousing and outgoing warehouses, the task execution steps are analyzed for the most complex task form of each.

[0079] The most complicated situation in the outbound task is that the outbound cargo location is not on the outbound layer, the vehicle is not on the layer where the outbound cargo location is located, and the elevator is not on the layer where the empty vehicle is located. There are several steps to complete this outbound task. 1. The elevator goes to the layer where the vehicle is located to pick up the empty vehicle ("the elevator assigned to process 2" picks up the "four-way vehicle assigned to process 1"); 2. The empty vehicle is put on the elevator ("the four-way vehicle assigned to process 1" is put on the "elevator assigned to process 2"); 3. The elevator carries the empty vehicle to the layer where the outbound cargo location is located ("the elevator assigned to process 2" carries the "four-way vehicle assigned to process 1" to the layer where the outbound cargo location is located); 4. The empty vehicle goes to pick up the goods ("the four-way vehicle assigned to process 3" goes to pick up the goods), among which, the process 3. The four-way vehicle assigned by process 1 is the four-way vehicle assigned by process 1), 5. The elevator goes to the floor where the outbound cargo position is located to pick up the cargo, (the elevator assigned by process 4 goes to the floor where the outbound cargo position is located to pick up the cargo), 6. The cargo is put on the elevator (the cargo is on the "elevator assigned by process 4"), 7. The elevator delivers the cargo to the outbound floor (the "elevator assigned by process 4" delivers the cargo to the outbound floor), 8. If there is a vehicle on the outbound floor, the cargo is directly transported to the outbound destination. If there is no vehicle, the vehicle is first transported to the outbound floor via the elevator. (The "four-way vehicle assigned by process 5" is on the outbound floor and directly transports the cargo to the outbound destination. Otherwise, the "four-way vehicle assigned by process 5" is first transported to the outbound floor via the "elevator assigned by process 6".)

[0080] One of the most complicated situations in the warehousing task is that the incoming cargo location is not on the incoming layer, the car is not on the incoming layer, and the elevator is not on the empty car layer. There are several steps to complete this warehousing task. 1. The elevator goes to the layer where the car is located to pick up the empty car, empty car ("the elevator assigned to process 2" picks up the "four-way car assigned to process 1") 2. The empty car goes on the elevator ("the four-way car assigned to process 1" goes on the "elevator assigned to process 2"), 3. The elevator carries the empty car to the incoming layer, ("the elevator assigned to process 2" carries the "four-way car assigned to process 1" to the incoming layer) 4. The empty car goes to pick up the goods ("the four-way car assigned to process 3" goes to pick up the goods, among which the four-way car assigned to process 3 is the four-way car assigned to process 1), 5. The elevator goes to the incoming layer to pick up the goods (the elevator assigned to process 4 goes to the incoming layer to pick up the goods 6. The goods are put on the elevator (the goods are put on the "elevator assigned by process 4"). 7. The elevator delivers the goods to the floor where the target cargo location is located (the "elevator assigned by process 4" delivers the goods to the floor where the target cargo location is located). 8. If there is a car on the incoming floor, the goods are directly delivered to the incoming cargo location. If there is no car, the car is first transported to the floor where the incoming cargo location is located by the elevator and then delivered to the target location (the "four-way car assigned by process 5" is on the floor where the target cargo location is located, and the goods are directly delivered to the incoming cargo location. Otherwise, the "four-way car assigned by process 5" is first transported to the floor where the target cargo location is located by the "elevator assigned by process 6".)

[0081] The execution steps of the inbound and outbound tasks in other cases can be included in the most complex steps of each, and you can give your own examples. That is, in actual applications, any task can be broken down into 6 dispatched tasks. (Because process 1 and process 3 dispatch the same four-way vehicle, it can also be 5 dispatched tasks. This application uses 6 dispatched tasks for the calculation of subsequent formulas)

[0082] In some embodiments, the preset intelligent scheduling model aims to minimize the maximum task completion time under preset constraints. The preset constraints include: each process can only be assigned to one device at the same time; one device can only process one process at the same time; each process arrives after the system operation time; the front-to-back relationship between processes under the same task; the start time of each process under the same device is the sum of the start time and operation time of the previous process; the equipment number corresponding to process 1 and process 1 under the same task is the same.

[0083] Specifically, the four-way vehicle dispatching process involves two aspects: task assignment and path planning. The corresponding parameters used and their meanings are shown in Table 1.

[0084] Table 1: Parameters

[0085]

[0086]

[0087] This application aims at the situation where there is a chain machine in front of each elevator and four-way vehicles or goods are put on the elevator separately. The four-way vehicle scheduling problem is converted into a six-stage workshop scheduling problem, that is, the i-th task can be equivalent to the 6i-5, 6i-4, 6i-3, 6i-2, and 6i-th processes. The corresponding objective function and constraints in the solution process are shown in Formula (1) to Formula (8).

[0088]

[0089] in,

[0090] T i =t iCar +t iLift ;

[0091] t iCar =t iRun +t iTurn +t iUpLift +t iDownLift +t iCarWaitLift +t iAvoidTime ;

[0092] t lifti =t iLiftCar +t iLiftCargo ;

[0093] st

[0094]

[0095] t oes -t o’es ≥p o’ ;

[0096] o∈{1, 2, 3, ..., 0}; o'∈{1, 2, 3, ..., 0}; o≠o'; (3)

[0097] t os ≥0;

[0098] o∈{1, 2, 3, .., O}; (4)

[0099] t os ≥t (o-1)s ;

[0100] o=6i-4, 6i-3, 6i-2, 6i-1, 6i; (5)

[0101] t os +p o ≥t (o+1)s ;

[0102] o=6i-5, 6i-4, 6i-3, 6i-2, 6i-1; (6)

[0103] x oe =x o’e ;

[0104] o=6i-5;o'=6i-3;(7)

[0105] t os =t (o-1)s +p o-1 +t mk ;

[0106] o=6i-5, 6i-4, 6i-3, 6i-2, 6i-1, 6i; (8)

[0107] Formula 1 represents the objective function, which minimizes the maximum task completion time; Formula 2 represents that each process after equivalence can only be assigned to one device; Formula 3 represents that one device can only execute one task at the same time; Formula 4 represents that each process arrives after the system operation time; Formula 5 represents the front-end relationship between processes under the same task; Formula 6 represents the relationship between the start time of each process under the same task; Formula 7 represents that the equipment numbers in the first and third processes of the same task are the same; Formula 8 represents that the start time of each process under the same equipment is the sum of the start time of the previous process and the operation time of the previous process. In addition, when the process is the 2nd, 4th, and 6th process, the waiting time for the four-way car to the elevator must be added.

[0108] Further, the path planning of the assigned task vehicle includes: performing path planning for the purpose of reducing the number of turns. Performing simulation operation includes: calculating the equipment operation time based on preset parameters;

[0109] The preset parameters include: the acceleration of the trolley in the X direction without load, the deceleration of the trolley in the X direction without load, the acceleration of the trolley in the Y direction without load, the deceleration of the trolley in the Y direction without load, the acceleration of the trolley in the X direction with load, the deceleration of the trolley in the X direction with load, the acceleration of the trolley in the Y direction with load, the deceleration of the trolley in the Y direction with load, the speed of the trolley in the X direction without load, the speed of the trolley in the Y direction with load, the switching time of the trolley in the XY directions without load, the switching time of the trolley in the XY directions with load, the switching time of the trolley in the YX direction without load, the switching time of the trolley in the YX direction with load, the acceleration of the hoist without load, the deceleration of the hoist without load, the acceleration of the hoist with load, the deceleration of the hoist with load, the speed of the hoist without load, and the speed of the hoist with load.

[0110] Specifically, the most important thing in path planning calculation is the calculation of running time. The obtained time value will be used as the fitness value in task dispatching for fitness calculation. The main goal of path planning is to reduce the number of turns and minimize the time consumed by the path between the start and end points.

[0111] like Figure 2 As shown in the figure, the acceleration, deceleration and speed of the vehicle can be divided from the two directions of X and Y, and further divided from the two perspectives of loaded and unloaded, where the X direction refers to the four-way vehicle inventory direction, also known as the row, and the Y direction refers to the four-way vehicle main channel direction, also known as the column; the turning time is divided into turning from the X to the Y direction and turning from the Y to the X direction; the acceleration, deceleration and speed of the hoist can be divided from the two directions of loaded and unloaded, and the corresponding parameters in the simulation optimization are shown in Tables 2 and 3.

[0112] Table 2: Parameters related to the running of the four-way car program

[0113] parameter meaning noLoadXAcc Acceleration in X direction without load noLoadXDec Deceleration in X direction without load noLoadYAcc Acceleration in Y direction without load noLoadYDec Deceleration in Y direction without load loadXAcc Acceleration in X direction with load loadXDec Loaded X-direction deceleration loadYAcc Acceleration in Y direction with load loadYDec Loaded Y direction deceleration noLoadXVel X direction speed without load loadXVel X direction speed with load noLoadYVel No load Y direction speed loadYVel Load Y direction speed XYNoLoadturnTime No-load commutation time in XY direction XYLoadturnTime XY direction load switching time YXNoLoadturnTime No-load switching time in Y and X directions YXLoadturnTime Load-carrying switching time in Y and X directions

[0114] Table 3: Parameters related to the operation of the hoist program

[0115] parameter meaning noLoadAcc No load acceleration noLoadDec No load deceleration loadAcc Load acceleration loadDec Load deceleration noLoadVel No load speed loadVel Loading speed

[0116] The calculation process of the four-way vehicle running time is as follows:

[0117] The operation process of four-way vehicles can be divided into two types, such as Figure 3 As shown in the figure, the first type is a three-stage process, namely, the acceleration start stage, the uniform speed stage after reaching the maximum allowable speed, and the deceleration stop stage; the second type is a two-stage process, namely, the acceleration start stage and the deceleration stop stage, in which the maximum speed is not reached. The time consumed by the four-way vehicle in straight-line motion is calculated as shown in formula (9) to formula (13).

[0118] Three stages

[0119]

[0120] Where S represents the distance from the starting cargo position to the ending cargo position in the current straight section, which can be calculated by multiplying the number of cargo positions by the length of a single cargo position in the x direction or y direction. t represents the time required for the equipment to complete a whole straight line movement. V max It represents the maximum uniform speed that can be achieved, a1 represents acceleration, a2 represents deceleration, t1 represents the time required from zero to the end of acceleration, and t2 represents the end time of uniform motion, and the same below.

[0121] ② Two stages

[0122]

[0123] Furthermore, the operation process of the elevator is similar to that of the four-way vehicle, and is also divided into two types. The first type is three-stage, acceleration start stage, constant speed stage, deceleration stop stage; the second type is two-stage, acceleration start stage and deceleration stop stage.

[0124] In some embodiments, the processes and the equipment that executes the processes are coded based on a table; wherein the table includes a task number row and an equipment number row; the task number row is used to fill in the numbers of each process; different process numbers are filled in different columns; the equipment number row is used to fill in the numbers of the equipment that executes the process; wherein the process number and the number of the equipment that executes the corresponding process are in the same column.

[0125] By splitting the inbound and outbound tasks, the corresponding processes equivalent to the workshop scheduling problem are shown in Table 4.

[0126] Table 4: Equivalent procedures for cross-layer inbound / outbound tasks (empty vehicles need to be transported by elevators)

[0127]

[0128]

[0129] In this mode where there is a chain machine in front of each elevator and the goods or cars go up the elevator separately, there are at least two cars, one of which is always on the storage and outgoing layer. For outgoing, if there is always a car on the outgoing layer, the elevator in step 6 is not needed. For incoming, if there is always a car on the incoming layer, the first two steps are not needed.

[0130] The relevant tables for other related scenarios are shown in Table 5-Table 7:

[0131] Table 5: Equivalent procedures for cross-layer inbound / outbound tasks (empty vehicles do not need to be transported by elevators)

[0132] Equipment required for inbound and outbound tasks Corresponding process number after equivalence The type of device being assigned Four-way vehicle for pickup 1 Four-way car The elevator on which the goods are loaded after pickup 2 Hoist Four-way vehicle used to reach the destination floor 3 Four-way car Car corresponding hoist 4 Hoist

[0133] Table 6: Equivalent processes for inbound / outbound tasks on the same floor (empty vehicles need to be transported by elevators)

[0134] Equipment required for inbound and outbound tasks Corresponding process number after equivalence The type of device being assigned The car currently assigned to the task 1 Four-way car Car corresponding hoist 2 Hoist Four-way vehicle for pickup 3 Four-way car Car corresponding hoist 4 Hoist

[0135] Table 7: Equivalent processes for inbound / outbound tasks on the same level (no need for elevators to pick up empty vehicles)

[0136]

[0137]

[0138] The encoding form corresponding to Table 4 is shown in Table 8.

[0139] Table 8: Encoding format

[0140]

[0141] The four-way vehicle numbers in process 1 and process 3 are the same, and the four-way vehicle numbers in process 5 are different from the four-way vehicle numbers in process 1 and process 3.

[0142] In the actual simulation test, in order to ensure the reliability of the simulation program, all possible situations are tested as much as possible. The measurement factors involved in the test process include the number of vehicles (single vehicle, multiple vehicles), the number of tasks (single task, multiple tasks), the type of task (outbound task, inbound task), whether it is cross-layer (same layer, cross-layer), the type of conflict (x direction, y direction, right angle encounter), obstacle avoidance measures (empty vehicle vs. empty vehicle, empty vehicle vs. full vehicle, full vehicle vs. full vehicle), etc. The corresponding test plan is as follows Figure 4 Examples of conflict types include Figure 5 shown.

[0143] During the specific testing process, relevant data needs to be imported from an Excel spreadsheet. The corresponding data formats are shown in Tables 9 to 12.

[0144] The task list data format is shown in Table 9, which mainly includes the starting cargo location, the target cargo location, the operation type (1 represents inbound storage, 3 represents outbound storage), the task number and the pallet number. The starting cargo location and the target cargo location coordinate format are composed of 4 bits of data, which represent the warehouse number, layer coordinate (z coordinate), x coordinate, and y coordinate, respectively, separated by a short horizontal line.

[0145] The vehicle status data format is shown in Table 10, which is mainly used to indicate the current coordinates of the four-way vehicle, whether it is currently loaded (1 means loaded, 2 means not loaded), the current power percentage, the coordinates of the mission starting point and the coordinates of the mission end point.

[0146] The elevator status data format is shown in Table 11, which is mainly used to indicate the current floor of the elevator, the target floor to be reached, and the four-way vehicle number or pallet number to be picked up.

[0147] The chain machine status data format is shown in Table 12, which is mainly used to indicate the chain machine coordinates, whether the current chain machine allows the release of goods (0 means that the release of goods is allowed, 1 means that the release of goods is not allowed), and whether there is a delivery request (1 means that there is a delivery request, 0 means no delivery request).

[0148] Table 9: Task list data format

[0149]

[0150] Table 10: Vehicle status data format

[0151]

[0152] Table 11: Hoist status data format

[0153]

[0154] Table 12: Chain machine status data format

[0155]

[0156]

[0157] In summary, the solution provided by this application first establishes a mathematical model for task dispatching and proposes a new coding method, which can represent two types of equipment, the four-way car and the elevator, and can also express tasks under compound instructions. It can not only represent complex in-and-out warehouse task steps, but also be compatible with simple in-and-out warehouse task steps; secondly, according to actual conditions, the time parameters required for the operation of the four-way car or elevator in path planning are summarized, and a detailed parameter list and calculation formula are given; finally, in order to ensure the reliability of the simulation program, the various factors involved in the simulation process are summarized, and a relatively complete test scheme is designed according to the combination of different factors. Specifically, this coding form of the present application is proposed for a four-way car warehouse system with a chain machine in front of the elevator. It is suitable for complex in-and-out warehouse processes under compound operations, and is downwardly compatible with simple in-and-out warehouses. The coding includes three elements, namely, in-and-out warehouse tasks, four-way cars and elevators. This coding is practical and contains comprehensive content. It does not require repeated design in this scenario and has good applicability. This application integrates path planning content in the task dispatch fitness calculation process, and gives detailed time parameters and corresponding mathematical models in the path planning calculation process based on actual conditions, which is conducive to improving simulation accuracy. This application gives a relatively complete simulation test plan based on actual conditions to further improve simulation reliability.

[0158] Exemplary Devices

[0159] The device embodiments of the present application can be used to execute the method embodiments of the present application. For details not disclosed in the device embodiments of the present application, please refer to the method embodiments of the present application.

[0160] Figure 6 FIG. 1 is a block diagram of an intelligent dispatching simulation optimization device for a four-way vehicle stereoscopic garage provided by an embodiment of the present application. Figure 6 As shown, the intelligent dispatching simulation optimization device of the four-way vehicle stereoscopic garage includes:

[0161] The import module 61 is used to import the task list to be scheduled and the current device status;

[0162] The dispatching module 62 is used to equate the to-be-scheduled tasks in the task list to the processes in the workshop scheduling problem, and to dispatch each process based on a preset intelligent scheduling model;

[0163] The simulation module 63 is used to perform simulation operation based on the assignment result and the current equipment status to obtain the simulation result; wherein the simulation operation includes: based on the multi-vehicle obstacle avoidance strategy and the actual operation parameters of the equipment, path planning for the assigned vehicle.

[0164] Exemplary Electronic Devices

[0165] Below, reference Figure 7 To describe an electronic device according to an embodiment of the present application. Figure 7 A block diagram of an electronic device according to an embodiment of the present application is illustrated.

[0166] like Figure 7 As shown, electronic device 700 includes one or more processors 710 and memory 720 .

[0167] The processor 710 may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the electronic device 700 to perform desired functions.

[0168] The memory 720 may include one or more computer program products, and the computer program product may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 710 may run the program instructions to implement the intelligent scheduling simulation optimization method for the four-way vehicle stereoscopic garage of each embodiment of the present application described above and / or other desired functions. Various contents such as category correspondences may also be stored in the computer-readable storage medium.

[0169] In one example, the electronic device 700 may further include: an input device 730 and an output device 740 , and these components are interconnected via a bus system and / or other forms of connection mechanisms (not shown).

[0170] In addition, the input device 730 may also include, for example, a keyboard, a mouse, an interface, etc. The output device 740 may output various information to the outside, including analysis results, etc. The output device 740 may include, for example, a display, a speaker, a printer, a communication network and a remote output device connected thereto, etc.

[0171] Of course, to simplify, Figure 7 Only some of the components in the electronic device related to the present application are shown, and components such as a bus, an input / output interface, etc. are omitted. In addition, the electronic device may further include any other appropriate components according to specific application conditions.

[0172] Exemplary computer program products and computer-readable storage media

[0173] In addition to the above-mentioned methods and devices, an embodiment of the present application may also be a computer program product, which includes computer program instructions, which, when executed by a processor, enable the processor to execute the steps of the intelligent scheduling simulation optimization method for a four-way vehicle garage according to various embodiments of the present application described in the above-mentioned "Exemplary Method" section of this specification.

[0174] The computer program product may be written in any combination of one or more programming languages ​​to write program codes for performing the operations of the embodiments of the present application, including object-oriented programming languages, such as Java, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as an independent software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.

[0175] In addition, an embodiment of the present application may also be a computer-readable storage medium on which computer program instructions are stored. When the computer program instructions are executed by a processor, the processor executes the steps of the intelligent scheduling simulation optimization method for a four-way vehicle garage according to various embodiments of the present application described in the above "Exemplary Method" section of this specification.

[0176] The computer readable storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.

[0177] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present application to the forms disclosed herein. Although multiple example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.

Claims

1. An intelligent scheduling simulation optimization method for a four-way vehicle stereoscopic garage, characterized in that: include: Import the task list to be scheduled and the current equipment status; The tasks to be scheduled in the task list are equivalent to the processes in the workshop scheduling problem, and the various processes are assigned based on a preset intelligent scheduling model; Based on the assignment result and the current equipment status, simulation is performed to obtain simulation results; wherein the simulation operation includes: based on the multi-vehicle obstacle avoidance strategy and the actual operation parameters of the equipment, path planning is performed for the assigned task vehicle; Based on the simulation results and the preset intelligent scheduling model, the dispatch of each process is optimized.

2. The intelligent scheduling simulation optimization method for a four-way vehicle stereoscopic garage according to claim 1 is characterized in that: The step of equating the tasks to be scheduled in the task list to the processes in the workshop scheduling problem includes: Split each task into 6 preset processes according to the most complex cross-layer situation; The preset process includes: Process 1: assign a four-way vehicle to the initial pickup process of the current task; In process 2, if the starting position of the four-way vehicle assigned in process 1 is not at the cargo layer, a hoist is assigned for the process in which the four-way vehicle assigned in process 1 reaches the cargo layer. Process 3: assign a four-way vehicle to the picking process in the cargo layer; The four-way vehicle assigned in process 3 is the same as the four-way vehicle assigned in process 1; Process 4, assigning a hoist to the process of getting the goods from the cargo layer to the target layer after picking up; Process 5, assigning four-way vehicles to the process in which the goods in the target layer are transported to the target location; In process 6, if the starting position of the four-way vehicle transporting the goods in process 5 is not at the target layer, a hoist is assigned to the process of the four-way vehicle transporting the goods in process 5.

3. The intelligent scheduling simulation optimization method for a four-way vehicle stereoscopic garage according to claim 2 is characterized in that: The preset intelligent scheduling model aims to minimize the maximum task completion time under preset constraints.

4. The intelligent scheduling simulation optimization method for a four-way vehicle stereoscopic garage according to claim 3 is characterized in that: The preset constraints include: Each process can only be assigned to one device at a time; One device can only process one process at a time; There is a sequential relationship between the processes under the same task; The start time of each process under the same equipment is the sum of the start time of the previous process and the operation time; The equipment numbers corresponding to process 1 and process 3 under the same task are the same.

5. The intelligent scheduling simulation optimization method for a four-way vehicle stereoscopic garage according to claim 2 is characterized in that: Path planning for the assigned vehicle includes: Path planning is performed with the goal of reducing the number of turns.

6. The intelligent scheduling simulation optimization method for a four-way vehicle stereoscopic garage according to claim 2 is characterized in that: The performing simulation operation includes: calculating the equipment operation time based on preset parameters; The preset parameters include: the acceleration of the trolley in the X direction without load, the deceleration of the trolley in the X direction without load, the acceleration of the trolley in the Y direction without load, the deceleration of the trolley in the Y direction without load, the acceleration of the trolley in the X direction with load, the deceleration of the trolley in the X direction with load, the acceleration of the trolley in the Y direction with load, the deceleration of the trolley in the Y direction with load, the speed of the trolley in the X direction without load, the speed of the trolley in the Y direction with load, the switching time of the trolley in the XY directions without load, the switching time of the trolley in the XY directions with load, the switching time of the trolley in the YX direction without load, the switching time of the trolley in the YX direction with load, the acceleration of the hoist without load, the deceleration of the hoist without load, the acceleration of the hoist with load, the deceleration of the hoist with load, the speed of the hoist without load, and the speed of the hoist with load.

7. The intelligent scheduling simulation optimization method for a four-way vehicle stereoscopic garage according to claim 2 is characterized in that: Coding of processes and equipment for performing them based on a correspondence table; The table includes a task number row and an equipment number row; The task number row is used to fill in the number of each process; different process numbers are filled in different columns; The equipment number row is used to fill in the number of the equipment that executes the process; the process number and the number of the equipment that executes the corresponding process are in the same column.

8. An intelligent dispatching simulation optimization device for a four-way vehicle stereoscopic garage, characterized in that: include: Import module, used to import the task list to be scheduled and the current device status; A dispatching module, used to equate the tasks to be scheduled in the task list to the processes in the workshop scheduling problem, and to dispatch each process based on a preset intelligent scheduling model; The simulation module is used to perform simulation operation based on the dispatch results and the current equipment status to obtain simulation results; wherein, the simulation operation includes: path planning for the assigned vehicle based on the multi-vehicle obstacle avoidance strategy and the actual operating parameters of the equipment; and optimization of the dispatch of each process based on the simulation results and the preset intelligent scheduling model.

9. An electronic device, characterized in that: include: A processor, and a memory for storing a program executable by the processor; The processor is used to implement the intelligent scheduling simulation optimization method for the four-way vehicle garage according to any one of claims 1 to 7 by running the program in the memory.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, which, when executed by a processor, enables the processor to execute the intelligent scheduling simulation optimization method for a four-way vehicle garage as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Scheduling system and method for four-way shuttle vehicle

    CN111913483A

  • Four-way shuttle vehicle system composite operation scheduling optimization method in cross-layer operation mode

    CN116629525A

  • Scheduling optimization method of four-way shuttle vehicle system

    CN117800006A

Cited By

  • Scheduling method and equipment for four-way vehicle warehousing system with chain type machine

    CN119599570A